Canton, Massachusetts · Saved source text
FY23 Municipal - Capital Requests - January 2022 zip file
Saved text from 313 source pages. Transcription and OCR may contain errors; verify figures and wording against the original. Retrieved 2026-10-15.
Tab 9 - Enterprise - Water and Sewer.pdf · Source page 4
TOWN OF CANTON FORM B - FISCAL 2023 CAPITAL PROJECT / EQUIPMENT REQUEST DEPARTMENT: SUBMITTED BY: Public Works ~~ Wotee Michael Trotta PROJECT / EQUIPMENT TITLE: Canton Water System Management and Capital Improvement Plan TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000): $80,000 DESCRIPTION: Update Canton Water System 5 year Capital Improvement Plan. PURPOSE AND JUSTIFICATION: In 2005 Canton Public Works developed and implemented a 5 year Capital Improvement Plan (CIP). Periodic updates have been made to the CIP, the latest in 2017/2018. By the end of 2022 most of the projects recommended in 2018 will have been completed. These projects improved fire flow, system reliability, and quality by replacing aged mains and reconnecting house services to newer water mains. Given those improvements, new residential and commercial development, the CIP planning model needs to be updated, the impacts to the water distribution system evaluated, prioritize a new 5 CIP for the water distribution system. NEED CLASSIFICATION: (Check ail that apply) Departmental Priority Ranking: Required for Safety Please rank this request out of your total ~~ Required by Law or Mandate requests for this year: (#1 as top priority) ~__ Improve/Expand Service or Increase Efficiency 2(#) OF 2 (#) Planned Project or Replacement Expected Useful Life: (Check one) ~~ Unplanned Project or Replacement 20 or More Yrs x 5 to 9 Years “xX_ New Project/Item (not on last year's 5-Yr, Plan) | —_10 to 19 Years "3 to 4 Years Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one) ___Will Reduce Cost by $ ___ Will Produce Addl Revenue by $ _x_No Impact _x Revenue Neutral (no impact) ___ Will Increase Cost by $ ___Will Decrease Revenue by $ OTHER COMMENTS OR INFORMATION: (Attach supporting documentation) Arf ‘ a PORT IIET TSCA 2ULe
Tab 9 - Enterprise - Water and Sewer.pdf · Source page 5
PN ( KLEINFEL DER Bright People. Right Solutions. = November 1, 2021 Mr. Michael Trotta, Director Department of Public Works Town of Canton 801 Washington Street Canton, MA 02021 SUBJECT: Canton Water System Management and Capital improvements Plan Update - Proposal Dear Mr. Trotta: Kleinfelder has worked with the Town of Canton to develop and implement periodic Water System Management and Capital Improvement Plans for many years. The latest Plan was last updated in 2018 to develop a prioritized list of distribution system capital improvements. By the end of FY22, Canton will have completed construction on two contracts representing approximately 23,000 linear feet of water system improvements recommended by the Plan. A third contract recommended under the 2018 plan representing approximately 11,700 linear feet of system improvements is expected to be awarded for construction in summer of 2022. These projects improve fire flow and system reliability and quality by replacing aged and break-prone mains and by reconnecting services to newer water mains. Since the 2018 Plan update, additional system records have become available and new developments in the Town have come online. Working with your Department during the course of Plan implementation we have discussed that an FY23 update of the water system model, coupled with records review and water main coupon testing would provide value to the Town in reprioritizing a new 5-year CIP for the distribution system. We are pleased to present this proposal. PROPOSED SCOPE OF SERVICES The purpose of this project is to update the Canton Water System Management and Capital Improvement Plan for the distribution system. Kleinfelder proposes to complete the following tasks: 1. Water Demand Analysis e Assess current and future water demand and supply adequacy. Evaluate recent demand history (past 5 years} and trends for average day and maximum daily demand and changes in demand patterns. Assess planned and permitted significant development projects as identified by Town of Canton Planning Department. Page 1 of 3 November 1, 2021 © 2021 Kleinfelder www.kleinfelder.com KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p | 617.497.7800 f | 617.498.4630
Tab 9 - Enterprise - Water and Sewer.pdf · Source page 6
2. Water system records review Work with the Town Water Superintendent and GIS Analyst to review, compile, and update water distribution system asset information from historic record plans, tie cards, recent upgrades and new developments and other documentation to update diameter, material, and year installed attributes. 3. Hydraulic Model updates and Distribution System Evaluation Make updates to the distribution system in the current model to reflect new development and water main replacement projects. Incorporate current pump curves with available data from recent well maintenance work and from the results of inspection and testing (by others). Develop modeling scenarios for the operational pumping sequences most frequently used by Canton. These operational scenarios will be modeled to determine their ability to maintain tank elevations and provide adequate pressure and fire flow to system customers. Perform up to 3 days of flow testing at recommended areas to update or verify asset C- factor data. Results will be used to recalibrate the existing hydraulic model, identify needs areas (based on fire flow and water age). Kleinfelder will refine demand allocations by account number based on billing data usage provided by Canton to Kleinfelder. Kleinfelder will analyze the water distribution system utilizing the updated hydraulic model. The hydraulic analysis will consist of evaluating the water system under projected future maximum day demands and monitoring pipeline headlosses, water storage tank level fluctuations, pump operation, and available fire flow. Utilizing the hydraulic model, improvement scenarios will be evaluated and prioritized based on providing the most cost- effective benefit to the water system. 4, Water Main Testing Perform destructive testing on selected portions of main to confirm or refine CIP recommendations. Test will include a Ring Test in accordance with AWWA C106-7SJ to determine the Modulus of Rupture. This value will be compared to the similar value of the original pipe to determine loss of pipe strength. The Town will extract up to five (5) pipe samples for mechanical testing to estimate remaining pipe life. 5. Capital Improvements Program and Water Distribution System Master Plan Report © Based on the results of Tasks 1 through 4, develop recommendations for water main improvements projects. e Develop planning level budget estimates for construction and engineering for each of the recommendations and develop a prioritized phased 5-year schedule of distribution system improvements. e Prepare a Draft Water Distribution System Master Plan / CIP Report. Kleinfelder will meet with Canton to review the Draft Plan and prepare a Final Plan based on one round of comments on the document. Page 2 of 3 November 1, 2021 © 2021 Kleinfelder www. kleinfeider.com KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p | 617.497.7800 f | 617.498.4630
Tab 9 - Enterprise - Water and Sewer.pdf · Source page 7
FEE ESTIMATE We propose to complete the proposed scope of services for a fee not to exceed $79,800 which represents approximately 560 hours of labor and testing expenses. SCHEDULE Kleinfelder would commence work immediately upon receipt of an executed copy of an Agreement and plan to complete work within 6 months. Respectfully Yours, KLEINFELDER a NV by Kirsten N. Ryan Senior Project Manager cc: File Page 3 of 3 November 1, 2021 © 2021 Kleinfelder www.kleinfelder.com KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p | 617.497.7800 f | 617.498.4630
Tab 9 - Enterprise - Water and Sewer.pdf · Source page 8
TOWN OF CANTON FORM B - FISCAL 2023 CAPITAL PROJECT / EQUIPMENT REQUEST SUBMITTED BY: DEPARTMENT: Public Works a Si CWwar Michael Trotta PROJECT / EQUIPMENT TITLE: Year 1 Sewer I/I Rehab Project TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000): $300,000 DESCRIPTION: Design of Year 1 Sewer Inflow / Infiltration (I/I) Rehabilitation construction project. PURPOSE AND JUSTIFICATION: Sewer flow metering data was collected over a 10 week period, January - March 2021. Infiltration into the sewer system town wide is estimated a 2,000,000 gallons per day. Five Sewershed areas were identified as priorities for I/1 rehab, i.e. they exceeded MA DEP Jimits of 4,000 gallons/inch diameter/mile/day. Reducing I/I saves operational cost by reducing sewerage flow to the MWRA. NEED CLASSIFICATION: (Check ali that apply) Departmental Priority Ranking: ___ Required for Safety Please rank this request out of your total Required by Law or Mandate : requests for this year: (#1 as top priority) “_ Improve/Expand Service or Increase Efficiency 1 (#) OF 2 (#) x Planned Project or Replacement Expected Useful Life: (Check one) ~_ Unplanned Project or Replacement _x 200rMore Yrs ___5 to 9 Years ____ New Project/Item (not on last year's 5-Yr. Plan) | 10 to i9 Years 3 to 4 Years Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one) x_ Will RJ85 - 100,000 /yr. ___ Will Produce Addl Revenue by $ No Impact _x Revenue Neutral (no impact) Will Increase Cost by $ ___ Will Decrease Revenue by $ OTHER COMMENTS OR INFORMATION: (Attach supporting documentation) TOTS OT TOO IS LOLS
Tab 9 - Enterprise - Water and Sewer.pdf · Source page 9
Trotta, Michael From: Courtney Eaton <CEaton@kleinfelder.com> Sent: Monday, November 01, 2021 4:12 PM To: Trotta, Michael Cc: Kirsten Ryan; David Peterson Subject: RE: Sewer Budget Request... CAUTION: This email originated from outside your organization. Exercise caution when opening attachments or clicking links, especially from unknown senders. Mike, Just to be clear — we are not suggesting that the full $8.3M would need to be spent. Using information that we learned through our Year 5 IWRP work, we assume that roughly 20% of the $8.3M (or $1.6 M) would need to be spent to address critical 1/1 pipe work. That was based on our review of the Town’s CCTV effort back in 2019 — roughly 20% of the pipes fell in the high priority category based on present defects. To be safe, we were estimating a range of $1.5 -S2M (engineering + construction) to address the I/I found through the 2020 flow Monitoring Study. Using the table we put into the letter sent last Friday, | am updating it to show the Budget est + timing to help clarify. Effort Budget Est. Timing FY21 AM Review $250,000 Nov 2021 - May 2022 SSES $150,000 February — May 2022 CIP Update June — July 2022 Design of Sewer Rehab Project — Year 1 $250,000 - $300,000 Aug 2022 — Feb 2023 Start of Construction ~ Year 1* $1,250,000 - $ 1, 700,000 July 2024 *This could also be phased over 2 years as needed for budget considerations. Hopefully, this clarifies your question — if not, | am happy to discuss further with you. Thanks! Courtney Eaton, PE, ENV SP m| 617.671.9245 Ss From: Trotta, Michael <mtrotta@town.canton.ma.us> Sent: Monday, November 1, 2021 10:15 AM To: Courtney Eaton <CEaton@kleinfelder.com> Cc: Kirsten Ryan <KRyan@kleinfelder.com>; David Peterson <DTPeterson@kleinfelder.com> Subject: RE: Sewer Budget Request... External Email Courtney - Do you have a schedule or chart of when $8.3 M would be spent
Tab 9 - Enterprise - Water and Sewer.pdf · Source page 10
—— KLEINFELDER QU Bright People. Right Sofutions. October 29, 2021 Kleinfelder Project No.: 20212633.001A Mr. Michael Trotta Superintendent of Public Works Town of Canton 801 Washington Street Canton, MA 02021 SUBJECT: Sewer System CIP Update / Targeted Sanitary Sewer Evaluation Survey (SSES) Dear Mr. Trotta: As part of the October 2020, Canton Wastewater System Asset Management Plan, Kleinfelder identified infiltration and inflow within their sewer system as a high priority for the Town to investigate further. In that Plan, it was estimated that I/I flows could be as much as 50% of the overall sewer flows in the system on average. To this end, Kleinfelder recommended a Flow Monitoring Study to hone in more specifically on sewersheds within the Town that had high rates of I/I. Based upon preliminary flow monitoring results, infiltration makes up 42% of the average dry weather flow, resulting in an annual cost of approximately $1.9M paid to MWRA for transport and treatment (STT). Using the results from this study, Kleinfelder completed a cost-effectiveness analysis (C/E/A) of the flow metering data obtained over the course of that study to estimate a budget recommendation for the next steps of the Town’s sewer capital improvement program (CIP). The C/E/A compared the STT cost for infiltration flows against the cost of rehabilitation in high priority sections of the Town. The C/E/A methodology and results are summarized in more detail in Attachment 1 but recommendations for follow on work to identify specific sources of infiltration are provided herein. The recommended work should be completed in the following two phases: 1) Phase 1 Flow Isolation & CCTV video inspection — Spring 2022 2) Phase 2 Design of I/I Rehabilitation Recommendations — Fall - Spring 2023 This type of work targets infiltration sources only. These inspections, collectively, make up the Sanitary Sewer Evaluation Survey, or SSES. There are no recommendations for FY23 budgeting that target inflow removal. In general, the Town does not have reported issues with chronic sewer backups, surcharging or sanitary sewer overflows. Further, the total volume of inflow over the course a year is typically far less than the volume of infiltration, Therefore, if the Town’s objective is to save operational costs by reducing flow to the MWRA, the Town should prioritize infiltration removal over inflow removal. Project No: 20220721.001A Page 1 of 3 October 29, 2021 © 2021 Kleinfelder www.kleinfelder.com KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p | 617.497.7800 f | 617.498.4630
Tab 9 - Enterprise - Water and Sewer.pdf · Source page 11
As detailed herein, we recommend the Town budget for an SSES program that consists of the following work: Type Quantity Unit Price Cost Target Timeframe Flow Isolation 88,200 feet $0.35 / foot $35,000 Feb - Mar 2022 CCTV 20,000 ft $80,000 Mar — May 2022 Engineering $35,000 Feb — June 2022 SSES Budget for FY23 | $150,000 This work should be targeted for the Spring of 2022 when the groundwater is elevated, and infiltration rates are seasonally high. Flow isolation, coupled with CCTV inspection, will narrow down the segments of sewer that are contributing infiltration to the system. We understand the Town has authorized approximately $700,000 for I/I related work; this SSES will further the Town’s efforts to identify specific sources of |/1; therefore, could be funded with this source. Additionally, we have also inquired with MWRA about potential funding for this effort as well; there is a high likelihood that they will be able to partially or fully fund this effort with monies set aside for Canton already. We will begin the application process immediately to be considered for their next round of funding. At the conclusion of this SSES work, we will provide specific recommendations for rehabilitation and / or replacement within the 5 high priority |/1 sub areas within the Town. These recommendations will also be coordinated and integrated with the FY21 Asset Management effort, which will focus on updates to the Town’s sewer CIP related to non-I/I rehabilitation priorities. We estimate that construction cost of the I/I related rehabilitation could be on the order of $1.5 to $S2M for engineering and construction. We suggest that the Town consider using the remaining allocated |/I funds (~$550,000) to begin the design contract in FY23 with a plan to bid the work at the beginning of FY24. The design work would be on the order of $250,000 - $300,000. it is expected that the majority of this work can be funded through MWRA’s I/I fund for member communities; however, the Town will need to show that they have appropriate the funds for the full amount in advance. A key outcome of both the recommended SSES study as well as the FY21 AM project will be to provide the Town with a detailed CIP for the next 3 — 5 years of sewer work. Project No: 20220721.001A Page 2 of 3 October 29, 2021 © 2021 Kleinfelder www. kleinfelder.com KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p | 617.497.7800 f | 617.498.4630
Tab 9 - Enterprise - Water and Sewer.pdf · Source page 12
Effort Timing FY21 AM Review Nov 2021 — May 2022 SSES February — May 2022 CIP Update June —July 2022 Design of Sewer Rehab Project — Year 1 Aug 2022 — Feb 2023 Start of Construction ~ Year 1 July 2024 Sincerely, KLEINFELDER (on FEA Courtney L Eaton, PE, ENV SP Project Manager cc: Kirsten Ryan, Kleinfelder File Project No: 20220721.001A Page 3 of 3 October 29, 2021 © 2021 Kleinfelder www. kleinfelder.com KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p | 617.497.7800 f | 617.498.4630
Tab 9 - Enterprise - Water and Sewer.pdf · Source page 13
ATTACMENT Inflow / Infiltration (I/l) C/E/A Analysis & Findings
Tab 9 - Enterprise - Water and Sewer.pdf · Source page 14
—
KLEINFELDEF
Bright People. Right Solutions.
Table 2. C/E/A Analysis of Priority Sewersheds
Cost- Cost-
Pipe Total Pipe Annual Total T&T Cost T&T Cost Benefit Benefit
Metered Material Length Percent Infiltration | gpd/ | Removable Construction (20 Years at | (20 Years at | Ratio (at | Ratio (at
Area Distribution (LE) Available (gpd) idm | Infiltration Cost 3% Annual | 8% Annual 3% 8%
' u to Rehab. (gal) Inflation) Inflation) Annual Annual
Inflation) | Inflation’
52% AC
4 28% RC 22,580 18,064 269,280 | 4,247 | 49,143,600 $3,062,813 $3,123,513 | $5,319,543 1.02 1.74
20% PVC
72% AC
7 28% PVG 7,820 5,630 48,960 4,132 | 8,935,200 $361,125 $567,912 $967,190 1.57 2.68
53% AC
16 28% PVC 24,560 17,683 252,000 | 4,014 | 45,990,000 $2,563,313 $2,923,074 | $4,978,182 1.14 1.94
18% RC
45% AC
18 32% VC 15,520 11,950 128,160 | 4,647 | 23,389,200 $1,047,938 $1,486,592 | $2,531,761 1.42 2.42
23% PVC
59% AC
22 38% VC 17,720 17,188 464,160 | 5,714] 29,959,200 $1,221,750 $1,904,174 | $3,242,930 1.56 2.65
3% PVC
Totals: | 88,200 70,515 862,560 157,417,200 $8,256,938 | $10,005,265 | $17,039,605
Project #20140151.008A Page 4 of 4 . October 2021
© 2020 Kleinfelder
www {einfelder.com
KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p| 617.497.7800 f| 617.498.4630Tab 9 - Enterprise - Water and Sewer.pdf · Source page 15
——N
KLEINFELDEFR
QL Bright People, Right Sofutions.
MEMORANDUM
TO: Michael Trotta, Chris Sykes, Jay Mello, Town of Canton DPW
FROM: Jill Rossini, David Peterson, Kleinfelder
cc: Courtney Eaton, Kirsten Ryan, Kleinfelder
DATE : 10/25/2021
SUBJECT: _ Inflow / Infiltration (I/l) C/E/A Analysis & Findings
1.1. COST EFFECTIVENESS ANALYSIS METHODOLOGY
Using results from the 2021 Infiltration and Inflow (l/l) study, Kleinfelder analyzed the
temporary flow metering data obtained from its subcontractor, EST Associates and
partitioned the data into the following three components:
1) Dry weather sanitary flow
2) Dry weather infiltration
3) Wet weather inflow
Following standard practices contained in the MassDEP I/! Guidelines, 2017’, Kleinfelder
identified those metered sewersheds that have an excessive rate of infiltration, defined
as greater than 4,000 gallons per day per inch-mile (gpd/in-mi) of sewer inventory.
Subsequently, Kleinfelder estimated the cost-effectiveness of rehabilitating sewers within
those sewersheds with excessive infiltration. This analysis is referred to as the cost-
effectiveness analysis or C/E/A.
The C/E/A compares the cost of rehabilitating sewers ($R) versus the cost of doing
nothing and continuing to send infiltration flows to MWRA for transportation and treatment
at Deer Island ($TT). The ratio of these two costs ($TT/$R) was then calculated. If the
ratio is greater than 1, then the cost to continue to send flow to MWRA is more expensive
than removing the infiltration, and as such, it is cost-effective to rehabilitate the sewer and
attempt to remove the infiltration.
The C/E/A analysis derived data from the following sources and assumptions:
MWARA Transportation and Treatment Costs ($TT)
' Massachusetts Department of Environmental Protection, “Guidelines for Performing
Infiltration/inflow Analyses and Sewer System Evaluation Surveys,” May 2017.
Project #20140151.008A Page 1 of 4 October 2021
© 2020 Kleinfelder www ideinfelder.com
KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p {617.497.7800 f| 617.498.4630Tab 9 - Enterprise - Water and Sewer.pdf · Source page 16
—~ KLEINFELDEF Bright People. Right Solutions. 1) MWRA annual assessment costs were provided verbally by the Town for FY18, FY19, and FY20 2) Annual average daily flows were obtained from MWRA records 3) Based on the MWRA assessment formula, only 51.1% of the assessment would be affected by the Town's efforts to reduce infiltration. Therefore, the effective transportation and treatment unit cost used for the C/E/A is $0.0024/gallon. Sewer Rehabilitation Cost ($R) The method for estimating sewer rehabilitation costs is high level at this stage of planning. The data from temporary flow metering only indicates if there is elevated infiltration and/or inflow from a particular sewershed, but it does not provide sufficient information to understand what specific sewer assets (pipes, manholes) are sources of infiltration and/or inflow. For the purposes of the C/E/A the following assumptions are used: 1) Sewer rehabilitation method assumed as cured-in-place pipelining (CIPP), which was also the basis of estimate rehabilitation costs. A construction contingency of 35% and an engineering services allowance of 25% were assumed on top of the base rehabilitation cost estimated. 2) We assumed only a percentage of the sewershed requires rehabilitation. For this analysis, we assumed all PVC pipe will not require rehabilitation but the remainder of pipe types will. This assumption would be refined after a Sanitary Sewer Evaluation Survey (SSES). 3) We also assumed only 50% of the documented infiltration will successfully be removed. This is based on engineering judgment, past experience and an understanding that infiltration and inflow tends to find its way into the sewer system, even with rehabilitation programs in place. 1.2 FINDINGS Kleinfelder analyzed flow metering data collected over the 10-week data collection period. The infiltration entering the collection town-wide was estimated to be approximately 2 million gallons per day. This rate of infiltration compares well with estimates developed by the MWRA. For each sewershed, the infiltration rate (gpd/in-mile) was calculated and 5 of the 28 sewersheds were found to exceed 4,000 gpd/in-mile. Infiltration results are tabulated below: Project #20140151.008A Page 2 of 4 October 2021 © 2020 Kleinfelder www.kleinfelder.com KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p | 617.497.7800 f| 617.498.4630
Tab 9 - Enterprise - Water and Sewer.pdf · Source page 17
coe KLEINFELDER QL Bright People. Right Solutions. Table 1. Priority Sewersheds based on Infiltration Rate Measured Metered Rank Area gpd / idm 1 22 5,714 2 18 4,647 3 4 4,247 4 7 4,132 5 16 4,014 The 5 sewersheds with infiltration rates exceeding 4,000 gpd/in-mile were analyzed using the C/E/A methodology described. Based on the results of the C/E/A analysis, Kleinfelder found that it is likely cost-effective to pursue infiltration removal from all 5 sewersheds. This should be confirmed with a detailed SSES performed in all sewersheds noted in Table 2. 1.3. RECOMMENDATION Based on the C/E/A analysis, Kleinfelder recommends pursing infiltration removal in the top 5 sewersheds that are calculated to have a favorable cost-benefit to removal infiltration through sewer rehabilitation. The next step would be to complete an SSES in the target sewershed areas to identify specific sources of infiltration and update the C/E/A as well as the Town’s sewer Capital Improvement Plan (CIP) with the specific defects identified. Project #20140151.008A Page 3 of 4 October 2021 © 2020 Kleinfelder www.kleinfelder.com KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p| 617.497.7800 f| 617.498.4630
Tab 9 - Enterprise - Water and Sewer.pdf · Source page 18
TOWN OF CANTON FORM B ~ FISCAL 2023 CAPITAL PROJECT / EQUIPMENT REQUEST DEPARTMENT: SUBMITTED BY: Public Works ~ Seweye Michael Trotta PROJECT / EQUIPMENT TITLE: Truck 31 TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000): $115,000 DESCRIPTION: Replace Truck No. 31 a 2005 Ford F-550 Utility Body Pick-up with a new or current model year Ford Super Duty F-550 4WD truck equipped with a Utility Body and 9 foot snow plow assembly. PURPOSE AND JUSTIFICATION: Truck No. 31 is the Sewer Division working Foreman's everyday vehicle. It is used to carry tools, equipment, supplies to the job site. It is 15 years old with 100,000 plus miles of use. The recommended replacement cycle for this type of public works vehicle is 8 years / 100,000 miles. NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking: Required for Safety Please rank this request out of your total ~~ Required by Law or Mandate requests for this year: (#1 as top priority) ~_ Improve/Expand Service or Increase Efficiency 2 (#) OF 2 (#) x Planned Project or Replacement Expected Useful Life: (Check one) ~~ Unplanned Project or Replacement ___20 or More Yrs _x_5 to 9 Years ~_ New Project/Item (not on last year's 5-Yr. Plan) | __10 to 19 Years "3 to 4 Years Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one) ___ Will Reduce Cost by $ ___ Will Produce Addl Revenue by $ _Xx No Impact _x Revenue Neutral (no impact) ___Will Increase Cost by $ ___ Will Decrease Revenue by $ OTHER COMMENTS OR INFORMATION: (Attach supporting documentation) fs Aran erase mn PORTS ETTSCAL 202s
Tab 9 - Enterprise - Water and Sewer.pdf · Source page 19
MEGBV ERN To: Canton Public Works Department Attn; William Walsh 801 Washington Street Canton, MA 02021 GBPC/BAPERN Contract _ Page 1 of 3 Estimate Date: Estimate# Customer ID: TRUCK 31 Salesperson: 11/3/2021 CPWD11032021 Paul G King 508-918-2210 W6 99N 44G 660A AS TGM 8XL 90L 63A 473 67B 86M 52B 62R 68U 18B 512 6iL 2022 Ford Super Duty F-550 DRW (F5H) XL 4WD Reg Cab 169" WB 84" CA EXTERIOR COLOR: Gem Green - VSO SPECIAL PAINT Engine: 7.3L 2V DEVCT NA PFI V8 Gas (STD) Transmission: TorqShift 10-Speed Automatic-inc: neutral idle and selectable drive modes: normal, tow/haul, eco, deep sand/snow and slippery OPTION PACKAGE: Order Code 660A Gross Vehicle Weight Rating - 19,000 Lbs Gross Combined Weight Rating - 28,000 Lbs Medium Earth Gray, HD Vinyl 40/20/40 Split Bench Seat-inc: center armrest, cupholder and driver's side manual lumbar Tires: 225/70Rx19.5G BSW Traction-inc: 4 traction tires on the rear and 2 A/P tires on the front Limited Slip w/4.88 Axie Ratio Power Equipment Group-inc: Deletes passenger side lock cylinder, upgraded door-trim panel, Accessory Delay, Advanced Security Pack, SecuriLock Passive Anti-Theft System (PATS) and inclination/intrusion sensors, MyKey, owner controls feature, Power Locks, Manual Telescoping Folding Trailer Tow Mirrors, power/heated glass and heated convex spotter mirror, Remote Keyless Entry, Power Front Side Windows, 1-touch up/down driver/passenger window Utility Lighting System-inc: LED side-mirror spotlights Snow Plow Prep Package-ine: pre-selected springs 397 Amp Alternator Dual 78 AH Battery Trailer Brake Controller-inc: smart trailer tow connector, Verified to be compatible w/electronic actuated drum brakes only Transmission Power Take-Off Provision-inc: transmission mounted live drive and stationary mode PTO GVWR: 19,000 Ibs Payload Upgrade Package -inc: upgraded frame and upgraded rear-axle Platform Running Boards Spare Tire, Wheel & Jack Front Wheel Well Liners PF fF 660.00 190.00 360.00 "915,00 160.00 250.00 115.00 210.00 270,00 280.00 850.00 320.00 350.00 180.00 fn A ww 39,002.00 640,20 184,30 349.20 887.55 155.20 242.50 114,55 203.70 261,90 271.60 824,50 310.40 339.50 174.60
Tab 9 - Enterprise - Water and Sewer.pdf · Source page 20
Page 2 of 3 Rear View Camera & Prep Kit-inc: Pre-installed content includes cab wiring and frame wiring to the rear most cross member, Upfitters kit includes camera w/mounting bracket, 20' jumper wire and camera mounting/aiming instructions 872 $ 415.00 $ 402.55 REMAINING STANDARD EQUIPMENT AS SHOWN IN CHROME DATA REPORT THE FOLLOWING EQUIPMENT TO BE INSTALLED BY JC MADIGAN 9 FT. KNAPHEIDE UTILITY BODY MODEL KUVcc WITH A 72” ROOF HEIGHT INSTALLED ON A SUPPLIED CHASSIS UNDERCOATED AND PAINTED BLACK WITH THE FOLLOWING ITEMS. POLY/STAINLESS STEEL ROTARY PADDLE HANDLES TWO (2) SIX (6) DRAW C-TECH ALUMINUM DRAW SYSTEMS STANDARD SHELF PACKAGE W/ DIVIDERS LED INTERIOR COMPARTMENT LIGHTING $ 54,862.50 Pm AH ' 1300Ib G-2 SERIES TOMMYGATE LIFTGATE MODEL G2-60- 1342 BG27 W/ STEEL BAR GRATE PLATFORM A BACK-UP ALARM - MUDFLAPS — LED LIGHTING FLUSH MOUNTED LED ST/TL WIRED FLASHERS SPLIT REAR MASTERLOCKS DOORS HYDRAULIC TOOL CIRCUIT W/ (2) LINE CABINET MTD. HOSE REEL 3000 WATT THOR INVERTER W/ (1) 12v BATTERY ea fF fF WH RHINO LINER APPLIED TO BED, CABINET TOPS, AND BUMPER E-TRACK ONE (1) ROW ON CARGO AREA WALLS $ - 2" RECEIVER W/ 7 SPADE RV PLUG & ELECTRIC BRAKES WIRED IN WIRE IN FACTORY OEM CAMERA SYSTEM $ - 9' EVEREST RL SERIES SNOW PLOW ASSEMBLY INSTALLED Wi JOY STICK CONTROLS, FISHER HEADGEAR, CUTTING $ 13,770.00 EDGE, PLOW LIGHTS AND GUIDEPOLES Code 3 Mega Thin LED Single or Multi-color Pair ULT6-AA, Amber LED Lights Mounted on Grille $ 380.00 Acari Low Profile Mounting Platform $ 273.60 ECCO Refles Mini Lightbar Amber LED/CLEAR Lens P/N 5590CA $ 402.38 Two (2) Code 3 Micropak Amber LED Lights - One Mounted $ 164.58 Above Each Rear Wheel on the Body ‘ Two (2) Code 3 M180S Amber LED Lights - Mounted on Rear of $ 430.06 Utility Body Above S/T/T Lights . 2 Piece Ventshades $ 101.00 Weathertech Floorliners $ 150.00 $ $ - PLEASE NOTE THAT PRICING IS BASED ON CURRENT CONTRACT PRICING THAT EXPIRES 9-30-22, VEHICLE MUST $ . BE ORDERED PRIOR TO THIS DATE OR PRICING MY CHANGE
Tab 9 - Enterprise - Water and Sewer.pdf · Source page 21
Page 3 of 3 Special Instructions: Custom or Special Orders are Non-Refundable Vehicle Subtotal This Estimate is for Budgetary Purposes and is Not a Guarantee of Cost for Services. Upfit Subtotal Estimate is Based on Current Information From Client About the Project Grand Total $114,865.37 Requirments Actual Cost May Change Once Project Elements are Finalized McGovern Municipal 1200 Worcester Road, Framingham NA 01702
Tab 9 - Enterprise - Water and Sewer.pdf · Source page 22
1417/21, 2:37 PM Ram-KUV-129-SU-7-1024x683.jpg (1024*683) https:/Avww.knapheide.com/wp-content/uploads/2019/4 2/Ram-KUV-129-SU-7-1024x683,jpg 4/1
Tab 9 - Enterprise - Water and Sewer.pdf · Source page 23
14/7/24, 2:38 PM Ram-KUV-129-SU-14-1024x683.jpg (1024x683) https:/Avww.knapheide.com/wp-content/uploads/2019/4 2/Ram-KUV-129-SU-14-1024x683.jpg 4/4
Tab 9 - Enterprise - Water and Sewer.pdf · Source page 24
CHROMEDAIA An Autodata Solutions Brand CANTON PUBLIC WORKS - TRUCK 31 Vehicle: [Fleet] 2022 Ford Super Duty F-550 DRW (F5H) XL 4WD Reg Cab 169" WB 84" CA
Tab 9 - Enterprise - Water and Sewer.pdf · Source page 25
CHROMEDATA An Autodata Solutions Brand Vehicle: [Fleet] 2022 Ford Super Duty F-550 DRW (F5H) XL 4WD Reg Cab 169" WB 84" CA (Complete ) Weight Ratings WEIGHT RATINGS Front Gross Axle Weight Rating: 7000 Ibs Rear Gross Axle Weight Rating: 14706 Ibs Gross Vehicle Weight Rating: 19500.00 Ibs Prices, specifications, and availability are subject to change without notice, and do not include certain fees, faxes and charges that may be required by law or vary by manufacturer or region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer's input is subject to the accuracy of the input provided. Data Version: 15075, Data updated Nov 2, 2021 1:04:00 PM PDT Nov 3, 2021 Page 2
Tab 9 - Enterprise - Water and Sewer.pdf · Source page 26
CHROMEDATA
An Autodata Solutions Brand
Vehicle: [Fleet] 2022 Ford Super Duty F-550 DRW (F5H) XL 4WD Reg Cab 169" WB 84" CA ("Complete
)
Technical Specifications
Chassis
Weight Information
Standard Weight - Front
Base Curb Weight
Gross Axle Wt Rating - Rear
Curb Weight - Rear
Option Weight - Rear
Reserve Axle Capacity - Rear
As Spec'd Payload
Gross Combined Wt Rating
Curb Weight
Total Option Weight
Payload Weight Rear
Trailering
Dead Weight Hitch - Max Trailer Wt.
Wt Distributing Hitch - Max Trailer Wt.
Fifth Wheel Hitch - Max Trailer Wt.
Maximum Trailering Capacity
Frame
Frame Type
Frame RBM
Frame Thickness
Suspension
Suspension Type - Front
Spring Capacity - Front
Axle Type - Front
Axte Capacity - Front
Axle Ratio (:1) - Front
Shock Absorber Diameter - Front
0.00 lbs
7047 Ibs
14706 Ibs
2980 Ibs
105.00 Ibs
11621.00 Ibs
12299,00 Ibs
28000 Ibs
7046.00 Ibs
155.00 Ibs
0 lbs
5000 ibs
18340 Ibs
19800 lbs
18340 Ibs
N/A
N/A
N/A
Other
7000 Ibs
Non-Independent
7000 Ibs
4.88
N/A
Standard Weight - Rear
Gross Axie Wt Rating - Front
Curb Weight - Front
Option Weight - Front
Reserve Axle Capacity - Front
As Spec'd Curb Weight
Maximum Payioad Capacity
Gross Axle Weight Rating
Reserve Axle Capacity
Payload Weight Front
Gross Vehicle Weight Rating
Dead Weight Hitch - Max Tongue Wt.
Wt Distributing Hitch - Max Tongue Wt.
Fifth Wheel Hitch - Max Tongue Wt.
Sect Modulus Rails Only
Frame Strength
Suspension Type - Rear
Spring Capacity - Rear
Axle Type - Rear
Axle Capacity - Rear
Axle Ratio (:1) - Rear
Shock Absorber Diameter - Rear
0.00 Ibs
7000 Ibs
4066 Ibs
50,00 lbs
"2884.00 Ibs
7201.00 tbs
12454.00 Ibs
21706.00 Ibs
14505.006 Ibs
0 Ibs
19500,00 Ibs
500 Ibs
1834 Ibs
4950 lbs
N/A
N/A
Leaf
15000 Ibs
Rigid Axle
14706 Ibs
4.88
NIA
Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or
region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report
preparer’s input is subject to the accuracy of the input provided. Data Version: 15075, Data updated Nov 2, 2021 1:04:00 PM POT
Nov 3, 2021
Page 3Tab 9 - Enterprise - Water and Sewer.pdf · Source page 27
CHROMEDAIA An Autodata Solutions Brand Vehicle: [Fleet] 2022 Ford Super Duty F-550 DRW (F5H) XL 4WD Reg Cab 169" WB 84" CA (-’ Complete ) Chassis Suspension Stabilizer Bar Diameter - Front Tires Front Tire Order Code Spare Tire Order Code Rear Tire Size Front Tire Capacity Spare Tire Capacity Revolutions/Mile @ 45 mph - Rear Wheels Front Wheel Size Spare Wheel Size Rear Whee! Material Steering Steering Type Steering Ratio (:1), On Center Turning Diameter - Curb to Curb Brakes Brake Type Brake ABS System (Second Line) Disc - Rear (Yes or ) Rear Brake Rotor Diam x Thickness Rear Drum Diam x Width Fuel Tank Fuel Tank Capacity, Approx Fuel Tank Location NIA TGM 512 LT225/70SR19.5 7500 Ibs NIA 645 19.5 X 6 in Full-Size in Steel Re-Circulating Ball N/A 48.5 ft 4-Wheel Disc 4-Wheel Yes 15.7 in N/A 40 gal N/A Stabilizer Bar Diameter - Rear Rear Tire Order Code Front Tire Size Spare Tire Size Rear Tire Capacity Revolutions/Mile @ 45 mph - Front Revolutions/Mile @ 45 mph - Spare Rear Wheel Size Front Wheel Material Spare Wheel Material Steering Ratio (:1), Overall Steering Ratio (:1), At Lock Turning Diameter - Wall to Wall Brake ABS System Disc - Front (Yes or ) Front Brake Rotor Diam x Thickness Drum - Rear (Yes or ) Aux Fuel Tank Capacity, Approx Aux Fuel Tank Location N/A TGM LT225/70SR19.5 Full-Size 15000 ibs 647 N/A 19.5 X 6 in Steel Steel N/A N/A N/A 4-Wheel Yes 15.4 in N/A N/A NIA Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer's input is subject to the accuracy of the input provided. Data Version: 15075, Data updated Nov 2, 2021 1:04:00 PM PDT Noy 3, 2021 Page 4
Tab 9 - Enterprise - Water and Sewer.pdf · Source page 28
CHROMEDAITA An Autodata Solutions Brand Vehicle: [Fleet] 2022 Ford Super Duty F-550 DRW (F5H) XL 4WD Reg Cab 169" WB 84" CA ( -.’ Complete ) Vehicle Emissions Tons/yr of CO2 Emissions @ 15K mi/year Powertrain Transmission Drivetrain Trans Type Trans Description Cont. Again Second Gear Ratio (:1) Fourth Gear Ratio (:1) Sixth Gear Ratio (:1) Clutch Size Final Drive Axle Ratio (:1) Transfer Case Gear Ratio (:1), High Transfer Case Power Take Off Eighth Gear Ratio (:1) Tenth Gear Ratio (:1) Mileage EPA Fuel Economy Est - Hwy EPA Fuel Economy Est - City Cruising Range - Hwy Engine " Engine Order Code Displacement SAE Net Horsepower @ RPM Engine Oil Cooler Electrical Cold Cranking Amps @ 0° F (Primary) Cold Cranking Amps @ 0° F (3rd) N/A Four Wheel Drive 10 N/A 2.98 1.77 1.27 N/A N/A NIA Yes 0.85 N/A N/A N/A N/A 9ON 7.3 L445 350 @ 3900 None 750 N/A EPA Greenhouse Gas Score Trans Order Code Trans Description Cont. First Gear Ratio (:1) Third Gear Ratio (:1) Fifth Gear Ratio (:1) Reverse Ratio (:1) Trans Power Take Off Transfer Case Model Transfer Case Gear Ratio (:1), Low Seventh Gear Ratio (:1) Ninth Gear Ratio (:1) Cruising Range - City Fuel Economy Esit-Combined Engine Type Fuel System SAE Net Torque @ RPM Cold Cranking Amps @ 0° F (2nd) Maximum Alternator Capacity (amps) N/A 44G Automatic w/OD 4.70 2.16 1.52 4.87 Yes Electronic N/A 1.00 N/A N/A N/A Regular Unleaded V-8 Sequential MPI 468 @ 3900 750 157 Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations, Content based on report preparer’s input is subject to the accuracy of the input provided. Data Version: 15075, Data updated Nov 2, 2021 1:04:00 PM PDT Nov 3, 2021 Page 5
Tab 9 - Enterprise - Water and Sewer.pdf · Source page 29
CHROMEDATA An Autodata Solutions Brand Vehicle: [Fleet] 2022 Ford Super Duty F-550 DRW (F5H) XL 4WD Reg Cab 169” WB 84" CA (~ Complete ) Powertrain Cooling System Total Cooling System Capacity Dimensions Interior Dimensions Passenger Capacity Front Leg Room Front Hip Room Second Leg Room Second Hip Room Exterior Dimensions Wheelbase Length, Overall w/rear bumper Width, Max w/o mirrors Overhang, Front Front Bumper to Back of Cab Cab to End of Frame Ground to Top of Frame Ground Clearance, Front Body Length Cargo Area Dimensions Cargo Box Width @ Top, Rear Cargo Box Width @ Wheelhousings Tailgate Width Ext'd Cab Cargo Volume N/A 43.9 in 62.5 in NIA N/A 169 in N/A 80 in 38.3 in N/A 131.2 in NIA 8.3 in 0.00 ft NIA N/A N/A N/A Front Head Room Front Shoulder Room Second Head Room Second Shoulder Room Length, Overall w/o rear bumper Length, Overall Height, Overall Overhang, Rear w/o bumper Cab to Axie Ground to Top of Load Floor Frame Width, Rear Ground Clearance, Rear Cab to Body Cargo Box Width @ Floor Cargo Box (Area) Height Cargo Volume 40.8 in 66.7 in NIA N/A N/A 254.8 in 81.1 in 47.2 in 84 in N/A 34.2 in 8.3 in NIA N/A N/A N/A Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer's input is subject to the accuracy of the input provided. Data Version: 15075, Data updated Nov 2, 2021 1:04:00 PM PDT Nov 3, 2021 Page 6
Tab 9 - Enterprise - Water and Sewer.pdf · Source page 30
CHROMEDATA An Autodata Solutions Brand Vehicle: [Fleet] 2022 Ford Super Duty F-550 DRW (F5H) XL 4WD Reg Cab 169" WB 84" CA ( - Complete ) Selected Model and Options MODEL CODE MODEL F5H 2022 Ford Super Duty F-550 DRW XL 4WD Reg Cab 169" WB 84" CA COLORS CODE DESCRIPTION Wé6 Green Gem ENGINE CODE DESCRIPTION 99N Engine: 7.3L 2V DEVCT NA PFI V8 Gas (STD) TRANSMISSION CODE DESCRIPTION 446 Transmission: TorqShift 10-Speed Automatic -inc: 10R140 w/neutral idle and selectable drive modes: normal, tow/haul, eco, deep sand/snow and slippery (STD) OPTION PACKAGE CODE DESCRIPTION 660A Order Code 660A AXLE RATIO CODE DESCRIPTION X8L Limited Slip w/4.88 Axle Ratio TIRES CODE DESCRIPTION TGM Tires: 225/70Rx19.5G BSW Traction -inc: 4 traction tires on the rear and 2 A/P tires on the front PRIMARY PAINT CODE DESCRIPTION W6 Green Gem Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided. Data Version: 15075, Data updated Nov 2, 2021 1:04:00 PM PDT Nov 3, 2021 Page 7
Tab 9 - Enterprise - Water and Sewer.pdf · Source page 31
CHROMEDAIA An Autodata Solutions Brand Vehicle: [Fleet] 2022 Ford Super Duty F-550 DRW (F5H) XL 4WD Reg Cab 169" WB 84" CA ( + Complete ) SEAT TYPE CODE AS DESCRIPTION Medium Earth Gray, HD Vinyl 40/20/40 Split Bench Seat -inc: center armrest, cuphoider, storage and driver's side manual lumbar ADDITIONAL EQUIPMENT - PACKAGE CODE 90L DESCRIPTION Power Equipment Group -inc: Deletes passenger side lock cylinder, upgraded door-trim panel, Accessory Delay, Advanced Security Pack, SecuriLock Passive Anti-Theft System (PATS) and inclination/intrusion sensors, MyKey, owner controls feature, Power Locks, Remote Keyless Entry, Folding Trailer Tow Mirrors w/Power Heated Glass, manual telescoping, heated convex spotter mirror and integrated clearance lamps/turn signals, Power Front Side Windows, 1-touch up/down driver/passenger window ADDITIONAL EQUIPMENT ~ MECHANICAL CODE 473 52B 62R 67B 68M 86M DESCRIPTION Snow Plow Prep Package -inc: pre-selected springs (see order guide supplemental reference for springs/FGAWR of specific vehicle configurations), Note 1: Restrictions apply; see supplemental reference or body builders layout book for details, Note 2: Also allows for the attachment of a winch, Note 3: Highly recommended to add (86M) dual battery on 7.3L gas engines, Adding (67B) 397 amp alternators for diesel engine is highly recommended for max output Trailer Brake Controller -inc: smart trailer tow connector, Verified to be compatible w/electronic actuated drum brakes only Transmission Power Take-Off Provision -inc: mobile and stationary PTO modes 397 Amp Alternators GVWR: 19,500 lb Payload Plus Upgrade Package -inc: upgraded frame, rear-axle and low deflection/high capacity springs, Increases max RGAWR to 14, 706, Note: See Order Guide Supplemental Reference for further details on GVWR Dual 78 AH Battery ADDITIONAL EQUIPMENT - EXTERIOR CODE 18B 512 59H 61d 6iL 63A DESCRIPTION Platform Running Boards Spare Tire, Wheel & Jack -inc: Excludes carrier, 6-Ton Hydraulic Jack Center High-Mounted Stop Lamp (CHMSL) 6-Ton Hydraulic Jack Front Wheel Well Liners (Pre-installed) Utility Lighting System -inc: LED side-mirror spotlights Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided. Data Version: 15075, Data updated Nov 2, 2021 1:04:00 PM POT Nov 3, 2021 Page 8
Tab 9 - Enterprise - Water and Sewer.pdf · Source page 32
CHROMEDATA An Autodata Solutions Brand Vehicle: [Fleet] 2022 Ford Super Duty F-550 DRW (F5H) XL 4WD Reg Cab 169" WB 84" CA (= Complete ) ADDITIONAL EQUIPMENT - INTERIOR CODE DESCRIPTION 872 Rear View Camera & Prep Kit -inc: Pre-installed content includes cab wiring and frame wiring to the rear most cross member, Upfitters kit includes camera w/mounting bracket, 20' jumper wire and camera mounting/aiming instructions Options Total Prices, specifications, and availability are subject to change without notice, and do nof include certain fees, taxes and charges that may be required by law or vary by manufacturer or region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided. Data Version: 15075, Data updated Nov 2, 2021 1:04:00 PM PDT Nov 3, 2024 Page 9
Tab 9 - Enterprise - Water and Sewer.pdf · Source page 33
CHROMEDAIA An Autodata Solutions Brand Vehicle: [Fleet] 2022 Ford Super Duty F-550 DRW (F5H) XL 4WD Reg Cab 169" WB 84" CA (-’ Complete ) Standard Equipment Mechanical Exterior Engine: 7.3L 2V DEVCT NA PFI V8 Gas (STD) Transmission: TorqShift 10-Speed Automatic -inc: 10R140 w/neutral idle and selectable drive modes: normal, tow/haul, eco, deep sand/snow and slippery (STD) 4.88 Axle Ratio (STD) 50-State Emissions System Transmission w/Oil Cooler Electronic Transfer Case Part-Time Four-Wheel Drive 78-Amp/Hr 750CCA Maintenance-Free Battery w/Run Down Protection HD 240 Amp Alternator Towing Equipment -inc: Trailer Sway Control Trailer Wiring Harness 10950# Maximum Payload GVWR: 18,000 Ibs Payioad Package HD Shock Absorbers Front And Rear Anti-Roll Bars Firm Suspension Hydraulic Power-Assist Steering 40 Gal. Fuel Tank Single Stainless Steel Exhaust Dual Rear Wheels Auto Locking Hubs Front Suspension w/Coil Springs Leaf Rear Suspension w/Leaf Springs 4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs and Brake Assist Upfitter Switches Wheels: 19.5" x 6" Argent Painted Steel -inc: Hub covers/center ornaments not included Tires: 225/70Rx19.5G BSW A/P (STD) Clearcoat Paint Black Front Bumper w/Black Rub Strip/Fascia Accent and 2 Tow Hooks Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or tegion. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer's input Is subject to the accuracy of the input provided, Data Version: 15075, Data updated Nov 2, 2021 1:04:00 PM PDT Nov 3, 2021 Page 10
Tab 9 - Enterprise - Water and Sewer.pdf · Source page 34
CHROMEDAIA An Autodata Solutions Brand Vehicle: [Fleet] 2022 Ford Super Duty F-550 DRW (F5H) XL 4WD Reg Cab 169" WB 84" CA (- Complete ) Exterior Entertainment interior Black Fender Flares Black Side Windows Trim and Black Front Windshield Trim Black Door Handles Black Manual Side Mirrors w/Manual Folding Manual Extendable Trailer Style Mirrors Fixed Rear Window Light Tinted Glass Variable Intermittent Wipers Aluminum Panels Front Splash Guards Black Grille Autolamp Auto On/Off Aero-Composite Halogen Daytime Running Lights Preference Setting Headlamps w/Delay-Off Cab Clearance Lights Radio w/Seek-Scan and Clock Radio: AM/FM Stereo w/MP3 Player -inc: 4 speakers Fixed Antenna SYNC Communications & Entertainment System -inc: enhanced voice recognition, 911 Assist, 4.2" LCD center stack screen, AppLink, 1 smart-charging USB port and steering whee! audio controls 2.LCD Monitors In The Front 4-Way Driver Seat -inc: Manual Recline and Fore/Aft Movement 4-Way Passenger Seat -inc: Manual Recline and Fore/Aft Movement Manual Tilt/Telescoping Steering Column Gauges -inc: Speedometer, Odometer, Oil Pressure, Engine Coolant Temp, Tachometer, Transmission Fluid Temp, Engine Hour Meter, Trip Odometer and Trip Computer FordPass Connect 4G Mobile Hotspot Internet Access Manual Air Conditioning Illuminated Locking Glove Box Interior Trim -inc: Chrome Interior Accents Full Cloth Headliner Urethane Gear Shifter Material Prices, specifications, and availability are subject to change without notice, and do not include ceriain fees, taxes and charges that may be required by law or vary by manufacturer or region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on repost preparer's input is subject to the accuracy of the input provided. Data Version: 15075, Data updated Nov 2, 2021 1:04:00 PM PDT Nov 3, 2021 Page 11
Tab 9 - Enterprise - Water and Sewer.pdf · Source page 35
CHROMEDATA An Autodata Solutions Brand Vehicle: [Fleet] 2022 Ford Super Duty F-550 DRW (F5H) XL 4WD Reg Cab 169" WB 84" CA (:: Complete ) Interior Safety-Mechanical Safety-Exterior Safety-Interior HD Vinyl 40/20/40 Split Bench Seat -inc: center armrest, cupholder, storage and driver's side manual lumbar Day-Night Rearview Mirror Passenger Visor Vanity Mirror 3 12V DC Power Outlets Front Map Lights Fade-To-Off Interior Lighting Full Vinyl/Rubber Floor Covering Smart Device Remote Engine Start instrument Panel Covered Bin and Dashboard Storage Manual 1st Row Windows Systems Monitor Trip Computer Outside Temp Gauge Analog Appearance Seats w/Vinyl Back Material Manual Adjustable Front Head Restraints Air Filtration Driveline Traction Control Side Impact Beams Dual Stage Driver And Passenger Seat-Mounted Side Airbags Dual Stage Driver And Passenger Front Airbags w/Passenger Off Switch Safety Canopy System Curtain 1st Row Airbags Outboard Front Lap And Shoulder Safety Belts -inc: Height Adjusters Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer's input is subject to the accuracy of the input provided. Data Version: 15075, Data updated Nov 2, 2021 1:04:00 PM PDT Nov 3, 2021 Page 12
Tab 9 - Enterprise - Water and Sewer.pdf · Source page 36
CHROMEDAIA An Autodata Solutions Brand Vehicle: [Fleet] 2022 Ford Super Duty F-550 DRW (F5H) XL 4WD Reg Cab 169" WB 84" CA (-’ Complete ) WARRANTY Basic Years: 3 Basic Miles/km: 36,000 Drivetrain Years: 5 Drivetrain Miles/km: 60,000 Corrosion Years: 5 Corrosion Miles/km: Unlimited Roadside Assistance Years: 5 Roadside Assistance Miles/km: 60,000 Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report prepater's input is subject to the accuracy of the input provided. Data Version; 15075, Data updated Nov 2, 2021 1:04:00 PM PDT Nov 3, 2021 . Page 13