FY24 Municipal - Capital Requests - January 2023 pdf file

Budgets & Finance · Record year 2023 · Record fe9b630befb67f1775

Open original municipal record ↗Open interactive reader

Saved text from 313 source pages. Transcription and OCR may contain errors; verify figures and wording against the original. Retrieved 2026-10-15.

Source page 242

Prepared For:                                                                                                          Prepared by;
Bill Walsh                                                                                                             Richard Coutu
Canton Town Of
                                                                                                ATG TRI STATE TRUCK CENTER, LLC
801 Washington St
Canton, MA 2021                                                                                           411 HARTFORD TURNPIKE
UNITED STATES                                                                                              SHREWSBURY, MA 01545
Phone ; 781-821-5025                                                                                            Phone :508-753-1200




                                                         A proposal for
                                                      Canton Town Of



                                                          Prepared by
                                     ATG TRI STATE TRUCK CENTER, LLC

                                                         Richard Coutu




                                                    November 02, 2022

                                                 Freightliner M2 106




                               Components shown may not reflect all spec'd options and are not to scale




Application Version 11,7.603                                                                                 11/02/2022 1 2:37 PM
Data Version PRL-27M.018
Canton AWD M2 106 MY2023-                      FREIGHTLINER                                                           Page 1 of 1

Source page 243

Prepared For:                                                                                   Prepared by:
Bill Walsh                                                                                      Richard Coutu
Canton Town Of
                                                                          ATG TRI STATE TRUCK CENTER, LLC
801 Washington St
Canton, MA 2021                                                                    411 HARTFORD TURNPIKE
UNITED STATES                                                                       SHREWSBURY, MA 01545
Phone : 781-821-5025                                                                     Phone .'508-753-1200




                                     SPECIFICATION PROPOSAL
                     Description




                    M2 106 CONVENTIONAL CHASSIS

                    2024 MODEL YEAR SPECIFIED

                    SET BACK AXLE - TRUCK

                    STRAIGHT TRUCK PROVISION

                    LH PRIMARY STEERING LOCATION



                   TRUCK CONFIGURATION

                   DOMICILED, USA 50 STATES (INCLUDING CALIFORNIA
                   AND CARB OPT-IN STATES)

                   CONSTRUCTION SERVICE

                   GOVERNMENT BUSINESS SEGMENT

                   DIRT/SAND/ROCK COMMODITY

                   TERRAIN/DUTY: 100% (ALL) OF THE TIME, IN TRANSIT, IS
                   SPENT ON PAVED ROADS
                   MAXIMUM 8% EXPECTED GRADE

                   ROUGH, MAINTAINED, CONCRETE OR ASPHALT
                   PAVEMENT - MOST SEVERE IN-TRANSIT (BETWEEN
                   SITES) ROAD SURFACE
                   MEDIUM TRUCK WARRANTY

                   EXPECTED FRONT AXLE(S) LOAD 10000.0 lbs

                   EXPECTED REAR DRIVE AXLE(S) LOAD 20280.0 lbs

                   EXPECTED GROSS VEHICLE WEIGHT CAPACITY 30280.0
                   lbs



Application Version 11.7.603                                                          11/02/2022 12:37 PM
Data Version PRL-27M.018                                                                      Page 1 of 17
Canton AWD M2 106 MY2023                         FREIGHTLINER

Source page 244

Prepared For:                                                                                Prepared by:
Bill Walsh                                                                                   Richard Coutu
Canton Town Of                                                          ATG TRI STATE TRUCK CENTER, LLC
801 Washington St
                                                                                 411 HARTFORD TURNPIKE
Canton. MA 2021
                                                                                  SHREWSBURY, MA 01545
UNITED STATES
                                                                                       Phone :508-753-1200
Phone : 781-821-5025




                     Description



                    FRONT PLOW/END DUMP BODY

                    EXPECTED TRUCK BODY LENGTH 14.0 ft

                    EXPECTED TRUCK BODY WIDTH 96.0 in

                    MUNICIPAL EQUIPMENT

                    EXPECTED BODY/PAYLOAD CG HEIGHT ABOVE FRAME
                    "XX" INCHES 32.0 in


                    CUM B6.7 325 HP @ 2400 RPM, 2600 GOV, 750 LB-FT @
                    1800 RPM


                    67 MPH ROAD SPEED LIMIT

                    CRUISE CONTROL SPEED LIMIT SAME AS ROAD SPEED
                    LIMIT
                    PTO MODE BRAKE OVERRIDE - SERVICE BRAKE
                    APPLIED
                    PTO RPM WITH CRUISE SET SWITCH -1100 RPM

                    PTO RPM WITH CRUISE RESUME SWITCH -1100 RPM

                    PTO MODE CANCEL VEHICLE SPEED - 5 MPH

                    PTO GOVERNOR RAMP RATE - 250 RPM PER SECOND

                    PTO MINIMUM RPM - 700

                    REGEN INHIBIT SPEED THRESHOLD - 5 MPH



                    2010 EPA/CARB/GHG21 CONFIGURATION

                    2008 CARB EMISSION CERTIFICATION - CLEAN IDLE
                    (INCLUDES 6X4 INCH LABEL ON LOWER FORWARD
                    CORNER OF DRIVER DOOR)
                    STANDARD OIL PAN

                    ENGINE MOUNTED OIL CHECK AND FILL

                    SIDE OF HOOD AIR INTAKE WITH FIREWALL MOUNTED
                    DONALDSON AIR CLEANER



 Application Version 11.7.603                                                        11/02/2022 12:37 PM
                                                                                             Page 2 of 17
 Data Version PRL-27M.018
 Canton AWD M2 106 MY2023
                                                  FREIGHTLINER

Source page 245

Prepared For:                                                                               Prepared by:
Bill Walsh                                                                                  Richard Couto
Canton Town Of
                                                                       ATG TRI STATE TRUCK CENTER, LLC
801 Washington St
Canton, MA 2021                                                                 411 HARTFORD TURNPIKE
UNITED STATES                                                                    SHREWSBURY, MA 01545
Phone : 781-821-5025                                                                  Phone :508-753-1200




                     Description

                    DR 12V 200 AMP 28-SI QUADRAMOUNT PAD
                    ALTERNATOR WITH REMOTE BATTERY VOLT SENSE
                    (2) DTNA GENUINE, FLOODED STARTING, MIN 2000CCA,
                    370RC, THREADED STUD BATTERIES
                    BATTERY BOX FRAME MOUNTED

                    STANDARD BATTERY JUMPERS

                    SINGLE BATTERY BOX FRAME MOUNTED LH SIDE
                    UNDER CAB

                    WIRE GROUND RETURN FOR BATTERY CABLES WITH
                    ADDITIONAL FRAME GROUND RETURN

                    NON-POLISHED BATTERY BOX COVER

                    CAB AUXILIARY POWER CABLE

                    POSITIVE LOAD DISCONNECT WITH CAB MOUNTED
                    CONTROL SWITCH MOUNTED OUTBOARD DRIVER SEAT
                    POSITIVE AND NEGATIVE POSTS FOR JUMPSTART
                    LOCATED ON FRAME NEXT TO STARTER
                    CUMMINS TURBOCHARGED 18.7 CFM AIR COMPRESSOR
                    WITH INTERNAL SAFETY VALVE
                    STANDARD MECHANICAL AIR COMPRESSOR
                    GOVERNOR
                   AIR COMPRESSOR DISCHARGE LINE

                    ELECTRONIC ENGINE INTEGRAL WARNING AND DERATE
                    PROTECTION SYSTEM

                   CUMMINS ENGINE INTEGRAL BRAKE WITH VARIABLE
                   GEOMETRY TURBO ON/OFF

                   RH OUTBOARD UNDER STEP MOUNTED HORIZONTAL
                   AFTERTREATMENT SYSTEM ASSEMBLY WITH RH B-
                   PILLAR MOUNTED VERTICAL TAILPIPE
                   ENGINE AFTERTREATMENT DEVICE, AUTOMATIC OVER
                   THE ROAD REGENERATION AND DASH MOUNTED
                   REGENERATION REQUEST SWITCH
                   11 FOOT 06 INCH (138 INCH+0/-5.9 INCH) EXHAUST
                   SYSTEM HEIGHT

                   STANDARD CURVE BRIGHT UPPER STACK(S)

                   RH CURVED VERTICAL TAILPIPE B-PILLAR MOUNTED
                   ROUTED FROM STEP

                   6 GALLON DIESEL EXHAUST FLUID TANK




Application Version 11.7.603                                                       11/02/2022 12:37 PM
Data Version PRL-27M.018
Canton AWD M2 106 MY2023                         FREIGHTLINER                             Page 3 of 17

Source page 246

Prepared For:                                                                                 Prepared by:
Bill Walsh                                                                                    Richard Coutu
Canton Town Of                                                            ATGTRI STATE TRUCK CENTER, LLC
801 Washington St
                                                                                  411 HARTFORD TURNPIKE
Canton, MA 2021
                                                                                   SHREWSBURY, MA 01545
UNITED STATES
                                                                                        Phone :508-753-1200
Phone : 781-821-5025




                     Description
                    100 PERCENT DIESEL EXHAUST FLUID FILL

                    LH MEDIUM DUTY STANDARD DIESEL EXHAUST FLUID
                    TANK LOCATION
                    STANDARD DIESEL EXHAUST FLUID PUMP MOUNTING

                    STANDARD DIESEL EXHAUST FLUID TANK CAP

                    STAINLESS STEEL AFTERTREATMENT
                    DEVICE/MUFFLER/TAILPIPE SHIELD
                    AIR POWERED ON/OFF ENGINE FAN CLUTCH

                    AUTOMATIC FAN CONTROL WITHOUT DASH SWITCH,
                    NON ENGINE MOUNTED
                    CUMMINS SPIN ON FUEL FILTER

                    •FULL FLOW OIL FILTER

                    950 SQUARE INCH ALUMINUM RADIATOR

                    ANTIFREEZE TO -34F, OAT (NITRITE AND SILICATE FREE)
                    EXTENDED LIFE COOLANT
                    GATES BLUE STRIPE COOLANT HOSES OR EQUIVALENT

                    CONSTANT TENSION HOSE CLAMPS FOR COOLANT
                    HOSES

                    RADIATOR DRAIN VALVE

                    NO RADIATOR/OIL PAN GUARD

                    PHILLIPS-TEMRO 750 WATT/115 VOLT BLOCK HEATER

                    CHROME ENGINE HEATER RECEPTACLE MOUNTED
                    UNDER LH DOOR
                    ALUMINUM FLYWHEEL HOUSING

                    ELECTRIC GRID AIR INTAKE WARMER

                    DELCO 12V 29MT STARTER WITH INTEGRATED
                    MAGNETIC SWITCH



                    ALLISON 3500 RDS AUTOMATIC TRANSMISSION WITH
                    PTO PROVISION
l i hl nt)i l,i    >i»Jj




 Application Version 11.7.603                                                          11/02/2022 12:37 PM
 Data Version PRL-27M.018                                                                     Page 4 of 17
 Canton AWD M2 106 MY2023
                                                  FREIGHTLINER

Source page 247

Prepared For:                                                                              Prepared by:
Bill Walsh                                                                                 Richard Coutu
Canton Town Of
                                                                      ATG TRI STATE TRUCK CENTER, LLC
801 Washington St
Canton, MA 2021                                                                411 HARTFORD TURNPIKE
UNITED STATES                                                                   SHREWSBURY, MA 01545
Phone: 781-821-5025                                                                  Phone :508-753-1200




                     Description
                    ALLISON VOCATIONAL PACKAGE 223 - AVAILABLE ON
                    3000/4000 PRODUCT FAMILIES WITH VOCATIONAL
                    MODELS RDS, HS, MH AND TRV
                    ALLISON VOCATIONAL RATING FOR CONCRETE MIXER
                    APPLICATIONS ONLY AVAILABLE WITH 3000 PRODUCT
                    FAMILIES
                    PRIMARY MODE GEARS, LOWEST GEAR 1, START GEAR
                    1, HIGHEST GEAR 5, AVAILABLE FOR 3000/4000
                    PRODUCT FAMILIES ONLY
                    SECONDARY MODE GEARS, LOWEST GEAR 1, START
                    GEAR 1, HIGHEST GEAR 3, AVAILABLE FOR 3000/4000
                    PRODUCT FAMILIES ONLY
                    S1 PERFORMANCE PRIMARY SHIFT SCHEDULE,
                    AVAILABLE FOR 3000/4000 PRODUCT FAMILIES ONLY
                    S1 PERFORMANCE SECONDARY SHIFT SCHEDULE,
                    AVAILABLE FOR 3000/4000 PRODUCT FAMILIES ONLY
                    2400 RPM PRIMARY MODE SHIFT SPEED

                    2400 RPM SECONDARY MODE SHIFT SPEED

                    ENGINE BRAKE RANGE PRESELECT RECOMMENDED BY
                    DTNA AND ALLISON, THIS DEFINED BY ENGINE AND
                    VOCATIONAL USAGE
                    ENGINE BRAKE RANGE ALTERNATE PRESELECT
                    RECOMMENDED BY DTNA AND ALLISON, THIS DEFINED
                    BY ENGINE AND VOCATIONAL USAGE
                    FUEL SENSE 2.0 DISABLED - PERFORMANCE - TABLE
                    BASED

                    DRIVER SWITCH INPUT - DEFAULT - NO SWITCHES

                    MAXIMUM ENGINE SPEED FOR PTO ENGAGEMENT 900
                    RPM

                   MAXIMUM OUTPUT SPEED FOR PTO ENGAGEMENT 250
                   RPM

                   MAXIMUM OUTPUT SPEED FOR PTO OPERATION 4000
                   RPM - ALLISON 5TH GEN TRANSMISSIONS
                   VEHICLE INTERFACE WIRING CONNECTOR WITHOUT
                   BLUNT CUTS, AT END OF FRAME
                   ELECTRONIC TRANSMISSION CUSTOMER ACCESS
                   CONNECTOR FIREWALL MOUNTED
                   CUSTOMER INSTALLED MUNCIE CS10 SERIES PTO

                   PTO MOUNTING, LH SIDE OF MAIN TRANSMISSION
                   ALLISON

                   MAGNETIC PLUGS, ENGINE DRAIN, TRANSMISSION
                   DRAIN, AXLE(S) FILL AND DRAIN



Application Version 11.7.603                                                      11/02/2022 12:37 PM
Data Version PRL-27M.018
Canton AWD M2 106 MY2023                        FREIGHTLINER                             Page 5 of 17

Source page 248

Prepared For:                                                                               Prepared by:
Bill Walsh                                                                                  Richard Coutu
Canton Town Of                                                         ATG TRI STATE TRUCK CENTER, LLC
801 Washington St
                                                                                411 HARTFORD TURNPIKE
Canton, MA 2021
                                                                                 SHREWSBURY, MA 01545
UNITED STATES
                                                                                      Phone :508-753-1200
Phone: 781-821-5025




                     Description

                    PUSH BUTTON ELECTRONIC SHIFT CONTROL, DASH
                    MOUNTED
                    TRANSMISSION PROGNOSTICS - ENABLED 2013

                    WATER TO OIL TRANSMISSION COOLER, IN RADIATOR
                    END TANK
                    MERITOR MTC-4210 AND MTC-4213 TRANSFER CASE OIL
                    COOLER
                    TRANSMISSION OIL CHECK AND FILL WITH ELECTRONIC
                    OIL LEVEL CHECK
                    MERITOR MTC 4210XL-EC 2-SPEED TRANSFER CASE

                    TRANSFER CASE SHIFT CONTROLS WITH TRANSFER
                    CASE PTO ON/OFF SWITCH WHEN APPLICABLE
                    SYNTHETIC TRANSMISSION FLUID (TES-295 COMPLIANT)




                    MX-10-120HR-EVO 10,000# 1790MM KPI SINGLE FRONT
                    DRIVE AXLE WITH HR CARRIER

                    5.57 FRONT AXLE RATIO

                    MXL 16T MERITOR EXTENDED LUBE FRONT STEERING
                    AXLE DRIVELINE WITH HALF ROUND YOKES
                    MERITOR 16.5X5 Q+ MX DRIVE AXLE CAST SPIDER
                    HEAVY DUTY CAM FRONT BRAKES

                    NON-ASBESTOS FRONT BRAKE LINING

                    MERITOR CAST IRON FRONT BRAKE DRUMS

                    FRONT BRAKE DUST SHIELDS

                    FRONT OIL SEALS

                    STANDARD SPINDLE NUTS FOR ALL AXLES

                    MERITOR AUTOMATIC FRONT SLACK ADJUSTERS

                    TRWTHP-60 POWER STEERING

                    POWER STEERING PUMP

                    2 QUART SEE THROUGH POWER STEERING RESERVOIR


                    CURRENT AVAILABLE SYNTHETIC 75W-90 FRONT AXLE
                    LUBE



 Application Version 11.7.603                                          ®            11/02/2022 12;37 PM
 Data Version PRL-27M.018                                                                  Page 6 of 17
 Canton AWD M2 106 MY2023
                                                 FREIGHTLINER

Source page 249

Prepared For:                                                                            Prepared by:
Bill Walsh                                                                               Richard Coutu
Canton Town Of                                                      ATG TRI STATE TRUCK CENTER, LLC
801 Washington St
                                                                             411 HARTFORD TURNPIKE
Canton, MA 2021
                                                                              SHREWSBURY, MA 01545
UNITED STATES
                                                                                   Phone :508-753-1200
Phone: 781-821-5025




                    Description



                    12,000# DUAL TAPERLEAF FRONT SUSPENSION

                    MAINTENANCE FREE RUBBER BUSHINGS - FRONT
                    SUSPENSION
                    FRONT SHOCK ABSORBERS



                    RS-23-160 23,000# R-SERIES SINGLE REAR AXLE

                   5.63 REAR AXLE RATIO

                    IRON REAR AXLE CARRIER WITH STANDARD AXLE
                    HOUSING
                   MXL 176T MERITOR EXTENDED LUBE MAIN DRIVELINE
                   WITH HALF ROUND YOKES
                   MXL 176T MERITOR EXTENDED LUBE
                   INTERTRANSMISSION DRIVELINE WITH HALF ROUND
                   YOKES
                   DRIVER CONTROLLED TRACTION DIFFERENTIAL -
                   SINGLE REAR AXLE
                   (1) DRIVER CONTROLLED DIFFERENTIAL LOCK REAR
                   VALVE FOR SINGLE DRIVE AXLE
                   BUZZER AND BLINKING LAMP WITH EACH MODE
                   SWITCH, DIFFERENTIAL UNLOCK WITH IGNITION OFF,
                   ACTIVE <5 MPH
                   MERITOR 16.5X7 Q+ CAST SPIDER CAM REAR BRAKES,
                   DOUBLE ANCHOR, FABRICATED SHOES

                   NON-ASBESTOS REAR BRAKE LINING

                   BRAKE CAMS AND CHAMBERS ON REAR SIDE OF DRIVE
                   AXLE(S)
                   CAST IRON OUTBOARD REAR BRAKE DRUMS

                   REAR BRAKE DUST SHIELDS

                   REAR OIL SEALS

                   WABCO TRISTOP D LONGSTROKE 1-DRIVE AXLE
                   SPRING PARKING CHAMBERS
                   MERITOR AUTOMATIC REAR SLACK ADJUSTERS

                   CURRENT AVAILABLE SYNTHETIC 75W-90 REAR AXLE
                   LUBE




Application Version 11.7.603                                                    11/02/2022 1 2:37 PM
                                                                                        Page 7 of 17
Data Version PRL-27M.018
Canton AWD M2 106 MY2023
                                                 FREIGHTLINER

Source page 250

Prepared For:                                                                              Prepared by:
Bill Walsh                                                                                 Richard Coutu
Canton Town Of                                                        ATG TRI STATE TRUCK CENTER, LLC
801 Washington St
Canton. MA 2021                                                                411 HARTFORD TURNPIKE
                                                                                SHREWSBURY, MA 01545
UNITED STATES
                                                                                     Phone -.508-753-1200
Phone: 781-821-5025




                     Description



                    26,000# FLAT LEAF SPRING REAR SUSPENSION WITH
                    HELPER AND RADIUS ROD

                    SPRING SUSPENSION -1.50" AXLE SPACER

                    STANDARD AXLE SEATS IN AXLE CLAMP GROUP

                    FORE/AFT CONTROL RODS



                    AIR BRAKE PACKAGE

                    WABCO 4S/4M ABS

                    REINFORCED NYLON, FABRIC BRAID AND WIRE BRAID
                    CHASSIS AIR LINES

                    FIBER BRAID PARKING BRAKE HOSE

                    STANDARD BRAKE SYSTEM VALVES

                    STANDARD AIR SYSTEM PRESSURE PROTECTION
                    SYSTEM
                    STD U.S. FRONT BRAKE VALVE

                    RELAY VALVE WITH 5-8 PSI CRACK PRESSURE, NO
                    REAR PROPORTIONING VALVE
                    BW AD-9SI BRAKE LINE AIR DRYER WITH HEATER

                    AIR DRYER MOUNTED INBOARD ON LH RAIL

                    STEEL AIR TANKS MOUNTED BELOW FRAME RAILS

                    PULL CABLES ON ALL AIR RESERVOIR(S)



                    PRIMARY CONNECTOR/RECEPTACLE WIRED FOR
                    COMBINATION STOP/TURN, CENTER PIN POWERED
                    THROUGH IGNITION WITH STOP SIGNAL PREWIRE
                    PACKAGE
                    SAE J560 7-WAY PRIMARY TRAILER CABLE RECEPTACLE
                    MOUNTED END OF FRAME

                    UPGRADED CHASSIS MULTIPLEXING UNIT

                    UPGRADED BULKHEAD MULTIPLEXING UNIT




 Application Version 11.7.603                                                      11/02/2022 12:37 PM
 Data Version PRL-27M.Q18                                                                  Page 8 of 17
 Canton AWD M2 106 MY2023
                                                 FREIGHTLINER

Source page 251

Prepared For:                                                                                Prepared by:
Bill Walsh                                                                                   Richard Coutu
Canton Town Of                                                          ATG TRI STATE TRUCK CENTER, LLC
801 Washington St
Canton, MA 2021                                                                  411 HARTFORD TURNPIKE
                                                                                  SHREWSBURY, MA 01545
UNITED STATES
                                                                                       Phone :508-753-1200
Phone: 781-821-5025




                    4100MM (161 INCH) WHEELBASE

                    11/32X3-1/2X10-15/16 INCH STEEL FRAME
                    (8.73MMX277.8MM/0.344X10.94 INCH) 120KSI
                    TEM TO EVALUATE AND INSTALL FRAME RAIL
                    REINFORCEMENT AS NEEDED FOR FRONT FRAME
                    MOUNTED EQUIPMENT
                    1600MM (63 INCH) REAR FRAME OVERHANG

                    FRAME OVERHANG RANGE: 61 INCH TO 70 INCH

                    8 INCH BOLT ON FRONT FRAME EXTENSION

                    CALC'D BACK OF CAB TO REAR SUSP C/L (CA) 95.87 in

                    CALCULATED EFFECTIVE BACK OF CAB TO REAR
                    SUSPENSION C/L (CA) 91.37 in
                    CALC'D FRAME LENGTH - OVERALL 253.8 in

                   CALCULATED FRAME SPACE LH SIDE 61.15 in

                   CALCULATED FRAME SPACE RH SIDE 43.07 in

                   SQUARE END OF FRAME

                   FRONT CLOSING CROSSMEMBER

                   STANDARD WEIGHT ENGINE CROSSMEMBER

                   STANDARD CROSSMEMBER BACK OF TRANSMISSION

                   STANDARD MIDSHIP #1 CROSSMEMBER(S)

                   STANDARD REARMOST CROSSMEMBER

                   STANDARD SUSPENSION CROSSMEMBER



                   THREE-PIECE 14 INCH CHROMED STEEL BUMPER WITH
                   COLLAPSIBLE ENDS
                   FRONT TOW HOOKS - FRAME MOUNTED

                   BUMPER MOUNTING FOR SINGLE LICENSE PLATE




Application Version 11.7.603                                                        11/02/2022 12:37 PM
                                                                                            Page 9 of 17
Data Version PRL-27M.018
Canton AWD M2 106 MY2023
                                                  FREIGHTLINER

Source page 252

Prepared For:                                                                                 Prepared by:
Bill Walsh                                                                                    Richard Couto
Canton Town Of                                                           ATG TRI STATE TRUCK CENTER, LLC
801 Washington St
                                                                                  411 HARTFORD TURNPIKE
Canton. MA 2021
                                                                                   SHREWSBURY, MA 01545
UNITED STATES
                                                                                        Phone : 508-753-1200
Phone : 781-821-5025




                       Description
                     FENDER AND FRONT OF HOOD MOUNTED FRONT
                     MUDFLAPS
                     GRADE 8 THREADED HEX HEADED FRAME FASTENERS

                     CLEAR FRAME RAILS FROM BACK OF CAB TO FRONT
                     REAR SUSPENSION BRACKET, BOTH RAILS OUTBOARD



                     50 GALLON/189 LITER SHORT RECTANGULAR ALUMINUM
                     FUEL TANK - LH
                     RECTANGULAR FUEL TANK(S)

                     POLISHING OF FUEL/HYDRAULIC TANK(S) WITH PAINTED
                     BANDS
                     FUELTANK(S) FORWARD

                     BLACK STEP FINISH

                     CHROME FUEL TANK CAP(S)

                     DETROIT FUEL/WATER SEPARATOR WITH WATER IN
                     FUEL SENSOR AND HAND PRIMER

                     EQUIFLO INBOARD FUEL SYSTEM

                     HIGH TEMPERATURE REINFORCED NYLON FUEL LINE



                     BRIDGESTONE M726 255/70R22.5 16 PLY RADIAL FRONT
                     TIRES
                     BRIDGESTONE M726 255/70R22.5 16 PLY RADIAL REAR
                     TIRES



                     MERITOR IRON FRONT HUBS

                     CONMET PRESET PLUS PREMIUM IRON REAR HUBS

'■i/heeis                        ........./                                                              j.-.'
                     ALCOA ULA18X 22.5X8.25 10-HUB PILOT 5.81 INSET
                     ALUMINUM DISC FRONT WHEELS
                     ALCOA ULA18X 22.5X8.25 10-HUB PILOT ALUMINUM DISC
                     REAR WHEELS
                     POLISHED FRONT WHEELS; OUTSIDE ONLY

                     POLISHED REAR WHEELS; OUTSIDE OF OUTER WHEELS
                     ONLY



  Application Version 11.7.603                                                         11/02/2022 12:37 PM
                                                                                             Page 10 of 17
  Data Version PRL-27M.018
  Canton AWD M2 106 MY2023
                                                   FREIGHTLINER

Source page 253

Prepared For:                                                                                Prepared by:
Bill Walsh                                                                                   Richard Coutu
Canton Town Of                                                         ATG TRI STATE TRUCK CENTER, LLC
801 Washington St
Canton, MA 2021                                                                 411 HARTFORD TURNPIKE
                                                                                 SHREWSBURY, MA 01545
UNITED STATES
                                                                                      Phone : 508-753-1200
Phone : 781-821-5025




                    Description
                    FRONT WHEEL MOUNTING NUTS

                    REAR WHEEL MOUNTING NUTS



                    106 INCH BBC FLAT ROOF ALUMINUM CONVENTIONAL
                    CAB

                    AIR CAB MOUNTING

                    NONREMOVABLE BUGSCREEN MOUNTED BEHIND
                    GRILLE

                    LH AND RH GRAB HANDLES

                    HOOD MOUNTED CHROMED PLASTIC GRILLE

                    CHROME HOOD MOUNTED AIR INTAKE GRILLE

                    FIBERGLASS HOOD

                   TUNNEL/FIREWALL LINER

                   SINGLE 14 INCH ROUND HADLEY AIR HORN UNDER LH
                   DECK
                   SINGLE ELECTRIC HORN

                   SINGLE HORN SHIELD

                   REAR LICENSE PLATE MOUNT END OF FRAME

                   INTEGRAL HEADLIGHT/MARKER ASSEMBLY WITH
                   CHROME BEZEL
                   LED AERODYNAMIC MARKER LIGHTS

                   INTEGRAL LED STOP/TAIL/BACKUP LIGHTS

                   STANDARD FRONT TURN SIGNAL LAMPS

                   DUAL WEST COAST BRIGHT FINISH HEATED MIRRORS
                   WITH LH AND RH REMOTE
                   DOOR MOUNTED MIRRORS

                   102 INCH EQUIPMENT WIDTH

                   LH AND RH 8 INCH BRIGHT FINISH CONVEX MIRRORS
                   MOUNTED UNDER PRIMARY MIRRORS




Application Version 11,7.603                                       ®               11/02/2022 12:37 PM
Data Version PRL-27M.018                                                                  Page 11 of 17
Canton AWD M2 106 MY2023
                                               FREIGHTLINER

Source page 254

Prepared For:                                                                             Prepared by:
Bill Walsh                                                                                Richard Coutu
Canton Town Of                                                       ATG TRI STATE TRUCK CENTER, LLC
801 Washington St
Canton, MA 2021                                                               411 HARTFORD TURNPIKE
                                                                               SHREWSBURY, MA 01545
UNITED STATES
                                                                                    Phone :508-753-1200
Phone : 781-821-5025




                     Description
                    RH DOWN VIEW MIRROR

                    STANDARD SIDE/REAR REFLECTORS

                    RH AFTERTREATMENT SYSTEM CAB ACCESS WITH
                    POLISHED DIAMOND PLATE COVER
                    COMPOSITE EXTERIOR SUN VISOR

                    63X14 INCH TINTED REAR WINDOW

                    TINTED DOOR GLASS LH AND RH WITH TINTED
                    OPERATING WING WINDOWS
                    RH AND LH ELECTRIC POWERED WINDOWS,
                    PASSENGER SWITCHES ON DOOR(S)
                    1-PIECE BONDED HEATED WIPER PARK SOLAR GREEN
                    GLASS WINDSHIELD

                    2 GALLON WINDSHIELD WASHER RESERVOIR WITH
                    FLUID LEVEL INDICATOR, FRAME MOUNTED



                    OPAL GRAY VINYL INTERIOR

                    MOLDED PLASTIC DOOR PANEL WITHOUT VINYL INSERT
                    WITH ALUMINUM KICKPLATE LOWER DOOR
                    MOLDED PLASTIC DOOR PANEL WITHOUT VINYL INSERT
                    WITH ALUMINUM KICKPLATE LOWER DOOR

                    BLACK MATS WITH SINGLE INSULATION

                    NO FORWARD ROOF MOUNTED CONSOLE

                    IN DASH STORAGE BIN

                    (2) CUP.HOLDERS LH AND RH DASH

                    GRAY/CHARCOAL FLAT DASH

                    SMART SWITCH EXPANSION MODULE

                    2- 1/2 LB. FIRE EXTINGUISHER

                    FIRST AID KIT

                    HEATER, DEFROSTER AND AIR CONDITIONER

                    STANDARD HVAC DUCTING WITH SNOW SHIELD FOR
                    FRESH AIR INTAKE




 Application Version 11.7.603                                                     11/02/2022 12:37 PM
                                                                                        Page 12 of 17
 Data Version PRL-27M.018
 Canton AWD M2 106 MY2023
                                                   FREIGHTLINER

Source page 255

Prepared For:                                                                            Prepared by:
Bill Walsh                                                                               Richard Coutu
Canton Town Of                                                      ATG TRI STATE TRUCK CENTER, LLC
801 Washington St
Canton, MA 2021                                                              411 HARTFORD TURNPIKE
                                                                              SHREWSBURY, MA 01545
UNITED STATES
                                                                                   Phone :508-753-1200
Phone : 781-821-5025




                    Description
                    MAIN HVAC CONTROLS WITH RECIRCULATION SWITCH

                    STANDARD HEATER PLUMBING WITH BALL SHUTOFF
                    VALVES AT SUPPLY LINES ONLY
                    VALEO HEAVY DUTY A/C REFRIGERANT COMPRESSOR

                    BINARY CONTROL, R-134A

                    STANDARD INSULATION

                    SOLID-STATE CIRCUIT PROTECTION AND FUSES

                    12V NEGATIVE GROUND ELECTRICAL SYSTEM

                    DOME DOOR ACTIVATED LH AND RH, DUAL READING
                    LIGHTS, FORWARD CAB ROOF
                    DOOR LOCKS AND IGNITION SWITCH KEYED THE SAME

                    KEY QUANTITY OF 3

                    LH AND RH ELECTRIC DOOR LOCKS

                   (2) 12 VOLT POWER RECEPTACLES MOUNTED IN DASH

                   TRIANGULAR REFLECTORS WITHOUT FLARES

                   PREMIUM ISRINGHAUSEN HIGH BACK AIR SUSPENSION
                   DRIVERS SEAT WITH 2 AIR LUMBAR, INTEGRATED
                   CUSHION EXTENSION, TILT AND ADJUSTABLE SHOCK
                   2 MAN TOOL BOX MID BACK NON SUSPENSION
                   PASSENGER SEAT
                   INBOARD DRIVER SEAT ARMREST, NO PASSENGER
                   SEAT ARMREST
                   LH AND RH INTEGRAL DOOR PANEL ARMRESTS

                   VINYL WITH VINYL INSERT DRIVER SEAT

                   VINYL WITH VINYL INSERT PASSENGER SEAT

                   BLACK SEAT BELTS

                   ADJUSTABLE TILT AND TELESCOPING STEERING
                   COLUMN

                   18 INCH (450MM) LEATHER WRAPPED STEERING WHEEL




Application Version 11.7.603                                                    11/02/2022 12:37 PM
Data Version PRL-27M.018                                                               Page 13 of 17
Canton AWD M2 106 MY2023
                                               FREIGHTLINER

Source page 256

Prepared For:                                                                             Prepared by:
Bill Walsh                                                                                Richard Coutu
Canton Town Of                                                       ATG TRI STATE TRUCK CENTER. LLC
801 Washington St
                                                                              411 HARTFORD TURNPIKE
Canton. MA 2021
                                                                               SHREWSBURY, MA 01545
UNITED STATES
                                                                                    Phone :508-753-1200
Phone : 781-821-5025




                     Description                                                 _________
                    DRIVERAND PASSENGER INTERIOR SUN VISORS



                    GRAY DRIVER INSTRUMENT PANEL

                    GRAY CENTER INSTRUMENT PANEL

                    ENGINE REMOTE INTERFACE WITH PARK BRAKE AND
                    NEUTRAL INTERLOCKS

                    BLACK GAUGE BEZELS

                    LOW AIR PRESSURE INDICATOR LIGHT AND AUDIBLE
                    ALARM
                    2 INCH PRIMARY AND SECONDARY AIR PRESSURE
                    GAUGES
                    DASH MOUNTED AIR RESTRICTION INDICATOR WITH
                    GRADUATIONS
                    97 DB BACKUP ALARM

                    ELECTRONIC CRUISE CONTROL WITH SWITCHES IN LH
                    SWITCH PANEL
                    KEY OPERATED IGNITION SWITCH AND INTEGRAL
                    START POSITION; 4 POSITION
                    OFF/RUN/START/ACCESSORY
                    ICU3S, 132X48 DISPLAY WITH DIAGNOSTICS, 28 LED
                    WARNING LAMPS AND DATA LINKED
                    HEAVY DUTY ONBOARD DIAGNOSTICS INTERFACE
                    CONNECTOR LOCATED BELOW LH DASH

                    2 INCH ELECTRIC FUEL GAUGE

                    ENGINE REMOTE INTERFACE NOT CONFIGURED

                    ENGINE REMOTE INTERFACE CONNECTOR IN ENGINE
                    COMPARTMENT
                    ELECTRICAL ENGINE COOLANT TEMPERATURE GAUGE

                    2 INCH TRANSMISSION OIL TEMPERATURE GAUGE

                    ENGINE AND TRIP HOUR METERS INTEGRAL WITHIN
                    DRIVER DISPLAY AND HOBBS PTO OPERATION HOUR
                    METER
                    CUSTOMER FURNISHED AND INSTALLED PTO
                    CONTROLS
                    ELECTRIC ENGINE OIL PRESSURE GAUGE




 Application Version 11.7.603                                                    ■ 11/02/2022 12:37 PM
                                                                                         Page 14of17
 Data Version PRL-27M.018
 Canton AWD M2 106 MY2023
                                                 FREIGHTLINER

Source page 257

Prepared For:                                                                             Prepared by:
Bill Walsh                                                                                Richard Coutu
Canton Town Of                                                      ATG TRI STATE TRUCK CENTER, LLC
801 Washington St
Canton, MA 2021                                                              411 HARTFORD TURNPIKE
                                                                              SHREWSBURY, MA 01545
UNITED STATES
                                                                                   Phone .'508-753-1200
Phone : 781-821-5025




                    Description
                    OVERHEAD INSTRUMENT PANEL

                    SMARTPLEX HUB MODULE WITH OVERHEAD SWITCH
                    MOUNTING, DRIVER SIDE ONLY (6 SWITCH SLOTS)

                    AM/FM/WB WORLD TUNER RADIO WITH SIRIUSXM,
                    BLUETOOTH, IPOD INTERFACE, USB AND AUXILIARY
                    INPUTS, J1939
                    DASH MOUNTED RADIO

                    (2) RADIO SPEAKERS IN CAB

                   AM/FM ANTENNA MOUNTED ON FORWARD LH ROOF

                    INTEROPERABLE SDAR ANTENNA

                    ELECTRONIC MPH SPEEDOMETER WITH SECONDARY
                    KPH SCALE, WITHOUT ODOMETER
                   STANDARD VEHICLE SPEED SENSOR

                    ELECTRONIC 3000 RPM TACHOMETER

                   TMC RP 1226 ACCESSORY CONNECTOR LOCATED
                   BEHIND DASH B PANEL
                   IGNITION SWITCH CONTROLLED ENGINE STOP

                   ONE ON/OFF ROCKER SWITCH IN THE DASH WITH
                   INDICATOR LIGHT WIRED TO JUNCTION BLOCK ON
                   FRAME WITH MARKER LIGHT CIRCUIT, LABEL OPT
                   PRE-TRIP LAMP INSPECTION, ALL OUTPUTS FLASH,
                   WITH SMART SWITCH
                   6 ON/OFF LATCHING SMARTPLEX SWITCHES

                   DIGITAL VOLTAGE DISPLAY INTEGRAL WITH DRIVER
                   DISPLAY

                   SINGLE ELECTRIC WINDSHIELD WIPER MOTOR WITH
                   DELAY AND ARCTIC TYPE BLADES
                   MARKER LIGHT SWITCH INTEGRAL WITH HEADLIGHT
                   SWITCH AND DUAL CONNECTORS AND SWITCH FOR
                   CUSTOMER FURNISHED SNOW PLOW LIGHTS, LOW
                   BEAMS OFF WITH HIGH BEAMS
                   ONE VALVE PARKING BRAKE SYSTEM WITH DASH
                   VALVE CONTROL AUTONEUTRAL AND WARNING
                   INDICATOR
                   SELF CANCELING TURN SIGNAL SWITCH WITH DIMMER,
                   WASHER/WIPER AND HAZARD IN HANDLE
                   INTEGRAL ELECTRONIC TURN SIGNAL FLASHER WITH



Application Version 11.7.603                                                     11/02/2022 12:37 PM
Data Version PRL-27M.018
Canton AWD M2 106 MY2023
                                                FREIGHTLINER                           Page 15 of 17

Source page 258

Prepared For:                                                                                                 Prepared by:
Bill Walsh                                                                                                    Richard Coutu
Canton Town Of                                                                           ATG TRI STATE TRUCK CENTER LLC
801 Washington St
Canton, MA 2021                                                                                   411 HARTFORD TURNPIKE
                                                                                                   SHREWSBURY. MA 01545
UNITED STATES
                                                                                                        Phone :508-753-1200
Phone: 781-821-5025




                       Description
                      HAZARD LAMPS OVERRIDING STOP LAMPS



                      PAINT: ONE SOLID COLOR



                      CAB COLOR A: L5946EY GREEN ELITE EY

                      BLACK, HIGH SOLIDS POLYURETHANE CHASSIS PAINT

                      SUNVISOR PAINTED SAME AS CAB COLOR A

                      STANDARD E COAT/UNDERCOATING

;-t <bihl hl'intirll’ A.d 1 M<)V     t‘|-'

                      AXLE: NON-DETRO1T FRONT ONLY: MD MODERATE 5
                      YEARS/100,000 MILES/161,000 KM EXTENDED AXLE
                      COVERAGE
r) V Jit|i> blOtl I Gorrt i|

                      U.S. FMVSS CERTIFICATION, EXCEPT SALES CABS AND
                      GLIDER KITS


                      CORPORATE PDI CENTER IN-SERVICE ONLY

                      FRONT DRIVE AXLE ENGAGEMENT IS LIMITED TO 20%
                      OR LESS OF TOTAL ANNUAL MILEAGE PER MERITOR
                      SNOW PLOW APPLICATION REQUIREMENTS - DEALER
                      ADVISED AND ACCEPTS



                               CARB22 BASE WARRANTY SURCHARGE DD5/DD8 SS/B6.7/L9 <=325
                               GHG21 ENHANCEMENT PRICE
                               CUMMINS TARIFF CHARGE - $205
                               FRONT TIRE SURCHARGE
                               REAR TIRE SURCHARGE
                               MY24/CY23 PRICING SURCHARGE
                               STANDARD DESTINATION CHARGE


Exacted yvanaiiv.               ',. J;                                              \ Jt: J-W;
                      CUMMINS ENGINE CARB22: B6.7 HD1 MD DTY 5 YEARS /100,000 MILES /161,000 KM
                      EXTENDED WARRANTY. FEX APPLIES
                      TOWING: 5 YEARS/UNLIMITED MILES/KM EXTENDED TOWING COVERAGE $750 CAP FEX
                      APPLIES




  Application Version 11.7.603                                                                        11/02/2022 12:37 PM
                                                                                                            Page 16 of 17
  Data Version PRL-27M.018
  Canton AWD M2 106 MY2023
                                                      FREIGHTLINER

Source page 259

Prepared For:                                                                                                                            Prepared by:
 Bill Walsh                                                                                                                               Richard Coutu
 Canton Town Of                                                                                                ATG TRI STATE TRUCK CENTER, LLC
 801 Washington St
 Canton, MA 2021                                                                                                          411 HARTFORD TURNPIKE
                                                                                                                           SHREWSBURY, MA 01545
 UNITED STATES
                                                                                                                                Phone .'508-753-1200
 Phone:781-821-5025




(+) Weights Shown are estimates only.
 If weight is critical, contact Customer Application Engineering.

(**) Prices shown do not include taxes, fees, etc... "Net Equipment Selling Price" is located on the Quotation Details Proposal Report.
(***) All cost increases for major components (Engines, Transmissions, Axles, Front and Rear Tires) and government mandated
requirements, tariffs, and raw material surcharges will be passed through and added to factory invoices.




 Application Version 11.7.603                                                                              ®                  11/02/2022 12:37 PM
 Data Version PRL-27M.018                                                                                                            Page 17 of 17
 Canton AWD M2 106 MY2023
                                                            FREIGHTLINER

Source page 260

TOWN OF CANTON
                                FORM B - FISCAL 2024
   WESF                CAPITAL PROJECT / EQUIPMENT REQUEST


 DEPARTMENT:                                              SUBMITTED BY:
                   Public Works                                     Michael Trotta


 PROJECT / EQUIPMENT TITLE:
                   Massapoag Brook / Bolivar Pond Flood Mitigation


 TOTAL PROJECT / EQUIPMENT COST (must be at least $5,00(H:
                                    $260,000

  DESCRIPTION:
This planning project will develop conceptual plans and cost estimates to implement active
flood controls on Massapoag Brook to lessen downstream impacts on Bolivar Pond.




  PURPOSE AND JUSTIFICATION:
Canton completed a flood modeling and vulnerability assessment which recommended
developing active reservoir management on Massapoag Brook, installing monitoring devices
on Massapoag Brook, updating control board use on Bolivar Pond, developing strategies with
the Towns of Stoughton and Sharon to mitigate their upstream impact on Massapoage Brook.




  NEED CLASSIFICATION: (Check all that apply)          Departmental Priority Ranking:
 ___ Required for Safety                                  Please rank this request out of your total
 ___ Required by Law or Mandate                           requests for this year: (#1 as top priority)
 ___ Improve/Expand Service or Increase Efficiency        _______ 2 (#) OF _______ 10_(#)

 ___ Planned Project or Replacement                    Expected Useful Life: (Check one)
 ___ Unplanned Project or Replacement                  x 20 or More Yrs      5 to 9 Years
  x New Project/Item (not on last year's 5-Yr. Plan)   __ 10 to 19 Years       3 to 4 Years


  Impact to Dept. Operating Budget: (Check one)         Revenue Impact: (Check one)
 ___ Will Reduce Cost by $____________________         __ Will Produce Addl Revenue by $__________
   x No Impact                                         __ Revenue Neutral (no impact)
 ___ Will Increase Cost by $___________________        __ Will Decrease Revenue by $_____________


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

Source page 261

CWSRF Planning Project: Massapoag Brook Flood Mitigation Alternatives &
Smart Reservoir Management, Town of Canton

Town Contact:
    Michael Trotta, Director of Public Works, mtrotta@town.canton.ma.us

Consultant Contact:
    Courtney Eaton, Project Manager, Kleinfelder, ceaton@kleinfelder.com



A. Project Objective and Need:
The Town of Canton recently completed a flood modeling and climate resiliency assessment which found
that these catchments are vulnerable under current and future climate scenarios. A recent storm event
nearly caused flooding at new $5.9M pool facility adjacent to Bolivar Pond; it was avoided only by;
impromptu actions at Forge and Bolivar Pond reservoirs to remove flash boards. The resiliency assessment
recommended Active (Smart) Reservoir Management, as well as green infrastructure (Gl) and nature­
based solutions (a Clean Water SRF Priority) as strategies for mitigation. This planning project would
evaluate existing site conditions and feasibility and develop conceptual plans for green infrastructure.

This project would also support MS4 compliance and help the Town meet objectives (water quality,
recharge) within Canton's MassDEP-approved Watershed-Based Plan1 which recommends identification
and implementation of additional stormwater BMPs in these catchments.

B. Scope of Work:

Task 1 - Site Survey and Field Investigation
 Kleinfelder will retain a Massachusetts Registered Professional Land Surveyor to provide base survey
 plans of the proposed project area within the Bolivar Pond / Messenger Park sub-catchment area
 (approximately 3 acres). The boundary for this area will be depicted by Assessors Maps only. The field
 survey will be conducted to produce plans at 1" = 20' with 2' contours and including invert elevations
 on any drainage and sewer infrastructure within the project limits and wetland resource boundary
 delineation. Surveyor will provide:
   •   Conduct research at the Town's Assessor's for locus and abutters information to add to the plan.
    •   Establish a survey baseline on the project site by means of GPS on the respective datums.
    •   Conduct an on the ground field survey to locate the following features: edge of pavement,
        curbing, buildings, walls, fences, utilities, signs, striping, individual trees, light poles, walkways,
        etc.
    •   Obtain finish floor elevations at any doorway abutting the project limits



1 "Watershed-Based Plan for Pequit Brook and Beaver Meadow Brook Watersheds within the Town of Canton",
2019

Source page 262

August 19, 2021
                                                                                          KLEINFELDER
Town of Canton -                                                                                 Bright People. Right Solutions.



CWSRF Massapoag Brook Flood Mitigation Alternatives & Smart Reservoir Management Planning PEF


    •   Surveyor will be provided the utility plans for this site and will best place them based on physical
        evidence or best interpretation. They will be shown as approximate.
    •   Locate wetland flags, flagged by wetlands subconsultant.
    •   Set temporary benchmarks on site for future construction.
    •   Obtain inverts on any drainage (i.e., catch basins / outfalls) and sewer structures found within the
        project limits; Collect pipe invert elevations near historic flood areas with undersized drainage
        (Rockland-Mechanic-Howard Streets), and 2 upstream neighborhoods (Century Drive/High
        Street, Walnut Knoll)
    •   Final Product for the topography will be delivered in AutoCAD Civil 3D 2018 and delivered in
        electronic format on a sheet size of 22" x 34".
 Kleinfelder will work with the Town to confirm the location of below grade stormwater infrastructure
 as well as other utilities information that will be added into the survey map. Record drawings as well
 as the Town's GIS system will be used as the source of initial data and spot confirmed in the field.

 Kleinfelder will also conduct site visits to perform existing condition assessment of outlet control
 structures at Bolivar Pond and Forge Pond.

 Task 1 Deliverables
 Draft and Final Site Survey Map, in electronic format.



Task 2 - Refinement of Town's 2D Hydrologic & Hydraulic Model
The drainage model developed for the Town of Canton, during a previous Climate Resiliency Study, will
be refined for this sub-catchment area (near Rockland-Mechanic-Howard Streets) to include more details
in terms of smaller pipes (the Town-wide model was based on pipes of 18-inch diameter or greater),
associated manholes and catchbasins. Additional pipe from two nearby neighborhoods (Century Drive /
High Street and Walnut Knoll) will be added into the sub-catchment area as well. A review of the Bolivar
Pond dam structure stage discharge will be conducted as well as to further understand current operation
and opportunities for upgrade.


In addition, the Task includes a higher resolution 2-D model for this area to better simulate overland
flooding. Site survey information from Task 1 will be included in the 1- and 2-D model refinement. The
Task allows for running up to 4 storm scenarios, expected to be for the 10- and 100-year storms for the
2030- and 2070-time horizons, as well as short-duration storm events not previously modeled. The model
will also be used to develop Massapoag Brook flow profiles (including Old Shepard's Pond, Silk Mill Pond
and Bailey Court Conservation Area) to further refine how storm events impact water levels in these
impoundment structures both in 2030 and 2070.
The model will also be used to determine preferred sites for potential green infrastructure, nature-based
and/or sub-surface storage solutions.




                                                                                                                  2

Source page 263

August 19, 2021
                                                                                        KLEINFELDER
Town of Canton -                                                                               Bright People, Right Solutions.



CWSRF Massapoag Brook Flood Mitigation Alternatives & Smart Reservoir Management Planning PEF




          Figure 1. Bolivar Pond Outlet Structure




 Task 2 Deliverables
 Updated sub-catchment flood maps for all scenarios.



Task 3 - Massapoag Brook Flood Mitigation Alternatives Analysis
In collaboration with the Town, Kleinfelder will develop several alternatives for flood reduction within
three general categories including green infrastructure, nature-based and/or sub-surface storage
solutions. The areas of likely focus will include:
        Messinger Park - nature-based solutions
        Sub-watershed distributed green infrastructure focused in two neighborhoods - Century Drive /
        High Street and Walnut Knoll)
        Grey infrastructure improvements (improved conveyance via increased catch basins, double­
        grated catch basins, pipe upsizing, etc.)
        Identify flow rate needed for stormwater pump station(s) or additional catchment storage
        volume to be effective
            o at Old Shepard and Shepard's Pond,
             o    at Rockland, Mechanic, and Bolivar Streets (culverted channel)
             o    upstream diversion (increase flow to Bailey St Conservation Area; added storage
                  upstream of Shephard's Pond)


Kleinfelder will develop up to 6 alternatives using a combination of possible strategies noted above that


                                                                                                                3

Source page 264

August 19, 2021
                                                                                             KLEINFELDER
Town of Canton -                                                                                    Bright People. Right Solutions.



CWSRF Massapoag Brook Flood Mitigation Alternatives & Smart Reservoir Management Planning PEF


will provide site-specific flood reduction benefit as estimated through the refined flood modeling.
Alternative development will include considerations such as site infiltration feasibility, desktop
assessment of potential utility conflicts, site concept grading, sub-surface drainage needs, etc.
Kleinfelder will evaluate the identified alternatives using criteria that consider economics, environmental
and community metrics and priorities, resulting from Town input.

 Task 3 Deliverables
 Draft and Final Alternatives Evaluation Technical Memo including updated flood maps, evaluation and
 recommendations.




Task 4 - Site Infiltration Feasibility & Evaluation
This task will serve to determine the feasibility of infiltration of stormwater at a select number of
preferred locations (as determined through the modeling effort) within the Messinger Park Project Area.
The analysis will determine both surrounding sub-surface soil conditions and the potential groundwater
mounding.

 Task 4a - Preliminary Site Screening
Preliminary site evaluation shall be performed to assess up to five pre-determined sites suitable for the
construction of a stormwater BMP. The preliminary site suitability evaluation will incorporate the
following fieldwork, soil characterization, and geotechnical soiltesting:

 Field Work

          •   Advance up to five (5) total soil borings. Soil borings will be used for soil classification, to
               identify any restrictive layers, and to determine groundwater depth. One boring at each
               location will be completed as a monitoring well.

          •   All soil borings will be advanced to a depth of twenty-five (25) feet below ground surface
               or until auger refusal is encountered. Soil samples will be collected at 5-ft intervals with
              split spoon sampler.

          »   Soil boring samples to undergo geotechnical laboratory testing include two (2) soil
              samples from each site. One (1) soil sample will be collected at the bottom elevation of
              the proposed infiltration BMP, and one (1) soil sample will be collected at the bottom of
              the soil boring.

          •    Upon completion of groundwater monitoring well installation, Kleinfelder will develop
              the monitoring well in preparation for hydraulic conductivitytesting.

          •    Kleinfelder will utilize the monitoring wells to perform Slug Testing in accordance with
              ASTM D4044, to determine the hydraulic conductivity at each groundwater monitoring
              well location.
          •    Prepare soil boring logs and monitoring well construction logs.
Geotechnical LaboratoryTesting
Geotechnical laboratory testing will include thefollowing:
                   o   Particle size analysis (ASTM D422)

Source page 265

August 19, 2021
                                                                                               KLEINFELDER
Town of Canton -                                                                                      Bright People. Right Solutions.



CWSRF Massapoag Brook Flood Mitigation Alternatives & Smart Reservoir Management Planning PEF


                    o      Soil Porosity (ASTM D4404)
                    o      Water Content (ASTM D2216)
                   o Textural Classification (USDA)
 Note: Kleinfelder will review databases maintained by state and federal agencies for information on
 releases of oil or hazardous materials (OHM) that could potentially impact environmental conditions
 in the project area. This program does not include provision for environmental sampling and analysis
 of soils. Results of the research will be incorporated in the deliverable noted below.

 Task 4B - Selected Site Evaluation
 This site evaluation will focus on assessment of the selected sites, as determined under Task 4A. The
 site evaluation will incorporate the following fieldwork and geotechnical soiltesting:

 Field Work

           e   A total of five (5) test pits will be performed at the site. (One test per 15,000 square feet
               of proposed infiltration BMP).

           o   All five (5) test pits will be excavated to a maximum depth of 10-feet below ground
               surface, or until bedrock or fully saturated conditions are encountered.

           •   Kleinfelder will record test pitting activities, and soil description in a test pit log for each
               test pit.

           ©   Hydraulic conductivity testing will be conducted at each of the test pit locations.
               Hydraulic conductivity rates will be determined at the bottom elevation of the proposed
               stormwater infiltration BMP, which is approximately 5-foot below ground surface. Field
               test methods to assess hydraulic conductivity will follow ASTM D5126-
               90 (2004) Standard Guide for Comparison of Field Methods for Determining Hydraulic
               Conductivity in the Vadose Zone. Kleinfelder will utilize Compact Constant Head
               Permeameter - (Amoozegar 1992) to perform thistest.
Geotechnical Laboratory Testing
Geotechnical laboratory testing will be performed on soil samples collected at each location; a hydraulic
conductivity test will be performed during the test pitting activities.


Task 4c - Groundwater Mounding Analysis
Prior to conducting the mounding analysis, Kleinfelder will estimate basement elevation of the
surrounding neighborhood utilizing Canton GIS Contour elevation and field observation of estimated
First floor Elevation. A groundwater computer model usingthe Hantush method will be developed by
Kleinfelder. This model will be capable of calculating the height of a groundwater mound model
resulting from the infiltration of a single storm water event. The goal of the mounding analysis in the
design of the tank is to confirm that the bottom elevation of the tank meets the groundwater
separation requirement in the Massachusetts storm waterguidelines.

 Task 4 Deliverables



Technical memorandum summarizing results of Tasks 4a through 4c.

                                                                                                                       5

Source page 266

August 19, 2021
                                                                                          KLEINFELDER
Town of Canton -                                                                                Bright People. Right Solutions.



CWSRF Massapoag Brook Flood Mitigation Alternatives & Smart Reservoir Management Planning PEF


Task 5 - Operational Plan Update (Active Reservoir Management) within
Massapoag Brook sub-catchment)

Kleinfelder will document the existing reservoir management procedures currently in place by
conducting operational staff interviews.
Kleinfelder will formalize stop log operational thresholds (for observed rainfall intensity-duration and
forecasted precipitation). Based upon review H+H model results performed in Task 2, Kleinfelder will
then determine outlet control elevations and/or outlet structure retrofits, that can achieve the
following:
        Identify feasible Low-Flow Target (Ecological Thresholds & Odor Issues)
        Tradeoffs (modeled performance, i.e., flood extents/depth reduction) vs. other pond uses
        (recreation, ecological)


Kleinfelder will develop conceptual plans and estimate costs for the Town to implement Smart
Reservoir Management - Active Controls, including the addition of upstream flow monitoring
equipment (near border with Sharon at Massapoag Brook, near border with Stoughton at Steep Hill
Brook). Upon Town's review and input, Kleinfelder will then make recommended updates to the
Town's Reservoir Management Plan. Kleinfelder will support the Town with development of a Draft
MOU with the Town of Sharon.

 Deliverables
Draft and Final Reservoir Management Plan for Impoundments within Massapoag Brook sub­
catchment area

Task 6 - Project Management / SRF Administration
 Under this task, Kleinfelder will provide project management including quality assurance/quality
 control review, team coordination, schedule and budget monitoring and project progress meetings
 (three budgeted) with the Town. Kleinfelder will also lead administration of the SRF funding process,
 including development of the application, communication with SRF throughout the project duration
 and development of reimbursement deliverables.



 Task 6 Deliverables
 Meeting minutes, reporting and reimbursement documentation necessary for SRF funding.




                                                                                                                 6

Source page 267

August 19, 2021
                                                                                           KLEINFELDER
Town of Canton -                                                                                 Bright People. Right Solutions.



CWSRF Massapoag Brook Flood Mitigation Alternatives & Smart Reservoir Management Planning PEF


C. Estimated Project Budget


                                      Estimated                     Subconsultants       Estimated
              Task                   Labor Hours       Labor fee     & Expenses            Total



1- Site Survey / Field Investigate       120       $       17,856   $      16,000    $       33,856
2- Refine Model                          450       $       66,960                    $       66,960
3 - Alt Analysis / Concept Layout        300       $       44,640                    $       44,640
4-Site Infiltration Feasibility &
Evaluation                               230       $       34,224   $      12,500    $       46,724
5 - Active Reservoir Management          260       $       38,688                    $       38,688
6- PM/SRF Admin                          200       $       28,391                    $       28,391
                                        1560       $      230,759                    $      259,259




                                                                                                                  7

Source page 268

TOWN OF CANTON
                                     FORM B - FISCAL 2024
                         CAPITAL PROJECT J EQUIPMENT REQUEST

 DEPARTMENT:                                             SUBMITTED BY:
                      Public Works                                 Michael Trotta


 PROJECT / EQUIPMENT TITLE:
                         Memorial Field Flood Mitigation Study


 TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
                                    $252,000

  DESCRIPTION:
The Memorial Field Study would evaluate the feasibility and develop conceptual plans of
installing green infrastructure (GI) in the vicinity of Memorial Field to improve water quality
run-off and flood mitigation for abutting properties.



  PURPOSE AND JUSTIFICATION:
Canton completed a flood modeling and vulnerability assessment which found that GI and
nature-based solutions in the area of Memorial Field could reduce downstream flooding in
residential neighborhoods, streets, and commuter rail. This planning project would evaluate
existing site conditions, develop conceptual GI mitigation on Town property. This project
would also support compliance with MA DEP and US EPA storm water discharge permits.




 NEED CLASSIFICATION: (Check all that apply)           Departmental Priority Ranking:
     Required for Safety                                 Please rank this request out of your total
     Required by Law or Mandate                          requests for this year: (#1 as top priority)
     Improve/Expand Service or Increase Efficiency                3 (#) OF             10 (#)

    Planned Project or Replacement                     Expected Useful Life: (Check one)
    Unplanned Project or Replacement                   x 20 or More Yrs      5 to 9 Years
  x New Project/Item (not on last year's 5-Yr. Plan)     10 to 19 Years       3 to 4 Years


 Impact to Dept. Operating Budget: (Check one)         Revenue Impact: (Check one)
    Will Reduce Cost by $                                Will Produce Addl Revenue by $,
  x No Impact                                            Revenue Neutral (no impact)
    Will Increase Cost by $                              Will Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)




f-ORM-&^FfOCAL-SO£4

Source page 269

CWSRF Planning Project: Memorial Field Green Infrastructure and Flood
Mitigation, Town of Canton

Town Contact:
    Michael Trotta, Director of Public Works, mtrotta@town.canton.ma.us

Consultant Contact:
    Courtney Eaton, Project Manager, Kleinfelder, kryan@kleinfelder.com



A. Project Objective and Need:
The Town of Canton recently completed a flood modeling and vulnerability assessment which found that
green infrastructure (Gl) and nature-based solutions (a Clean Water SRF Priority) in the area of the Town's
Memorial Field could reduce downstream flooding in residential neighborhoods, as well as near key
transportation routes and the commuter rail hub. This planning project would evaluate existing site
conditions and feasibility and develop conceptual plans for green infrastructure on Town property. This
project would also support MS4 compliance and help the Town meet objectives (water quality, recharge)
within the MassDEP-approved Watershed-Based Plan ("Watershed-Based Plan for Pequit Brook and
Beaver Meadow Brook Watersheds within the Town of Canton", 2019), which recommends identification
and implementation of additional stormwater BMPs in these catchments.

The approximate project area is shown on Figure 1. The goal would be to intercept some flow from the
upstream drainage area (pink shaded area) from piped infrastructure within the study area (red box). If
stormwater could be held and infiltrated, it could mitigate overwhelming the channelized pinch points
located downstream.

B. Scope of Work:

Task 1 - Site Survey and Field Data Collection
 Kleinfelder will retain a Massachusetts Registered Professional Land Surveyor to provide base survey
 plans of the proposed project area (approximately 8 acres). The boundary for this area will be
 depicted by Assessors Maps only. The field survey will be conducted to produce plans at 1" = 20' with
 2' contours and including invert elevations on any drainage and sewer infrastructure within the
 project limits and wetland resource boundary delineation. Kleinfelder will work with the Town to
 confirm the location of below grade stormwater infrastructure as well as other utilities information
 that will be added into the survey map. Record drawings as well as the Town's GIS system will be used
 as the source of initial data and spot confirmed in the field.

Source page 270

August 19, 2021
                                                                                          KLEINFELDER
Town of Canton -                                                                                Bright People. Right Solutions.

CWSRF Memorial Field Green Infrastructure and Flood Mitigation Planning PEF




 Task 1 Deliverables
 Draft and Final Site Survey Map, in electronic format.



Task 2 - Refinement of Town's 2D Hydrologic & Hydraulic Model
The drainage model developed for the Town of Canton, during a previous Climate Resiliency Study, will
be refined for this Memorial Field sub-catchment area to include more details in terms of smaller pipes
(the Town-wide model was based on pipes of 18-inch diameter or greater), associated manholes and
catchbasins. In addition, the Task includes a higher resolution 2-D model for this area to better simulate
overland flooding at the site scale. Site survey information from Task 1 will be included in the 1- and 2-D
model refinement. The Task allows for running up to 4 storm scenarios, expected to be for the 10- and
100-year storms for the 2030- and 2070-time horizons, as well as short-duration storm events not
previously modeled. The model will be used to determine preferred sites to be investigated in Task 3 for
potential green infrastructure, nature-based and/or sub-surface storage solutions.


 Task 2 Deliverables
 Updated sub-catchment flood maps for all scenarios.

            Figure 1. Proposed Project Area




                                                                                                                 2

Source page 271

August 19, 2021
                                                                                                               KLEINEELDER
Town of Canton -                                                                                                       Bright People. Right Solutions.

CWSRF Memorial Field Green Infrastructure and Flood Mitigation Planning PEF


Task 3 - Site Infiltration Feasibility & Evaluation
This task will determine the feasibility of infiltration of stormwater at a number of preferred locations
(as determined through the modeling effort in Task 2) within the Memorial Field Project Area. The
analysis will determine both surrounding sub-surface soil conditions and the potential groundwater
mounding.




        Figure 2. Possible locations for site infiltration feasibility testing (green polygons) to intercept piped drainage
        (circled in red).



 Task 3a - Preliminary Site Evaluation
Preliminary site evaluation shall be performed to assess up to five pre-determined sites suitable for the
construction of a stormwater BMP. The preliminary site suitability evaluation will incorporate the
following fieldwork, soil characterization, and geotechnical soiltesting:

 Field Work

           •    Advance two (2) hollow-stem augered soil borings at each site. Soil borings will be used
                for soil classification, to identify any restrictive layers, and to determine groundwater
                depth. One boring at each location will be completed as a monitoring well.

           •    All soil borings will be advanced to a depth of twenty-five (25) feet below ground surface
                or until auger refusal is encountered. Soil samples will be collected at 5-ft intervals with
                split spoon sampler.

           •    Soil boring samples to undergo geotechnical laboratory testing include two (2) soil
                samples from each site. One (1) soil sample will be collected at the bottom elevation of


                                                                                                                                        3

Source page 272

August 19, 2021
                                                                                               KLEINFELDER
Town of Canton -                                                                                      Bright People. Right Solutions.

CWSRF Memorial Field Green Infrastructure and Flood Mitigation Planning PEF


               the proposed infiltration BMP, and one (1) soil sample will be collected at the bottom of
               the soil boring.

           •   Upon completion of groundwater monitoring well installation, Kleinfelder will develop
               the monitoring well in preparation for hydraulic conductivitytesting.

           s   Kleinfelder will utilize the monitoring wells to perform Slug Testing in accordance with
               ASTM D4044, to determine the hydraulic conductivity at each groundwater monitoring
               well location.
           ®   Prepare soil boring logs and monitoring well construction logs.
Geotechnical LaboratoryTesting
Geotechnical laboratory testing will include thefollowing:
                    o      Particle size analysis (ASTM D422)
                    o      Soil Porosity (ASTM D4404)
                    o      Water Content (ASTM D2216)
                    o      Textural Classification (USDA)
 Note: Kleinfelder will review databases maintained by state and federal agencies for information on
 releases of oil or hazardous materials (OHM) that could potentially impact environmental conditions
 in the project area. This program does not include provision for environmental sampling and analysis
 of soils. Results of the research will be incorporated in the deliverable noted below.

 Task 3B - Selected Site Evaluation
 This site evaluation will focus on assessment of the selected sites, as determined under Task 3A. The
 site evaluation will incorporate the following fieldwork and geotechnical soiltesting:

 Field Work

           0   A total of five (5) test pits will be performed at the site. (One test per 15,000 square feet
               of proposed infiltration BMP).

           •   All five (5) test pits will be excavated to a maximum depth of 10-feet below ground
               surface, or until bedrock or fully saturated conditions areencountered.

           •   Kleinfelder will record test pitting activities, and soil description in a test pit log for each
               test pit.

           ®   Hydraulic conductivity testing will be conducted at each of the test pit locations.
               Hydraulic conductivity rates will be determined at the bottom elevation of the proposed
               stormwater infiltration BMP, which is approximately 5-foot below ground surface. Field
               test methods to assess hydraulic conductivity will follow ASTM D5126-
               90 (2004) Standard Guide for Comparison of Field Methods for Determining Hydraulic
               Conductivity in the Vadose Zone. Kleinfelder will utilize Compact Constant Head
               Permeameter- (Amoozegar 1992) to perform thistest.
Geotechnical LaboratoryTesting
Geotechnical laboratory testing will be performed on soil samples collected at each location; a hydraulic
conductivity test will be performed during the test pitting activities.
 Task 3b Deliverables
     •   Technical Memorandum summarizingfindings from Tasks 3a and 3b.


                                                                                                                       4

Source page 273

August 19, 2021
                                                                                           KLEINFELDER
Town of Canton -                                                                                    Bright People. Right Solutions.

CWSRF Memorial Field Green Infrastructure and Flood Mitigation Planning PEF




Task 3c - Groundwater Mounding Analysis
Prior to conducting the mounding analysis, Kleinfelder will estimate basement elevation of the
surrounding neighborhood utilizing Canton GIS Contour elevation and field observation of estimated
First floor Elevation. A groundwater computer model using the Hantush method will be developed by
Kleinfelder. This model will be capable of calculating the height of a groundwater mound model
resulting from the infiltration of a single storm water event. The goal of the mounding analysis in the
design of the tank is to confirm that the bottom elevation of the tank meets the groundwater
separation requirement in the Massachusetts storm waterguidelines.

 Task 3c Deliverables
   ©   Results of the mounding analysis will be summarized as a technical memorandum, which will be
       included as appendix to the main report.

Task 4 - Alternatives Analysis and Conceptual Layouts
In collaboration with the Town, Kleinfelder will develop several alternatives for flood reduction within
three general categories including green infrastructure, nature-based and/or sub-surface storage
solutions. Kleinfelder will develop up to 4 alternatives using a combination of possible strategies that
will provide site-specific flood reduction benefit as estimated through the refined flood modeling.
Alternative development will include considerations such as site infiltration feasibility, desktop
assessment of potential utility conflicts, site concept grading, sub-surface drainage needs, etc.
Kleinfelder will evaluate the identified alternatives using criteria that consider economics,
environmental and community metrics and priorities, resulting from Town input. Based upon the
evaluation, a recommended alternative will be selected to develop with further detail. For the
recommended alternative, conceptual layout drawings will be developed.

 Task 4 Deliverables
 Alternatives Evaluation Summary (included in Report).
 Conceptual Layout Drawings



Task 5 - Draft and Final Report
 Upon completion of Tasks 1-4, Kleinfelder will provide a draft report presenting desktop analysis
 and conceptual alternatives evaluation for Memorial Field focusing on distributed Gl strategies,
 nature-based solutions and sub-surface storage. The report will include opinion of probable capital
 costs. The report will be provided for Town review and comment prior to publication of the Final
 Report.

 Task 5 Deliverables
 Draft and Final Report.

Task 6 - Project Management / SRF Administration
 Under this task, Kleinfelder will provide project management including quality assurance/quality
 control review, team coordination, schedule and budget monitoring and project progress meetings


                                                                                                                     5

Source page 274

August 19, 2021
                                                                                                   KLEINFELDER
Town of Canton -                                                                                         Bright People. Right Solutions.

CWSRF Memorial Field Green Infrastructure and Flood Mitigation Planning PEF


 (three budgeted) with the Town. KleinfeIder will also lead administration of the SRF funding process,
 including development of the application, communication with SRF throughout the project duration
 and development of reimbursement deliverables.



 Task 6 Deliverables
 Meeting minutes, reporting and reimbursement documentation necessary for SRF funding.



C. Estimated Project Budget
                                          Estimated                         Subconsultants       Estimated
                 Task                    Labor Hours           Labor fee     &E xpenses            Total
                                                           $                $
1- Site Survey                               160                   23,808          29,375    $       53,183
                                                           $
2- Refine Model                              200                   29,760                    $       29,760
                                     F                 F
3- Site Infiltration Feasibility &
                                                           $                $
Site Evaluation                              320                   47,616          26,000    $       73,616
                                                           $
4- Alt Analysis / Concept Layout             300                   44,640                    $       44,640
                                                           $
5 - Draft and Final Report                   160                   23,808                    $       23,808
                                                           $
6- PM/SRF Admin                              180                   26,070                    $       26,070
                                                           $                $
                                            1320                  195,702          55,375    $      251,077




                                                                                                                          6

Source page 275

TOWN OF CANTON
                                FORM B - FISCAL 2024
   WESF                CAPITAL PROJECT / EQUIPMENT REQUEST


 DEPARTMENT:                                              SUBMITTED BY:
                   Public Works                                     Michael Trotta


 PROJECT / EQUIPMENT TITLE:
                        SCAG Windstorm Ride-on Leaf Blower


 TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
                                    $13,000

 DESCRIPTION:
New or current year model SCAG WS23-37B-EFI Ride-on Leaf Blower.




  PURPOSE AND JUSTIFICATION:
This is a new piece of equipment to be used by Forestry and Highway Divisions to increase the
efficiency of season! clean up.




  NEED CLASSIFICATION: (Check all that apply)          Departmental Priority Ranking:
 ___ Required for Safety                                  Please rank this request out of your total
 ___ Required by Law or Mandate                           requests for this year: (#1 as top priority)
   x Improve/Expand Service or Increase Efficiency        _______ 4 (#) OF _______ 10_(#)

 ___ Planned Project or Replacement                    Expected Useful Life: (Check one)
 ___ Unplanned Project or Replacement                  __ 20 or More Yrs ____ 5 to 9 Years
  x New Project/Item (not on last year's 5-Yr. Plan)    x 10 to 19 Years ____3 to 4 Years


 Impact to Dept, Operating Budget: (Check one)          Revenue Impact: (Check one)
 ___ Will Reduce Cost by $____________________         __ Will Produce Addl Revenue by $.__________
  x No Impact                                           x Revenue Neutral (no impact)
 ___ Will Increase Cost by $___________________        __ Will Decrease Revenue by $_____________ _


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

Source page 276

STAND-ON BLOWERS (HTTPS://WWW.SCA



WINDSTORM

A PERFECT STORM
A storm is on the horizon, and it's about Ip blow tough jobs away. Powered by a 37 bp, fuel-injected Briggs Vanguard® BIG BLOCK" engine, the Windstorm® delivers incredible .ground-deanog farce. A a
slanbon design makes maneuvering Ira tight spaces a cinch while its ism^frd:irecli9na.l sir output aims airflow exactly where it's needed-

Source page 277

Invoice Estimate                                                  446974
                                                                           Thank you for the opportunity io provide you with this estimate. We know your
                                                                           time is valuable and appreciate you visiting with us. Our price always includes
                                                                           complete set up and comprehensive demonstration. Pricing subject to
     POWER EQUIPMENT                              INC,                     change.
                       W * 1O880CM M-WIW » 7«J-W-3iW

                               Bill To                                                                       Ship To
             CANTON DPW
             801 WASHINGTON ST
             BILL WALSH
             Canton, MA 02021-2576

   Customer              Contact              Customer Tax Number          Phone            Cell Phone             Transaction          PO Number
   40629             Steve Schoiniere        046-001-105               (781) 821-5025     (781) 424-6098            Estimate
  Counter Person        Sales Person         Date Printed      Reference                       Email Address        .                   Department
     Bill Smith           Bill Smith           10/28/22         446974                 wwa!sh@town.canton.ma.us                           Default
         Model              Line        Description                        Ordered     B/O'd Shipped           List            Net          Amount
     WS23-37BV-EFI          SCQ        Windstorm stnd-on blower 37hp EFI          1                  1 $13,381.00 $10,704.80           $10,704.80
                                       V.G.

                           Wholegoods Notes
                           Scag Windstorm ride on blower, 37hp VanGuard electric start EFi engine, remote PTO
                           fan engagement, remote controled multi-directional chute with no power toss, separate
                           wheel drive pumps and motors. Scag built dependability.
     Note
     TH ANK YOU FOR THE OPPORTUNITY TO PRESENT YOU WITH THIS QUOTE. PLEASE CALL US
     WITH ANY QUESTIONS YOU MAY HAVE REGARDING THIS PROPOSAL.

                                                                                                                   Invoice Total       $10,704.80
                                                                                                                        Sales Tax            $0.00

                                                                                                                   Grand Total         $10,704,80
                                                                                                               + <EU1ZB%> + ZtWAfc




This estimate is valid for 30 days from issue. Delivery of this equipment is available for and additional fee. Please follow
manufacturers safety and maintenance procedures. Pricing subject to change.           Thank you for your business !
Notes:



                                                                !■
Stewart's Power Equipment, Inc Invoice Estimate # 446974 - CANTON DPW
                                                                                       Customer acknowledges receipt thereof:




                                                                                                                                     Page     1 of 1

Source page 278

TOWN OF CANTON
   gteagl                       FORM B - FISCAL 2024
   W|MF                CAPITAL PROJECT / EQUIPMENT REQUEST


  DEPARTMENT:                                              SUBMITTED BY:
                   Public Works                                      Michael Trotta


 PROJECT / EQUIPMENT TITLE:
                                     Flail Arm/Boom Arm Mower


 TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000h
                                       TBD

 DESCRIPTION:
New or current year model Flail Arm attachment for Multihog CX 75 Heavy Duty Tractor.




  PURPOSE AND JUSTIFICATION:
The Multihog Heavey Duty Tractor and attachments were approved at ATM 22 for FY 23.
Supply issues forced an increase in price for the machine. In order to fit project budget the
Flail Arm Mower was cut from the package. This request is for funding to purchase the arm in
FY 24.




 NEED CLASSIFICATION: (Check a!! that apply)           Departmental Priority Ranking:
 ___ Required for Safety                                  Please rank this request out of your total
 ___ Required by Law or Mandate                           requests for this year: (#1 as top priority)
 ___ Improve/Expand Service or Increase Efficiency        _______ 5 (#) OF _______ 10_(#)

 x Planned Project or Replacement                      Expected Useful Life: (Check one)
___ Unplanned Project or Replacement                   __ 20 or More Yrs ____ 5 to 9 Years
___ New Project/Item (not on last year's 5-Yr. Plan)    x 10 to 19 Years ___ 3 to 4 Years


 Impact to Dept. Operating Budget: (Check one)          Revenue Impact: (Check one)
___ Will Reduce Cost by $_____________________         __ Will Produce Addl Revenue by $__________
  x No Impact                                           x Revenue Neutral (no impact)
___ Will Increase Cost by $___________________         __ Will Decrease Revenue by $_____________


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

Source page 279

Multihnog          One Machine - One Driver - Endless Applications

Flail Arm/Boom Arm Mower
KBM 350

e The KBM 350 flail or boom arm mower is designed specifically for small tractors and is ideal for
the Multihog CX range

e Designed for mowing of grass on embankments and verges along the highway

e ~The arm is front-mounted on the Multihog and is hydraulically driven

e@ Compact design means the arm folds up in front of the Multihog for easy transport
e Easy operation whilst mowing via joystick located within the operator cabin

e The arm is equipped with a flail mower head as standard, however other additional accessories
are available including sign washer, hedgecutter, weed brush and ditch cleaner

e Reach of the KBM 350 arm is 3.5 metres (11.5 ft)
e Clear view during transport - width when folded in front of the Multihog is 1.65 metres (5.4 ft)
e = Arm can work on the left and right of the Multihog

e Swivel angle of the arm is 270°

Due to our policy of continuous improvement, specifications may change sub:   to publication of this sheet.

Multihog Limited, IDA Finnabair Business Park, Dundalk, Co. Louth, Ireland | Tel: +353 42 9386738 | Email: info@multihog.com                                        g = 2   www.multi ho g.com

Source page 280

TOWN OF CANTON
                                 FORM B - FISCAL 2024
   WEpF                 CAPITAL PROJECT / EQUIPMENT REQUEST


 DEPARTMENT:                                                SUBMITTED BY:
                    Public Works                                      Michael Trotta


 PROJECT / EQUIPMENT TITLE:
                                                 Truck 14


 TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
                                       TBD

 DESCRIPTION:
Replace Truck No. 14 a 2006 Ford F-250 Pick-up with a new or current model year Ford Super
Duty F-350 4WD truck equipped with a Flat Bed Body and 8 foot snow plow assembly.




  PURPOSE AND JUSTIFICATION:
Truck No. 14 is a Highway Division everyday vehicle. It is used to carry equipment and
supplies to the job site. It is 14 years old with 100,000 plus miles of use. The recommended
replacement cycle for this type of public works vehicle is 8 years / 100,000 miles.




 NEED CLASSIFICATION: (Check all that apply)            Departmental Priority Ranking:
 ___ Required for Safety                                    Please rank this request out of your total
 ___ Required by Law or Mandate                             requests for this year: (#1 as top priority)
 ___ Improve/Expand Service or Increase Efficiency          _______ 6 (#) OF _______ 10 (#)

  x Planned Project or Replacement                      Expected Useful Life: (Check one)
 ___ Unplanned Project or Replacement                   __ 20 or More Yrs   x 5 to 9 Years
 ___ New Project/Item (not on last year's 5-Yr. Plan)   __ 10 to 19 Years ____ 3 to 4 Years


  Impact to Dept, Operating Budget: (Check one)          Revenue Impact: (Check one)
 ___ Will Reduce Cost by $____________________          __ Will Produce Addl Revenue by $__________
   x No Impact                                           x Revenue Neutral (no impact)
 ___ Will Increase Cost by $___________________         __ Will Decrease Revenue by $____________ _


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

Source page 281

TOWN OF CANTON
                                    FORM B - FISCAL 2024
   WSt                 CAPITAL PROJECT / EQUIPMENT REQUEST

 DEPARTMENT:                                              SUBMITTED BY:
                   Public Works                                     Michael Trotta


 PROJECT / EQUIPMENT TITLE:
                                     Pleasant Circle Storm Drain


 TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
                                    $270,000

  DESCRIPTION:
Design and construct 18" RCP Storm Drain and appurtenances in the vicinity of 72 Pleasant
Cir.




  PURPOSE AND JUSTIFICATION:
Storm water is running from upland lots, from Pleasant Cir. road surface, flooding #72,
eroding lawn and plantings, discharging into Reservoir Pond. The run-off and discharge does
not meet EPA and MA DEP storm water discharge standards. The new 18" drain will control
the run-off, pass the run-off through a water quality structure before discharge into Reservoir
Pond. The treated run-off will help the Town meet its MS4 permit requirements.




 NEED CLASSIFICATION: (Check all that apply)           Departmental Priority Ranking:
 ___ Required for Safety                                  Please rank this request out of your total
 ___ Required by Law or Mandate                           requests for this year: (#1 as top priority)
 ___ Improve/Expand Service or Increase Efficiency        _______ 7 (#) OF _______ 10_(#)

 ___ Planned Project or Replacement                    Expected Useful Life: (Check one)
 ___ Unplanned Project or Replacement                  x 20 or More Yrs      5 to 9 Years
  x New Project/Item (not on last year's 5-Yr. Plan)   __ 10 to 19 Years       3 to 4 Years


  Impact to Dept. Operating Budget: (Check one)         Revenue Impact: (Check one)
 ___ Will Reduce Cost by $____________________         __ Will Produce Addl Revenue by $__________
   x No Impact                                          x Revenue Neutral (no impact)
 ___ Will Increase Cost by $___________________        __ Will Decrease Revenue by $_____________


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)