Prepared For: Prepared by;
Bill Walsh Richard Coutu
Canton Town Of
ATG TRI STATE TRUCK CENTER, LLC
801 Washington St
Canton, MA 2021 411 HARTFORD TURNPIKE
UNITED STATES SHREWSBURY, MA 01545
Phone ; 781-821-5025 Phone :508-753-1200
A proposal for
Canton Town Of
Prepared by
ATG TRI STATE TRUCK CENTER, LLC
Richard Coutu
November 02, 2022
Freightliner M2 106
Components shown may not reflect all spec'd options and are not to scale
Application Version 11,7.603 11/02/2022 1 2:37 PM
Data Version PRL-27M.018
Canton AWD M2 106 MY2023- FREIGHTLINER Page 1 of 1Source page 243
Prepared For: Prepared by:
Bill Walsh Richard Coutu
Canton Town Of
ATG TRI STATE TRUCK CENTER, LLC
801 Washington St
Canton, MA 2021 411 HARTFORD TURNPIKE
UNITED STATES SHREWSBURY, MA 01545
Phone : 781-821-5025 Phone .'508-753-1200
SPECIFICATION PROPOSAL
Description
M2 106 CONVENTIONAL CHASSIS
2024 MODEL YEAR SPECIFIED
SET BACK AXLE - TRUCK
STRAIGHT TRUCK PROVISION
LH PRIMARY STEERING LOCATION
TRUCK CONFIGURATION
DOMICILED, USA 50 STATES (INCLUDING CALIFORNIA
AND CARB OPT-IN STATES)
CONSTRUCTION SERVICE
GOVERNMENT BUSINESS SEGMENT
DIRT/SAND/ROCK COMMODITY
TERRAIN/DUTY: 100% (ALL) OF THE TIME, IN TRANSIT, IS
SPENT ON PAVED ROADS
MAXIMUM 8% EXPECTED GRADE
ROUGH, MAINTAINED, CONCRETE OR ASPHALT
PAVEMENT - MOST SEVERE IN-TRANSIT (BETWEEN
SITES) ROAD SURFACE
MEDIUM TRUCK WARRANTY
EXPECTED FRONT AXLE(S) LOAD 10000.0 lbs
EXPECTED REAR DRIVE AXLE(S) LOAD 20280.0 lbs
EXPECTED GROSS VEHICLE WEIGHT CAPACITY 30280.0
lbs
Application Version 11.7.603 11/02/2022 12:37 PM
Data Version PRL-27M.018 Page 1 of 17
Canton AWD M2 106 MY2023 FREIGHTLINERSource page 244
Prepared For: Prepared by:
Bill Walsh Richard Coutu
Canton Town Of ATG TRI STATE TRUCK CENTER, LLC
801 Washington St
411 HARTFORD TURNPIKE
Canton. MA 2021
SHREWSBURY, MA 01545
UNITED STATES
Phone :508-753-1200
Phone : 781-821-5025
Description
FRONT PLOW/END DUMP BODY
EXPECTED TRUCK BODY LENGTH 14.0 ft
EXPECTED TRUCK BODY WIDTH 96.0 in
MUNICIPAL EQUIPMENT
EXPECTED BODY/PAYLOAD CG HEIGHT ABOVE FRAME
"XX" INCHES 32.0 in
CUM B6.7 325 HP @ 2400 RPM, 2600 GOV, 750 LB-FT @
1800 RPM
67 MPH ROAD SPEED LIMIT
CRUISE CONTROL SPEED LIMIT SAME AS ROAD SPEED
LIMIT
PTO MODE BRAKE OVERRIDE - SERVICE BRAKE
APPLIED
PTO RPM WITH CRUISE SET SWITCH -1100 RPM
PTO RPM WITH CRUISE RESUME SWITCH -1100 RPM
PTO MODE CANCEL VEHICLE SPEED - 5 MPH
PTO GOVERNOR RAMP RATE - 250 RPM PER SECOND
PTO MINIMUM RPM - 700
REGEN INHIBIT SPEED THRESHOLD - 5 MPH
2010 EPA/CARB/GHG21 CONFIGURATION
2008 CARB EMISSION CERTIFICATION - CLEAN IDLE
(INCLUDES 6X4 INCH LABEL ON LOWER FORWARD
CORNER OF DRIVER DOOR)
STANDARD OIL PAN
ENGINE MOUNTED OIL CHECK AND FILL
SIDE OF HOOD AIR INTAKE WITH FIREWALL MOUNTED
DONALDSON AIR CLEANER
Application Version 11.7.603 11/02/2022 12:37 PM
Page 2 of 17
Data Version PRL-27M.018
Canton AWD M2 106 MY2023
FREIGHTLINERSource page 245
Prepared For: Prepared by:
Bill Walsh Richard Couto
Canton Town Of
ATG TRI STATE TRUCK CENTER, LLC
801 Washington St
Canton, MA 2021 411 HARTFORD TURNPIKE
UNITED STATES SHREWSBURY, MA 01545
Phone : 781-821-5025 Phone :508-753-1200
Description
DR 12V 200 AMP 28-SI QUADRAMOUNT PAD
ALTERNATOR WITH REMOTE BATTERY VOLT SENSE
(2) DTNA GENUINE, FLOODED STARTING, MIN 2000CCA,
370RC, THREADED STUD BATTERIES
BATTERY BOX FRAME MOUNTED
STANDARD BATTERY JUMPERS
SINGLE BATTERY BOX FRAME MOUNTED LH SIDE
UNDER CAB
WIRE GROUND RETURN FOR BATTERY CABLES WITH
ADDITIONAL FRAME GROUND RETURN
NON-POLISHED BATTERY BOX COVER
CAB AUXILIARY POWER CABLE
POSITIVE LOAD DISCONNECT WITH CAB MOUNTED
CONTROL SWITCH MOUNTED OUTBOARD DRIVER SEAT
POSITIVE AND NEGATIVE POSTS FOR JUMPSTART
LOCATED ON FRAME NEXT TO STARTER
CUMMINS TURBOCHARGED 18.7 CFM AIR COMPRESSOR
WITH INTERNAL SAFETY VALVE
STANDARD MECHANICAL AIR COMPRESSOR
GOVERNOR
AIR COMPRESSOR DISCHARGE LINE
ELECTRONIC ENGINE INTEGRAL WARNING AND DERATE
PROTECTION SYSTEM
CUMMINS ENGINE INTEGRAL BRAKE WITH VARIABLE
GEOMETRY TURBO ON/OFF
RH OUTBOARD UNDER STEP MOUNTED HORIZONTAL
AFTERTREATMENT SYSTEM ASSEMBLY WITH RH B-
PILLAR MOUNTED VERTICAL TAILPIPE
ENGINE AFTERTREATMENT DEVICE, AUTOMATIC OVER
THE ROAD REGENERATION AND DASH MOUNTED
REGENERATION REQUEST SWITCH
11 FOOT 06 INCH (138 INCH+0/-5.9 INCH) EXHAUST
SYSTEM HEIGHT
STANDARD CURVE BRIGHT UPPER STACK(S)
RH CURVED VERTICAL TAILPIPE B-PILLAR MOUNTED
ROUTED FROM STEP
6 GALLON DIESEL EXHAUST FLUID TANK
Application Version 11.7.603 11/02/2022 12:37 PM
Data Version PRL-27M.018
Canton AWD M2 106 MY2023 FREIGHTLINER Page 3 of 17Source page 246
Prepared For: Prepared by:
Bill Walsh Richard Coutu
Canton Town Of ATGTRI STATE TRUCK CENTER, LLC
801 Washington St
411 HARTFORD TURNPIKE
Canton, MA 2021
SHREWSBURY, MA 01545
UNITED STATES
Phone :508-753-1200
Phone : 781-821-5025
Description
100 PERCENT DIESEL EXHAUST FLUID FILL
LH MEDIUM DUTY STANDARD DIESEL EXHAUST FLUID
TANK LOCATION
STANDARD DIESEL EXHAUST FLUID PUMP MOUNTING
STANDARD DIESEL EXHAUST FLUID TANK CAP
STAINLESS STEEL AFTERTREATMENT
DEVICE/MUFFLER/TAILPIPE SHIELD
AIR POWERED ON/OFF ENGINE FAN CLUTCH
AUTOMATIC FAN CONTROL WITHOUT DASH SWITCH,
NON ENGINE MOUNTED
CUMMINS SPIN ON FUEL FILTER
•FULL FLOW OIL FILTER
950 SQUARE INCH ALUMINUM RADIATOR
ANTIFREEZE TO -34F, OAT (NITRITE AND SILICATE FREE)
EXTENDED LIFE COOLANT
GATES BLUE STRIPE COOLANT HOSES OR EQUIVALENT
CONSTANT TENSION HOSE CLAMPS FOR COOLANT
HOSES
RADIATOR DRAIN VALVE
NO RADIATOR/OIL PAN GUARD
PHILLIPS-TEMRO 750 WATT/115 VOLT BLOCK HEATER
CHROME ENGINE HEATER RECEPTACLE MOUNTED
UNDER LH DOOR
ALUMINUM FLYWHEEL HOUSING
ELECTRIC GRID AIR INTAKE WARMER
DELCO 12V 29MT STARTER WITH INTEGRATED
MAGNETIC SWITCH
ALLISON 3500 RDS AUTOMATIC TRANSMISSION WITH
PTO PROVISION
l i hl nt)i l,i >i»Jj
Application Version 11.7.603 11/02/2022 12:37 PM
Data Version PRL-27M.018 Page 4 of 17
Canton AWD M2 106 MY2023
FREIGHTLINERSource page 247
Prepared For: Prepared by:
Bill Walsh Richard Coutu
Canton Town Of
ATG TRI STATE TRUCK CENTER, LLC
801 Washington St
Canton, MA 2021 411 HARTFORD TURNPIKE
UNITED STATES SHREWSBURY, MA 01545
Phone: 781-821-5025 Phone :508-753-1200
Description
ALLISON VOCATIONAL PACKAGE 223 - AVAILABLE ON
3000/4000 PRODUCT FAMILIES WITH VOCATIONAL
MODELS RDS, HS, MH AND TRV
ALLISON VOCATIONAL RATING FOR CONCRETE MIXER
APPLICATIONS ONLY AVAILABLE WITH 3000 PRODUCT
FAMILIES
PRIMARY MODE GEARS, LOWEST GEAR 1, START GEAR
1, HIGHEST GEAR 5, AVAILABLE FOR 3000/4000
PRODUCT FAMILIES ONLY
SECONDARY MODE GEARS, LOWEST GEAR 1, START
GEAR 1, HIGHEST GEAR 3, AVAILABLE FOR 3000/4000
PRODUCT FAMILIES ONLY
S1 PERFORMANCE PRIMARY SHIFT SCHEDULE,
AVAILABLE FOR 3000/4000 PRODUCT FAMILIES ONLY
S1 PERFORMANCE SECONDARY SHIFT SCHEDULE,
AVAILABLE FOR 3000/4000 PRODUCT FAMILIES ONLY
2400 RPM PRIMARY MODE SHIFT SPEED
2400 RPM SECONDARY MODE SHIFT SPEED
ENGINE BRAKE RANGE PRESELECT RECOMMENDED BY
DTNA AND ALLISON, THIS DEFINED BY ENGINE AND
VOCATIONAL USAGE
ENGINE BRAKE RANGE ALTERNATE PRESELECT
RECOMMENDED BY DTNA AND ALLISON, THIS DEFINED
BY ENGINE AND VOCATIONAL USAGE
FUEL SENSE 2.0 DISABLED - PERFORMANCE - TABLE
BASED
DRIVER SWITCH INPUT - DEFAULT - NO SWITCHES
MAXIMUM ENGINE SPEED FOR PTO ENGAGEMENT 900
RPM
MAXIMUM OUTPUT SPEED FOR PTO ENGAGEMENT 250
RPM
MAXIMUM OUTPUT SPEED FOR PTO OPERATION 4000
RPM - ALLISON 5TH GEN TRANSMISSIONS
VEHICLE INTERFACE WIRING CONNECTOR WITHOUT
BLUNT CUTS, AT END OF FRAME
ELECTRONIC TRANSMISSION CUSTOMER ACCESS
CONNECTOR FIREWALL MOUNTED
CUSTOMER INSTALLED MUNCIE CS10 SERIES PTO
PTO MOUNTING, LH SIDE OF MAIN TRANSMISSION
ALLISON
MAGNETIC PLUGS, ENGINE DRAIN, TRANSMISSION
DRAIN, AXLE(S) FILL AND DRAIN
Application Version 11.7.603 11/02/2022 12:37 PM
Data Version PRL-27M.018
Canton AWD M2 106 MY2023 FREIGHTLINER Page 5 of 17Source page 248
Prepared For: Prepared by:
Bill Walsh Richard Coutu
Canton Town Of ATG TRI STATE TRUCK CENTER, LLC
801 Washington St
411 HARTFORD TURNPIKE
Canton, MA 2021
SHREWSBURY, MA 01545
UNITED STATES
Phone :508-753-1200
Phone: 781-821-5025
Description
PUSH BUTTON ELECTRONIC SHIFT CONTROL, DASH
MOUNTED
TRANSMISSION PROGNOSTICS - ENABLED 2013
WATER TO OIL TRANSMISSION COOLER, IN RADIATOR
END TANK
MERITOR MTC-4210 AND MTC-4213 TRANSFER CASE OIL
COOLER
TRANSMISSION OIL CHECK AND FILL WITH ELECTRONIC
OIL LEVEL CHECK
MERITOR MTC 4210XL-EC 2-SPEED TRANSFER CASE
TRANSFER CASE SHIFT CONTROLS WITH TRANSFER
CASE PTO ON/OFF SWITCH WHEN APPLICABLE
SYNTHETIC TRANSMISSION FLUID (TES-295 COMPLIANT)
MX-10-120HR-EVO 10,000# 1790MM KPI SINGLE FRONT
DRIVE AXLE WITH HR CARRIER
5.57 FRONT AXLE RATIO
MXL 16T MERITOR EXTENDED LUBE FRONT STEERING
AXLE DRIVELINE WITH HALF ROUND YOKES
MERITOR 16.5X5 Q+ MX DRIVE AXLE CAST SPIDER
HEAVY DUTY CAM FRONT BRAKES
NON-ASBESTOS FRONT BRAKE LINING
MERITOR CAST IRON FRONT BRAKE DRUMS
FRONT BRAKE DUST SHIELDS
FRONT OIL SEALS
STANDARD SPINDLE NUTS FOR ALL AXLES
MERITOR AUTOMATIC FRONT SLACK ADJUSTERS
TRWTHP-60 POWER STEERING
POWER STEERING PUMP
2 QUART SEE THROUGH POWER STEERING RESERVOIR
CURRENT AVAILABLE SYNTHETIC 75W-90 FRONT AXLE
LUBE
Application Version 11.7.603 ® 11/02/2022 12;37 PM
Data Version PRL-27M.018 Page 6 of 17
Canton AWD M2 106 MY2023
FREIGHTLINERSource page 249
Prepared For: Prepared by:
Bill Walsh Richard Coutu
Canton Town Of ATG TRI STATE TRUCK CENTER, LLC
801 Washington St
411 HARTFORD TURNPIKE
Canton, MA 2021
SHREWSBURY, MA 01545
UNITED STATES
Phone :508-753-1200
Phone: 781-821-5025
Description
12,000# DUAL TAPERLEAF FRONT SUSPENSION
MAINTENANCE FREE RUBBER BUSHINGS - FRONT
SUSPENSION
FRONT SHOCK ABSORBERS
RS-23-160 23,000# R-SERIES SINGLE REAR AXLE
5.63 REAR AXLE RATIO
IRON REAR AXLE CARRIER WITH STANDARD AXLE
HOUSING
MXL 176T MERITOR EXTENDED LUBE MAIN DRIVELINE
WITH HALF ROUND YOKES
MXL 176T MERITOR EXTENDED LUBE
INTERTRANSMISSION DRIVELINE WITH HALF ROUND
YOKES
DRIVER CONTROLLED TRACTION DIFFERENTIAL -
SINGLE REAR AXLE
(1) DRIVER CONTROLLED DIFFERENTIAL LOCK REAR
VALVE FOR SINGLE DRIVE AXLE
BUZZER AND BLINKING LAMP WITH EACH MODE
SWITCH, DIFFERENTIAL UNLOCK WITH IGNITION OFF,
ACTIVE <5 MPH
MERITOR 16.5X7 Q+ CAST SPIDER CAM REAR BRAKES,
DOUBLE ANCHOR, FABRICATED SHOES
NON-ASBESTOS REAR BRAKE LINING
BRAKE CAMS AND CHAMBERS ON REAR SIDE OF DRIVE
AXLE(S)
CAST IRON OUTBOARD REAR BRAKE DRUMS
REAR BRAKE DUST SHIELDS
REAR OIL SEALS
WABCO TRISTOP D LONGSTROKE 1-DRIVE AXLE
SPRING PARKING CHAMBERS
MERITOR AUTOMATIC REAR SLACK ADJUSTERS
CURRENT AVAILABLE SYNTHETIC 75W-90 REAR AXLE
LUBE
Application Version 11.7.603 11/02/2022 1 2:37 PM
Page 7 of 17
Data Version PRL-27M.018
Canton AWD M2 106 MY2023
FREIGHTLINERSource page 250
Prepared For: Prepared by:
Bill Walsh Richard Coutu
Canton Town Of ATG TRI STATE TRUCK CENTER, LLC
801 Washington St
Canton. MA 2021 411 HARTFORD TURNPIKE
SHREWSBURY, MA 01545
UNITED STATES
Phone -.508-753-1200
Phone: 781-821-5025
Description
26,000# FLAT LEAF SPRING REAR SUSPENSION WITH
HELPER AND RADIUS ROD
SPRING SUSPENSION -1.50" AXLE SPACER
STANDARD AXLE SEATS IN AXLE CLAMP GROUP
FORE/AFT CONTROL RODS
AIR BRAKE PACKAGE
WABCO 4S/4M ABS
REINFORCED NYLON, FABRIC BRAID AND WIRE BRAID
CHASSIS AIR LINES
FIBER BRAID PARKING BRAKE HOSE
STANDARD BRAKE SYSTEM VALVES
STANDARD AIR SYSTEM PRESSURE PROTECTION
SYSTEM
STD U.S. FRONT BRAKE VALVE
RELAY VALVE WITH 5-8 PSI CRACK PRESSURE, NO
REAR PROPORTIONING VALVE
BW AD-9SI BRAKE LINE AIR DRYER WITH HEATER
AIR DRYER MOUNTED INBOARD ON LH RAIL
STEEL AIR TANKS MOUNTED BELOW FRAME RAILS
PULL CABLES ON ALL AIR RESERVOIR(S)
PRIMARY CONNECTOR/RECEPTACLE WIRED FOR
COMBINATION STOP/TURN, CENTER PIN POWERED
THROUGH IGNITION WITH STOP SIGNAL PREWIRE
PACKAGE
SAE J560 7-WAY PRIMARY TRAILER CABLE RECEPTACLE
MOUNTED END OF FRAME
UPGRADED CHASSIS MULTIPLEXING UNIT
UPGRADED BULKHEAD MULTIPLEXING UNIT
Application Version 11.7.603 11/02/2022 12:37 PM
Data Version PRL-27M.Q18 Page 8 of 17
Canton AWD M2 106 MY2023
FREIGHTLINERSource page 251
Prepared For: Prepared by:
Bill Walsh Richard Coutu
Canton Town Of ATG TRI STATE TRUCK CENTER, LLC
801 Washington St
Canton, MA 2021 411 HARTFORD TURNPIKE
SHREWSBURY, MA 01545
UNITED STATES
Phone :508-753-1200
Phone: 781-821-5025
4100MM (161 INCH) WHEELBASE
11/32X3-1/2X10-15/16 INCH STEEL FRAME
(8.73MMX277.8MM/0.344X10.94 INCH) 120KSI
TEM TO EVALUATE AND INSTALL FRAME RAIL
REINFORCEMENT AS NEEDED FOR FRONT FRAME
MOUNTED EQUIPMENT
1600MM (63 INCH) REAR FRAME OVERHANG
FRAME OVERHANG RANGE: 61 INCH TO 70 INCH
8 INCH BOLT ON FRONT FRAME EXTENSION
CALC'D BACK OF CAB TO REAR SUSP C/L (CA) 95.87 in
CALCULATED EFFECTIVE BACK OF CAB TO REAR
SUSPENSION C/L (CA) 91.37 in
CALC'D FRAME LENGTH - OVERALL 253.8 in
CALCULATED FRAME SPACE LH SIDE 61.15 in
CALCULATED FRAME SPACE RH SIDE 43.07 in
SQUARE END OF FRAME
FRONT CLOSING CROSSMEMBER
STANDARD WEIGHT ENGINE CROSSMEMBER
STANDARD CROSSMEMBER BACK OF TRANSMISSION
STANDARD MIDSHIP #1 CROSSMEMBER(S)
STANDARD REARMOST CROSSMEMBER
STANDARD SUSPENSION CROSSMEMBER
THREE-PIECE 14 INCH CHROMED STEEL BUMPER WITH
COLLAPSIBLE ENDS
FRONT TOW HOOKS - FRAME MOUNTED
BUMPER MOUNTING FOR SINGLE LICENSE PLATE
Application Version 11.7.603 11/02/2022 12:37 PM
Page 9 of 17
Data Version PRL-27M.018
Canton AWD M2 106 MY2023
FREIGHTLINERSource page 252
Prepared For: Prepared by:
Bill Walsh Richard Couto
Canton Town Of ATG TRI STATE TRUCK CENTER, LLC
801 Washington St
411 HARTFORD TURNPIKE
Canton. MA 2021
SHREWSBURY, MA 01545
UNITED STATES
Phone : 508-753-1200
Phone : 781-821-5025
Description
FENDER AND FRONT OF HOOD MOUNTED FRONT
MUDFLAPS
GRADE 8 THREADED HEX HEADED FRAME FASTENERS
CLEAR FRAME RAILS FROM BACK OF CAB TO FRONT
REAR SUSPENSION BRACKET, BOTH RAILS OUTBOARD
50 GALLON/189 LITER SHORT RECTANGULAR ALUMINUM
FUEL TANK - LH
RECTANGULAR FUEL TANK(S)
POLISHING OF FUEL/HYDRAULIC TANK(S) WITH PAINTED
BANDS
FUELTANK(S) FORWARD
BLACK STEP FINISH
CHROME FUEL TANK CAP(S)
DETROIT FUEL/WATER SEPARATOR WITH WATER IN
FUEL SENSOR AND HAND PRIMER
EQUIFLO INBOARD FUEL SYSTEM
HIGH TEMPERATURE REINFORCED NYLON FUEL LINE
BRIDGESTONE M726 255/70R22.5 16 PLY RADIAL FRONT
TIRES
BRIDGESTONE M726 255/70R22.5 16 PLY RADIAL REAR
TIRES
MERITOR IRON FRONT HUBS
CONMET PRESET PLUS PREMIUM IRON REAR HUBS
'■i/heeis ........./ j.-.'
ALCOA ULA18X 22.5X8.25 10-HUB PILOT 5.81 INSET
ALUMINUM DISC FRONT WHEELS
ALCOA ULA18X 22.5X8.25 10-HUB PILOT ALUMINUM DISC
REAR WHEELS
POLISHED FRONT WHEELS; OUTSIDE ONLY
POLISHED REAR WHEELS; OUTSIDE OF OUTER WHEELS
ONLY
Application Version 11.7.603 11/02/2022 12:37 PM
Page 10 of 17
Data Version PRL-27M.018
Canton AWD M2 106 MY2023
FREIGHTLINERSource page 253
Prepared For: Prepared by:
Bill Walsh Richard Coutu
Canton Town Of ATG TRI STATE TRUCK CENTER, LLC
801 Washington St
Canton, MA 2021 411 HARTFORD TURNPIKE
SHREWSBURY, MA 01545
UNITED STATES
Phone : 508-753-1200
Phone : 781-821-5025
Description
FRONT WHEEL MOUNTING NUTS
REAR WHEEL MOUNTING NUTS
106 INCH BBC FLAT ROOF ALUMINUM CONVENTIONAL
CAB
AIR CAB MOUNTING
NONREMOVABLE BUGSCREEN MOUNTED BEHIND
GRILLE
LH AND RH GRAB HANDLES
HOOD MOUNTED CHROMED PLASTIC GRILLE
CHROME HOOD MOUNTED AIR INTAKE GRILLE
FIBERGLASS HOOD
TUNNEL/FIREWALL LINER
SINGLE 14 INCH ROUND HADLEY AIR HORN UNDER LH
DECK
SINGLE ELECTRIC HORN
SINGLE HORN SHIELD
REAR LICENSE PLATE MOUNT END OF FRAME
INTEGRAL HEADLIGHT/MARKER ASSEMBLY WITH
CHROME BEZEL
LED AERODYNAMIC MARKER LIGHTS
INTEGRAL LED STOP/TAIL/BACKUP LIGHTS
STANDARD FRONT TURN SIGNAL LAMPS
DUAL WEST COAST BRIGHT FINISH HEATED MIRRORS
WITH LH AND RH REMOTE
DOOR MOUNTED MIRRORS
102 INCH EQUIPMENT WIDTH
LH AND RH 8 INCH BRIGHT FINISH CONVEX MIRRORS
MOUNTED UNDER PRIMARY MIRRORS
Application Version 11,7.603 ® 11/02/2022 12:37 PM
Data Version PRL-27M.018 Page 11 of 17
Canton AWD M2 106 MY2023
FREIGHTLINERSource page 254
Prepared For: Prepared by:
Bill Walsh Richard Coutu
Canton Town Of ATG TRI STATE TRUCK CENTER, LLC
801 Washington St
Canton, MA 2021 411 HARTFORD TURNPIKE
SHREWSBURY, MA 01545
UNITED STATES
Phone :508-753-1200
Phone : 781-821-5025
Description
RH DOWN VIEW MIRROR
STANDARD SIDE/REAR REFLECTORS
RH AFTERTREATMENT SYSTEM CAB ACCESS WITH
POLISHED DIAMOND PLATE COVER
COMPOSITE EXTERIOR SUN VISOR
63X14 INCH TINTED REAR WINDOW
TINTED DOOR GLASS LH AND RH WITH TINTED
OPERATING WING WINDOWS
RH AND LH ELECTRIC POWERED WINDOWS,
PASSENGER SWITCHES ON DOOR(S)
1-PIECE BONDED HEATED WIPER PARK SOLAR GREEN
GLASS WINDSHIELD
2 GALLON WINDSHIELD WASHER RESERVOIR WITH
FLUID LEVEL INDICATOR, FRAME MOUNTED
OPAL GRAY VINYL INTERIOR
MOLDED PLASTIC DOOR PANEL WITHOUT VINYL INSERT
WITH ALUMINUM KICKPLATE LOWER DOOR
MOLDED PLASTIC DOOR PANEL WITHOUT VINYL INSERT
WITH ALUMINUM KICKPLATE LOWER DOOR
BLACK MATS WITH SINGLE INSULATION
NO FORWARD ROOF MOUNTED CONSOLE
IN DASH STORAGE BIN
(2) CUP.HOLDERS LH AND RH DASH
GRAY/CHARCOAL FLAT DASH
SMART SWITCH EXPANSION MODULE
2- 1/2 LB. FIRE EXTINGUISHER
FIRST AID KIT
HEATER, DEFROSTER AND AIR CONDITIONER
STANDARD HVAC DUCTING WITH SNOW SHIELD FOR
FRESH AIR INTAKE
Application Version 11.7.603 11/02/2022 12:37 PM
Page 12 of 17
Data Version PRL-27M.018
Canton AWD M2 106 MY2023
FREIGHTLINERSource page 255
Prepared For: Prepared by:
Bill Walsh Richard Coutu
Canton Town Of ATG TRI STATE TRUCK CENTER, LLC
801 Washington St
Canton, MA 2021 411 HARTFORD TURNPIKE
SHREWSBURY, MA 01545
UNITED STATES
Phone :508-753-1200
Phone : 781-821-5025
Description
MAIN HVAC CONTROLS WITH RECIRCULATION SWITCH
STANDARD HEATER PLUMBING WITH BALL SHUTOFF
VALVES AT SUPPLY LINES ONLY
VALEO HEAVY DUTY A/C REFRIGERANT COMPRESSOR
BINARY CONTROL, R-134A
STANDARD INSULATION
SOLID-STATE CIRCUIT PROTECTION AND FUSES
12V NEGATIVE GROUND ELECTRICAL SYSTEM
DOME DOOR ACTIVATED LH AND RH, DUAL READING
LIGHTS, FORWARD CAB ROOF
DOOR LOCKS AND IGNITION SWITCH KEYED THE SAME
KEY QUANTITY OF 3
LH AND RH ELECTRIC DOOR LOCKS
(2) 12 VOLT POWER RECEPTACLES MOUNTED IN DASH
TRIANGULAR REFLECTORS WITHOUT FLARES
PREMIUM ISRINGHAUSEN HIGH BACK AIR SUSPENSION
DRIVERS SEAT WITH 2 AIR LUMBAR, INTEGRATED
CUSHION EXTENSION, TILT AND ADJUSTABLE SHOCK
2 MAN TOOL BOX MID BACK NON SUSPENSION
PASSENGER SEAT
INBOARD DRIVER SEAT ARMREST, NO PASSENGER
SEAT ARMREST
LH AND RH INTEGRAL DOOR PANEL ARMRESTS
VINYL WITH VINYL INSERT DRIVER SEAT
VINYL WITH VINYL INSERT PASSENGER SEAT
BLACK SEAT BELTS
ADJUSTABLE TILT AND TELESCOPING STEERING
COLUMN
18 INCH (450MM) LEATHER WRAPPED STEERING WHEEL
Application Version 11.7.603 11/02/2022 12:37 PM
Data Version PRL-27M.018 Page 13 of 17
Canton AWD M2 106 MY2023
FREIGHTLINERSource page 256
Prepared For: Prepared by:
Bill Walsh Richard Coutu
Canton Town Of ATG TRI STATE TRUCK CENTER. LLC
801 Washington St
411 HARTFORD TURNPIKE
Canton. MA 2021
SHREWSBURY, MA 01545
UNITED STATES
Phone :508-753-1200
Phone : 781-821-5025
Description _________
DRIVERAND PASSENGER INTERIOR SUN VISORS
GRAY DRIVER INSTRUMENT PANEL
GRAY CENTER INSTRUMENT PANEL
ENGINE REMOTE INTERFACE WITH PARK BRAKE AND
NEUTRAL INTERLOCKS
BLACK GAUGE BEZELS
LOW AIR PRESSURE INDICATOR LIGHT AND AUDIBLE
ALARM
2 INCH PRIMARY AND SECONDARY AIR PRESSURE
GAUGES
DASH MOUNTED AIR RESTRICTION INDICATOR WITH
GRADUATIONS
97 DB BACKUP ALARM
ELECTRONIC CRUISE CONTROL WITH SWITCHES IN LH
SWITCH PANEL
KEY OPERATED IGNITION SWITCH AND INTEGRAL
START POSITION; 4 POSITION
OFF/RUN/START/ACCESSORY
ICU3S, 132X48 DISPLAY WITH DIAGNOSTICS, 28 LED
WARNING LAMPS AND DATA LINKED
HEAVY DUTY ONBOARD DIAGNOSTICS INTERFACE
CONNECTOR LOCATED BELOW LH DASH
2 INCH ELECTRIC FUEL GAUGE
ENGINE REMOTE INTERFACE NOT CONFIGURED
ENGINE REMOTE INTERFACE CONNECTOR IN ENGINE
COMPARTMENT
ELECTRICAL ENGINE COOLANT TEMPERATURE GAUGE
2 INCH TRANSMISSION OIL TEMPERATURE GAUGE
ENGINE AND TRIP HOUR METERS INTEGRAL WITHIN
DRIVER DISPLAY AND HOBBS PTO OPERATION HOUR
METER
CUSTOMER FURNISHED AND INSTALLED PTO
CONTROLS
ELECTRIC ENGINE OIL PRESSURE GAUGE
Application Version 11.7.603 ■ 11/02/2022 12:37 PM
Page 14of17
Data Version PRL-27M.018
Canton AWD M2 106 MY2023
FREIGHTLINERSource page 257
Prepared For: Prepared by:
Bill Walsh Richard Coutu
Canton Town Of ATG TRI STATE TRUCK CENTER, LLC
801 Washington St
Canton, MA 2021 411 HARTFORD TURNPIKE
SHREWSBURY, MA 01545
UNITED STATES
Phone .'508-753-1200
Phone : 781-821-5025
Description
OVERHEAD INSTRUMENT PANEL
SMARTPLEX HUB MODULE WITH OVERHEAD SWITCH
MOUNTING, DRIVER SIDE ONLY (6 SWITCH SLOTS)
AM/FM/WB WORLD TUNER RADIO WITH SIRIUSXM,
BLUETOOTH, IPOD INTERFACE, USB AND AUXILIARY
INPUTS, J1939
DASH MOUNTED RADIO
(2) RADIO SPEAKERS IN CAB
AM/FM ANTENNA MOUNTED ON FORWARD LH ROOF
INTEROPERABLE SDAR ANTENNA
ELECTRONIC MPH SPEEDOMETER WITH SECONDARY
KPH SCALE, WITHOUT ODOMETER
STANDARD VEHICLE SPEED SENSOR
ELECTRONIC 3000 RPM TACHOMETER
TMC RP 1226 ACCESSORY CONNECTOR LOCATED
BEHIND DASH B PANEL
IGNITION SWITCH CONTROLLED ENGINE STOP
ONE ON/OFF ROCKER SWITCH IN THE DASH WITH
INDICATOR LIGHT WIRED TO JUNCTION BLOCK ON
FRAME WITH MARKER LIGHT CIRCUIT, LABEL OPT
PRE-TRIP LAMP INSPECTION, ALL OUTPUTS FLASH,
WITH SMART SWITCH
6 ON/OFF LATCHING SMARTPLEX SWITCHES
DIGITAL VOLTAGE DISPLAY INTEGRAL WITH DRIVER
DISPLAY
SINGLE ELECTRIC WINDSHIELD WIPER MOTOR WITH
DELAY AND ARCTIC TYPE BLADES
MARKER LIGHT SWITCH INTEGRAL WITH HEADLIGHT
SWITCH AND DUAL CONNECTORS AND SWITCH FOR
CUSTOMER FURNISHED SNOW PLOW LIGHTS, LOW
BEAMS OFF WITH HIGH BEAMS
ONE VALVE PARKING BRAKE SYSTEM WITH DASH
VALVE CONTROL AUTONEUTRAL AND WARNING
INDICATOR
SELF CANCELING TURN SIGNAL SWITCH WITH DIMMER,
WASHER/WIPER AND HAZARD IN HANDLE
INTEGRAL ELECTRONIC TURN SIGNAL FLASHER WITH
Application Version 11.7.603 11/02/2022 12:37 PM
Data Version PRL-27M.018
Canton AWD M2 106 MY2023
FREIGHTLINER Page 15 of 17Source page 258
Prepared For: Prepared by:
Bill Walsh Richard Coutu
Canton Town Of ATG TRI STATE TRUCK CENTER LLC
801 Washington St
Canton, MA 2021 411 HARTFORD TURNPIKE
SHREWSBURY. MA 01545
UNITED STATES
Phone :508-753-1200
Phone: 781-821-5025
Description
HAZARD LAMPS OVERRIDING STOP LAMPS
PAINT: ONE SOLID COLOR
CAB COLOR A: L5946EY GREEN ELITE EY
BLACK, HIGH SOLIDS POLYURETHANE CHASSIS PAINT
SUNVISOR PAINTED SAME AS CAB COLOR A
STANDARD E COAT/UNDERCOATING
;-t <bihl hl'intirll’ A.d 1 M<)V t‘|-'
AXLE: NON-DETRO1T FRONT ONLY: MD MODERATE 5
YEARS/100,000 MILES/161,000 KM EXTENDED AXLE
COVERAGE
r) V Jit|i> blOtl I Gorrt i|
U.S. FMVSS CERTIFICATION, EXCEPT SALES CABS AND
GLIDER KITS
CORPORATE PDI CENTER IN-SERVICE ONLY
FRONT DRIVE AXLE ENGAGEMENT IS LIMITED TO 20%
OR LESS OF TOTAL ANNUAL MILEAGE PER MERITOR
SNOW PLOW APPLICATION REQUIREMENTS - DEALER
ADVISED AND ACCEPTS
CARB22 BASE WARRANTY SURCHARGE DD5/DD8 SS/B6.7/L9 <=325
GHG21 ENHANCEMENT PRICE
CUMMINS TARIFF CHARGE - $205
FRONT TIRE SURCHARGE
REAR TIRE SURCHARGE
MY24/CY23 PRICING SURCHARGE
STANDARD DESTINATION CHARGE
Exacted yvanaiiv. ',. J; \ Jt: J-W;
CUMMINS ENGINE CARB22: B6.7 HD1 MD DTY 5 YEARS /100,000 MILES /161,000 KM
EXTENDED WARRANTY. FEX APPLIES
TOWING: 5 YEARS/UNLIMITED MILES/KM EXTENDED TOWING COVERAGE $750 CAP FEX
APPLIES
Application Version 11.7.603 11/02/2022 12:37 PM
Page 16 of 17
Data Version PRL-27M.018
Canton AWD M2 106 MY2023
FREIGHTLINERSource page 259
Prepared For: Prepared by:
Bill Walsh Richard Coutu
Canton Town Of ATG TRI STATE TRUCK CENTER, LLC
801 Washington St
Canton, MA 2021 411 HARTFORD TURNPIKE
SHREWSBURY, MA 01545
UNITED STATES
Phone .'508-753-1200
Phone:781-821-5025
(+) Weights Shown are estimates only.
If weight is critical, contact Customer Application Engineering.
(**) Prices shown do not include taxes, fees, etc... "Net Equipment Selling Price" is located on the Quotation Details Proposal Report.
(***) All cost increases for major components (Engines, Transmissions, Axles, Front and Rear Tires) and government mandated
requirements, tariffs, and raw material surcharges will be passed through and added to factory invoices.
Application Version 11.7.603 ® 11/02/2022 12:37 PM
Data Version PRL-27M.018 Page 17 of 17
Canton AWD M2 106 MY2023
FREIGHTLINERSource page 260
TOWN OF CANTON
FORM B - FISCAL 2024
WESF CAPITAL PROJECT / EQUIPMENT REQUEST
DEPARTMENT: SUBMITTED BY:
Public Works Michael Trotta
PROJECT / EQUIPMENT TITLE:
Massapoag Brook / Bolivar Pond Flood Mitigation
TOTAL PROJECT / EQUIPMENT COST (must be at least $5,00(H:
$260,000
DESCRIPTION:
This planning project will develop conceptual plans and cost estimates to implement active
flood controls on Massapoag Brook to lessen downstream impacts on Bolivar Pond.
PURPOSE AND JUSTIFICATION:
Canton completed a flood modeling and vulnerability assessment which recommended
developing active reservoir management on Massapoag Brook, installing monitoring devices
on Massapoag Brook, updating control board use on Bolivar Pond, developing strategies with
the Towns of Stoughton and Sharon to mitigate their upstream impact on Massapoage Brook.
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking:
___ Required for Safety Please rank this request out of your total
___ Required by Law or Mandate requests for this year: (#1 as top priority)
___ Improve/Expand Service or Increase Efficiency _______ 2 (#) OF _______ 10_(#)
___ Planned Project or Replacement Expected Useful Life: (Check one)
___ Unplanned Project or Replacement x 20 or More Yrs 5 to 9 Years
x New Project/Item (not on last year's 5-Yr. Plan) __ 10 to 19 Years 3 to 4 Years
Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
___ Will Reduce Cost by $____________________ __ Will Produce Addl Revenue by $__________
x No Impact __ Revenue Neutral (no impact)
___ Will Increase Cost by $___________________ __ Will Decrease Revenue by $_____________
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)Source page 261
CWSRF Planning Project: Massapoag Brook Flood Mitigation Alternatives &
Smart Reservoir Management, Town of Canton
Town Contact:
Michael Trotta, Director of Public Works, mtrotta@town.canton.ma.us
Consultant Contact:
Courtney Eaton, Project Manager, Kleinfelder, ceaton@kleinfelder.com
A. Project Objective and Need:
The Town of Canton recently completed a flood modeling and climate resiliency assessment which found
that these catchments are vulnerable under current and future climate scenarios. A recent storm event
nearly caused flooding at new $5.9M pool facility adjacent to Bolivar Pond; it was avoided only by;
impromptu actions at Forge and Bolivar Pond reservoirs to remove flash boards. The resiliency assessment
recommended Active (Smart) Reservoir Management, as well as green infrastructure (Gl) and nature
based solutions (a Clean Water SRF Priority) as strategies for mitigation. This planning project would
evaluate existing site conditions and feasibility and develop conceptual plans for green infrastructure.
This project would also support MS4 compliance and help the Town meet objectives (water quality,
recharge) within Canton's MassDEP-approved Watershed-Based Plan1 which recommends identification
and implementation of additional stormwater BMPs in these catchments.
B. Scope of Work:
Task 1 - Site Survey and Field Investigation
Kleinfelder will retain a Massachusetts Registered Professional Land Surveyor to provide base survey
plans of the proposed project area within the Bolivar Pond / Messenger Park sub-catchment area
(approximately 3 acres). The boundary for this area will be depicted by Assessors Maps only. The field
survey will be conducted to produce plans at 1" = 20' with 2' contours and including invert elevations
on any drainage and sewer infrastructure within the project limits and wetland resource boundary
delineation. Surveyor will provide:
• Conduct research at the Town's Assessor's for locus and abutters information to add to the plan.
• Establish a survey baseline on the project site by means of GPS on the respective datums.
• Conduct an on the ground field survey to locate the following features: edge of pavement,
curbing, buildings, walls, fences, utilities, signs, striping, individual trees, light poles, walkways,
etc.
• Obtain finish floor elevations at any doorway abutting the project limits
1 "Watershed-Based Plan for Pequit Brook and Beaver Meadow Brook Watersheds within the Town of Canton",
2019Source page 262
August 19, 2021
KLEINFELDER
Town of Canton - Bright People. Right Solutions.
CWSRF Massapoag Brook Flood Mitigation Alternatives & Smart Reservoir Management Planning PEF
• Surveyor will be provided the utility plans for this site and will best place them based on physical
evidence or best interpretation. They will be shown as approximate.
• Locate wetland flags, flagged by wetlands subconsultant.
• Set temporary benchmarks on site for future construction.
• Obtain inverts on any drainage (i.e., catch basins / outfalls) and sewer structures found within the
project limits; Collect pipe invert elevations near historic flood areas with undersized drainage
(Rockland-Mechanic-Howard Streets), and 2 upstream neighborhoods (Century Drive/High
Street, Walnut Knoll)
• Final Product for the topography will be delivered in AutoCAD Civil 3D 2018 and delivered in
electronic format on a sheet size of 22" x 34".
Kleinfelder will work with the Town to confirm the location of below grade stormwater infrastructure
as well as other utilities information that will be added into the survey map. Record drawings as well
as the Town's GIS system will be used as the source of initial data and spot confirmed in the field.
Kleinfelder will also conduct site visits to perform existing condition assessment of outlet control
structures at Bolivar Pond and Forge Pond.
Task 1 Deliverables
Draft and Final Site Survey Map, in electronic format.
Task 2 - Refinement of Town's 2D Hydrologic & Hydraulic Model
The drainage model developed for the Town of Canton, during a previous Climate Resiliency Study, will
be refined for this sub-catchment area (near Rockland-Mechanic-Howard Streets) to include more details
in terms of smaller pipes (the Town-wide model was based on pipes of 18-inch diameter or greater),
associated manholes and catchbasins. Additional pipe from two nearby neighborhoods (Century Drive /
High Street and Walnut Knoll) will be added into the sub-catchment area as well. A review of the Bolivar
Pond dam structure stage discharge will be conducted as well as to further understand current operation
and opportunities for upgrade.
In addition, the Task includes a higher resolution 2-D model for this area to better simulate overland
flooding. Site survey information from Task 1 will be included in the 1- and 2-D model refinement. The
Task allows for running up to 4 storm scenarios, expected to be for the 10- and 100-year storms for the
2030- and 2070-time horizons, as well as short-duration storm events not previously modeled. The model
will also be used to develop Massapoag Brook flow profiles (including Old Shepard's Pond, Silk Mill Pond
and Bailey Court Conservation Area) to further refine how storm events impact water levels in these
impoundment structures both in 2030 and 2070.
The model will also be used to determine preferred sites for potential green infrastructure, nature-based
and/or sub-surface storage solutions.
2Source page 263
August 19, 2021
KLEINFELDER
Town of Canton - Bright People, Right Solutions.
CWSRF Massapoag Brook Flood Mitigation Alternatives & Smart Reservoir Management Planning PEF
Figure 1. Bolivar Pond Outlet Structure
Task 2 Deliverables
Updated sub-catchment flood maps for all scenarios.
Task 3 - Massapoag Brook Flood Mitigation Alternatives Analysis
In collaboration with the Town, Kleinfelder will develop several alternatives for flood reduction within
three general categories including green infrastructure, nature-based and/or sub-surface storage
solutions. The areas of likely focus will include:
Messinger Park - nature-based solutions
Sub-watershed distributed green infrastructure focused in two neighborhoods - Century Drive /
High Street and Walnut Knoll)
Grey infrastructure improvements (improved conveyance via increased catch basins, double
grated catch basins, pipe upsizing, etc.)
Identify flow rate needed for stormwater pump station(s) or additional catchment storage
volume to be effective
o at Old Shepard and Shepard's Pond,
o at Rockland, Mechanic, and Bolivar Streets (culverted channel)
o upstream diversion (increase flow to Bailey St Conservation Area; added storage
upstream of Shephard's Pond)
Kleinfelder will develop up to 6 alternatives using a combination of possible strategies noted above that
3Source page 264
August 19, 2021
KLEINFELDER
Town of Canton - Bright People. Right Solutions.
CWSRF Massapoag Brook Flood Mitigation Alternatives & Smart Reservoir Management Planning PEF
will provide site-specific flood reduction benefit as estimated through the refined flood modeling.
Alternative development will include considerations such as site infiltration feasibility, desktop
assessment of potential utility conflicts, site concept grading, sub-surface drainage needs, etc.
Kleinfelder will evaluate the identified alternatives using criteria that consider economics, environmental
and community metrics and priorities, resulting from Town input.
Task 3 Deliverables
Draft and Final Alternatives Evaluation Technical Memo including updated flood maps, evaluation and
recommendations.
Task 4 - Site Infiltration Feasibility & Evaluation
This task will serve to determine the feasibility of infiltration of stormwater at a select number of
preferred locations (as determined through the modeling effort) within the Messinger Park Project Area.
The analysis will determine both surrounding sub-surface soil conditions and the potential groundwater
mounding.
Task 4a - Preliminary Site Screening
Preliminary site evaluation shall be performed to assess up to five pre-determined sites suitable for the
construction of a stormwater BMP. The preliminary site suitability evaluation will incorporate the
following fieldwork, soil characterization, and geotechnical soiltesting:
Field Work
• Advance up to five (5) total soil borings. Soil borings will be used for soil classification, to
identify any restrictive layers, and to determine groundwater depth. One boring at each
location will be completed as a monitoring well.
• All soil borings will be advanced to a depth of twenty-five (25) feet below ground surface
or until auger refusal is encountered. Soil samples will be collected at 5-ft intervals with
split spoon sampler.
» Soil boring samples to undergo geotechnical laboratory testing include two (2) soil
samples from each site. One (1) soil sample will be collected at the bottom elevation of
the proposed infiltration BMP, and one (1) soil sample will be collected at the bottom of
the soil boring.
• Upon completion of groundwater monitoring well installation, Kleinfelder will develop
the monitoring well in preparation for hydraulic conductivitytesting.
• Kleinfelder will utilize the monitoring wells to perform Slug Testing in accordance with
ASTM D4044, to determine the hydraulic conductivity at each groundwater monitoring
well location.
• Prepare soil boring logs and monitoring well construction logs.
Geotechnical LaboratoryTesting
Geotechnical laboratory testing will include thefollowing:
o Particle size analysis (ASTM D422)Source page 265
August 19, 2021
KLEINFELDER
Town of Canton - Bright People. Right Solutions.
CWSRF Massapoag Brook Flood Mitigation Alternatives & Smart Reservoir Management Planning PEF
o Soil Porosity (ASTM D4404)
o Water Content (ASTM D2216)
o Textural Classification (USDA)
Note: Kleinfelder will review databases maintained by state and federal agencies for information on
releases of oil or hazardous materials (OHM) that could potentially impact environmental conditions
in the project area. This program does not include provision for environmental sampling and analysis
of soils. Results of the research will be incorporated in the deliverable noted below.
Task 4B - Selected Site Evaluation
This site evaluation will focus on assessment of the selected sites, as determined under Task 4A. The
site evaluation will incorporate the following fieldwork and geotechnical soiltesting:
Field Work
e A total of five (5) test pits will be performed at the site. (One test per 15,000 square feet
of proposed infiltration BMP).
o All five (5) test pits will be excavated to a maximum depth of 10-feet below ground
surface, or until bedrock or fully saturated conditions are encountered.
• Kleinfelder will record test pitting activities, and soil description in a test pit log for each
test pit.
© Hydraulic conductivity testing will be conducted at each of the test pit locations.
Hydraulic conductivity rates will be determined at the bottom elevation of the proposed
stormwater infiltration BMP, which is approximately 5-foot below ground surface. Field
test methods to assess hydraulic conductivity will follow ASTM D5126-
90 (2004) Standard Guide for Comparison of Field Methods for Determining Hydraulic
Conductivity in the Vadose Zone. Kleinfelder will utilize Compact Constant Head
Permeameter - (Amoozegar 1992) to perform thistest.
Geotechnical Laboratory Testing
Geotechnical laboratory testing will be performed on soil samples collected at each location; a hydraulic
conductivity test will be performed during the test pitting activities.
Task 4c - Groundwater Mounding Analysis
Prior to conducting the mounding analysis, Kleinfelder will estimate basement elevation of the
surrounding neighborhood utilizing Canton GIS Contour elevation and field observation of estimated
First floor Elevation. A groundwater computer model usingthe Hantush method will be developed by
Kleinfelder. This model will be capable of calculating the height of a groundwater mound model
resulting from the infiltration of a single storm water event. The goal of the mounding analysis in the
design of the tank is to confirm that the bottom elevation of the tank meets the groundwater
separation requirement in the Massachusetts storm waterguidelines.
Task 4 Deliverables
Technical memorandum summarizing results of Tasks 4a through 4c.
5Source page 266
August 19, 2021
KLEINFELDER
Town of Canton - Bright People. Right Solutions.
CWSRF Massapoag Brook Flood Mitigation Alternatives & Smart Reservoir Management Planning PEF
Task 5 - Operational Plan Update (Active Reservoir Management) within
Massapoag Brook sub-catchment)
Kleinfelder will document the existing reservoir management procedures currently in place by
conducting operational staff interviews.
Kleinfelder will formalize stop log operational thresholds (for observed rainfall intensity-duration and
forecasted precipitation). Based upon review H+H model results performed in Task 2, Kleinfelder will
then determine outlet control elevations and/or outlet structure retrofits, that can achieve the
following:
Identify feasible Low-Flow Target (Ecological Thresholds & Odor Issues)
Tradeoffs (modeled performance, i.e., flood extents/depth reduction) vs. other pond uses
(recreation, ecological)
Kleinfelder will develop conceptual plans and estimate costs for the Town to implement Smart
Reservoir Management - Active Controls, including the addition of upstream flow monitoring
equipment (near border with Sharon at Massapoag Brook, near border with Stoughton at Steep Hill
Brook). Upon Town's review and input, Kleinfelder will then make recommended updates to the
Town's Reservoir Management Plan. Kleinfelder will support the Town with development of a Draft
MOU with the Town of Sharon.
Deliverables
Draft and Final Reservoir Management Plan for Impoundments within Massapoag Brook sub
catchment area
Task 6 - Project Management / SRF Administration
Under this task, Kleinfelder will provide project management including quality assurance/quality
control review, team coordination, schedule and budget monitoring and project progress meetings
(three budgeted) with the Town. Kleinfelder will also lead administration of the SRF funding process,
including development of the application, communication with SRF throughout the project duration
and development of reimbursement deliverables.
Task 6 Deliverables
Meeting minutes, reporting and reimbursement documentation necessary for SRF funding.
6Source page 267
August 19, 2021
KLEINFELDER
Town of Canton - Bright People. Right Solutions.
CWSRF Massapoag Brook Flood Mitigation Alternatives & Smart Reservoir Management Planning PEF
C. Estimated Project Budget
Estimated Subconsultants Estimated
Task Labor Hours Labor fee & Expenses Total
1- Site Survey / Field Investigate 120 $ 17,856 $ 16,000 $ 33,856
2- Refine Model 450 $ 66,960 $ 66,960
3 - Alt Analysis / Concept Layout 300 $ 44,640 $ 44,640
4-Site Infiltration Feasibility &
Evaluation 230 $ 34,224 $ 12,500 $ 46,724
5 - Active Reservoir Management 260 $ 38,688 $ 38,688
6- PM/SRF Admin 200 $ 28,391 $ 28,391
1560 $ 230,759 $ 259,259
7Source page 268
TOWN OF CANTON
FORM B - FISCAL 2024
CAPITAL PROJECT J EQUIPMENT REQUEST
DEPARTMENT: SUBMITTED BY:
Public Works Michael Trotta
PROJECT / EQUIPMENT TITLE:
Memorial Field Flood Mitigation Study
TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
$252,000
DESCRIPTION:
The Memorial Field Study would evaluate the feasibility and develop conceptual plans of
installing green infrastructure (GI) in the vicinity of Memorial Field to improve water quality
run-off and flood mitigation for abutting properties.
PURPOSE AND JUSTIFICATION:
Canton completed a flood modeling and vulnerability assessment which found that GI and
nature-based solutions in the area of Memorial Field could reduce downstream flooding in
residential neighborhoods, streets, and commuter rail. This planning project would evaluate
existing site conditions, develop conceptual GI mitigation on Town property. This project
would also support compliance with MA DEP and US EPA storm water discharge permits.
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking:
Required for Safety Please rank this request out of your total
Required by Law or Mandate requests for this year: (#1 as top priority)
Improve/Expand Service or Increase Efficiency 3 (#) OF 10 (#)
Planned Project or Replacement Expected Useful Life: (Check one)
Unplanned Project or Replacement x 20 or More Yrs 5 to 9 Years
x New Project/Item (not on last year's 5-Yr. Plan) 10 to 19 Years 3 to 4 Years
Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
Will Reduce Cost by $ Will Produce Addl Revenue by $,
x No Impact Revenue Neutral (no impact)
Will Increase Cost by $ Will Decrease Revenue by $
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
f-ORM-&^FfOCAL-SO£4Source page 269
CWSRF Planning Project: Memorial Field Green Infrastructure and Flood
Mitigation, Town of Canton
Town Contact:
Michael Trotta, Director of Public Works, mtrotta@town.canton.ma.us
Consultant Contact:
Courtney Eaton, Project Manager, Kleinfelder, kryan@kleinfelder.com
A. Project Objective and Need:
The Town of Canton recently completed a flood modeling and vulnerability assessment which found that
green infrastructure (Gl) and nature-based solutions (a Clean Water SRF Priority) in the area of the Town's
Memorial Field could reduce downstream flooding in residential neighborhoods, as well as near key
transportation routes and the commuter rail hub. This planning project would evaluate existing site
conditions and feasibility and develop conceptual plans for green infrastructure on Town property. This
project would also support MS4 compliance and help the Town meet objectives (water quality, recharge)
within the MassDEP-approved Watershed-Based Plan ("Watershed-Based Plan for Pequit Brook and
Beaver Meadow Brook Watersheds within the Town of Canton", 2019), which recommends identification
and implementation of additional stormwater BMPs in these catchments.
The approximate project area is shown on Figure 1. The goal would be to intercept some flow from the
upstream drainage area (pink shaded area) from piped infrastructure within the study area (red box). If
stormwater could be held and infiltrated, it could mitigate overwhelming the channelized pinch points
located downstream.
B. Scope of Work:
Task 1 - Site Survey and Field Data Collection
Kleinfelder will retain a Massachusetts Registered Professional Land Surveyor to provide base survey
plans of the proposed project area (approximately 8 acres). The boundary for this area will be
depicted by Assessors Maps only. The field survey will be conducted to produce plans at 1" = 20' with
2' contours and including invert elevations on any drainage and sewer infrastructure within the
project limits and wetland resource boundary delineation. Kleinfelder will work with the Town to
confirm the location of below grade stormwater infrastructure as well as other utilities information
that will be added into the survey map. Record drawings as well as the Town's GIS system will be used
as the source of initial data and spot confirmed in the field.Source page 270
August 19, 2021
KLEINFELDER
Town of Canton - Bright People. Right Solutions.
CWSRF Memorial Field Green Infrastructure and Flood Mitigation Planning PEF
Task 1 Deliverables
Draft and Final Site Survey Map, in electronic format.
Task 2 - Refinement of Town's 2D Hydrologic & Hydraulic Model
The drainage model developed for the Town of Canton, during a previous Climate Resiliency Study, will
be refined for this Memorial Field sub-catchment area to include more details in terms of smaller pipes
(the Town-wide model was based on pipes of 18-inch diameter or greater), associated manholes and
catchbasins. In addition, the Task includes a higher resolution 2-D model for this area to better simulate
overland flooding at the site scale. Site survey information from Task 1 will be included in the 1- and 2-D
model refinement. The Task allows for running up to 4 storm scenarios, expected to be for the 10- and
100-year storms for the 2030- and 2070-time horizons, as well as short-duration storm events not
previously modeled. The model will be used to determine preferred sites to be investigated in Task 3 for
potential green infrastructure, nature-based and/or sub-surface storage solutions.
Task 2 Deliverables
Updated sub-catchment flood maps for all scenarios.
Figure 1. Proposed Project Area
2Source page 271
August 19, 2021
KLEINEELDER
Town of Canton - Bright People. Right Solutions.
CWSRF Memorial Field Green Infrastructure and Flood Mitigation Planning PEF
Task 3 - Site Infiltration Feasibility & Evaluation
This task will determine the feasibility of infiltration of stormwater at a number of preferred locations
(as determined through the modeling effort in Task 2) within the Memorial Field Project Area. The
analysis will determine both surrounding sub-surface soil conditions and the potential groundwater
mounding.
Figure 2. Possible locations for site infiltration feasibility testing (green polygons) to intercept piped drainage
(circled in red).
Task 3a - Preliminary Site Evaluation
Preliminary site evaluation shall be performed to assess up to five pre-determined sites suitable for the
construction of a stormwater BMP. The preliminary site suitability evaluation will incorporate the
following fieldwork, soil characterization, and geotechnical soiltesting:
Field Work
• Advance two (2) hollow-stem augered soil borings at each site. Soil borings will be used
for soil classification, to identify any restrictive layers, and to determine groundwater
depth. One boring at each location will be completed as a monitoring well.
• All soil borings will be advanced to a depth of twenty-five (25) feet below ground surface
or until auger refusal is encountered. Soil samples will be collected at 5-ft intervals with
split spoon sampler.
• Soil boring samples to undergo geotechnical laboratory testing include two (2) soil
samples from each site. One (1) soil sample will be collected at the bottom elevation of
3Source page 272
August 19, 2021
KLEINFELDER
Town of Canton - Bright People. Right Solutions.
CWSRF Memorial Field Green Infrastructure and Flood Mitigation Planning PEF
the proposed infiltration BMP, and one (1) soil sample will be collected at the bottom of
the soil boring.
• Upon completion of groundwater monitoring well installation, Kleinfelder will develop
the monitoring well in preparation for hydraulic conductivitytesting.
s Kleinfelder will utilize the monitoring wells to perform Slug Testing in accordance with
ASTM D4044, to determine the hydraulic conductivity at each groundwater monitoring
well location.
® Prepare soil boring logs and monitoring well construction logs.
Geotechnical LaboratoryTesting
Geotechnical laboratory testing will include thefollowing:
o Particle size analysis (ASTM D422)
o Soil Porosity (ASTM D4404)
o Water Content (ASTM D2216)
o Textural Classification (USDA)
Note: Kleinfelder will review databases maintained by state and federal agencies for information on
releases of oil or hazardous materials (OHM) that could potentially impact environmental conditions
in the project area. This program does not include provision for environmental sampling and analysis
of soils. Results of the research will be incorporated in the deliverable noted below.
Task 3B - Selected Site Evaluation
This site evaluation will focus on assessment of the selected sites, as determined under Task 3A. The
site evaluation will incorporate the following fieldwork and geotechnical soiltesting:
Field Work
0 A total of five (5) test pits will be performed at the site. (One test per 15,000 square feet
of proposed infiltration BMP).
• All five (5) test pits will be excavated to a maximum depth of 10-feet below ground
surface, or until bedrock or fully saturated conditions areencountered.
• Kleinfelder will record test pitting activities, and soil description in a test pit log for each
test pit.
® Hydraulic conductivity testing will be conducted at each of the test pit locations.
Hydraulic conductivity rates will be determined at the bottom elevation of the proposed
stormwater infiltration BMP, which is approximately 5-foot below ground surface. Field
test methods to assess hydraulic conductivity will follow ASTM D5126-
90 (2004) Standard Guide for Comparison of Field Methods for Determining Hydraulic
Conductivity in the Vadose Zone. Kleinfelder will utilize Compact Constant Head
Permeameter- (Amoozegar 1992) to perform thistest.
Geotechnical LaboratoryTesting
Geotechnical laboratory testing will be performed on soil samples collected at each location; a hydraulic
conductivity test will be performed during the test pitting activities.
Task 3b Deliverables
• Technical Memorandum summarizingfindings from Tasks 3a and 3b.
4Source page 273
August 19, 2021
KLEINFELDER
Town of Canton - Bright People. Right Solutions.
CWSRF Memorial Field Green Infrastructure and Flood Mitigation Planning PEF
Task 3c - Groundwater Mounding Analysis
Prior to conducting the mounding analysis, Kleinfelder will estimate basement elevation of the
surrounding neighborhood utilizing Canton GIS Contour elevation and field observation of estimated
First floor Elevation. A groundwater computer model using the Hantush method will be developed by
Kleinfelder. This model will be capable of calculating the height of a groundwater mound model
resulting from the infiltration of a single storm water event. The goal of the mounding analysis in the
design of the tank is to confirm that the bottom elevation of the tank meets the groundwater
separation requirement in the Massachusetts storm waterguidelines.
Task 3c Deliverables
© Results of the mounding analysis will be summarized as a technical memorandum, which will be
included as appendix to the main report.
Task 4 - Alternatives Analysis and Conceptual Layouts
In collaboration with the Town, Kleinfelder will develop several alternatives for flood reduction within
three general categories including green infrastructure, nature-based and/or sub-surface storage
solutions. Kleinfelder will develop up to 4 alternatives using a combination of possible strategies that
will provide site-specific flood reduction benefit as estimated through the refined flood modeling.
Alternative development will include considerations such as site infiltration feasibility, desktop
assessment of potential utility conflicts, site concept grading, sub-surface drainage needs, etc.
Kleinfelder will evaluate the identified alternatives using criteria that consider economics,
environmental and community metrics and priorities, resulting from Town input. Based upon the
evaluation, a recommended alternative will be selected to develop with further detail. For the
recommended alternative, conceptual layout drawings will be developed.
Task 4 Deliverables
Alternatives Evaluation Summary (included in Report).
Conceptual Layout Drawings
Task 5 - Draft and Final Report
Upon completion of Tasks 1-4, Kleinfelder will provide a draft report presenting desktop analysis
and conceptual alternatives evaluation for Memorial Field focusing on distributed Gl strategies,
nature-based solutions and sub-surface storage. The report will include opinion of probable capital
costs. The report will be provided for Town review and comment prior to publication of the Final
Report.
Task 5 Deliverables
Draft and Final Report.
Task 6 - Project Management / SRF Administration
Under this task, Kleinfelder will provide project management including quality assurance/quality
control review, team coordination, schedule and budget monitoring and project progress meetings
5Source page 274
August 19, 2021
KLEINFELDER
Town of Canton - Bright People. Right Solutions.
CWSRF Memorial Field Green Infrastructure and Flood Mitigation Planning PEF
(three budgeted) with the Town. KleinfeIder will also lead administration of the SRF funding process,
including development of the application, communication with SRF throughout the project duration
and development of reimbursement deliverables.
Task 6 Deliverables
Meeting minutes, reporting and reimbursement documentation necessary for SRF funding.
C. Estimated Project Budget
Estimated Subconsultants Estimated
Task Labor Hours Labor fee &E xpenses Total
$ $
1- Site Survey 160 23,808 29,375 $ 53,183
$
2- Refine Model 200 29,760 $ 29,760
F F
3- Site Infiltration Feasibility &
$ $
Site Evaluation 320 47,616 26,000 $ 73,616
$
4- Alt Analysis / Concept Layout 300 44,640 $ 44,640
$
5 - Draft and Final Report 160 23,808 $ 23,808
$
6- PM/SRF Admin 180 26,070 $ 26,070
$ $
1320 195,702 55,375 $ 251,077
6Source page 275
TOWN OF CANTON
FORM B - FISCAL 2024
WESF CAPITAL PROJECT / EQUIPMENT REQUEST
DEPARTMENT: SUBMITTED BY:
Public Works Michael Trotta
PROJECT / EQUIPMENT TITLE:
SCAG Windstorm Ride-on Leaf Blower
TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
$13,000
DESCRIPTION:
New or current year model SCAG WS23-37B-EFI Ride-on Leaf Blower.
PURPOSE AND JUSTIFICATION:
This is a new piece of equipment to be used by Forestry and Highway Divisions to increase the
efficiency of season! clean up.
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking:
___ Required for Safety Please rank this request out of your total
___ Required by Law or Mandate requests for this year: (#1 as top priority)
x Improve/Expand Service or Increase Efficiency _______ 4 (#) OF _______ 10_(#)
___ Planned Project or Replacement Expected Useful Life: (Check one)
___ Unplanned Project or Replacement __ 20 or More Yrs ____ 5 to 9 Years
x New Project/Item (not on last year's 5-Yr. Plan) x 10 to 19 Years ____3 to 4 Years
Impact to Dept, Operating Budget: (Check one) Revenue Impact: (Check one)
___ Will Reduce Cost by $____________________ __ Will Produce Addl Revenue by $.__________
x No Impact x Revenue Neutral (no impact)
___ Will Increase Cost by $___________________ __ Will Decrease Revenue by $_____________ _
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)Source page 276
STAND-ON BLOWERS (HTTPS://WWW.SCA WINDSTORM A PERFECT STORM A storm is on the horizon, and it's about Ip blow tough jobs away. Powered by a 37 bp, fuel-injected Briggs Vanguard® BIG BLOCK" engine, the Windstorm® delivers incredible .ground-deanog farce. A a slanbon design makes maneuvering Ira tight spaces a cinch while its ism^frd:irecli9na.l sir output aims airflow exactly where it's needed-
Source page 277
Invoice Estimate 446974
Thank you for the opportunity io provide you with this estimate. We know your
time is valuable and appreciate you visiting with us. Our price always includes
complete set up and comprehensive demonstration. Pricing subject to
POWER EQUIPMENT INC, change.
W * 1O880CM M-WIW » 7«J-W-3iW
Bill To Ship To
CANTON DPW
801 WASHINGTON ST
BILL WALSH
Canton, MA 02021-2576
Customer Contact Customer Tax Number Phone Cell Phone Transaction PO Number
40629 Steve Schoiniere 046-001-105 (781) 821-5025 (781) 424-6098 Estimate
Counter Person Sales Person Date Printed Reference Email Address . Department
Bill Smith Bill Smith 10/28/22 446974 wwa!sh@town.canton.ma.us Default
Model Line Description Ordered B/O'd Shipped List Net Amount
WS23-37BV-EFI SCQ Windstorm stnd-on blower 37hp EFI 1 1 $13,381.00 $10,704.80 $10,704.80
V.G.
Wholegoods Notes
Scag Windstorm ride on blower, 37hp VanGuard electric start EFi engine, remote PTO
fan engagement, remote controled multi-directional chute with no power toss, separate
wheel drive pumps and motors. Scag built dependability.
Note
TH ANK YOU FOR THE OPPORTUNITY TO PRESENT YOU WITH THIS QUOTE. PLEASE CALL US
WITH ANY QUESTIONS YOU MAY HAVE REGARDING THIS PROPOSAL.
Invoice Total $10,704.80
Sales Tax $0.00
Grand Total $10,704,80
+ <EU1ZB%> + ZtWAfc
This estimate is valid for 30 days from issue. Delivery of this equipment is available for and additional fee. Please follow
manufacturers safety and maintenance procedures. Pricing subject to change. Thank you for your business !
Notes:
!■
Stewart's Power Equipment, Inc Invoice Estimate # 446974 - CANTON DPW
Customer acknowledges receipt thereof:
Page 1 of 1Source page 278
TOWN OF CANTON
gteagl FORM B - FISCAL 2024
W|MF CAPITAL PROJECT / EQUIPMENT REQUEST
DEPARTMENT: SUBMITTED BY:
Public Works Michael Trotta
PROJECT / EQUIPMENT TITLE:
Flail Arm/Boom Arm Mower
TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000h
TBD
DESCRIPTION:
New or current year model Flail Arm attachment for Multihog CX 75 Heavy Duty Tractor.
PURPOSE AND JUSTIFICATION:
The Multihog Heavey Duty Tractor and attachments were approved at ATM 22 for FY 23.
Supply issues forced an increase in price for the machine. In order to fit project budget the
Flail Arm Mower was cut from the package. This request is for funding to purchase the arm in
FY 24.
NEED CLASSIFICATION: (Check a!! that apply) Departmental Priority Ranking:
___ Required for Safety Please rank this request out of your total
___ Required by Law or Mandate requests for this year: (#1 as top priority)
___ Improve/Expand Service or Increase Efficiency _______ 5 (#) OF _______ 10_(#)
x Planned Project or Replacement Expected Useful Life: (Check one)
___ Unplanned Project or Replacement __ 20 or More Yrs ____ 5 to 9 Years
___ New Project/Item (not on last year's 5-Yr. Plan) x 10 to 19 Years ___ 3 to 4 Years
Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
___ Will Reduce Cost by $_____________________ __ Will Produce Addl Revenue by $__________
x No Impact x Revenue Neutral (no impact)
___ Will Increase Cost by $___________________ __ Will Decrease Revenue by $_____________
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)Source page 279
Multihnog One Machine - One Driver - Endless Applications Flail Arm/Boom Arm Mower KBM 350 e The KBM 350 flail or boom arm mower is designed specifically for small tractors and is ideal for the Multihog CX range e Designed for mowing of grass on embankments and verges along the highway e ~The arm is front-mounted on the Multihog and is hydraulically driven e@ Compact design means the arm folds up in front of the Multihog for easy transport e Easy operation whilst mowing via joystick located within the operator cabin e The arm is equipped with a flail mower head as standard, however other additional accessories are available including sign washer, hedgecutter, weed brush and ditch cleaner e Reach of the KBM 350 arm is 3.5 metres (11.5 ft) e Clear view during transport - width when folded in front of the Multihog is 1.65 metres (5.4 ft) e = Arm can work on the left and right of the Multihog e Swivel angle of the arm is 270° Due to our policy of continuous improvement, specifications may change sub: to publication of this sheet. Multihog Limited, IDA Finnabair Business Park, Dundalk, Co. Louth, Ireland | Tel: +353 42 9386738 | Email: info@multihog.com g = 2 www.multi ho g.com
Source page 280
TOWN OF CANTON
FORM B - FISCAL 2024
WEpF CAPITAL PROJECT / EQUIPMENT REQUEST
DEPARTMENT: SUBMITTED BY:
Public Works Michael Trotta
PROJECT / EQUIPMENT TITLE:
Truck 14
TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
TBD
DESCRIPTION:
Replace Truck No. 14 a 2006 Ford F-250 Pick-up with a new or current model year Ford Super
Duty F-350 4WD truck equipped with a Flat Bed Body and 8 foot snow plow assembly.
PURPOSE AND JUSTIFICATION:
Truck No. 14 is a Highway Division everyday vehicle. It is used to carry equipment and
supplies to the job site. It is 14 years old with 100,000 plus miles of use. The recommended
replacement cycle for this type of public works vehicle is 8 years / 100,000 miles.
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking:
___ Required for Safety Please rank this request out of your total
___ Required by Law or Mandate requests for this year: (#1 as top priority)
___ Improve/Expand Service or Increase Efficiency _______ 6 (#) OF _______ 10 (#)
x Planned Project or Replacement Expected Useful Life: (Check one)
___ Unplanned Project or Replacement __ 20 or More Yrs x 5 to 9 Years
___ New Project/Item (not on last year's 5-Yr. Plan) __ 10 to 19 Years ____ 3 to 4 Years
Impact to Dept, Operating Budget: (Check one) Revenue Impact: (Check one)
___ Will Reduce Cost by $____________________ __ Will Produce Addl Revenue by $__________
x No Impact x Revenue Neutral (no impact)
___ Will Increase Cost by $___________________ __ Will Decrease Revenue by $____________ _
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)Source page 281
TOWN OF CANTON
FORM B - FISCAL 2024
WSt CAPITAL PROJECT / EQUIPMENT REQUEST
DEPARTMENT: SUBMITTED BY:
Public Works Michael Trotta
PROJECT / EQUIPMENT TITLE:
Pleasant Circle Storm Drain
TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
$270,000
DESCRIPTION:
Design and construct 18" RCP Storm Drain and appurtenances in the vicinity of 72 Pleasant
Cir.
PURPOSE AND JUSTIFICATION:
Storm water is running from upland lots, from Pleasant Cir. road surface, flooding #72,
eroding lawn and plantings, discharging into Reservoir Pond. The run-off and discharge does
not meet EPA and MA DEP storm water discharge standards. The new 18" drain will control
the run-off, pass the run-off through a water quality structure before discharge into Reservoir
Pond. The treated run-off will help the Town meet its MS4 permit requirements.
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking:
___ Required for Safety Please rank this request out of your total
___ Required by Law or Mandate requests for this year: (#1 as top priority)
___ Improve/Expand Service or Increase Efficiency _______ 7 (#) OF _______ 10_(#)
___ Planned Project or Replacement Expected Useful Life: (Check one)
___ Unplanned Project or Replacement x 20 or More Yrs 5 to 9 Years
x New Project/Item (not on last year's 5-Yr. Plan) __ 10 to 19 Years 3 to 4 Years
Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
___ Will Reduce Cost by $____________________ __ Will Produce Addl Revenue by $__________
x No Impact x Revenue Neutral (no impact)
___ Will Increase Cost by $___________________ __ Will Decrease Revenue by $_____________