Source page 125

nIndustrial
aCommunications®
EQUIPMENT RECOMMENDATION

Prepared by:      Bill Davis
Date:             10/28/2014

Prepared for:     Canton DPW
                  801 Washington Street
                  Canton, MA 02021

Attn:             Bill Walsh     Highway Maintenance Supervisor - 781-821-5025

Re:               Digital Mobile Radios - Trucks 801 & 74

ITEM #     QTY    Model #/Description                                               UNIT PRICE      EXTENDED
   1        2     Motorola XPR4550 Mobile Radio                                    $     745.00    $   1,490.00
                  UHF 450-512 Mhz; 25-40 watt analog/digital; palm mic;
                  mounting bracket; 1/4 wave antenna; 3 year warranty.

  2          2    GPS Glass Mount Antenna - cable and sma connector                $       39.00   $          78.00

  3          2    Mobile Installation                                              $      150.00   $        300.00

  4         1     Travel                                                           $       39.00   $          39.00

  5         2     Programming                                                      $       25.00   $         50.00

  6         1     Shipping                                                         $       12.00   $         12.00



                                                                                       Total       $       1,969.00




      Industrial Communications & Electronics, Inc., 40 Lone Street, Marshfield, MA 02050 • 800-822-9999

Source page 126

TOWN OF CANTON
                                     FORM B - FISCAL 2016
                          CAPITAL PRO3ECT / EQUIPMENT REQUEST

 DEPARTMENT:                                               SUBMITTED BY:
                      Public Works                                    Michael Trotta


 PROJECT / EOUIPMENT TITLE:
                CCTV Security System for Pasquarosa Campus Bolivar St.


 TOTAL PROJECT / EQUIPMENT COST:
                                               $60,000

 DESCRIPTION:
New IP CCTV security system for Pasquarosa Campus includes cameras, wiring, programming,
and 3 year maintenance plan.




 PURPOSE AND JUSTIFICATION:
Provide 24 hour visual security to Garages, Salt Shed, Admin Building, Kennel, and general campus area.
Ensure the safety of equipment, stored materials, and users of Public Works buildings and grounds.




 NEED CLASSIFICATION: (Check all that apply)            Departmental Priority Ranking:
    Required for Safety                                   Please rank this request out of your total
    Required by Law or Mandate                            requests for this year: (#1 as top priority)
    Improve/Expand Service or Increase Efficiency                 6 (#) OF              11 (#)

     Planned Project or Replacement                     Expected Useful Life: (Check one)
     Unplanned Project or Replacement                     20 or More Yrs      5 to 9 Years
  x New Project/Item (not on last year's 5-Yr. Plan)      10 to 19 Years      3 to 4 Years


 Impact to Dept. Operating Budget: (Check one)          Revenue Impact: (Check one)
    Will Reduce Cost by $                                 Will Produce Addle Revenue by $
  x No Impact                                           x Revenue Neutral (no impact)
    Will Increase Cost by $                               Will Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)




         - 1-1JUHL.   1

Source page 127

setronics
             security int egr ators


                                                                                                             October 30, 2014


Mr. Bill Walsh
Highway Maintenance Supervisor
Canton Public Works
801 Washington Street
Canton, MA 02021

Re: Proposal P-14-949, Canton Public Works, IP Camera System Solution - Bolivar Street

Dear Bill,

Setronics is please to provide Canton Public Works this budgetary proposal for a new IP CCTV system for
the Bolivar Street Facility. The pricing examples in this proposal are supplied to provide you estimated
costs for inclusion to the 2015 budget.

                                   dayscetl-iè biidget-Lexa „                                           nee
                                      ctfbr exact:, n :g4stmr                                         A
                                                                                           nt 2A15 pricing

S                                  p ii
- InsaiIation bfthé N R'(Net ok=Video Recot-der
- Installation of (14) IP cameras
- Installation of (2) network switches
- Installation of CAT 6 cabling including termination
- Installation of electrical conduit
- System programming including remote access for CPW staff

Customer Requirements
- Provide quad 110 power outlet in Network closet
- Provide an air conditioner in Network closet

This proposal includes a 1-year warranty for Setronics provided equipment, assumes prevailing wage
weekday labor rates and is valid for thirty days. Applicable taxes are not included.

Any changes to the above summarized scope may result in additional investment.

Thank you for choosing Setronics. If you have any questions regarding this proposal please do not
hesitate to call.

Sincerely,



Scott Roberts
Sales Executive
978-835-3790




The information contained herein may be privileged and confidential and protected from disclosure by any parties other than the
recipients of this document. If the reader of this document is not the intended recipient, or an employee or agent responsible for
delivering this message to the intended recipient, you are hereby notified that any dissemination, distribution or copying of this
communication to any vendor, supplier or any other party is strictly prohibited.


 5 Executive Park Drive      Billerica, Massachusetts 01862       978-671-5450

Source page 128

setronics
                security integrators

 October 30, 2014                                                                                        Proposal # P 14 949
                                                                                                                         -   -




                            PROPOSED CCTV SYSTEM LOCATED AT CANTON, MA

                                       SUMMARY OF EQUIPMENT & COSTS


         Ouantitv Description
                  1    Cable and Materials
                  1 20MP IP 180 Degree Exterior Dome Camera
                  8 3MP IP Exterior Dome Camera
                  5 5MP IP Exterior Dome Camera




                         ninth'fruptbi Power Sup)*

                       Total Equipment MSRP                                                                         $57,863.00
                       Installation Labor                                                                           $19,200.00
                       Total System Sell                                                                            $77,063.00
                       Less Discount                                                                                $22,405.00
                       Total Discounted Sell                                                                        $54,658.00




The information contained herein may be privileged and confidential and protected from disclosure by any parties other than the
recipients of this document. If the reader of this document is not the intended recipient, or an employee or agent responsible for
delivering this message to the intended recipient, you are hereby notified that any dissemination, distribution or copying of this
communication to any vendor, supplier or any other party is strictly prohibited.

Source page 129

setronics
         —     security integrators



  October 30, 2014                                                                                       Proposal # P-14-949

                     PROPOSED CCTV SYSTEM LOCATED AT CPWC001 CANTON, MA

                                            PURCHASE OPTIONS SUMMARY


  Services provided with Setronics' support options are summarized on our Service Plans
  attachment.



  Purchase Optionsi




 5-Year Maintenance Plan
                                        FIDENTU                                                          $8,564.00
                                                                                                                    oo L




 5-Year Monthly Lease Option                                                                             $1,042.00 2

 5-Year Monthly Lease Option w/Maintenance                                                               $1,216.00 2




 Taxes not included. Prices subject to change based on customer approved system installation change orders.
2 Preliminary estimate only. To be finalized with completion of customer credit review.



The information contained herein may be privileged and confidential and protected from disclosure by any parties other than the
recipients of this document. If the reader of this document is not the intended recipient, or an employee or agent responsible for
delivering this message to the intended recipient, you are hereby notified that any dissemination, distribution or copying of this
communication to any vendor, supplier or any other party is strictly prohibited.

Source page 130

TOWN OF CANTON
                                     FORM B - FISCAL 2016
                        CAPITAL PROJECT / EQUIPMENT REQUEST

  DEPARTMENT:                                                SUBMITTED BY:
                    Public Works                                        Michael Trotta


 PROJECT / EQUIPMENT TITLE:
                       Old Shepard St Dam Repair Design Report


 TOTAL PROJECT / EQUIPMENT COST:
                                                 $75,000

  DESCRIPTION:
Preparation of design report for needed repairs to Old Shepard Pond Dam. The report to
incude; concrete and embankment structure repair and design, hydraulic and stability
analysis, survey, USACE Permit, MEPA Permit, Chapter 253 Permit, and Canton Conservation
Permit.


 PURPOSE AND JUSTIFICATION:
Old Shepard St Dam is classified as significant hazard. That is, it is located where failure may cause
loss of life or damage to homes, and industrial or commercial facilities. Recent Phase / reports (2008,
2012) have identified approximately $420,000 in needed repairs to abutments, spillway, rip-rap, and
dam crest. The design report will deliver a project ready for construction funding to meet the next MA
Office of Dam Safety inspection scheduled for 2017.


 NEED CLASSIFICATION: (Check all that apply)             Departmental Priority Rankina:
  x Required for Safety                                    Please rank this request out of your total
 —  Required by Law or Mandate                             requests for this year: (#1 as top priority)
    Improve/Expand Service or Increase Efficiency                  7 (#) OF              11 (#)

  x Planned Project or Replacement                       Expected Useful Life: (Check one)
    Unplanned Project or Replacement                     x 20 or More Yrs      5 to 9 Years
    New Project/Item (not on last year's 5-Yr. Plan)     _ 10 to 19 Years _ to 4 Years
                                                                               3


 Impact to Dept. Operatina Budaet: (Check one)            Revenue Impact: (Check one)
     Will Reduce Cost by $                                     Will Produce Addle Revenue by $
 _x No Impact                                             x Revenue Neutral (no impact)
 _   Will Increase Cost by $                             ____. Will Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

Source page 131

Stephens Associates                                Certified W/DBE in MA, ME, NH and VT




It
                             Consulting Engineers         www.stephensengineers.com
                                                          60 Northrup Dr          668 Main Street, Suite 250
             Insightful, Cost-               Structural                           Wilmington, MA 01887
             saving Solutions
             for Buildings and
                                          Geotechnical
                                                          Brentwood, NH 03833
                                                          Phone: (603) 772-1417   Phone: (978) 988-2115        ASFE
             Infrastructure      Hydrology & Hydraulics   Fax: (603) 772-1418     Fax: (978) 988-2117


November 7, 2014                                                                                                SA File 052



Town of Canton
Department of Public Works
Town Hall
801 Washington Street
Canton, MA 02021
Attention:     Mr. Michael Trotta
               Superintendent of the Department of Public Works


Re: Old Shepard Street Dam
      Evaluation, Design and Permitting Budget
      Canton, MA


Ladies and gentlemen:

Stephens Associates Consulting Engineers, LLC (SA, we, our or us) has prepared this letter at request of Mr.
Michael Trotta, Superintendent of the Department of Public Works, Town of Canton Massachusetts (Town,
Client, you or your) regarding budgeting for evaluation, design, and permitting of repairs to Old Shepard
Street (Dam). SA prepared a Phase I Inspection/Evaluation Report dated September 14, 2012 in which we
described potential Town goals and alternatives to repair and/or improve the Dam. We understand that the
Town has not selected an alternative, but it is unlikely to pursue decommissioning. Based on that Report, we
recommend that the Town budget $75,000 in 2015 for evaluation, design and permitting of repairs, which we
anticipate would accommodate most alternatives, except decommissioning. If the Town changes approach and
chooses to decommission the dam, significant additional budget would be needed for evaluation (e.g.
environmental exploration/evaluation, etc.), design and permitting.

We trust that this recommendation is sufficient to meet your current needs for budgeting. We can consult with
the Town to assist in selecting a course of action for Dam repairs in consideration of the Town's goals, and
prepare a proposal to evaluate, design and permit the selected alternative. If you have any questions, or
require clarification, please call us.

Sincerely,

Stephens Associates Consulting Engineers, LLC



James E. Turner, PE
Project Manager

JET:tgbg

Source page 132

TOWN OF CANTON
                                        FORM B - FISCAL 2016
                            CAPITAL PROJECT / EQUIPMENT REQUEST

 DEPARTMENT:                                                 SUBMITTED BY:
                         Public Works                                   Michael Trotta


 PROJECT / EQUIPMENT TITLE:
                                          Enclosed Cargo Trailer


 TOTAL PROJECT / EQUIPMENT COST:
                                                   $6,000

 DESCRIPTION:
A new or current year model Stealth 7 x 12 Liberty Series Tandem Axel Trailer.




 PURPOSE AND JUSTIFICATION:
This enclosed cargo trailer is to be used to carry line painting machine and paint supplies to the job site.
Current open flat bed trailer does not have adequate capacity to carry machine and days supply of paint
and cleaning equipment. Enclosed trailer would also allow moving weather sensitive cargo and
equipment.




 NEED CLASSIFICATION: (Check all that apply)              Departmental Priority Ranking:
   Required for Safety                                      Please rank this request out of your total
   Required by Law or Mandate                               requests for this year: (#1 as top priority)
   Improve/Expand Service or Increase Efficiency                    8 (#) OF              11 (#)

 ____ Planned Project or Replacement                      Expected Useful Life: (Check one)
    Unplanned Project or Replacement                        20 or More Yrs      5 to 9 Years
  x New Project/Item (not on last year's 5-Yr. Plan)      x 10 to 19 Years      3 to 4 Years


 Impact to Dept. Operatina Budaet: (Check one)            Revenue Impact: (Check one)
    Will Reduce Cost by $                                   Will Produce Addle Revenue by $
  x No Impact                                             x Revenue Neutral (no impact)
    Will Increase Cost by $                                 Will Decrease Revenue by $
                                                                                                           -
 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)




  I-UtIM b - 1^1J1_,AL

Source page 133

1825 Fall River Avenue, Seekonk, MA 02771
                        Office: 508.336.8530      Fax: 508.336.8501




              STEALTH LIBERTY SERIES - ROUND TOP ROOF
STANDARD FEATURES
       INTERIOR HEIGHTS 5W'=60"H          6'&7'W=72" H 8'W=78"H
       LIPPERT 4" DROP SPRING AXLES / WIDE TRACK ON 7' WIDE
       ST205/75R 15 LRC 6 PLY RADIAL TIRES
       DOUBLE REAR DOORS
       16"0/C TUBULAR WALL POSTS 3/8" PLYWOOD WALLS .030 SMOOTH SCREWLESS EXTER.
       ONE PIECE ALUMINUM ROOF W/ .080 ROOF COVE W/ ROOF VENT
       ALUMINUM FRAMED SIDE DOOR W/ PULL HANDLE
       3/4" ENGINEERED RAINBLOCK FLOORING            16" ON CENTER CROSS MEMBERS
       24" ATP STONEGUARD                            ATP FENDERS
       (2) LED DOME LIGHTS W/ WALL SWITCH            EXTERIOR DOT APPROVED LED LIGHTS
       3" BOTTOM TRIM
       ALL TUBE FRAME AND TONGUE
       LIMITED 5 YEAR WARRANTY

TRAILER MODEL: SLT712TA2 7X12 BLACK 7000#GVWR 2 AXLE

OPTIONS:
     RAMP DOOR PACKAGE: 3K CAPACITY RAMP DOOR W/FLAP,
           RV FLUSH LOCK W/ BAR LOCK, ALUMINUM DOOR HOLDBACK,
           2ND GRAB HANDLE RAMP, SALEM SIDE WALL VENTS
     7' WIDE FRAME UPGRADE: 6" EXTRA HEIGHT, 2"X6" MAIN FRAME


$5,550.00 cash or check




      "Quality is never an accident; it is always the result of high intention, sincere effort,
       intelligent direction and skillful execution; it represents the wise choice of many
                                            alternatives."

Source page 134

2015 STEALTH 7X12 LIBERTY SERIES TANDEM AXLE ENCLOSED TRAILER 70... Page 1 of 1




  WRIGHT
  TRAILERS, INC.                                                                                We cater to emergency
                                                                                                   responders and
                                                                                                    municipalities
                                 Monday - Friday 7am - 5pm, Saturday 7am - 12pm
                                                 (508) 336-8530
      ABOUT US              SALES OPT.      SERVICE DEPT.             PARTS DEPT.                RESOURCES                  CONTACT US

     Dump Inserts & Truck Bodies            2015 STEALTH 7X12 LIBERTY SERIES TANDEM AXLE
                                            ENCLOSED TRAILER 7000#GVWR
     Steel and Aluminum Enclosed Trailers   Category: Store > Steel and Aluminum Enclosed Trailers

     Deckover Equipment Trailers

     Utility and Equipment Trailers
                                                                                                            SKU S-32686

     Tilt Trailers                                                                                          In stock

     Dump Trailers                                                                                          $5,150
     Clearance and Used

     Tiny House Trailer Platforms
                                                                                                               re
                                                                                                                          H
     Specialty Work
                                                                                                                             _ (2)
                                                                                                          View detailed irnecp

     Skid Steer Buckets and Attachments

     Fisher Snowplows

     Boss Snowplow Dealer


                                            MN S-32686
                               Search       Brand STEALTH
                                            GVWR 2015
                                            CARRYING CAPACITY 5200#
                                            COLOR BLACK

                                            2015 STEALTH 7X12 LIBERTY SERIES TANDEM AXLE ENCLOSED TRAILER, RAMP DOOR, SIDE
                                            DOOR, SEAMLESS ALUMINUM ROOF W/ ROOF VENT, RADIAL TIRES, 16" 0/C FLOOR & WALLS, ALL
                                            TUBE FRAME & TONGUE W/ 6" MAIN FRAME AND TONGUE, LED INTERIOR 8c EXTERIOR LIGHTS,
                                            .030 SCREWLESS EXTERIOR, 24" ATP STONEGUARD & ATP FENDERS, 2 5/16" COUPLER, 6'6"
                                            INTERIOR HEIGHT, SALEM SIDE VENTS, ELECTRIC BRAKES ALL WHEELS, LIMITED 5 YEAR
                                            WARRANTY.




                                                            Please note: all prices displayed are cash or check payment only.




http://www.wrighttrailers.com/                                                                                                       11/5/2014

Source page 135

TOWN OF CANTON
                                          FORM B - FISCAL 2016
                               CAPITAL PROJECT / EQUIPMENT REQUEST

  DEPARTMENT:                                               SUBMITTED BY:
                           Public Works                                Michael Trotta


  PROJECT / EOUIPMENT TITLE:
                                              Speed Alert Sign


 TOTAL PRO3ECT / EOUIPMENT COST:
                                                  $12,000

 DESCRIPTION:
Two new Speed Alert 18 Message Signs including base unit, mounting bracket, power kit,
batteries, and program software.




  PURPOSE AND JUSTIFICATION:
These speed message signs provide drivers with speed feedback, enables specific messaging to vehicle
speed to inform drivers of proper speed for road and conditions. The signs can also serve as message
boards. The signs can be moved to different location as needed. "This hybrid of features makes the
Speed Alert an extremely versatile tool for both traffic calming and messaging."



 NEED CLASSIFICATION: (Check all that apply)             Departmental Priority Ranking:
      Required for Safety                                   Please rank this request out of your total
      Required by Law or Mandate                            requests for this year: (#1 as top priority)
      Improve/Expand Service or Increase Efficiency                 9 (#) OF              11 (#)

     Planned Project or Replacement                      Expected Useful Life: (Check one)
     Unplanned Project or Replacement                       20 or More Yrs       5 to 9 Years
  x New Project/Item (not on last year's 5-Yr. Plan)     x 10 to 19 Years        3 to 4 Years


 Impact to Dept. Operating Budget: (Check one)           Revenue Impact: (Check one)
     Will Reduce Cost by $                                  Will Produce Addle Revenue by $
  x No Impact                                               Revenue Neutral (no impact)
     Will Increase Cost by $                                Will Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)




 t-llt111/1 - 1-1JUAL_ ZU 17

Source page 136

All Traffic Solutions
 ALL TRAFFIC Div
    SOLUTIONS
                 of Intuitive Control Systems, LLC   QUOTE Q-15352
                        3100 Research Drive          DATEMME: 10/24/2014 PAGE NO: 1
                        State College, PA 16801      6:40:11 PM
                        Phone: 814-237-9005
                        Fax: 814-237-9006            For Questions contact:
                                                     Manufacturer:             Independent Sales Rep:
                         Tax ID: 25-1887906          All Traffic Solutions
  A sign of the future.- GSA # GS-07F-6092R          Mark Coupland
                                                     (866) 366-6602 x220
BILL TO:                                                   SHIP TO:
Town of Canton                                             Town of Canton
801 Washington St                                          160 Bolivar St
Canton, MA 02021-2500                                      Canton, MA 02021

Attn: Billy Walsh
PAYMENT TERMS: CUSTOMER: 204761                      CONTACT:      (781) 821-5013
Net 30
ITEM NO:     DESCRIPTION:                                                       QTY:           EACH:          EXT.
                                                                                                            PRICE:


4000741             SpeedAlert 18 Radar Message Sign (RMS); base                    2.00    $3,528.00     $7,056.00
                    unit w/ mounting bracket
4000768             Base Model CREDIT, radar messaging; requires                    2.00    ($800.00)    ($1,600.00)
                    min 1 yr SmartApp Traffic Suite
4000760             All Options Activation: Bluetooth, Traffic Data,                2.00    $3,000.00     $6,000.00
                    Violator Alert, Pictures, Linking (as applic)
4000719             Options CREDIT; requires SmartApp Traffic Suite                 2.00   ($3,000.00)   ($6,000.00)

4000647             App, Traffic Suite (12mo); Equip Mgmt,                          2.00    $1,470.00     $2,940.00
                    Reporting, Image Mgmt, Alerts, Mapping and
                    PremierCare
4000744             LFP Power kit, 16Ah battery (2), internal power                 2.00      $882.00     $1,764.00
                    controller, charger w/connector
4000685             LFP Battery, 16Ah LFP 12.8VDC (requires LFP                     4.00      $385.00     $1,540.00
                    Power Kit 4000613 or 4000684)
4000641             Shipping                                                        2.00       $55.00       $110.00


Special Notes:                                                SALES                                      $11,810.00
                                                              AMOUNT:
Hi Billy,                                                     SHIPPING:
This is identical quote to the units purchased by you         TOTAL:                                     $11,810.00
previously and all prices have been held for you. Includes
1 year of web services and ALL features activated
perpetually - hardware credits applied as shown for initial
purchase.
Let me know if you need anything else.
Have a great weekend - Mark
Extra Batteries added as requested

Source page 137

ALL TRAFFIC
                                                        „mo                                              SOLUTIONS
                              SpeedAlert Radar Message Y loi n                                                           Tu


                              By combining radar feedback with variable messages, our
                              SpeedAlert family of Radar Message Signs provide drivers
                              with speed feedback, messages specific to vehicle speeds
                              or dedicated messages. This hybrid of features makes
                              the SpeedAlert an extremely versatile tool for both traffic              A sign of the future.-
                              calming and messaging.                                                             YOUR




Product highl ights
SPEED DEPENDENT MESSAGING
Slow traffic by using the sign as a large speed display and show                                      loud-
custom messages directed toward drivers at specific speeds.

MESSAGING VERSATILITY
Go beyond basic messages with a full-matrix sign that makes
multiple screens of text, chevrons or custom images simple.
And, conditional sensor messaging allows different messages
to be displayed based on live inputs, including Time-to-
Destination, road surface or air temperatures, timer values,
vehicle weights, high winds, and available parking spaces.          messages and reports with others. Our enhanced
                                                                    TraffiCloudTm features (see reverse) and always-current
TIME TO DESTINATION TECHNOLOGY                                      user interface will keep you in contact with our signs and
DriveTimesTm allows traffic conditions using cloud-based            all your traffic management equipment. Make your traffic
communications in the form of live travel times for custom          management system more productive and effective.
routes, updated constantly on a sign, anywhere, without the
need for any fixed sensor infrastructure, which radically reduces   SIMPLE, UNIVERSAL MOUNTING
the complexity and cost for customers to design                     Mount this sign almost anywhere in about a minute; post,
and maintain an advanced, dynamic time to destination               pole, trailer or vehicle.
message system.
                                                                    DURABLE CONSTRUCTION
CLOUD BASED CASE AND ACCESSIBILITY
       -                                                            The welded aluminum enclosure, concealed mounting
Eliminate traffic data file management, easily sync messages        hardware, shatterproof Lexan and graffiti-resistant powder,
across mobile devices over the Internet and instantly share         coat make it super tough.


                                                                                          Product -pe
                                                                                         SpeedAlert 18
                                                                                         Speed - 2 or 3 digits; 18"H
                                                                                         Text - 1 Line; 4 Characters; 10” H
                                                                                         Text -2 Line; 6 Characters; 7" H
                                                                                         Dimensions: 20" H x 30" W x 2.96" D
                                                                                         Weight: 25 lbs

                                                                                          SpeedAlert 24
                                                                                          Speed — 2 or 3 digits; 24"H
                                                                                         Text - 1 Line; 4 Characters; 24" H
                                                                                         Text -2 Line; 8 Characters; 11" H
                                                                                         Text -3 Line; 12 Characters; 7" H
                                                                                         Dimensions: 28" H x 60"W x 1.6" D
                                                                                         Weight: 43 lbs

                                                                                         Common Hardware Options
                                                                                         Bluetooth, Datalogging, Pictures,
                                                                                         Metric

Source page 138

TOWN OF CANTON
                                    FORM B - FISCAL 2016
                       CAPITAL PROJECT / EQUIPMENT REQUEST

 DEPARTMENT:                                             SUBMITTED BY:
                   Public Works                                     Michael Trotta


 PROJECT / EQUIPMENT TITLE:
                                        Sidewalk Tractor 47


 TOTAL PROJECT / EOUIPMENT COST:
                                              $200,000

 DESCRIPTION;
Replace Highway Division Sidewalk Tractor 47,a 1979 Bombardier, with a new or current
model year Trackless Series MT 6 multi purpose tractor with attachments.




  PURPOSE AND JUSTIFICATION:
This piece of equipment is a gas powered sidewalk plow. Its age and condition are a safety
concern for continued use. Public Works wants to replace 47 with a diesel powered tractor
that can be fitted with attachments such as snow blower, dump body, and flail mower for year
round utilization.



 NEED CLASSIFICATION: (Check all that apply)          Departmental Priority Ranking:
    Required for Safety                                 Please rank this request out of your total
    Required by Law or Mandate                          requests for this year: (#1 as top priority)
 x Improve/Expand Service or Increase Efficiency               10 (#) OF              11 (#)

 x Planned Project or Replacement                     Expected Useful Life: (Check one)
   Unplanned Project or Replacement                     20 or More Yrs
                                                      x 10 to 19 Years
                                                                         ...._
                                                                            5 to 9 Years
 _ New Project/Item (not on last year's 5-Yr. Plan)                         3 to 4 Years


 Impact to Dept. Operating Budget: (Check one)        Revenue Impact: (Check one)
    Will Reduce Cost by $                               Will Produce Addl Revenue by $
  x No Impact                                         x Revenue Neutral (no impact)
    Will Increase Cost by $                             Will Decrease Revenue by $
                                                                                                       ,
 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

Source page 139

9110FC.N.                          WOOD CO., INC


                              MUNICIPAL AND CONTRACTORS EQUIPMENT

                                                                                     Tel. (781) 935 1919
 200 Merrimac St                            PROPOSAL                                 Fax [781] 937 9809
 Woburn MA 01801
Town of Canton                                                                     October 22, 2014
Department of Public Works
801 Washington Street
Canton, MA 02021
ATT: William Walsh Highway and Maintenance Supervisor

C. N. Wood is pleased to offer the following budget proposal through FAC88 lawns and grounds
equipment, parts and service contract.
 1 New Trackless MT 6 multi purpose Tractor with Cummins 115 hp bio diesel tier three engine,
radial winter tires, air ride seat, am/fm/cd radio, back up alarm, license plate bracket, painted
yellow and all other standard equipment.
SELLING PRICE                    $105,600.00.
OPTIONS
Extra pump and valve             $3,910.00
Air conditioner roof mount $5,655.00
Locking differential             $4,270.00
Reversing fan                    $2,975.00                                     000
Forward/ reverse rocker          $840.00                                                            0.00 [III
51" ribbon snow blower           $14,975.00
5' hinged plow complete          $6,260.00                                                  105,600.00 Eli
60'x32"power angle broom $7,540.00                                                             3,910.00 LE
Water tank and spray bar         $3,970.00                                                     5, 655.00 Eli
74" front flail mower            $9,835.00                                                     4.270.00 LIJ
Side boom flail mower            $29,125.00
                                                                                               2,975.00 Ed
Dual winter tries                $4,950.00 [required for side boom flail]
                                                                                                  840.00 B1
NOTE: This pricing is valid through December 31, 2015                                         14,975.00 LIJ
                                                                                               6,260.00 Eli
Thank you for considering C. N. Wood for your equipment needs.                                 7,540.00 Ed
Stephen M. Russell                                                                             3,970.00 LO
                                                                                               9,835.00 I±1
Sales Representative                                                                          29,125.00
                                                                                                4,950.00 LO
                                                                                013
                                                                                             199,905.00 Lii-J+

Source page 140

TOWN OF CANTON
                                    FORM B - FISCAL 2016
                       CAPITAL PROJECT / EQUIPMENT REQUEST

  DEPARTMENT:                                             SUBMITTED BY:
                   Public Works                                      Michael Trotta
                                                                                                         ,
  PROJECT / EQUIPMENT TITLE:
                         WK 800 Loader Mounted Snow Blower


  TOTAL PROJECT / EQUIPMENT COST:
                                               $122,000

  DESCRIPTION:
The request is for a new or current year SnoGo WK 800 Snow Blower. This is a large snow
blower that attaches to the 928 Cat Front End Loader.




 PURPOSE AND JUSTIFICATION:
This is a new piece of equipment for Public Works. The blower will enhance the Department's winter
storm fighting ability. The Front End Loader equipped with the SnoGo will be used in snow removal
efforts to widen snow clogged streets, making room for cars to pass, and reduce snow piles at
intersections and dead ends, improving visibility for cars and pedestrians.




 NEED CLASSIFICATION: (Check all that apply)           Departmental Priority Ranking:
    Required for Safety                                   Please rank this request out of your total
 —  Required by Law or Mandate                            requests for this year: (#1 as top priority)
 x Improve/Expand Service or Increase Efficiency
 _                                                               11 (#) OF              11 (#)

     Planned Project or Replacement                    Expected Useful Life: (Check one)
     Unplanned Project or Replacement                     20 or More Yrs     5 to 9 Years
  x New Project/Item (not on last year's 5-Yr. Plan)   x 10 to 19 Years      3 to 4 Years


 Impact to Dept. Operatina Budaet: (Check one)         Revenue Impact: (Check one)
     Will Reduce Cost by $                               Will Produce Addle Revenue by $
  x No Impact                                          x Revenue Neutral (no impact)
 —   Will Increase Cost by $                           _ Will Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

Source page 141

Milton CAT
                          Southworth-MIlton. Inc.
                          www.miltoncat.com



  Mr. William Walsh
  Superintendent

  Town of Canton
  Public Works Department
  801 Washington Street
  Canton, MA 02021
                                                                                                                                    October 22, 2014


  Dear Mr. Walsh,

  The following is your budgetary quotation for a New 2013 Sno Go WK800 snow blower for the front
  of your CAT 928G loader. Price includes all mountings and accessories needed to attach it. Ref: State
  Contract FAC71

 (1) New 2013 Sno-Go WK800 snow blower                                                                                             $115,000.00
 (2) Optional wireless remote control                                                                                              $ 6,500.00




 Thank you for your consideration,

 Tom Benedetti Jr
 Milton CAT
 Governmental and State Sales
 774-258-1636 Mobile Phone
 774-907-3062 Fax
 tom_benedetti@miltoncat.com




Corporate Headquarters   14 Kendrick Road. Rt. 28   2158 Plainfield Pike   1-89 Exit 6             RI 103.1-89 Exit 7       79 Robertson Boulevard      16 Pleasant Hill Road
100 Quarry Drive         Wareham, MA 02571          Cranston, RI 02920     Mail to: 554 Maple St   Warner, NH 03278         Brewer, ME 04412            Scarborough, ME 04070
Milford, MA 01757                                   401.946.6350           Hopkinton, NH 03229     603.746.4671             207.989.1890                207.883.9586
508.634.3400                                                               603.746.4611



One Cat Lane, RI 2       500 Commerce Drive         294 Ainsley Drive      2140 Military Road      275 Market Place Drive   55 Industrial Park DM    84 Concord St

                                                                                                                                                     North Reading, MA.
Richmond, VI 05477       Clifton Park, NY 12065     Syracuse, NY 13205     Buffalo, NY 14150       Rochester, NY 14623      Binghamton, NY 13904     978-276-2400
802.434.4228             518.877.8000               315.476.9981           716.694.7200            585.475.1330             607.772.6500

Source page 142

short-native-text

AMBULANCE

Source page 143

TOWN OF CANTON
                                     FORM B - FISCAL 2016
                          CAPITAL PROJECT / EQUIPMENT REQUEST

 DEPARTMENT:                                               SUBMITTED BY:
                   Fire Department                                  Charles E. Doody


 PROJECT / EQUIPMENT TITLE:
                                     Replacement of Ambulance 2


 TOTAL PROJECT / EQUIPMENT COST:
                                                $260,000

  DESCRIPTION:
Ambulance 2 is a 2009 International/Horton truck with approximately 90,000 miles. It is the
front line ambulance that is housed at Station 2. Ambulance 2 is the town's Advanced Life
Support Ambulance.



  PURPOSE AND JUSTIFICATION:
The town maintains one ambulance in each district. Ambulance 2 has surpassed it's
anticipated service life and needs to be replaced due to increased maintenance costs and
reliablity.




 NEED CLASSIFICATION: (Check all that apply)            Departmental Priority Rankino:
  x Required for Safety                                   Please rank this request out of your total
     Required by Law or Mandate                           requests for this year: (#1 as top priority)
  x Improve/Expand Service or Increase Efficiency               1A (#) OF                 6 (#)

  x Planned Project or Replacement                      Expected Useful Life: (Check one)
     Unplanned Project or Replacement                      20 or More Yrs x 5 to 9 Years
     New Project/Item (not on last year's 5-Yr. Plan)      10 to 19 Years    3 to 4 Years


 Impact to Dept. Operating Budget: (Check one)          Revenue Impact: (Check one)
    Will Reduce Cost by $                                  Will Produce Addl Revenue by $
  x No Impact                                           x Revenue Neutral (no impact)
    Will Increase Cost by $                                Will Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)




  FORM 13 - FISCAL 2014

Source page 144

Murgia, James R.

From:                         Doody, Charles E.
Sent:                         Wednesday, November 12, 2014 3:47 PM
To:                           Murgia, James R.
Attachments:                  Ambulance 2 replacement.pdf



Hi Jim,
I talked to committee chair and the number will be between 250 and 260. I put 260 on the form for now. As
soon as the committee has nailed down a spec, I can give you the details on the truck. Probably won't be
ready until December.

Charlie




                                                     1

Source page 145

k\                                                    .
                                                           7 1


                                                                 -
    ra':!


                                                       •



                                                                              7' .777
                                                                                        g',`T6'17.1
                                                                     U41/4,




                                                • • ----

                                       ..




            ••   •




                              •   •-
                     ... ..

•




                                            e

Source page 146

short-native-text

WATER
ENTERPRISE

Source page 147

TOWN OF CANTON
                                              FORMS - FISCAL 2016
                                  CAPITAL PROJECT / EQUIPMENT REQUEST

  DEPARTMENT:                                                  SUBMITTED BY:
                               Public Works   OA)                         Michael Trotta


  PROJECT / EOUIPMENT TITLE:
                                                    Truck 91


  TOTAL PROJECT / EOUIPMENT COST:
                                                    $142,000

  DESCRIPTION:
Replace Water Division Truck 91 a 2000 Ford F-250 with a new or current model year
International 4300 truck with utility body.




  PURPOSE AND JUSTIFICATION:
Truck 91 is 14 years old and has 180,000 miles of use. The American Public Works Association
recommended replacement cycle for this type of truck is 10 years or 80,000 miles. The body is showing
rust corrosion in several areas. The new truck will be fitted out with a utility body, welder, air
compressor, generator, and lift gate. The truck will be a work crew service truck supporting job site
system operation and maintenance activities.


 NEED CLASSIFICATION: (Check all that apply)              Departmental Priority Ranking:
   Required for Safety                                         Please rank this request out of your total
    Required by Law or Mandate                                 requests "or this year: (#1 as top priority)
   Improve/Expand Service or Increase Efficiency                       4 (#) OF             Si ' (#)
  x Planned Project or Replacement                        Expected Useful Life: (Check one)
    Unplanned Project or Replacement                         20 or More Yrs     5 to 9 Years
    New Project/Item (not on last year's 5-Yr. Plan)      x 10 to 19 Years      3 to 4 Years


 Impact to Dept. Operating Budget: (Check one)            Revenue Impact: (Check one)
     Will Reduce Cost by $                                  Will Produce Addle Revenue by $
  x No Impact                                             x Revenue Neutral (no impact)
     Will Increase Cost by $                                Will Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)




  L,   .....ne,   b-r   •—•• ■■
                             ffst J111,

Source page 148

DuraStar Budget Quote 14' Body

                                    NAVISTAR INC / INTERNATIONAL TRUCK
                                       GREATER BOSTON POLICE COUNCIL
                                 2014 COOPERATIVE PROCUREMENT CONTRACT
                                          # GBPC 2014-INTERNATIONAL
 101     2015 INTERNATIONAL 4300 SBA W/ISB 220 HP                        $65,288.00
                               Upgrade to 29,000 G.V.W.R.
 OPTIONAL EQUIPMENT:
 ITEM #             DESCRIPTION                                            COST
 107 ISB-300 HP Upgrade 4300                                               $3,170.00
 119 3500 RDS-P 5 or 6-Speed Allison Transmission                          $4,991.00
 124 10,000 lb. Capacity Front Axle                                          $698.00
 127 19,000 lb. Capacity Rear Axle                                          $755.00
 147 Hood Service Hatch                                                     $472.00
 146 Stationary Grille                                                      $104.00
148 Power Windows/Power Door Locks                                          $367.00
149 Air Conditioning                                                        $823.00
151 Fiberglass Exterior Roof Sun Visor                                      $253.00
166 Driver Controlled Locking Differential                                  $965.00
167 Trailer Brake Connections                                               $345.00
173 Front Tow Hooks - Double                                                  $73.00
180 Bug Screen/ Ember Screen                                                $195.00
185 Powder Coated Wheels                                                      $72.00
316 Add for each 2 Ft. Increment                                            $900.00
327 Dash Mounted Electric Brake Controller                                  $300.00
328 Plate Mounted Pintle Hook with Trailer Plug                             $900.00
301 Ten (11) Foot Custom Utility Body                                    $15,000.00
351 Removable Utility Vise                                                $1,500.00
309 120 VAC GFCI Outlet           ($250.00 x 4)                           $1,000.00
594 LED Strobe System: Two Flashers Mounted in Front Corners of Body and
       Two Rear Mounted Flashers with Brake and Turn Signals              $2,800.00
601 Small Roof Mounted LED Light Bar                                      $1,400.00
603 Small LED Arrow Board                                                 $1,800.00
623 61" Canopy Roof for 11' Body                                          $6,000.00
628 3 in 1 - Welder/Air Compressor/Generator                             $20,000.00
642 2,000 lb. Liftgate - Tuckaway Type                                    $4,000.00
         Additional Custom Modifications to the Utility Body                              $7,500.00
                                             TOTAL DELIVERED PRICE                     $141,671.00
SERVICING INTERNATIONAL DEALER

     TAYLOR & LLOYD, INC.
     8 Railroad Ave.
     Bedford, MA 01730
     781-275-9290                                                                      October 29, 2014
                        By: Jim Tsotsi                                          Date
MUNICIPALITY:
     TOWN OF CANTON — D.P.W.
     801 WASHINGTON ST
     CANTON, MA 02021


These Contract prices are valid for orders placed before October 31, 2015

Source page 149

TOWN OF CANTON
                                         FORM B - FISCAL 2016
                             CAPITAL PROJECT / EQUIPMENT REQUEST

  DEPARTMENT:                                                   SUBMITTED BY:
                          Public Works   1 atter)                          Michael Trotta


  PROJECT / EQUIPMENT TITLE:
                  Mechanic Street and Vicinity Water Main Replacement


 TOTAL PROJECT / EOUIPMENT COST:
                                                $2,630,000

 DESCRIPTION:
Replace 12,400 feet of existing 6- inch water main in Mechanic, Rockland, Howard, Belcher,
Walnut, Messinger, Beverly Hill, and Walnut Knoll with new 8- inch weirtr main and
appurtenances.



  PURPOSE AND JUSTIFICATION:
These 6-inch pipes are among the oldest in Canton water system. The existing mains will be replaced
with larger 8-inch diameter pipe. Replacement of these water mains will improve water supply
reliability for area residents, improve fire flow protection, and reduce water supply losses resulting from
leaks.




 NEED CLASSIFICATION: (Check all that apply)             •   Departmental Priority Rankina:
   Required for Safety                                         Please rank this request out of your total
   Required by Law or Mandate                                  requests for this year: (#1 as top priority)
   Improve/Expand Service or Increase Efficiency                         (#) OF                3 (#)
  x Planned Project or Replacement                           Expected Useful Life: (Check one)
     Unplanned Project or Replacement                                               5 to 9 Years
     New Project/Item (not on last year's 5-Yr. Plan)          10 to 19 Years      3 to 4 Years


 Impact to Dept. Operating Budoet: (Check one)               Revenue Impact: (Check one)
     Will Reduce Cost by $                                      Will Produce Addle Revenue by $
  x No Impact                                                x Revenue Neutral (no impact)
     Will Increase Cost by $                                    Will Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)




         - 1-IJUAL 4.17

Source page 150

KLEINFELDER
             Bright People. Right Solutions.




                                         MEMORANDUM

 TO:              Michael Trotta, Superintendent, Canton Department of Public Works
FROM:             David Peeling, RE., Kleinfelder

DATE:             November 6, 2014

SUBJECT: FY16 Budget Recommendations




Kleinfelder recommends the following projects be considered during the Town of Canton's FY2016 budget
planning. Please contact me if you have any question or would like any additional information on these
recommendations.


Integrated Water Resources Management Plan — Year 2

This project is the second year of a planned 5-year phased Program to integrate Water, Sewer, and Stormwater
Systems including Asset Inventory and Data Management.
Budget Recommendation: $311,000
Budget Basis: Scope task list, as detailed below.


                               •               Task                                             Estimated
                                                                                                 Budget
              1. Canton Septic Systems Database Development
                                                                                                     $7,000
              2. Planning Board Electronic Submittal Standards ; Bylaw review
                                                                                                     $8,000
              3. Updates to GIS - Refine Inventory for water, sewer, & drain
                                                                                                 $35,000
                 priority data gaps
              4. Asset Management Software: ArcGIS online license; one year
                                                                                                 $17,500
                 hosting of all VueWorks modules (Work Order, VW Mobile, Risk,
                 Condition, Budget Forecasting, Facilities)
              5. Configure ArcGIS Online; staging environment for modules
                                                                                                 $12,500
             6. Water Hydraulic Model update & condition calculation
                                                                                                 $10,000
             7. Field Data Collection & Mobile Apps development; purchase of
                                                                                                 $30,000
                two refurbished tablets
             8. Risk -framework hydrants, catchbasins; configure WV
                                                                                                 $15,000
             9. Pavement GIS Vueworks configuration & training
                                                                                                 $50,000
                                                  Page 1 of 2

              215 First Street, Suite 320, Carnbricipe, MA 02142 p I 617.497.7800 f I 617,498.4630

Source page 151

Task                                            Estimated
                                                                                                    Budget
                 10. DPW Work Orders - work flow development, configuration,
                                                                                                   $100,000
                     training
                       • 6 WO forms; 2 each water, stormwater, sewer
                       • Mobile WO Set-up, configuration, training
                 11. Drainage problem areas —needs assessment & project definition
                                                                                                     $6,000
                 12. Documentation, coordination and IVVRM Report Update
                                                                                                    $20,000


                                                                                     TOTAL         $311,000

 Mechanic Street and Vicinity Water Main Replacement

 The 2011 Water Master Plan identified 12,400 linear feet of water main in need of replacement in the area of
  Mechanic Street, as listed below. The project area was further identified as "high risk" in the Integrated Water
 Resource Management Plan — Year 1 report These 6-inch pipes are among the oldest in the Canton water
 system. The water main is proposed for replacement with larger, 8-inch diameter pipe. Replacement of these
 water mains will improve water supply reliability for residents served in this area, improve fire protection, reduce
 the Town's water losses resulting from teaks, and will reduce the maintenance burden on Water Department
 staff.

               Location                                          Description
           Mechanic Street           Replace 4,100 feet of 6-inc water main with 8-inch water
                                                                                              main
           Rockland Street           Replace 2,700 feet of 6-inch water main with 8-inch water
                                                                                               main
           Howard Street             Replace 360 feet of 6-inch water main with 8-inch water main
           Belcher Street            Replace 340 feet of 6-inch water main with 8-inch water
                                                                                             main
          Walnut Street              Replace 1,400 feet of 6-inch water main with 8-inch water
                                                                                               main
          Messinger Street           Replace 1,300 feet of 6-inch water main with 8-inch water main
          Beverly Hill               Replace 800 feet of 6-inch water main with 8-inch water main
          Walnut Knolls              Replace 1,400 feet of 6-inch water main with 8-inch water main ,


Budget Recommendation: $2,630,000
Budget Basis: Linear foot cost estimate developed as part of the November 2011 Water Master Plan,
increased by 8.7% to match Engineering News-Record construction cost index change from 2011 to October
2014. Linear foot cost includes permitting, design, public bidding, construction, and construction inspection.




                                                   Page 2 of 2
                                                                                                 November 6, 2014
   KLEINFELDER
                            215 First Street, Suite 320, Cambridqe, MA 02142 p I 617.497.7800 f I 617,498.4630

Source page 152

TOWN OF CANTON
                                          FORM B - FISCAL 2016
                          CAPITAL PROJECT / EQUIPMENT REQUEST
,
     DEPARTMENT:                                              SUBMITTED BY:
                      Public Works    (
                                          t10    ' ,                     Michael Trotta


     PROJECT / EQUIPMENT TITLE:
                             Water Sewer Division Pine St Garage


     TOTAL PROJECT / EOUIPMENT COST:
                                                   $230,000

     DESCRIPTION:
    Engineering and construction of structural, HVAC, and plumbing modification to the Water
    Sewer Division Garage on Pine Street.




     PURPOSE AND JUSTIFICATION:




     NEED CLASSIFICATION: (Check all that apply)           Departmental Priority Ranking:
       Required for Safety                                   Please rank this request out of your total
       Required by Law or Mandate                            requests for this year: (#1 as top priority)
       Improve/Expand Service or Increase Efficiency                ,; (#) OF             :, (#)
        Planned Project or Replacement                     Expected Useful Life: (Check one)
        Unplanned Project or Replacement                     20 or More Yrs      5 to 9 Years
        New Project/Item (not on last year's 5-Yr. Plan)     10 to 19 Years      3 to 4 Years
                                                                                                            ,
     Impact to Dept. Operating Budget: (Check one)         Revenue Impact: (Check one)
        Will Reduce Cost by $                                Will Produce Addle Revenue by $
        No Impact                                            Revenue Neutral (no impact)
        Will Increase Cost by $                              Will Decrease Revenue by $


     OTHER COMMENTS OR INFORMATION: (Attach supporting documentati9n)

Source page 153

COMMITMENT & INTEGRITY                  980 Washington Street I Suite 325        T 800.446,5518
             DRIVE RESULTS                           Dedham, Massachusetts 02026              T 781,251.0200
                                                     www.woodardcurran.conn                   F 781.251.0847




             MEMORANDUM
             TO:            Michael Trotta, Superintendent of Public Works, Canton

   A  L      FROM:
             DATE:
                            Dennis Morton, Water/Sewer Supervisor, Canton
                            Joseph D. Shea, PE
                            November 7, 2014
      Ilk    RE:            Concepts for Water Department Building Improvements
WOODARD                     44 Pine Street, Canton
8.1.CURRAN
             We have compiled our thoughts and recommendations for the possible improvements to the Water / Sewer
             Department Building at 44 Pine Street in Canton. This memo outlines the concepts, discussion points, and
             planning level costs for the potential improvements. We would like to meet with you both to discuss this memo in
             early December.

             Prior to the site visit, W&C reviewed the available record information from the construction of 44 Pine Street in
             the mid-1990s via a design by Anderson-Nichols and constructed by Cape Building Systems, Inc., with
             substantial completion in 1997. In general, W&C reviewed and discussed the following goals for improvements
             during our September 4, 2014 site visit:
                   1. Create dedicated space for staff locker areas, with appropriate amenities,
                   2. Add heat into the vehicle bays, and
                   3. Create a second lavatory for staff use.

             W&C recommends that the Town consider the removal of most of the usable space in Bay #1 to create a CMU
             block locker room with mezzanine storage above. The locker room will house about 16 lockers with tables for
             break space. The space is expected to be about 350 square feet (14' x 25' roughly) situated in two possible
             configurations in Bay 1. The proposed space is anticipated to include the following:
                   •   350 square feet (14' x 25' roughly, depending on configuration) with vinyl or VCT flooring
                   •   Approx. sixteen (16) lockers, 18 inches wide, with fixed benches equivalent to the DPW locker room at
                       150 Bolivar Street
                   •   To the extent possible, break tables and chairs will be included
                   •   Dependent on configuration, sink facilities, mirror and shelves, but no shower facilities
                   •   Access to cable TV for watching the news during storm events
                   •   Upgrade existing building systems for compliance with Massachusetts Building Code as
                       required per ASHRAE 62.1 2007, Ventilation for Acceptable Indoor Air Quality
                   •   Improved hot water heater for expanded water demand
                   •   Mezzanine space sufficient for a 40 psf live load for storage with railings and kick plates per code

             For adding heat into the vehicle bay, W&C has carried concept cost for modifying the heating system to be in
             compliance with ASHRAE 90.1 2012 (Energy Standards for Buildings Except Low Rise Residential Buildings)
             and the International Energy Code as adopted by the Commonwealth of Massachusetts. This will include
             additional unit heaters and additional disbursement fans within the bay. It is expected that a natural gas service
             will need to be extended from the Bolivar Field portion of Pine Street to the site at 44 Pine Street, given that the
             existing three (3) LP gas tanks may not provide sufficient volume for the heating demand.

             W&C recommends converting the existing storage room into a Men's lavatory. The existing single lavatory will
             remain ADA accessible and will become a Women's Room with locker accommodations for female staff. The
             new men's room will include a toilet, urinal and sink which will connect into existing feed and waste piping in the
             adjacent wet wall, with some slab modifications for waste piping required. We strongly recommend a meeting

Source page 154

with the Building Inspector and Plumbing Inspector to discuss the viability of modifying this space without
          triggering occupancy limitations, ADA, and other possible "new construction" code issues that cannot be fully
          accommodated in the existing space.

          In addition to the core three (3) improvements, additional building improvements may be included in the project
          as funding allows:
                •     Upgrade water service with a Reduced Pressure Zone (RPZ) Back Flow Preventer in accordance with
   Ailk         •
                      requirements of the Massachusetts Plumbing Code (248 CMR)
                      Add railing and kick plates to the existing mezzanine storage areas
WOODARD         •     New tool corral area with modern storage and work bench space (equivalent to the Lappens'
&CURRAN               equipment at 150 Bolivar Street)
                •     Egress modifications at the man doors from the existing occupied space into the garage area
                •     General painting and housekeeping improvements to the existing occupied space

          We understand the Town's desire to self-perform notable portions of the work with existing licensed and capable
          staff. We do not anticipate any specified category of work to exceed $20,000; therefore, we do not recommend a
          General Contractor procurement with filed sub bids under MGL Chapter 149. Based upon these concepts, we
          recommend that the Town include an Annual Town Meeting article for $230,000 to be expended by the DPW for
          these improvements.

          Recommended next actions in preparation for Town Meeting:
                1. Meeting with gas company about serving 44 Pine Street
                2. Meeting with Building Inspector and Plumbing Inspector about concepts and code compliance with any
                   potential improvements.
                3. Review this proposed scope of work with existing Water 7 Sewer Staff to solicit any additional input or
                   thoughts.

          Thank you for the opportunity to give you our thoughts and concepts on how to meet your goals for this building.
          We look forward to continuing the discussion about the potential project.




          2014 11 07 Building Improvement Options                                                                   Page 2 of 2

Source page 155

'
                                                                 90C: 0'




                :




                              A2A
          B

3/41:5(4'x4' .FLYWOOD
BACKBOARD— COORD—,
EXACT LOCATION
ELECTRICAL. •,




                                                            .•      •




      NSLOC:Est\fiT. PA

                                                                               :
                                                                           •
                          •




                                                 CONCRETE:FILLED•SILE
                                    '            PIPE BOLLARD— SE
                                        •   .•

Source page 156

short-native-text

SEWER
ENTERPRISE

Source page 157

TOWN OF CANTON
                                     FORM B - FISCAL 2016
                       CAPITAL PROJECT / EQUIPMENT REQUEST

 DEPARTMENT:                                               SUBMITTED BY:
                   Public Works               OA)                     Michael Trotta


 PROJECT / EQUIPMENT TITLE:
                                 ec ki Way Sewer Replacement
 TOTAL PROJECT / EQUIPMENT COST:
                                                $250,000

 DESCRIPTION:
Replace 180 feet of sanitary sewer in Esty Way. Pave street upon completion of sewer work.




 PURPOSE AND JUSTIFICATION:
TV inspection of existing 8 inch sanitary sewer in Esty Way found the pipe to be in poor condition,
cracked, broken, with much of the pipe invert substantially below deigned self cleaning grade. Most of
the pipe joints have opened allowing ground water and gravel into the pipe. The pipe needs to be
replaced to remove excess ground water infiltration, reestablish grade, and lessen pipe cleaning and
maintenance.


 NEED CLASSIFICATION: (Check all that apply)            Departmental Priority Ranking:
    Required for Safety                                   Please rank this request out of your total
    Required by Law or Mandate                            requests for this year: (#1 as top priority)
   Improve/Expand Service or Increase Efficiency                  1 (#) OF

     Planned Project or Replacement                     Expected Useful Life: (Check one)
  x Unplanned Project or Replacement                    x 20 or More Yrs      5 to 9 Years
     New Project/Item (not on last year's 5-Yr. Plan)     10 to 19 Years      3 to 4 Years


 Impact to Dept. Operating Budget: (Check one)          Revenue Impact: (Check one)
     Will Reduce Cost by $                                Will Produce Addle Revenue by $
  x No Impact                                           x Revenue Neutral (no impact)
     Will Increase Cost by $                              Will Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)




  t-Utl   -

Source page 158

Canton Public Works                         November 3, 2014

                          Capital Improvement Estimate


                    ESTEY WAY SEWER REPLACEMENT
Length = 100 ft.
                                                          Unit
  Quantity         Unit                 Item              Price        Amount
    160             CY              Excavation                20.00      3,200.00
    160             CY          Control Density Fill          75.00     12,000.00
    180             LF         PVC Pipe & Fittings            50.00      9,000.00
     1              EA             F&I Manholes             3000.00      3,000.00
     1              EA        Structure Adjustments          250.00        250.00
     1              EA           Frames & Covers             450.00        450.00
    48             Hrs                Policing                65.00      3,120.00
     2              EA           Test Excavations          1000.00       2,000.00
     1              LS    AC Pipe Removal and Disposal      5000.00      5,000.00
    33             Tons      Temporary Asphalt Patch          85.00      2,770.37
     1              LS     Traffic Safety & Maintenance    1500.00       1,500.00
     1              LS              Dewatering             2500.00       2,500.00
                                                          SubTotal      44,790.37



ESTEY WAY & MICHAEL LN RECLAMATION & PAVING

St Length:    1255
                                                          Unit
  Quantity         Unit               Item                Price        Amount
   1100            Tons           Street Paving               75.00     82,500.00
   4800             SY            Reclamation                   2.10    10,080.00
     10            Tons            Hand Work                  70.00        700.00
   2600             LF            Asphalt Berm                12.00     31,200.00
    100             LF            R&R Granite                 16.00      1,600.00
     15            EA     Lower/Raise MH Adjustments         100.00      1,500.00
     10            EA     Lower/Raise CB Adjustments         100.00      1,000.00
     25            EA       Covers/Frames and Grates         400.00     10,000.00
      5            EA       Lower/Raise Water Gates          100.00        500.00
      3            EA        Lower/Raise Gas Gates            10.00         30.00
    160            HR               Policing                  65.00     10,400.00
    315             SY           Loam and Seed                10.00      3,150.00
    850             SY        Full Depth Sidewalk             40.00     34,000.00
   310             CY      Full Depth SW Excavation           20.00      6,200.00
   280             CY      Full Depth SW Proc Gravel          22.00      6,160.00
     4             EA                Ramp                  1500.00       6,000.00
                                                          SubTotal     205,020.00


      Grand Total: $                   250,000.00

Source page 159

TOWN OF CANTON
                                     FORM B - FISCAL 2016
                         CAPITAL PROJECT / EQUIPMENT REQUEST



                                    C
  DEPARTMENT:                                              SUBMITTED BY:
                     Public Works                                     Michael Trotta
                                                „)




  PROJECT / EOUIPMENT TITLE:
                   Integrated Water Resources Management Program


  TOTAL PROJECT / EOUIPMENT COST:
                                                $311,000

 DESCRIPTION:
A 5 year plan to implement a data driven integrated approach to managing the Town's water,
wastewater, and storm water infrastructure that utilizes technologies to deliver a sustainable
Asset Management System. Asset Management can be identified as a data driven practice that
weighs asset related decisions and activities to achieve a balance of cost, risk, and
nprfnrman


 PURPOSE AND JUSTIFICATION:
The Integrated Water Resource Management Program is designed to use a risk based approach that will
allow the Town to make smarter investments, achieve greater efficiency, and be less vulnerable to
regulatory risk or "management by crisis". The initiative will keep Public Works focused on abandoning
the traditional reactive way of conducting operation and establishing a culture of asset management
that is centralized, automatized, efficient, and sustainable.


 NEED CLASSIFICATION: (Check all that apply)            Departmental Priority Rankina:
   Required for Safety                                    Please rank this request out of your total
   Required by Law or Mandate                             requests for this year: (#1 as tors priority)
   Improve/Expand Service or Increase Efficiency                 2—(#) OF

  x Planned Project or Replacement                      Expected Useful Life: (Check one)
     Unplanned Project or Replacement                     20 or More Yrs      5 to 9 Years
     New Project/Item (not on last year's 5-Yr. Plan)   x 10 to 19 Years      3 to 4 Years


 Impact to Dept. Operatina Budaet: (Check one)          Revenue Impact: (Check one)
    Will Reduce Cost by $                                 Will Produce Addle Revenue by $
    No Impact                                           x Revenue Neutral (no impact)
  x Will Increase Cost by $_20,000                        Will Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)




 tLThMb 1-10W-IL Z1177

Source page 160

KLEINFELDER
             Bright People. Right Solutions.




                                         MEMORANDUM

 TO:              Michael Trotta, Superintendent, Canton Department of Public Works
 FROM:            David Peeling, RE., Kleinfelder
DATE:             November 6, 2014

SUBJECT: FYI 6 Budget Recommendations




Kleinfelder recommends the following projects be considered during the Town of Canton's FY2016 budget
planning. Please contact me if you have any question or would like any additional information on these
recommendations.


Integrated Water Resources Management Plan — Year 2

This project is the second year of a planned 5-year phased Program to integrate Water, Sewer, and Stormwater
Systems including Asset Inventory and Data Management.
Budget Recommendation: $311,000
Budget Basis: Scope task list, as detailed below.


                                               Task                                          Estimated
                                                                                              Budget
              1. Canton Septic Systems Database Development
                                                                                                  $7,000
              2. Planning Board Electronic Submittal Standards ; Bylaw review
                                                                                                  $8,000
              3. Updates to GIS - Refine Inventory for water, sewer, & drain
                                                                                              $35,000
                 priority data gaps
             4. Asset Management Software: ArcGIS online license; one year
                                                                                              $17,500
                hosting of all VueWorks modules (Work Order, VW Mobile, Risk,
                Condition, Budget Forecasting, Facilities)
             5. Configure ArcGIS Online; staging environment for modules
                                                                                              $12,500
             6. Water Hydraulic Model update & condition calculation
                                                                                              $10,000
             7. Field Data Collection & Mobile Apps development; purchase of
                                                                                              $30,000
                two refurbished tablets
             8. Risk -framework hydrants, catchbasins; configure VW
                                                                                              $15,000
             9. Pavement GIS Vueworks configuration & training
                                                                                              $50,000
                                                Page 1 of 2

              215 First Street, Suite 320, Cambridue, MA 02142 p 1 617.497.7800 f 1617.498.4630

Source page 161

Task                                            Estimated
                                                                                                  Budget
                10. DPW Work Orders - work flow development, configuration,                      $100,000
                    training
                      • 6 WO forms; 2 each water, stormwater, sewer
                      • Mobile WO Set-up, configuration, training
                11. Drainage problem areas —needs assessment & project definition
                                                                                                   $6,000
                12. Documentation, coordination and IWRM Report Update
                                                                                                  $20,000


                                                                                   TOTAL         $311,000

 Mechanic Street and Vicinity Water Main Replacement

The 2011 Water Master Plan identified 12,400 linear feet of water main in need of replacement in the area of
Mechanic Street, as listed below. The project area was further identified as "high risk" in the Integrated Water
Resource Management Plan — Year 1 report. These 6-inch pipes are among the oldest in the Canton water
system. The water main is proposed for replacement with larger, 8-inch diameter pipe. Replacement of these
water mains will improve water supply reliability for residents served in this area, improve fire protection, reduce
the Town's water losses resulting from leaks, and will reduce the maintenance burden on Water Department
staff.

               Location                                         Description
          Mechanic Street           Replace 4,100 feet of 6-inc water main with 8-inch water main
          Rockland Street           Replace 2,700 feet of 6-inch water main with 8-inch water main
          Howard Street             Replace 360 feet of 6-inch water main with 8-inch water main
          Belcher Street            Replace 340 feet of 6-inch water main with 8-inch water main
          Walnut Street            Replace 1,400 feet of 6-inch water main with 8-inch water main
          Messinger Street         Replace 1,300 feet of 6-inch water main with 8-inch water main
          Beverly Hill             Replace 800 feet of 6-inch water main with 8-inch water main
          Walnut Knolls            Replace 1,400 feet of 6-inch water main with 8-inch water main

Budget Recommendation: $2,630,000
Budget Basis: Linear foot cost estimate developed as part of the November 2011 Water Master Plan,
increased by 8.7% to match Engineering News-Record construction cost index change from 2011 to October
2014. Linear foot cost includes permitting, design, public bidding, construction, and construction inspection.




                                                  Page 2 of 2                                  November 6, 2014
    KLEINFELDER            215 First Street, Suite 320, Cambridoe, MA 02142 p I 617.497.7800 f I 617.498.4630

Source page 162

Canton S-Year Implementation Plan for Asset-Management Based Integrated Water Resources Management Plan
                                                                  'rex 1 2014                                      Ova)    2015                                                  2311,                                              7,1, - 2017                                     2014

                                                                                            Facus onwork management for all tatIlides end on pavement
                                                           Foam on Inventory, end LOS                                                                    Fops on Watts System faclinle”nd on Valuadon                     Fame m Condition Assents eat                  Foam oaken-Tenn Budget
                                                                                                               manegement
Systent Oval                            •

                                                                                                                                                                                                                      Transidon Risk Framework to VUEWorks
•II utilitYtYttm.                                                  Define LOS                         eW kitegatlertfle_rhteMINOCIA_MId WO(                    Implement LOS Eval.From W.O. Data
                                                                                                               Ye      LOS evaluation                                  - LOS mnduation                                                    LOS evaluation
                                                                                               Add I a commercial users to risemodel MMINNI:=1=1:=02TBINBTRM
                                                                                          IMIMMISSE:=E2=1:KMMEMME
                                                                                                                                                                                                                Incorporate %Megaton. infonnation In d model
                                                                   Delo model                                  Refine Inventory/GIS

                                                                                                          Llpdete thdraulkagodel with GIS                                                                                     Reline HYdraulleModel
                                                                Data gapanalyds               Cells Condleon from Hyd. Model Cmalues (Stored In DISI                                                                            Update risk mak!
                                                                 Risk framework                     Cale. °gladly from klyd. &Sod .1. ISO Bre How
                                                            Cale- remaining useful life           kscorporate Pavement Inforrnaden In RiskModel
                                                                                                     Reradtulate Msksvith updated infonnation
                                                                                                          De-T'
                                                                                                             Ls • • %V.O.ForiasentIRe -
                                                                   Data model                                    Refine kwentory
                                                                    amatory                             Use hyd. Model to derive cond. Data
                                                                                                             Drpolop Risk Framework
                                                                                                                  W.O. Forme md
                                                                   Data model                                    Reline Invenbary                                                                                            Develop Risk Fran■
                                                                                                                                                                                                                                              ework
                                                                    Pam. •                               'ileeelM WM-Perms and Ile..
                                                                                                                     Moan
                                                                   Data raedel                                       Inwatory                                Integrate meter infonnatIon InVUEWssis
                                                                                                                  Wm. Foni.iad
                                                                   Data model                                    Refine inventory                               Develop W.O.Fonns and Reports
                                                                    W.snMry


"ZE:1=1111111111=111=11 watts supprywells (fee)
                                                                                                                  Refine inventory


                                                                                                                                                                DeveloP ..rt, 49°
                                                                                                                                                                                                                                                      FaacyAseals
                                                                                                                                                                                                                                                                    -
                                                                                                                                                                                 -
                        water pump stations (fad                                                                                                                                              -DeL-WatAW,9••F9
                                                                                                                                                                                                            --tW4
Water Fealties          water tanks (lac)                                                                                                                                                Cio;ii9 LOS r.""H'i asset tWe.      facilitiet
                        water treatment pleat (fee)                                                                                                                                               Dopoprattovoe      , rk        _
                        '<Milhous =males assets.>                                                                                                                                                                                     vii
                                                                  Data model                                     Refine IrWentory                            Compile previousyear cleartingadvities
                                                                    knantory •                         _ (Develop Malan). Flow metering                                Update risk model
saver gravity mains Comdex asset t11.                          Data Imp analysis                           MmmoraM VI Data In 9,stern                            (Implement 1811 nen PIMM                           CM impaction Plan and Start Implementation
                                                                Rids framework                                    w•Q•Feirme end RePorts                                                                                        Update Mk model
                                                            Cal. remain useful life
                                                                   Data model                                                                                                                                                  Manhole Insneetim
sewer manholes          ComPIM asset nese                                                                                                                                                                                    Develop Risk Fremmatork
                                                                    Inventory
sewer force mains       hAel, in

                                                                    Imentay
sewer pump stations Mamd
7L7 P1...iik.P. 7O-.9•11 72LL       •                              Data model
                                                                   Data medal                                                                                                            Develop and Implement Condition Assessment
                                                                                                                                                                                                                                  Reane Risk
                                                                Data Op                                                                                                                                                            ValuatIM
                                                                 Risk framework
                                                                   Data model                                     Sofa.
                                                                    amiably                                           fin
                                                                                                                        ka7i
                                                                                                                           st"
                                                                                                                            'k V
                                                                                                         0iVilePWA5,Parra-s and
                                                                   Data model                                        kWentoty
 teammates culverts Simple asset top.
                                                                                                               r • W.O.Fortne Milne
Pon:neater                                                                                                DarloPW-Ottonne end
                                   type
datendon/Infiltration Simple asset
                                                                   Date modd                                              IMentory•
Parameter ntanholes Simple asset type
                                                                    Owen                                       • • 1.4.0. Fame and Re •
 tormwater                                                         Data model
                        Simple asset type
separators oil/water
                                                                 , DataModel                            Dewlap W.O.Fonne led Report.
stommater anthill, Simple asset M.
                                                                    'riven                        Develo • Raclin samplin pro m -Dm 105
                                                                                                                    Oatamodel
                                                                                                                         ow

                                                                                                     Integrate PO data P. VUEWorks avai ls GIS _
Roads                   Complm mset twe
                                                                                                         Camden W.O.Fortaim  ' tdRePoste       '



                                                                                                                                                        1111111111111=1===111•11•111.

                                                                                                                                                                        Acquire Fadaties                                        Acquire Risk Module
C1:11                                                                                         ' Ac9ulai W4vC°nd.find344PtForeMilleff M
                                                                                                          einem W.O.      • end mettle



  KLEINFELDER
         aduv 0.06 O1.1 solveur..
                                                      Kw
                                                                                          Whedsthe Pate of my men?                                                                   77azamaz.              Work MOO Metero my roin Ilfewde coPCIP 90+M tamed.
                                                                                          LOS: %Mut myreouired sustainable LOS                                                                                   WA:hams are clued to moaned performance?
                                                                                           conTermFunceng                                                                                                   Applies more then Lphese of AM
                                                                                          Other supporting auks

Source page 163

INTEGRATED WATER RESOURCES
MANAGEMENT / CAPITAL
IMPROVEMENTS PROGRAM,
TOWN OF CANTON, MA
                                                                                                                           DRAFT, rev. 10/1/2014


0.0 Executive Summary & How to Use this Document

This document provides an introduction, project need, project approach, and regulatory context for
Canton's Integrated Water Resources Management and Capital Improvements Program (IWRM-CIP).
The IWRM-CIP builds on prior planning efforts for the water and wastewater systems of Canton and
incorporates a newly developed Stormwater Master Plan. Canton intends to implement this program
using a risk-based asset management approach developed over a 5-year period.

Canton's Integrated Water Resources Program is designed to align with the components of IWRMPs
required for regulatory purposes, but also to identify needs and rank recommendations on the basis of
1) reducing risks and 2) maintaining Canton's desired Levels of Service for its water, sewer, and storm
drain systems. Canton has used a 'triple bottom line' approach, which considers the public, the
environment, and economics.

Year 1 (January—October 2014) implementation has included two major components: 1) a Stormwater
Master Plan and 2) Year 1 of the 5-year IWRM-CIP asset management plan. Year 1 tasks focused on the
Stormwater System as this system has the least well developed capital planning framework and the
most imminent regulatory compliance demands.

The electronic version of this document has been provided as part of an IWRM-CIP Library, with a folder
structure that includes the various component Master Plans and associated reference documents, which
cross reference each other via hyperlinks either within the library, or to external resources on the
Internet. The document, and the capital planning tool, is designed to be updated annually along with
the Town's fiscal planning cycle. In future years, certain components will be integrated via the Town's
Asset Management software modules.

The components and folder that make up the IWRM-CIP Library are shown below:




  GA_clients \Canton MA \ 20140151.001A -IWRM-CIP \ Documents \ Canton IWRMP-CIP Year 1 Draft Deliverable\ Canton Integrated Water Resource Mgmt Plan-Draftdocx

  DRAFT REV. 10/1/2014                                                                 1                                                             C)KLE1NFELDER 2014

Source page 164

Folder Structure for IWRM-CIP Library

                                               . 1 - Canton Asset Mgmt Program -CIP
                                                  2 - Stormwater Master Plan
                                                  3 - Water Master Plan
                                                  4 - Sewer Plans
                                             j. 5 - Other Reference Docs
                                            ej Canton Integrated Water Resource Mgmt Plan-Draft



The Town intends to store this Library on a common server for multiple Departments to access and to
add to. The management of documents and data related to the IWRM-CIP will be a focus for Year 2 of
the project. The reader is referred to the Canton Asset Management Program-CIP folder for details on
the implementation of asset management and capital planning for Year 1. The reader is referred to the
other Master Planning folders for the individual detailed plans for each system.



1.0 Introduction

Over the past 10-plus years, the Town of Canton Department of Public Works has worked to address a
number of water resources needs and regulatory requirements that often compete with each other (and
with other public works projects) for very limited funds. While various stormwater and water
withdrawal offset and conservation projects have been undertaken periodically, and partially advanced,
funding and staff time has not been available to quantify the effectiveness of these efforts, nor to follow
through on all of them. Following through on many of these projects and others would provide
environmental benefits and implement measures consistent with multiple regulatory drivers. However,
it becomes difficult to justify spending on watershed restoration efforts when their benefits are
unknown.

The vision that was formed by the Canton Public Works leadership was an integrated program that met
overlapping regulatory challenges related to drinking water, stormwater and wastewater, but that did
so in a proactive, logical, and cost effective way that was best for Canton's citizens, businesses, Town
infrastructure, and environment. In order to be successful, the Program must be dynamic; it must be
updated and informed by new data and changing conditions, and must be re-evaluated periodically for
effectiveness as it goes forward.

This Integrated Water Resources Management Program (IWRMP) is designed to use a risk-based Asset
Management approach that will allow the Town to make smarter investments, achieve greater
efficiency and be less vulnerable to regulatory risk or "management by crisis." Implementation of the
Program is planned to be phased over a five year period, with this document representing the progress
made during Year 1. The Canton Asset Management Program (CAMP) Year 1 Implementation Report
includes a Capital Improvements Plan (CIP) and associated ranking tool to help the Town prioritize



  G:\_cflents\Canton MA \ 20140151.001A - IWRM-C1P \ Documents \ Ca nton IWRIMP-CIP Year 1 Draft Deliverable \Canton Integrated Water Resource Mgmt Plan-Draftelocx
  DRAFT REV. 10/1/2014                                                                   2                                                               CKLEINFELDER 2014