TOWN OF CANTON
FORM B - FISCAL 2026
CAPITAL PROJECT / EQUIPMENT REQUEST
DEPARTMENT: SUBMITTED BY:
Parks and Recreation Tyler Radicioni
PROJECT / EQUIPMENT TITLE:
2025 Ford Super Duty F-350 SRW
TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
$60,000
DESCRIPTION:
Purchase of new F350 Pick-Up Truck with hazard lights and snow plow attachments.
PURPOSE AND JUSTIFICATION:
This truck would re-place our current 2015 F350 which is currently offline. Our current 350 has
exhaust and engine issues which need total replacements. The estimated cost for everything was
over 20k. This truck has continously given us issues and is an essential part of our fleet for our
guys especially in the Spring and Summer. Our trucks are used on a daily basis to transport
machines, tow items and general maintenance use.
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking:
Required for Safety Please rank this request out of your total
Required by Law or Mandate requests for this year: (#1 as top priority)
X Improve/Expand Service or Increase Efficiency 1 (#) OF 4 (#)
X Planned Project or Replacement Expected Useful Life: (Check one)
Unplanned Project or Replacement 20 or More Yrs 5 to 9 Years
New Project/Item (not on last year's 5-Yr. Plan) X 10 to 19 Years 3 to 4 Years
Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
Will Reduce Cost by $__________________ Will Produce Addl Revenue by $_________
X No Impact X Revenue Neutral (no impact)
Will Increase Cost by $1000.00 Will Decrease Revenue by $____________
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
With our current truck offline during the Spring and Summer months we have to shuffle around
trucks with our guys. This truck is used for everything field related as well as snow removal.
FORM B - FISCAL 2017Source page 2
Quote
Company/Dept: Town of Canton - Parks & Recreation Department Date: October 19, 2024
Contact: Tyler Radicioni Quote #: CPR10192024
Street Address: 92 Pleasant Street Revision #:
City, State, Zip: Canton, MA 02021 Customer ID:
Phone: Sales Rep: PAUL G KING
E-Mail: tradicioni@town.canton.ma.us Contract: MAPC/GBPC/BAPERN
Job Description: BUDGETARY ESTIMATE
QTY Item # VEHICLE LINE DESCRIPTION UNIT PRICE Ext Line Total
2025 Ford Super Duty F-350 SRW (F3B) XL 4WD Reg
Cab 8' Box $47,885.00
W6 EXTERIOR PAINT: VSO PAINT - GEM GREEN METALLIC $660.00 $640.20
99A Engine: 6.8L 2V DEVCT NA PFI V8 Gas (STD)
Transmission: TorqShift-G 10-Speed Automatic
-inc: SelectShift and selectable drive modes: normal,
44F eco, slippery roads, tow/haul and off-road(STD)
610A OPTION PACKAGE: Order Code 610A
Gross Vehicle Weight Rating: 11,400 Lbs
Gross Combined Weight Rating: 21,000 Lbs
SEAT TYPE: Medium Dark Slate, HD Vinyl 40/20/40
Split Bench Seat -inc: center armrest, cupholder,
AS storage and driver's side manual lumbar
Wheels: 18" Argent Painted Steel -inc: painted hub
64F covers/center ornaments(STD)
Tires: LT275/70Rx18E BSW A/T (4) -inc: Spare may
TDX not be the same as road tire $265.00 $257.05
X3E Electronic-Locking w/3.73 Axle Ratio $430.00 $417.10
67B 410 Amp Dual Alternators -inc: 250 + 160 Amp $115.00 $111.55
86M Dual 68 AH/65 AGM Batteries $210.00 $203.70
Trailer Brake Controller -inc: smart trailer tow
52B connector $300.00 $291.00
McGovern MHQ Inc - 401 Elm St., Marlborough, MA 01752 Page 1 of 3Source page 3
Snow Plow Prep Package -inc: computer selected
springs for snowplow application, Dual battery
473 (86M) recommended w/6.8L or 7.3L gasoline engines $250.00 $242.50
61S/62S Front & Rear Splash Guards/Mud Flaps $130.00 $126.10
18B Platform Running Boards $320.00 $310.40
592 LED Roof Clearance Lights $95.00 $92.15
61N Front & Rear Wheel Well Liners $325.00 $315.25
Tough Bed Spray-In Bedliner-inc: tailgate-guard, black
box bed tie-down hooks and black bed attachment
85S bolts $595.00 $577.15
Upfitter Switches (6) -inc: Located in overhead
66S console $165.00 $160.05
Vehicle Total: $51,629.20
QTY Item # Equipment Description UNIT PRICE Ext Line Total
Two SoundOff Signal 4x2 mPower Lights Quick
Mount Amber LED Lights Mounted $500.00
Lo Profile Mounting Platform $350.00
SoundOff Signal 24" Nforce Mini Lightbar 6 Amber
LED per module to be mounted on Lo Profile
Platform $850.00
Two SoundOff Signal Universal Undercover "Hide-a-
LED" Amber Mounted in Reverse Light Housing $400.00
Switching for Emergency Lighting $150.00
Weathertech Floorliners $150.00
2 Piece Rainguards $110.00
Shop Supplies $150.00
Contract Equipment Total: $2,660.00
QTY Item # NON-CONTRACT EQUIPMENT LINE DESCRIPTION UNIT PRICE Ext Line Total
Estimated 202* Model Year Increase for Budgeting
Purposes (Varies per vehicle) $0.00
Estimated Equipment Increase for Budgeting
Purposes (10% of quoted equipment) $266.00
$0.00
McGovern MHQ Inc - 401 Elm St., Marlborough, MA 01752 Page 2 of 3Source page 4
DELIVERY OF VEHICLE TO CUSTOMER @ $2.00 MILE-
WILL BE DEDUCTED IF VEHICLE PICKED UP BY
CUSTOMER $118.00
$0.00
$0.00
$0.00
Non-Contract Equipment Total: $384.00
Vehicle and Equipment Total: $54,673.20
Vehicle Quantity: 1
Sub total: $54,673.20
Trade Description Trade VIN Trade Miles Trade Value
Trade Vehicle/s Total: $0.00
Quote Grand Total: $54,673.20
TERMS AND CONDITIONS
Custom or Special Orders are Non-Refundable
This Quote is for Budgetary Purposes and is Not a Guarantee of Cost for Services
Quote is Based on Current Information From Client About the Project Requirments
Actual Cost May Change Once Project Elements are Finalized
Trade value is subject to change based on time, mileage and condition of vehice at turn-in
ORDER ACKNOWLEDGEMENT
By signing this document you are agreeing to the above terms and conditions of this order from McGovern MHQ, Inc.
x
PRINT NAME
x
TITLE
x
SIGNATURE
McGovern MHQ Inc - 401 Elm St., Marlborough, MA 01752 Page 3 of 3Source page 5
TOWN OF CANTON
FORM B - FISCAL 2026
CAPITAL PROJECT / EQUIPMENT REQUEST
DEPARTMENT: SUBMITTED BY:
Parks and Recreation Tyler Radicioni
PROJECT / EQUIPMENT TITLE:
2025 Ford Maverick XLT AWD Supercrew Hybrid
TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
$40,000
DESCRIPTION:
Purchase of new 2025 Ford Maverick (W8J) XLT AWD SuperCrew Hybrid
PURPOSE AND JUSTIFICATION:
Currently we have a 2010 Ford Explorer that is shared between 4 people in the office. The recreation
director, the assistant director, the recreation supervisor and the CAASA program cooridnator. With the
amount of meetings, equipment moving, special events, and site visits trying to cooridnate and juggle all
schedules for the car gets extremely difficult. During the school year and summer months we have multiple
programs being run at different locations especially during the summer. Our staff is not all at one place so
it is vital to have this additional vehicle.
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking:
Required for Safety Please rank this request out of your total
Required by Law or Mandate requests for this year: (#1 as top priority)
X Improve/Expand Service or Increase Efficiency 2 (#) OF 4 (#)
Planned Project or Replacement Expected Useful Life: (Check one)
x Unplanned Project or Replacement 20 or More Yrs 5 to 9 Years
New Project/Item (not on last year's 5-Yr. Plan) X 10 to 19 Years 3 to 4 Years
Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
Will Reduce Cost by $__________________ Will Produce Addl Revenue by $_________
X No Impact X Revenue Neutral (no impact)
Will Increase Cost by $1000.00 Will Decrease Revenue by $____________
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
This truck would allow for an additional vehicle to help transport materials, as well as be used as
a back-up truck to our fleet if one had to go offline. The amount of equipment and material that
we have to transport and pick-up for our programs continues to grow. The current Ford Explorer
unfortunately has served as well but has been taken offline a few times due to its high mileage
and general wear and tear.
FORM B - FISCAL 2017Source page 6
Quote
Company/Dept: Town of Canton - Parks & Recreation Department Date: October 26, 2024
Contact: Tyler Radicioni Quote #: CDPW10262024
Street Address: 92 Pleasant Street Revision #:
City, State, Zip: Canton, MA 02021 Customer ID:
Phone: (781) 821-5030 Sales Rep: PAUL G KING
E-Mail: tradicioni@town.canton.ma.us Contract: MAPC/GBPC/BAPERN
Job Description:
QTY Item # VEHICLE LINE DESCRIPTION UNIT PRICE Ext Line Total
2025 Ford Maverick (W8J) XLT AWD SuperCrew $30,785.00
M7 EXTERIOR COLOR: Carbonized Gray Metallic
993 Engine: 2.5L Hybrid (STD)
Transmission: Automatic Continuous Variable (CVT)
44E (STD)
301A OPTION PACKAGE: Equipment Group 301A $1,200.00
2.91 Axle Ratio (STD)
Wheels: 17" Carbonized Gray Painted Aluminum
64T (STD)
SEAT TYPE: Navy Pier/Aspen Gray, Unique Cloth
Front Bucket Seats -inc: 6-way manual adjustable
driver and 4-way manual adjustable passenger, front
7B floor console w/eShifter, armrest and storage bin
63B Front & Rear Molded Splash Guards (4-Piece) $180.00 $174.60
96G Tough Bed Spray-In Bedliner $495.00 $480.15
Front & Rear Floor Liners w/o Carpet Mats
16C -inc: Deletes standard carpeted front floor mats $135.00 $130.95
21D Tonneau Pickup Box Cover - Soft Folding $590.00 $572.30
Vehicle Total: $33,343.00
QTY Item # Equipment Description UNIT PRICE Ext Line Total
McGovern MHQ Inc - 401 Elm St., Marlborough, MA 01752 Page 1 of 3Source page 7
Two SoundOff Signal 4" mPower Lights Stud Mount,
8 Amber LED Mounted in Grille $425.00
Two SoundOff Signal 4" mPower Lights Stud Mount,
8 Amber LED Mounted in Shrouds - One on Each Side
of Rear View Mirror $425.00
Two Window Shroud Kit for 4" Light w/ Stud Mount -
Black for Mounting Above Lights $30.00
Two SoundOff Signal 4" mPower Lights Stud Mount,
8 Amber LED Mounted in Shrouds - Mounted Below
Rear Headliner Above Rear Headrests $425.00
Two Window Shroud Kit for 4" Light w/ Stud Mount -
Black for Mounting Above Lights $30.00
Two SoundOff Signal Universal Undercover "Hide-a-
LED" Amber Mounted in Reverse Light Housing $400.00
Switching for Emergency Lights $150.00
Shop Supplies $150.00
$0.00
Contract Equipment Total: $2,035.00
QTY Item # NON-CONTRACT EQUIPMENT LINE DESCRIPTION UNIT PRICE Ext Line Total
Estimated 202* Model Year Increase for Budgeting
Purposes (Varies per vehicle) $0.00
Estimated Equipment Increase for Budgeting
Purposes (15% of quoted equipment) $0.00
DELIVERY OF VEHICLE TO CUSTOMER @ $2.00 MILE-
WILL BE DEDUCTED IF VEHICLE PICKED UP BY
CUSTOMER $120.00
$0.00
$0.00
Non-Contract Equipment Total: $120.00
Vehicle and Equipment Total: $35,498.00
Vehicle Quantity: 1
Sub total: $35,498.00
Trade Description Trade VIN Trade Miles Trade Value
McGovern MHQ Inc - 401 Elm St., Marlborough, MA 01752 Page 2 of 3Source page 8
Trade Vehicle/s Total: $0.00
Quote Grand Total: $35,498.00
TERMS AND CONDITIONS
Custom or Special Orders are Non-Refundable
This Quote is for Budgetary Purposes and is Not a Guarantee of Cost for Services
Quote is Based on Current Information From Client About the Project Requirments
Actual Cost May Change Once Project Elements are Finalized
Trade value is subject to change based on time, mileage and condition of vehice at turn-in
ORDER ACKNOWLEDGEMENT
By signing this document you are agreeing to the above terms and conditions of this order from McGovern MHQ, Inc.
x
PRINT NAME
x
TITLE
x
SIGNATURE
McGovern MHQ Inc - 401 Elm St., Marlborough, MA 01752 Page 3 of 3Source page 9
TOWN OF CANTON
FORM B - FISCAL 2026
CAPITAL PROJECT / EQUIPMENT REQUEST
DEPARTMENT: SUBMITTED BY:
Parks and Recreation Tyler Radicioni
PROJECT / EQUIPMENT TITLE:
Tilden Field Renovation
TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
$22,000
DESCRIPTION:
This project will address the current infield issues we experience every year. This is a 60' softball
field. The infield skin is currently 1' low and approximately 6' of weeds and grass needs to be edged
and removed. The current infield mix is also causing hazardous playing conditions as it has way to
much clay in it.
PURPOSE AND JUSTIFICATION:
This field is heavily used daily in Spring by the little league organization. This will address those
current playing conditions and create a safer playing area for the youth. This will also address the
infield mix which currently holds water causing us to close the field down more than it should be.
We are hopeful by adding a new mix and re-grading the infield it will allow for proper flow of water
off the infield.
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking:
X Required for Safety Please rank this request out of your total
Required by Law or Mandate requests for this year: (#1 as top priority)
X Improve/Expand Service or Increase Efficiency 2 (#) OF 3 (#)
X Planned Project or Replacement Expected Useful Life: (Check one)
Unplanned Project or Replacement 20 or More Yrs 5 to 9 Years
New Project/Item (not on last year's 5-Yr. Plan) X 10 to 19 Years 3 to 4 Years
Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
Will Reduce Cost by $__________________ Will Produce Addl Revenue by $_________
X No Impact X Revenue Neutral (no impact)
Will Increase Cost by $_________________ Will Decrease Revenue by $____________
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
This field is used almost 7 days a week during the baseball/softball season by little league. It is a
field that plays an important role in the operations for our youth leagues. These few items that
need to be fixed will help restore this field to a much safer playing area.
FORM B - FISCAL 2025Source page 10
SPORTS TURF SPECIALTIES, INC. Estimate
20 Kenneth Miner Drive
Wrentham, MA 02093 Date Estimate #
10/26/24 13522
Name / Address
Town of Canton
Canton Parks & Recreation
92 Pleasant Street
Canton, MA 02021
ESTIMATES VALID FOR 60 DAYS
This estimate must be signed and returned to us before we can schedule P.O. No. JOB
your job. Your signature means you agree to the work, and will pay the
invoice in a timely manner. The customer is required to locate and
clearly identify all underground irrigation lines, heads and control
valves, electrical and other buried objects. Sports Turf Specialties is not
responsible for damage to unmarked or shallow objects, and must be
notified of irrigation depth.
Item Description Qty Cost Total
Softball Field Ren... Tilden Softball Field located in Canton 6,000.00 6,000.00
0.00
This estimte is for the 60' softball field. The infield skin
is currently 1' low and approximately 6' of weeds and
grass will need to be edged and removed.
Below is a description of the renovation process:
Survey and measure, locate, and set homeplate, pitchers
mound, and bases to the correct location.
1. Edge and remove grass and weeds off the entire infield 0.00
skin.
2. Rough grade existing infield mix. 0.00
3.Supply and install 85 ton DuraEdge native premium 0.00
infield mix. All materials will be transported from
parking lot to field using low ground pressure machines
with turf tires to eliminate any damage to surrounding
turf.
4. Laser grade infield mix to within 1/4" of proposed 0.00
finish grades. Laser Grader is a fully automated unit.
5.Sand pro and roll infield mix
6. Install turface pro league red soil conditioner
7.Install Dura edge pro packing clay at the pitchers box
and landing areas
Phone #
Total
Signature
508-384-1084
Page 1Source page 11
SPORTS TURF SPECIALTIES, INC. Estimate
20 Kenneth Miner Drive
Wrentham, MA 02093 Date Estimate #
10/26/24 13522
Name / Address
Town of Canton
Canton Parks & Recreation
92 Pleasant Street
Canton, MA 02021
ESTIMATES VALID FOR 60 DAYS
This estimate must be signed and returned to us before we can schedule P.O. No. JOB
your job. Your signature means you agree to the work, and will pay the
invoice in a timely manner. The customer is required to locate and
clearly identify all underground irrigation lines, heads and control
valves, electrical and other buried objects. Sports Turf Specialties is not
responsible for damage to unmarked or shallow objects, and must be
notified of irrigation depth.
Item Description Qty Cost Total
MATERIALS RE UIRED: 0.00
DE Native/Mass P... DuraEdge Native Premium by the ton 85 96.60 8,211.00
Turface-Pro Red Pro League Red 50 bag soil conditioner 60 21.85 1,311.00
DuraPitch Pro Mo... DuraPitch Pro Mound Clay 15 22.42533 336.38
Brown bag 50 lb bag
Phone #
Total 15,858.38
Signature
508-384-1084
PageSource page 12
TOWN OF CANTON
FORM B - FISCAL 2026
CAPITAL PROJECT / EQUIPMENT REQUEST
DEPARTMENT: SUBMITTED BY:
Parks and Recreation Tyler Radicioni
PROJECT / EQUIPMENT TITLE:
48'' Hydro Walk Behind Kawasaki 185.HP
TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000):
$8,500
DESCRIPTION:
48" HYDRO WALK BEHIND KAWSAKI 18.5HP Mower.
PURPOSE AND JUSTIFICATION:
This stand behing mower would be a new mower for our fleet. Currently we have only 32'' stand
behinds and 48'' ride on mowers. In some of the new areas we have had to manage, we have come
across the difficulty of using ride on mowers because of the slopes of the areas. This creates a
unsafe way to mow. This 48'' mower would help us tremendously and safely at the Earl New House
location, the Gridley School and at the Ice Rink. Using the smaller 32'' stand behind mower is not
effeicent and takes double the time it should.
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking:
Required for Safety Please rank this request out of your total
Required by Law or Mandate requests for this year: (#1 as top priority)
X Improve/Expand Service or Increase Efficiency 4 (#) OF 4 (#)
Planned Project or Replacement Expected Useful Life: (Check one)
Unplanned Project or Replacement 20 or More Yrs 5 to 9 Years
x New Project/Item (not on last year's 5-Yr. Plan) X 10 to 19 Years 3 to 4 Years
Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
Will Reduce Cost by $__________________ Will Produce Addl Revenue by $_________
X No Impact X Revenue Neutral (no impact)
Will Increase Cost by $_________________ Will Decrease Revenue by $____________
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
This stand behind mower will increase our departments efficiency and safety at some of the newer
location we have been asked to manage.
FORM B - FISCAL 2025Source page 13
IN STORE PICKUP 01 - WRENTHAM
10/21/2024 9:15:15 (O) 1
01
CANTO031 7819568892 Q20868
TOWN OF CANTON PARK AND REC ALDRICH
92 PLEASANT STREET
CANTON MA 02021
MIKE HAYNES MTH
Description ** Q U O T E ** EXPIRY DATE: 11/20/2024 Amount
FAC 116 STATE DISCOUNT INCLUDED IN PRICE
ALDRICH
781-956-8892
New WRIGHT WVHC48SFS600 48" HYDRO WALK BEHIND KAWSAKI 18.5HP 8299.99
Subtotal: 8299.99
Authorization: _________________________ Quote Total: 8299.99Source page 14
FORM A
TOWN OF CANTON
CAPITAL PLANNING COMMITTEE
SIX-YEAR PLAN FY2025 5-Year 6-Year
Beginning with Fiscal Year 2025 and ending with 2030 VOTED Fy2026 | FYz027 | Fy2028 | FYz029 | FY2030 TOTAL FY2031 TOTAL
(000's omitted)
|BoarD OF SELECTMEN RESPONSIBILITY
POLICE DEPARTMENT
VEHICLES
Patrol Car - K9 2020 Ford Explorer #681 ) ()
Patrol Car 2021 Ford Explorer #682 56 0 {)
Patrol Car 2020 Ford Explorer #683 56 ) 0
Patrol Car 2019 Ford Explorer #684 71 71 1
Patrol Car 2014 Ford Explorer #685 71 71 71
Patrol Car MVC-On Order # 686 71 771 71
Patrol Car 2020 Ford Explorer #687 () ()
Lieutenant Car 2017 Ford Explorer #688 0 0
Detective Sergeant 2012 Ford Taurus Sedan #689 61 Q C)
Patrol Car 2019 Ford Explorer #690 () Q
Patrol Car 2020 Ford Explorer #692 56 4 {)
Patrol Car 2020 Ford Explorer #693 ) Q
Patrol Car 2021 Ford Explorer #694 71 71 71
Patrol Car 2020 Ford Explorer #695 0 0
Patrol Car - K9 2019 Ford Explorer #696 Q ()
BCI 2016 Ford Explorer #697 0 Y
BCI 2017 Ford Escape #698 0 0
DC-Keleher 2020 Ford Explorer #699 ( )
DC-Sherrill 2014 Ford Explorer #699 Q ]
MOPS 2016 Ford F150 #700 Q ()
SRO/Court | 2014 Ford Fusion Q 0
Patrol Cycle 2015 Harley Davidson FLHTP MC102 t) 0
Patrol Cycle 2015 Harley Davidson FLHP. MC103 () 0
Patrol Cycle 2015 Harley Davidson FLHTP MC104 0 0
Truck 2008 Dodge Ram (seized) 0 (
Trailer 1998 Wells Utility Traiter TriLgtEct ) ()
Radar Trailer 2008 B & W 9050 Trailer Q tC)
Tractor 2005 Kubota - Utility () 0
Trailer 2005 Cross Utly Trailer for Kubota 0 0
MSG Trailer 2014 ADDCO Utility Trailer i) 0
Police Vehicles - replacements ) 234 234 234 234 936 936
available for use (() 0
available for use (7 (')
[ TOTAL VEHICLES | 229] [5f8| 204] 204] 2047] 0] 7220 ) 7,220
TECHNOLOGY
Computer Software/Hardware - Police Booking Station 0 (}
Training Costs for Records Data Management System - Overtime Costs ) 0
Software-Replace IMC Record Data Management System (2nd round) i!) 0
Audio/Video Recording System () 0
Computer Software/Hardware - Communication Console 0 ()
Radios & Portables YJ Q
[ TOTAL- TECHNOLOGY ] i] o| [ oll oT oT oT 0] [ 0] [ 0] [ 0]
EQUIPMENT
Body Armor - 14 Bullet Resistant Vests & Vest Carriers 26 6 6 0 12 12
Apex Officer Training Simulator 65 {‘} ()
9 Defibrillators - In Cruisers and Police Station 34 0 0
Audio Video Recording Equipment - 11 Cruiser Audio/Video Systems, 50 Body Camera Units 0 ['}
Audio Video Recording Equipment - Upgrade for interview/interrogation & booking areas 39 C) [')
Tasers oO 0
Body Cameras {i} 0
Replace 12 Stationary Radar Guns 0 0
Radar Trailers w/ LPR 0 0
Weapons 0 0
Ballistic Shields w/ Ports 85 85 85
oO 0
TOTAL- EQUIPMENT ] [164] [85] 6] 6 | oT 0] l 97] [ 0} [ 12]
[303] [eos[ 2407 2a0T 23sT | C1317] [0] [i232]
SPACE NEEDS
[ | | | | | | ] [ o] | | | 0]
l i | | | | J [ o} | im o}
[ TOTAL - SPACE NEEDS ] I Oo} Cf Ol oT oT Cal 0] [ o7} o7) ov]
\\usrdsks\desktopthfindlen\DesktopiFY 26 Cruisers.XLSX6-YEAR PLAN FORM A MUNICIPAL
411712024 2:37 PMSource page 15
FORM A
TOWN OF CANTON
CAPITAL PLANNING COMMITTEE
SIX-YEAR PLAN FY2025 5-Year 6-Year
Beginning with Fiscal Year 2025 and ending with 2030 VOTED Fy2026 | Fv2027 | rvz028 | Fy2029 | Fv2030 TOTAL FY2031 TOTAL
(000's omitted)
TECHNOLOGY/ EQUIPMENT
RMS/Data Management Replacement Software 450 450 450
Audio Video Recording Equipment - 11 Cruiser Audio/Video Systems, 50 Body Camera Units 353 0 0
Replace Tasers - 50 [} )
Defibrillators - 9 Life Pak 1000 Defibrillators for police ares and within building 0 ()
Mobile Range 393 393 393
[ TOTAL - DEBT 353 L393] 450 [ oT oT 0] [ 843] [ oj [ 843 |
TOTAL DEBT [353] [| 393] 450] o| o| 0] L843] [ 0] 843
| TOTAL - POLICE DEPARTMENT | [746] [ 996] oof 240] 234] | L 2160] [ 0] [2.075]
FIRE DEPARTMENT
CASH CAPITAL
VEHICLES:
Car-1 Chief 2017 Ford Explorer #A7T11 0 (')
Car-2 Deputy 2015 Ford Explorer #5983 ) L')
Command Car C-3 2010 Ford Explorer # 8598 L'} 0
Car-4 Fire Prevention 2014 Ford Explorer MFA461 i!) ()
Car-6 EMS 2010 Ford Explorer # 3265 0 (‘}
Pick up 2008 Ford F-350 XL Super Duty #5985 ('} [)
E-2 - Refurbishment 2005 E-One Typhoon Pumper #7235 0 (')
E-2 - Fire Engine Replacement ($50,000 cash reserves & $1,000,000 Memorial surplus) 1,050 1,050 1,050
E-6 - Fire Engine 6 Replacement ($1,090,000 from cash reserves) 1,090 0 0
Sq-2 (fka E-4) Refurbish 2001 Ford 450 #3270 ) 0
American LaFrance 1925 LaFrance #5979 0 0
Trailer 1983 Wr Trailer # 5976 YJ )
[_TOTAL- VEHICLES [1,090] ~=—‘[_ 1,050 | oT oT oT 0] [1,050] [ 0] 1,050
TECHNOLOGY
Fire Records & Dispatch Software L'} (')
Station Alerting System [} i!)
3-5 year Fire Department Operational Study 8 8 8
Replace Fire Intercom System i} ('}
[TOTAL. TECHNOLOGY [ Oo] f[ 8] oT oT oT 0] [ 8] | 0] [ 8]
EQUIPMENT
Generator #1 (Station 1) 0 ()
Boat-1 Trailer 2004 Amer. Trailver Karavan #5982 25 25 25
Boat-2 Trailer 2007 EZL Boat Trailer #5927 25 25 25
Trailer 2007 Cross Country Fit Bed Tralr #9811 0 L'}
Trailer 2005 Magnu Utility Trailer #74329 (') )
Rescue Jet Ski 0 0
Furnishings & Equipment 0 0
Washer & Dryer Replacements at Station 1 and Station 2 20 0 0
Radio Master Boxes - Radio Repeater - Wash. St. Tower 0 {)
Audio Video Recording Equipment - 11 Cruisers, 50 Body 0 0
Radio Communications System Replacement for Police & Fire Depts. (cash reserves 1,620 0 0
Other Equipment - EMS Simulation Mannequin 0 0
Replace Hurst Extrication Equipment (Station 1) () 0
Turnout Gear 0 0
4 Thermal Imaging Camera Replacements 0 )
[TOTAL- EQUIPMENT C1640] [50] oT oT oT 0] L 50] [| 0} [ 50]
BUILDING & GROUNDS REPAIRSAMPROVEMENTS
Overhead Doors [) )
Repaint Interior Station 2 0 )
Diesel Exhaust Systems - Update ('} ()
Repair Floors at Fire Stations [} 0
[_TOTAL- BUILDINGS, ETC [ 0] [ oT Cl Ol Hl 0] [ oj [ oj [ 0]
TOTAL CASH CAPITAL L2730] [itos[T of oT of od L1t08] | of} [1,108]
DEBT
VEHICLES
Replace E-1 1993 Emg. Cycl. #3274 0 (')
E-2 Replacement 2005 E-One Typhoon Pumper #7235 40 750 790 790
Sq-1 (fka E-3) 2004 Ford 550 Brush Truck #3272 ) ()
Sq-2 (fka E-4) Refurbish 2001 Ford 450 # 3270 ARPA $230K| (() )
\usrdsks\desktop\hfindlen\Desktop\FY 26 Cruisers.XLSX6-YEAR PLAN FORM A MUNICIPAL
1177/2024 2:37 PMSource page 16
TOWN OF CANTON FORM B - FISCAL 2026 CAPITAL PROJECT / EQUIPMENT REQUEST DEPARTMENT: SUBMITTED BY: Police Department Chief Helena Rafferty PROJECT / EQUIPMENT TITLE: Mobile Range TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000): $392,786 DESCRIPTION: GSA 53' Ground Hog On Site Range Unit PURPOSE AND JUSTIFICATION: Police Officers in MA are required to do two "live fire” qualifications per year and they must be a certain number of months apart. The outdoor ranges in the state are beginning to become fewer and fewer and the competition for time at the ones that do allow police to utilize is fierce. Unlike Norwood PD and Needham PD, this facility was not built with an indoor range. This range would allow us to complete both our handgun and rifle training in the lot of the Canton Police Department. Even more exciting is that we could utilize the range as a revenue producer and allow other departments to rent it (with our instructors) when members of the Canton Police are not using it. NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking: ___ Required for Safety Please rank this request out of your total x Required by Law or Mandate requests for this year: (#1 as top priority) “X_Improve/Expand Service or Increase Efficiency 2 (#) OF 4 (#) Planned Project or Replacement Expected Useful Life: (Check one) “x_Unplanned Project or Replacement ___20 or More Yrs _x_ 5 to 9 Years ___New Project/Item (not on last year's 5-Yr. Plan) | _ 10 to19 Years __ 3. to 4 Years Impact_to Dept. rating Budget: (Check one) Revenue Impact: (Check one) Will Reduce Cost by $ _x_ Will Produce Addl Revenue by $_? ~x_No Impact ~_ Revenue Neutral (no impact) ~__ Will Increase Cost by $ ~__ Will Decrease Revenue by $ OTHER COMMENTS OR INFORMATION: (Attach supporting documentation) ORS OaG
Source page 17
MOBILE a Scott Hinton Scott@MrtRange.com 303-489-1767 CUSTOMER: CANTON MA. POLICE DEPARTMENT (THOMAS KELEHER) DELIVERY ADDRESS: CANTON MA. DATE: 9-30-24 NOTES: QUOTE IS FOR A 53’ GROUND HOG DELIVERED GSA 53’ GROUND HOG: SIN 333318TDTM Part Number 53-GH-STD QTY | SUBTOTAL The base package of all our ranges includes everything you need to have a safe comfortable shooting experience inside and outside without spending additional money. 1. Type of Shooting Range: 53’ Static Rifle Container Shooting Range o This shooting range is designed for static rifle shooting. 2. Supported Calibers: o Supports most common rifle calibers up to 308 Winchester (7.62x51 2800FPS) 3. Firing Range Features: o Control Room: Separate mini spit for heating and cooling, easy to clean paintable surfaces, ballistic glass for viewing range, low voltage conduit into range for speakers and other devices, stainless steel folding shelf, rolling chair o Simplex Push Button Lock: Provides secure access to the range. o Range with 3 Shooting Booths: Includes three designated shooting areas. o Down Range LED Lighting: Lighting is provided for visibility in the shooting booth and range. o 3 Shooters Shelves: o 9-yard Caliber Target Retrieval System: Includes hard rails and target control screens, one for each lane. o Separate Mechanical Room: Provides easy access for filter changes.
Source page 18
4. Safety Features: O° io} MRT Slopped Rubber Berm Bullet Trap: A sloped bullet trap designed for safety. Exterior red strobe light: Indicates range is in use Fire extinguisher 360° Armor Plating: The range is protected by tested ballistic plating to ensure a round can’t escape the range. Engineered MRT HEPA Recirculating Air Filtration with AC/Heat: Air filtration system for safety and comfort. Insulation: Insulated to reduce exterior noise. 5. Sound Dampening: oO 2" Sound Foam on Ceiling and Walls Firing Line to Bullet Trap: Provides sound insulation for safety and comfort inside and outside the range. 1” Drywall and Insulation on Every Wall and Ceiling Panel: Reduces exterior noise and added insulation for cooling and heating cost. 6. Flooring: fe) Sealed Rubber Floor: Flooring mats are installed then caulked and sealed for easy cleaning and to help stop unburned gun powder build up. 7. Electrical Requirements: oO Requires Single Phase 50amp, 208-240 Power: Most other ranges require 3 phase power, which is not always available as a standard in most buildings and is very expensive to add. 8. Accessories and Warranty: ° ie} O° ° 1-Year Full Parts by MRT. 5-year Structural Warranty. 5-Year Parts Warranty from Suppliers. Consumable Package: Includes target backers and filters (6 pre filters, 4 bag filters and 2 HEPA filters) 10. Customization: fo) Let us quote any changes you would like, to make it your own unique range. Customers Choice of Exterior Color Custom Padge Graphics
Source page 19
11. Training and Set up: o Set up and Onsite Training: Range is completely installed by our factory trained crews. Training is provided at the customer's location after set up. BASE PACKAGE TOTAL $392,786 Available Upgrades Part Part Description Qty | Unit | Unit Cost | Extended | Total Cost Number ($) Cost ($) 53-GH Down Range 1” Rubber Wall Ea. $26,505 Available DRWT-R Treatments, Firing Line Not Inc. Forward (excludes 2” sound foam on wails) Price is for each 53’ container 53-GH- CR- | 3-Lane Turning Target 4 Ea. $55,602 $55,602 Available 2TL-3 Retrieval System to Include 3- Not Inc. Levels White, Red/Blue Strobes — (mounts in front of drive unit on each lane) and a CR-2TL Master Controller to Make Your own Scenarios Total Options Base Unit | $392,786 Shipping Inc Tax ? TOTAL Note: Customer responsible for site prep, permits, taxes, electrical to unit and amble access for semi and trailer. CUSTOMER SIGNITURE:
Source page 20
TOWN OF CANTON FORM B - FISCAL 2026 CAPITAL PROJECT / EQUIPMENT REQUEST DEPARTMENT: Police Department SUBMITTED BY: Chief Helena Rafferty PROJECT IPMENT TITLE: Cruisers TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000): $284,000 DESCRIPTION: Replace marked units 684, 685, 686 and 694 PURPOSE AND JUSTIFICATION: 24/7 basis. Matter of safety for all officers. These marked vehicles have to be changed out on a rotating basis as they are operated ona NEED CLASSIFICATION: (Check ail that apply) _x Required for Safety Required by Law or Mandate “x_ Improve/Expand Service or Increase Efficiency _x_ Planned Project or Replacement ____ Unplanned Project or Replacement ___New Project/Item (not on last year's 5-Yr. Plan) Departmental Priority Ranking: Please rank this request out of your total requests for this year: (#1 as top priority) 1(#) OF 4 (#) Expected Useful Life: (Check one) 20 or More Yrs 5 to 9 Years ~__10to 19 Years _x_3 to 4 Years Impact _ to Dept. Operating Budget: (Check one) Will Reduce Cost by $. No Impact Will Increase Cost by $. Revenue Impact: (Check one) Will Produce Addl Revenue by $. ~_ Revenue Neutral (no impact) ___Will Decrease Revenue by $ OTHER COMMENTS OR INFORMATION: (Attach supporting documentation) engeelh nk OR SOP DE
Source page 21
McGovern MHQ Inc 401 ELM STREET MARLBOROUGH MA 01752 United States Bill To CANTON POLICE DEPT 1492 WASHINGTON ST CANTON MA 02021 United States Sales Rep Christopher Analetto VIN Quantity Item 1 Vehicle Group Description 1 K8A-DEL 1 51R 4 18D CONTRACT EQUIP 1 BUDGETING 1 36-2125 1 36-6005SMP4 4 EMPS4001SE 1 36-2125WC 2 EMPS2QMS5RBVp, 2 ELUC3H010E a PLUCTCL1 MEG MUNI OVERN CIPAL H Ship To CANTON POLICE DEPT 1492 WASHINGTON ST CANTON MA 02021 United States PO# Make Description 2025 INTERCEPTOR POLICE UTILITY AWD Black Gas Spot Lamp - LED Bulb Driver Only-Unity Global Lock/Unlock ESTIMATED 2025 MODEL YEAR INCREASE FOR BUDGETING PURPOSES 10-15% Police Interceptor Utility 2020-2023 Push Bumper Light Channel 23.5 inch for Code MR6 & Soundoff MPowerHD 4 Hole MPOWER HD BLUE/WHITE FRONT PUSH BAR Police Interceptor Utility 2020-2023 POWER 4" FASCIA 18-LED - ED/BLU/WHT HIDE AWAY, UNDER COVER, DUAL BLUE/WHITE ADAPTOR Memo Budget Quote Model Contract ID GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN Rate $44,995.00 $388.15 $0.00 $3,265.50 $550.00 $50.00 $225.00 $50.00 $225.00 $200.00 $0.00 Quote #QUO01338 10/10/2024 of Expected Ready Date Color Amount $44,995.00 $388.15 $0.00 $3,265.50 $550.00 $50.00 $900.00 $50.00 $450.00 $400.00 $0.00
Source page 22
Quantity Item Description INTERSECTOR LED SURFACE ENT3B3E MOUNT BLUE/WHT Under Mirror Mount Bracket Kit (each) PMP2BKUMB8- for installation on Ford PI Utility 2025 for D use with mpower® 3" and 4" Stud and Intersector Surface Mount, Driver Side Under Mirror Mount Bracket Kit (each) for installation on Ford PI Utility 2025 for PMP2BKUMB8- use with mpower® 3" and 4" Stud and P Intersector Surface Mount, Passenger Side NFORCE DECK/GRILLE MNT LGT ENFSGS3E BLU/WHT ENFWBO004YL = =REAR INNER EDGE B/A/2R PIU POWER 4" FASCIA 18-LED - EMPS2QMSSRBVee on uit UNDERCOVER SCREW IN LED ELUC3HO10J INSERT RED/BLUE EMPLBOOMHR2CM POWER 6IN LEDLB ENGSA5200RSP BLUEPRINT ENGHNK02 ENGHNK02 ENGND04102) =REMOTE NODE SPEAKER 100J 100WATT ETSS100J WI/UNIVERSAL BRK ETSSVBK01 100 SERIES BRACKET ENGLMK013 LINK ENGSYMD01 =SOUNDOFF BLUEPRINT SYNC C-VS-1012- Vehicle-Specific 22" Angled Console for INUT-2 2020-2025 Ford Interceptor Utility C-ARM-103 - Armrest For Top Mount Console Large merge out Pad SELF-ADJUSTING DOUBLE CUP CUP21001 HOLDER C-MCB Mic Clip Bracket MMSU1 MAGNETIC MIC CLIP SINGLE UNIT 0912195 0912195 EcvpmLTatoo LED WHITE/RED DOME LIGHT UNIVERSAL P1000UINT20AOSBNGLE PRO-CELL 1/2 PART PIU 2020 LOFT-PIU20- LOFT 2 GUNRACK STORAGE PIU 2G 2020 Labor Loft Timer Through Siren Contract ID GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN Rate $300.00 $0.00 $0.00 $225.00 $1,200.00 $225.00 $200.00 $2,800.00 $2,550.00 $0.00 $0.00 $0.00 $0.00 $250.00 $200.00 $750.00 $150.00 $150.00 $0.00 $50.00 $70.00 $125.00 $2,850.00 $1,250.00 $0.00 Amount $600.00 $0.00 $0.00 $450.00 $1,200.00 $450.00 $400.00 $2,800.00 $2,550.00 $0.00 $0.00 $0.00 $0.00 $250.00 $200.00 $750.00 $150.00 $150.00 $0.00 $100.00 $70.00 $250.00 $2,850.00 $1,250.00 $0.00
Source page 23
Quantity Item Description STRIP LIGHTING 36” SELF ADHESIVE 4 CW0136 STRIP STROBE PRE-EMPTION NOVA CLEAR 4 MDASHCPE LENS HARD MIMO SHARK FIN GPS/GNSS 4 GPSD7272458 2G/3G/4G WLAN ANTENNA, FME MPL 5M CS23 CABLE 1 C23F5M 05128 1 AFMU2 FLEXIBLE 1/4 WAVE UHF 450-520MHz U2dB 1 C29SP5SJCELL CS29 CABLE 1 C23FP5SPGNSS FMEM-M TRANSFER- 1 PARTS Dual Head Radar 1 TRANSFER: arm Rest Print PARTS est Printer 1 TRANSFER- Motorola Radio PARTS 4 TRANSFER- Computer with Mount PARTS purerwan Moun TRANSFER- 1 PARTS WatchGuard 4 FLEET KEY Fleet Key Vehicle Code 0213X 1 TINT16 TINT WINDOWS FRONT ONLY 20% SHOP 1 SUPPLIES- SHOP SUPPLIES DEL 1 94332 VENTSHADE UTILITY/EXPLORER 2020 1 Labor Wig Wag 1 Labor Flash Rings CONTRACT EQUIP SUB PAINT VEHICLE THROUGH SUBLET 1 PAINT VENDOR NON CONTRACT EQUIP NON CONTRACT EQUIP SUB TRADE IN Contract ID GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN GBPC/BAPERN Rate $0.00 $350.00 $450.00 $0.00 $0.00 $0.00 $0.00 $225.00 $125.00 $225.00 $250.00 $750.00 $250.00 $225.00 $275.00 $125.00 $125.00 $125.00 $1,400.00 Amount $0.00 $350.00 $450.00 $0.00 $0.00 $0.00 $0.00 $225.00 $125.00 $225.00 $250.00 $750.00 $250.00 $225.00 $275.00 $125.00 $125.00 $125.00 $69,018.65 $1,400.00 $1,400.00
Source page 24
Quantity Item Description Contract Rate ID Amount TRADE IN $0.00 SUB $70,418.65 Subtotal $70,418.65 Tax (0%) $0.00 Total $70,418.65 TERMS AND CONDITIONS Custom or Special Orders are Non-Refundable. This Quote is for Budgetary Purposes and is Not a Guarantee of Cost for Services. Quote is based on Current Information from the Client about the Project Requirements. Actual Cost may change once Project Elements are finalized. Trade value is subject to change based on time, mileage, and condition of the Vehicle at turn-in ORDER ACKNOWLEDGEMENT By signing this document you are agreeing to the above terms and conditions of this order from McGovern MHQ, Inc. Print Name Title Signature
Source page 25
Rafferty, Helena From: Goode, Sean E Sent: Thursday, November 7, 2024 10:17 AM To: Rafferty, Helena Subject: Re: Green Communities - Vehicles That’s great! Sent from my iPhone On Nov 7, 2024, at 10:04 AM, Rafferty, Helena <hrafferty@town.canton.ma.us> wrote: Thanks!! Sent from my iPhone On Nov 7, 2024, at 9:58 AM, Rafferty, Helena <hrafferty@town.canton.ma.us> wrote: Sent from my iPhone Begin forwarded message: From: "Torres, Taylor" <ttorres@town.canton.ma.us> Date: November 7, 2024 at 9:33:34 AM EST To: "Rafferty, Helena" <hrafferty@town.canton.ma.us>, "Jutras, Louis" <ljutras@town.canton.ma.us> Subject: FW: Green Communities - Vehicles Good Morning Chief Rafferty and Louis, | discussed the police vehicle policy the other day with our green communities rep. She shared some resources below and said that the effective date will most likely get pushed out another year. Some good news (I think) is that hybrid ford explorers are eligible under the fuel efficiency standards. Also, green communities grants can be applied for to offset the cost difference for purchasing a hybrid vs. the regular model. Hope that is helpful. Taylor (TJ) Torres Town Planner Town of Canton, MA 781-575-6575 Connect on LinkedIn From: Sullivan, Lisa M (ENE) <Lisa.M.Sullivan@mass.gov> Sent: Wednesday, November 6, 2024 3:42 PM To: Torres, Taylor <ttorres@town.canton.ma.us> Subject: Green Communities - Vehicles 1
Source page 26
CAUTION: This email originated from outside your organization. Exercise caution when opening attachments or on clicking links from unknown senders. Hi Taylor, | haven’t forgot about you. We discussed your question and it looks like we will be updating our guidance and most likely pushing out the exemption for police vehicles. | hope it will be updated very soon asa draft is in the works, This is the Michigan State Police Vehicle Evaluation/Testing Link. https://www.michigan.gov/msp/- /media/Project/Websites/msp/training/ MY2024-Police-Vehicle- Evaluation-Test- Book.pdf?rev=a92d7115b6a641fb8e156524bc14d1b8&hash=729E6CAB 2687057B7CD1C1CA5600BAEO https://www.government-fleet.com/355846/mass-state-police-on- transitioning-to-hybrid-patrol-vehicles Lisa M. Sullivan, AICP Regional Coordinator, Green Communities Massachusetts Department of Energy Resources C/O MassDEP Southeast Regional Office 20 Riverside Drive, Lakeville, MA 02347 Cell: 617-312-4018
Source page 27
TOWN OF CANTON
FORM B - FISCAL 2026
CAPITAL PROJECT / EQUIPMENT REQUEST
DEPARTMENT: SUBMITTED BY:
Police Department Chief Helena Rafferty
PROJECT / EQUIPMENT TITLE:
RMS Replacement System-Reallocation Request
TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000): 117,064
DESCRIPTION:
Capital Article 12104-58723-A2207 $97,585
Capital Article 12104-58723-A2300 $19,479
PURPOSE AND JUSTIFICATION:
This money was originally set aside for RMS and Data Management replacement. These
funds in addition to $170,000 in ARPA funds were going to be used to change out our
current vendor. We did not want to change out software with the audit pending and the
ARPA money had to be used by December 2024, so we released it back to the town. The
above noted money is not near enough to complete the project overall. Couple that with the
training costs that would be required and it is not feasible that this project will be done until
FY 27 at the earliest. With that said, I would like to reallocate the money to a fire
suppression system in the evidence room that is not water (this was discussed in the most
recent evidence audit) and/or to enhancing cameras in both inside and outside the Canton
Police facility and a new monitor set up in the control room.
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking:
Required for Safety Please rank this request out of your total
Required by Law or Mandate requests for this year: (#1 as top priority)
x Improve/Expand Service or Increase Efficiency 4 (#) OF 4 (#)
Planned Project or Replacement Expected Useful Life: (Check one)
Unplanned Project or Replacement 20 or More Yrs 5 to 9 Years
x New Project/Item (not on last year's 5-Yr. Plan) x 10 to 19 Years 3 to 4 Years
Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
Will Reduce Cost by $__________________ Will Produce Addl Revenue by $_________
x No Impact x Revenue Neutral (no impact)
Will Increase Cost by $_________________ Will Decrease Revenue by $____________
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
Gave back $170,000 in ARPA funding for this project as we did not want to transition to a
new RMS system with the audit pending and the money had to be spent by December 2024
FORM B - FISCAL 2026Source page 28
TOWN OF CANTON FORM B - FISCAL 2026 CAPITAL PROJECT / EQUIPMENT REQUEST DEPARTMENT: Police Department SUBMITTED BY: Chief Helena Rafferty PROJECT / EQUIPMENT TITLE: Ballistic Shields w/Ports TOT. OJECT / EQUIPMENT COST (mus t least $5,000): 84,220 DESCRIPTION: Then, $8,100 for 5 or more (6=$48,600) Vanguard PB-SH3O0OASVSV1H2L0 Vanguard 20x 30 The shields are $8,905 each for the first 4 ($35,620) PURPOSE AND JUSTIFICATION: goal. These shields are an added safety feature for our officers who are responding to calls for active assailants in schools, town buildings, workplaces or shopping malls ie. They have a window for the officers to see thru as they approach the scene. These are the best rated shields and will stop rifle rounds in addition to handgun rounds. The overall goal is to "stop the killing, stop the dying and rapid evacuation" and these shields will allow us to realize that NEED CLASSIFICATION: (Check all that apply) x Required for Safety ~~ Required by Law or Mandate ~_ Improve/Expand Service or Increase Efficiency ____ Planned Project or Replacement Unplanned Project or Replacement x New Project/Item (not on last year's 5-Yr. Plan) Departmental Priority Ranking: Please rank this request out of your total requests for this year: (#1 as top priority) 3 (#) OF 4 (#) Expected Useful Life: (Check one) ___20 or More Yrs _x_5 to 9 Years ___10 to 19 Years 3 to 4 Years Impact_to Dept. Operating Budget: (Check one) Will Reduce Cost by $ “x_No Impact ___Will Increase Cost by $ Revenue Impact: (Check one) Will Produce Addl Revenue by $ “x_Revenue Neutral (no impact) ___ Will Decrease Revenue by $ PORN WT TSUN 2UL0 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
Source page 29
Doughboy Uniforms
Quote Page 1
295 Union Street
Rockland, MA 02370 USA Account No. Date Ref No.
(781)878-0302 17925-1 10/01/24 178582-1
Sold To
Canton Police Department
1492 Washington Street
Canton, MA 02021
__ Clerk Time Station | PONumber | Ship Via _Est Delivery | Order Ref No.
Drake Barry 3:01PM 89
Item Description Qty Ship Price Extended
03169792 PB-SH3OASVSV1H2L0 * Vanguard-Vs 20x30 Wiv Nil 1 ty) 8,904.62 8,904.62
Quantity 1-4
03169792 PB-SH3OASVSV1H2L0 * Vanguard-Vs 20x30 Wiv NII 1 0 8,100.00 mT- 8,100.00
quantity 5+
Total Qty 2 0
Freight 0.00
Sub Total 17,004.62
Tax 6.25% 0.00
| Total 17,004.62
| Received 0.00
| Balance 17,004.62
WRITTEN CONFIRMATION IS REQUIRED WHEN ACCEPTING QUOTES. Please email your acceptance, or Purchase Order, to
Contact@DoughboyUniforms.com. Orders from Quotes will not be processed without written confirmation.
QUOTES ARE GOOD FOR 30 DAYS.Source page 30
BAB VANGUARD VANGUARD BALLISTIC SHIELD vs VL (Large) VR (Rectangle) © 20" x30" - 14.8 Ibs with viewport © 21" x 36" - 16.8 Ibs with viewport © 21" x 36" - 18.5 [bs with viewport * 20" x 30” - 16.1 [bs with viewport & light © 21" x 36" - 18.1 Ibs with viewport & light © 21" x 36" - 19.7 [bs with viewport & light XL (Extra Large) 20" x 48" - 25.5 Ibs with viewport FEATURES + Lightweight (20” x 30” with viewport) weighs only 14.8 lbs . Lous $= 0.4” * Thickness = 0.4 THICKNESS =O NON-BALLISTIC TRAINING SHIELDS * 3" x9" Reinforced Ballistic Viewport ///// BALLISTIC PERFORMANCE ///// AVAILABLE IN THREE SIZES/ SHAPES * Left and right weapon index platform for accurate Special Threats Rounds Tested handgun or long-gun deployment © 1.62mm x 51mm (80) * Solid handle system © 7.62nm x 39mm PS Ball (MSC) co * Thick high density foam pad © 5.56 x 45mm (M193) * Hook and Loop forearm strap attachment system * Reinforced Ballistic Bolt System for added protection 1-800-413-5155 = PointBlankEnterprises.com ARACLETE UNOER FIRE
Source page 31
TOWN OF CANTON FORM B - FISCAL 2026 CAPITAL PROJECT / EQUIPMENT REQUEST DEPARTMENT: SUBMITTED BY: Central Maintenance PROJECT / EQUIPMENT TITLE: Senior Center HVAC replacement to main portion of the building, not including the kitchen __which has_a separate system TOTAL PROJECT UIPMENT COST (must be at least $5 : $393,769 DESCRIPTION: Remove the exisitng York rooftop unit and replace with 2 city split units and an Energy Recovery Ventilator ( ERV) for the make up air portion of the project. There will be 13 interior units on 12 thermostats. Each unit can supply heat or A/C as needed at any time PURPOSE AND JUS ICATION: “This new system will allow each room to supply either heat or A/C as needed. Due to the South facing rear of the building the rear offices get much more radiant heat while the front of the building can be much cooler. The current system either makes only heat or A/c and the air flow can never be below 20% so even when a room has met it's thermostat setting it is still getting more flow that is not needed, thus overheating or cooling. The current York unit is SUBSTANTIALLY OVERSIZED for the building and has been problematic since it's installation. The Town has spent a substantial amount of money redesigning the system and working on different control models with only minimal success. This new system will allow every room to be comfortable for whoever is using the area at any time whether excersizing or just playing _ | NEED CLASSIFICATION: (Check all that apply) De tal Priority Ranking: ___ Required for Safety Please rank this request out of your total Required by Law or Mandate requests for this year: (#1 as top priority) “v_Improve/Expand Service or Increase Efficiency 2 (#) OF 5 (#) Planned Project or Replacement Expected Useful Life: (Check one) ~~ Unplanned Project or Replacement 20 or More Yrs 5 to 9 Years ~__ New Project/Item (not on last year's 5-Yr. Plan) | _v_ 10 to 19 Years 3 to 4 Years Impact_to Dept. Operating Budget: (Check one) Revenue Impact: (Check one) ____ Will Reduce Cost by §. ___ Will Produce Addi Revenue by $ ____No Impact ___ Revenue Neutral (no impact) ____Will Increase Cost by $ _v_Will Decrease Revenue by $ $2441/mth OTHER COMMENTS OR INFORMATION: (Aitach supporting documentation) ORFS OA POLO
Source page 32
“Vision Energy Solutions November 4", 2024 Dear Steven Choiniere/ Brian Lynch, Vision Energy Solutions is pleased to present you with this energy conservation proposal. We trust you will find this proposal a cost effective means to, not only reducing your energy costs, but also improving the quality of the environment throughout your facility. Other factors to consider as you evaluate this proposal are existing equipment related disruptions and maintenance costs are eliminated or minimized until the new equipment enters its end of life — typically several years. In the attached proposal you will find a detailed report recommending various Energy Conservation Measures (ECMs). Vision Energy Solutions has incentives from Eversource which substantially reduced the net cost of this project. The utility incentives reflected in this proposal are estimated. I hope you find this proposal informative. If you have any questions, please do not hesitate to contact me. Sincerely, Jorge Soares Vision Energy Solutions
Source page 33
Vision Energy Solutions Disclaimer This report is not for general use and is the property of Vision Energy Solutions. For any questions regarding this report, please contact Jorge Soares, Energy Efficiency Consultant for Vision Energy Solutions, Inc. at 401-430-0457. Any additional use of this report is prohibited unless permission is given in writing from Vision Energy Solutions, Inc.
Source page 34
ca€ Executive Summary ~ Vision Energy Solutions Vision Energy Solutions recently conducted an energy survey at Canton Senior Center. Our recommendations are known as Energy Conservation Measures which are outlined in separate write-ups. The expected energy savings were determined based on current operating hours of equipment surveyed. Poorly performing equipment will reduce the effectiveness of employing these ECMs, and the cost to repair or replace that equipment is not covered in this estimate. : Est. Electricity Est. . Total Project Estimated Customer Savings Est. O8M | otal Cost Payback Monthly Energy Conservation Measures Utility : iB Cost + Period ~ Cost \ ti Cost Savines Savings : Cost Incentives : kwh |. Cost avings (years) Savings Install Variable Refrigerant Flow System $380,289 $80,500 | $299,789 | 61,348 | $19,018 $8,333 $27,351 11.0 $2,279 Install Building Management System $23,701 $2,443 $21,258 | 5,091 | $1,578 $0 $1,578 13.5 $132 TOTAL $403,990 $82,943. | $321,047 | 66,438-| $20,596.| $8,333 «| $28,929 112 $2,414
Source page 35
~ Vision Energy Solutions Install Variable Refrigerant Flow System at Senior Center Existing Conditions Currently, the Senior Center uses and oversized Rooftop Unit (RTU) and multiple Variable Air Volume (VAVs) that we equiped with electric heating elements. The general size of the Rooftop Unit, is causing the unit to short cycle and the electric heaters is leaing to large energy consumption in the winter months. Energy Conservation Measure Details It is recommended that two 12 Ton Variable Refrigerant Flow Heat Recovery Systems are installed to heat/cool the senior center. An Energy Recovery Ventilator (ERV) is also recommended as well to use exhausted air to preheat the fresh air going into the space. This will result in a reduction of electricity in the winter and electricity savings in the summer. The scope of work includes the following: e Remove Existing RTU, Exhaust Fan. e Abandon VAY boxes in place per request from Engineer Lock damper open 100%. e Provide Crane and Rigging Services to receive, store (up to 1 month), deliver and replace (1) equipment from private property. e Rigging Includes disposal of existing RTU. Single weekday Mobilization, No permits, or _ Police Detail. e Supply and Install New Heat Pump ERV and curb with new Condensing Unit e Furnish and install (1) new 12-ton Daikin Emerion Recovery Heat Pump Condensers. e Furnish and install (1) new 12-ton Daikin Emerion Heat Pump Condensers. e Furnish and Install 13 Indoor Units. e Furnish and install all required hangers and supports for (13) Daikin VRV indoor units. e Furnish and install all required hangers and supports for all refrigerant and condensate piping. e Furnish and install ACR hard drawn copper for suction and liquid lines on exterior of the building. e Soft copper tubing to be used for all interior PIPING in attic. e Furnish and install condensate removal piping. ¢ Furnish and install (2) stands for heat pumps. e Provide all necessary openings for refrigerant piping and condensate piping. e Furnish and install all insulation for refrigerant piping. e Provide system pressure test on refrigerant piping as per manufacturers specifications. e Provide system evacuation / dehydration as per manufacturers specifications.
Source page 36
“© Vision Energy Solutions e Provide system refrigerant charge as per manufacturers specifications. e Provide start up and Commissioning. Assumptions & Exclusions e Excludes Electrical. e Excludes Sheet Metal. ¢ No Overtime. Regular Work Hours. e The fire alarm system is excluded because the system is under 2000 CFMs e Excludes Roofing By implementing this project, the facility can save approximately 61,348 kWh can be realized. There are also Operation and Maintenance Savings of $8,333; therefore, the total cost savings of $27,351 can be obtained. Implementation The total material and labor cost for the purchase and installation of two heat pump systems for the senior center is $380,289. The incentives for this project are estimated at $80,500; therefore, the adjusted Customer Cost is $299,789. The simple payback is calculated as follows: Customer Cost $299,789 Cost Savings $27,351 Payback Period = = 11 years
Source page 37
-” Vision Energy Solutions Install Energy Management System to Integrate into VRF Heat Pump System Energy Conservation Measure Details It is being recommended that the existing BMS to integrate the new Heat Pumps and Energy Recovery Ventilation unit into the Tridium N4 BMS Building Management System. It is recommended that two 12 Ton Variable Refrigerant Flow Heat Recovery Systems are installed to heat/cool the senior center. An Energy Recovery Ventilator (ERV) is also recommended as well to use exhausted air to preheat the fresh air going into the space. This will result in a reduction of electricity in the winter and electricity savings in the summer. The scope of work includes the following: @ Integrate to twelve (13) new Heat Pumps. o Tie into the provided Daikin iTM panel via BACnet. o Includes graphics, programming, and checkout. e Integrate to one (1) new Energy Recovery Ventilator. ©. Tie into the provided BACnet controller. o Includes graphics, programming, and checkout. By implementing this project, the facility can save approximately 5,091 kWh therefore, the total cost savings of $1,578 can be obtained. Implementation The total material and labor cost for the purchase and installation of energy management integration is $23,701. The incentives for this project are estimated at $2,443; therefore, the adjusted Customer Cost is $21,258. The simple payback is calculated as follows: Customer Cost _ $21,258 Cost Savings $1,578 Payback Period = = 13.5 years
Source page 38
Vision Energy Solutions Installation and Warranty Information Ifyou decide to proceed with this proposal, Vision Energy Solutions will be responsible for the following tasks: Develop final equipment specifications and equipment layout Processing and filing application for utility incentives Material ordering and receiving Dismantling and removing existing systems from premises Construction Final walk-through with you Development and delivery of comprehensive project completion manual. Installation All installation staff will agree to submit to a CORI check before proceeding with project. The removal and disposal of asbestos and toxic materials if present are the owner’s responsibility and should be determined before proceeding with the project. Warranty Included with your project is a one-year warranty on all labor and materials provided by Vision Energy Solution. At the end of the first year materials remain covered by standard warranties provided by their manufacturers. Warranty periods begin when the installation is completed. Due to the fluctuation in commodities this proposal is valid for a period of 30 days from the date shown at the top of this proposal, after which time we will be happy to provide an adjusted quote if necessary.
Source page 39
HUGHES SHEET METAL, INC. P.O. BOX 5217 469 ALDEN STREET FALL RIVER, MA. 02723 May 14, 2024 Town of Canton 801 Washington Street Canton, MA 02021 Attn: Mr. Steven Choiniere In Re: Canton Senior Center. Ductwork Associated with ERV Unit. 1] v0 at Fv 5 Dear Mr. Choiniere: o/ - ID We are pleased to quote Ten Thousand Nine Hundred Dollars, ($10,900.00) for the above project. Work Includes: - Demolition of Ductwork from Existing RTU. - Fabricate and Install Galvanized Ductwork For New ERV Unit. - Sealing Ductwork. - All Necessary Hangers and Supports. Work Includes: - — Insulation of Ductwork. - Leak Testing. QUOTE IS VALID FOR 30 DAYS. Thank you for giving us the opportunity to quote on the above project. Yours truly, John Hughes President
Source page 40
NN McDONALD ELECTRICAL CORPORATION MEC Systems | MEC Power Group DIVISIONS OF McDONALD ELECTRICAL CORPORATION May 14, 2024 Steve Choinere Canton Senior Center 500 Pleasant Street, Canton, MA schojniere@town.canton.ma.us Re: Canton Senior Center - HVAC System Upgrade PROPOSAL #SVP2024-119 We are pleased to provide you with our proposal for the above-referenced project. Our proposal includes labor, material, and tooling for the following: SCOPE: Electrical demo of existing RTU, exhaust fan, seven (7) VAV boxes. Wiring of new Daikin units based on project report, dated 1/11/2024. o ACCU.1 and ACCU.2 (to be 208v, not to exceed 60a) All interconnect wiring to be 16/2 shielded. All equipment and T-stats by others, Vv Vw QUALIFICATIONS: > All work is based on normal working haurs Monday thru Friday 7:00am to 3:30pm. INCLUSIONS: > Allelectrical permits shall be obtained by MEC. EXCLUSIONS: > Fire alarm and fire dampers. : 4 2 aye 2? Y > Roofing, > Any BMS work/witing. >» Any wiring for condensate pumps. ga585 | O o- Budget pricing based on scope, qualifications and exclusions as listed...........escecec sence eteseeeeeseesens Our proposal is valid for (30) days and is based upon a mutually satisfactory contract agreement being reached between our two companies, Thank you for the opportunity to provide this proposal. If you have any questions, please do not hesitate to call, or email. Sincerely, Dave Keenow McDonald Electrical Corporation (617) 593-6586 dkeenan@mcdonaldcorp.com 72 Sharp Street, Unit C-8 | Hingham, MA 02043 Tel: 781-340-0008 | Fax: 781-340-4949 | www.medonaldcorp.com Page|[1of1 Master Lic, #3541 Al