Source page 282

Pleasant Circle (#72) Storm Drain Estimate
                          CIP Estimate for Future Storm Drain Installation


                                            QUANTITY     UNITS      PRICE/UNIT         TOTAL
NOI, Wetland Flags, & Permitting                 1         LS          $10,000.00      $10,000.00
Survey & Design                                  1         LS         $40,000.00       $40,000.00
Easements & Takings, & Filing                    1         LS          $15,000.00      $15,000.00
Town Counsel Fees                                1         LS          $10,000.00      $10,000.00
Relocate Water Services                          4         EA           $1,500.00       $6,000.00
Relocate Shed                                    1         EA           $1,500.00       $1,500.00
Unclassified Excavation                        350         CY                $20.00     $7,000.00
Ledge Excavation                                20         CY             $100.00       $2,000.00
Dense Grade Gravel                              100        CY                $40.00     $4,000.00
3/4" Crushed Stone                              150        CY                $50.00     $7,500.00
Sawcutting & Sweeping                           140        SY                 $4.00       $560.00
Catch Basins                                     5         EA           $5,000.00      $25,000.00
Drain Manholes                                   3         EA           $5,000.00      $15,000.00
Water Quality Structures                         1         EA          $10,000.00      $10,000.00
18" RC Drain                                   325         LF             $100.00      $32,500.00
Castings                                         9         EA             $500.00       $4,500.00
Temp Patch                                      35        Tons            $150.00       $5,250.00
Loam & Seed                                     125        SY                $18.00     $2,250.00
Plantings                                        1         LS           $2,000.00       $2,000.00
Silt Sock                                      400         LF                 $5.00     $2,000.00
Police Details                                  120        HR             $100.00      $12,000.00
                                                          Drain Install Sub Total:    $214,060.00


Milling Extended                                520        SY                10.00      $5,200.00
Paving 2.5" Extended                            75        Tons            150.00       $11,250.00
                                                          Final Paving Sub Total:      $16,450.00


                                                                          Subtotal    $230,510.00
                                                                 15% Contingency       $34,576.50
                                                                  Estimate Total:     $265,086.50




                                                                     Estimate Created November 1, 2022

Source page 283

TOWN OF CANTON
   g^Sl                        FORM B - FISCAL 2024
   WgjF               CAPITAL PROJECT / EQUIPMENT REQUEST


 DEPARTMENT:                                             SUBMITTED BY:
                  Public Works                                     Michael Trotta


 PROJECT / EQUIPMENT TITLE:
                        Public Works Garage Exterior Painting


 TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
                                       TBD

 DESCRIPTION:
Clean, point, paint the exterior concrete block wall at the Public Works Garage 150 Bolivar St.




 PURPOSE AND JUSTIFICATION:
The exterior of the Public Works Garage is weathered and faded, in need of painting. The
Garage was last painted in 2011.




 NEED CLASSIFICATION: (Check all that apply)          Departmental Priority Ranking:
___ Required for Safety                                  Please rank this request out of your total
___ Required by Law or Mandate                           requests for this year: (#1 as top priority)
___ Improve/Expand Service or Increase Efficiency        _______ 8 (#) OF _______ 10 (#)

___ Planned Project or Replacement                    Expected Useful Life: (Check one)
___ Unplanned Project or Replacement                  __ 20 or More Yrs ____ 5 to 9 Years
 x New Project/Item (not on last year's 5-Yr. Plan)    x 10 to 19 Years ___ 3 to 4 Years


 Impact to Dept. Operating Budget: (Check one)        Revenue Impact: (Check one)
___ Will Reduce Cost by $____________________         __ Will Produce Addl Revenue by $__________
 x No Impact                                           x Revenue Neutral (no impact)
___ Will Increase Cost by $.________________ __       __ Will Decrease Revenue by $_____________


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

Source page 284

TOWN OF CANTON
   ffijijll                    FORM B - FISCAL 2024
   WgiF               CAPITAL PROJECT / EQUIPMENT REQUEST


 DEPARTMENT:                                             SUBMITTED BY:
                  Public Works                                     Michael Trotta


 PROJECT / EQUIPMENT TITLE:
                         Public Works Garage Interior Floors


 TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000);
                                       TBD

 DESCRIPTION:
Clean, seal, paint the interior concrete floor at the Public Works Garage 150 Bolivar St.




 PURPOSE AND JUSTIFICATION:
When the Public Works Garage was redone in 2011 the Mechanic Bay floors were rehabbed.
This project is for upgrades to the Forestry Bay and Highway Bay floors.




 NEED CLASSIFICATION: (Check all that apply)         Departmental Priority Ranking:
___ Required for Safety                                 Please rank this request out of your total
___ Required by Law or Mandate                          requests for this year: (#1 as top priority)
___ Improve/Expand Service or Increase Efficiency       _______ 9 (#) OF _______ 10 (#)

___ Planned Project or Replacement                   Expected Useful Life: (Check one)
___ Unplanned Project or Replacement                 __ 20 or More Yrs ____ 5 to 9 Years
 x New Project/Item (noton last year's 5-Yr. Plan)    x 10 to 19 Years ___ 3 to 4 Years


 Impact to Dept. Operating Budget: (Check one)       Revenue Impact: (Check one)
___ Will Reduce Cost by $____________________        __ Will Produce Addl Revenue by $__________
 x No Impact                                          x Revenue Neutral (no impact)
___ Will Increase Cost by $___________________       __ Will Decrease Revenue by $_____________


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

Source page 285

TOWN OF CANTON
   gHjglll                      FORM B - FISCAL 2024
   WOP                 CAPITAL PROJECT / EQUIPMENT REQUEST


 DEPARTMENT:                                              SUBMITTED BY:
                   Public Works                                     Michael Trotta


 PROJECT / EQUIPMENT TITLE:
                                         Ford Explorer Hybrid


 TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
                                    $55,000

 DESCRIPTION:
New or current year Model Ford Explorer RWD Limited with a 3.3L Hybrid Engineer




 PURPOSE AND JUSTIFICATION:
New addition to the Public Works Fleet. This vehicle is to be used by Storm Water Manager
and Engineering.




  NEED CLASSIFICATION: (Check all that apply)          Departmental Priority Ranking:
 ___ Required for Safety                                  Please rank this request out of your total
 ___ Required by Law or Mandate                           requests for this year: (#1 as top priority)
 ___ Improve/Expand Service or Increase Efficiency        ______ 10_(#) OF _______ 10_(#)

 ___ Planned Project or Replacement                    Expected Useful Life: (Check one)
 ___ Unplanned Project or Replacement                  __ 20 or More Yrs ____ 5 to 9 Years
  x New Project/Item (not on last year's 5-Yr. Plan)    x 10 to 19 Years ___ 3 to 4 Years


 Impact to Dept. Operating Budget: (Check one)          Revenue Impact: (Check one)
___ Will Reduce Cost by $_____________________         __ Will Produce Addl Revenue by $__________
  x No Impact                                           x Revenue Neutral (no impact)
___ Will Increase Cost by $___________________         __ Will Decrease Revenue by $_____________ _


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

Source page 286

2023 Explorer
                                              LIMITED


PAINT 54


COLOR
Forged Green Metallic




SUMMARY


                   $54,360                                        $700
                 ESTIMATED NET PRICE 55                 PER MONTH FOR 36 MONTH LEASE 56




  DA I NT 54

Source page 287

Forged Green Metallic                                                                                             $0
POWERTRAIN ™

3.3L Hybrid Engine                                                                                                 $0
Rear Wheel Drive                                                                                                               $0
10-Speed Automatic Modular Hybrid Transmission                                                                     $0
PACKAGES “

310A                                                                                                                         $0
Ford Co-Pilot360™ Assist+                                                                                        $0
Limited Convenience Package                                                                                     $0

[Original embedded text, retained for comparison]
Forged Green Metallic                            $0


POWERTRAIN 54


3.3L Hybrid Engine                               $0


Rear Wheel Drive                                 $0


10-Speed Automatic Modular Hybrid Transmission   $0



PACKAGES S4


310A                                             $0


Ford Co-Pilot360™ Assist +                       $0


Limited Convenience Package                      $0

Source page 288

EXTERIOR S4


20” 10-Spoke Aluminum Wheels                                     $0


Roof-Rack Side Rails                                             $0


SecuriCode® Keyless Entry Keypad                                 $0


Remote Start System                                              $0


Evasive Steering Assist                                          $0


Intelligent Adaptive Cruise Control                              $0


Pedestrian Alert Sounder                                         $0


BLIS® (Blind Spot Information System) with Cross-Traffic Alert   $0


Active Noise Cancellation                                        $0


360-Degree Camera (with Split View)                              $0


LED Fog Lamps                                                    $0

Source page 290

INTERIOR 54


Sandstone                                                                         $0


Leather Seating Surfaces with Micro-Perforated Inserts, City Silver Accent        $0
Stitching and ST Logo


Second Row Captain's Chairs with E-Z Entry, Armrests                              $0


Third Row 50/50 PowerFold Seat (folds flat)                                       $0


Floor Liners, Front and Second Rows (without Carpet Floor Mats)                 $160


8-Way Power Passenger Seats (Includes Power Lumbar and Power Recline)             $0


Driver's Seat - Memory                                                            $0


Mini Spare Tire                                                                   $0


Auto Start-Stop Removal                                                           $0


Rear Auxiliary Controls                                                           $0


Power Tilt/Telescoping SteeringColumn                                             $0


Heated Steering Wheel                                                             $0


110V/150W AC Power Outlet                                                         $0


B&O® Sound System by Bang & Olufsen with HD Radio                                $0


B&O™ Sound System by Bang & Olufsen with 12 Speakers                             $0


SYNC® 3 with SiriusXM                                                             $0


Voice-Activated Navigation System                                                 $0




PRICING SUMMARY

BASE MSRP5’                                                                  $52,060
OPTIONS54                                                                     + $160
ACCESSORIES 58                                                                  + SO

Source page 291

DESTINATION CHARGES 517                                                                                                                       + $1,495
ACQUISITION FEE 518                                                                                                                               + $645
TOTAL MSRP516                                                                                                                              =$54,360
ESTIMATED NET PRICE 55                                                                                                                    =$54,360

MONTHLY PAYMENT55                                                                                                                                  $700
Lease based on $5,372 down payment,
36 month term and 10,500 mileage, $0 trade-in-value




                                                                YOUR ZIP CODE 02021

                                                         CLOSEST FORD DEALER
                                                         Jack Madden Ford Sales Inc
                                                         3.07 miles away
                                                         (833) 512-0792




           Your Configuration: 2023 Ford Explorer Limited, Rear Wheel Drive, 3.3L Hybrid Engine, 10-Speed Automatic Modular Hybrid Transmission
                                               Pricing shown for Zip code 02021 as of November 07,2022 52




                                                               DISCLOSURES v


     Note.
     Information is provided on an "as is" basis and could include technical, typographical or other errors. Ford makes no warranties,
     representations, or guarantees of any kind, express or implied, including but not limited to, accuracy, currency, or completeness, the
     operation of the Site, the information, materials, content, availability, and products. Ford reserves the right to change product
     specifications, pricing and equipment at any time without incurring obligations. Your Ford dealer is the best source of the most up-to-
     date information on Ford vehicles.

     Disclosures through S18 apply to Search Dealer Inventory, Request A Quote, Get An Internet Price, Get A Quote, Let Us
     Find It For You, Build & Price and Incentives & Offers.

     51.
     Manufacturer’s Suggested Retail Price (also referred to as "MSRP", "Base MSRP”, "Base Price" or the “Starting At” price), excludes
     destination/delivery charge, taxes, title, license, and registration and/or electronic filing fees, dealer fees, and total of options.
     For authenticated AXZ Plan customers, the price displayed may represent Plan pricing. Not all AXZ Plan customers will qualify for the
     Plan pricing shown and not all offers or incentives are available to AXZ Plan customers.

     52.
     Images shown are for information purposes only, and may not necessarily represent the configurable options selected or available on
     the vehicle. We cannot be responsible for typographical or other errors, including data transmission, display, or software errors, that
     may appear on the site.

     53.
     Offers shown may not be available to all customers. Incentives lists are examples of offers available at the time of posting and are
     subject to change and expiration. Not all incentives can be redeemed together. To take advantage of rebates, incentives and/or
     financing offers you must take new retail delivery from dealer stock by the expiration date noted. Not all buyers will qualify for Ford
     Credit financing or other offers. Restrictions apply. See your local dealer for complete details.

     54.

Source page 292

TOWN OF CANTON
                                          FORM B - FISCAL 2024
                           CAPITAL PROJECT / EQUIPMENT REQUEST

  DEPARTMENT:                                                       SUBMITTED BY:
         Revere & Son Heritage Trust Corp.                                           Vic Del Vecchio

  PROJECT / EQUIPMENT TITLE:
                                                    Storage Shed

  TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
                                     $25,000

  DESCRIPTION:
A Storage Shed approximately 20’ x 14’ in size.
• Higher quality (and insulated for some heft) locked doors with better hinges (double doors 6’ wide at gable end and
single door 3’ wide on the long side)
• 8’ side walls that peak with higher accessibility
• 2 transom windows to provide some light (no side windows to avoid vandalism)
• Polyethylene resin shingles aka “shakes" (a plasticized, higher quality denser product than simple “vinyl"). Light
yellow color to compliment the existing barn. Never needs painting.

  PURPOSE AND JUSTIFICATION:
The Trust requested, and the Select Board approved installation of a pre-made storage shed and advanced an amount
not to exceed $25,000 from Account 142 (restaurant rental fees). The Trust is seeking a Town Meeting shed
appropriation in that amount and, upon approval, transfer the $25,000 TM appropriation to replenish Account 142.
Should TM not approve the capital request, the Trust would itself then raise or appropriate matching funds next year
to deposit in Account 142.
Background info for the need and timing of the storage shed:
In September C. Aspinwall, E. Walsh, C. Doody, V. Del Vecchio and others did a site visit of the barn and mill to create
a punch list of final items that Bernie Plante needed to address before the buildings were transferred to the Town.
During our review of the barn, Ed observed that we needed to remove chairs, tables and other material that had been
stored in a large area in the rear of one of the stairways. Ed explained, our use of that storage space didn’t meet
code compliance.
The repurposed barn mirrors the size and shape of the original structure, built in 1845, to maintain (as much as
reasonably possible) historically accurate interior dimensions. Storage and closet space were in short supply back
then, and continue to be an issue in the soon-to-be museum building. To accommodate the chairs, tables, donated
displays and retail cases, etc., we need exterior storage capacity. And to meet fire and safety code requirements in a
timely manner, we need to do so as soon as reasonably possible - thus our request.
In studying how best to accommodate our storage needs, the Trust looked at various pre-made shed manufacturers
and after a quote process came up with one in particular, Reeds Ferry. Reeds Ferry makes a quality product with a 30
year warranty (25 for the roofing material) that should last for years (RF built the Town’s pre-made irrigation shed).
We priced out an attractive model that, with a discount, should not exceed $25,000.

  NEED CLASSIFICATION: (Check all that apply)                    Departmental Priority Ranking:
  X Required for Safety                                            Please rank this request out of your total
     Required by Law or Mandate                                    requests for this year: (#1 as top priority)
     Improve/Expand Service or Increase Efficiency                         1 (#) OF               2 (#)

     Planned Project or Replacement                              Expected Useful Life: (Check one)
     Unplanned Project or Replacement                            X 20 or More Yrs      5 to 9 Years
   X New Project/Item (not on last year's 5-Yr. Plan)              10 to 19 Years      3 to 4 Years


  Impact to Dept. Operating Budget: (Check one)                  Revenue Impact: (Check one)
     Will Reduce Cost by $__________________                       Will Produce Addl Revenue by $_________
   X No Impact                                                   X Revenue Neutral (no impact)
     Will Increase Cost by $_________________                      Will Decrease Revenue by $____________


  OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
Attached is the aerial shot of the shed location. We agree that the preferred location is Option 1. All
ConCom and ZBA approvals will be obtained (preliminary outreach has already been started with both).
Please see attached image of proposed shed and the associated Sales Order.
FORM B - RSHTC Shed

Source page 293

Current Selection

14' x 20', Victorian Cottage,
Vinyl Shakes, Layout 7

Source page 294

\\vhb\gbl\proj\Wat-LD\09989.01\cad\ld\Planmisc\Revere Barn\Revere Barn Patio.dwg




                                                                                                                                                                                      vhb.co
                                                                                                                                                                                101 Walnut Street
                                                                                                                                                                                PO Box 9151
                                                                                                                                                                                Watertown, MA 02471
                                                                                                                                                                                617.924.1770




                                                                                                                            PATIO


                                                                                                                       RETAINING
                                                                                                                       WALL


                                                                                                                       ADA RAMP
                                                                                                                       W/ HANDRAILS
                                                                                                                       (7.5% MAX)



                                                                                                                       BIT. CONC.
                                                                                                                       SIDEWALK



                                                                                                                                    14' X 20 SHED                           0   10      20                         40 Feet

                                                                                                                                    (OPTION 2)


                                                                                                                                                    Paul REvere Heritage
                                                                                                                                                    Park
                                                                                                                                                    Revolution Way
                                                                                                                                                    Canton, Massachusetts
                                                                                                                                                    No.          Revision                             Date             Appvd.
Saved Friday, September 30, 2022 5:23:07 PM KSTAFFIER Plotted Saturday, October 1, 2022 11:04:52 AM Kenneth Staffier




                                                                                                                           14' X 20 SHED
                                                                                                                           (OPTION 1)               Designed by
                                                                                                                                                                    KSS
                                                                                                                                                                                                      Checked by
                                                                                                                                                                                                                   KSS
                                                                                                                                                    Issued for                                        Date


                                                                                                                                                    Client Review                                             9/30/2022


                                                                                                                                                    Not Issued for Construction
                                                                                                                                                     Drawing Title


                                                                                                                                                     Revere Barn
                                                                                                                                                     Site Improvements


                                                                                                                                                                                     Drawing Number




                                                                                                                                                                                     Sheet                   of

                                                                                                                                                                                             1                     1


                                                                                                                                                                                     Project Number

                                                                                                                                                                                     09989.01

Source page 295

Reeds Ferry Small Buildings, Inc.
3 Tracy Lane                              Sales Order
           .            .
Hudson, NH 03051                                                                     |     Date     Ls    S. O. No.
888) 85-                                                                                                              fo
(      )      SHEDS    11/2/2022    |        36418
a     .         i     ..
Bill To                                                                 !              | Ship To
TOWN OF CANTON              | REVERE & SON HERITAGE TRUST
ATTN. RANDY SCOLLINS                                         : VICTOR DEL VECCHIO
801 WASHINGTON ST                                                 :              | 2 ROLLING MILL WAY
CANTON, MA 02021                                                       i               | CANTON, MA 02021
i                                                                                      |               | 617-249-4662
|
cerca            Le
    Due Date           Rep          Install Date
     2/24/2023 |       cve            2/24/2023
Item                                         Description                                  _ Ordered             Rate                 Amount
“MISC         “114X20 Vinyl Shake Victorian Cottage Shed 8' Studs            el              21,079.00,           21,079.00T |
WINTER I... | January/February Incentive: Lock into 2022 pricing on any building                                       0.00                  0.00
ordered by 11/30/22 with installation being taken in January or
WS        February 2023. dedSdmdepesitreqived-athestineefesdemaad final
payment on the day of installation. These dates are limited and this
incentive will end when January/February is fully committed.
NO FLOOR _ ; Delete floor on Building (per sq.ft. of floor)                                           280                   -1.00              -280.00T
SILL SEAL | Sill Seal                                                                                             1.52                       0.00                     0.00T
AUTUMN ... | Certainteed Cedar Impressions Straight Perfections D/7 Autumn                      136                6.17647                840.00T
Yellow                                                                         i
STD BLACK | *Black 3-Tab Shingles                                                        |           16.1                     0.00                   0.00T
NO SHUTTERS / NO WINDOWS                                          /
ADD W HT... | Add Wall Height to Viny! Shakes Or Cedar Shake Panel ****8'                      68)                  24.00              1,632.00T
studs****                                                                                       i
PREHUNG ... | CHANGE 5' STD DOOR TO 6' Primed Insulated Shed Door 6068                      L                 750.00                750.00T
6-Panel,Outswing RHP, Vinyl Brickmold, Wood Jams
PREHUNG... | Primed Insulated Shed Door 3068 6-Panel Outswing. RH, Vinyl                        1                 670.00                670.00T
Brickmold, Wood Jams
PREHUNG ... | 4-9/16" x 3’ Pre-hung Sill Pan                                                                  1                      0,00                    0.00T
PREHUNG ... | 4-9/16" x 6' Pre-hung Sill Pan                                                                      1                       0.00                     0.00T
DELETE 30... | Delete 30x40 Window                                                                         2                 -112.50               -225.00T
TWO6R         6' Transom Window - Raised into Gable                                                      i                      0.00                    0.00T
ADD TW 6'R | Additional 6' Transom Window « Raised into Gable N/C                                  1                      0.00                    0.00T
RIDGE & S... | Ridge & Soffit Vent (per length of building} This removes the Gable                  20                    14.00                280.00T
vents that come with the building, for optimal air flow.
SUBTOTAL                                                                   :                                                     24,746.00
WILL BE SENDING OVER PO AND ST-2 FORMS LATER       :
TODAY                                                                                                                 i
[Sales Tax     i       0.00) 0.00
|                                                                                                         | Total                               $24,746.00

Based upon the volatility in materials pricing due to the Covid-19 pandemic, if the customer requests a change to the installation
date,  vlacoous, are subject to change based upon pricing at the time the request is made. Repest-oF25%ereetrtrechuporrorder        Sending   p,  OO

balance, ly upon install.     i sales order information,                                             hy WA
Signature                 Wii}  R.   A         Wrap

Source page 296

TERMS & AGREEMENT FOR WINTER INSTALLATION

Winter Incentive- installation requires the installation site, surrounding area, and a 3-foot-wide path to the site from
where the truck will be parked to be kept clear of snow and ice.

The site must be within 6 inches of level, be 16 feet away from powerlines in all directions, and have 3 feet of clearance
from any fences, trees, or any other permanent structures.

All setback and Be requirements must be inquired about by the customer and have in hand if required by the town.
\ LY)         AVA       Oe

i      cedwittrtire balance due upon installation. Installation must occur
in January or February 2023.

We strongly encourage all customers to prepare their site as soon as possible, prior to the ground freezing, and place an
appropriately sized tarp over the area where the building is to be installed until the day of installation.

All orders will obtain current 2022 pricing. If customer does not meet the requirements outlined above or requests a
change to their installation date outside of the winter installation period noted above, they may be rescheduled to
our current lead time, and their pricing will be subject to change, based upon pricing at the time the request is made.

Should the instance arise where Reeds Ferry arrives on site to find the site is not accessible or buildable, a rescheduling
fee of $500.00 will be incurred.

**Please send photos of your completed site to sitephotos @reedsferry.com to get on our waitlist for a potential earlier
installation date.

William A. Scoflind, aot

Customer Name Printed

Mlle fl. Sell ith              tila laoaa

Customer Signature                                                                     Date

Source page 297

9

NM.

\— p/so 8909

9

02

ivT

Source page 298

SUMMARY OF BIDS RECEIVED

Vendor Name

Bid Amount                                                Rank
Reeds Ferry Small Buildings, Inc.                          $24,746                                            1
New England Outdoor Sheds & Gazebos                   $24,832                                              2
Tuff Shed                                                           $20,131.25                                           3

Explanation of awarding contract to vendor other than lowest bidder.

The Tuff Shed product does not come in vinyl, which is preferred for long-term maintenance savings with painting.

The Tuff Shed product also does not come with barn doors, which is preferred for ease storing & removing large items.

The Reeds Ferry product is offered with the preferred vinyl and barn doors.

Source page 299

TOWN OF CANTON
                                      FORM B - FISCAL 2024
                         CAPITAL PROJECT / EQUIPMENT REQUEST

 DEPARTMENT:                                                 SUBMITTED BY:
        Revere & Son Heritage Trust Corp.                                  Vic Del Vecchio


 PROJECT / EQUIPMENT TITLE:
                            Website Redesign for paulreveremuseum.org


 TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
                                    $20,000

 DESCRIPTION:

First redesign of the paulreveremusuem.org website, which is related to the Revere Heritage
Site properties and attractions at Rolling Mill Way in the Town of Canton and under
management of the Revere & Son Heritage Trust Corporation Board of Trustees.


 PURPOSE AND JUSTIFICATION:
The paulreveremuseum.org website is the gateway through which the public can learn everything about
what the Revere and Son Heritage Trust Corporation does and its future goals. The website was
originally, however, designed by amateurs. When compared to the websites of other local but similar
destinations such as Plimoth Plantation (https://plimoth.org/), the USS Salem Museum
(https://www.uss-salem.org/), the Fairbanks House (https://fairbankshouse.org/), and the Concord
Museum (https://concordmuseum.org/), the paulreveremuseum.org website makes a poor visitor
impression. The Revere and Son Heritage Trust is requesting $20,000 to engage a professional website
builder with nonprofit website design experience to create an effective website that can be found easily
through searches, will interest all types of site visitors, increase site traffic, better lead visitors to
donate to the construction of the Paul Revere Museum of Discovery and Innovation, and add to the
Trust’s volunteer corps.


 NEED CLASSIFICATION: (Check all that apply)             Departmental Priority Ranking:
    Required for Safety                                    Please rank this request out of your total
    Required by Law or Mandate                             requests for this year: (#1 as top priority)
 X Improve/Expand Service or Increase Efficiency                   2 (#) OF               2 (#)

    Planned Project or Replacement                       Expected Useful Life: (Check one)
    Unplanned Project or Replacement                       20 or More Yrs X 5 to 9 Years
  X New Project/Item (not on last year's 5-Yr. Plan)       10 to 19 Years      3 to 4 Years


 Impact to Dept. Operating Budget: (Check one)           Revenue Impact: (Check one)
    Will Reduce Cost by $__________________              X Will Produce Addl Revenue by $_________
                                                                                          TBD
  X No Impact                                              Revenue Neutral (no impact)
    Will Increase Cost by $_________________               Will Decrease Revenue by $____________


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)




FORM B - RSHTC Website

Source page 300

TOWN OF CANTON
FORM B - FISCAL 2024

CAPITAL PROJECT / EQUIPMENT REQUEST

DEPARTMENT:                                           SUBMITTED BY:

Town Clerk

Tracy Kenney

PROJECT / EQUIPMENT TITLE:
7 Poll Pads

TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
$11,025

DESCRIPTION:
Supply each of Canton's seven polling precincts with additional Poll Pad tablets.

PURPOSE AND JUSTIFICATION:

Poll pads are used to electronically check voters in on Election Day, at Town Meeting and
during in person Early Voting. An additional Poll Pad at each precinct would be a valuable
asset to help voters determine where they should be voting, alliviate long lines at check-in.

NEED CLASSIFICATION: (Check all that apply)
___ Required for Safety

Required by Law or Mandate
“X_Improve/Expand Service or Increase Efficiency
___Planned Project or Replacement
_X Unplanned Project or Replacement

New Project/Item (not on last year's 5-Yr. Plan)

Departmental Priority Ranking:
Please rank this request out of your total
requests for this year: (#1 as top priority)

1       G#) OF        1      (#)

Expected Useful Life: (Check one)
___20 or More Yrs _X_5 to 9 Years
___10 to 19 Years        3 to 4 Years

Impact to Dept. Operating Budget: (Check one)
Will Reduce Cost by $.

No Impact
X Will Increase Cost by $2,100 starting in year 2

[|

for maintenance support.

Revenue Impact: (Check one)
Will Produce Addl Revenue by $.

“X_Revenue Neutral (no impact)

___ Wil! Decrease Revenue by $

FORM B- FISCAL 2024

OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

Source page 301

Jones, Ellen

From:                             Scollins, William
Sent:                             Thursday, November 10, 2022 3:33 PM
To:                               Jones, Ellen
Cc:                               Kenney, Tracy; Doody, Charles E.
Subject:                          FW: Poll Pad Quote - 7 Additional
Attachments:                      Quote Canton MA - Poll Pad Purchase Additional_V1.pdf; LHS PP Sole Source Letter.pdf


Ellen,
Please add to the capital request binder.

Tracy,
All set!

Thank you, Randy

Randy Scollins | Finance Director CGA MCPPO / Treasurer Collector | Town of Canton
Treasurer | Revere & Son Heritage Trust Corporation
Treasurer | Canton Affordable Housing Trust
O: 781-575-6612 | E: rscollins@town.canton.ma.us | F: 781-575-6608

From: Kenney, Tracy <tkenney@town.canton.ma.us>
Sent: Thursday, November 10, 2022 2:30 PM
To: Doody, Charles E. <townadmin@town.canton.ma.us>; Scollins, William <rscollins@town.canton.ma.us>
Subject: FW: Poll Pad Quote - 7 Additional

Gentleman,

Attached please find a quote for the purchase of 7 additional Poll Pads which can be used to check-in voters on Election
Day, at Town Meeting and during Early Voting.

Let me know if you need anything else.

Thank you,

Tracy

From: Brenda L'Italien <bcm@lhsassociates.com>
Sent: Thursday, November 10, 2022 12:23 PM
To: Kenney, Tracy <tkenney@town.canton.ma.us>
Subject: Poll Pad Quote - 7 Additional


CAUTION: This email originated from outside your organization. Exercise caution when opening attachments or clicking
links, especially from unknown senders.

Tracey please see attached. If interested please sign and return the attached quote. The quote is over 10,000.00 so I have
provided a Sole Source letter should you need it.


                                                            1

Source page 302

Keep in mind the normal turnaround time is 8-10 weeks.

Brenda

Brenda L'Italien
Director of Business Development
LHS Associates, Inc.
10 Manor Parkway, Unit B
Salem, NH 03079
(978)651-2511-Direct line
(603)212-0027-Direct fax


CONFIDENTIALITY NOTICE: This document and the attached files, if any, are intended only for the addressee and may
contain information which is privileged, confidential, or otherwise protected from disclosure. If this email has been sent
to you by mistake, please inform us by reply email and then delete the email, destroy any printed copy, and do not
disclose or use the information in it. Any review, use, transmission, or dissemination of this message and/or any
attached files is prohibited. There is no warranty that this email is error-or virus-free. This email is copyrighted.




                                                             2

Source page 303

Quote Canton MA - Poll Pad Purchase
                                                                                                                                 Additional




Company Address 10 Manor Parkway, Unit B                                  Created Date        11/10/2022
                Salem, NH 03079                                           Quote Number        00000796
                US


 Contact Information

Prepared By          Brenda L'Italien                                     Customer Name       Canton
Title                Director of Business Development                     Contact Name        Tracy Kenney
Phone                (978) 651-2511                                       Title               Town Clerk
Email                bcm@lhsassociates.com                                Email               tkenney@town.canton.ma.us


 Address Information

Bill To Name         Canton
Bill To              801 Washington Steet
                     Canton, MA 02021


Product                                                                                                           Sales                 Total
               Product                           Product Description                                                    Quantity
Code                                                                                                              Price                 Price

          NOTE: Ongoing Poll Pad
          Software and Application               The Poll Pad Software and Application Support Fee after the
PP-000001                                                                                                         $0.00      7.00       $0.00
          Support Fee $300.00 per Poll           1-year Warranty Expires is $300.00 per Poll Pad.
          Pad

                                                 Includes: iPad WiFi 32gb (MP2F2LL/A), 10-Foot Charger,
PP-001         Poll Pad Bundle                   Transport Case, Stand, Stylus, 1st Year Software License,     $1,275.00     7.00 $8,925.00
                                                 MDM Enrollment, and Basic Poll Pad Manager

               Poll Pad Star Micronics Receipt
PP-004                                           TSP65411                                                       $300.00      7.00 $2,100.00
               Printer



                                                                          Subtotal            $11,025.00
                                                                          Total Price         $11,025.00


 Signature
By signing below, you are acknowledging that the above pricing is accurate and within budget, and that you are ready to move forward with the
official purchase and contract initiation:


Customer Signature: _____________________________

Printed Name & Title: __________________________________________

Date: ____________________

Anticipated First Use Date: ____________________

Source page 304

To Whom it May Concern,

This letter has been written to confirm LHS Associates of Salem New Hampshire is KNOWiNK
LLC.’s exclusive vendor in the Commonwealth of Massachusetts for the KNOWINK PollPad product
used throughout the Commonwealth. As the sole source provider in Massachusetts, LHS
Associates is the only company authorized by KNOWINK for sales, support and the supply of
specific supplies for the operation of products owned by KNOWINK.

Regards,

~ €evin J. Schott
CFO
KNOWINK LLC.

sales@knowink.com | 855.765.5723 | www.knowink.com | 2111 Olive Street, St. Louis, MO 63103

Source page 305

TOWN OF CANTON
FORM B - FISCAL 2024

CAPITAL PROJECT / EQUIPMENT REQUEST

DEPARTMENT:                                              SUBMITTED BY:
Board of Health                                          Barbara Reardon

PROJECT / EQUIPMENT TITLE:
Emergency Generator to power medical grade vaccine refrigerator and light in Public Health
Nurses' Office.

TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):

$30,800

DESCRIPTION:
Emergency generator is needed to power vaccine refrigerator in Public Health Nurses' Office.

PURPOSE AND JUSTIFICATION:

The Health Department stores both flu and COVID vaccines in the refrigerator located at 79
Pleasant St.(Pequitside Farm). The Vaccine Unit of MA DPH requires that all vaccines be
stored within strict temperature requirements.  Temperature logs must be reviewed daily and
reported to DPH monthly. Temperature excursions must be reported immediately to DPH.
Depending on the severity of the excursion and the sensitivity of the vaccine, vaccine may
become unusable. A temperature excursion this fall rendered Flu Mist unusable.   Pequitside
has experienced numerous power outages. When a power outage is anticipated the Health
Department has preemptively stored vaccine in neighboring communities.

NEED CLASSIFICATION: (Check all that apply)       Departmental Priority Ranking:

x_ Required for Safety                                           Please rank this request out of your total
_x_ Required by Law or Mandate                              requests for this year: (#1 as top priority)
_x Improve/Expand Service or Increase Efficiency                1 (#) OF           1 (#)

Planned Project or Replacement                      Expected Useful Life: (Check one)
~__ Unplanned Project or Replacement                       20o0rMore Yrs ___—5 to 9 Years
___New Project/Item (not on last year's 5-Yr. Plan)    _1 10 to 19 Years _ 3 to 4 Years

Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)

Will Reduce Cost by $                                ___Will Produce Addl Revenue by $
No Impact                                         ___ Revenue Neutral (no impact)
x       |  Increase annual cost $400 for maintenance ___ Will Decrease Revenue by $

OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
FM Generator provided a working budget via email on 11/10/22. Health Department met with
Pequitside Subcommittee and Building Maintenance on 11/14/22. Subcommittee requested
generator be placed on west side of building and that fencing be installed for aesthetic
reasons. Building Maintenance requested additional funding for gravel stone to be installed
between concrete pad and fence. Maintenance also provided cost estimate for annual
maintenance.

LEQRM 2S .FISCAL 2024.

Source page 306

[storage Unit Placement

ood air circulation around the outside of the storage unit is important. Place a storage unit in a well-ventilated room,
ving space between the unit, ceiling, and any wall. Nothing should block the cover of the motor compartment. The unit
should be firm and level, with the bottom of the unit above the floor. Make sure the unit door opens and closes smoothly and
fits squarely against the body of the unit. If not secured properly, unit doors pose a particular risk to maintaining appropriate
internal temperatures of vaccine storage units. Studies find most units work best when placed in an area with standard
indoor room temperatures, usually between 20° C and 25°C (68° F and 77° F). Check the manufacturer-supplied owner’s
manual for additional guidance on placement and spacing.

You may see vendors use terms such as “VFC-compliant,” “CDC-compliant,” or “satisfies VEC requirements’ in their marketing
materials or on their websites. In this context, "compliance" and related terms may lead consumers to incorrectly believe that
CDC or the VFC program has independently assessed and verified the quality of these products. CDC/VEFC is not authorized to
assess, validate, verify, or endorse the products or services of private companies. Should you encounter this type of language in
vendor marketing materials, please keep in mind that neither CDC nor the VEC program has validated any product or service for
compliance with CDC or VFC program requirements or standards,

Stabilizing Temperatures in New and Repaired Units

It may take two to seven days to stabilize the temperature in a newly installed or repaired refrigerator and two to three
days for a freezer.

Before using a unit for vaccine storage, check and record the minimum and maximum temperatures each workday
for two to seven days. If temperatures cannot be recorded digitally, check and record temperatures a minimum of two
times each workday. Once you have two consecutive days of temperatures recorded within the recommended range,
your unit is stable and ready for use.

—
mperature Ranges

Refrigerators should maintain temperatures between 2° C and 8°C (96° F and 46° F).” Freezers should maintain
temperatures between -50° C and -15° C (-58° F and +5° F), Refrigerator or freezer thermostats should be set at the
factory-set or midpoint temperature, which will decrease the likelihood of temperature excursions.

Consult the owner’s manual for instructions on how to operate the thermostat. Thermostats are marked in various
ways and, in general, show levels of coldness rather than temperatures. The only way to know the temperature where
vaccines are stored is to measure and monitor it with a temperature monitoring device.

Temperature Monitoring Device (TMD)

Every vaccine storage unit must have a TMD. An accurate temperature history that reflects actual vaccine
temperatures is critical for protecting your vaccines. Investing in a reliable device is less expensive than replacing
vaccines wasted due to the loss of potency that comes from storage at out-of-range temperatures.

© CDC recommends a specific type of TMD called a “digital data logger” (DDL). A DDL provides the most
accurate storage unit temperature information, including details on how long a unit has been operating outside the
recommended temperature range (referred to as a “temperature excursion”). Unlike a simple minimum/maximum
thermometer, which only shows the coldest and warmest temperatures reached in a unit, a DDL provides detailed
information on all temperatures recorded at preset intervals.

Many DDLs use a buffered temperature probe, which is the most accurate way to measure actual vaccine
temperatures. Temperatures measured by a buffered probe match vaccine temperatures more closely than those
measured by standard thermometers, which tend to reflect only air temperature.

Temperature data from a DDL can either be downloaded to a computer using special software or retrieved from a
“™bsite. The software or website may also allow you to set the frequency of temperature readings. Reviewing DDL data
+» critical for vaccine viability, so it is important to decide whether independent software or a website program works
best for your facility.

“Probes that are permanently embedded in a buffer are acceptable as long as the temperature monitoring system for the entire unit can be
i       ion-tested.
Gar bration-tested                                                                                         VACCINE STORAGE AND HANDLING TOOLKIT

Source page 307

COVID-19 vaccine products may impact the types of vaccine storage units and temperature monitoring devices used  |
to maintain the cold chain, including the use of ultra-cold storage. Temperature ranges for COVID-19 vaccines may

also differ from those for other vaccines. Carefully review the COVID-19 vaccine storage and handling addendum for
information about which storage units and monitoring devices are appropriate, including specifications for monitoring
devices that can monitor ultra-cold temperatures, how best to monitor temperatures, and how a specific vaccine
product's cold chain requirements may affect other vaccines in a storage unit.

It is important your facility has proper storage and monitoring                                               ae               .
equipment that is set up correctly, maintained appropriately, and  Donet store any BESS an & dormitory-style  .
repaired as needed. This equipment protects patients from                or bar style combined refrigerator/freezer unit
inadvertently receiving compromised vaccine and your facility           under any circumstances.

against costs of revaccinating patients, replacing expensive

:               ;        :                   :               :                    These units have a single exterior door and an
vaccines, and losing patient confidence in your practice.

evaporator plate/cooling coil, usually located in an
Vaccine Storage Units: Refrigerator and Freezer                           icemaker/freezer compartment. These units pose a
Recommendations                                                             significant risk of freezing vaccines, even when used
for temporary storage. (Note: Not all small storage
units are dormitory- or bar-style units. Compact,
purpose-built units for biologics can be used to
store vaccines.)

There are several types of vaccine storage units available.
Purpose-built units are specifically designed to store vaccines.
However, household-grade units are also an acceptable option for
vaccine refrigeration under the right conditions.

2)  Use purpose-built or pharmaceutical-grade units
designed to either refrigerate or freeze. These units can be

compact, under-the-counter style or large.                              Storage unit doors
Purpose-built units, sometimes referred to as “pharmaceutical-                      faiel             led           _—
grade,” are designed specifically for storage of biologics,                   A door tl  at is not sealed properly or left open  ;         _
including vaccines. These units often have:                                              unnecessarily not only affects the temperature in a unit, it

also exposes vaccines to light, which can reduce potency
of some vaccines. Consider using safeguards to ensure
the doors of the unit remain closed—for example, self-
closing door hinges, door alarms, or door locks.

+ Microprocessor-based temperature control with a digital
temperature sensor (thermocouple, resistance temperature
detector [RTD], or thermistor)

+ Fan-forced air circulation with powerful fans or multiple
cool air vents promoting uniform temperature and fast
temperature recovery from an out-of-range temperature.

Household-grade units can be an acceptable alternative to
pharmaceutical-grade vaccine storage units. As the name
implies, these units are primarily designed and marketed for
home use. However, the freezer compartment of this type of unit
is not recommended to store vaccines and there may be other
areas of the refrigerated compartment that should be avoided as

well. If your facility provides frozen vaccine, a separate freezer
unit is necessary.

To fully ensure the safety of vaccines, equipment
should include a recommended unit with enough
space to accommodate your maximum inventory
without crowding.

VACCINE STORAGE AND HANDLING TOOLKIT

Source page 308

SECTION THREE: Vaccine Storage and Temperature Monitoring Equioment

COVID-9 vaccine products may impact the types of vaccine storage units and temperature monitoring devices used  |
to maintain the cold chain, including the use of ultra-cold storage. Temperature ranges for COVID.

also differ from those for other vaccines. Carefully review the COVID-19 vaccine storage and handling addendum for
information about which storage units and monitoring devices are appropriate, including specifications for monitoring
devices that can monitor ultra-cold temperatures, how best to monitor temperatures, and how a specific vaccine

product's cold chain requirements may affect other vaccines in a storage unit.

—

It is important your facility has proper storage and monitoring                                                   ie                .
equipment that is set up correctly, maintained appropriately, and  Donot store any eee euoe dormitory-style  :
repaired as needed. This equipment protects patients from                il bar-style combined refrigerator/freezer unit
inadvertently receiving compromised vaccine and your facility           under any circumstances.

against costs of revaccinating patients, replacing expensive

.              :        é                  .              :                   These units have a single exterior door and an
vaccines, and losing patient confidence in your practice.

evaporator plate/cooling coil, usually located in an
Vaccine Storage Units: Refrigerator and Freezer                         icemaker/freezer compartment. These units pose a
Recommendations                                                                significant risk of freezing vaccines, even when used
for temporary storage. (Note: Not all small storage
units are dormitory- or bar-style units. Compact,
purpose-built units for biologics can be used to
store vaccines.)

There are several types of vaccine storage units available.
Purpose-built units are specifically designed to store vaccines.
However, household-grade units are also an acceptable option for
vaccine refrigeration under the right conditions.

©  Use purpose-built or pharmaceutical-grade units
designed to either refrigerate or freeze, These units can be

compact, under-the-counter style or large.                              Storage unit doors
rpose-built units, sometimes referred to as “pharmaceutical                           ,             baal           bye late
_ ade,” are designed specifically for storage of biologics,                    A door that is not sealed properly or left open  ;         7
including vaccines. These units often have:                                          unnecessarily not only affects the temperature in a unit, it

also exposes vaccines to light, which can reduce potency
of some vaccines. Consider using safeguards to ensure
the doors of the unit remain closed_for example, self-
closing door hinges, door alarms, or door locks.

* Microprocessor-based temperature control with a digital
temperature sensor (thermocouple, resistance temperature
detector [RTD], or thermistor)

+ Fan-forced air circulation with powerful fans or multiple
cool air vents promoting uniform temperature and fast
temperature recovery from an out-of-range temperature.

VEN  Ha
{( (ST) )         Storage Unit Best Practices
PS — a

To fully ensure the safety of vaccines, equipment
should include a recommended unit with enough}
space to accommodate your maximum inventory
without crowding.                                             |

Household-grade units can be an acceptable alternative to
pharmaceutical-grade vaccine storage units. As the name
implies, these units are primarily designed and marketed for
home use. However, the freezer compartment of this type of unit
is not recommended to store vaccines and there may be other
areas of the refrigerated compartment that should be avoided as
well. If your facility provides frozen vaccine, a separate freezer
unit is necessary.

VACCINE STORAGE AND HANDLING TOOLKIT                                                                       8

Source page 309

Reardon, Barbara

—————————————————

From:                 Steve Belcher <SBelcher@fmgenerator.com>

Sent:                Thursday, November 10, 2022 2:41 PM

To:                    Reardon, Barbara; Choiniere, Steven; Tiffany Prevett; CommercialSales
Subject:             FM Generator - CANTON BOH Budget Quick question and price please
Attachments:          PSS8 WINCO.pdf

CAUTION: This email originated from outside your organization. Exercise caution when opening attachments or clicking
links, especially from unknown senders.

All,

Thank you for your time on Monday.

Attached is the sheet of the WINCO 8 KW generator we would look to use for your application. This is a light-commercial
type generator, meeting the minimum of what | am OK with for your application.

For Capital budget planning:

e $20K Generator located on the East side of building near gas meter and office to be backed up
© $10K - Generator and related equipment
© $10K - Electrical and gas installation
= SOW

e Pad

e New dedicated electrical outlets
e 60 amp Load center

¢ Gas line from meter to generator
e Warranty startup

© $10K - Generator and related equipment

© $20K - Electrical and gas installation (adder if additional materials and time to run added distance)
= SOW

e = 6Pad

e New dedicated electrical outlets
¢ 60 amp Load center

© Gas line from meter to generator
e Warranty startup

During 11/14/22 meeting,
Pequitside Subcommittee
requested generator be
placed on west side of the
building for aesthetic reasons.
Further Building Maintenance
quoted the need for an
additional $800 for gravel
Steven W. Belcher                                                                      beyond base and fencing.
Special Accounts Project Manager

UL Standard 6200 Technical Panel

EGSA & NFPA Member

Thank you for your consideration of FM Generator for this budget price — Steve

FM Generator — Canton MA

Source page 310

From: Reardon, Barbara <breardon@town.canton.ma.us>

Sent: Thursday, November 3, 2022 3:50:04 PM

To: Choiniere, Steven <schoiniere@town.canton.ma.us>; Steve Belcher <SBelcher@fmgenerator.com>
Subject: RE: Quick question and price please

Thanks Steves.

Steve Belcher, my phone number is 781 821 5021. Please do not hesitate to call if you have questions.
Best Regards,

Barbara

Barbara T Reardon, PE, REHS
Director of Public Health

79 Pleasant Street

Canton, MA 02021

781 821 5021

From: Choiniere, Steven <schoiniere@town.canton.ma.us>
Sent: Thursday, November 3, 2022 2:37 PM

To: Steve Belcher <SBelcher@fmgenerator.com>

Cc: Reardon, Barbara <breardon@town.canton.ma.us>
Subject: Quick question and price please

The BOH ( Barbara Reardon) needs a small generator just to cover a refrigerator for vaccines
Not a portable but an small one to do a couple of fridges and some lights

It will located at 79 Pleasant

Thank you

Steven Choiniere
Supervisor of Facilities
Town of canton
O-781-821-5015
C-781-562-9224

*** This e-mail and any files transmitted with it are confidential and intended solely for the use of the individual or

entity to whom they are addressed. If you have received this e-mail in error please notify the originator of this message.
Town of Canton

Source page 311

ING

GENERATORS

= An American Company
We produce our products in our 200,000ft2 facility located
in Le Center, Minnesota, equipped with modern engineering,
fabrication and assembly capabilities

oO

Full Load Tested

Every generator is 100% load tested

DSE 3110 Controller

Provides operating and diagnostic information

Sure Flow Cooling System

—O
Three cooling intakes provide exceptional airflow and
reduce heatsoak.
Th}
Battery Charger                     g

1.5 Amp, smart marine charger standard

TUV Certified

The design, construction, and performance of our
Stationary generators conform to UL2200 and CSA standards

PSS8B2W

8,400 WATTS

Rugged Design,
Durable enclosure with powder coat paint

Mecc Alte Genend,

Brushless

Source page 312

ELECTRICAL

-O
STANDBY                                                                PRIME
LP                                  NG                                  LP                                   NG
MAIN
VOLTS        WATTS | KVA | AMPS | WATTS | KVA | AMPS | WATTS | KVA | AMPS | WATTS | KVA   AMPS | CB
120/240 1-PH} 8,400       8.4        35         7,600       7.6        32        6,720       67        28        6,080       6.0        25         35
Notes: The solar panel option has a 25 Amp arcuit breaker.
O                                                                                                  oO
ENGINE BRAND                               BRIGGS & STRATTON            MOTOR STARTING (CODE G)                                    3'HP
ENGINE MODEL                                            VANGUARD            DBA @ 7 METERS
NO LOAD                                                                64.5
INE STAR
ENGINE STARTER                                                   ELECTRIC                 FULL LOAD                                                               66.0
ENGINESEEED                                                 ooo            TOTAL HARMONIC DISTORTION                                 <5%
IDE!                                                      hs
ENGINE CYLINDERS                                                V-TWIN             ASSEMBLED IN                                                            USA
GOVERNOR                                      MECHANICAL          EPA APPROVED                                             YES
DISPLACEMENT/TYPE                                 570 CC/ OHV           CARB APPROVED                                                   YES
(1)                                        E                    =
TEENS RE GUEION                                                see               TUV CERTIFICATION                                                        UL2200
LOW OIL PROTECTION                                         STANDARD                                                                                                    CSA
RECOMMENDED OIL?!                                            10W-30             UNIT WARRANTY                                 2 YEARS/2000 HRS
OIL CAPACITY                                                                1.5 QT            NOTES’ (1) For more generator warranty, see operator's manual,
EXHAUST                                                        CRITICAL GRADE
NOTES: (1) Steady state frequency regulation. (2) The recommended oll is for
normal applications. See operator's manual for the recommended oil for your
needs                             GENERATOR END         ae
VOLTAGE REGULATION                            CAPACITOR +/- 5%
FU EL                                                                                          TEMPERATURE RISE                                                 125/40°C
o       TYPE                                           REVOLVING FIELD
INLET PRESSURE                   4-6 O2Z/7-11” WATER COLUMN            BRUSHLESS                                                              YES
FUEL INLET SIZE                                               3/¥          SPEED                                                   3600 RPM
FUEL CONSUMPTION LP                                                             ROTOR                                                           2/3 PITCH
100%                                 1.6 GAL/HR - 158,760 BTU/HR
WINDINGS                                                            100% COPPER
FUEL CONSUMPTION NG
100%                                   132 FT?/HR - 132,000 BTU/HR            COUPLING                                     DIRECT/MOTOR SHAFT
BEARINGS                                          SINGLE (MAINTENANCE FREE)
INSULATION                                                   CLASS H
DERATES                                                                        INGRESS PROTECTION                                                  IP23
—o
ABOVE SEA LEVEL                                    3% PER 1640 FT
MAX OPERATING                                                               122°F
TEMPERATURE                                3% PER 10°F > 104°F         BATTE RY
—Oo
DC SYSTEM                                                                  12V
BATTERY RACK/CABLE                                    INCLUDED
BATTERY CHARGER                                                 1.5 AMP
REQUIRED BATTERY!)                         GROUP 26 500 CCA

NOTES: (1) Battery not included.

en |

Source page 313

SHIPPING                            DSE 3110 CONTROLLER

SHIPPING DIMENSIONS (Lx wx H)                       a5x30x3" ENGINE DISPLAY/PROTECTION

SHIP WEIGHT                                                           400 LBS            LOW OIL PRESSURE                                                         YES

FREIGHT CLASS                                                                            70              HIGH OIL TEMP                                                                           YES
OVER/UNDER SPEED                                                            YES

GENSET DISPLAY/PROTECTION

OPTIONAL ACCESSORIES    be    OVER/UNDER VOLTAGE                        —

UNDER FREQUENCY                                                             YES
BATTERY                                                                                      ADDITIONAL DISPLAYS/PROTECTIONS
BATTERY HEATER                                                                                           BATTERY OVER/UNDER VOLTAGE                                          YES
AUTOMATIC TRANSFER SWITCH                                                         COMMUNICATIONS
VAPOR FUEL STRAINER                                                                USB CONNECTABLE                                                    YES
OIL HEATER                                                                                       ADDITIONAL FEATURES
MAINTENANCE KIT                                                               CONFIGURABLE INPUTS                                              6
SOLAR PANEL CHARGER                                                                CONFIGURABLE OUTPUTS                                                 4

Notes. Control displays generic fault Codes

27.375"

36"                                                                                           29.75"

Specifications are subyect to change without notice.

Source page 316

Reardon, Barbara

nl
From:                                  Steve Belcher <SBelcher@fmgenerator.com>
Sent:                                Thursday, November 3, 2022 7:34 PM
To:                                   Reardon, Barbara; Choiniere, Steven; Tiffany Prevett; CommercialSales
Subject:                              Re: Quick question and price please

CAUTION: This email originated from outside your organization. Exercise caution when Opening attachments or clicking links,
especially from unknown senders.

Steve,
I'll look at that location to see what I'd needed and what can be installed.

For these applications, we use the Winco 8 or 12 kw air cooled. Close in cost to a residential generator, however built to
a light commercial/critical application-Steve

Sent from my Verizon, Samsung Galaxy smartphone
Get Outlook for Android

From: Reardon, Barbara <breardon@town.canton.ma.us>
Sent: Thursday, November 3, 2022 3:50:04 PM

To: Choiniere, Steven <schoiniere@town.canton.ma.us>; Steve Belcher <SBelcher@fmgenerator.com>
Subject: RE: Quick question and price please

Thanks Steves.

Steve Belcher, my phone number is 781 8215021. Please do not hesitate to call if you have questions.
Best Regards,
Barbara

Barbara T Reardon, PE, REHS
Director of Public Health

79 Pleasant Street

Canton, MA 02021

781 8215021

From: Choiniere, Steven <schoiniere@town.canton.ma.us>
Sent: Thursday, November 3, 2022 2:37 PM

To: Steve Belcher <SBelcher@fmgenerator.com>

Cc: Reardon, Barbara <breardon@town.canton.ma.us>
Subject: Quick question and price please

The BOH ( Barbara Reardon) needs a small generator just to cover a refrigerator for vaccines
Not a portable but an small one to do a couple of fridges and some lights

It will located at 79 Pleasant

Source page 317

Thank you

Steven Choiniere
Supervisor of Facilities
Town of canton
0-781-821-5015
C-781-562-9224