Tab 9 - Enterprise - Water and Sewer.pdf · Source page 4

TOWN OF CANTON
FORM B - FISCAL 2023

CAPITAL PROJECT / EQUIPMENT REQUEST

DEPARTMENT:                                              SUBMITTED BY:
Public Works ~~ Wotee            Michael Trotta

PROJECT / EQUIPMENT TITLE:
Canton Water System Management and Capital Improvement Plan

TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
$80,000

DESCRIPTION:
Update Canton Water System 5 year Capital Improvement Plan.

PURPOSE AND JUSTIFICATION:
In 2005 Canton Public Works developed and implemented a 5 year Capital Improvement Plan
(CIP). Periodic updates have been made to the CIP, the latest in 2017/2018. By the end of
2022 most of the projects recommended in 2018 will have been completed. These projects
improved fire flow, system reliability, and quality by replacing aged mains and reconnecting
house services to newer water mains. Given those improvements, new residential and
commercial development, the CIP planning model needs to be updated, the impacts to the
water distribution system evaluated, prioritize a new 5 CIP for the water distribution system.

NEED CLASSIFICATION: (Check ail that apply)       Departmental Priority Ranking:

Required for Safety                                             Please rank this request out of your total
~~ Required by Law or Mandate                             requests for this year: (#1 as top priority)
~__ Improve/Expand Service or Increase Efficiency                 2(#) OF            2 (#)

Planned Project or Replacement                      Expected Useful Life: (Check one)
~~ Unplanned Project or Replacement                       20 or More Yrs x 5 to 9 Years
“xX_ New Project/Item (not on last year's 5-Yr, Plan) | —_10 to 19 Years "3 to 4 Years

Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)

___Will Reduce Cost by $                                ___ Will Produce Addl Revenue by $
_x_No Impact                                        _x Revenue Neutral (no impact)
___ Will Increase Cost by $                              ___Will Decrease Revenue by $

OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

Arf  ‘  a
PORT IIET TSCA 2ULe

Tab 9 - Enterprise - Water and Sewer.pdf · Source page 5

PN
(  KLEINFEL DER

Bright People. Right Solutions.

=

November 1, 2021

Mr. Michael Trotta, Director
Department of Public Works
Town of Canton

801 Washington Street
Canton, MA 02021

SUBJECT:         Canton Water System Management and Capital improvements Plan Update - Proposal

Dear Mr. Trotta:

Kleinfelder has worked with the Town of Canton to develop and implement periodic Water System
Management and Capital Improvement Plans for many years. The latest Plan was last updated in 2018
to develop a prioritized list of distribution system capital improvements. By the end of FY22, Canton will
have completed construction on two contracts representing approximately 23,000 linear feet of water
system improvements recommended by the Plan. A third contract recommended under the 2018 plan
representing approximately 11,700 linear feet of system improvements is expected to be awarded for
construction in summer of 2022. These projects improve fire flow and system reliability and quality by
replacing aged and break-prone mains and by reconnecting services to newer water mains.

Since the 2018 Plan update, additional system records have become available and new developments in
the Town have come online. Working with your Department during the course of Plan implementation
we have discussed that an FY23 update of the water system model, coupled with records review and
water main coupon testing would provide value to the Town in reprioritizing a new 5-year CIP for the
distribution system. We are pleased to present this proposal.

PROPOSED SCOPE OF SERVICES

The purpose of this project is to update the Canton Water System Management and Capital
Improvement Plan for the distribution system. Kleinfelder proposes to complete the following tasks:

1. Water Demand Analysis
e Assess current and future water demand and supply adequacy. Evaluate recent demand
history (past 5 years} and trends for average day and maximum daily demand and changes
in demand patterns. Assess planned and permitted significant development projects as
identified by Town of Canton Planning Department.

Page 1 of 3                                            November 1, 2021
© 2021 Kleinfelder                                                                                                                                 www.kleinfelder.com

KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p | 617.497.7800 f | 617.498.4630

Tab 9 - Enterprise - Water and Sewer.pdf · Source page 6

2. Water system records review

Work with the Town Water Superintendent and GIS Analyst to review, compile, and update
water distribution system asset information from historic record plans, tie cards, recent
upgrades and new developments and other documentation to update diameter, material,
and year installed attributes.

3. Hydraulic Model updates and Distribution System Evaluation

Make updates to the distribution system in the current model to reflect new development
and water main replacement projects.

Incorporate current pump curves with available data from recent well maintenance work
and from the results of inspection and testing (by others).

Develop modeling scenarios for the operational pumping sequences most frequently used
by Canton. These operational scenarios will be modeled to determine their ability to
maintain tank elevations and provide adequate pressure and fire flow to system customers.
Perform up to 3 days of flow testing at recommended areas to update or verify asset C-
factor data. Results will be used to recalibrate the existing hydraulic model, identify needs
areas (based on fire flow and water age).

Kleinfelder will refine demand allocations by account number based on billing data usage
provided by Canton to Kleinfelder.

Kleinfelder will analyze the water distribution system utilizing the updated hydraulic model.
The hydraulic analysis will consist of evaluating the water system under projected future
maximum day demands and monitoring pipeline headlosses, water storage tank level
fluctuations, pump operation, and available fire flow. Utilizing the hydraulic model,
improvement scenarios will be evaluated and prioritized based on providing the most cost-
effective benefit to the water system.

4, Water Main Testing
Perform destructive testing on selected portions of main to confirm or refine CIP recommendations.
Test will include a Ring Test in accordance with AWWA C106-7SJ to determine the Modulus of Rupture.
This value will be compared to the similar value of the original pipe to determine loss of pipe strength.
The Town will extract up to five (5) pipe samples for mechanical testing to estimate remaining pipe life.

5. Capital Improvements Program and Water Distribution System Master Plan Report
© Based on the results of Tasks 1 through 4, develop recommendations for water main

improvements projects.

e Develop planning level budget estimates for construction and engineering for each of the

recommendations and develop a prioritized phased 5-year schedule of distribution system

improvements.

e Prepare a Draft Water Distribution System Master Plan / CIP Report. Kleinfelder will meet with
Canton to review the Draft Plan and prepare a Final Plan based on one round of comments on
the document.

Page 2 of 3                                        November 1, 2021

© 2021 Kleinfelder                                                                                                                         www. kleinfeider.com

KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p | 617.497.7800 f | 617.498.4630

Tab 9 - Enterprise - Water and Sewer.pdf · Source page 7

FEE ESTIMATE

We propose to complete the proposed scope of services for a fee not to exceed $79,800 which
represents approximately 560 hours of labor and testing expenses.

SCHEDULE

Kleinfelder would commence work immediately upon receipt of an executed copy of an Agreement and
plan to complete work within 6 months.

Respectfully Yours,
KLEINFELDER

a  NV    by

Kirsten N. Ryan
Senior Project Manager

cc:         File

Page 3 of 3                                           November 1, 2021
© 2021 Kleinfelder                                                                                                                  www.kleinfelder.com

KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p | 617.497.7800 f | 617.498.4630

Tab 9 - Enterprise - Water and Sewer.pdf · Source page 8

TOWN OF CANTON
FORM B - FISCAL 2023

CAPITAL PROJECT / EQUIPMENT REQUEST

SUBMITTED BY:

DEPARTMENT:
Public Works      a  Si CWwar                            Michael Trotta

PROJECT / EQUIPMENT TITLE:
Year 1 Sewer I/I Rehab Project

TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
$300,000

DESCRIPTION:
Design of Year 1 Sewer Inflow / Infiltration (I/I) Rehabilitation construction project.

PURPOSE AND JUSTIFICATION:
Sewer flow metering data was collected over a 10 week period, January - March 2021.
Infiltration into the sewer system town wide is estimated a 2,000,000 gallons per day. Five
Sewershed areas were identified as priorities for I/1 rehab, i.e. they exceeded MA DEP Jimits
of 4,000 gallons/inch diameter/mile/day. Reducing I/I saves operational cost by reducing
sewerage flow to the MWRA.

NEED CLASSIFICATION: (Check ali that apply)       Departmental Priority Ranking:

___ Required for Safety                                             Please rank this request out of your total
Required by Law or Mandate       :                    requests for this year: (#1 as top priority)
“_ Improve/Expand Service or Increase Efficiency                1 (#) OF           2 (#)
x Planned Project or Replacement                     Expected Useful Life: (Check one)
~_ Unplanned Project or Replacement                   _x 200rMore Yrs ___5 to 9 Years
____ New Project/Item (not on last year's 5-Yr. Plan) | 10 to i9 Years 3 to 4 Years

Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)

x_ Will RJ85 - 100,000 /yr.                            ___ Will Produce Addl Revenue by $
No Impact                                       _x Revenue Neutral (no impact)
Will Increase Cost by $                             ___ Will Decrease Revenue by $

OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

TOTS OT TOO IS LOLS

Tab 9 - Enterprise - Water and Sewer.pdf · Source page 9

Trotta, Michael

From:                                Courtney Eaton <CEaton@kleinfelder.com>
Sent:                             Monday, November 01, 2021 4:12 PM

To:                                 Trotta, Michael

Cc:                                Kirsten Ryan; David Peterson

Subject:                                  RE: Sewer Budget Request...

CAUTION: This email originated from outside your organization. Exercise caution when opening attachments or clicking
links, especially from unknown senders.

Mike,

Just to be clear — we are not suggesting that the full $8.3M would need to be spent. Using information that we learned
through our Year 5 IWRP work, we assume that roughly 20% of the $8.3M (or $1.6 M) would need to be spent to
address critical 1/1 pipe work. That was based on our review of the Town’s CCTV effort back in 2019 — roughly 20% of the
pipes fell in the high priority category based on present defects. To be safe, we were estimating a range of $1.5 -S2M
(engineering + construction) to address the I/I found through the 2020 flow Monitoring Study. Using the table we put
into the letter sent last Friday, | am updating it to show the Budget est + timing to help clarify.

Effort                                                                 Budget Est.                       Timing

FY21 AM Review                                                             $250,000                  Nov 2021 - May 2022
SSES                                                                                $150,000                   February — May 2022
CIP Update                                                            June — July 2022
Design of Sewer Rehab Project — Year 1                      $250,000 - $300,000          Aug 2022 — Feb 2023
Start of Construction ~ Year 1*                                $1,250,000 - $ 1, 700,000               July 2024

*This could also be phased over 2 years as needed for budget considerations.
Hopefully, this clarifies your question — if not, | am happy to discuss further with you.

Thanks!

Courtney Eaton, PE, ENV SP
m| 617.671.9245

Ss

From: Trotta, Michael <mtrotta@town.canton.ma.us>

Sent: Monday, November 1, 2021 10:15 AM

To: Courtney Eaton <CEaton@kleinfelder.com>

Cc: Kirsten Ryan <KRyan@kleinfelder.com>; David Peterson <DTPeterson@kleinfelder.com>
Subject: RE: Sewer Budget Request...

External Email

Courtney - Do you have a schedule or chart of when $8.3 M would be spent

Tab 9 - Enterprise - Water and Sewer.pdf · Source page 10

——
KLEINFELDER

QU Bright People. Right Sofutions.

October 29, 2021
Kleinfelder Project No.: 20212633.001A

Mr. Michael Trotta
Superintendent of Public Works
Town of Canton

801 Washington Street

Canton, MA 02021

SUBJECT:         Sewer System CIP Update / Targeted Sanitary Sewer Evaluation Survey (SSES)
Dear Mr. Trotta:

As part of the October 2020, Canton Wastewater System Asset Management Plan, Kleinfelder identified
infiltration and inflow within their sewer system as a high priority for the Town to investigate further. In
that Plan, it was estimated that I/I flows could be as much as 50% of the overall sewer flows in the
system on average.

To this end, Kleinfelder recommended a Flow Monitoring Study to hone in more specifically on
sewersheds within the Town that had high rates of I/I. Based upon preliminary flow monitoring results,
infiltration makes up 42% of the average dry weather flow, resulting in an annual cost of approximately
$1.9M paid to MWRA for transport and treatment (STT).

Using the results from this study, Kleinfelder completed a cost-effectiveness analysis (C/E/A) of the flow
metering data obtained over the course of that study to estimate a budget recommendation for the
next steps of the Town’s sewer capital improvement program (CIP). The C/E/A compared the STT cost
for infiltration flows against the cost of rehabilitation in high priority sections of the Town. The C/E/A
methodology and results are summarized in more detail in Attachment 1 but recommendations for
follow on work to identify specific sources of infiltration are provided herein. The recommended work
should be completed in the following two phases:

1) Phase 1 Flow Isolation & CCTV video inspection — Spring 2022
2) Phase 2 Design of I/I Rehabilitation Recommendations — Fall - Spring 2023

This type of work targets infiltration sources only. These inspections, collectively, make up the Sanitary
Sewer Evaluation Survey, or SSES.

There are no recommendations for FY23 budgeting that target inflow removal. In general, the Town
does not have reported issues with chronic sewer backups, surcharging or sanitary sewer overflows.
Further, the total volume of inflow over the course a year is typically far less than the volume of
infiltration, Therefore, if the Town’s objective is to save operational costs by reducing flow to the
MWRA, the Town should prioritize infiltration removal over inflow removal.

Project No: 20220721.001A                            Page 1 of 3                                       October 29, 2021

© 2021 Kleinfelder                                                                                                                                 www.kleinfelder.com

KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p | 617.497.7800 f | 617.498.4630

Tab 9 - Enterprise - Water and Sewer.pdf · Source page 11

As detailed herein, we recommend the Town budget for an SSES program that consists of the following
work:

Type                     Quantity               Unit Price              Cost                     Target Timeframe

Flow Isolation          88,200 feet             $0.35 / foot            $35,000                  Feb - Mar 2022

CCTV                       20,000 ft                                               $80,000                   Mar — May 2022

Engineering                                                                 $35,000                 Feb — June 2022
SSES Budget for FY23 | $150,000

This work should be targeted for the Spring of 2022 when the groundwater is elevated, and infiltration
rates are seasonally high. Flow isolation, coupled with CCTV inspection, will narrow down the segments
of sewer that are contributing infiltration to the system.

We understand the Town has authorized approximately $700,000 for I/I related work; this SSES will
further the Town’s efforts to identify specific sources of |/1; therefore, could be funded with this source.
Additionally, we have also inquired with MWRA about potential funding for this effort as well; there is a
high likelihood that they will be able to partially or fully fund this effort with monies set aside for Canton
already. We will begin the application process immediately to be considered for their next round of
funding.

At the conclusion of this SSES work, we will provide specific recommendations for rehabilitation and / or
replacement within the 5 high priority |/1 sub areas within the Town. These recommendations will also
be coordinated and integrated with the FY21 Asset Management effort, which will focus on updates to
the Town’s sewer CIP related to non-I/I rehabilitation priorities.

We estimate that construction cost of the I/I related rehabilitation could be on the order of $1.5 to $S2M
for engineering and construction. We suggest that the Town consider using the remaining allocated |/I
funds (~$550,000) to begin the design contract in FY23 with a plan to bid the work at the beginning of
FY24. The design work would be on the order of $250,000 - $300,000. it is expected that the majority of
this work can be funded through MWRA’s I/I fund for member communities; however, the Town will
need to show that they have appropriate the funds for the full amount in advance.

A key outcome of both the recommended SSES study as well as the FY21 AM project will be to provide
the Town with a detailed CIP for the next 3 — 5 years of sewer work.

Project No: 20220721.001A                              Page 2 of 3                                          October 29, 2021
© 2021 Kleinfelder                                                                                                                  www. kleinfelder.com

KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p | 617.497.7800 f | 617.498.4630

Tab 9 - Enterprise - Water and Sewer.pdf · Source page 12

Effort                                                                          Timing

FY21 AM Review                                            Nov 2021 — May 2022
SSES                                                                      February — May 2022
CIP Update                                                          June —July 2022
Design of Sewer Rehab Project — Year 1               Aug 2022 — Feb 2023
Start of Construction ~ Year 1                                       July 2024

Sincerely,

KLEINFELDER

(on FEA

Courtney L Eaton, PE, ENV SP
Project Manager

cc:      Kirsten Ryan, Kleinfelder

File
Project No: 20220721.001A                              Page 3 of 3                                           October 29, 2021
© 2021 Kleinfelder                                                                                                                                www. kleinfelder.com

KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p | 617.497.7800 f | 617.498.4630

Tab 9 - Enterprise - Water and Sewer.pdf · Source page 13

ATTACMENT
Inflow / Infiltration (I/l) C/E/A Analysis & Findings

Tab 9 - Enterprise - Water and Sewer.pdf · Source page 14

—
KLEINFELDEF

Bright People. Right Solutions.

Table 2. C/E/A Analysis of Priority Sewersheds

Cost-        Cost-
Pipe          Total         Pipe                                     Annual            Total          T&T Cost      T&T Cost      Benefit     Benefit
Metered      Material       Length      Percent      Infiltration | gpd/ | Removable    Construction    (20 Years at | (20 Years at | Ratio (at | Ratio (at
Area    Distribution    (LE)     Available      (gpd)      idm | Infiltration       Cost       3% Annual | 8% Annual      3%        8%
'      u                      to Rehab.                                   (gal)                              Inflation)       Inflation)      Annual     Annual
Inflation) | Inflation’
52% AC
4         28% RC      22,580      18,064       269,280 | 4,247 | 49,143,600      $3,062,813     $3,123,513 | $5,319,543      1.02        1.74
20% PVC
72% AC
7         28% PVG      7,820        5,630         48,960     4,132 | 8,935,200        $361,125        $567,912       $967,190        1.57         2.68
53% AC
16         28% PVC       24,560        17,683         252,000 | 4,014 | 45,990,000       $2,563,313       $2,923,074 | $4,978,182        1.14          1.94
18% RC
45% AC
18          32% VC       15,520       11,950         128,160 | 4,647 | 23,389,200       $1,047,938      $1,486,592 | $2,531,761       1.42          2.42
23% PVC
59% AC
22          38% VC        17,720        17,188         464,160 | 5,714] 29,959,200       $1,221,750       $1,904,174 | $3,242,930        1.56          2.65
3% PVC
Totals: | 88,200        70,515         862,560                157,417,200      $8,256,938 | $10,005,265 | $17,039,605
Project #20140151.008A                                Page 4 of 4                             .                   October 2021

© 2020 Kleinfelder

www {einfelder.com

KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p| 617.497.7800 f| 617.498.4630

Tab 9 - Enterprise - Water and Sewer.pdf · Source page 15

——N
KLEINFELDEFR

QL Bright People, Right Sofutions.
MEMORANDUM

TO:            Michael Trotta, Chris Sykes, Jay Mello, Town of Canton DPW
FROM:        Jill Rossini, David Peterson, Kleinfelder

cc:            Courtney Eaton, Kirsten Ryan, Kleinfelder

DATE :        10/25/2021

SUBJECT: _ Inflow / Infiltration (I/l) C/E/A Analysis & Findings

1.1. COST EFFECTIVENESS ANALYSIS METHODOLOGY

Using results from the 2021 Infiltration and Inflow (l/l) study, Kleinfelder analyzed the
temporary flow metering data obtained from its subcontractor, EST Associates and
partitioned the data into the following three components:

1) Dry weather sanitary flow

2) Dry weather infiltration

3) Wet weather inflow

Following standard practices contained in the MassDEP I/! Guidelines, 2017’, Kleinfelder
identified those metered sewersheds that have an excessive rate of infiltration, defined
as greater than 4,000 gallons per day per inch-mile (gpd/in-mi) of sewer inventory.

Subsequently, Kleinfelder estimated the cost-effectiveness of rehabilitating sewers within
those sewersheds with excessive infiltration. This analysis is referred to as the cost-
effectiveness analysis or C/E/A.

The C/E/A compares the cost of rehabilitating sewers ($R) versus the cost of doing
nothing and continuing to send infiltration flows to MWRA for transportation and treatment
at Deer Island ($TT). The ratio of these two costs ($TT/$R) was then calculated. If the
ratio is greater than 1, then the cost to continue to send flow to MWRA is more expensive
than removing the infiltration, and as such, it is cost-effective to rehabilitate the sewer and
attempt to remove the infiltration.

The C/E/A analysis derived data from the following sources and assumptions:

MWARA Transportation and Treatment Costs ($TT)

' Massachusetts Department of Environmental Protection, “Guidelines for Performing
Infiltration/inflow Analyses and Sewer System Evaluation Surveys,” May 2017.
Project #20140151.008A                         Page 1 of 4                                     October 2021
© 2020 Kleinfelder                                                                                                                      www ideinfelder.com
KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p {617.497.7800 f| 617.498.4630

Tab 9 - Enterprise - Water and Sewer.pdf · Source page 16

—~

KLEINFELDEF

Bright People. Right Solutions.

1) MWRA annual assessment costs were provided verbally by the Town for FY18,
FY19, and FY20

2) Annual average daily flows were obtained from MWRA records

3) Based on the MWRA assessment formula, only 51.1% of the assessment would
be affected by the Town's efforts to reduce infiltration. Therefore, the effective
transportation and treatment unit cost used for the C/E/A is $0.0024/gallon.

Sewer Rehabilitation Cost ($R)

The method for estimating sewer rehabilitation costs is high level at this stage of planning.
The data from temporary flow metering only indicates if there is elevated infiltration and/or
inflow from a particular sewershed, but it does not provide sufficient information to
understand what specific sewer assets (pipes, manholes) are sources of infiltration and/or
inflow. For the purposes of the C/E/A the following assumptions are used:

1) Sewer rehabilitation method assumed as cured-in-place pipelining (CIPP), which
was also the basis of estimate rehabilitation costs. A construction contingency of
35% and an engineering services allowance of 25% were assumed on top of the
base rehabilitation cost estimated.

2) We assumed only a percentage of the sewershed requires rehabilitation. For this
analysis, we assumed all PVC pipe will not require rehabilitation but the
remainder of pipe types will. This assumption would be refined after a Sanitary
Sewer Evaluation Survey (SSES).

3) We also assumed only 50% of the documented infiltration will successfully be
removed. This is based on engineering judgment, past experience and an
understanding that infiltration and inflow tends to find its way into the sewer
system, even with rehabilitation programs in place.

1.2 FINDINGS

Kleinfelder analyzed flow metering data collected over the 10-week data collection period.
The infiltration entering the collection town-wide was estimated to be approximately 2
million gallons per day. This rate of infiltration compares well with estimates developed
by the MWRA.

For each sewershed, the infiltration rate (gpd/in-mile) was calculated and 5 of the 28
sewersheds were found to exceed 4,000 gpd/in-mile. Infiltration results are tabulated
below:

Project #20140151.008A                           Page 2 of 4                                        October 2021
© 2020 Kleinfelder                                                                                                                                      www.kleinfelder.com
KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p | 617.497.7800 f| 617.498.4630

Tab 9 - Enterprise - Water and Sewer.pdf · Source page 17

coe
KLEINFELDER

QL Bright People. Right Solutions.

Table 1. Priority Sewersheds based on Infiltration Rate Measured

Metered
Rank             Area                 gpd / idm
1                 22                      5,714
2                         18                               4,647
3                  4                       4,247
4                  7                      4,132
5                         16                               4,014

The 5 sewersheds with infiltration rates exceeding 4,000 gpd/in-mile were analyzed using
the C/E/A methodology described. Based on the results of the C/E/A analysis, Kleinfelder
found that it is likely cost-effective to pursue infiltration removal from all 5 sewersheds.
This should be confirmed with a detailed SSES performed in all sewersheds noted in
Table 2.

1.3. RECOMMENDATION

Based on the C/E/A analysis, Kleinfelder recommends pursing infiltration removal in the
top 5 sewersheds that are calculated to have a favorable cost-benefit to removal
infiltration through sewer rehabilitation. The next step would be to complete an SSES in
the target sewershed areas to identify specific sources of infiltration and update the C/E/A
as well as the Town’s sewer Capital Improvement Plan (CIP) with the specific defects
identified.

Project #20140151.008A                             Page 3 of 4                                            October 2021
© 2020 Kleinfelder                                                                                                                              www.kleinfelder.com
KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p| 617.497.7800 f| 617.498.4630

Tab 9 - Enterprise - Water and Sewer.pdf · Source page 18

TOWN OF CANTON
FORM B ~ FISCAL 2023

CAPITAL PROJECT / EQUIPMENT REQUEST

DEPARTMENT:                                              SUBMITTED BY:
Public Works ~ Seweye                          Michael Trotta

PROJECT / EQUIPMENT TITLE:
Truck 31

TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
$115,000

DESCRIPTION:
Replace Truck No. 31 a 2005 Ford F-550 Utility Body Pick-up with a new or current model year
Ford Super Duty F-550 4WD truck equipped with a Utility Body and 9 foot snow plow
assembly.

PURPOSE AND JUSTIFICATION:
Truck No. 31 is the Sewer Division working Foreman's everyday vehicle. It is used to carry
tools, equipment, supplies to the job site. It is 15 years old with 100,000 plus miles of use.
The recommended replacement cycle for this type of public works vehicle is 8 years / 100,000
miles.

NEED CLASSIFICATION: (Check all that apply)        Departmental Priority Ranking:

Required for Safety                                            Please rank this request out of your total
~~ Required by Law or Mandate                              requests for this year: (#1 as top priority)
~_ Improve/Expand Service or Increase Efficiency                2 (#) OF           2 (#)

x Planned Project or Replacement                      Expected Useful Life: (Check one)
~~ Unplanned Project or Replacement                   ___20 or More Yrs _x_5 to 9 Years
~_ New Project/Item (not on last year's 5-Yr. Plan) | __10 to 19 Years "3 to 4 Years

Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)

___ Will Reduce Cost by $                                ___ Will Produce Addl Revenue by $
_Xx No Impact                                         _x Revenue Neutral (no impact)
___Will Increase Cost by $                              ___ Will Decrease Revenue by $

OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

fs  Aran erase  mn
PORTS ETTSCAL 202s

Tab 9 - Enterprise - Water and Sewer.pdf · Source page 19

MEGBV

ERN

To:            Canton Public Works Department
Attn; William Walsh
801 Washington Street

Canton, MA 02021

GBPC/BAPERN  Contract _

Page 1 of 3

Estimate

Date:
Estimate#

Customer ID:

TRUCK 31

Salesperson:

11/3/2021
CPWD11032021

Paul G King
508-918-2210

W6
99N

44G

660A

AS

TGM

8XL

90L

63A
473
67B
86M

52B

62R

68U

18B
512
6iL

2022 Ford Super Duty F-550 DRW (F5H) XL 4WD Reg Cab 169"
WB 84" CA

EXTERIOR COLOR: Gem Green - VSO SPECIAL PAINT
Engine: 7.3L 2V DEVCT NA PFI V8 Gas (STD)

Transmission: TorqShift 10-Speed Automatic-inc: neutral idle and
selectable drive modes: normal, tow/haul, eco, deep sand/snow
and slippery

OPTION PACKAGE: Order Code 660A
Gross Vehicle Weight Rating - 19,000 Lbs

Gross Combined Weight Rating - 28,000 Lbs

Medium Earth Gray, HD Vinyl 40/20/40 Split Bench Seat-inc:
center armrest, cupholder and driver's side manual lumbar

Tires: 225/70Rx19.5G BSW Traction-inc: 4 traction tires on the
rear and 2 A/P tires on the front

Limited Slip w/4.88 Axie Ratio

Power Equipment Group-inc: Deletes passenger side lock
cylinder, upgraded door-trim panel, Accessory Delay, Advanced
Security Pack, SecuriLock Passive Anti-Theft System (PATS) and
inclination/intrusion sensors, MyKey, owner controls feature,
Power Locks, Manual Telescoping Folding Trailer Tow Mirrors,
power/heated glass and heated convex spotter mirror, Remote
Keyless Entry, Power Front Side Windows, 1-touch up/down
driver/passenger window

Utility Lighting System-inc: LED side-mirror spotlights
Snow Plow Prep Package-ine: pre-selected springs
397 Amp Alternator

Dual 78 AH Battery

Trailer Brake Controller-inc: smart trailer tow connector, Verified to
be compatible w/electronic actuated drum brakes only

Transmission Power Take-Off Provision-inc: transmission
mounted live drive and stationary mode PTO

GVWR: 19,000 Ibs Payload Upgrade Package -inc: upgraded
frame and upgraded rear-axle

Platform Running Boards
Spare Tire, Wheel & Jack
Front Wheel Well Liners

PF fF

660.00

190.00

360.00

"915,00

160.00
250.00
115.00
210.00

270,00

280.00

850.00

320.00
350.00
180.00

fn A ww

39,002.00

640,20

184,30

349.20

887.55

155.20
242.50
114,55
203.70

261,90

271.60

824,50

310.40
339.50
174.60

Tab 9 - Enterprise - Water and Sewer.pdf · Source page 20

Page 2 of 3

Rear View Camera & Prep Kit-inc: Pre-installed content includes
cab wiring and frame wiring to the rear most cross member,
Upfitters kit includes camera w/mounting bracket, 20' jumper wire
and camera mounting/aiming instructions

872                                                                                                                $                415.00 $                402.55

REMAINING STANDARD EQUIPMENT AS SHOWN IN CHROME
DATA REPORT

THE FOLLOWING EQUIPMENT TO BE INSTALLED BY JC
MADIGAN

9 FT. KNAPHEIDE UTILITY BODY MODEL KUVcc WITH A 72”
ROOF HEIGHT INSTALLED ON A SUPPLIED CHASSIS
UNDERCOATED AND PAINTED BLACK WITH THE
FOLLOWING ITEMS.

POLY/STAINLESS STEEL ROTARY PADDLE HANDLES

TWO (2) SIX (6) DRAW C-TECH ALUMINUM DRAW SYSTEMS
STANDARD SHELF PACKAGE W/ DIVIDERS

LED INTERIOR COMPARTMENT LIGHTING

$             54,862.50

Pm AH
'

1300Ib G-2 SERIES TOMMYGATE LIFTGATE MODEL G2-60-
1342 BG27 W/ STEEL BAR GRATE PLATFORM

A

BACK-UP ALARM - MUDFLAPS — LED LIGHTING
FLUSH MOUNTED LED ST/TL WIRED FLASHERS

SPLIT REAR MASTERLOCKS DOORS

HYDRAULIC TOOL CIRCUIT W/ (2) LINE CABINET MTD. HOSE
REEL

3000 WATT THOR INVERTER W/ (1) 12v BATTERY

ea fF fF WH

RHINO LINER APPLIED TO BED, CABINET TOPS, AND
BUMPER
E-TRACK ONE (1) ROW ON CARGO AREA WALLS                                             $                  -

2" RECEIVER W/ 7 SPADE RV PLUG & ELECTRIC BRAKES
WIRED IN

WIRE IN FACTORY OEM CAMERA SYSTEM                                               $               -

9' EVEREST RL SERIES SNOW PLOW ASSEMBLY INSTALLED
Wi JOY STICK CONTROLS, FISHER HEADGEAR, CUTTING                               $         13,770.00
EDGE, PLOW LIGHTS AND GUIDEPOLES

Code 3 Mega Thin LED Single or Multi-color Pair ULT6-AA, Amber

LED Lights Mounted on Grille                                                                    $            380.00
Acari Low Profile Mounting Platform                                                               $             273.60
ECCO Refles Mini Lightbar Amber LED/CLEAR Lens P/N 5590CA                          $            402.38
Two (2) Code 3 Micropak Amber LED Lights - One Mounted                                 $            164.58
Above Each Rear Wheel on the Body                                                                         ‘
Two (2) Code 3 M180S Amber LED Lights - Mounted on Rear of                             $            430.06
Utility Body Above S/T/T Lights                                                                                            .
2 Piece Ventshades                                                                                         $              101.00
Weathertech Floorliners                                                                   $           150.00
$
$                -
PLEASE NOTE THAT PRICING IS BASED ON CURRENT
CONTRACT PRICING THAT EXPIRES 9-30-22, VEHICLE MUST                            $                 .

BE ORDERED PRIOR TO THIS DATE OR PRICING MY
CHANGE

Tab 9 - Enterprise - Water and Sewer.pdf · Source page 21

Page 3 of 3

Special Instructions:                Custom or Special Orders are Non-Refundable                                   Vehicle Subtotal
This Estimate is for Budgetary Purposes and is Not a Guarantee of Cost for
Services.                                                                                        Upfit Subtotal
Estimate is Based on Current Information From Client About the Project
Grand Total           $114,865.37

Requirments
Actual Cost May Change Once Project Elements are Finalized

McGovern Municipal 1200 Worcester Road, Framingham NA 01702

Tab 9 - Enterprise - Water and Sewer.pdf · Source page 22

1417/21, 2:37 PM                                                       Ram-KUV-129-SU-7-1024x683.jpg (1024*683)

https:/Avww.knapheide.com/wp-content/uploads/2019/4 2/Ram-KUV-129-SU-7-1024x683,jpg                                                                                                    4/1

Tab 9 - Enterprise - Water and Sewer.pdf · Source page 23

14/7/24, 2:38 PM                                                             Ram-KUV-129-SU-14-1024x683.jpg (1024x683)

https:/Avww.knapheide.com/wp-content/uploads/2019/4 2/Ram-KUV-129-SU-14-1024x683.jpg                                                                                                  4/4

Tab 9 - Enterprise - Water and Sewer.pdf · Source page 24

CHROMEDAIA

An Autodata Solutions Brand

CANTON PUBLIC WORKS - TRUCK 31

Vehicle: [Fleet] 2022 Ford Super Duty F-550 DRW (F5H) XL 4WD Reg Cab 169" WB 84" CA

Tab 9 - Enterprise - Water and Sewer.pdf · Source page 25

CHROMEDATA

An Autodata Solutions Brand

Vehicle: [Fleet] 2022 Ford Super Duty F-550 DRW (F5H) XL 4WD Reg Cab 169" WB 84" CA (Complete
)

Weight Ratings

WEIGHT RATINGS
Front Gross Axle Weight Rating:                                                                                            7000 Ibs
Rear Gross Axle Weight Rating:                                                                                            14706 Ibs
Gross Vehicle Weight Rating:                                                                                                      19500.00 Ibs

Prices, specifications, and availability are subject to change without notice, and do not include certain fees, faxes and charges that may be required by law or vary by manufacturer or
region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report
preparer's input is subject to the accuracy of the input provided. Data Version: 15075, Data updated Nov 2, 2021 1:04:00 PM PDT

Nov 3, 2021                                                                                                                                                                                                     Page 2

Tab 9 - Enterprise - Water and Sewer.pdf · Source page 26

CHROMEDATA

An Autodata Solutions Brand

Vehicle: [Fleet] 2022 Ford Super Duty F-550 DRW (F5H) XL 4WD Reg Cab 169" WB 84" CA ("Complete

)

Technical Specifications

Chassis

Weight Information
Standard Weight - Front
Base Curb Weight
Gross Axle Wt Rating - Rear
Curb Weight - Rear
Option Weight - Rear
Reserve Axle Capacity - Rear
As Spec'd Payload
Gross Combined Wt Rating
Curb Weight
Total Option Weight
Payload Weight Rear

Trailering

Dead Weight Hitch - Max Trailer Wt.
Wt Distributing Hitch - Max Trailer Wt.
Fifth Wheel Hitch - Max Trailer Wt.

Maximum Trailering Capacity

Frame
Frame Type
Frame RBM

Frame Thickness

Suspension
Suspension Type - Front
Spring Capacity - Front
Axle Type - Front
Axte Capacity - Front
Axle Ratio (:1) - Front

Shock Absorber Diameter - Front

0.00 lbs
7047 Ibs
14706 Ibs
2980 Ibs
105.00 Ibs
11621.00 Ibs
12299,00 Ibs
28000 Ibs
7046.00 Ibs
155.00 Ibs

0 lbs

5000 ibs

18340 Ibs
19800 lbs
18340 Ibs

N/A
N/A
N/A

Other

7000 Ibs
Non-Independent
7000 Ibs

4.88

N/A

Standard Weight - Rear
Gross Axie Wt Rating - Front
Curb Weight - Front

Option Weight - Front
Reserve Axle Capacity - Front
As Spec'd Curb Weight
Maximum Payioad Capacity
Gross Axle Weight Rating
Reserve Axle Capacity
Payload Weight Front

Gross Vehicle Weight Rating

Dead Weight Hitch - Max Tongue Wt.

Wt Distributing Hitch - Max Tongue Wt.

Fifth Wheel Hitch - Max Tongue Wt.

Sect Modulus Rails Only
Frame Strength

Suspension Type - Rear
Spring Capacity - Rear
Axle Type - Rear

Axle Capacity - Rear
Axle Ratio (:1) - Rear

Shock Absorber Diameter - Rear

0.00 Ibs

7000 Ibs
4066 Ibs
50,00 lbs

"2884.00 Ibs

7201.00 tbs
12454.00 Ibs
21706.00 Ibs
14505.006 Ibs
0 Ibs
19500,00 Ibs

500 Ibs
1834 Ibs
4950 lbs

N/A
N/A

Leaf
15000 Ibs
Rigid Axle
14706 Ibs
4.88

NIA

Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or
region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report
preparer’s input is subject to the accuracy of the input provided. Data Version: 15075, Data updated Nov 2, 2021 1:04:00 PM POT

Nov 3, 2021

Page 3

Tab 9 - Enterprise - Water and Sewer.pdf · Source page 27

CHROMEDAIA

An Autodata Solutions Brand

Vehicle: [Fleet] 2022 Ford Super Duty F-550 DRW (F5H) XL 4WD Reg Cab 169" WB 84" CA (-’ Complete

)

Chassis

Suspension

Stabilizer Bar Diameter - Front

Tires
Front Tire Order Code
Spare Tire Order Code
Rear Tire Size
Front Tire Capacity
Spare Tire Capacity
Revolutions/Mile @ 45 mph - Rear

Wheels
Front Wheel Size
Spare Wheel Size
Rear Whee! Material

Steering

Steering Type

Steering Ratio (:1), On Center

Turning Diameter - Curb to Curb

Brakes
Brake Type
Brake ABS System (Second Line)
Disc - Rear (Yes or )
Rear Brake Rotor Diam x Thickness

Rear Drum Diam x Width

Fuel Tank
Fuel Tank Capacity, Approx

Fuel Tank Location

NIA

TGM

512
LT225/70SR19.5
7500 Ibs

NIA

645

19.5 X 6 in
Full-Size in

Steel

Re-Circulating
Ball

N/A
48.5 ft

4-Wheel Disc
4-Wheel

Yes

15.7 in

N/A

40 gal
N/A

Stabilizer Bar Diameter - Rear

Rear Tire Order Code

Front Tire Size

Spare Tire Size

Rear Tire Capacity
Revolutions/Mile @ 45 mph - Front
Revolutions/Mile @ 45 mph - Spare

Rear Wheel Size
Front Wheel Material
Spare Wheel Material

Steering Ratio (:1), Overall

Steering Ratio (:1), At Lock
Turning Diameter - Wall to Wall

Brake ABS System
Disc - Front (Yes or )
Front Brake Rotor Diam x Thickness

Drum - Rear (Yes or )

Aux Fuel Tank Capacity, Approx

Aux Fuel Tank Location

N/A

TGM
LT225/70SR19.5
Full-Size

15000 ibs

647

N/A

19.5 X 6 in
Steel
Steel

N/A

N/A
N/A

4-Wheel
Yes
15.4 in
N/A

N/A
NIA

Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or
region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report
preparer's input is subject to the accuracy of the input provided. Data Version: 15075, Data updated Nov 2, 2021 1:04:00 PM PDT

Noy 3, 2021

Page 4

Tab 9 - Enterprise - Water and Sewer.pdf · Source page 28

CHROMEDAITA

An Autodata Solutions Brand

Vehicle: [Fleet] 2022 Ford Super Duty F-550 DRW (F5H) XL 4WD Reg Cab 169" WB 84" CA ( -.’ Complete
)

Vehicle

Emissions

Tons/yr of CO2 Emissions @ 15K mi/year

Powertrain

Transmission
Drivetrain
Trans Type
Trans Description Cont. Again
Second Gear Ratio (:1)
Fourth Gear Ratio (:1)
Sixth Gear Ratio (:1)
Clutch Size
Final Drive Axle Ratio (:1)

Transfer Case Gear Ratio (:1), High

Transfer Case Power Take Off
Eighth Gear Ratio (:1)
Tenth Gear Ratio (:1)

Mileage
EPA Fuel Economy Est - Hwy
EPA Fuel Economy Est - City

Cruising Range - Hwy

Engine
" Engine Order Code

Displacement
SAE Net Horsepower @ RPM

Engine Oil Cooler

Electrical

Cold Cranking Amps @ 0° F (Primary)

Cold Cranking Amps @ 0° F (3rd)

N/A

Four Wheel Drive
10
N/A
2.98
1.77
1.27
N/A
N/A
NIA
Yes
0.85
N/A

N/A
N/A
N/A

9ON

7.3 L445
350 @ 3900

None

750
N/A

EPA Greenhouse Gas Score

Trans Order Code
Trans Description Cont.
First Gear Ratio (:1)
Third Gear Ratio (:1)
Fifth Gear Ratio (:1)
Reverse Ratio (:1)
Trans Power Take Off
Transfer Case Model
Transfer Case Gear Ratio (:1), Low
Seventh Gear Ratio (:1)
Ninth Gear Ratio (:1)

Cruising Range - City

Fuel Economy Esit-Combined

Engine Type

Fuel System

SAE Net Torque @ RPM

Cold Cranking Amps @ 0° F (2nd)

Maximum Alternator Capacity (amps)

N/A

44G
Automatic w/OD
4.70

2.16

1.52

4.87

Yes
Electronic
N/A

1.00

N/A

N/A
N/A

Regular Unleaded
V-8

Sequential MPI
468 @ 3900

750
157

Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or
region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations, Content based on report
preparer’s input is subject to the accuracy of the input provided. Data Version: 15075, Data updated Nov 2, 2021 1:04:00 PM PDT

Nov 3, 2021

Page 5

Tab 9 - Enterprise - Water and Sewer.pdf · Source page 29

CHROMEDATA

An Autodata Solutions Brand

Vehicle: [Fleet] 2022 Ford Super Duty F-550 DRW (F5H) XL 4WD Reg Cab 169” WB 84" CA (~ Complete

)

Powertrain

Cooling System
Total Cooling System Capacity

Dimensions

Interior Dimensions
Passenger Capacity
Front Leg Room
Front Hip Room
Second Leg Room

Second Hip Room

Exterior Dimensions
Wheelbase
Length, Overall w/rear bumper
Width, Max w/o mirrors
Overhang, Front
Front Bumper to Back of Cab
Cab to End of Frame
Ground to Top of Frame
Ground Clearance, Front

Body Length

Cargo Area Dimensions

Cargo Box Width @ Top, Rear

Cargo Box Width @ Wheelhousings

Tailgate Width
Ext'd Cab Cargo Volume

N/A

43.9 in
62.5 in
NIA
N/A

169 in
N/A

80 in
38.3 in
N/A
131.2 in
NIA

8.3 in
0.00 ft

NIA
N/A
N/A
N/A

Front Head Room
Front Shoulder Room
Second Head Room

Second Shoulder Room

Length, Overall w/o rear bumper
Length, Overall

Height, Overall

Overhang, Rear w/o bumper
Cab to Axie

Ground to Top of Load Floor
Frame Width, Rear

Ground Clearance, Rear

Cab to Body

Cargo Box Width @ Floor
Cargo Box (Area) Height

Cargo Volume

40.8 in
66.7 in
NIA
N/A

N/A
254.8 in
81.1 in
47.2 in
84 in
N/A
34.2 in
8.3 in
NIA

N/A
N/A
N/A

Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or

region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report

preparer's input is subject to the accuracy of the input provided. Data Version: 15075, Data updated Nov 2, 2021 1:04:00 PM PDT

Nov 3, 2021

Page 6

Tab 9 - Enterprise - Water and Sewer.pdf · Source page 30

CHROMEDATA

An Autodata Solutions Brand

Vehicle: [Fleet] 2022 Ford Super Duty F-550 DRW (F5H) XL 4WD Reg Cab 169" WB 84" CA ( - Complete
)

Selected Model and Options

MODEL

CODE                  MODEL

F5H                   2022 Ford Super Duty F-550 DRW XL 4WD Reg Cab 169" WB 84" CA
COLORS

CODE                 DESCRIPTION

Wé6                     Green Gem
ENGINE

CODE DESCRIPTION
99N        Engine: 7.3L 2V DEVCT NA PFI V8 Gas (STD)

TRANSMISSION
CODE DESCRIPTION
446       Transmission: TorqShift 10-Speed Automatic -inc: 10R140 w/neutral idle and selectable drive modes: normal,

tow/haul, eco, deep sand/snow and slippery (STD)

OPTION PACKAGE
CODE DESCRIPTION
660A        Order Code 660A

AXLE RATIO
CODE DESCRIPTION
X8L         Limited Slip w/4.88 Axle Ratio

TIRES
CODE DESCRIPTION
TGM        Tires: 225/70Rx19.5G BSW Traction -inc: 4 traction tires on the rear and 2 A/P tires on the front

PRIMARY PAINT
CODE DESCRIPTION
W6         Green Gem

Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or

region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report

preparer’s input is subject to the accuracy of the input provided. Data Version: 15075, Data updated Nov 2, 2021 1:04:00 PM PDT

Nov 3, 2021

Page 7

Tab 9 - Enterprise - Water and Sewer.pdf · Source page 31

CHROMEDAIA

An Autodata Solutions Brand

Vehicle: [Fleet] 2022 Ford Super Duty F-550 DRW (F5H) XL 4WD Reg Cab 169" WB 84" CA ( + Complete
)

SEAT TYPE

CODE
AS

DESCRIPTION

Medium Earth Gray, HD Vinyl 40/20/40 Split Bench Seat -inc: center armrest, cuphoider, storage and driver's side
manual lumbar

ADDITIONAL EQUIPMENT - PACKAGE

CODE
90L

DESCRIPTION

Power Equipment Group -inc: Deletes passenger side lock cylinder, upgraded door-trim panel, Accessory Delay,
Advanced Security Pack, SecuriLock Passive Anti-Theft System (PATS) and inclination/intrusion sensors, MyKey,
owner controls feature, Power Locks, Remote Keyless Entry, Folding Trailer Tow Mirrors w/Power Heated Glass,
manual telescoping, heated convex spotter mirror and integrated clearance lamps/turn signals, Power Front Side
Windows, 1-touch up/down driver/passenger window

ADDITIONAL EQUIPMENT ~ MECHANICAL

CODE
473

52B

62R
67B
68M

86M

DESCRIPTION

Snow Plow Prep Package -inc: pre-selected springs (see order guide supplemental reference for springs/FGAWR
of specific vehicle configurations), Note 1: Restrictions apply; see supplemental reference or body builders layout
book for details, Note 2: Also allows for the attachment of a winch, Note 3: Highly recommended to add (86M)
dual battery on 7.3L gas engines, Adding (67B) 397 amp alternators for diesel engine is highly recommended for
max output

Trailer Brake Controller -inc: smart trailer tow connector, Verified to be compatible w/electronic actuated drum
brakes only

Transmission Power Take-Off Provision -inc: mobile and stationary PTO modes
397 Amp Alternators

GVWR: 19,500 lb Payload Plus Upgrade Package -inc: upgraded frame, rear-axle and low deflection/high
capacity springs, Increases max RGAWR to 14, 706, Note: See Order Guide Supplemental Reference for further
details on GVWR

Dual 78 AH Battery

ADDITIONAL EQUIPMENT - EXTERIOR

CODE
18B
512
59H
61d
6iL
63A

DESCRIPTION

Platform Running Boards

Spare Tire, Wheel & Jack -inc: Excludes carrier, 6-Ton Hydraulic Jack
Center High-Mounted Stop Lamp (CHMSL)

6-Ton Hydraulic Jack

Front Wheel Well Liners (Pre-installed)

Utility Lighting System -inc: LED side-mirror spotlights

Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or

region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report

preparer’s input is subject to the accuracy of the input provided. Data Version: 15075, Data updated Nov 2, 2021 1:04:00 PM POT

Nov 3, 2021

Page 8

Tab 9 - Enterprise - Water and Sewer.pdf · Source page 32

CHROMEDATA

An Autodata Solutions Brand

Vehicle: [Fleet] 2022 Ford Super Duty F-550 DRW (F5H) XL 4WD Reg Cab 169" WB 84" CA (= Complete
)

ADDITIONAL EQUIPMENT - INTERIOR
CODE DESCRIPTION

872         Rear View Camera & Prep Kit -inc: Pre-installed content includes cab wiring and frame wiring to the rear most
cross member, Upfitters kit includes camera w/mounting bracket, 20' jumper wire and camera mounting/aiming
instructions

Options Total

Prices, specifications, and availability are subject to change without notice, and do nof include certain fees, taxes and charges that may be required by law or vary by manufacturer or
region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report
preparer’s input is subject to the accuracy of the input provided. Data Version: 15075, Data updated Nov 2, 2021 1:04:00 PM PDT

Nov 3, 2024                                                                                                                                                                                              Page 9

Tab 9 - Enterprise - Water and Sewer.pdf · Source page 33

CHROMEDAIA

An Autodata Solutions Brand

Vehicle: [Fleet] 2022 Ford Super Duty F-550 DRW (F5H) XL 4WD Reg Cab 169" WB 84" CA (-’ Complete
)

Standard Equipment

Mechanical

Exterior

Engine: 7.3L 2V DEVCT NA PFI V8 Gas (STD)

Transmission: TorqShift 10-Speed Automatic -inc: 10R140 w/neutral idle and selectable drive modes: normal,

tow/haul, eco, deep sand/snow and slippery (STD)
4.88 Axle Ratio (STD)

50-State Emissions System

Transmission w/Oil Cooler

Electronic Transfer Case

Part-Time Four-Wheel Drive

78-Amp/Hr 750CCA Maintenance-Free Battery w/Run Down Protection
HD 240 Amp Alternator

Towing Equipment -inc: Trailer Sway Control
Trailer Wiring Harness

10950# Maximum Payload

GVWR: 18,000 Ibs Payioad Package

HD Shock Absorbers

Front And Rear Anti-Roll Bars

Firm Suspension

Hydraulic Power-Assist Steering

40 Gal. Fuel Tank

Single Stainless Steel Exhaust

Dual Rear Wheels

Auto Locking Hubs

Front Suspension w/Coil Springs

Leaf Rear Suspension w/Leaf Springs

4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs and Brake Assist

Upfitter Switches

Wheels: 19.5" x 6" Argent Painted Steel -inc: Hub covers/center ornaments not included

Tires: 225/70Rx19.5G BSW A/P (STD)
Clearcoat Paint

Black Front Bumper w/Black Rub Strip/Fascia Accent and 2 Tow Hooks

Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or

tegion. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report

preparer's input Is subject to the accuracy of the input provided, Data Version: 15075, Data updated Nov 2, 2021 1:04:00 PM PDT

Nov 3, 2021

Page 10

Tab 9 - Enterprise - Water and Sewer.pdf · Source page 34

CHROMEDAIA

An Autodata Solutions Brand

Vehicle: [Fleet] 2022 Ford Super Duty F-550 DRW (F5H) XL 4WD Reg Cab 169" WB 84" CA (- Complete
)

Exterior

Entertainment

interior

Black Fender Flares

Black Side Windows Trim and Black Front Windshield Trim
Black Door Handles

Black Manual Side Mirrors w/Manual Folding
Manual Extendable Trailer Style Mirrors
Fixed Rear Window

Light Tinted Glass

Variable Intermittent Wipers

Aluminum Panels

Front Splash Guards

Black Grille

Autolamp Auto On/Off Aero-Composite Halogen Daytime Running Lights Preference Setting Headlamps
w/Delay-Off

Cab Clearance Lights

Radio w/Seek-Scan and Clock
Radio: AM/FM Stereo w/MP3 Player -inc: 4 speakers
Fixed Antenna

SYNC Communications & Entertainment System -inc: enhanced voice recognition, 911 Assist, 4.2" LCD center
stack screen, AppLink, 1 smart-charging USB port and steering whee! audio controls

2.LCD Monitors In The Front

4-Way Driver Seat -inc: Manual Recline and Fore/Aft Movement
4-Way Passenger Seat -inc: Manual Recline and Fore/Aft Movement
Manual Tilt/Telescoping Steering Column

Gauges -inc: Speedometer, Odometer, Oil Pressure, Engine Coolant Temp, Tachometer, Transmission Fluid
Temp, Engine Hour Meter, Trip Odometer and Trip Computer

FordPass Connect 4G Mobile Hotspot Internet Access
Manual Air Conditioning

Illuminated Locking Glove Box

Interior Trim -inc: Chrome Interior Accents

Full Cloth Headliner

Urethane Gear Shifter Material

Prices, specifications, and availability are subject to change without notice, and do not include ceriain fees, taxes and charges that may be required by law or vary by manufacturer or
region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on repost
preparer's input is subject to the accuracy of the input provided. Data Version: 15075, Data updated Nov 2, 2021 1:04:00 PM PDT

Nov 3, 2021

Page 11

Tab 9 - Enterprise - Water and Sewer.pdf · Source page 35

CHROMEDATA

An Autodata Solutions Brand

Vehicle: [Fleet] 2022 Ford Super Duty F-550 DRW (F5H) XL 4WD Reg Cab 169" WB 84" CA (:: Complete

)

Interior

Safety-Mechanical

Safety-Exterior

Safety-Interior

HD Vinyl 40/20/40 Split Bench Seat -inc: center armrest, cupholder, storage and driver's side manual lumbar

Day-Night Rearview Mirror

Passenger Visor Vanity Mirror

3 12V DC Power Outlets

Front Map Lights

Fade-To-Off Interior Lighting

Full Vinyl/Rubber Floor Covering

Smart Device Remote Engine Start
instrument Panel Covered Bin and Dashboard Storage
Manual 1st Row Windows

Systems Monitor

Trip Computer

Outside Temp Gauge

Analog Appearance

Seats w/Vinyl Back Material

Manual Adjustable Front Head Restraints

Air Filtration

Driveline Traction Control

Side Impact Beams

Dual Stage Driver And Passenger Seat-Mounted Side Airbags

Dual Stage Driver And Passenger Front Airbags w/Passenger Off Switch

Safety Canopy System Curtain 1st Row Airbags
Outboard Front Lap And Shoulder Safety Belts -inc: Height Adjusters

Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or

region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report

preparer's input is subject to the accuracy of the input provided. Data Version: 15075, Data updated Nov 2, 2021 1:04:00 PM PDT

Nov 3, 2021

Page 12

Tab 9 - Enterprise - Water and Sewer.pdf · Source page 36

CHROMEDAIA

An Autodata Solutions Brand

Vehicle: [Fleet] 2022 Ford Super Duty F-550 DRW (F5H) XL 4WD Reg Cab 169" WB 84" CA (-’ Complete
)

WARRANTY

Basic Years: 3

Basic Miles/km: 36,000

Drivetrain Years: 5

Drivetrain Miles/km: 60,000

Corrosion Years: 5

Corrosion Miles/km: Unlimited
Roadside Assistance Years: 5
Roadside Assistance Miles/km: 60,000

Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or
region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report
prepater's input is subject to the accuracy of the input provided. Data Version; 15075, Data updated Nov 2, 2021 1:04:00 PM PDT

Nov 3, 2021                                                                                  .                                                                                                                             Page 13