Skip to content
Search Canton

Canton, Massachusetts · Saved source text

FY23 School - Capital Requests - January 2022 zip file

Budgets & Finance · Record year 2022 · Record 6f17b46e0ecc30c8b1

Open original municipal record ↗Open interactive reader

Saved text from 88 source pages. Transcription and OCR may contain errors; verify figures and wording against the original. Retrieved 2026-10-15.

Tab 27 - School - Furniture & Fixtures.pdf · Source page 4

\

Stearret sal bea a Giosn Mais) (c7ASB-S6F doublarslacked Smarsteam 01 stainless steel, volletles3,

Convection steamen Gach SENG Ne Shall Ee a Siren ne TOKW ‘eectlc Steam
oy 2 gyi

ata

PROJECT NAME:

LOCATION:

ITEM NO:

Qry:

MODEL NO:

-  wag?  “a  ‘

| AIANO:

SIS NO:

CONSTRUCTION: steamer cavity and cabinet
shall be all stainless steel construction, with removable
tight and left-side panels, providing access to intemal
components, Steamer shall have no side vents for
increased water/spray resistance, Steamer doars shall
be all stainless steel with a strong continuous hinge and
field-reversible for left or right swing. Doors shall be
insulated and provided with a one-piece, replaceable
seal. Hands free door latches shall provide positive lock
and seal when doors are pushed or slammed shut. A
hidden magnetic door switch shall cut power to blower
fan and shut down power to the steam generating
reservoir when the door is opened. Pan support racks
shall be stainless steel and removable for easy cleaning.
Astainless steel condensate collection tray shall be
positioned under each cavity door.

FINISH; Cabinet exterior, including door, shall be a #3
uniform finish. Cavity interior shall be polished stainless
steel. Control panel face plate shall be smudge-resistant
polyester film, ensuring maximum ease in cleaning and
maintenance of an attractive appearance.

UL LISTING: Steamer shall-be UL and cUL listed.

SANITATION: Steamer shall be designed and
manufactured to meet NSF requirements and all known
health codes. Steamer shall be NSF listed.

CONTROLS: steamer controls shall include an
on-off rocker switch; electronic timer, with continuous
steam, timed steam and stop buttons; READY light which
indicates when cavity is warm and ready for steaming.

PERFORMANCE FEATURES: Each steamer
cavity shall have a powerful, side-mounted blower to
increase steam velocity and provide efficient steam
distribution throughout the cavity and between loaded
pans. Steam generators shall deliver 2.4 KW of electric
power input per 2-1/2" deep steam pan. Steamer shall
have a steam lid positioned over each steam generating

reservoir to ensure that adding/removing food does |
not lower the water temperature. Heat up time to
READY shall typically be 15 minutas or less, Cavity
is kept warm and ready for instant steam between

loads. No cavity warm up required after READY light
comes on.

10-Pan Bollerless Convection
Steamer (5 pans per cavity), doubli
stacked, stand-mounted, stainless
steel, self-contained, electric heate
(Model (2)SSB-SEF shown)

ATMOSPHERIC STEAM GENERATING |
RESERVOIR: Each steamer shall have an             |
electric-heated steam generating reservoir to provide
atmospheric steam to the cavity at a temperature

of approximately 212° F. The high-efficiency steam
generating reservoirs shall have water level sensors. |
Electric heating elements are not immersed in water
and replaceable from the rear. Acidic products and
other commercial chemicals shall not be used to
clean the steamer. A dally wipe down of the steamer
cavity, steam lid and floats is sufficient to maintain
optimal operation of the steamer. However, Groen      |
Descaler or approved equal may be required.

®©®®

PAN CAPACITY:            | OPTIONS/ACCESSORIES:
|. PanSize            Per Cavity             Total || 1 Flanged Foot Kit

2x20x1"              10                   2 ||            abst ppet ean
     L                                                               | (1 Caster Kit (for support stand)
| 12x20x4"                3                      6                  1 Single water connection
INSTALLATION: Each cavity shall require 208,
240, or 480 Volt, 3-phase electrical service. All units
ship three-phase, and are field convertible to single-        |
phase operation. Each cavity shall have (2) 94” NH water
supply lines and a single 2-1/2" free venting drain.
WATER SUPPLY REQUIREMENTS:
Steamer must be connected to an on-site water
supply. Water supply at 30 - 60 PSIG with flow at |
.75 - 1.5 GPM per cavity.                              i                       ee
ORIGIN OF MANUFACTURE: Designed and                            ~ SmariSteamil
manufactured in the United States.                                               144870 Rev

Revised 11/

Tab 27 - School - Furniture & Fixtures.pdf · Source page 5

GROEN.

Water Treatment System model ssB-wT

Description                                                                            Model SSB-WT shown
SmartSteam100 Water Treatment System shall be Groen
Model SSB-WT (Part No. 149100) designed specifi-
cally for use with the Groen SmartSteam100 Boilerless
w» gteamer as follows:                                                     ;

Construction

System shall consist of a stainless steel mounting bracket
with a single cartridge head, a clear filter bowl, a treat-
ment cartridge, an integrated manifold and a water shut-
off valve. It shall be designed for quick and easy cartridge

feplacement. Separate systems are recommended for
each steamer at a location.

 K    re

Replaceable Treatment Cartridges

System shall employ one replaceable cartridge that locks
into the manifold head and is surrounded by a clear filter
bowl. The treatment cartridge is designed to dispense
a special treatment blend at a constant rate as water
flows through the filter bowl. The cartridge can be easily
changed without special tools. The cartridge is designed
{o provide sufficient treatment to the water consumed by
a double-stacked SmartSteam100 steamer for 6 months,
or longer, before needing replacement. The clear filter
bowl provides visible indication of the amount of treat-
ment chemical remaining in the unit.

Installation

Install using 3/4” NH [Garden Hose Type] connections
in unit incoming fireated] water line. No special tools
required. Note: The SmartSteam100 models are sup-
plied with a single water input using NH connection
fittings. Mounting bracket to be secured to wall, post or
bracket with two sheet metal screws (supplied in the kit)
and wall anchors as needed to support 20 pounds. See

planograph for mounting hole position and overall unit
dimensions.

Installation Location Recommendation

The SmartSteam100 Water Treatment Kit can be
installed anywhere in the incoming water line, prior to
the SmariSteam100 steamer using the treated water.
However, we recommend it be mounted near the steamer
to allow easy and frequent operator inspection of the
cartridge. Note: Cartridge MUST be replaced when
exhausted to ensure effective treatment of incoming
water and long term trouble free cleaning of steam cook-
ing equipment.

Options/Accessories
Replacement Cartridge [Part No. 149101]

Origin of Manufacture

Treatment system and replaceable cartridges shall be
made in the United States.

RRB OF

nie denies teste

Gy

Single-Stage, Replaceable
Cartridge, In-Line
Water Treatment System

For Use With:
SmariSteany1 00™

Short Form

Water Treatment System
shall be a Groen Model SSB-
WT (P/N 149101), designed
for use with Groen Model
SmartSteam100 _ Bailerless
Steamer, per Bulletin 149200
as follows. SSB-WT system
to be a single stage, wall
mounted treatment system

cartridge and a clear filter
bow! to allow observation ai
the condition of the treatment
Material. Treatment chemical
to assist in Cleanability of the
steamer cavity from hard
water deposits forming in the
steam generator. Cartridges
to install without specia
tools and to provide up tc
six months of treated wate:
for a single double-stackec
steamer. System requires
wall mounting and simple
plumbing. Water treatmer
Kit and cartridges to be made
inUSA

Applications
Treatment of Water
Containing:
Calcium

Iron

Magnesium

For use with Groen iMlodel:
SmartSteam100™

eal

1055 Mendell Davis Drive, Jackson, MS 39272

888-994-7636, unifiedbrands.net

Information contained in this document is known to be current and accurate at the time
of printing/creation. Unified Brands recommends referencing our product line websites,
unifiedbrands.net, for the most updated product information and specifications.

Groen Water Treatment System, Page

‘149360
Revised 03/C

with a replaceable treatment ~ ”

Tab 27 - School - Furniture & Fixtures.pdf · Source page 6

AVAILABLE MODELS:
CLASSIC CONTROLS:
BPP-30EC (80 GALLON)
BPP-40EC.(40 GALLON)
ADVANCED CONTROLS:
BPP-20EA (30 GALLON)
BPP-40EA.(40 GALLON)
COOKZTEMP CONTROLS:
BPP-30EC2T (30 GALLON)
BPP-4QECZT (40 GALLON

CONSTRUCTION: the pan body shall be of type 304
stainless;steel, salld one-plece welded heavy-duty construction,
with 10*\pan depth. All exposed surfaces shall be stainless
steel. The cooking surface Is a heavy 5/8” thick stainless

steel clad plate fitted with flat bar electric heating elements,
ensuting efficient heat transfer over the entire cooking surface.
The heavy;plate prevents warping or distortion. Controls and
tilt mechanism are mounted In a stainless steel water resistant
IPX6-rated housing mounted right of pan body. Braising pan
shall come standard with mounting bracket for either right-
side, left-side or right-rear faucet mounting. Graduated fil-evel
marks in both gallons and liters are standard.

FANISH: Interior of braising pan shall be pollshed to a

100 emery grit finish on C/A models, 180 emergy grit on C2T
models, Exterior of braising pan shall have a #3 finish, ensuring
maximum ease In cleaning and maintaining appearance.

SANITATION & NSF LISTING: praising pan shall
be designed and constructed to be NSF-listed, meeting all
known health department and sanitation codes. True open leg

tubular stand design and 3” radius pan interior make cleaning
easier.

UL LISTING: praising pan shall be UL- and cUlL- listed.

POWER TILT: The braising pan shall have a smooth-
action, quick-tilting pan body with motorized tilt mechanism,
which provides precise control during pouring of pan contents.
A powerful motor is activated by a 3-position control switch.
Unit shall have an easy access, manual override capability to
tilt the pan in case of power failure.

CONTROLS: Alt controls to be located in a right-front
Mounted water resistant (IPX6 rated) enclosure:

Classic -C Models include: Power ON-OFF switch with
indicator light, temperature control knob with 175 to 400°F
(79 to 204°C) range Increments and HEAT(Ing) indicator light,
Advanced -A Models include: Same control features as
Classic madels with the addition of temperature and time set
knob (175 tb 400°F/79 to 204°C range), LED display of set
temperature or cook time, buttons for reset of Low Temp and
High Temp presets, MANUAL mode button for knob-setting of
pan temperature, and TIMER-set button with Indicator light,
Coak2Temp -C2T Models include: Same control features as
Classic and Advanced models with the addition af Auto C2T
and Manual C2T buttons with core probe connection port,
MANUAL made button for knob-setting of pan temperature for
manual cooking and manual C2T cocking.

PERFORMANCE/FEATURES: Braising pan
shall be equipped with controls that allow operation at
7-degree angle to facilitate griddling. Bralsing pan shall

be thermostatically-controlled for automatic shut-off when
desired temperature Is reached and automatic power ON
when temperature falls below desired setting. Bralsing pan
to have high limit thermostat as safety feature.

INSTALLATION: one electrical connection required.

Specify 208, 240 or 480 Volt electrical service, All units
ship three-phase, and are field convertible to single-phase
operation.

ORIGIN OF MANUFACTURE: pesigned and
manufactured in the United States,

®O®

PROJEST NAME,
  LOCATION:
TEMG

aT

MODEL iC

: Ala SG

3S NO

TSE

BPP-40EA Model shown
with optional tangent drawoff

OPTIONS/ACCESSORIES:
Single pantry water faucet
Double pantry water faucet
Single or double pantry faucet wit
spray hose assembly (48" or 60")
2" tangent drawoff (option: must
be ordered with unit)
Strainer for tangent drawoff valve
Caster kit w/restraint cable
Flanged feet
Pouring lip strainer
Steamer pan cartier
Steamer pan inserts
Replacement core probe
(on C2T models only)

Braising Pa
175752 Rev
Revised 04/

Tab 27 - School - Furniture & Fixtures.pdf · Source page 7

an

TOWN OF CANTON
FORM B - FISCAL 2023

CAPITAL PROJECT / EQUIPMENT REQUEST                    =|

DEPARTMENT:                                            SUBMITTED BY:
CHS Administration ~- ~*-         Jeffrey Sperling
PROJECT / EQUIPMENTTITLE: of ft     oy

Furniture for Canton High School

TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000): $14,119

DESCRIPTION:
Main Office conference room table (Table top-$560, Table bottom-$440)
Main Office conference room chairs (12 guest chairs-$2440)
Main Office desk chairs (3 office chairs-$1126)
Distance Learning Lab (DLL) audience seating chairs (50 chairs - $9553)

PURPOSE AND JUSTIFICATION:
Main Office conference room in need of table and chair replacement.
Main Office desk chairs need upgrade and replacement.
Many audience chairs in DLL were damaged due to venitlation issue; replace and upgrade all
audience chairs in room as DLL is used for many classes, School Committee meetings, and
athletic forums.

NEED CLASSIFICATION: (Check all that apply)       Departmental Priority Ranking:
L |  Required for Safety                                               Please rank this request out of your total
im  Required by Law or Mandate                              requests for this year: (#1 as top priority)
 Improve/Expand Service or Increase Efficiency                  (#) OF             (#)
L] Planned Project or Replacement                    Expected Useful Life: (Check one)
CL]  Unplanned Project or Replacement                [| 20 or More Yrs  LC] 5 to 9 Years
LC]  New Project/Item(not on last year's 5-Yr.Plan) 10 to 19 Years  | 3 to 4 Years

Impact to Dept.Operating Budget:(Check one)      Revenue Impact: (Check one)
[J Will Reduce Cost by $                            []wi Produce Addl Revenue by $
 No Impact                                          [¥ ]Revenue Neutral ‘(no impact)
[| Will Increase Cost by $                            [will Decrease Revenue by     $

OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

FORMB—FISCA! 2023.

yom

Tab 27 - School - Furniture & Fixtures.pdf · Source page 8

Canton Public Schools Conf & Auditorium 10-06-2021                 1 of 1

Marsha Armando          MA State Contract OFF38             valid 30 days
Quote # cps10062021bv                           Witoh sbbinr
Item          Alias 1          Preview| Mfg | Qty | PartNumber |                           Part Description                                    Sell               Ext Sell
1       CONFERENCE                  HON      1     HTLC48144      Preside 144W x 48D Rectangular Shaped Laminate Top               $ 559.86         $ 559.86
—
G                 2MMI/Flat
D                  Edge: Natural Maple
iN                 No Grommets.
$(L1STD)        Grd L1 Standard Laminates
Vv)                                                .D               LAM: Natural Maple
2       CONFERENCE                   HON      1     HTTLEG144     Preside Aluminum T leg for 144" Table Tops                              $ 439.89         $ 439.89
s(P1)          P1 Paint Opts                                                                          a
v                                                       P                 Black
3      CONFERENCE        &     HON     12 |HIGSE           Ignition Guest/Multi-Purpose Chair Four-Leg Stacking                $ 203.36       $ 2,440.32
.F                 Arm: Fixed
“H                 Hard
IM                Back: Black
$(1)              Gr 1 UPH
‘NR               Inertia
75                 COLOR: Leaf
v                                                       Aus                 Black
4      AUDITORIUM          A     HON     50 |HIGS6           Ignition Guest/Multi-Purpose Chair Four-Leg Stacking                $ 191.06       $ 9,553.00
.N                 Arm: Armless
.E                 Glide
IM              Back: Black
$(1)               Gr 1 UPH
-NR               Inertia
75,                 ‘COLOR: Leaf
Vv!                                                       A                  Black
5       CONFERENCE          PY      HON       3° |HIWM3            Ignition Wk Mid-bck Pneu Syn tilt Bck Adj Tilt Seat Gld                 $ 375.15        $ 1,125.45
-F                 ‘Arm: Fixed
H                 CASTER: Hard (Standard)
_M                 Back: Mesh Back
$(1)               Gr 1 UPH
.CU               Centurion
10                 COLOR: Black
T                 FRAME: Black
A                                                       .SB                Base: Standard Base
Grand Total                                                                   $ 14,118.52

\\wbneond4\Brockton\PManning\Canton Public Schools\Canton PS CONF RM AND CHAIRS 10-06-2021.sp4 Wed Oct 6 16:29:58 2021

Tab 28 - School - Extraordinary MaintVehicles.pdf · Source page 1

TOWN OF CANTON
FORM B - FISCAL 2023

CAPITAL PROJECT / EQUIPMENT REQUEST

DEPARTMENT:                                           SUBMITTED BY:

Business Office                            Stephen Marshall

PROJECT / EQUIPMENT TITLE: .
School Bus Replacment

TOTAL PROJECT / EQUIPMENT COST (must be at least $5,000): $200,000

DESCRIPTION:
Replace 2 yellow school buses.

PURPOSE AND JUSTIFICATION:

2 buses out of our fleet of 3 are aging and in poor condition. Repair costs continue to rise to
keep these buses roadworthy. Replacement is necessary. Maintaining our small fleet of
buses saves the district significant costs from outsourcing.

NEED CLASSIFICATION: (Check all that apply)       Departmental Priority Ranking:

  Required for Safety                                             Please rank this request out of your total
LE]  Required by Law or Mandate                             requests for this year: (#1 as top priority)
 Improve/Expand Service or Increase Efficiency                   (#) OF             (#)

CL]  Planned Project or Replacement                    Expected Useful Life: (Check one)

im  Unplanned Project or Replacement                 [| 20 or More Yrs 5 to 9 Years

O

New Project/Item(not on last year's 5-Yr.Plan)    [| 10 to 19 Years  | 3 to 4 Years

Impact to Dept.Operating Budget:(Check one)      Revenue Impact: (Check one)
[| Will Reduce Cost by $                            [_|wil Produce Addl Revenue by $
 No Impact                                          [¥ ]Revenue Neutral (no impact)
| Will Increase Cost by $                             [will Decrease Revenue by     $

OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

FORMB FISCAL 20232

Tab 28 - School - Extraordinary MaintVehicles.pdf · Source page 2

Quote Date:        |

10/21/2021                                    |

| Quote Number:    |

VEH98 Quote Form

MSD

185865                     |

Order-by Date:

11/25/2021

OPERATIONAL SERVICES DIVISION

Use one quote form per vehicle specification. Only multiples of the exact same spec'd vehicle can be included on each Individual form.

For options/upfits/transferred equipment, each line item must be fully populated,

Canton Public Schools

VENDOR INFORMATION

ndoco INC

usiness Office

[70 Amaral Street, E. Providence, RI

Business Office

im Anderson

5§:|960 Washington Street

:|401-434-5900

Stephen Marshal

281-821-5060

hectowb@contonma.org

“ Vehi

;| Jim @andersonmotors.com

:          Dealer Inventory/Stock
To,

Factory Order

Already on order / OEM pool unit

VEHICLE INEORW

oy

Uy exterior col

Upgrade Premium

;] BBCV 3303-71 Passengers

1                                                                                              89,508.00
ADDED FACTORY OPTIONS AND BRCKAGES (PER VEHICLE)
Quantityper ||” Supplier”      Factory ~                                         Seer        "| Contract Unit!         3      Say
i                                      ion D.       ti     |           r}                 ‘f        3                   tal          jicle:
Vehicle:           eee        GE      Package I\ Option Description:       MSRP:      Discount %:     price:            Tol  I Per Vehicle:
This vehicle must be built and
available for delivery in the
coming weeks. All
specifications are included
in the pricing below.
lf factory options exceed this space, include as a separate list & summarize above,                                                 "Factory Options Total (per vehicte):|           $0.00
TS / INCENTIVES / CREDITS (PER VEHICLE)
:       “Grants       $0.00       CRI chiar tance           wet
"Tax Credits/Rebates          $0.00          fae                                                   Total Additional Incentives:.
‘Promotional DISCOUNTS               $0.00                                                                                                                        $0.00
Volume Discounts             $0.00

TOTAL PURCHASE PRICE (incl

Vehicle Lea     e to Dealer:            12-14 weeks                                       ‘Factory Options per                $0.00
Upfit/Transfer Leadtime at Dealer:                  1-2. weeks                                             Total Upfit per vehicle (next peel         $1,343.70
TOTAL Order to Delivery Leadtime:                  13-46 weeks                                           Total Transfer per vehicle (next page):|            $0.00
{in weeks / Executive Agencies to Westboro)                                                          a                                       Contract'Base Vehicle Price:| $89,508.00
Trade-in Details *(value listed to the right):|                                                                                                                                         *Trade in Value:'                $0.00
_(does not apply to Executive Agencies)                                                                 i          Total Additional Incentives:          $0.00
Vee              :                 “i                              HICLE snicldine all add-ons and incentives):           $90,851.70

VEHICLE! QUANTITY:
ing Trade-In Value):

$90,851.70

Tab 28 - School - Extraordinary MaintVehicles.pdf · Source page 3

ADDED ACCESSORIES/UPFIT (PER VEHICLE)

‘Quantity per
Vehicle:

TRANSFERRED EQUIPMENT/MISC (PE

_ ‘Equipment Description: |

(note: for paint jobs, please include # hours estimated per vehicle)

e Quantity per                        " supplier                7
_Nehicle: |                    _ | Option #:                     :           :          :                :               sis                      frit Puen St        :

1                                 30060 - 21         HEATER,80K, LH, REAR, F/M        $1,018.00         10%            $916.20                   $916.20

1                  BlueBird {30981 - 03         LOCK,SECURITY,ENT DOOR          $117.00           10%             $105.30                     $105.30

1                 Blue Bird |00219-01       SLIDING BOLT VANDAL LOCK -       $358.00          10%            $322.20                    $322.20

f—~ _*       Pia

)
Ifadded accessories & upfits exceed this space, Include as a separate list & summarize above,                                    Added ‘Acc/Upfit Total (per vehicle):         $1,343.70

R VEHICLE)

Fixed Transfer Rate Per Item:

Total for Transferred ©
Equipment per vehicle: |.

If transfers / mise exceed this space, include as a separate list & summarize above.

Transfers / Misc Total (pei

r vehicle):|

$0.00