FY15 School Capital Requests
Saved text from 134 source pages. Transcription and OCR may contain errors; verify figures and wording against the original. Retrieved 2026-10-15.
Source page 121
NOLLYAD1A .I.SV2
CI-1E0( IDA70 REVISIONS 1 DATE
CLASSROOM ADDITION or- MPG I , ROY S. BROWN ARCHITECTS
LT. PETER M. HANSEN ELEMENTARY SCHOOL
25 PECUNIT STREET L 85 CHILSON ROAD
WILBRAHAM, MA 0 I 095
CANTON, MA 02021 010.10Cr No. `,V;7 g!
3-
4 I 3.595.2300
FAX 4 I 3,590.2300
COPYING WIMOUT WRITTEN PERM155:0N 51131ECT TO LAWFOL PROSECIITIGNSource page 122
u 6-74/-/ L)e,6
TOWN OF CANTON
FORM B - FISCAL-201-9-2-0%6-
CAPITAL PROJECT / EQUIPMENT REQUEST
DEPARTMENT: SUBMITTED BY:
Facilities Department Ken Leon/Brian Lynch
PROJECT / EQUIPMENT TITLE:
ROOF REPLACEMENT-LUCE SCHOOL
TOTAL PROJECT / EQUIPMENT COST:
$287,734
DESCRIPTION:
Replace roof sections as per Updated Roof Evaluation Report
PURPOSE AND JUSTIFICATION:
See attached
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking:
Required for Safety Please rank this request out of your total
Required by Law or Mandate requests for this year: (#1 as top priority)
Improve/Expand Service or Increase Efficiency (#) OF (#)
x Planned Project or Replacement Expected Useful Life: (Check one)
Unplanned Project or Replacement X 20 or More Yrs 5 to 9 Years
New Project/Item (not on last year's 5-Yr. Plan) 10 to 19 Years 3 to 4 Years
Impact to Dept Operating Budget: (Check one) Revenue Impact: (Check one)
Will Reduce Cost by $ Will Produce Addl Revenue by $
No Impact Revenue Neutral (no impact)
Will Increase Cost by $ Will Decrease Revenue by $
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
FORM B - FISCAL 2016Source page 123
TOWN OF CANTON
FORM B - FISCAL 2016
CAPITAL PROJECT / EQUIPMENT REQUEST
DEPARTMENT: SUBMITTED BY:
Facilities Department Ken Leon/Brian Lynch
PROJECT / EQUIPMENT TITLE:
ROOF REPLACEMENT-HANSEN SCHOOL
TOTAL PROJECT / EQUIPMENT COST:
$1,132,288
DESCRIPTION:
Replace roof sections as per Updated Roof Evaluation Report
PURPOSE AND JUSTIFICATION:
See attached
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking:
Required for Safety Please rank this request out of your total
Required by Law or Mandate requests for this year: (#1 as top priority)
Improve/Expand Service or Increase Efficiency (#) OF (#)
x Planned Project or Replacement Expected Useful Life: (Check one)
Unplanned Project or Replacement X 20 or More Yrs 5 to 9 Years
New Project/Item (not on last year's 5-Yr. Plan) 10 to 19 Years 3 to 4 Years
Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
Will Reduce Cost by $ Will Produce Addl Revenue by $
No Impact Revenue Neutral (no impact)
Will Increase Cost by $ Will Decrease Revenue by $
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
FORM B - FISCAL 2016Source page 124
L 41/J q / c-/2 _ _ 4:5r
TOWN OF CANTON
FORM B - FISCAL 2018
CAPITAL PROJECT / EQUIPMENT REQUEST
DEPARTMENT: SUBMITTED BY:
Facilities Department Ken Leon/Brian Lynch
PROJECT / EQUIPMENT TITLE:
ROOF REPLACEMENT-HANSEN SCHOOL MODULARS
TOTAL PROJECT / EQUIPMENT COST:
$128,325
DESCRIPTION:
Replace roof sections as per Updated Roof Evaluation Report
PURPOSE AND JUSTIFICATION:
See attached
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking:
Required for Safety Please rank this request out of your total
Required by Law or Mandate requests for this year: (#1 as top priority)
Improve/Expand Service or Increase Efficiency (#) OF (#)
x Planned Project or Replacement Expected Useful Life: (Check one)
Unplanned Project or Replacement X20 or More Yrs 5 to 9 Years
New Project/Item (not on last year's 5-Yr. Plan) 10 to 19 Years 3 to 4 Years
Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
Will Reduce Cost by $ Will Produce Addl Revenue by $
No Impact Revenue Neutral (no impact)
Will Increase Cost by $ Will Decrease Revenue by $
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
FORM B - FISCAL 2016Source page 125
TOWN OF CANTON
FORM B - FISCAL 2018
CAPITAL PROJECT / EQUIPMENT REQUEST
DEPARTMENT: SUBMITTED BY:
Facilities Department Ken Leon/Brian Lynch
PROJECT / EQUIPMENT TITLE:
ROOF REPLACEMENT-GALVIN SCHOOL MODULARS
TOTAL PROJECT / EQUIPMENT COST:
$51,793
DESCRIPTION:
Replace roof sections as per Updated Roof Evaluation Report
PURPOSE AND JUSTIFICATION:
See attached
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking:
Required for Safety Please rank this request out of your total
Required by Law or Mandate requests for this year: (#1 as top priority)
Improve/Expand Service or Increase Efficiency (#) OF (#)
x Planned Project or Replacement Expected Useful Life: (Check one)
Unplanned Project or Replacement X 20 or More Yrs 5 to 9 Years
New Project/Item (not on last year's 5-Yr. Plan) 10 to 19 Years 3 to 4 Years
Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
Will Reduce Cost by $ Will Produce Addl Revenue by $
No Impact Revenue Neutral (no impact)
Will Increase Cost by $ Will Decrease Revenue by $
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
FORM B - FISCAL 2016Source page 126
BARR
All ES
Russo Barr Associates, Inc.
33 Center Street, 2nd Hoar
Burlington, MA 01803
781-273-1537 tel
781-273-1695 fax
September 30, 2013
Mr. Kenneth Leon
Business Administrator
Canton Public Schools
960 Washington Street
Canton, MA 02021
Re: Update Roof Evaluation Report Project
Canton Public Schools
RBA Project No. 2014051.00
Mr. Leon:
We have prepared this updated roof condition summary report that focuses on the longevity of
existing roof systems, the approximate year of anticipated replacement and the estimated
construction costs for the roof replacement projects. We have attempted to anticipate roof
replacements for a 10 year period. The buildings included in this report are:
1. Galvin School
2. Hansen School
3. High School
4. Kennedy School
5. Luce School
6. Rodman Center
This report is based upon previous roof condition surveys, the roof manufacturer's (Sarnafil) roof
warranty files and current observations of the buildings. This report includes a Summary of
Roof Conditions, Schematic Roof Plans and a Spreadsheet of Recommended Roof
Replacements.
We have projected the dates of anticipated roof replacement(s) based upon the known ages
and conditions of exiting roof systems and an estimated longevity of 25 years for adhered
Sarnafil PVC roof systems. We have prepared spreadsheets of the many roof systems and
have projected the year of anticipated replacement. The estimated costs of construction listed
have been adjusted for yearly 4% inflation increases.
Schematic roof plans are included that indicate areas of roofs that were recently replaced and
the related warranty information.
We trust this information will be a valuable tool for budgeting for roof replacement and repair
operations. If you have any questions or comments please call.
Sincerely,
eZe,44
Michael J. Flaherty RC
Senior Project Manager
Enclosures
Building Envelope Consulting EngineersSource page 127
Russo Barr Associates, Inc.
33 Center Street, 2" Floor
Burlington, MA 01803
781-273-1537 tel
781-273-1695 fax
SUMMARY OF ROOF CONDITIONS
LUCE SCHOOL
Canton, MA
September 30, 2013
RBA Project No: 20130519.00
Total Roof Area: 70,807 SF
Roofs completed since 2011: Roof Areas F & G — Classrooms
19,851 SF
MDM Engineering in 2011
Sarnafil Warranty No: 0184740109-184309.1
Expires: 8/25/29
Remaining roofs:
Roof Areas A, C and E; 11,370 SF, 19 year old adhered Sarnafil PVC. Warranty expired.
Replacement projected for 2019 @ $287,734*.
Roof Areas B, D, H, I, J and K were replaced during a building expansion in approximately
2002. We have no information on current warranties.
There is relatively minor work that should be performed prior to roof replacement. This work
should include replacement of one roof drain strainer on Roof B. The anticipated cost for drain
strainer replacement is $400.
Fasteners have come loose at Roof A and one seam at a skylight enclosure is failing. No leaks
were reported. Repair may be delayed until the roofs are replaced ion 2019.
There is no current warranty on Sarnafil roofs associated with the 2002 expansion. The Owner
may wish to research their records for a final determination of roof warranties.
* Estimated construction cost in dollars of year of replacement.
Building Envelope Consulting EngineersSource page 128
RUSSO BA
ASSOC
RR
A/T E S
Russo Barr Associates, Inc.
33 Center Street, 2nd Floor
Burlington, MA 01803
781-273-1537 tel
781-273-1695 fax
SUMMARY OF ROOF CONDITIONS
HANSEN SCHOOL
Canton, MA
September 30, 2013
RBA Project No: 20130519.00
Total Roof Area: 63,800 SF
Roofs completed since 2004: Roof Areas A & B — Cafeteria and Loading Dock
8,200 SF
Wayne Roofing in 2004
Sarnafil Warranty No: 0185180504-174004.2
Expires: 11/1/24
Remaining roofs:
Roof Areas C, D, E, F, G and H, 50,330 SF, 22 year old adhered Sarnafil PVC. Warranty
expired. Replacement projected for 2016 @ $1,132,288*.
Modular Classroom Roof Area, 5,270 SF, +/- 15 year old adhered EPDM. Warranty expired.
Replacement projected for 2018 @ $128,235*.
There is relatively minor work that should be performed prior to roof replacement. This work
should include termination of base flashings on Roof F, securement of one loose gutter at the
modular classrooms and trimming of trees north of Roof B. The anticipated cost for roof repairs
(excluding tree trimming) is $2,000.
* Estimated construction cost in dollars of year of replacement
4_ Building Envelope Consulting EngineersSource page 129
BAliRs Russo Barr Associates, Inc.
33 Center Street, 2" Floor
Burlington, MA 01803
781-273-1537 tel
781-273-1695 fax
SUMMARY OF ROOF CONDITIONS
GALVIN SCHOOL
Canton, MA
September 31, 2013
RBA Project No: 2013051.00
Total Roof Area: 62,365 SF
Roofs completed since 2008: Roof Area C — Gymnasium
10,240 SF
Rockwell Roofing in 2008
Sarnafil Warranty No: 0184990308-173808.1
Expires: 7/31/28
Remaining roofs:
46,900 SF, 16 year old Sarnafil PVC on Roofs A, B, D, E, F and G. Warranty expired.
Replacement projected for 2022 @ $1,562,512*.
2,365 SF, 15 year old EPDM roof on modular classrooms. No warranty. Replacement
projected for 2018 @ $51,793*.
* Estimated construction cost in dollars of year of replacement
Note that Roof Areas A, B and C are essentially covered with photovoltaic solar panels. The
cost of panel management has been carried in the replacement cost of Roofs A & B.
Building Envelope Consulting EngineersSource page 130
BARR
ES
Russo Barr Associates, Inc.
33 Center Street, 2nd Floor
Burlington, MA 01803
VIES
781-273-1537 tel
781-273-1695 fax
SUMMARY OF ROOF CONDITIONS
CANTON HIGH SCHOOL
Canton, MA
September 30, 2013
RBA Project No: 2013051.00
Total Roof Area: 160,400 SF
Roofs completed since 2004: Roof Areas I through LL
123,000 SF
Stanley Roofing in 2003
Sarnafil Warranty No: 0185070403-134606.1
Expires: 8/31/21
(These roofs were replaced during the school expansion in
2003.)
Roof Areas A through H
37,400 SF
SOM Roofing in 2011
Sarnafil Warranty No: 04780-295511.1
Expires: 11/7/26
Remaining roofs: None
Note that Roof Areas F, L, I, Y, Z, AA, CC and DD are essentially covered with photovoltaic
solar panels.
A number of roof related issues were noted including:
• Detached lightning protection systems (4 locations).
• Loose access ladders (3 locations).
• Deteriorated mortar and sealant joints at the west end of Roof EE.
• Failed seals at lightning ground cable penetrations (2 locations).
• 1 missing downspout.
• 1 electric control box resting on the roof.
• Electric wires once rested on wood supports and were covered with PVC covers on Roof
C. The covers and were removed and the wood supports dispersed. The covers now
rest on Roof U.
The estimated cost to address the above issues is $10,000 to $15,000.
Building Envelope Consulting EngineersSource page 131
I'ljnY BARR
Russo Barr Associates, Inc.
33 Center Street, 2nd Floor
AT ES Burlington, MA 01803
781-273-1537 tel
781-273-1695 fax
SUMMARY OF ROOF CONDITIONS
KENNEDY SCHOOL
Canton, MA
September 30, 2013
RBA Project No.: 2013051.00
Total Roof Area: 40,800 SF
Roofs completed since 2004: Majority of roofs
38,213 SF
Wayne Roofing in 2004
Sarnafil Warranty No: 0185180404-173804.1
Expires: 11/1/24
Elevator and Classroom additions
2,587 SF
The elevator was added in approximately 2005 and a
2,250 SF addition was built in 2012. We have no
information on current warranties for these roofs
Remaining roofs: None
Roof Areas J and K are Sarnafil roof systems but no current warranty exists. The Owner may
wish to research their records for a final determination of roof warranties.
There is one (1) delaminated PVC [patch n Roof AA that should be covered under the current
Sarnafil warranty.
Building Envelope Consulting EngineersSource page 132
RUSSO
ASSOC
BARR
A / TES
Russo Barr Associates, Inc.
33 Center Street, 2nd Floor
Burlington, MA 01803
781-273-1537 tel
781-273-1695 fax
SUMMARY OF ROOF CONDITIONS
RODMAN CENTER
Canton, MA
September 30, 2013
RBA Project No: 2013051.00
Total Roof Area: 21,750 SF
Roofs completed since 2011: All Roof Areas
21,750 SF
SOM Roofing in 2011
Sarnafil Warranty No: 04780-295511.1
Expires: 11/7/26
There is relatively minor work that should be performed prior to roof replacement. This work
should replacement of one roof drain clamping ring on Roof A2. The anticipated cost for this
work is $500.
Building Envelope Consulting EngineersSource page 133
-7.411(2/.1-e-e
TOWN OF CANTON
FORM B - FISCAL f- --
CAPITAL PROJECT / EQUIPMENT REQUEST
DEPARTMENT: SUBMITTED BY:
Athletic Department Danny Erickson, Athletic Director
PROJECT / EQUIPMENT TITLE:
Memorial Field Walkway and Traffic Flow Project
TOTAL PROJECT / EQUIPMENT COST:
$71,269
DESCRIPTION:
Creation of a walkway from the lower lot to the Veteran's Memorial Field lot....Creation of a
"cut-out" for drop offs at Veteran's Memorial field....Engineering improvements which limits
access to vehicles in the Veteran's Memorial Field lot. Signage and pavement painting
improvements to create better auto traffic flow, pedestrian traffic flow and parking.
PURPOSE AND JUSTIFICATION:
The existing layout of both the road and the lot at Veteran's Memorial Field is unsafe,
unpractical and not efficient. Pedestrians and automobiles share the same space for accessing
the parking lots and the fields. On any given game day, you can find a parking disaster in the
Veteran's Memorial Field lot. It is only a matter of time before a serious accident occurs.
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking:
X Required for Safety Please rank this request out of your total
Required by Law or Mandate requests for this year:- (#1 as top priority)
X Improve/Expand Service or Increase Efficiency zi (#) OF .5 (#)
Planned Project or Replacement Expected Useful Life: (Check one)
X Unplanned Project or Replacement x 20 or More Yrs 5 to 9 Years
X New Project/Item (not on last year's 5-Yr. Plan) 10 to 19 Years 3 to 4 Years
Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
x Will Reduce Cost by $ about $1,000 Will Produce Addl Revenue by $
No Impact Revenue Neutral (no impact)
Will Increase Cost by $ Will Decrease Revenue by $
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
FORMS - FISCAL 2014Source page 134
TOWN OF CANTON
FORM B - FISCAL 2015
CAPITAL PROJECT I. EQUIPMENT REQUEST
DEPARTMENT: SUBMITTED BY:
Athletic Department Danny Erickson, Athletic Director
PROJECT / EQUIPMENT TITLE:
Field Turf replacement and Track resurfacing Project
TOTAL PROJECT / EQUIPMENT COST:
$750,000
DESCRIPTION:
Replacement of existing turf surface at WWII Veteran's Memorial Field. Resurfacing and
restriping of the George King Track at Memorial Field.
PURPOSE AND JUSTIFICATION:
the turf field is now in its 8th year of use. The life expectancy of such fields is about 10-12
years. We will need to replace as the fibers are starting to show significant wear. The
rubberized track also has a 10 year life expectancy and must be resurfaced. We need to get
this project in the capital discussion. It should be noted that the field has been maintained
regularly and up to industry standards.
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking:
X Required for Safety Please rank this request out of your total
Required by Law or Mandate requests for this year: (#1 as top priority)
Improve/Expand Service or Increase Efficiency (#) OF (#)
X Planned Project or Replacement Expected Useful Life: (Check one)
Unplanned Project or Replacement 20 or More Yrs 5 to 9 Years
New Project/Item (not on last year's 5-Yr. Plan) x 10 to 19 Years 3 to 4 Years
Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
x Will Reduce Cost by $ Will Produce Addl Revenue by $
No Impact x Revenue Neutral (no impact)
Will Increase Cost by $ Will Decrease Revenue by $
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
ae attached.
FORM B - FISCAL 2014