Canton, Massachusetts · Saved source text
FY26 School Capital Requests - January 2025 pdf file
Saved text from 112 source pages. Transcription and OCR may contain errors; verify figures and wording against the original. Retrieved 2026-10-15.
Source page 81
D 0 ni ot use for designianginearing or ad copy approval. ALL DIMENSIONS ARE APPROXIMATE DAKTRONICS ~ RENDERING DETAILS * Scoreboard Model: Daktronics FB-2021 White LED’s White TNMC’s White Electronic Captions Decorative Accents: DA-1001-25 Arch Truss (1) 2’ x 25’ Non-Backlit Ad Panels Paint Color: Green #8750 White Captions White Border Striping Total Equipment Height: 14 Total Equipment Width: 25’ SCOREBOARD ENTERPRISES SALES - INSTALLATION + SERVICE
Source page 82
TOWN OF CANTON FORM B - FISCAL 2025 CAPITAL PROJECT / EQUIPMENT REQUEST DEPARTMENT: | Music SUBMITTED BY: Catherine Eckersley PROJECT / EQUIPMENT TITLE: Musical Instrument Replacements TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000): $10,000 DESCRIPTION: Continue to fund and improve musical instrument upgrades in the district. PURPOSE AND JUSTIFICATION: Each year the district funds musical instruments. Over the past 4 years we have used this money to expand our program to include upright bass for the orchestra in grades 4-12 and have used the money to fund our borrowed instruments program which allows students to borrow due to financial need and to borrow due to inability to fit large instruments on the bus. As the program continues to grow, this funding would allow for additional purchases of upright basses, cellos, and storage racks. NEED CLASSIFICATION: (Check ail that apply) Required for Safety [] Required by Law or Mandate [Vv] Improve/Expand Service or Increase Efficiency LC] Planned Project or Replacement [Vv] Unplanned Project or Replacement’ New Project/Item(not on last year's 5-Yr.Plan) LIN Departmental Priority Ranking: Please rank this request out of your total requests for this year: (#1 as top priority) 5 (#) OF 6 (#) Expected Useful Life: (Check one) [| 20 or More Yrs 5 to 9 Years [| 10 to 19 Years [_] 3 to 4 Years Impact to Dept.Operating Budget:(Check one) [| Will Reduce Cost by $ No Impact [ Will Increase Cost by $ Revenue Impact: (Check one) L__]will Produce Addl Revenue by $ L¥ ]Revenue Neutral (no impact) LE Jwill Decrease Revenue by $ OTHER COMMENTS OR INFORMATION: (Attach supporting documentation) FORM BWWELSCAL 2025,
Source page 83
Your Cart (6 items) + Add All Products to Wishlist Strobel MB-160 Student Series 1/2 Size Hybrid Bass Outfit Helicore Item #1431702 Model #MB-160-12 $5,898.00 ($2,949.00 each) Quantity 2 a Delivery In Stock & Ready for Delivery @ Wishlist [i] Remove Strobel MB-80 Student Series 1/8 Size Bass Outfit Standard Item #1422443 Model #MB-80-18 $5,700.00 ($2,850.00 each) Quantity 2 Only 1 in stock and 2 on backorder ah Delivery Only 1 left in stock @ Wishlist Ti] Remove Strobel MC-80 Student Series 4/4 Size Cello Outfit Standard Item #1422289 Model #MC-80-44 $1,789.00 Quantity 1 Ba Delivery In Stock & Ready for Delivery @Bwishlist [i] Remove Strobel MC-80 Student Series 3/4 Size Cello Outfit Standard Item #1422288 Model #MC-80-34 $1,789.00 Quantity 1 2B Delivery In Stock & Ready for Delivery
Source page 84
In-Store Pickup No stores near you soose Location Tune Up Your Cart D> PUN AN K@) Nevins. wy RemUve: .] ~~ lg ae ia ~N TOP SELL TOP SELLER TOP SELLER TOP RATED TOP SELLEF Artino Pin Stopper For cello / Thomastik Dominant 4/4 Vic Firth American Classic Eastman BC40 S. Eastman Eastman BB20G Series Protec Protec F double bass Cello shape Size Cello Strings 4/4 C... Terra Series Value 4-Pack 5... Series Select Brazilwood... Brazilwood German Bass... Neoprene Saxo tek te te (2) tek tek (1) tee tek & (1) $21.83 $76.95 $44.99 $132.00 $178.40 $19.99 Add to Cart Add to Cart Add to Cart Add to Cart Add to Cart Add to Order Summary Have a promo code? Subtotal $15,176.00 Shipping Calculated in checkout Estimated Tax = Total: visa @D ace Prscuxd $15,176.00
Source page 85
TOWN OF CANTON FORM B - FISCAL 2025 CAPITAL PROJECT / EQUIPMENT REQUEST DEPARTMENT: Science SUBMITTED BY: Ericka Fitzgerald PROJECT / EQUIPMENT TITLE: CHS Science Lab Table Replacement TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000): $33,000 DESCRIPTION: Replace old and damaged tables in the CHS Science lab to allow for better student outcomes. PURPOSE AND JUSTIFICATION: The lab tables in rooms 150, 152, 156 and 158 are all falling apart. They are impossible to keep level as the screw feet do not stay. The legs are falling off and they are generally becoming hazardous and useless for physics labs which often require flat, stable surfaces. We would like to purchase new tables for these classrooms to have proper labspace. NEED CLASSIFICATION: (Check alf that apply) L | Required for Safety | Required by Law or Mandate LY] Improve/Expand Service or Increase Efficiency im Planned Project or Replacement [¥] Unplanned Project or Replacement New Project/Item(not on last year's 5-Yr.Plan) LIN Departmental Priority Ranking: Please rank this request out of your total requests for this year: (#1 as top priority) 6 (#) OF 6 (#) Expected Useful Life: (Check one) [¥ | 20 or More Yrs L_] 5 to 9 Years [] 10 to 19 Years [_] 3 to 4 Years Impact to Dept.Operating Budget:(Check one) [| will Reduce Cost by $ No Impact [| Will Increase Cost by $ Revenue Impact: (Check one) [_|will Produce Addl Revenue by $ [¥ _]Revenue Neutral (no impact) [will Decrease Revenue by $ OTHER COMMENTS OR INFORMATION: (Attach supporting documentation) FORMBIEISCAL 2025,
Source page 86
note Name:
rency: USD
Created Date: 09-12-2024
Expiration Date: 11-11-2024
Customer Number: 410198
Requestor Name: Erica Fitzgerald
fitzgeralde@cantonma.org
1 (781) 8215050
SSL Quote Number: Q-508526
Status: Approved
To place an order using this quote,
contact:
Phone 888-388-3224 4 School
Email orders@schoolspecialty.com Y Specialty.
Sales Rep Name: Daniel Mcgrath
Sales Rep Email: daniei.mcgrath@schoolspecialty.com
Sales Rep Phone: (203) 962-6163
Bill To: CANTON SCHOOL DISTRICT
960 WASHINGTON ST
CANTON, MA 02021-2574
Ship To: CANTON HIGH SCHOOL
Lift Gate Truck Required: [X]
Inside Delivery:
900 WASHINGTON ST
CANTON, MA 02021-2574
Customer Program: MA OFF51-OFF53-OMNIA R230305
Notes: Pricing per OMNIA . additional discounts applied to this quote
only
Quantity SSL Item Customer Pack Image Item Description List Price Your Price Extended
{tem # Size Price
30 5008788 Each TABLE - DIVERSIFIED SPACES - FAB-LAB $1,612.95 $1,099.96 $32,998.80
i TABLE - HPL TOP - 28-1/2 - 36-1/2 INCH
ADJUSTABLE HEIGHT - SPECIFY EDGE COLOR
- SPECIFY FRAME COLOR - 72 W X 30 DIN -
SPECIFY TOP COLOR
Frame Color: Black
Top Color: Charcoal
Edge Color: Black
Subtotal $32,998.80
Estimated Taxes $0.00
Shipping & Handling $0.00
Total $32,998.80
Accept this quote by sending back your purchase order number or signing it electronically. For orders over $15,000.00, please submit a hard
copy of your Purchase Order.
Prices subject to change until all finish selections have been completed. Order will not be placed until all finish options are selected.
Page 1 of 2Source page 87
Signature: Name: Date: Purchase Order Number: Shipping Instructions: Pack Slip Notes: Page 2 of 2
Source page 88
Furniture & Fixtures FY26 CAPITAL BUDGET
Source page 89
TOWN OF CANTON FORM B - FISCAL 2025 CAPITAL PROJECT / EQUIPMENT REQUEST DEPARTMENT: Facilities SUBMITTED BY: David Buccelli PROJECT / EQUIPMENT TITLE: District Cafeteria Table Replacements and Improvements TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000): $16,899 DESCRIPTION: Elementary cafeteria tables are outdated, damaged, and insufficient for enrollment. PURPOSE AND JUSTIFICATION: Elementary cafeteria tables are deteriorating and need replacing. With increased enrollment, some lunch sections are utilizing auxiliary seating and tables due to the number of students and/or damage to existing tables. LJ LJ v LIN NEED CLASSIFICATION: (Check ali that apply) ra Required for Safety Required by Law or Mandate Improve/Expand Service or Increase Efficiency Planned Project or Replacement Unplanned Project or Replacement New Project/Item(not on last year's 5-Yr.Plan) Departmental Priority Ranking: Please rank this request out of your total requests for this year: (#1 as top priority) 1 (#) OF 2 (#) Expected Useful Life: (Check one) [| 20 or More Yrs LC] 5 to 9 Years 10 to 19 Years [__] 3 to 4 Years Impact to Dept.Operating Budget:(Check one) [| Will Reduce Cost by $ No Impact [| Will Increase Cost by $ Revenue Impact: (Check one) [_|will Produce Addl Revenue by $ L¥_]Revenue Neutral (no impact) [wil Decrease Revenue by $ EQRM BO WEISCAL 2025 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
Source page 90
Quote / Saved Cart ey School Sign In / Create Account h b Specialty. Your Shopping Cart Cart 1046707712 | Last modified on 10/04/2024 Prices are subject to change in saved carts. 3 Items Product Delivery Quantity Unit Price Total Price
Source page 91
Classroom Select Mobile Table, 12 © Stools, Rectangle Fr _ shipping: ineligible 3 $2,600.. $7,800.63 $3,466.95 Item #: 1433632 Ships Directly from Manufacturer Typically Within 4-8 weeks - Lead Times Vary Selected Options A Tabletop Dimensions: 12 ft Top Type: MDF Top Color: Fusion Maple a Edge Type: LockEdge Edge Color: Ebony @ Frame Color: Chrome Seat Color: Ebony 2) Number of Seats: 12 Product Height: 29 Inch 2 Edit Options Subtotal $7,800.63 Total $7,800.63 Excludes Tax and Shipping Charges. Please login or enter an address to see your updated total.
Source page 92
TOWN OF CANTON FORM B - FISCAL 2025 CAPITAL PROJECT / EQUIPMENT REQUEST DEPARTMENT: JFK SUBMITTED BY: Saundra Watson PROJECT / EQUIPMENT TITLE: JFK Furniture Improvements TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000): $12,952 DESCRIPTION: Replace outdated furniture. PURPOSE AND JUSTIFICATION: The existing furniture is outdated and needs updating. This request would outfit two classrooms with new furniture and replace older chairs and carts in the building. NEED CLASSIFICATION: (Check al/ that apply) L | Required for Safety [] Required by Law or Mandate lv] Improve/Expand Service or Increase Efficiency C] Planned Project or Replacement [Vv] Unplanned Project or Replacement New Project/Item(not on last year's 5-Yr.Plan) LIN Departmental Priority Ranking: Please rank this request out of your total requests for this year: (#1 as top priority) 2 (#) OF 2 (#) Expected Useful Life: (Check one) [| 20 or More Yrs | 5 to 9 Years 10 to 19 Years [_] 3 to 4 Years Impact to Dept.Operating Budget:(Check one) (| Will Reduce Cost by $ No Impact [| Will Increase Cost by $ Revenue Impact: (Check one) LC Jwin Produce Addl Revenue by $ [¥_|Revenue Neutral (no impact) [_]will Decrease Revenue by $ [FORM BI FISCAL 2025 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
Source page 93
Product Title Classroom Select Contemporary Open Front Rectangle Classroom Select Royal Seating 1100 Four Leg Plastic Shell Chair Order Total: Subtotal Info: Shopping Cart Name: Cart Number: Modified Date: Download Date: Item # Quantity '5009340' 40 '1362378' 40 $7,406.80 $7,406.80 Your Shopping Cart '1046476250' 9/23/2024 09/23/20248
Source page 94
Unit Price $119.96 $65.21
Source page 95
Variant Information Desktop Dimensions: 18 x 24 in;Top Type: Laminate;Top Color: Bannister Oak;Edge Type: T-Mold;Edge Color: Mai Seat Height: 18 in;Frame Color: Chrome;Seat and Back Color: Marine;Glide/Caster Type: Glide;Glide Type: Nylon;
Source page 96
Total Price $4,798.40 $2,608.40
Source page 97
Extraordinary Maintenance /Vehicle Replacement FY26 CAPITAL BUDGET
Source page 98
TOWN OF CANTON FORM B - FISCAL 2025 CAPITAL PROJECT / EQUIPMENT REQUEST DEPARTMENT: SUBMITTED BY: Transportation Brian Lynch PROJECT / EQUIPMENT TITLE: 14 Passenger Van TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000): $75,000 DESCRIPTION: Add a second van to the existing fleet. PURPOSE AND JUSTIFICATION: Adding an additional vehicle to the District's available fleet of vehicles would allow for greater flexibility in transporting students. The current vehicle is constantly in demand, and some of our clubs, teams, and other student groups do not always require a full size bus for their transportation needs. NEED CLASSIFICATION: (Check a// that apply) Departmental! Priority Ranking: L | Required for Safety Please rank this request out of your total C] Required by Law or Mandate requests for this year: (#1 as top priority) Improve/Expand Service or Increase Efficiency 1 (#) OF 4 (#4) [_ ] Planned Project or Replacement Expected Useful Life: (Check one) Unplanned Project or Replacement [| 20 or More Yrs 5 to 9 Years LE] New Project/Item(not on last year's 5-Yr.Plan) [| 10 to 19 Years L] 3 to 4 Years Impact to Dept.Operating Budget:(Check one) Revenue Impact: (Check one) [_] will Reduce Cost by $ [_]will Produce Addl Revenue by $ No Impact [¥_|Revenue Neutral (no impact) [_] Will Increase Cost by $ [will Decrease Revenue by $ OTHER COMMENTS OR INFORMATION: (Attach supporting documentation) FORM BW EISCAL 2025,
Source page 99
Pricing Summary Base MSRP =! $59,470 Options + + $4140 Accessories 28 + $0 Destination Charges 2/ + $2,095 Total MSRP 22 = $65,705 Available Incentives 22 © - $500 Estimated Net Price= = $65,205
Source page 100
Safety and Security FY26 CAPITAL BUDGET
Source page 101
TOWN OF CANTON FORM B - FISCAL 2025 CAPITAL PROJECT / EQUIPMENT REQUEST DEPARTMENT: SUBMITTED BY: Facilities Brian Lynch/David Buccelli PROJECT / EQUIPMENT TITLE: Safety Planning for Entryway Access TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000): $60,000 DESCRIPTION: Study and design safety items for the entryway for each school building. PURPOSE AND JUSTIFICATION: For safety purposes, this capital request would allow the District to procure design services to study and design various options for implementation of access improvements in each school building. Specifically, this allows for a review of potentially vulnerable areas where the installation of items like bollards, ballistic glass, and other safety tools would benefit the district. With this information in hand, the District can prioritize those upgrades in future capital requests. The District is hopeful to implement simple/low cost solutions in FY26 and this study would inform future year capital requests of larger cost/scale. NEED CLASSIFICATION: (Check ail that apply) Departmental Priority Ranking: Required for Safety Please rank this request out of your total L] Required by Law or Mandate requests for this year: (#1 as top priority) Improve/Expand Service or Increase Efficiency 1 (#) OF 4 (#) LC] Planned Project or Replacement Expected Useful Life: (Check one) Unplanned Project or Replacement A 20 or More Yrs [] 5 to 9 Years New Project/Item(not on last year's 5-Yr.Plan) [| 10 to 19 Years [_] 3 to 4 Years L Impact to Dept.Operating Budget: (Check one) Revenue Impact: (Check one) L__] will Reduce Cost by $ [__]will Produce Addl Revenue by $ No Impact [¥_]Revenue Neutral (no impact) [| Will Increase Cost by $ [wilt Decrease Revenue by $ OTHER COMMENTS OR INFORMATION: (Attach supporting documentation) FORM BO EISCAL 2025,
Source page 102
TOWN OF CANTON FORM B - FISCAL 2025 CAPITAL PROJECT / EQUIPMENT REQUEST DEPARTMENT: Athletics/CHS SUBMITTED BY: Daniel Erickson PROJECT / EQUIPMENT TITLE: Lower Campus Traffic Study TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000): $60,000 DESCRIPTION: Study traffic pattern and pedestrian flow for recommended improvements. PURPOSE AND JUSTIFICATION: The existing lower campus traffic flow causes significant safety challenges during athletic events and during school days. Lack of clarity of right of way when merging onto the lower parking lot can be dangerous. Pedestrian interaction with the traffic areas is also challenging. This capital item would produce a study and recommendations to inform future capital requests. The District is hopeful to implement simple solutions in FY26 and request larger cost/scale items in future capital requests. NEED CLASSIFICATION: (Check all that apply) Required for Safety Required by Law or Mandate [v7] Improve/Expand Service or Increase Efficiency L | Planned Project or Replacement [| Unplanned Project or Replacement New Project/Item(not on last year's 5-Yr.Plan) U Departmental Priority Ranking: Please rank this request out of your total requests for this year: (#1 as top priority) 2 (#) OF 4 (#) Expected Useful Life: (Check one) [Lv 20 or More Yrs L_] 5 to 9 Years [| 10 to 19 Years [_] 3 to 4 Years Impact to Dept.Operating Budget: (Check one) CL] Will Reduce Cost by $ No Impact [| Will Increase Cost by $ Revenue Impact: (Check one) L Jwill Produce Addl Revenue by $ [V ]Revenue Neutral (no impact) [_]Will Decrease Revenue by $ OTHER COMMENTS OR INFORMATION: (Attach supporting documentation) EQOPRPMB IEISCAL 2025
Source page 103
TOWN OF CANTON FORM B - FISCAL 2025 CAPITAL PROJECT / EQUIPMENT REQUEST DEPARTMENT: Preschool SUBMITTED BY: Shelley Needle PROJECT / EQUIPMENT TITLE: Rodman Preschool Access Improvement TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000): $100,000 DESCRIPTION: Improve access for our Preschool students and families within the Rodman building. PURPOSE AND JUSTIFICATION: For safety purposes, the Preschool program would like to install a wall and door with key card and other safety items to better control access to the Preschool program on first floor of the Rodman building. Additionally, access from the exterior to interior of the building for our Preschool students and families require upgrades including asphalt areas of the parking lot and walkways, ramp/handicap access to the building, and sidewalk improvements. All of these items would improve the flow of students and families through our building while resolving safety hazards. IN LJ lv] L] ] NN LIN NEED CLASSIFICATION: (Check all that apply) Required for Safety Required by Law or Mandate Improve/Expand Service or Increase Efficiency Planned Project or Replacement Unplanned Project or Replacement New Project/Item(not on last year's 5-Yr.Plan) Departmental Priority Ranking: Please rank this request out of your total requests for this year: (#1 as top priority) 3 (#) OF 4 (#) Expected Useful Life: (Check one) [¥ | 20 or More Yrs L_] 5 to 9 Years [| 10 to 19 Years L_] 3 to 4 Years Impact to Dept.Operating Budget:(Check one) CL] Will Reduce Cost by $ No Impact | Will Increase Cost by $ Revenue Impact: (Check one) [__]will Produce Add! Revenue by $ [¥_|Revenue Neutral (no impact) [_]Will Decrease Revenue by $ HORM A EISCAL 2025. OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
Source page 104
New England School Services, Inc. 98 Hicks Avenue Medford, MA 02155 rION Quote Number: B-Rodm InteriorHallw USA Quote Date: — Nov 25, 2024 Page: 4 Voice: 617-776-4700 Fax: 781-396-8088 Quoted To: Ship to: Canton Public Schools 960 Washington Street 960 Washington Street Canton, MA 02021 Canton, MA 02021 Customer ID Good Thru Payment Terms Sales Rep CANTON 12/25/24 Net 30 Days Brian Hingston Quantity Item Description 1.00 | FRAME-HM 16 W/T&S 2.00 | DOOR-HM18-F 2.00 | VISION-KIT-5x20 8.00 GLASS-Fire rated 2.00 | Panel 2.00 | exit- VD9927 2.00 | CLOSER-LCN1 2.00 | HINGES-SL11x CLRx83" LABOR PAINTING Rodman Building -Interior Hallway doors Furnish and install new doors, frame, and hardware New fire rated transom and sidelight frame -frame and doors to be factory powder coat painted 16g fire rated frame with transom & Sidelights 18 gauge fire rated metal door primed and reinforced for hardware Metal Vision Kit- Exposed Glass Size= 5" x 20" 1/4" fire rated safety glass FIRELITE NT 90 18g metal panel - same construction as doors Von Duprin 9927 SVR exit device x Fire rated x Lever trim x us28 x 3" LCN 4111 door closer x painted aluminum (sp28) x parallel arm mount (PA) Full mortise x CLR x 83” Labor to furnish and install material. * Installation is based on work performed Monday through Friday during normal business hours factory powder coat painting of doors and frame Please note that we are vendors under MHEC and Comm Buys Mass Higher Education Collaborative Vendors ID : MC 14-E05 Subtotal Combuys Operational Services Division Vendor ID 300183 17,691.00 | Sales Tax Freight Total 17,691.00
Source page 105
MAtiEnhS PAVING P.O Box 186 Sharon, MA 02067 Specializing in ASPHALT DRIVEWAYS * ROADWAYS « PARKING LOTS Cell: 781-844-8948 * www.MattsPaving.com “Our reputation is built on your driveway” Job Proposal / Invoice Name C442 heer LE 2_J5SeL0. Date 7 A PD Address FEO CLK. Lg pa City Cs A state LA tip OF Day Phone#_ 2° ‘CHOY «SECT rvening Phonet Asphalt Paving, Preparation & Installation CJ Dig out loam and grass Sweep and prepare areas to be paved [A Excavate and remove: existing asphalt CAT Install and fine grade 6”- 8” of processed gravel base or as necessary, Compact and roll Let Install 1 1/2 inch of asphalt binder, compact and roll [install 1 1/2” to 2” finish asphalt top, compact and roll [J Seal Coating [7 Description of any special details ““4-@ Zou a7 LPOESLE 77. LIA Ce Ly fal: LIZ ran payment to be made at the start of the job, balance to be made upon completion. “att’s Paving guarantees all work for one year against workmanship. Matt’s Paving cannot be responsible for chemical spills, oil, or gas spills, vegetation growth, arks due to sharp objects or tirc marks and settlement. Matt’s Paving cannot guarantee against water puddling. Matt’s Paving reserves the right to require additional cost increase in the event of encountering granite, ledge, or tree stumps to be removed or any other special circumstances not specified on the front of this contract. MM Li e— Total $ 3%, g ¥S Authorized Signature x. WA WA, Customers Signature
Source page 106
pb LAWLESS RESTORATION & WATERPROOFING PROVIDED TO: David Buccelli Canton Public Schools Site Address: 960 Washington St, Canton. MA (Rodman Building) PROVIDED BY: Lawless Restoration & Waterproofing 3 Bessom Street, Suite 112. Marblehead. MA 01907 Sdowdy@lawlessrw.com Proposal Date: 4.29.2024 Valid for 60 days
Source page 107
b LAWLESS RESTORATION & WATERPROOFING Property Specifications Description of Property: Educational Facility Type of Project: Masonry & Waterproofing Scope: Masonry & Waterproofing + Remove and rebuild masonry ramp wall. Approximately 3’ x 14’ area. * Remove and clean existing capstones. Save on site for reuse after wall is rebuilt. « Furnish and install new sealants between capstones. Approx 25 * Remove existing ramp waterproofing membrane. « Cut out and replace deteriorated concrete up to 12 SF. Route and seal approximately 50 LF. * Furnish and install a new pedestrian waterproofing membrane system or MUST PICK OPTION. Pricing: Gutter & Downspout repair Clear penetrating sealer. LS Masonry Wall rebuild $22,450.00 Membrane removal #&S $3,100.00 Membrane option1 [ERR $6,750.00 Clear Sealer option 135 SF $1,850.00 Ramp concrete LS $2,100.00 repairs Project Estimate $22,450.00 $3,100.00 $6,750.00 $1,850.00 $2,100.00 $TBD Payments e 20% deposit required for projects over $25,000.00 e Terms are 100% Net 30 e Late or Unpaid balance shall accrue interest at a rate of 3.0% per month e Payments received 20 days after the invoice due date shall void any and all Warranties.
Source page 108
LAWLESS RESTORATION & WATERPROOFING Effect of default In the event of a default by the customer of any of the covenants or conditions of this agreement, Lawless Restoration & Waterproofing, LLC shall be entitled to the following remedies: A. Right to stop work - Lawless shall have the right to stop work if any of the payments are not made as contracted in this agreement. Lawless shall also have the right to stop work if any of the site conditions as outlined in “Customer Responsibilities” are not provided. . Cost of performance - If Lawless is entitled to stop work as outlined in subparagraph A above, it shall have the right to bill the customer for the work performed up to the date of stoppage and for all materials shipped to the project site (minimum of 30% of the contracted amount). Additional work - Any additional cost to Lawless resulting from the failure of the customer to provide site conditions as Outlined in “Customer Responsibilities” shall be paid by the customer. Attorney’s Fees - If Lawless is required to initiate legal action to collect any amounts due owing or to foreclose on any lien filed on the work, such costs and fees that Lawless may recover include any and all pre-litigation expenses, including attorney’s fees incurred in atternpting to recover said amounts. Any litigation shall take place within the Commonwealth of Massachusetts. Arbitration - In the event of a dispute between the parties in connection with this Agreement, Lawless may by notice to the Customer, request arbitration of the dispute. In the event of such notice, each party shall within ten days thereafter appoint an arbitrator. The two arbitrators thus selected shall by agreement within ten additional days select a third arbitrator. The three arbitrators shall within thirty days thereafter review all aspects of the dispute, have a right to examine all documents related to the dispute and shall take sworn testimony from the parties and any other persons designated by the arbitrators. Within thirty days thereafter, the arbitrators shall by majority vote render a disposition of the dispute and such finding shall be enforceable in any court of law within the United States. We reserve the right to bill for any and all legal expenses. General notes This proposal does not include any sales tax. (Unless otherwise noted) This proposal is based on completion of the above project in one phase. (Unless otherwise noted) This proposal is based on completion of the above project during straight time weekday hours. (Unless otherwise noted) This proposal is based on the completion of the above project using non-union personnel. (Unless otherwise noted) This proposal is based on completion of the above project paying non-prevailing rate. (Unless otherwise noted) F. This agreement between Lawless and customer shall supersede all previous communications, representations and agreements, oral or written, between the parties hereto with respect to the subject matter hereof. No modifications shall be affected by the acceptance of the customer's purchase order form, or other documents containing terms and conditions in addition to or invariance with set forth here. G. This contractor maintains the reservation of all rights to develop its own independent punch list and to return to any project to rectify that punch list at specified time / date prior to full payment on the project. The client agrees to allow contractor access at a specified time / date to make such repairs and agrees these repairs are considered to be a substantial part of the contract. H. In the event of significant delay or price increase of material occurring during the performance of the contract through no fault of the contractor, the contract sum, time of performance, and contract requirements shall be equitably adjusted by change order in accordance with the procedures of the contract documents. A change in the price of an item of material shall be considered significant when the 9 ODP m
Source page 109
b. LAWLESS . . RESTORATION & WATERPROOFING . price and or surcharge of an item increases 5% between the date of this contract and the date of installation. All eligible Labor and Manufacturer warranties shall be submitted in accordance with the final invoice. Agreement to Proceed: Signature: Name Printed: Date:
Source page 110
TOWN OF CANTON FORM B - FISCAL 2025 CAPITAL PROJECT / EQUIPMENT REQUEST DEPARTMENT: Facilities SUBMITTED BY: David Buccelli PROJECT / EQUIPMENT TITLE: Exterior Door Improvements TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000): $27,000 DESCRIPTION: School building exterior doors are a critical safety item that needs various levels of upgrading and improvement throughout the district. PURPOSE AND JUSTIFICATION: Doors at each building have had ongoing damage and egress issues. While critical doors have been replaced in years past, there are others that still require improvement. Additionally, uniform numbering of doors and latching systems are critical public safety elements that should be updated. This request would replace one significantly damaged door and would allow for the replenishment of our inventory of door equipment to allow staff to immediately respond to damage, ensuring the continued safety of our buildings. NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking: L_] Required for Safety im Required by Law or Mandate [Vv] Improve/Expand Service or Increase Efficiency LC] Planned Project or Replacement Al Unplanned Project or Replacement New Project/Item(not on last year's 5-Yr.Plan) LIN Please rank this request out of your total requests for this year: (#1 as top priority) 4 (#) OF 4 (#) Expected Useful Life: (Check one) [| 20 or More Yrs L_] 5 to 9 Years 10 to 19 Years L_] 3 to 4 Years Impact to Dept.Operating Budget:(Check one) [__] will Reduce Cost by $ v¥ | No Impact | Will Increase Cost by $ Revenue Impact: (Check one) [_Jwill Produce Addl Revenue by $ [Vv _]Revenue Neutral (no impact) [will Decrease Revenue by $ OTHER COMMENTS OR INFORMATION: (Attach supporting documentation) EOBM BW FISCAL 2025
Source page 111
New England School Services, Inc. 98 Hicks Avenue as ~ mee ue Medford, MA 02155 Quote Number: B- ExtDoo HRDREP USA Quote Date: Nov 26, 2024 Page: 1 Voice: 617-776-4700 Fax: 781-396-8088 Quoted To: Ship to: Canton Public Schools 960 Washington Street 960 Washington Street Canton, MA 02021 Canton, MA 02021 Customer ID Good Thru Payment Terms Sales Rep CANTON 12/26/24 Net 30 Days Brian Hingston Quantity Item Description 1.00 | MULL-VD4954 2.00 | EXIT DEVICE 2.00 | CLOSER-LCN3 1.00 | LABOR 1.00 | Material EXTERIOR DOOR HARDWARE REPLACEMENT Removal and disposal of the existing hardware Furnish and install new rim exit devices and center post mullion New closers Reconnect existing electric latch retraction in the new devices Von Durpin 4954 removable mullion. Finish: sp28 x Height:7 EACH 8810F 32D SARGENT Rim Exit Device, Exit Only Device Only, No Trim 33 Thru 36 Inch Door Satin Stainless Steel LCN 4111 door closer x painted aluminum (sp28) x parallel arm mount (PA) x Hold open arm Labor to furnish and install material. TOTAL LABOR COST $ 991 TOTAL material cost : $ 4,067.00 Please note that we are vendors under MHEC and Comm Buys Mass Higher Education Collaborative Vendors ID : MC 14-E05 Subtotal 5,058.00 Sales Tax Combuys Operational Services Division Vendor ID 300183 ~ Freight Total 5,058.00
Source page 112
uy Fi New England School Services, Inc. : Quote Number: B-DC6210 closer 98 Hicks Avenue Medford, MA 02155 USA Quote Date: Dec 5, 2023 Page: 1 Voice: 617-776-4700 Fax: 781-396-8088 Quoted To: Canton Public Schools 960 Washington Street Canton, MA 02021 Customer ID Good Thru Payment Terms Sales Rep CANTON 1/4124 Net 30 Days Brian Hingston Quantity Item Description Unit Price Amount Closers to Furnish - Furnish Only -Delivery included 15.00 | CLOSER Door closer DC 6210 689 M54 291.00 4,365.00 Corbin Russwin Grade 1 Closer Cast Iron Body Tri-Pack - Reg, TJ, PA Mount Non-Hold Open - Size 1-6 w/ Thru-Bolts Satin Alumin Subtotal 4,365.00 Sales Tax TOTAL 4,365.00