TOWN OF CANTON
FORM B - FISCAL 2026

CAPITAL PROJECT / EQUIPMENT REQUEST

SUBMITTED BY:

DEP.    ENT:
Central Maintenance                                        Brian Lynch
PROJECT  UIPMENT TITLE:
Fire station 1 Boiler replacement
TOTAL P  E   EQUIPME    ST (must be at least  {0]
$350,000
DESCRIPTION:

Replace exiting single boiler with three condensing boilers.

PURPOSE AND JUSTIFICATION:

Execting boiler from 2005 is leaking soot and CO2, we have had some of the sections of the
boiler repaired before, but now it is time for replacement.

NEED CLASSIFICATION: (Check all that apply)
____ Required for Safety

____ Required by Law or Mandate
_v_Improve/Expand Service or Increase Efficiency

Planned Project or Replacement
Unplanned Project or Replacement
New Project/Item (not on last year’s 5-Yr. Plan)

D     r        al Priority Ranking:
Please rank this request out of your total
requests for this year: (#1 as top priority)
1 (#) OF         5 (#)

Expected Useful Life: (Check one)
_v_ 20 or More Yrs       5 to 9 Years
___ 10 to 19 Years       3 to 4 Years

Impact_to Dept. Operating Budget: (Check one)
v_ Will Reduce Cost by $.
No Impact

Will Increase Cost by $.

Revenue Impact: (Check one)
Will Produce Add! Revenue by $

~_ Revenue Neutral (no impact)
_v_Will Decrease Revenue by $.

OTHE       Ts        TION: (Attach supporting documentation)

TORT SPT OCA LOLS

Source page 42

March 14, 2024

Mr. Brian Lynch

Director of Facilities and Grounds
Facilities and Grounds Division
Town of Canton

79 Pleasant Street

Canton, MA 02201

RE:     Boiler Room Renovations
Fire Station No. 1

Dear Mr. Lynch:

In accordance with your request, BLW Engineers, Inc. (BLW) is pleased to submit a Scope of Services
and Proposed Fee to provide Mechanical and Electrical Engineering Services at the above referenced
facility.

Scope of Services

Construction Document Services will include the preparation of plans and specifications for the
mechanical and electrical systems associated with a portion of the roof replacement project, in
accordance with the following:                                          Boi fer

e Mechanical design shall include demolition of existing boilers, associated piping, pumps, expansion
tank and controls and replace with condensing type boilers, pumps, piping, insulation, water
specialties, controls, etc.

e Plumbing design to revisions to the gas piping and protected water system for cold water makeup
piping for the new boilers. Existing domestic hot water system to remain.

e Electrical design to provide power the new boiler and associated equipment.

e BLW will provide required fieldwork for verifying existing conditions.

e BLW will attend all required meetings as requested by Town of Canton for the development of the
project plans and specifications.

e All systems design shall conform to Massachusetts State Building Code.

Bidding Services will include attendance at the pre-bid conference; answering of contractor questions
during the bid process, issuance of any necessary addenda; and review the bid results for
recommendation of the lowest responsible general bidder.

Construction Administration Services will include shop drawing review; answering of contractor
questions; prepare any project directives; attend all construction meetings with meeting minutes; review
any change orders; construction site visits during construction with field written field reports; and
provide final punchlist inspections with reports at the end of the project for each discipline.

Record Drawings for each discipline shall be provided to the owner at the completion of the project by
the Contractor. BLW will provide electronic files of the mechanical and electrical systems design to the

BLW ENGINEERS, INC.                                                                        CONSULTANTS
311Great Road, Post Office Box Littleton, Massachusetts 01460                         Tel: 978.486.4301 Fax: 978.428.0067

Source page 43

BLWJENGINEERS

fdA

Cost Estimate

311 Great Road, Post Office Box 1551, Littleton, Massachusesetts 01460 tel 978.486.4301 fax 978.428.0067 e-mail Info@blwengineers.com

BLW ENGINEERS, INC.

Construction Cost Estimate

Project phase:       Schematic                          Project:        Boiler Replacement                                                         Sheet
Trade Specification Section:        220000/230000/                  Fire Station No. 1                                                  1 of 1
260000                           Canton, MA                                                         Date
By: | KRB___ Checked By:   __KRB   Project Number:         4                            03.14.24
Material                   Labor
Description                                   Qty |Units} Unit Cost    [        Total            Unit Cost        Total                  Total
Boiler Replacement _          ee   se ee    _             =   _     ee
00 10 00 - General Conc Conditions   ee    ZZ                     _         ee |
General Conditions                                 -                         -                                  a         i=         ~~)           30,000
03 30 00 - CONCRETE                                       |          _       |                    ee
Concrete Equipment Pad Extension     7     14s          750,  750 |        750]        750         1,500
220000-PLUMBING _         a SG       es | ee
Demolition   _     _    1 [EAP      2,500) 2, 500         2,500
Piping, Val Valves & Insulation -      EA 75007500 |    17,500, —_—-17,500      25,000
| Vent Piping/Combustion Air ‘Piping            | 1    EA.       4,000       4,000 _——:8,000       8,000        12,000
23 00 00 - HVAC                |__|      [-          es es
Demolition                    | 1    EA |         |       a 7,500, —_—7,500|      7,500
Condensing Boilers -  OF vet vi 2.      —_ L 3 | EA]   10,000}  __ 30,000, 3,000         9,000      ___ 39,000
BoilerPumps                    -        3  EAs 1,750) “5,250       1,250)     3,750          9,000
| Building Pumps _      _                       3     _2 | EA  _      2,500,         5,000         2,500'  ——§,000          10,000
| Domestic Water Pumps _                [41 | Ea!     1,500)     1,500, = 1,250, 1,250       2,750
| Water Specialties |                                  1      EA |        4,000 |        4,000, 5,000 ~—_—i5,000           9,000
Piping, Insulation & Valves  _           _     1    Ls |      12,500, 12,500     25,000,      25,000}} 37,500
| Automatic Temperature Controls |                    1      EA |       7                     25,000, 25,000         25,000
Commissioning | __    —   7   =    1   EA |      7   _    _       2,500,     2,500} |2,500 |
Testing and Balancing                                 1      EA |                                 2,500         2,500           2,500
f260000-ELECTRICAL—— (“es—(‘(‘i;!C!CUdLLL
| Demolition                     a       _       1    EA)     =                 | _2,500        2,500] 2,500
Boiler Room Power Wiring                      1 | EA        4,000       4,000 |    __ 8,000    8,000   _    12,000
i
Subtotal                                                         $ 74,500              $ 125,750]}$ 230,250
15% Overhead & Profit                                                                                                                $       34,538
Subtotal                                                                                              $    264,788
15% Contingency                                                                           $    34,538
TOTAL                  $    299,325

Source page 44

Contractor for the production of Record Drawings and will subsequently review “as-built” drawings
prepared by the contractor.

Assumptions

BLW will generate electronic format backgrounds for the mechanical and electrical design of the

proposed project.

BLW will provide reproducible contract documents for public bid. BLW has not included
reproduction costs or time for bid document distribution to contractors in this proposal.

Environmental Consulting services are not included in this proposal.

Structural Engineering services are not included in this proposal.

LEED documentation and Energy Modeling are not included in this proposal.

Commissioning is not included in this proposal.

Attendance at bid openings is included in this proposal.

Acoustical related services have not been included in this proposal.

Proposed Fee

Boiler Room Renovations

Construction Documents                    $ 19.200.00
Bidding                            $ 1,200.00
Construction Administration              $ 6,000.00

Total | $ 26,400.00

Invoices for the above stated construction documents fee would be submitted monthly, based on a lump
sum, percent complete basis by task. Reimbursable expenses will be invoiced at cost plus ten percent.

Thank you for the opportunity to present this proposal. If you have any questions or need additional
information, please feel free to contact our office.

Very truly yours,                                             Accepted:

BLW Engineers, Inc.

Town of Canton

Kenneth P Beck

Facilities and Grounds Division

Ken Beck, Principal                                   date:
PE, LEED AP, MCPPO, CPHC

BLW ENGINEERS, INC.

CONSULTANTS

311Great Road, Post Office Box Littleton, Massachusetts 01460

Tel: 978.486.4301

Fax: 978.428.0067

Source page 45

TOWN OF CANTON
FORM B - FISCAL 2026

CAPITAL PROJECT / EQUIPMENT REQUEST

DEPARTMENT:                                                           SUBMITTED BY:

Central Maintenance

PROJECT / EQUIPMENT TITLE:
Upgrade Police Building Automation System

TOTAL PROJEC     I    T       t    least  000):
$53,920

DESCRIPTION:
Provide engineering, installation, and programming to replace existing problematic Metasys
BAS with A Niagara BAS system.

PURPOSE AND JUSTIFICATION:
Unlike the Metasys system the Niagara is an "open"system because any third party contractor
can purchase components and service the system. The Johnson controls Metasysy system
costs about $35,000.00 per year for maintenance and upgrades. The Niagara system is about
$7500.00 per year. The current Metasys is very outdated and we have only minimal control
from out computers. We will also be replacing / repairing know mechanical issues such as
economzer dampers and cotro! motorsthat are currently only working intermittently When we
notice an issue we have to go out and manually adjust them.

nking:

NEED CLASSIFICATION: (Check all that apply)  Departmental Pri

Required for Safety
Required by Law or Mandate
v_ Improve/Expand Service or Increase Efficiency

Please rank this request out of your total
requests for this year: (#1 as top priority)
3 (#) OF               5 (#)

Will Increase Cost by $

v_ Planned Project or Replacement                     Expected Useful Life: (Check one)
~__ Unplanned Project or Replacement                   ___200rMore Yrs ___ 5 to 9 Years
____ New Project/Item (not on last year's 5-Yr. Plan) | _v 10to19 Years 3 to 4 Years
Impact_to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)

Will Reduce Cost by $                               ___ Will Produce Addi Revenue by $
~~ No Impact                                               Revenue Neutral (no impact)

~_ Will Decrease Revenue by $     $2441/mth

using it for all new/ replacement systems in town.

KORE FIC AIBOSE

OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
We have already switched over to the Niagara system at Memorial hall and the Senior Center and will be

Source page 46

energysource*               q g§3

March 20", 2023

Dear Steven Choiniere,

Energy Source is pleased to present you with this energy conservation proposal. We trust you will
find this proposal a cost effective means to not only reduce your energy costs, but also improve the
quality of the environment throughout your facility.

In the attached proposal you will find a detailed report recommending an upgrade to the Building
Automation System (BAS) at Canton Police Station.

I hope you find this proposal informative. If you have any questions please do not hesitate to
contact me.

Sincerely,
Rich Finn

Energy Source

Disclaimer

All savings estimates and rebates must be considered estimated until reviewed and approved by the utility companies
designated within this report.

For any questions regarding this report, please contact Rich Finn, Director of Project Development for Energy Source,
Inc. at 781-267-8495. Any additional use of this report is prohibited unless permission is given in writing from Energy
Source, Inc.

Source page 47

energysource

Building Automation System Upgrade

Energy Conservation Measure Details

The existing building automation system at the Police Station is a JCI Metasys system
utilizing an NCE supervisory controller with N2 field controllers. Energy Source, in partnership
with FMC, proposes to replace the JCI NCE with a new supervisory controller using a JCI FX Jace
which is a Niagara-based platform. We will load the existing program from the NCE into the Jace.
FMC will create graphics and enable alarming. An internet connection will need to be provided by
the town of Canton for remote access to the system.

The proposed scope of work includes all materials and labor to install a JC] FX based
system, programming, graphics, startup, and training. This is a turnkey scope for this project. Also
included is a checkout of the functionality of the system. However, repair, replacement or

additional work beyond this scope is not included in this price.

Proposed Scope of Work:

e Head end
o Web enabled JCI FX8025 supervisory controller
® Requires Canton-provided internet connection

o Checkout of the field controllers functionality on the AHUs
o Optimized start/stop strategy
o Economizer control
o Programming, graphics, startup, and training

Project Benefits:

e The JCI FX is a Niagara-based platform and is considered “open” because programming,
service and components can be provided by third party contractors

e Future additions and replacement controllers can be BACnet which is a non-proprietary

protocol

Source page 48

ow
energysource

Pricing

Energy Source’s price to provide the scope described above is $20,800. The project is eligible for
an estimated utility incentive of $4,500 resulting in an estimated net cost of $16,300.

Clarifications

e Installation is based on prevailing wage labor rates, performed during normal business hours
e Repair or replacement of existing equipment outside this scope is excluded

e Sales tax not included

e Permit not included

e Pricing valid for 30 days

Source page 49

energysource

Installation and Warranty Information

If you decide to proceed with this proposal, Energy Source will be responsible for the following
tasks:

e Develop final equipment specifications and equipment layout
Processing and filing application for utility incentives
Material ordering and receiving

Dismantling and removing existing systems from premises
Construction

Final walk-through with you

Warranty

Included with your project is a one-year warranty on all labor and materials provided by Energy
Source. At the end of the first year materials remain covered by standard warranties provided by
their manufacturers. Warranty periods begin when the installation is completed. The owner has a
one-month period following the completion of the installation to accept or reject work performed
by Energy Source, after which time we will assume that the work has been accepted.

Due to the fluctuation in commodities this proposal is valid for a period of 30 days from the date
shown at the top of this proposal, after which time we will be happy to provide an adjusted quote if
necessary.

Source page 50

energysource

ENERGY SOURCE CONTRACT

The cost of this project includes all labor and materials necessary to install the systems referenced
above. Utility rebates are estimated and are subject to approval.

ve     32  qG 2 7]
Total Project Cost:                              $20,800.00 6 15 vA   x a)
Estimated Utility Rebates:                                              Sr
:                                                    x
Net Customer Cost:                                                      6,300.              by  noe
Koel  coud Tian           >)
x2 O

ACKNOWLEDGED AND ACCEPTED                                                         3  2 >  72

Town of Canton __is in agreement with the scope of work and terms set forth in this proposal
and that said services will be provided at the cost listed above.

ACCEPTANCE OF PROPOSAL-The above stated prices, specifications and conditions are satisfactory and are
hereby accepted. You are authorized to do the work as specified.

Signature:

Print Name:

Date of Acceptance:

FED ID #:

Source page 51

CSI ENGINEERING

HVAG * ELECTRIGAL ° PLUMBING «FIRE PROTECTION

October 29, 2024

Town of Canton
801 Washington Street
Canton, MA 02021

Attention: Steven Choiniere Supervisor of Facilities and Grounds
Re: Canton Police Department DDC Controls Upgrade Engineering Proposal

Pursuant to your request on behalf of CSI Engineering, Inc., we are pleased to submit our
proposal for engineering services for Canton Police Department DDC Controls Upgrade. We
propose to provide engineering services as described below, and on the terms and conditions set

forth herein.

Fee
The total fee for the engineering services shall be $20,000.00

Design Scope of Work

The scope of work includes preparation of mechanical and electrical drawings that describe
requirements associated with the Canton Police Department DDC Controls Upgrade in
accordance with the guidelines and requirements you provide.

Specifically, the scope of work is as follows:

Mechanical

+ Provide site visit to determine equipment locations.

Establish preliminary locations for new equipment.

¢ Provide mechanical DDC Controls design drawings including equipment locations,
equipment schedules, and controls details.

¢ Provide on drawings specifications for Niagara Platform DDC retrofit.

ad

Electrical

¢ Provide site visit to determine new equipment locations, etc.
¢ Indicate wiring for all mechanical controls’ components.
¢ Provide on drawings specifications.

Engineering Services
CSI will provide the following engineering services:

CSI Engineering                                                                                 Proposal # 2023-036

Portsmouth, NH 03801                                                                                                  Tel# (603) 319-8244
Web: www.CSI-Egnineers.com                                                                                       Fax# (603) 319-8561

Source page 52

CST ENGINEERING

HVAG e ELECTRICAL ¢ PLUMBING «FIRE PROTECTION

1. Attendance at one (1) design meeting/ site visit to gather existing conditions.

2. Preparation of Design Development submission. These documents consist of scaled
drawings and progress printing of the final specifications for use by owner to review and
comment. *

3. Preparation of a Permit Documents submission. These documents consist of scaled
drawings and final specifications, suitable for bidding/permitting.

4. Construction Administration Services including the following:
a. Assistance during the bid period and answer contractor questions.

b. Periodic site inspections, not to exceed (2) per trade, during construction to verify
contractors’ compliance with the contract documents and for preparation of a punch
list.

ce. Shop drawing review submittals.

5. Preparation of construction document submission, which consists of scaled drawings and
technical specifications suitable for bidding & permitting.

Drawings shall be in accordance with the Massachusetts State Building Code, Massachusetts
Electrical Code, NFPA 72, NFPA 13, ASHRAE Standard, International Mechanical Code, and
any other applicable Federal, State and local codes and ordinances.

*Any architectural, system or equipment changes made to the plans between the beginning
of design up to the Design Development Submission may, at our discretion, be subject to
additional fees depending upon the extent of the changes. Any changes made after the Design
Development Submission will be considered a redesign and subject to additional fees.

Services Not Included

The following services are not included in the ump sum fee; however, they can be included
upon request for an additional fee.

1. Engineering of low voltage wiring design including HVAC control wiring, cable TV
wiring, security system wiring, sound system wiring, and data wiring

Preparation of cost estimates.

Preparation of permits and regulatory agency application forms.
M, E, P and FP engineering beyond that specifically listed above.
System commissioning

Preparation of coordination and/or as-built drawings.

LEED design or associated documentation.

Value engineering and resultant design revisions

ee NAAR YN

Additional submission of design documents beyond the phases listed.

CSI Engineering                                                                           ;            Proposal # 2023-036

Portsmouth, NH 03801                                                                                           Tel# (603) 319-8244
Web: www.CSI-Egnineers.com                                                                              Fax# (603) 319-8561

Source page 53

CST ENGINEERING

HIVAG © ELECTRICAL «¢ PLUMBING °FIRE PROTECTION

10. Preparation of coordination and / or as-built drawings

Contract Terms and Conditions:

Clients’ Obligations
Town of Canton will provide CSI Engineering LLC, with the following:

1. AutoCAD/ Revit files of the architectural floor plans, reflected ceiling plans, elevations
and section details. These documents shall indicate walls, doors, windows, existing
equipment, furniture and be cleaned of all extraneous architectural notes & window, wall
and door tags. Architect shall use separate consistent layers for each component of the
drawings, such as windows, doors, new walls, existing walls etc...

2. When providing CAD/Revit documents, architect shall ensure that all the following are
included, Titleblock, proper fonts, plot styles, images, logos, CAD reference links, &
Xtef backgrounds:

PDF or complete architectural set include each time project is updated.

Existing as-built drawings to the extent available.

Any, and all, available information on existing DDC control system.

Product data for all owner supplied equipment

Client representative to make himself available to respond to any of our questions.

MAMAS wW

CSI Engineering, LLC, will rely on information provided by the Town of Canton and its agents
in performing our obligations described herein.

Final Inspection
CSI has the right to examine the project upon completion of that portion of the project on which
CSI has supplied engineering services. The purpose for the examination is to ensure compliance

with CSI's drawings and instructions. CSI shall not be responsible for any changes to the scope of
work or Owner's decisions to reject or amend CSI's instructions of which CSI was not made aware

as required herein.

Reimbursable Expenses

Reimbursable expenses are in addition to the fee above. These expenses include travel, overnight
and same day courier services, drawing reproduction, CAD plotting and scanning. All expenses
will be invoiced at 1.10 times the amount expended.

Billing Schedule
Billing will be monthly in proportion to the progress towards milestones of work as follows:

Milestone                                                                       Fee
Initial payment                                                                 $ 2,000.00
Design Development Package                                                   $15,000.00
Permit Document Submission                                 $ 3,000.00
CSI Engineering                                                                                 Proposal # 2023-036
Portsmouth, NH 03801                                                                 ;                                    Tel# (603) 319-8244

Web: www.CSI-Egnineers.com                                                                                       Fax# (603) 319-8561

Source page 54

CST ENGINEERING

HVAG «+ ELECTRICAL ¢ PLUMBING «FIRE PROTECTION

Net payment is due within 30 days. This account is subject to a FINANCE CHARGE for late
payment. This charge is computed at an annual percentage rate of 18% (periodic monthly rate of
1% %) on the total past due balance over 30 days. In the event of late payment, default, or
litigation, it is agreed that the purchaser will be liable for reasonable attorneys’ fees and costs of
collection,

Fee Basis

The fee above is based on an estimated project size and the scope of work as explained above.
Should the project size be increased, or the scope of work expanded, we reserve the right to
increase our fee accordingly.

Hourly Rate Schedule

Services requested in addition to, or not specifically listed above, will be invoiced at our standard
hourly rates. Our hourly rates for the calendar year 2024 are as follows:

Position                                        Rate

Principal                                      $250.00
Engineer                                      $175.00
Drafter/CAD Operator                        $ 100.00
Administration                                $ 75.00

We will not commence any additional services without prior written authorization.

Modifications

Oral modifications will not be accepted. Any changes or modifications to this proposal must be
set forth in writing, dated and signed by both parties. The proposal supersedes and replaces any
and all prior written or oral proposals.

Indemnification

Limitations on liability, waivers and indemnities in this Agreement are business understandings
between the parties and shall apply to all legal theories of recovery, including breach of contract
or warranty, breach of fiduciary duty, tort (including negligence), strict or statutory liability, or
any other cause of action, provided that these limitations on liability, waivers and indemnities will
not apply to any losses or damages that may be found by a trier of fact to have been caused by the
CSI’s gross negligence or willful misconduct.

CSI will not be responsible for the Contractor’s failure to perform the Work in accordance with
the requirements of the Specification for the Project. CSI will not have control over or charge of

CSI Engineering                                                                                 Proposal # 2023-036

Portsmouth, NH 03801                                                                                                   Tel## (603) 319-8244
Web: www.CSI-Egnineers.com                                                                                       Fax# (603) 319-8561

Source page 55

CST ENGINEERING

HVAC + ELECTRICAL * PLUMBING «FIRE PROTEGTION

and will not be responsible for acts or omissions of the Contractor, Subcontractors, or their agents
or employees, or any other entities performing portions of the Project.

To the fullest extent permitted by law, Contractor shall indemnify and hold harmless CSI, and its
agents and employees of any of them from and against claims, damages, losses and expenses, any
violation or infraction by Contractor of any law, order, code, citation, ordinance or statute,
including but not limited to attorney’s fees, arising out of or resulting from Contractor’s changes
or deviations from CSI’s Specifications under this Agreement but only to the extent caused in by
the acts or omissions of Contractor, Contractor’s Sub-Subcontractor(s), anyone directly or
indirectly employed by them or anyone for whose acts they may be liable, regardless of whether
or not such claim, damage, loss or expense is caused in part by a party indemnified hereunder.
The issuance of a Certificate of Completion by CSI shall not be a representation that CSI has (1)
made exhaustive or continuous on-site inspections to check the quality or quantity of the Work,
(2) reviewed construction means, methods, techniques, sequences or procedures, or (3) ascertained
how or for what purpose Contractor has modified CSI’s Specifications for the Project. CSI shall
not be liable for any modifications to the Specifications for the Project and Contractor shall bear
all risk of loss.

CSI shall be afforded its choice of legal counsel and Contractor shall be liable for the fees for
CSI’s costs of defense.

Contract between CSI and Town of Canton

If you find the above fee, scope of work and all terms and conditions acceptable, please sign and
return one signed copy of this proposal to us, authorizing us to proceed. Please send sign
acceptance to 125 Aviation Ave Ste. 4, Portsmouth NH, 03801 or fax us at (603) 319-8561.
Upon your acceptance, this proposal shall become our contract and shall constitute a legal, valid
and binding contract between CSI LLC & Town of Canton. This proposal is valid for sixty (60)
days only and is withdrawn if not executed within that period.

Authority

I, Steven Choiniere, represent that I have full authority, power and right without further action to
enter and execute this Contract.

Authorized Signature                                                              Date

CSI Engineering                                                                               Proposal # 2023-036

Portsmouth, NH 03801                                                                                          Tel# (603) 319-8244
Web: www.CSI-Egnineers.com                                                                            Fax# (603) 319-8561

Source page 56

CST ENGINEERING

HVAG e ELECTRICAL ° PLUMBING «FIRE PROTEGTION

Acceptance of Proposal

Project:          Canton Police Department DDC Controls Upgrade Engineering Proposal
Amount:        $ 20,000.00
Date:              October 29, 2024

Company Name:

Approved by:

Signature:

Date:

Accounts Payable Contact Name:

Accounts Payable Email Address:

CSI Engineering                                                                               Proposal # 2023-036

Portsmouth, NH 03801                                                                                                   Tel## (603) 319-8244
Web: www.CSI-Egnineers.com                                                                                            Fax# (603) 319-8561

Source page 57

TOWN OF CANTON
FORM B - FISCAL 2026

CAPITAL PROJECT / EQUIPMENT REQUEST

DEPARTMENT:
Central Maintenance

ITT       Yi:
Brian Lynch

SU

P.      E  PMENT TITLE:

Phase 2 Town hall Carpeting

TOTA   Cc

EQUIPMENT COST (must be at I

$49,000

RIPTIO}

Replace 20 year old carpet in Accounting office, Town Clerk office, room 125, basement
corridor,Engineering offices, DPW office Mike Trotta.

PURPOSE AND  IFICAT,

Replacing 20 year old carpet that is worn and in some areas ripped, some of the carpet
includes wrinkles that can cause a tripping hazard. As some of the seams are pulling away

from each other causing more trip hazards.

NEED CLASSIFICATION: (Check ail that apply)
_v_ Required for Safety

____ Required by Law or Mandate
_v_Improve/Expand Service or Increase Efficiency

v_ Planned Project or Replacement

ntal Priori              H
Please rank this request out of your total
requests for this year: (#1 as top priority)
4 (#) OF          5 (#)

Expected Useful Life: (Check one)

____Unplanned Project or Replacement                   _v_ 20 or More Yrs       5 to 9 Years
___ New Project/Item (not on last year's 5-Yr. Plan) | ___ 10 to 19 Years       3 to 4 Years
Impact_to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)

___ Will Reduce Cost by $
_V_No Impact
Will Increase Cost by $

___ Will Produce Addi Revenue by $
_v_Revenue Neutral (no impact)
___ Will Decrease Revenue by $

OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

CRPPH TTOCAL cue

Source page 58

Atkinson

PROPOSAL

October 30, 2024
To: Town of Canton

79 Pleasant Street

Canton, MA 02021
Attn: Brian Lynch
Re: Town Hall Flooring Replacements
Thank you for the opportunity to quote this project. We propose the following:

Supply and install Interface carpet tiles in style Cubic, or similar, color TBD, as well as Interface
walk off carpet tiles, style and color TBD (in basement entrance areas), Tarkett 4” base, color
TBD, where needed. Pricing includes receiving and redelivering materials, minor floor prep per
manufacturer’s specifications, transitions, materials, freight and adhesives. Work to be performed

during off hours using prevailing wage rates.

Basement = $29,515.00

Basement Halls                   = $16,389.00
Superintendent’s Office        =$ 2,808.00
Engineering                       = $10,318.00

Ist Floor = $18,962.00

Accountant                =$ 5,767.00
Town Clerk’s Office            =$ 5,767.00
Town Clerk Room 125        =$ 2,808.00
Break Room 121              =$ 4,620.00
GRAND TOTAL                = $48,477.00

fuse am       ma    a
ALL wae QeSkmes

Source page 59

Atkinson

Please note:
¢ All pricing is from the FAC98 Contract which is valid until 6/30/2025.

° Off hours = M-F 4pm-midnight, Saturday 6am-2pm

Sincerely,

Andrea Hood

eriied       STATEWIDE
WBENE          CONTRACT

Source page 60

TOWN OF CANTON
FORM B - FISCAL 2026

CAPITAL PROJECT / EQUIPMENT REQUEST

EP.     MENT:                                              SUBMITTED BY:
Central Maintenance                                        Brian Lynch

EQUI          TITLE:
Masonry repairs at PD and Pequitside

TAL PR  CT / EQUIPMENT COST  st   |    it)
$40,000

DESCRIPTION:
Repair chimney on Tavern, and masonry wails around foundation at Pequitside. Canton PD
repair fieldstone foundation walls in document storage room and exercise room.

P.                 T.            N:
Canton PD water is coming into the basement through the foundation walls in these two areas
and there are files in the document storage room that can't be damaged from water.
Pequitside the Tavern chimney is leaking and needs to be repointed. The foundation walls are
leaking into the basement where we keep all of the paper goods, and BOH supplies.

NEED CLASSIFICATION: (Check all that apply)             m     1 Priori      nki
Required for Safety                                               Please rank this request out of your total
Required by Law or Mandate                             requests for this year: (#1 as top priority)
v_ Improve/Expand Service or Increase Efficiency                5 (#) OF           5 (#)
Planned Project or Replacement                    Expected Useful Life: (Check one)
Unplanned Project or Replacement                    ___20 or More Yrs        5 to 9 Years
v_ New Project/Item (not on last year's 5-Yr. Plan) | _v_ 10 to 19 Years       3 to 4 Years
Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
Will Reduce Cost by $                                ___ Will Produce Addl Revenue by $
v_No Impact                                        ___ Revenue Neutral (no impact)
Will Increase Cost by $                              ___ Will Decrease Revenue by $
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

FOR FSC 802 0-

Source page 61

BAY STATE BRICK AND STONEWORK
.                       PO BOX 70
\                    MANSFIELD, MA 02048
617-323-6723              800-675-3940
Baystatebrick@hotmail.com

TO:            Town of Canton                                                        Proposal # 2271
Attn : Brian Lynch, CFA                                         October 4, 2024
Director of Municipal Facilities
Pequitside Farm
79 Pleasant Street
Canton, MA 02021
339-502-5700 x1432 / 781-807-1478
blynch@town.canton.ma.us

JOB LOCATION : Pequitside Farm

We hereby propose to furnish the materials and perform labor necessary for the completion of :
REPAIR TAVERN CHIMNEY
1) Erect scaffolding to access roof line.
2) Erect roof scaffolding to access chimney top.
3) Dismantle all loose bricks in top four courses and set aside.
4) Grind out all mortar joints in chimney above roofline and remove debris.
5) Wash chimney to remove loose residue.
6) Reset existing bricks, if re-usable, or best matching replacement bricks.
7) Repoint and too! mortar joints.
8) Build a new crown.
9) Install lead flashing strips beneath existing raglets to cover exposed aluminum step flashing on
both sides of chimney.
10) Seal flashing raglets, as necessary.
Provide three men per 8 hr day @ $2,850.00 per day- 3days to complete work.
Materials ..............$ 150.00
Total job cost ........$8,700.00
NOTES :
a) All construction debris to be removed from premises at conclusion of work.
b) Roof and grounds to be protected at all times.

All work to be done in accordance with the specifications of the above description and completed
in a substantial workmanlike manner for the sum of $ see above, with 1/2 due the day we start, balance
due day of completion.

Respectfully submitted : Michael Hernon

Source page 62

BAY STATE BRICK AND STONEWORK

PO BOX 70
MANSFIELD, MA 02048
617-323-6723               800-675-3940
Baystatebrick@hotmail.com

TO:             Town of Canton                                                           Proposal # 2270
Attn : Brian Lynch, CFA                                        October 4, 2024
Director of Municipal Facilities
Pequitside Farm
79 Pleasant Street
Canton, MA 02021
339-502-5700 x1432 / 781-807-1478
blynch@town.canton.ma.us

JOB LOCATION : Pequitside Farm

We hereby propose to furnish the materials and perform labor necessary for the completion of :
REPAIR EXTERIOR BRICK AND STONE FUNDATION WALLS
1) Excavate to approximately 12” along all areas of brick and stone foundation walls.
2) Grind out all open, cracked or loose mortar joints in brick work and remove debris.
3) Chisel out all open, cracked or loose mortar joints in stone work and remove debris.
4) Wash walls to remove loose residue.
5) Repoint and tcai brick joints with lime based mortar.
6) Repoint aiid tool stone joints with Portland cement and sand mix, with bonding agent.
7) Apply a sponge finish to stonework joints after initial set period.
8) Backfill and compact trenches.
9) All construction debris to be removed from premises at conclusion of work.
Provide three men per 8 hr day @ $2,850.00 per day- 3-4 days to complete work.
Materials ..............6 100.00
Total job cost ........$8,650.00 - $11,500.00

All work to be done in accordance with the specifications of the above description and completed
in a substantial workmanlike manner for the sum of $ see above, with 1/2 due the day we start, balance
due day of completion. -

Respectfully submitted : Michael Hernon

Acceptance of Proposal

The above prices, specifications and conditions are satisfactory and are hereby accepted. You are
authorized to do the work. Payment will be made as outlined.

SIGNATURE :                                                                                             DATE :

Source page 63

|

|    BAY STATE BRICK AND STONEWORK
|                  PO BOX 70

          MANSFIELD, MA 02048

| 617-323-6723          800-675-3940
         Baystatebrick@hotmail.com

TO:           Town of Canton                                                  Proposal # 2274
Attn : Brian Lynch, CFA                                      October 9, 2024
Director of Facilities
Pequitside Farm

79 Pleasant Street

Canton, MA 02021
339-502-5700 x1432 ,
781-807-1478
blynch@town.canton.ma.us

JOB LOCATION : Canton Police Department, 1492 Washington Street, Canton

We hereby propose t  furnish the materials and perform tabor necessary for the completion of :
REPAIR INTERIOR FIELDSTONE FOUNDATION WALLS — DOCUMENT STORAGE ROOM
1) Install a temporary high velocity exhaust fan in basement exterior door or window. This will

create low pressure in basement mitigating the potential for dust migration to habitable spaces.
) Move stored tama from perimeter walls.
) Cover stored items with plastic drop cloths.
) Wet wall to minimize dust.
5) Chisel off all areas of loose or spalling plaster coat and mortar joints from all exposed
accessible areas of interior fieldstone foundation walls and window sills and remove debris.
6) Wash walls to remove loose residue.
7) Fill all deep recesses and voids with cement and let set.
8) Apply a Portland cement and sand plaster coat, with bonding agent, to entire wall surfaces
including window sills.
9) Apply a sponge finish after initial set period.
40) Clean and remove all construction debris.
11) Return stored iterns to original positions.

2
3
4

Provide three men per 8 hr day at $2,850.00 per day
2 days to complete
Materials ..........6 325.00
Total cost of above item | $6,025.00

REPAIR INTERIOR FIELDSTONE FOUNDATION WALLS — EXERCISE ROOM

1) Repeat all elements of prep work and repair work as described above.

2) Additionally, remoye rubber floor mats in proximity to walls and replace same mats after work
is completed.

Source page 64

|
i

|
|

Provide three men per 8hr day @ $2,850.00 per day
4 days to complete job

Materials ...,................6 650.00

Total cost of above item : $12,050.00

NOTES :
a) Additional spaces in basement requiring foundation wail surface repairs would be
commensurate with pricing quoted above.

All work to be done in accordance with the specifications of the above description and completed
in a substantial workmanlike manner for the sum of $ see above, with 1/2 due the day we start, balance
due day of completion.

Respectfully submitted : Michael Hernon

Acceptance of Proposal

The above prices, specifications and conditions are satisfactory and are hereby accepted. You are
authorized to do the work. Payment will be made as outlined.

SIGNATURE :                                                                    DATE :