Source page 163

PI-51

                                          TOWN OF CANTON
                                        FORM B -FISCAL 2021
                          CAPITAL PROJECT /EQUIPMENT REQUEST

 DEPARTMENT: Athletics                                           SUBMITTED BY: Danny Erickson




 PROJECT / EOUiPMENT TITLE: Side basketball backboard systems




 TOTAL PROJECT /EQUIPMENT COST (must be at least $5,000): $44,127



 DESCRIPTION: Replace and update the six side-baskets in the Masciarelli Gymnasium. It would
                    replace the 6 fiberglass backboards and mounting systems with glass backboards
                    and new, modern systems for all 3 of the mini-courts that run perpendicular to the
                    main court.



PURPOSE, JUSTIFICATION AND SUPPORT FOR STRATEGIC FRAMEWORK:
(Attach additional pages if necessary)
The existing backboard systems are original to the CHS renovation project of 2002. Since the installation of
the existing side backboard systems, we have dealt with issues. These low-end fiberglass systems are
falling apart. They were not meant to last more than 10-15 years. More importantly, the mounting system
which lowers and raises the height of the hoops, is now obsolete and our maintenance dept. has been unable
to locate replacement parts. From this point on, as they fail, we will be unable to repair. It meets the Strategic
Framework #4- Achieving District Excellence- by developing state-of-the-art operational system.


NEED CLASSIFICATION:(Check a// that apply)                   Departmental Priority Ranking:
~✓ Required for Safety                                         Please rank this request out of your total
Q Required by Law or Mandate                                   requests for this year: (#1 as top priority)
~✓ Improve/Expand Service or Increase Efficiency               s         (#) OF s               (#)

Q Planned Project or Replacement                              Expected Useful Life: (Check one)
✓ Unplanned Project or Replacement
0                                                            ~✓ 20 or More Yrs Q 5 to 9 Years
✓ New Project/Item (not on last year's 5-Yr. Plan)
Q                                                            Q 10 to 19 Years 03 to 4 Years


Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
0Will Reduce Cost by $                        Q Will Produce Addl Revenue by $
0✓ No Impact                                  ~✓ Revenue Neutral (no impact)
Q Will Increase Cost by $                     Q Wil l Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
We have a basketball program that defines excellence and our side-backboard systems are not of
that level. They are poor and in serious disrepair. It is also important to note that these backboards
are used by the entire youth community of Canton, not just CHS basketball teams. See Attached
Quote.

Source page 164

PI-52




                                      ~~        ~


              N~tTiONA~ EQfJIPMENT ~ F~►CI~iTY SOLUTIONS

Canton Higb School                               Quote #:   51619
900 Washington Street                            Date;      5/16/19
Canton, MA 02021                                 Page       1 of 2


District Sales Office:        Rick Perras
                              166 Masons Island Road
                              Mystic, CT 06355
                              Mobile: 203-232-3041
                              Email: rickp@nefacsales.com

WE ARE PLEASED TO QUOTE THE FOLLOWING: Backsto Re lacemen


To:     Danny Erickson
        781-821-5050 ext. 2111
        ericksond ct,cantoruna.ora




Basketball Equipment

      6 Jaypro Front Braced, Forward Fold Basketball Backstop- Model #849-FFFB
           • Electric Winch with Key Switch-1 HP, 115 Volt, Single Phase Motor
           • 72" x 42" Rectangular Glass Backboard -Direct Attachment
           • Electric Height Adjuster w/ Key Switch
           • Posilok Safety Belt
           • Breakaway No-Tie Goal with Nylon Net
           • Bolt On Edge Padding

Total Furnished and Installed................... $44,127.00
**includes dismantle and disposal of 6 existing backstops**

Source page 165

PI-53




Qualifications

1.      Sales Taxes and all Bonds are not included.
2.      Liquidated Damages are not included
3.      All electrical wiring, both high and low voltage, and conduit by others
4.      LEED certificates not available
5.      Service to be performed during normal work hours and full access to gym

        Notes:
                 Any special insurance endorsements as required by contract will be
                 provided at additional charge.
                 Above cost is based on one shipment of all materials

       Insurance limits are $2 million, There is an add of $4,500 to $5 million.
     ➢ Quote Valid for 30 Days from above date.

Terms: Standard Payment Terms Net 30 days with approved credit application. On
              orders requiring multiple shipments or installation services, progress
              payments are required.

Lead Time: Approximately 6-S weeks after approvals and field check.
Labor: Open Shop Wages

Acceptance of Proposal The above prices, specifications and conditions are
satisfactory and accepted. You are authorized to provide all items as described above.

Date of acceptance:

Signature:

Company:

P.O. Number:

(Please include a physical copy of the purchase order for our records)

Source page 166

PI-54

                                           TOWN OF CANTON
                                         FORM B -FISCAL 2021
                           CAPITAL PROJECT /EQUIPMENT REQUEST

 DEPARTMENT: Performing Arts                                       SUBMITTED BY: Catherine Eckersley




 PROJECT /EQUIPMENT TITLE: CHS/District Auditorium Updates




 TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000): $77,359



 D ESCRIPTION: This capital proposal outlays proposed budget items to update the Auditorium
                    facility.




PURPOSE, JUSTIFICATION AND SUPPORT FOR STRATEGIC FRAMEWORK:
(Attach additional pa4es if necessary)
The auditorium is a space that is constantly being used by the school and community. There is one remaining priority
concern for the Auditorium: lighting. The attached lighting quote includes equipment that is needed to switch the
stage lights to LED lights which have many more features, last much longer, cost less to upkeep, and offer a high
technology to the stage lighting. This proposal is in support of Long term strategic objective 4, achieving district
excellence in completing facilities that not only support but inspire widespread transformation in student learning.
Students distict-wide would benefit from this facilities update. Theater tech classes will learn how to use this new
equipment and students and the community will have a high quality space to display student success and work.


NEED CLASSIFICATION:(Check a// that app/y)                     Departmental Priority Ranking:
0Required for Safety                                             P/ease rank this request out of your total
0Required by Law or Mandate                                      requests for this year:(#1 as top priority)
~✓ Improve/Expand Service or Increase Efficiency                 z         (#) OF z               (#)

✓ Planned Project or Replacement
Q                                                              Expected Useful Life: (Check one)
Q Unplanned Project or Replacement                            020 or More Yrs Q 5 to 9 Years
Q New Project/Item (not on last year's 5-Yr. Plan)            0✓ 10 to 19 Years Q 3 to 4 Years


Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
~ Will Reduce Cost by $                       Q✓ Will Produce Addl Revenue by $ ~seebelow
~✓ No Impact                                  ~✓ Revenue Neutral (no impact)
Q Wil l Increase Cost by $                   0Wi l l Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
 Items can be updated as a whole or over time. Please see attached quote.

*has potential to increase revenue due to updated quality of performances

Source page 167

4Wall Entertainment, Inc.                             QUOTE #SAL 181950-1 P~_55
                     125 Shawmut Rd.
                     Canton, MA 02021                               JOB CREATE DATE: JUN 15 18 10:19AM
                                                                            QUOTE #: SAL 181950-1
                         Remit to•                                   START/DEL DATE: JUN 15 18
                     ~   4Wall Entertainment, Inc.                  END/PICK-UP DATE: JUN 15 18
                         1 Carol Place                                      SHIP VIA: Best Way
                         Moonachie, NJ 07074
                                                                         RETURN VIA:


DESCRIPTION/JOB: fighting System

JOB FOR:                                                                     SHIP TO:
Canton High School                                                           Canton High School
900 Washington St                                                            900 Washington St
Canton, MA 02021                                                             Canton, MA 02021
ATTENTION: Anne Grady



Phone: (781) 883-6493                                                        Contact: Ann Grady
Fax:                                                                         Cell:
Email: amgrady42@gmail.com

                                    COD                TAX CODE:TAX EXEMPT          Sales Person: SeifAllah Salotto-...


SALES ITEMS
  Qty             Description                                         Unit Price                                 Total

  9   ColorSouce Par Deep Blue (Black)                                $ 603.75                                $ 5,433.75
 53   ColorSource Spot Light Engine w/ Barrel. Black                $ 1,132.50                               $ 60,022.50
 53   Assorted S4 Lenses                                              $ 131.25                                $ 6,956.25
 56   10' DMX CONTROL CABLE - 5 PIN XLR                                $ 30.70                                $ 1,719.20
 56   10' #12/3 PowerCon Extension Cable                               $ 32.35                                $ 1,811.60
 62   ETC C-Clamp                                                      $ 16.80                                $ 1,041.60
 62   Safety Cable for Figures -Black                                    $ 3.00                                 $ 186.00
  9   ETC D40 Medium Diffuser 7.5" Frame (45 deg)                      $ 21.00                                  $ 189.00
                                                         Sales Items Subtotal                                $ 77,359.90


                                                                           SALE ITEMS TOTAL:                 $77,359.90
                     Quote is valid for 30 days.
                     Shipping is not included.                                           TOTAL:              $77,359.90




 181950-1    Updated on JUN 18 18 at 12:13PM                                                                       Page 1

Source page 168

PI-56

                                           TOWN OF CANTON
                                         FORM B -FISCAL 2021
                          CAPITAL PROJECT /EQUIPMENT REQUEST

 DEPARTMENT: Performing Arts                                       SUBMITTED BY: Catherine Eckersley




 PRO]ECT /EQUIPMENT TITLE: Classroom-Based Instruments (District Wide)




 TOTAL PRO]ECT / EQUIPMENT COST (must be at least $5,000): $3 ,456.00


               Connolly bus company enforces rules of no instruments on the buses that do not fit in a child's lap.
 D ESCRIPTION• As a result, there has been a hardship on many two-income families counting on bus transportation
               for their children. This proposal will allow the school to own instruments to be used in school, while
               the students keep their rented instruments at home. It is absolutely essential that Canton begin to
               prepare for this as the buses become even more crowded, lest we decimate the ensembles of low
               pitched instruments and end up with flute and clarinet choirs and violin only groups.


PURPOSE, JUSTIFICATION AND SUPPORT FOR STRATEGIC FRAMEWORK:
(Attach additional aa4es if necessary)
This supports long term strategic objective 1, achieving educational excellence and ensuring
equity, by eliminating obstacles and barriers to student learning growth. Many families could not
afford to rent 2 instruments one for home, one for school which would have to happen if students
cannot take instruments on the bus and want to play in school ensembles.




NEED CLASSIFICATION:(Check a// that app/y)                     Departmental Priority Ranking:
0Required for Safety                                             Please rank this request out of your total
Q Required by Law or Mandate                                     requests for this year:(#1 as fop priority)
0✓ Improve/Expand Service or Increase Efficiency                  i        (#) OF z               (#)

✓ Planned Project or Replacement
Q                                                               Expected Useful Life: (Check one)
Q Unplanned Project or Replacement                             ~✓ 20 or More Yrs ~ 5 to 9 Years
Q New Project/Item (not on last year's 5-Yr. Plan)             Q 10 to 19 Years Q 3 to 4 Years


Impact to Dept. Oaeratinq Budget: (Check one) Revenue Impact: (Check one)
0Wil l Reduce Cost by $                       Q Wil l Produce Addl Revenue by $
~✓ No  Impact                                 ✓ Revenue Neutral (no impact)
                                              Q
Q✓ Wil l Increase Cost by $'see below         ~ Wil l Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
Please see the attached supporting documentation. The quote from Music &Arts is for purchasing the
entire list in one year, OR purchasing any portion of the list, in any quantities.

*may increase budget due to annual instrument repair

Source page 169

PIa57




M usic &Arts
Shopping Cart
8 Items) - $30,456.00
Your Items
                                                                          Unit Price
                                                                           Quantity
                                                                         Total Price




      J upiter JTU1030M Qualifier Series Convertible BBb Marching Tuba
        • li~r~~ i = 1 X1 1 ~~:~

        • ~onditior~: ~~~:~,~
        • i~t~tit]~: I .i~~~~ ii.~r
      $5,319.00
          2
      Remove
      $10,638.00

Source page 170

PI-58




     ,~.
     ~
 ~~—~—         --




Yamaha YSL~46G Intermediate Trombone
  •_ -

       '..~fi1dlticJ~1: I`deb~~
   ~ i~~tlon: SI:anCl-aril
$1,960.00
   4
Remove
$7,840.00




Sax Dakota SDB1400 Professional Baritone Saxophone
   ~     gill ~ I ~~/=~~,,,
  • i~~lodel # SDI ~ '.~~_
  • t+~~cfifii~n: i`de~~~~
  ~ ~:?~~s~i~n: ~~r,ay Onyx
$5,989.00
   2

Source page 171

PI-59



      Remove
      $1 1,978.00


8 Items) Subtotal $30,456.00
ORDER TOTAL$30,456~0

Source page 172

B                                                            C                 D            E             G
 i Cash Ca ital -Summa                         of Re nests
 z AVAILABLE                                                                                                                              5750,000
 3
                                                                                                                                                        All            Super•
 q CASH CAPITAL                                                                                                       Requestor           Paae #     Requests         Request
 5 P
 6                                                                                                                                         BR -
 7                                                                                                                                         ~~ft-a;
 8                                                                                                                                        BR - 17       S
 9                                                                                                                                        BR~19        51
10                                                                                                                                        BR -30       ~~
11                                                                                                                                        BR -35
12                                                                                                                                        6R-36
13                                                                                                                ~                       8R-37
14                                                                                                                                        BR-39
15                                                                                                                                        a
                                                                                                                                          ,R.,;O
16                                                                                                                                        BR -42        ~;
                                                                                         -                                                                              -
17
18
19                                                                                                                                        6R-43
20                                                                                                                                        B R ~!5
2t
22 ,                                                                                                                                                  $Sd~
23                                                                                                           i~,l    -         ~            IT 1       ~6:
   _                                                  -                          -                           ~~,~ ~,
24                                                                                                                                          IT-3       37,
zs                                                                                                           ,,~ •,                        it io       ~zo
26                   ~                     ~                                                                 `:I ~Alentlan~l               I T-I~       :~ s~            ,.
27                                                                                                           ~~~I ',V~nUanrl               IT-15
za -      -                                                                                                  ,A,I `>>ienUar~1              IT-1d
29            ~~ ~~rn~ i~,             ~                          -                                          ~~,I '~i~l~nUand              IT-21          3'_
30        'n-uUUl. ~l1~'~                      b!c~   ti -.           —                                       i   •~i?CI?i :jhclllllO~l    IT-~S

31
32 Safety ~ Security                                                                                                                                    y6'             S;;
33 -~-~ ~ -mar.l >~~unh~ ',;ii i<ri~~. ~_:;u~iCl-~,`hde                                                      ,~d '~i~;entlan~l             SS-1                         i'
34        ~    ~ I<~in; I lai I~~ ~~Y~ ~: Inlarior Do~~i 4`~/in~l~,~, ,~vei ings Or::hirf-~,Vu_le ~Yeai '!   B ~_ynr,h                     SS.q
35 -j ri~~'niri ~i '.                    ;r~l'r~ S~,vilGhes-DiSIYiC[-''I'~/ide                               ELI ~i`/~ntl-_lnd             ~S-8
36
37 Program Improvement                                                                                                                                S81 ?            5234 9'.
38    =:~~.-5 'IaS~iqulit ~ibiai ~eS-All CleinCl i r,tr/ ~Y,~i I tii .~                                      D Rconay                       PI ~1                       ;'-~
39    ~ '~ ~ ook Rooms-Ail Elemantary Year I of 3i                                                           D h ooney                     PI-1~1
ao        Piolessional Resowces for ~iterai~/ Instiuc:lion-All Elementary i'/?ai I of 3J                     C! F;~oney                    PI.20                        '~
41        L~lar~cy Ass2ssmenl-III Elemenlai~/ iY?ar I of 3~                                                  f~ ~ooney                     P1~28                         i
42    i Soci;al Sludi~s-All Elementary                                                                       D Rooney                      PI-32       '~J6
43      ~-gal Ails - DSLP, Cameras                                                                           P Palmer                      PI~~34      a20              >~~
44        al Alts Display Cases-~3P~15                                                                          Shannon                    ~i-37
45    ~Ilness Shiomebnek Carts-Distnrl-b~/ids                                                                R Gord9                       PI-40
46     i'eybail St<+ndards CHS                                                                               D Ei icks~n                   PI-4~
a~ - nor~al Field .~lorage dilcd~.ile-CHS                                                                    L ~rick;on                    PI-46        "~
48 > >,~etball B,ickbuar~l systems-CHS                                                                       G cricks~~n                   PI-51       34=1
49 - ~ Audilunum Updates-CHS (~l~~ar 31                                                                         Erl<erslev                 PI ~54      i7
50     ~~lacemenl of ~::lassr"urn Based Instiumenis-Dislrlct-~/`/ide                                         C c~k2islcy                   PI-56       ~"tQ,~}5~i       y2
51
5z Furniture &Fixtures                                                                                                                                 568,245          $44,990
53 Stainless Steel Work Tables-District-Wide                                                                 M. Lawless                     FF-1        $6,170           $6,170
sa Convection Steamer-District-Wide                                                                          M. Lawless                     FF-3       $11,220
55 Tilting Skillet-Hansen                                                                                    M. Lawless                    FF-5        $12,035
ss Round Cafeteria Tables-GMS                                                                                B. Lynch/S. Shannon           FF-7        $18,820          $18,820
s~ Replacement Computer Lab Furniture-GMS                                                                    M. Wentiand                   FF-10            $0
ss Custodial Equipment-District-Wide                                                                         B. Lynch                      FF-13       $20,000          $20,000
59
6o Extraordinary iUlaintenance                                                                                                                                  ~>0             3D
61
62
s3 Grand Total                                                                                                                                       $1,768,321        X804,087

Source page 173

FF-1

                                     TOWN OF CANTON
                                   FORM B -FISCAL 2021
                      CAPITAL PROJECT /EQUIPMENT REQUEST

 DEPARTMENT: Food Service Department                    SUBMITTED BY: Martha Lawless




 PROJECT /EQUIPMENT TITLE: Stainless Steel Work Tables




 TOTAL PROJECT /EQUIPMENT COST (must be at least $5,000):             6,170


 DESCRIPTION: Stainless Steel Work Table- 4 each- 72w x 30d x 35h includes stainless steel
                 under shelf and 2 draws each table. $5,700. See attached for pricing.

                 Stainless Steel Work Tables- 1 each 60w x 30d x 35h includes stainless steel
                 under shelf and 1 draw each. $470. See attached for pricing.

PURPOSE, JUSTIFICATION AND SUPPORT FOR STRATEGIC FRAMEWORK:
(Attach additional ua4es if necessary)
Replace original wood tables which cannot be easily cleaned or thoroughly sanitized.
Provide adequate workspace for food preparation

Strategic Framework 4.1 Indicators of Excellence and 4.2 Facilities



NEED CLASSIFICATION:(Check a// that app/y)           Departmental Priority Rankin4:
0✓ Required for Safety                                 Please rank this request out of your total
Q Required by Law or Mandate                           requests for this year:(#1 as top priority)
0✓ Improve/Expand Service or Increase Efficiency        i        (#) OF a               (#)

✓ Planned Project or Replacement
0                                                     Expected Useful Life: (Check one)
Q Unplanned Project or Replacement                   ~✓ 20 or More Yrs Q 5 to 9 Years
~ New Project/Item (not on last year's 5-Yr. Plan)   D 10 to 19 Years Q 3 to 4 Years


Impact to Dept. Oaeratinq Budget: (Check one) Revenue Imaact: (Check one)
0Will Reduce Cost by $                        Q Wi l l Produce Addl Revenue by $
 ✓
0No Impact                                    0✓ Revenue Neutral (no impact)
Q Will Increase Cost by $                     Q  Will Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

Source page 174

'~                                                                                                                        FF-2
                                                         Harbour Food Service Equipment                                    06/1U/x019
             Item        Qty                                  Description                                         Sell     Sell Total
                                GSW USA Model No. WT-P3072
                    ""''`'"~    Premium Work Table, 72"W x 30"D x 35"H, 1&/304 stainless steel top,
                                18 gauge stainless steel undershelf &legs with plastic bullet feet, ETL


                   3 ea DA-13215 Drawer, for work table, 16-11/32" x 20-7/8" x 3-1/2", ball                    $135.00       $405.00
         y    ~~~eS     bearing slides, 200 Ib. load capacity, stainless steel construction, ETL
                                                                                                     ITEM TOTAL:           $1,560.00
             4             2 ea WORK TABLE,STAIfVLESS STEEL TOP                                             $335.00          $670.00
                                GSW USA Modef No. WT-P3060
                                Premium Work Table, 60"W x 30"D x 3S"H, 16/304 stainless steel top,
                                18 gauge stainless steel undershelf &legs with plastic bullet feet, ETL


                          2 ea DA-13215 Drawer,for work table, 16-11/32" x 20-7/8" x 3-1/2", ball              $135.00       $270.00
                               bearing slides, Z00 ib. toad capacity, stainless steel construction, ETL
     ~       rib i~
                                                                                                        ITEM TOTAL:         $940.00
                                                                                                Total                     $23,755.00

                    Acceptance:                                                           Date:
                    Printed Name:
                    Project Grand Total: $23,755.00



             ~ tables 72"W x 30"D x 35"H: 4 tables x $1,135= $4,620
             8 drawers DA 13215: 8 drawers x $135=$1,080

             1 worktable 60"W x30"D x 35"H: 1 worktable x $335=$335
             1 drawer DA13215: 1 drawer x $135=$135

             Total Request: $6,170.00




                                                                                                                         Initial:
     Canton School System-Capital 2019
                                                                                                                             Page 2 of 2

Source page 175

FF~

                                     TOWN OF CANTON
                                   FORM B -FISCAL 2021
                      CAPITAL PROJECT /EQUIPMENT REQUEST

 DEPARTMENT: Food Service Department                    SUBMITTED BY: Martha Lawless




 PROJECT /EQUIPMENT TITLE: Convection Steamer




 TOTAL PROJECT /EQUIPMENT COST (must be at least $5,000):            X11,220

 DESCRIPTION: AccuTemp Convection Steamer, Electric Boilerless
                 Model No. S32083D100 DBL




PURPOSE,]USTIFICATION AND SUPPORT FOR STRATEGIC FRAMEWORK:
(Attach additional pages if necessary)
Replace the 40 +year old, original steamer/boiler

Strategic Framework 4.1 Indicators of Excellence 4.2 Facilities




NEED CLASSIFICATION:(Check all that apply)           Deaartmental Priority Ranking:
✓ Required for Safety
0                                                      Please rank this request out of your total
Q Required by Law or Mandate                           requests for this year:(#1 as top priority)
0✓ Improve/Expand Service or Increase Efficiency       z         (#) OF a               (#)

✓ Planned Project or Replacement
Q                                                    Exaected Useful Life: (Check one)
Q Unplanned Project or Replacement                   X20 or More Yrs Q 5 to 9 Years
Q New Project/Item (not on last year's 5-Yr. Plan)   Q 10 to 19 Years 03 to 4 Years


Impact to Dept. Operating Bud4et: (Check one) Revenue Impact: (Check one)
0Will Reduce Cost by $                        Q Will Produce Addl Revenue by $
0No Impact                                    ~✓ Revenue Neutral (no impact)
Q Will Increase Cost by $                     Q Will Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

Source page 176

FF-4

                                                                                                  Quotation
                                                                                                                    06/10/2019
                   Culdinp Thy Foad 9~ruloe lndnatry
                              91ncx 19Y9

   229 Marginal Street, Chelsea MA 02150
   (61'n 884-3900 • www.harbourfood.com




                                                       Project:                          From:
                                                       Canton School System-Capital 2019 Harbour Food Se[vfce Equipment
                                                       Attn: Martha Lawless              Doug DeLuca
                                                       Canton, Ma                        229 Marginal St
                                                                                         Chelsea, MA 02150-0006
                                                                                         6178843900
                                                                                         617-370-4323 (Contact)
                                                              Jab Reference Number:8379
    Item       Qty                                             Description                                Sell     Sel! Total
   1               1 ea CONVECTION STEAMER,ELECTRIC, BOILERLESS                                        $11,220.00   $11,220.00
          *~~ :         AccuTemp Model No. S32083D100 DBL
        ~z~~ ~~:
                        Two Steam'N'HoId TM Boilerless Convection Steamer, includes stand
        r `~            with casters, electric, holds {3) 12" x 20" x 2-1/2" deep pans each
                        compartment, vacuum cooking, manual mechanical timer controls, NO
                        water or drain connections required, lO.Okw each,(2) 208/60/3ph,(2)
                        5' cords & NEMA L15-30Ps, ENERGY STAR
                   1 ea 1 year parts &labor warranty, standard
                   1 ea Lifetime service and support guarantee
                   1 ea Alternate voltages available, contact factory for details
                   1 ea Door hinged on right standard
                   2 ea REBATE *** ENERGY STAR INSTANT REBATE °`**                                   $-1,000.00     $-2,000.00
                                                                                                ITEM TOTAL.          $9,~~.00
   2            1 ea      TILTING SKILLET BRAISING PAN, ELECTRIC                                       $11,285,00   $11,285.00
             ~
             > ~          AccuTemp Model No. ACES-30
     ; ,,, ;__~           AccuTemp Edge SeriesT"' Tilting Skillet, Electric, 30 gal capacity, manual
    ''''—'~'              tilt, stainless steel spring assist hinged cover with 4" vent port & no
         ""` ;            drip condensate guide, lip strainer, 10 ga. stainless steel pan with 5/8"
                          thick heating plate, NEMA-2 control housing for thermostatic control
                          with off 160°-445° F temp range, auto-off tilt switch, stainless steel
                          legs with front bullet &rear flanged feet, cCSAus, NSF
                   1 ea   Lifetime service and support guarantee
                   1 ea   208v/50/60/lph, 12.0 kW,57.7 amps
                   1 ea   ACSF-12 Single Pantry Faucet, 12" with swing spout                             $490.00       $490.00
                   1 ea   ACGMS-30 Etched Gallon Markings                                                $260.00       $260.00
                                                                                                ITEM TOTAL:         $12,035.00
   3               3 ea WORK TABLE,STAINLESS STEEL TOP                                                    $385.00    $1,155.00




                                                                                                                    Initial:
Canton School System-Capital 2019                                                                                       Page 1 of 2

Source page 177

TOWN OF CANTON
                                     FORM B -FISCAL 2021
                      CAPITAL PROJECT /EQUIPMENT REQUEST

 DEPARTMENT: Food Service Department                 I      SUBMITTED BY: Martha Lawless




 PROJECT / EOUiPMENT TITLE: Hansen School Tilting Skillet




 TOTAL PROJECT /EQUIPMENT COST (must be at least $5,000): ~~ 2,035



 DESCRIPTION: AccuTemp Tilting Skillet Braising Pan, Electric Model No. ACES-30




PURPOSE, JUSTIFICATION AND SUPPORT FOR STRATEGIC FRAMEWORK:
(Attach additional pa4es if necessary)
Replace 40+ year old Boiler/Kettle

Strategic Framework 4.1 Indicators of Excellence, 4.2 Facilities




NEED CLASSIFICATION:(Check al/ that app/y)               Departmental Priority Ranking:
✓ Required for Safety
0                                                          Please rank this request out of your total
0Required by Law or Mandate                                requests for this year:(#1 as top priority)
0✓ Improve/Expand Service or Increase Efficiency           3         (#) OF a               (#)

✓ Planned Project or Replacement
Q                                                     Expected Useful Life: (Check one)
Q Unplanned Project or Replacement                   0✓ 20 or More Yrs Q 5 to 9 Years
Q New Project/Item (not on last year's 5-Yr. Plan)   Q 10 to 19 Years Q 3 to 4 Years


Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
~ W i I I Reduce Cost by $                    Q Will Produce Addl Revenue by $
0✓ No Impact                                 0✓ Revenue Neutral (no impact)
~Will Increase Cost by $                      Q Wi l l Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

Source page 178

FF-6


                                                                                                       Quotation
                                                                                                                       06/10/2019
                     Cu1df~~R Tba Pood 9erutee JnJu eery
                                 Sfnce 1919

  229 Marginal Street, Chelsea MA 02150
  (617)884-3900• www.harboarfood.com
                            ce.or .e


                          ab.a.} nog
                                   • ~..a~.




                                                           Project:                           From:
                                                           Canton School System-Capital 2019 Harbour Food Service Equipment
                                                           Attn: Martha Lawless              Doug DeLuca
                                                           Canton, Ma                        229 Marginal St
                                                                                              Chelsea, MA 02150-0006
                                                                                              6178843900
                                                                                              617-370-4323 (Contact)
                                                                 Job Reference Number: 8379
    Item         Qty                                              Description                                   Setl    Sell Total
   1                 1 ea CONVECTION STEAMER,ELECTRIC, BOILERLESS                                         $11,220.00   $11,220.00
           ,t~                AccuTemp Model No. 532083D100 DBL
        ~'~`"r'~~~            Two Steam'N'Nold'"' Boilerless Convection Steamer, includes stand
        % ~,"?' ~             with casters, electric, holds(3) 12" x 20" x 2-1/2" deep pans each
                              compartment, vacuum cooking, manual mechanical timer controls, NO
                              water or drain connections required, 10.Okw each,(2) 208/60/3ph,(2)
                              5'cords & {VEMA L15-30Ps, ENERGY STAR
                     1 ea     1 year parts &labor warranty, standard
                     1 ea     Lifetime service and support guarantee
                     1 ea     Alternate voltages available, contact factory for details
                     1 ea     Door hinged on right standard
                     2 ea REBATE *** ENERGY STAR INSTANT REBATE ***                                       $-1,000.00   $-2,000.00
                                                                                                      ITEM TOTpL:       $9,220.00
   2               1 ea TILTING SKILLET BRAISING PAN, ELECTRIC                                            $11,285.00   $11,285.00
     f.~`"'"-;-t:       AccuTemp Model No. ACES-30
              ;:~-      AccuTemp Edge Series'"" Tilting Skillet, Electric, 30 gai capacity, manual
        `~` ~~'         tilt, stainless steel spring assist hinged cover with 4" vent port & no
   '""     ~ ~' ,       drip condensate guide, lip strainer, 10 ga. stainless steel pan with 5/8"
                          thick heating plate, NEMA-2 control housing for thermostatic control
                          with off 160°-445° F temp range, auto-off tilt switch, stainless steel
                          legs with front bullet &rear flanged feet, cCSAus, NSF
                     1 ea Lifetime service and support guarantee
                     1 ea 208v/50/60/1ph, 12.0 kW,57.7 amps
                     1 ea ACSF-12 Single Pantry Faucet, 12" with swing spout                                 $490.Q0      $490.00
                     1 ea ACGMS-30 Etched Gallon Markings                                                    $260,00      $260.00
                                                                                                      ITEM TOTAL:      $12,035.00
   3                 3 ea WORK TABLE,STAINLESS STEEL TOP                                                     $385.00    $1,155.Oa




                                                                                                                       Initial:
Canton School System-Capital 2019                                                                                          Page 1 of 2

Source page 179

FFm7

                                      TOWN OF CANTON
                                    FORM B -FISCAL 2021
                       CAPITAL PROJECT /EQUIPMENT REQUEST

 DEPARTMENT: GMS                                          SUBMITTED BY: Sarah Shannon




 PROJECT / EOUiPMENT TITLE: Cafeteria Tables




 TOTAL PROJECT /EQUIPMENT COST (must be at least $5,000): ~~ 8,820



 DESCRIPTION: Round tables to replace the long, rectangular tables we currently have.




PURPOSE, JUSTIFICATION AND SUPPORT FOR STRATEGIC FRAMEWORK:
(Attach additional aages if necessary)
Strategic Objective #2-Culture and Climate: Round tables encourage more conversation and
create a more welcoming environment in a school cafeteria. In addition, because students don't
have to yell to each other, they result in a quieter cafe. Finally, round tables offer the same number
of seats yet offer more space for movement around them leading to better access and supervision.



NEED CLASSIFICATION:(Check a// that app/y)             Departmental Priority Ranking:
~ Required for Safety                                    Please rank this request out of your total
0Required by Law or Mandate                              requests for this year:(#1 as top priority)
0Improve/Expand Service or Increase Efficiency            ~        (#) OF ~               (#)

Q Planned Project or Replacement                       Exaected Useful Life: (Check one)
✓ Unplanned Project or Replacement
0                                                     ~✓ 20 or More Yrs Q 5 to 9 Years
Q New Project/Item (not on last year's 5-Yr. Plan)    Q 10 to 19 Years Q 3 to 4 Years


Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
~ Will Reduce Cost by $                       Q Will Produce Addl Revenue by $
0No Impact                                    ✓ Revenue Neutral (no impact)
                                              Q
0Wi l l Increase Cost by $                    Q Will Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

Source page 180

9/12/2019                                         Canton Public Schools Mail - Re: Your Decker Equipment Quote
                                                                                                                           FF-8




                                                 .~                                                          ,~


                                  -                   _~J                                                         _J
                                             J                                                          J
                   finis image is no Langer ~v~il~i~le.                       This image is no langer ~v~ilable.
                 Visit             far rr~c~re infvfni~tion.               Visit          ~ fvr mare infvrr~-~~tion.




                                                                              .~

                                                                                   J
                                                                          J
                                                 This image is no longer available.
                                              Visit             for more infarmatian.


              Thank you JAMES for the quote request.


              Your quote number is 316528 .
                                                                                                                       EPeCeed
               Item Number                            Description                             Ertl Unit Price Disc
                                                                                                                                J
                               KI 60in. Round Bench Style Uniframe Cafeteria Table            6.00
                                                                                                           $
                                                                                                               7454.40'
              IUFB60P          Black Frame/ 8 Seating Capacity / 29in. Table Height                1242.4000~$

                 -    SEAT NG P- IS ANDD                          ~        ❑~C~
                      KI 60in. Round Bench Style Uniframe Cafeteria Table                 $
               UFB60P                                                        6.00
                                                                                ~          ~$ 7454.40
                      Black Frame/ 8 Seating Capacity / 29in. Table Height ~      1242.4000
                                                            OLV                             ❑~~~
                               SEAT NG PNICKEL EVO

                                                                                                             Sales Tax: $ 0.00
                                                                                                Shipping &Handling: $ 3911.00
                                                                                                       Order Total: $ 18819.80

https://mail.google.com/mail/u/0?ik=5e3bf49951 &view=pt&search=all&permthid=thread-f%3A1644312823949453706&simpl=msg-f%3A16443128239...   2/4

Source page 181

9/12/2019                                         Canton Public Schools Mail - Re: Your Decker Equipment Quote

               NOTE: Shipping is estimated                                                                                 FF-9




                  BILL TO:                                                SHIP TO:

                   ACCOUNTS PAYABLE                                       JAMES FARRINGTON
                   CANTON PUBLIC SCHOOLS                                  HEAD CUSTOIDAN
                   960 WASHINGTON ST                                      CALVIN MIDDLE SCHOOL
                   CANTON. MA 02021-2574                                  55 PECUNIT ST
                                                                          CANTON. MA 0202 '-1246



                 If you have any questions please call Rachel Thievin at 800-762-4899. Thank You.




                 QUOTE IS VALID FOR 30 DAYS
                 To Order Please Sign Below and Fax Back to 800-762-4894
                 X
                 PO#


                 PLEASE REFERENCE THE QUOTE NUMBER ON YOUR PO WHEN ORDERING
                 Or Credit Card#     -   -      -
                 Expiration Date: _/


                Thank you for giving me the opportunity to quote you the above product.
                Rachel Thievin




  Michelle Gobbi <gobbim@cantonma.org>                                                                      Wed, Sep 11, 2019 at 9:40 AM
  To: Brian Lynch <lynchb@cantonma.org>

    Hi Brian,
    Do you want me to use this #? Thanks.

    Michelle

    [Quoted text hidden)

    Yiichelle Gobbi
    Budget analyst
    Canton Public Schools
   (781)821-5060 eYt. 1146



https://mail.google.com/mail/u/0?ik=5e3bf49951 &view=pt&search=all&permthid=thread-f%3A1644312823949453706&simpl=msg-f%3A16443128239...   3/4

Source page 182

FF-10

                                            TOWN OF CANTON
                                          FORM B -FISCAL 2021
                           CAPITAL PROJECT /EQUIPMENT REQUEST

                                                                                  Mike Wentland/Technology
 DEPARTMENT: Technology                                             SUBMITTED BY: Administrator &Sara
                                                                                  Donovan/Computer Lab Teacher


 PROJECT / EOUiPMENT TITLE: GMS Computer Lab 311




 TOTAL PRO]ECT /EQUIPMENT COST (must be at least $5,000):



 DESCRIPTION: Update/Replace current computer lab furniture




PURPOSE,]USTIFICATION AND SUPPORT FOR STRATEGIC FRAMEWORK:
(Attach additional aa4es if necessary)
Current lab setup and furniture is over 14 years old. Seating is not flexible due to wires &poles. At any time, half of
the class is facing away from instruction. Any sort of storm/wind event causes at least 7-8 computers to be inoperable
until a Tech Specialist can some and reset it.

Strategic Plan Objective #3: Transforming Teaching and Learning: To create vigorous, relevant, and contemporary
learning experiences so that the PreK-12 journey supports student development and prepares students for their
futures.


 NEED CLASSIFICATION:(Check a// that app/y)                     Departmental Priority Ranking:
 Q Required for Safety                                            Please rank this request out of your total
 Q Required by Law or Mandate                                     requests for this year:(#1 as top priority)
 Q✓ Improve/Expand Service or Increase Efficiency                           (#) OF                 (#)

Q Planned Project or Replacement                               Exaected Useful Life: (Check one)
✓ Unplanned Project or Replacement
0                                                              Q 20 or More Yrs Q 5 to 9 Years
0New Project/Item (not on last year's 5-Yr. Plan)              Q✓ 10 to 19 Years Q 3 to 4 Years


Impact to Deat. Operating Budget: (Check one) Revenue Impact: (Check one)
~ Will Reduce Cost by $                       Q Will Produce Addl Revenue by $
~✓ No Impact                                  ✓ Revenue Neutral (no impact)
                                              Q
Q Wi l l Increase Cost by $                   Q Will Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

Source page 183

FF-11



            ~1 ~1
              z~:
           l ~,
            ;;

            P                ~ :; ---~

           ~ ~~,:~                          ,;

                      ` i~
                _~~            '-

     >`,                       L•
                                    e~~.W
                                       ~y
i~              {
                4              L. +
                               ~~   ,




~C~~~~-I                                         ~~~~   ~ ~-~ c~

Source page 184

FF-12
- - . ,.:                   ~:,-        -•:~
                                   ~~

            ~~--•r
 -~




~ U ~ ~-en~          e~'n~i ~~c~~ ~~1

Source page 185

FF-13

                                      TOWN OF CANTON
                                    FORM B -FISCAL 2021
                       CAPITAL PROJECT /EQUIPMENT REQUEST

 DEPARTMENT: Facilities-District                           SUBMITTED BY: Brian Lynch




 PRO]ECT /EQUIPMENT TITLE: Custodian Equipment System Wide




 TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000): ~2~,0~0



 DESCRIPTION: Replacement for equipment that has exceeded its life expectancy.




PURPOSE, JUSTIFICATION AND SUPPORT FOR STRATEGIC FRAMEWORK:
(Attach additional pa4es if necessary)
Due to ongoing wear and tear, broken equipment at each of the schools needs to be replaced on a
rotating cycle.

Strategic Area of Focus: 2.4 School Safety-Provide safe facilities and appropriate learning
environments that support a sense of security and comfort for students and staff; employ
emergency/crisis management plans and practices

NEED CLASSIFICATION:(Check a/I that apply)             Departmental Priority Ranking:
~✓ Required for Safety                                   Please rank this request out of your total
Q Required by Law or Mandate                             requests for this year:(#1 as top priority)
0✓ Improve/Expand Service or Increase Efficiency                   (#) OF                 (#)

✓ Planned Project or Replacement
0                                                       Expected Useful Life: (Check one)
Q Unplanned Project or Replacement                     020 or More Yrs Q 5 to 9 Years
Q New Project/Item (not on last year's 5-Yr. Plan)     0✓ 10 to 19 Years Q 3 to 4 Years


Imaact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
0Will Reduce Cost by $                        Q Will Produce Addl Revenue by $
Q No Impact                                   Q Revenue Neutral (no impact)
Q Wil l Increase Cost by $                    Q Wi l l Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
See attached quote.

Source page 186

PR~~~"QUOTE
...                           SUPPLY COMPANY, SINCE Igj2


          721 Duchaine Boulevard •New Bedford, h1A 02745
                (pJ 506-995-833' •(Q 506-995-4187
                        www.milhenchcom                                                                                  Page 1
                                                                                                                         Printed 09/27/19 CR
                                       ^"~i—~                                                              c+L:_    m.
                                       r.~...........

     CANTON PUBLIC SCHOOLS                                                             CANTON PUBLIC SCHOOLS
     960 WASHINGTON STREET                                                             960 WASHINGTON STREET
     CANTON MA 02021                                                                   CANTON MA 02021
     Te1:781-821-5060 Fax:781-575-6500




Quote a            Quote Date                  Exp Date    Customer N       Customer PIO #             Ship Via                         Writer
  025610 09/27/2019                                        0001487                                        OUR TRUCK             CR
Job ID                                                     Customer Terms                                 Salesman
                                                           Net 30                                         106 - Chad Richards
F~aduct!                           '.'.De~~~~..t~pn                                          ,C7M   .: ant.:
                                                                                                       .     ta'nit price ~xtsns~.an:
                                       EAG CT51B50-OBC-B-115                                 EA        3          4143.00        12429.00
                                       13/14 GAL SCRUBBER 201N BRUSH
                                       DRIVE ON BOARD CHARGER 115 WET
                                       CELL BATTERIES

                                       EDI 20LS3—BK—SV                                       EA        5           843.00          4215.00
                                       SATURN 20IN LOW SPEED FLOOR
                                       MACHINE PAD DRIVER INCLUDED

                                       EDI 401TR                                             EA        2          1637.80          3275.00
                                       FIVESTAR 3 GALLON SELF
                                       CONTAINED
                                       EXTRACTOR 85 PSI PUMP SINGLE
                                       2 STAGE VAC




                                                                                      Sub Total    $19,919.60
                                                                                      Freight           $0.00 T o t a "I
X:                                                                                    Misc Charges      $0.00