FY 2014 CAPITAL BUDGET PRIORITY SUMMARY rev 12 13 12 (prioritized)
(1) (2) (3) (4) (5) TOTAL
CASH CAPITAL
Building Repairs/ $311,338 $118,372 $0 $17,779 $0 $175,187 $311,338
Improvements
Grounds Improvement $24,210 $16,000 $0 $0 $0 $8,210 $24,210
Technology $433,638 $17,575 $95,356 $48,500 $140,800 $131,407 $433,638
Program Improvement $492,156 $0 $115,915 $0 $0 $376,241 $492,156
Furniture & Fixtures $75,855 $0 $5,503 $0 $70,352 $75,855
Vehicle Replacement $37,900 $0 $0 $0 $0 $37,900 $37,900
Extraordinary Maintenance $90,393 $8,000 12 12 12 $82,393 $90,393
TOTAL CASH CAPITAL $1,465,490 $159,947 $211,271 $71,782 $140,800 $881,690 $1,465,490
TOTAL OF PRIORITIES 1,2,3 $443,000
TARGET $443,000
LONG TERM DEBT
Bldg. Improvements $1,386,075 $0 $0 $0 $0 $0
TOTAL OF PRIORITIES 1,2,3 $0 to be determined
TARGET $112,000
(1) Safety, health,environmental or mandated issues
(2) Critical to instructional program
(3) Critical to non-instructional program
(4) Possible eligibility for Building IMP/Long term debt
(5) Important but not critical
12/26/2012Source page 2
FY 2014 CAPITAL BUDGET REQUESTS
BUILDING REPAIRS/IMPROVEMENTS (CASH)
HANSEN
Bathroom partitions 1 $19,372
SYSTEMWIDE
HVAC 1 $99,000
Hot water pump motor replacement-GMS 3 $17,779
(fund from leftover capital-$17,221)
GRAND TOTAL BUILDING REPAIRS/IMPROVEMENTS $136,151
GROUNDS IMPROVEMENT
Hansen School retaining wall repairs 1 $16,000
GRAND TOTAL GROUNDS /IMPROVEMENTS $16,000
12/26/2012Source page 3
TOWN OF CANTON
FORM - FISCAL 2014
CAPITAL PR 3ECT / EQUIPMENT EQUEST
DEPARTMENT: SUBMITTED BY:
Hansen School Brian Lynch
PROJECT / EQUIPMENT TITLE:
Bathroom partitions
TOTAL PROJECT / EQUIPMENT COST:
$19,372
DESCRIPTION:
Install new solid phenolic floor mounted overhead braced partitions.
PURPOSE AND JUSTIFICATION:
The original metal partitions are falling apart)and are in poor condition. This is a safety
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking:
x Required for Safety Please rank this request out of your total
Required by Law or Mandate requests for this year: (#1 as top priority)
Improve/Expand Service or Increase Efficiency (#) OF (#)
Planned Project or Replacement Expected Useful Life: (Check one)
Unplanned Project or Replacement x20 or More Yrs 5 to 9 Years
New Project/Item (not on last year's 5-Yr. Plan) 10 to 19 Years 3 to 4 Years
Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
Will Reduce Cost by $ Will Produce Addl Revenue by $
No Impact Revenue Neutral (no impact)
Will Increase Cost by $ Will Decrease Revenue by $
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)Source page 4
New England School Services, Inc.
98 Hicks Avenue
QUOTAT1
Quote Number: Hansen partitions
-Medford, MA 02155 Quote Date: Nov 2, 2012
Page: 1
Voice: 617-776-4700
Fax: 781-396-8088
7-ART:tip
Canton Public Schools 960 Washington Street
960 Washington Street Canton, MA 02021
Canton, MA 02021
12/V12 Net 30 Da s HINGWAYN
VrAIN Ira&
Hansen Elementary School - Remove and dispose of existing partitons. Install new solid
phenolic floor mounted overhead braced partitions in the following
These partitions have been quoted individually for your review.
2.00 Boys rooms upper and lowerrs) each restroom
1.00 Girls and boys room upper floor
Doors 14,741.50
Door Hardware Subtotal
Restroom Partitions Sales Tax
Access Control FreightSource page 5
New England School Services9 Inc.
98 Hicks Avenue
QUOTATION
Quote Number: Hansen partitions
Medford, MA 02155 Quote Date: Aug 8, 2012
Page: 1
ooice: 61.7-776-4700
Fax: 781-396-8088
Canton Public Schools
960 Washington Street
Canton, MA 02021
: ,N6130.1)6 e-
Hansen Elenietitary Schbol -'Remove and dispose of'existing partitons. Install new solid
phenolic floor mounted overhead braced partitions in the following
These partitions have been quoted individually for your review.
2.00 Boys rooms upper and lowerrs) each restroom
Doors
Door Hardware
Restroom Partitions
Access ControlSource page 6
TOWN OF CANTON
FORM - FISCAL 2014
CAPIT L PROJECT / EQUIPMENT REQUEST
DEPARTMENT: SUBMITTED BY:
Facilities-all schools Ken Leon/Brian Lynch •
PROJECT! E13U1PMENT TITLE'
Cash Capital - Heating, ventilation, air, circulation (HVAC) per ten year capital plan
TOTAL PROJECT / EQUIPMENT COST:
$99,000
DESCRIPTION:
Continuation of ten year plan
-
PURPOSE AND JUSTIFICATION: •
Implementation proactive preventative maintenance systems for all locations and fund small
HVAC,upgrades and technician within this allocation. This will update equipment/systems;
\
mprove energy efficiency; expand life expectancy of existing equipment.
- --- ---- -
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking:
x Required for Safety Please rank this request out of your total
x Required by Law or Mandate requests for this year: (#1 as top priority)
x Improve/Expand Service or Increase Efficiency (#) OF (#)
Planned Project or Replacement Expected Useful Life: (Check one)
Unplanned Project or Replacement x 20 or More Yrs 5 to 9 Years
New Project/Item (not on last year's 5-Yr. Plan) x 10 to 19 Years 3 to 4 Years
Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
Will Reduce Cost by $ Will Produce Addl Revenue by $
No Impact Revenue Neutral (no impact)
— Will Increase Cost by $ — Will Decrease Revenue by $
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
FORM,B - FISCAL 2014Source page 7
TEN YEAR REPLACEMENT/REPAIR BUDGET PROJECTION
Replacement Schedule Codes
Property Name: HIGH SCHOOL 1 100% in 1 yr ovr 5 yr
Date: 2/3/2010 2 50% ovr 2 • ovr 10yr
Age Of Facility (Yrs) 6 11/1/2012 3 33.3% ovr 3 ovr 20yr
4 25% ovr 4 other
Total Cost Age AV§ Replacement years R/S 1 Year I Year Year Year Year
Replacement Qty Unit Cost
Item Life Later Type l 2014 I 2015 2016 2017 2018
Item 2010$ Now 1st'
ll
2011 2015 2019 2023 3 $3,846 $3,846 $3,846 $3,846 $3,846
1 Maintain Boilers 3 $1,282 $3,846 5 4
1 2011 2012 2013 2014 1 $1,950 $1,950 $1,950 . $1,950
:• • $1,950
2 Adjust Bumers 3 $650 $1,950 1
2029 3 $0 $0 $0 $0 $0
3 Replace DHW Generators 3 $8,450 $25,350 5 8 2013 2021 2037
2029 2041 2053 2 $0 $0 $0 $0 $4,500
4 Rebuild DHW Thermostatic 2 $4,500 $9,000 5 12 2017
2020 2035 2050 2065 2 $0 $0 $0 $0 $0
5 Rebuild/Replace Primary 2 $14,800 $29,600 5 15
2035 2045 5 $0 $0 $D $0 $1,875
6 Replace Secondary Circulators 5 $1,875 $9,375 5 10 2015 , 2025
2045 2065 2085 6 $0 $0 $0 $0 $0
7 Replace Tstats 77 $170 $13,090 5 20 2025
2029 4 $2,000 $2,000 $2,000 $2,000 $8,450
8 Repair Exhaust fans 52 $650 $33,800 5 6 2011 2017 2023
2053 4 $0 $0 $0 $0 $35,750
9 Replace Exhaust fans 52 $2,750 $143,000 5 12 2017 2029 2041
2012 2013 2014 1 $11,042 $11,042 $11,042 $11,042 $11,042
10 Maintain Unit Ventilators 70 $200 $14,000 5 1 2011
2016 2021 2026 5 $0 $0 $0 $0 $11,900
11 Repair Unit Ventilators 70 $850 $59,500 5 5 2011
2011 2016 2021 2026 5 $4,900 $4,900 $4,900 $4,900 $4,900
12 Service Univent OA Damper 70 $350 $24,500 5 5
2105 5 $0 $0 $0 $0 $0
13 Replace Unit Ventilators 70 $5,750 $402,500 5 25 2030 2055 2080
2016 2021 2026 5 $2,860 $2,860 $2,660 $2,860 $2,860
14 Repair Fan Coil Units 22 $650 $14,300 5 5 2011
2055 2080 2105 5 $0 $0 $0 $0 $0
15 Replace Fan Coil Units 22 $3,250 $71,500 5 25 2030
2014 2017 2020 1 $600 $0 $0 $0 $0
16 Clean/Repair Kitchen Make-up 1 $600 $600 5 3 2011
2050 2065 1 $0 $0 $0 $0 $0
17 Replace Kitchen Make-up Air 1 $8,500 $8,500 5 15 2020 2035
5 5 2011 2016 2021 2026 3 $2,000 $2,000 $2,000 $2,000 $14,985
18 Repair Rooftop Air Handling 18 $2,500 $45,000
2045 2065 2085 3 $0 $0 $0 $0 $0
19 Replace Rooftop Air Handling 18 $9,500 $171,000 5 20 2025
2049 2089 2129 2169 1 $0 $0 $0 $0 $0
20 Controls Upgrade 1 $15,000 $15,000 1 40
5 2011 2016 2021 2026 1 $500 $500 $500 $500 $500
21 Controls Maintenance 1 $2,500 $2,500 5
$0 $0 $0 $0 $0
22 Replace Unit Heater 1 $3,500 $3,500 5 20 2025 2045 2065 2085 1
5 20 2025 2045 2065 2085 1 $0 $0 $0 $0 $0
23 Replace Fuel Oil Pumps 1 $4,500 $4,500
2029 2041 2053 5 $0 $0 $0 $0 $1,360
24 Service Fan-powered Terminal 16 $425 $6,800 5 12 2017
2016 2021 2026 3 $500 $500 $500 $500 $1,748
25 Repair Indoor Air Handling Units 7 $750 $5,250 5 5 2011
2045 2065 2085 3 $0 $0 $0 $0 $0
.26 Replace Indoor Air Handling 7 $7,500 $52,500 5 20 2025
2021 2026 $2,000 $2,000 $2,000 $2,000 $13,586
27 Repair A/C Condensing Units 17 $2,400 $40,800 5 5 2011 2016 3
2035 2050 2065 3 $0 $0 $0 $0 $0
28 Replace A/C Condensing Units 17 $6,500 $110,500 5 15 2020
2013 2014 1 $0 $0 $0 $0 $0
29 HVAC General Maintenance 1 $12,000 $12,000 5 1 2011 2012
2014 1 $850 $850 $850 $850 $850
30 Service Emergency Generator 1 $850 $850 5 1 2011 2012 2013
2014 1 $0 $0 $0 $0 $0
31 Architect/Engineering Fees 1 $4,000 $4,000 5 1 2011 2012 2013
1 $6,000 $6,000 $6,000 $6,000 $6,000
32 HVAC Technician 1 $6,000 $6,000 5 1 2011 2012 2013 2014
$0 $0 $0 $0 $0
33 Contingency 1 $10,000 $10,000 5 1 2011 2012 2013 2014 1
$38 448 . 38448 $38448 $38 .126102
Total $143202 $1 354 611
FY 14 HVAC HS Spreadsheet letter B 1 of 1Source page 8
TEN YEAR REPLACEMENT/REPAIR BUDGET PROJECTION
Replacement Schedule Codes
Date: 01-Nov 2012 revised 11/1/2012
Project Name: RODMAN (HIGH SCHOOL "A" BUILDING) 1 100% in 1 yr 4
Facility Age: 1948 2 50% ovr 2 yr 5
3 33% ovr 3 yr 6
Year Year Year Year Ye
Replacement Quantity Cost per Total Cost Age Avg Replacement years R/S Infl 15 16 17 18 1
Codes
Ctgy Item Replacement Item (unit) Item 1998$ Now Life 1st Later Typ Rate 2014 2015 2016 2017 201
MECHANICAL EQUIPMENT
1 1 EA $125,000 $125,000 49 56 7 63 119 175 1 3% $0 $0 $0 $0 $'
1 Replace Boiler "A"
1 2 Blow down Steam Traps 140 EA $60 $8,400 0 5 5 10 15 20 5 3% $0 $0 $0 $0 $
1 3 Replace Univents 25 EA $7,500 $187,500 49 49 1 50 99 148 3 3% $0 $0 $0 $0 $
1 4 Recalibrate/Replace Tstats 25 EA $400 $10,000 12 12 1 13 25 37 3 3% $400 $400 $400 $400 $40
1 5 Service Emerg. Gen. 1 EA $250 $250 0 1 1 2 3 4 1 3% $0 $0 $0 $0 $
1 6 Repair/Calibrate Burner 2 EA $200 $400 0 1 1 2 3 4 1 3% $1,045 $1,045 $1,045 $1,045 $1,04
1 7 Replace DHW Boiler 1 EA $4,100 $4,100 2 12 10 22 34 46 1 3% $0 $0 $0 $0 $
1 8 Repalr/Recalibrate Controls 1 EA $500 $500 0 , 1 1 2 3 4 1 3% $652 $652 $652 $652 $65
1 9 Maintain Boilers 2 EA $1,282 $2,564 0 1 1 2 3 4 1 3% $564 $564 $564 $564 $56
1 10 Maintain Air Compressor 1 EA $6,000 $6,000 11 12 1 13 25 37 1 3% $250 $250 $250 $250 $25
1 11 Replace Fuel Oil Pumps 1 EA $2,500 $2,500 25 28 3 31 59 87 1 3% $0 $0 $0 $0 $
1 12 Relocate Rooftop AH units 14 EA $1,800 $25,200 49 49 1 50 99 148 2 3% $0 $0 $0 $0 $
13 Architect/Engineer Fees 1 EA $2,500 $2,500 1 1 1 2 - 3 4 1 3% $0 $0 $0 $0 $
1 14 HVAC technician 1 EA $8,000 $8,000 1 1 1 2 3 4 1 3% $1,500 $1,500 $1,500 $1,500 $1,50
TOTALS: $382,914 $4,411 $4,411 $4,411 $4,411 $4,41
ABBREVIATIONS:
EA=EACH LF=LINEAL FOOT LS=LUMP SUM SF=SQUARE FOOT SQ=SQUARE(100SF) SY=SQ YARD
*NOTE: ITEMS WITH AN ASTERISK INDICATE AN AGE NOW THAT IS ESTIMATED OR MODIFIED
TO MORE ACCURATELY REFLECT EXISTING CONDITIONS AND/OR REPLACEMENT SCHEDULE.
Major Projects in BoldSource page 9
TEN YEAR REPLACEMENT/REPAIR BUDGET PROJECTION
Replacement Schedule Codes
Date: 01-Nov 1998 revised 1111/12
Project Name: GALVIN MIDDLE SCHOOL 1 100% in 1 yr 4
Facility Age: 1971 2 50% ovr 2 yr 5
3 33% ovr 3 yr 6
Year Year Year Year
Replacement Quantity Cost per Total Cost Age Avg Replacement years R/S Inn 16 17 18 19
Codes
Item Item (unit) Item 1998 $ Now Life 1st Later Typ Rate 2014 2015 2016 2017
Ctgy Item
MECHANICAL EQUIPMENT
2 EA $88,500 $177,000 27 29 2 31 60 89 1 3% $0 $0 $0 $0
1 1 Replace Boilers
2 EA $5,200 $10,400 27 29 2 31 60 89 2 3% $0 $0 $0 $0
1 2 Replace Primary Circulators
55 EA $7,500 $412,500 27 27 1 28 55 82 3 3% $0 $0 $0 $0
1 3 Repair Univents
4 Recalibrate/Replace T'stats 75 EA $200 $15,000 27 27 1 28 55 82 3 3% $1,000 $1,000 $1,000 $1,000
1
1 EA $40,000 $40,000 27 29 2 31 60 89 1 3% $0 $0 $0 $0
1 5 Replace Emerg. Gen.
2 EA $200 $400 0 1 1 2 3 4 1 3% $1,045 $1,045 $1,045 $1,045 $
1 6 Repair/Calibrate Burner
1 EA $3,850 $3,850 3 12 9 21 33 45 1 3% $0 $0 $0 $0
1 7 Replace DHW Boiler
1 EA $500 $500 0 1 1 2 3 4 1 3% $672 $672 • $672 - $672
1 8 Repair/Recalibrate Controls
2 EA $1,282 $2,564 0 1 1 2 3 4 1 3% $2,564 $2,564 $2,564 $2,564 $
1 9 Maintain Boilers
3 EA $450 $1,350 0 1 1 2 3 4 1 3% $1,350 $1,350 $1,350 $1,350 $
1 10 Maintain RTUs & A/C
7 EA $200 $1,500 $1,500 $1,500 $1,500 $
2 11 Maintain Gym RTUs
1 EA $250 $250 27 27 1 28 55 82 1 3% $250 $250 $250 $250
1 12 Maintain Air Compressor
Replace adm office condensers $0 $0 $0 $0
2 EA $2,500 $5,000 27 29 2 31 60 89 1 3% $0 $0 $0 $0
1 13 Replace Fuel Oil Pumps
14 Maintain Rooftop Exhausts 19 EA $1,800 $34,200 27 27 1 28 55 82 2 3% $3,600 $3,600 $3,600 $3,600 $
1
15 Install HV Unit- Boiler Room 1 EA $26,000 $0 $0 $0 $0
16 Architect/Engineer Fees 1 EA $2,500 $2,500 1 1 1 2 3 4 1 3% $0 $0 $0 $0
1
1 EA $15,000 $15,000 1 1 1 2 3 4 1 3% $4,000 $4,000 $4,000 $4,000 $
1 17 HVAC technician
$720,514 $15,981 $15,981 $15,981 $15,981 $1
TOTALS:
ABBREVIATIONS:
EA=EACH LF=LINEAL FOOT LS=LUMP SUM SF=SQUARE FOOT SQ=SQUARE(100SF) SY=SQ YARD
*NOTE: ITEMS WITH AN ASTERISK INDICATE AN AGE NOW THAT IS ESTIMATED OR MODIFIED
TO MORE ACCURATELY REFLECT EXISTING CONDITIONS AND/OR REPLACEMENT SCHEDULE.
Major Projects in BoldSource page 10
TEN YEAR REPLACEMENT/REPAIR BUDGET PROJECTION
Replacement Schedule Codes
Date: revised 11/1/12
Project Name: LUCE SCHOOL 1 100% in 1 yr 4
Facility Age: 1954; major addition, 1999 2 50% ovr 2 yr 5
3 33% ovr 3 yr 6
Year Year Year Year YeE
Codes Replacement Quantity Cost per Total Cost Age Avg Replacement years R/S Intl 16 17 18 19 2
Ctgy Item Item Item (unit) Item 1998$ Now Life 1st Later Typ Rate 2014 2015 2016 2017 201
MECHANICAL EQUIPMENT
$0 $0 27 29 2 31 60 89 1 3% $0 $0 $0 $0 $C
TT M TW W TT M M T
1 1 Replace Boilers 0
1 2 Replace Primary Circulators 0 $0 $0 27 29 2 31 60 89 2 3% $0 $0 $0 p Sc
1 3 Replace Univents 25 $7,500 $187,500 27 27 1 28 55 82 3 3% $0 $0 $0 $0 $C
1 4 Recalibrate/Replace Tstats 36 $200 $7,200 27 27 1 28 55 82 3 3% $400 $400 $400 $400 $40C
1 5 Replace Emerg. Gen. 0' $0 $0 27 29 2 31 60 89 1 3% $0 $0 $0 $C
1 6 Repair/Calibrate Burner 2 $1,800 $3,600 0 1 1 2 3 4 1 3% $1,045 $1,045 $1,045 $1,0:(5) $1,04:
1 7 Replace DHW Boiler 1 $3,850 $3,850 3 12 9 21 33 45 1 3% $0 $0 $0 $0 $C
1 8 Repair/Recalibrate Controls 1 $500 $500 0 1 1 2 3 4 1 3% $1,100 $1,100 $1,100 $1,100 51,10C
1 9 Maintain Boilers 2 $1,282 $2,564 0 1 1 2 3 4 1 3% $2,564 $2,564 $2,564 $2,564 $2,564
1 10 Maintain RTUs & A/C 4 $500 $2,000 0 1 1 2 3 4 1 3% $1,500 $1,500 $1,500 $1,500 $1,50(
1 11 Maintain Air Compressor 1 $9,000 $9,000 27 27 1 28 55 82 1 3% $250 $250 $250 $250 $25(
1 12 Replace Fuel Oil Pumps 2 $2,500 $5,000 27 29 2 31 60 89 1 3% $0 $0 $0 $0 $(
1 13 Maintain Rooftop Exhausters 16 $100 $1,600 27 27 1 28 55 82 2 3% $1,600 $1,600 $1,600 $1,600 $1,60(
14 Install sprit system-storage areas 1 $12,975 $0 $0 $0 $0 $(
15 Install Air Handler- Old Boiler Roc 1 $18,770 $0 $0 $0 $0 $(
1 16 Architect/Engineer Fees 1 $2,500 $2,500 1 1 1 2 3 4 1 3% $0 $0 $0 $0 $C
1 17 HVAC technician 1 $15,000 $15,00p 1 1 1 2 3 4 1 3% $4,000 $4,000 $4,000 $4,000 $4,00(
TOTALS: $240,314 $12,459 $12,459 $12,459 $12,459 512,45I
ABBREVIATIONS:
EA=EACH LF=LINEAL FOOT LS=LUMP SUM SF=SQUARE FOOT SQ=SQUARE(100SF) SY=SQ YARD
*NOTE: ITEMS WITH AN ASTERISK INDICATE AN AGE NOW THAT IS ESTIMATED OR MODIFIED
TO MORE ACCURATELY REFLECT EXISTING CONDITIONS AND/OR REPLACEMENT SCHEDULE
Major Projects in BoldSource page 11
TEN YEAR REPLACEMENT/REPAIR BUDGET PROJECTION
Replacement Schedule Codes
Date: 01-Nov 1998 revised 11/1/12
Project Name: HANSEN ELEMENTARY SCHOOL 1 100% in 1 yr 4
Facility Age: 1968 2 50% ovr 2 yr 5
3 33% ovr 3 yr 6
Year Year Year Year
Codes Replacement Quantity Cost per Total Cost Age Avg Replacement years R/S Infl 15 16 17 18
Ctgy Item Item Item (unit) Item 1998$ Now Life 1st Later Typ Rate 2014 2015 2016 2017
MECHANICAL EQUIPMENT
1 1 Replace Boilers 2 EA $76,500 $153,000 26 32 6 38 70 102 1 3% $0 $0 $0 $0
1 2 Replace Primary Circulators 2 EA $2,400 $4,800 26 32 6 38 70 102 1 3% $0 $0 $0 $0
1 3 Replace Univents 35 EA $7,500 $262,500 26 33 7 40 73 106 3 3% $0 $0 $0 $0
1 4 Recalibrate/replace Tstats 42 EA $200 $8,400 26 33 7 40 73 106 3 3% $400 $400 $400 $400 4
1 5 Service Emerg. Gen. 1 EA $22,000 $22,000 26 36 10 46 82 118 1 3% $0 $0 $0 $0
1 6 Repair/Calibrate Burner 2 EA $1,800 $3,600 0 1 1 2 3 4 1 3% $1,045 $1,045 $1,045 $1,045 $1,
1 7 . Replace DHW Boiler 1 EA $1,000 $1,000 2 6 4 10 16 22 1 3% $0 $0 $0 $0
1 8 Dedicated Kitchen DHIN 1 EA $1,200 $1,200 0 2 2 4 6 8 1 3% $0 $0 $0 $0
1 9 Repair/Recalibrate Controls 1 EA $500 $500 0 1 1 2 3 4 1 3% $1,800 $1,800 $1,800 $1,800 $1,
1 10 Maintain Boilers 2 EA $1,282 $2,564 0 1 1 2 3 4 1 3% $2,564 $2,564 $2,564 $2,564 $2,
1 11 Maintain Air Compressor 1 EA $6,000 $6,000 26 34 8 42 76 110 1 3% $250 $250 $250 $250 4
1 12 Replace Fuel Oil Pumps 2 EA $1,250 $2,500 26 32 6 38 70 102 1 3% $0 $0 $0 $0
1 13 Maintain Rooftop Exhausters 20 EA $1,800 $36,000 26 26 1 27 53 79 2 3% $3,600 $3,600 $3,600 $3,600 $3,
1 14 Maintain Office RTU, A/C 1 EA $5,200 $5,200 26 25 1 26 51 76 1 3% $600 $600 $600 $600
1 15 Maintain/Repair AHU, Gym 1 EA $1,400 $1,400 $500 $500 $500 $500 4
15a Replace library ac unit 4 $0 $0 $0. . $0
1 16 Replace AHU, Cafeteria 1 EA $25,000 $25,000 $0 $0 $0 ' $0
1 16 Architect/Engineer Fees 1 EA $2,500 $2,500 1 1 1 2 3 4 1 3% $0 $0 $0 $0
1 17 HVAC technican I EA $3,000 $3,000 1 1 1 2 3 4 1 3% $4,000 $4.000 $4,000 $4,000 $4,
TOTALS: $541,164 $14,759 $14,759 $14,759 $14,759 $14,
ABBREVIATIONS:
EA=EACH LF=LINEAL FOOT LS=1...UMR SUM SF=SQUARE FOOT SQ=SQUARE(100SF) SY=SQ YARD
*NOTE: ITEMS WITH AN ASTERISK INDICATE AN AGE NOW THAT'S ESTIMATED OR MODIFIED
TO MORE ACCURATELY REFLECT EXISTING CONDITIONS AND/OR REPLACEMENT SCHEDULE.
Major Projects in BoldSource page 12
TEN YEAR REPLACEMENT/REPAIR BUDGET PROJECTION
Replacement Schedule Codes
Date: 01-Nov 1998 revised 1111/12
Project Name: KENNEDY ELEMENTARY SCHOOL 1 100% in 1 yr 4
Facility Age: 1965 2 50% ovr 2 yr 5
3 33% ovr 3 yr 6
Year Year Year Year Yi
Codes Replacement Quantity Cost per Total Cost Age Avg Replacement years R/S Intl 15 16 17 18
Ctgy Item Item Item (unit) Item 1998 $ Now Life 1st Later Typ Rate 2014 2015 2016 2017 2C
MECHANICAL EQUIPMENT
MMTTTTTT MTTTTT T
1 1 Replace Boilers 2 $88,500 $177,000 33 38 5 43 81 119 1 3% $0 $0 $0 $0 '
1 2 Repair Primary Circulators 2 $4,400 $8,800 33 38 5 43 81 119 1 3% $0 $0 $0 $0 '
1 3 Replace Univents 25 $7,500 $187,500 33 41 8 49 90 131 3 3% $0 $0 $0 $0
1 4 Repair/RecalibrateT'stats 36 $200 $7,200. 33 36 3 39 75 111 3 3% $400 $400 $400 $400 $41
1 5 Replace Emerg. Gen. 1 $22,000 _ $22,000 33 43 10 53 96 139 1 3% $0 $0 $0 $0
1 6 Repair/Calibrate Burner 2 $200 $400 0 1 1 2 3 4 1 3% $1,045 $1,045 $1,045 $1,045 $1,0,
1 7 Replace DHW Boiler 1 $3,100 $3,100 2 12 10 22 34 46 1 3% $0 $0 $0 $0
1 8 Repair/Recalibrate Controls 1 $500 $500 0 1 1 2 3 4 1 3% .$500 $500 $500 $500 $51
1 9 Maintain Boilers 2 $1,282 $2,564 0 1 1 2 3 4 1 3% $2,564 $2,564 $2,564 $2,564 $2,51
1 10 Maintain Air Compressor 1 $200 $200 0 1 1 2 3 4 1 3% $250 $250 $250 $250 $21
1 11 Replace Fuel Oil Pumps 2 $2,000 $4,000 33 38 5 43 81 119 2 3% $0 $0 $0 $0
1 12 Maintain Rooftop Exhausters 6 $1,800 $10,800 33 38 5 43 81 119 5 3% $1,800 $1,800 $1,800 $1,800 $1,81
1 13 Office Ventilation 1 $15,000 $15,000 33 37 4 41 78 115 1 3% $0 $0 $0 $0
1 14 Replace INindow A/C 6 $750 $4,500 8 10 2 12 22 32 2 3% $0 $0 $0 $0 .
1 15 Maintain Office RTU 1 $500 $683 $683 $683 $683 $61
1 16 Replace AHU in Gym 1 $16,400 $0 $0 $0 $0
1 17 Replace AHU in Cafeteria 1 $30,000 $0 $0 $0 $0 '
1 18 Maintain AHU's 2 $350 $700 $700 $700 $700 $71
1 19 Replace low limits- Unit Vents 25 $480 $12,000 $0 $0 $0 $0
1 20 Architect/Engineer Fees 1 $2,500 $2,500 1 1 1 2 3 4 1 3% $0 $0 $0 $0
1 21 HVAC technician 1 $1,800 $1,800 1 1 1 2 3 4 1 3% $5,000 $5,000 $5,000 $5,000 $5,01
TOTALS: $459,864 $12,942 $12,942 $12,942 $12,942 $12,9,
ABBREVIATIONS:
EA=EACH LF=LINEAL FOOT LS=LUMP SUM SF=SQUARE FOOT SQ=SQUARE(100SF) SY=SQ YARD
*NOTE ITEMS WITH AN ASTERISK INDICATE AN AGE NOW THAT IS ESTIMATED OR MODIFIED
TO MORE ACCURATELY REFLECT EXISTING CONDITIONS AND/OR REPLACEMENT SCHEDULE
Major Projects in BoldSource page 13
TOWN OF CANTON
• FORM - FISCAL 2014
CAPITAL 'PROJECT / EQUIPMENT REf.L JEST
DEPARTMENT: SUBMITTED BY:
Facilities K. Leon/B. Lynch
PROJECT / EQUIPMENT TITLE:
Hot water pump motor replacement - GMS, Hansen, 3FK
TOTAL PROJECT / EQUIPMENT COST: S 564I AA et-64(5—
$70,000 plan 80/0 design - $75,600 &ay
DESCRIPTION:.
Hot water pump motors to be replaced and provided with new premium efficiency motors,
variable speed drives and differential pressure controls.
PURPOSE AND JUSTIFICATION:
Replace (3) at GMS, (2) at Hansen, and (2) at JFK; will provide energy savings; receive
Rmbates and pay back of less than five years.
)
i
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking:
Required for Safety Please rank this request out of your total
Required by Law or Mandate requests for this year: (#1 as top priority)
x Improve/Expand Service or Increase Efficiency (#) OF (#)
x Planned Project or Replacement Expected Useful Life: (Check one)
Unplanned Project or Replacement x 30 or More Yrs 5 to 9 Years
New Project/Item (not on last year's 5-Yr. Plan) 10 to 19 Years 3 to 4 Years
Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
x Will Reduce Cost by Will Produce Addl Revenue by $
No Impact Revenue Neutral (no impact)
Will Increase Cost by $ Will Decrease Revenue by $
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
1
FORM B - FISCAL 2014Source page 14
LW Engineers, Inc.
311 Great Road, Post Office Box 1551, Littleton, Massachusetts 01460 t978.486.4301 f 978.428.0067 e Info@blwengineers.com
Memorandum
DATE: November 30, 2011
TO: Ken Leon, Canton Public Schools
FROM: Ken Beck
SUBJECT: School Energy Conservation Measures
COPIES TO:
BLW Engineers has reviewed the engineering studies for mechanical systems upgrades for the
Canton Public Schools and recommends the following Energy Conservation Measures be
considered:
Canton High School
(247,803 sf; 1970/2005)
ECM-1 Kitchen Hood Exhaust Controls ($25,000.00)
The recommendation to provide a kitchen hood exhaust system control similar
to Melink controls is a low cost energy conservation measure that will provide
almost immediate payback and is recommended.
ECM-2 Condensing Boiler ($160,000.00)
BLW recommends that Canton consider the addition of a single 100hp gas fired,
condensing type boiler to provide high efficiency hot water heating during the
shoulder seasons a,s an energy conservation measure that will provide almost
immediate paybkk and is recommended.
ECM-2 Indirect Hot Water Heaters ($25,000.00)
Should ECM-2 be implemented, BLW recommends that Canton consider
utilizing the new condensing boiler for domestic hot water on a year round basis
through the installation of indirect storage type water heaters as an energy
conservation measure that will provide almost immediate payback and is
recommended.
Galvin Middle School
(131,151 sf; 1973)
ECM-1 Improve Boiler Controls ($5,000.00)
The recommendation to update the Boiler lead/lag controls is a low cost energy
conservation measure that will provide almost immediate payback and is
recommended.
Page 1 of 3Source page 15
I; LW Engineers, Ince
311 Great Road, Post Office Box 1551, Littleton, Massachusetts 01460 t 978.486.4301 f 978.428.0067 e Infablwengineers.corn
Memorandum
ECM-2 Condensing Boiler for DHW ($5,000.00)
The recommendation to modify the existing system operation to utilize the
existing condensing boiler for the domestic hot water system is a low cost energy
conservation measure that will provide almost immediate payback and is
recommended.
ECM-3 Condensing Boiler for DHW ($25,000.00)
The recommendation to update the controls with a new head end system for
remote monitoring/control is a low cost energy conservation measure that will
provide almost immediate payback and is recommended. •
Hot Water Pump Motor Replacement ($30,000.00)
BLW would recommend that all three hot water pump motors be replaced and
provided with new premium efficiency motors, variable speed drives and
differential pressure controls.
Hansen Elementary School
(60,640 sf; 1969)
ECM-1 Boiler Setpoint Control ($7,500.00)
The recommendation to update the Boiler Setpoint Control is a low cost energy
conservation measure that will provide almost immediate payback and is
recommended.
ECM-2 EMS Zone Scheduling and Remote Interface ($10,000.00)
The recommendation to update the time clocks with EMS zone scheduling and
remote interface is a low cost energy conservation measure that will provide
almost immediate payback and is recommended.
Hot Water Pump Motor Replacement ($20,000.00)
BLW would recommend that both hot water pump motors be replaced and
provided with new premium efficiency motors, variable speed drives and
differential pressure controls.
Kennedy Elementary School
(54,800 sf; 1968)
ECM-1 EMS Zone Scheduling and Remote Interface ($10,000.00)
The recommendation to update the time clocks with EMS zone scheduling and
remote interface is a low cost energy conservation measure that will provide
almost irmnediate payback and is recommended.
Page 2 of 3Source page 16
BLW Engineers, Ince
311 Great Road, Post Office Box 1551, Littleton, Massachusetts 01460 t 978.486:4301 f 978.428.0067 e Infablwengineers.com
Memorandum
Hot Water Pump Motor Replacement ($20,000.00)
BLW would recommend that both hot water pump motors be replaced and
provided with new premium efficiency motors, variable speed drives and
differential pressure controls.
Luce Elementary School
(67,225 sf; 1950/1988/2000)
ECM-1 Pneumatic Controls Upgrade ($150,000.00)
ECM-2 is for an energy management system installation; due to the scope of
work it would probably be in the best interest of the school to abandon
pneumatics altogether and provide a fully functional DDC system for the school.
ECM-2 Install Energy Management System ($50,000,00)
The recommendation to install a new energy management system has a high
first cost but is a conservation measure that will provide almost immediate
returns and is recommended. Not being able to adequately control the building
results in a tremendous waste of energy.
ECM-3 Hot Water Pump Motor Replacement ($20,000.00)
BLW would recommend that both hot water pump motors be replaced and
provided with new premium efficiency motors, variable speed drives and
differential pressure controls.
ECM-4 Condensing Boiler ($100,000.00)
BLW recommends that Canton consider the addition of a single 100hp gas fired,
condensing type boiler to provide high efficiency hot water heating during the
shoulder seasons as an energy conservation measure that will provide almost
immediate payback and is recommended.
ECM-5 Indirect Hot Water Heaters ($20,000.00)
Should ECM-4 be implemented, BLW recommends that Canton consider
utilizing the new condensing boiler for domestic hot water on a year round basis
through the installation of indirect storage type water heaters as an energy
conservation measure that will provide almost immediate payback and is
recommended.
If there should be any questions regarding this matter, please do not hesitate to contact our
office.
Page 3 of 3Source page 17
TOWN OF CANTON
FORM - FrscAL 2014
CAPITAL PROJECT / EQ IPMENT REQUEST
DEPARTMENT: SUBMITTED BY:
Facilities Department Brian Lynch
PROJECT / EQUIPMENT TITLE:
Retaining Wall Hansen School •
TOTAL PROJECT / EQUIPMENT COST:
$16,000
DESCRIPTION:
Replace 106' of retaining wall at Hansen school
PURPOSE AND JUSTIFICATION:
The existing wall is in poor condition and is ready to fall over.
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking:
x Required for Safety Please rank this request out of your total
Required by Law or Mandate requests for this year: (#1 as top priority)
Improve/Expand Service or Increase Efficiency (#) OF (#)
Planned Project or Replacement Expected Useful Life: (Check one)
x Unplanned Project or Replacement x 20 or More Yrs 5 to 9 Years
New Project/Item (not on last year's 5-Yr. Plan) 10 to 19 Years 3 to 4 Years
Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
Will Reduce Cost by $ Will Produce Addl Revenue by $
No Impact Revenue Neutral (no impact)
Will Increase Cost by $ Will Decrease Revenue by $
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)Source page 18
Willia atsh & Sons inow
1 Greenwood Road
_Canton_ MA 02021
Tel: (781) 828-6439 •
1 82 -8133
Proposal Submitted To . Phone . Fax
Town of Canton • HighWay &
Canton Public School Maintenance Dep .
lidgatmodiz,lipiptoptipp.A.w.,. , ,,,,,..„,,,...,.„....,:„..,„
...,.,.. ...: .. ,....„....„..„...„ , .- ..
..„...T.;.;::v.:::;..
_ .. . i4Sttfai-N,',;1*
'Date 0/061121
*Street Job Location Hansen School
Washington Street, Canton MA 26 Pecunit Street, Canton
Labor to Replace 106' Retaining Wall @ Hansen School
Form & Pour 106' x ,1' x 2' Footings & 106' x 1' x 8' Walls
#4 Rebar one foot on center
TOTAL $11,000.00
EXCLUSIONS
William J. Walsh & Sons, Inc. is not responsible for the following:
Concrete (material) Wire Mesh Bolts
Expansion (material) MA Sales Tax Excavator
Vapor barrier .(material) Concrete Pumps (per 4 hours)
Sealers/Hardeners (material) Damp Proofing/waterproofing
Temp Power/Water/Lighting Shoring or reshoring
Testing Police Details
Shipping & Freight Permits Windows
Estimate is figured for one mobilization-any additional will be extra
Please note William J. Walsh & Sons, Inc. has not included labor for iNintertime conditions in
these prices. Change orders will be requited for any changes tosiie of concrete fOundation.
This bid may be terminated by the SELLER at any time prior to receipt of written acceptance from
Buyer and automati, ally tz, minates with 30 days of this propel date. This original proposal with
the scope of work beds .• be included in full in the final contract if it is accepted.
P. POSALOr E* PROPOSAL ACCEPTED
, /
m J. W Js., resident
DATE: NoVe set 6., 2012 .
Terms forthe ontract are as follows:
1. Buyer agrees to pay on a weekly basis for work completed to date. If payment is not
forthcoming on the due date, SELLER shall have the right upon five days' written notice
to withdraw its forces, materiel, equipment, etc. from the project and shall not be in
breach of this contract thereby. BUYER aggress to pay on demand all reasonable
collection and attorney's fees in the collection of this agreement.
2. No back charges will be accepted for wither materials or services unless agreed to in
advarice and signed by an authorized representative of William J. Walsh .& Sons, Inc.
Also please note change orders are not subject to 10% retention.Source page 19
Wednesday, November 07, 2012 9:33:51 AM
Printed by:Brian Lynch
Title: Fw: Retaining Wall © Hansen School 11-06-12, : Canton Public... Page 1 of 1
From: N"Walsh, William" <wwalsh@town.canton.ma.us> 11/6/2012 7:...
Subject: Fw: Retaining Wall @ Hansen School 11-06-12,
To: Brian Lynch
Attachments: atru nc
Hello Brian g
I would ad over digging and hauling material to the crusher.
Thanks
Billy
Sent from my Motorola Smartphone on the Now Network from Sprint!
Original message
From: MARGARET WALSH <momgret22Avahoo.com >
To: "Walsh, William" <wwalshAtown.canton.ma.us>
,Sent: Tue, Nov 6, 2012 20:40:13 GMT+00:00
Subject: Retaining Wall @ Hansen School 11-06-12
Billy,
Attached is the proposal.
MPW
*** This e-mail and any files transmitted with it are confidential and intended solely for the use of the
individual or entity to whom they are addressed. If you have received this e-mail in error please notify
the originator of this message. Town of Canton 2000-2012 --Source page 20
FY 2014 CAPITAL BUDGET REQUESTS
TECHNOLOGY
District:
Infrastructure Upgrade Phase One (of $140,800) 3 $26,000
NetApp Storage Array 3 $22,500
District Classroom Printers 2 $19,995
Schools:
HS and Galvin Wireless Build-phase one 2 $50,555
CHS Art Lab Computer Upgrade 2 $14,500
Adobe Illustrator and PhotoShop Upgrade-submitted by K-12 Art Dir. 2 $10,306
Security:
Rodman Security Additions 1 $17,575
GRAND TOTAL TECHNOLOGY $161,431
12/26/2012Source page 21
OF .CAN-TON
FORM B - FISCAL 2014
,C mita P ° elECT / EQUIPMENT FEQUEST
- --- -
DEPARTMENT: SUBMITTED BY: .
Technology Mike Wentland
PRO3ECT / EQUIPMENT TITLE: c
Phase One: Infrastructure Upgrade ( 0-6' ivo/
'v f00
TOTAL PRO5ECT / EQUIPMENT COST:
$26,000
DESCRIPTION:
To upgrade all IDF's backbone switches from 10/100 to 10/100/1000 ethernet with a fiber uplink to local
MDF's
District (9) 48 Port = $16,650, (3) 24 port = $3,318, (12) fiber LC SX Modules = $2,268 Total Hardware
= $22,236
Labor is estimated at $3000 .
PURPOSE AND 3USTIFICATION:
Switches are antiquated and lacking in performance and throughput, 10/100/1000 speed will increase
1 )ork performance and connectivity as we move forward in coming years with newer technologies.
VVIIi also help to better build upon a wireless platform.
•
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking: (Check one)
Required for Safety x Top Moderate
Required by Law or Mandate High Lowest
x
_ Improve/Expand Service or Increase Efficiency
Planned Project or Replacement Expected Useful Life: (Check one)
Unplanned Project or Replacement 20 or More Yrs _x 5 to 9 Years
New Project/Item (not on last year's 5-Yr. Plan) 10 to 19 Years 3 to 4 Years
Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
Will Reduce Cost by $ Will Produce Addl Revenue by $
x No Impact x Revenue Neutral (no impact)
Will Increase Cost by $ _ Will Decrease Revenue by $
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
FORM B FISCAL 2009Source page 22
Raynham, MA 02767
IFi
Networking Solutions
0011189 877-329-0434
Version: '1
_Prepared By.
reparedlor„
Patrick Donlan
anton Public Schools Phone: 508-597-8080
like Wentland Email: pdonlan@unsitsupPort.com
30 Washington Street
anton, MA 02021
hone: 7818215060
mail: wentlandm@cantonma.org
• ..;"1,.,
g ' '-`" •":
;;q1.i'l'A" vr.,- ..,41Y --,!•- I. •. i`f ,
. e.Ei e
'.?,-
ork ind a enig , ,,,
.5 0. I, . 4 '
34 $62,867.70
, , . a witc .
5 $5,532.76
4. . . = ,wi. „c
$188 55 41 $7,730.55
,X121 10 SFP.' . i.atidbeiVtOr ,a.--
.
-
$5,669.5.6 1 $5,669.55
HP 8212 zl Switch with Premium Software
$2,699.55 1 $2,699.55
HP E8200 zl Management Module (Redundant)
$1,754.55 2 $3,509.10
HP 24-port SFP v2 zl Module
$1,484.55 6 $8,907.30
HP 24-port Gig-T v2 zl Module
$395.55 4 $1,582.20
• HP 875 W zl Power Supply
$404.55 8 $3,236.40
- HP X121 1G SFP LC LX Transceiver
$3,509.55 1 $3,509.55
HP 5406-48G zi Switch
$1,754.55 1 $1,754.55
HP 12-port Gig-T PoE+/12-port SFP v2 zl Module
$899.55 1 $899.55
HP zl Power Supply Shelf
Networking Materials Subtotal $107,898.75
ft1.19s
$107,898.75
Aworking Materials $1-,01141.<
h.. ft a!t•,. 14,4w- .
11124$4.
.. Mit -- eAt4.1-0Wg ,
Apiogip,
em
rt, L'•
e,4•441.1t
5}. e+ • -• .th
liggitjlet* 4 .4"*""':°. " me-tirt-NAINA?;:tiVe$44104144.P4a,Iii.W.0 104.:3•P
t'APC
14N4tstilt.':.%1W-C • t.),
xes, shipping, handling and otherfees may apply. We reserve the right to cancel orders arising from pricing or other errors.
Date
q's
r •'; .• • ti
"'; 0 . •
—Source page 23
TOWN OF CANTON
FORM 13 - FISCAL 2014
CAPITAL PRO3ECT / EQUIPMENT REQUEST
DEPARTMENT: SUBMITTED BY:
Technology Mike Wentland
PROJECT / EQUIPMENT TITLE:
NetApp Storage
TOTAL PROJECT / EQUIPMENT COST:
$22,500
DESCRIPTION:
Increase NetApp Storage Array
PURPOSE AND JUSTIFICATION:
Adding more clients to the Citrix requires more disk space to build Virtual Servers for XenApp to
)mmodate.
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking: (Check one)
Required for Safety x Top Moderate
Required by Law or Mandate High Lowest
Improve/Expand Service or Increase Efficiency
x Planned Project or Replacement • Expected Useful Life: (Check one)
Unplanned Project or Replacement 20 or More Yrs x 5 to 9 Years
New Project/Item (not on last year's 5-Yr. Plan) 10 to 19 Years 3 to 4 Years
Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
Will Reduce Cost by $ Will Produce Addl Revenue by $
x No Impact x Revenue Neutral (no impact)
Will Increase Cost by $ Will Decrease Revenue by $
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)Source page 24
Bill To 01111p Iv (1.1LIPLCII.ISJI I r-cLuc I /B
CANTON PUBLIC SCHOOLS CANTON F 'C SCHOOLS Quotation #: 2142911
960 WASHINGTON STREET Quotation Date: 1019I12-
Expiration Date: 11118112
CANTON MA 02021
ePlus Client Reference:
Quotation ATTN: ACCOUNTS PAYABLE Account Rep: G HASTINGS
Qty 'P'art Number MFG Name Description Onit Price Extended Pri
12 X290A-R5 NETAPP DISK DRIVE, 600GB 16K 3G SAS FAS2XXX 1 1,706.13 20,461
ePlus offersfiexible and easy leasing options for your IT equipment. Use leasing to increase your IT acquisition capability, overcome limited budgets, and manage the lifecycle of :Your assets. Contact an e
• Leasin • Coordinator at 1-703-984-8021 or leasin• • e • lus.com to receive a lease uote toda
, Unless Bill-To company is
Thank youi for your inquiry. Please note the following about this quotation: It will expire on the date stated above. Unless freight amount is indicated, or is zero, freight will be added to the invoice.
exempt froiri Sales Tax, it will be added to the invoice. Extended Warranties and Professional Services are available.
Customer Acceptance To Place An Order, Please Contact:
SubTotal: $20,41
Signature: Date: Sales: Melissa Penhale
Tax: TBD if Applio
Name: PO #: Phone: 610-495-1231
Freight:
Title: Ship VIA: Fax: 781-615-1401
This quotatdon is confidential for your internal use only.
email: mpenhale@eplus.com
This is a solicitation for an offer and is subject to credit approval. No contract is formed unless a
purchase order or other offer is received and accepted by our office. If you accept this quotation Address: 690 Canton St Ste.214, Westwood MA 02090
Total: $20,41
with the intent to have your chosen leasing company to pay the costs directly, please note that if the
Lessor does not pay ePlus for any reason, you will be responsible for payment to ePlus.
ti/if /TvSource page 25
• ------ --
_ ____. „-...... . ..__. . ._ _ _ .
.. „. ..._ .. •
--- • ------ - ----- TOWN SF CANTON
F Ritil FISCAL 1014 i
1■
CAPITAL PROJECT / EQUX' MENT REQUEST
-- - —
SUBMITTED BY:
DEPARTMENT:
Mike Wentland
Technology
PROJECT / EQUIPMENT TITLE:
District Classroom Printers
TOTAL PROJECT / EQUIPMENT COST:
$19 995
' DESCRIPTION:
Replace local Ink Printers with Network Laser Printers
CHS=- 25, GMS=25, Elementary Grades 3,4 and 5 30 each school, Rodman 15
Total = 155 Printers ,
PURPOSE AND JUSTIFICATION:
Grades 3,4,&5 now have 4 workstation areas that were deployed last year. Now we want to outfit each
'3room with network laser printers as well as all the other classrooms that are using inkjet printers
,
vvigith are not cost effective, and are failing
Departmental Priority Ranking:: (Check one)
NEED CLASSIFICATION: (Check all that apply)
x Top Moderate
Required for Safety
High Lowest
Required by Law or Mandate
Improve/Expand Service or Increase Efficiency
Expected Useful Life: (Check ne)
x Planned Project or Replacement
20 or More Yrs x 5 to 9 Years
Unplanned Project or Replacement
10 to 19 Years 3 to 4 Years
New Project/Item (not on last year's 5-Yr. Plan)
Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
Will Produce Addle Revenue by $
Will Reduce Cost by $
x Revenue Neutral (no impact)
x No Impact
Will Decrease Revenue by $.
—
Will Increase Cost by $
----- -
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
_ _, z-_ - •_____Source page 26
I ayout'?
_ ..
0,
1:70.r.f
NLINE PRICE QUOTATION Quote Name: Canton Printer Quote
Quote Number: 8050966
Today's Date : 10/1/2012 7:03:17 Quote Created Date : 9/28/2012 3:27:37 PM
PM Contract: MA - COMMONWEALTH OF MASSACHUSETTS.
Created By: (1/VSCA/NASPO) (ITC44)
pdonlan@unsitsupport.com
Product availability and product discontinuation are subject to change without notice. The prices in this quotation
are valid for 30 days from quote date above. Please include the quote number and contract from this quote on the
corresponding purchase order.
part no unit price qty ext price
items/description
Base $129.00 1 $129.00
HP LaserJet Pr P1102w Printer
CE658A#BGJ
HP LaserJet Pro P1102w Printer
Included
Yes
,HP LaserJet Pro 1102w Printer; Included
introductory HP Black LaserJet Toner
cartridge (-1600 pages); power cord;
Printer documentation and software on
CD-ROM; Getting Started guide, Support
flyer, Installation guide, Warranty guide;
USB cable (AP only)
No, please purchase USB cable Included
separately
Included
Up to 19 ppm
Manual (driver support provided) Included
Up to 5,000 pages per month Included
One (1) (plus 10-sheet priority feed slot) / Included
One (1) (plus 10-sheet priority feed slot)
Up to 160 sheets! Up to 160 sheets Included
Up to 100 sheets! Up to 100 sheets Included
Letter, legal, executive, postcards, Included
envelopes (No. 10, Monarch)
Included
8 MB/8 MB
Included
None
Hi-Speed USB 2.0; VViFi 802.1113/gin Included
Up to 600 x 600 x 2 dpi (1200 dpi effective Included
output) -
Microsoft® Windows® 7 (32-bit/64-bit), Included
• file://CAUsers\wentlanclm\AppData\Localgemp\fcctemp\tmpQuote8050966.htm
10/1/2012Source page 27
TOWN OF CANTON .
F ei ° M B — FISCAL 2014
,
CAPITAL PROJECT / EQUIPMENT REQUEST
SUBMITTED BY: .
DEPARTMENT:
Mike Wentland
Technology •
•
PROJECT / EQUIPMENT TITLE: .
HS Eit MS Wireless Build
.
TOTAL PROJECT / EQUIPMENT COST:
$50,555
,
DESCRIPTION:
Build out wireless access throughout High School and Middle School
•
•
PURPOSE AND JUSTIFICATION:
Wireless will be the key connectivity component for BYOD
Departmental Priority Ranking: (Check one)
NEED CLASSIFICATION: (Check all that apply)
x Top Moderate .
Required for Safety
High Lowest
Required by Law or Mandate
Improve/Expand Service or Increase Efficiency
Expected Useful Life: (Check one)
x Planned Project or Replacement
Unplanned. Project or Replacement 20 or More Yrs x 5 to 9 Years
New Project/Item (not on last year's 5-Yr. Plan) 10 to 19 Years 3 to 4 Years
Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
Will Produce Addl Revenue by $ .
Will Reduce Cost by $
x Revenue Neutral (no impact)
_ No Impact
x •
Will Increase Cost by $ _Will Decrease Revenue by $
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
$42,000 - Hardware x 10% Installation $4,200Source page 28
S. Easton, MA 02375
FAX: 508-238-1146
ITC47 MA Certified
Statement of Work
Wireless Network Installation
Canton High School and Galvin Middle School
Canton Punt Schools
lvi kis Wantland
(508)802-7415
HUB Technical Contacts:
Nccount Executive: Ed Zak
Phone: 508-238-9887 EXT: 4211
Email: Ezak@hubtechnicalcom
Engineer: Ryan Bates
Email: rbates@hubtechnical.com
Date: 10/25/12
WO#: 61701
Revision*
Confidentiality Notice
The material contained in this document is the property of HUB Technical Services LLC. and is intended only for the person or
entity to which it is addressed and may contain confidential and/or privileged material. Any review, retransmission,
dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the
intended recipient is prohibited without prior permission from HUB Technical Services LLC., 44 Norfolk Ave, South Easton,
MA02375. All Trademarks and Registered Trademarks referenced herein are the property of their respective holders.
ware.Source page 29
S. Easton, MA 02375
FAX: 508-238-1146
ITC47 MA State Certified
Table of Contents
2
Project Details
2
Project Overview
S 2
Scope of Work
3
Project Type
Project Timeline 3
3
Project Milestones
3
Project Documents
Assumptions 4
Appendix 6
Materials and Pricing 6
7
Statement of Work Acceptance
Payment Schedule Acceptance 8
t erms, Conditions, and Procedures 9
Change of Scope Procedures 10
General Terms 10
Payment Terms 5
10
Terms of Sales for Professional Services 11
Terms of Sales for Tangible Products 12
12
Returns
INIT:
1Source page 30
S. Easton, MA 02375
FAX: 508-238-1146
ITC47 MA State Certified
Project If
Project Overview:
Canton Public Schools has asked HUB Technical Services to provide a solution that will
allow for total wireless coverage for Canton High School and the Galvin Middle School.
HUB Technical will perform the following:
O Run Ethernet cables for all access points quoted.
O Install Power-over-Ethernet (PoE) switches in each IDF:
O Physically mount wireless access points throughout both schools to provide
coverage.
O Configure Ruckus ZoneDirector 3050 for management of all wireless access
points throughout the district.
Scope of Work:
1. Pre-Installation Phase
a. Meet with Canton Public Schools technical staff to determine project phasing and
available installation dates.
b. Obtain IP addresses for ZoneDirector appliance and all PoE switches.
c. Receive and inventory all hardware at HUB Technical Services warehouse.
d. Configure ZoneDirector appliance at HUB Technical Warehouse.
e. Configure DHCP scopes for wireless access points.
2. Physical Installation — High School
a. Run Ethernet cables for all wireless access points in pre-designated areas.
b. Mount all wireless access points.
c. Mount all PoE switches and ZoneDirector appliance.
3. Physical Installation — Galvin School
a. Run Ethernet cables for all wireless access points in pre-designated areas.
b. Mount all wireless access points.
c. Mount all PoE switches.
4. Test wireless signal coverage throughout schools.
5. Provide overview of basic administration of ZoneDirector appliance to Canton Public
Schools technical staff.
2Source page 31
S. Easton, MA 02375
FAX : 508-238-1146
ITC47 MA State Certified
Project Type:
HUB Technical has proposed a fixed price based upon the scope of work detailed within this
proposal. Should there be any additional labor or parts required not included in this
SOW, a "Change of Scope" SOW will be generated.
Project Timeline:
To be determined by client and HUB Technical
Project Milestones:
1. Project manager assigned and project plan signed by customer.
2. Hardware received and inventoried.
3. Cables installed and APs mounted.
4. Switches and ZoneDirector installed
5. Wireless network tested.
6. Administrative training provided.
.4oject Documents:
IP Addresses for all network devices.
AP location maps for each school.
3Source page 32
S. Easton, MA 02375
FAX: 508-238-1146
ITC47 MA State Certified
ssum pti ons
HUB Technical is solely responsible for items listed in the scope section of this statement of
work. Any additional requests not listed in that section will incur a change of scope and will be
billed per change of scope procedures listed below. Items listed in this section are a courtesy
summary of tasks that the Client may need to perform for successful completion of the project.
1. The Customer shall designate a point of contact for all project
communications who has the authority to act on all aspects of this project.
2. The Customer shall arrange for site access for HUB Technical Services
installation personnel according to the agreed schedule. This will include
arranging for afterhours access (as needed and agreed upon), access
badges, security escorts, or other arrangements in accordance with the
Customer's corporate security policies.
3. As needed, the Customer shall provide coordination between HUB
Technical Services and any 3rd party vendors.
4. Hub Technical is not responsible for any hardware required for installation
in non-standard configurations (server racks, network racks, etc.) that do
not meet current ANSII specifications.
5. During the implementation of the proposed project the customer will discuss
any modifications to the existing network / infrastructure with HUB Technical
before implementing them.
6. HUB Technical Services has not performed a wireless site survey for
Canton Public Schools and therefore cannot guarantee coverage
unless a full wireless site survey is performed to determine additional
information such as Signal-to-Noise ratio, RF interference, and
attenuation barriers. A wireless site survey will help determine access
point placement and quality.
7. This SOW is to be performed during normal business hours of 8:30 AM to
5:30 PM, Monday through Friday.
INIT:
4Source page 33
S. Easton, MA 02375
FAX: 508-238-1146
ITC47 MA State Certified
8. The customer is responsible for all network cables not listed in the
appendix.
9. There must be appropriate power available in each switch closet to
accommodate the PoE switches or power injectors.
10.The customer is responsible for the configuration of all devices connecting
to the wireless network. This includes laptops, desktops, notebooks, and/or
all handheld devices.
11.This SOW only contains creating the SSID and assigning the appropriate
encryption keys, NOT 802.1X, MAC, or Web Authentication. If configuration
is desired, a change of scope will be created for the additional time and
materials.
12.An item has been added to the appendix to expand the support of the
ZoneFlex 3050 to allow for control of the APs in the other schools.
NIT:
5Source page 34
S. Easton, MA 02375
FAX: 508-238-1146
ITC47 MA State Certified
ppencnx
Materials and Pricing:
Part # Price Ext. Price
PC Qty
rexlv
'91
E-7,41
:41.9.1 114.. tisA
opw. VaiRea.4.,
ZOneFlex dual-band (5 GHz and 2.4 GHz
33 — concurrent) 802.11n Wireless Access 901-7982-US00 $ 615.00 $ 4,920.00
8 Point, 19-element smart antenna, dual
25 =
ports, PoE support.
J9625A $ 995.00 $ 5,970.00
6 HP Procuive 2620-24-P0E+ Switch
$0.00 $0.00
ZoneDirector 3000, licensed for up to 50
ZoneFlex Access Points. ZD3000 can be 901-3050-US00
2 0 upgraded to support up to 500 APs with
AP license upgrades.
904-3050-0002 $0.00 $0.00
2 0 Premium Support for ZoneDirector 3050
$ 2,795.00 $ 2,795.00
License ( upgrade license ) - 50 access 909-0050-ZDOO
1 points
$ 395.00 $ 395.00
PREMIUM SUPPORT FOR 904-0050-0ZD2
1 ZONEDIRECTOR 50 F.WaSigg.71,
!:-7av cf." .57.,WWW
snxmirv-
.At.*;5.,-0
ositv ,,A1-gr .31Mq.:Ar2g,MlfpralpsiMP, itrAggf:WMW- 03P.it10,3*-Z.5:W,f,
vgfavol ■ 1144.4s
td.ga..1;41-t&g: • -.4t•Msti ii,T.W..,5:KalWA;ArifitagMazAkfa
dkil,
ZoneFlex dual-band (5 GHz and 2.4 GHz
$ 615.00 $ 15,990.00
concurrent) 802.11n Wireless Access 901-7982-US00
26 Point, 19-element smart antenna, dual
ports, PoE support.
J9625A $ 995.00 $ 2,985.00
3 HP Procurve 2620-24-P0E+ Switch
J9407B $ 55.00 $ 165.00
3 HP Power Injectors
HUB Cabling $12,685.00 $12,685.00
1 Cabling
HUB-TRV
Travel
HUB-INST $ 4,650.00 $ 4,650.00
1 Installation and Configuration
HUB-PRM Included
1 Project Management
HUB-DOC Included
1 Documentation / Training
Quotation Valid for Thirty (30) Days Total $ 50,555.00
Tax, Freight, insurance, Delivery, Setup
Fees, Cabling and Cabling Services Not
Included unless otherwise noted. Not
responsible for mathematical errors. Fixed
priced projects are invoiced in full and are
not eligible for labor rebate.
INIT:
6Source page 35
-.----- • ^
• • -•_ ---••
• •• • • ■
- • _ • --• ••• ■
•___ • • __•-
-• _
—' FISCAL' 2,0I4".' • 1-
PIT 11‘ L 03ECT EQUIPM ENT sEQUEST
DEPARTMENT: SUBMITTED BY:
Technology Mike Wentland
PROJECT / EQUIPMENT TITLE:
CHS Art Lab Computer Upgrade
TOTAL PROJECT I EQUIPMENT COST:
04,500
DESCRIPTION:
Upgrade the 9 year old art lab computers
PURPOSE AN JUSTIFICATION:
The newer Adobe application require more robust computer systems to run the programs. Will increase
tionality and productivity.
NEE CLASSIFICATION; (Check all that apply) Deoartmental Priority Rankinu: (Check one)
Required for Safety Top Moderate
Required by Law or Mandate High Lowest
Improve/Expand Service or Increase Efficiency
-x Planned Project or Replacement lExnected Useful Lifeg (Check one)
Unplanned Project or Replacement 20 or More Yrs x 5 to 9 Years
New Project/Item (not on last year's 5-Yr. Plan) 10 to 19 Years 3 to 4 Years
Impact to Dept. Operatino Budoet: (Check one) evenue Impact: (Check one) •
Will Reduce Cost by $ Will Produce Addl Revenue by $
x No Impact x Revenue Neutral (no impact)
Will Increase Cost by $ Will Decrease Revenue by $
OTHER COMMENTS OR INFORMATION; (Attach supporting documentation)
Ffid -Source page 36
641 Kaynnam, !VIA unit
(0.27 111–I ti) 877-329-0434
--Networking_Solutio.ns _
• en,.,•,•-•,1-••••-• •• • -4,1,• I' '
Prepared For_ _ _ Prepared_ By
Canton Public Schools Brian McDonald
Mike Wentland -Phone: 508-272-1650
960 Washington Street Email: bmcdonald@unsitsupport.com
Canton, MA 02021
Phone: 7818215060
Email: wentlandm@cantonma.org
-41aiP- ia/
HP Business Desktop Pro 4300 Computer
- Intel Core 13 i3-2120 3.3GHz
- Small Form Factor
-4 GB RAM
- 500 GB HDD
- DVD-Writer
- Intel HD 2000 Graphics Card
- Genuine Windows 7 Professional
,, DisplayPort
DVI
HP 4300 Subtotal $1,167.08
-1
"rr:RXN1,41,, 7*,
1P4300 $1,157.08
)ubotota!
ax
—47—r-
'hIPP11,19
'iota!
axes, shipping, handling and other fees may apply. We reserve the right to cancel orders arising from pricing or other errors.
iignature Date
X- 2F
cd-127c
J.T4
e-`47-1Pft.--TAYttvAlAdi
'' ) To v. °Source page 37
AbiAtiCiti#•tA': YON
• FRM B FISCAL 2014
PETAL ROJECT / EQUIPMENT REQUEST
DEPART ENT: SUBMITTED BY:
Technology Mike Wentland
PRO3ECT / EO IPMENT TITLE:
Adobe Illustrator and PhotoShop Upgrade
TOTAL P 03ECT / EQUIPMENT COST:
$10,306
ESC IPTION:
Upgrade CHS Art lab to latest version of Adobe Illustrator and PhotoShop
PURPOSE A D 3USTIFICA TI
Joyce Stenmon writes:
tl
'- nk that we should go ahead with the Adobe photoshop and Illustrator upgrades as you specified "so
L .students would gain the most up to date experience with current technology used by art
professionals". It's been a few years since we upgraded... I think the newest version of Photoshop is
CS6. We currently have CS3, and I see in your technology proposal that you are requesting Art Lab
Re s lacement Corn suters for FY 2014 - so I do believe we should so with the corn slete acka e."
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Rankino: (Check one)
Required for Safety Top Moderate
Required by Law or Mandate x High Lowest
Improve/Expand Service or Increase Efficiency
x Planned Project or Replacement Expected Useful Life: (Check one)
Unplanned Project or Replacement 20 or More Yrs 5 to 9 Years
' New Project/Item (not on last year's 5-Yr. Plan) 10 to 19 Years x 3 to 4 Years
Impact to Dept. Operatino Budget: (Check one) Revenue Impact: (Check one)
Will Reduce Cost by $ Will Produce Addl Revenue by $
x No Impact x Revenue Neutral (no impact)
Will Increase Cost by $ Will Decrease Revenue by $
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)Source page 38
QL1 I V TION
QUOTE #: 634114761
Customer #: 98601610
Contract #: 10ACV
CustomerAgreement #: ITS 42
Quote Date: 10/10/12
Date: 10/10112 9:11:05 PM Customer Name: MA-K CANTON PUBLIC SCHOOLS
TOTAL QUOTE AMOUNT: $10,306.00
Product Subtotal: $10,306.00
Tax: $0.00
Shipping & Handling: $0.00
Shipping Method: Ground Total Number of System Groups:
—
SOFTWARE & ACCESSORIES
Product Quantity Unit Price Total
VL filt-sidttistii,q,yepRgli.NIYEq0kg,00001,:(Aq0,4044), '25' - .- . .siit2 '..cidtti
ELECTRONIC LICENSE CONFIRMATION elec dwnld only (A3458532) i Vi.(i'd ' lifAio
Number of S & A Items: 2 .S4A.1.6.t 1 Arnou*S1066;00.
SALES REP: dan myers PHONE: 888-977-3355
Email Address: charles_myers@dell.com Phone Ext: 7250403
Please review this quote carefully. You may order online by signing into Premier at www.premier.dell.corn. Click
on the eQuotes link. To order without Premier, go to wunu.dell.comicito.
If you do not have a separate agreement with Dell that applies to your order, please refer to
www.dell.corn/terms as follows:
If purchasing for your internal use, your order will be subject to Dell's Terms and Conditions of
If purchasing
Sale-Direct including Dell's U.S. Return Policy, at www.dell.com/returnpolicv#total.
for resale, your order will be subject to Dell's Terms and Condition of Sale for Persons or Entities
Purchasing to Resell, and other terms of Dell's PartnerDirect program at www.dell.com/partner.
If your order includes services, visit www.dell.com/servicecontracts for service descriptions
and terms.
Quote information is valid for U.S. customers and U.S. addresses only, and is subject to change.
Sales tax on products shipped is based on "Ship To" address, and for downloads is based on
"Bill To" address. Please indicate any tax-exempt status on your PO, and fax your exemption
certificate with seller listed as Dell Marketing LP, to Dell's Tax Department at 800-433-9023.
Please in clude your Customer Number.
For certain products shipped to end-users in California, a State Environmental Fee will be applied.
or Asset Recovery/Recycling Services, visit wvvvv.dell.com/assetrecoverv.
file://CAUsers\wentlandrn\AppDataTocanemp\fectemp\Quote_634114761.html 10/11/2012Source page 39
OF-CANTO - _ __..„. „
-- TOW .
OistAL-i614 .- ' ' .
CART L PROJECT / EQ !MONT REQUEST
SUBMITTED BY:
DEPARTMENT:
Mike Wentland
Technology
PROJECT / EQUIPMENT TITLE:
Rodman Security Additions
_
TOTAL PROJECT / EQUIPMENT COST:
071575
, ESCRIPTION:
Addition 3rd floor security cameras (CHARMS) Floor, Additional exterior building cameras, and relocation
of several existing cameras 1
I
1
PURP SE AN JUSTIFICATION:
There are currently no exterior cameras in the areas of Pre-School arrival and pickup zones. I
're are no cameras of the playground area where the children have to cross to enter. i
1..,ed floor has no cameras, after school and weekend programs utilize the Rodman gym and if something I
were to happen We would not have the coverage up there. Gym and gym entrance and do not have ,I
proper coverage, this is the area for Cole Harrington and CHARMS arrival and pickup zones. I
Departmental Priority Ranking: (Check one)
NEED CLASSIFICATION: (Check all that apply)
Moderate
Required for Safety _ Top
x High Lowest
Required by Law or Mandate
_
Improve/Expand Service or Increase Efficiency
Expected Useful Life: (Check one)
Planned Project or Replacement
x Unplanned Project or Replacement 20 or More Yrs x 5 to 9 Years
10 to 19 Years 3 to 4 Years
New Project/Item (not on last year's 5-Yr. Plan)
Impact to Dept Operating Budget: (Check one) Revenue Impact: (Check one)
Will Produce Addl Revenue by $
_ Will Reduce Cost by $ x Revenue Neutral (no impact)
x No Impact
Will Decrease Revenue by $
Will Increase Cost by $
____
(Attach supporting documentation)
OTHER COMMENTS OR INFORMATION:Source page 40
_
it0111111U k1.11111.11%,
efailMr4TMICY
i'ia-'44!)-ArfirinwsCaqiffW
11.7 Was °igton St, Rt. 1
,
labrirille -MA -02762 • • -••• . ••••
ww.belpinexo IIi
DP '19-0300 P 508-699-5637 F
-9■ ocapinc.co INC.
'ww.facebook.comihelphlic . 'ELECTRONIC SECOMMf SIOUrflOPIS NINUMEMBIUMMINS
Ship To
NAME / ADDRESS
Administration Building
Canton Public Schools
960 Washington Street
Attn: Business Administrator
Canton, MA 02021
960 Washington Street
Canton, MA 02021
Net 30 CAC Additional Cameras
10/10/2012
DESCRIPTION QTY
ITEM
SUPPLY AND INSTALL THE FOLLOWING:Add Additional 11 Cameras in the
NOTES
following places:
* Main Level:
>Interior Vandal Dome at Gym Area Entrance
>Interior Vandal Dome at Left Side Interior Stairwell
>Interior 'WDR Vandal Dome Looking at Main Entrance Doors
* Upper Level:
>Interior Vandal Dome at left end of Hallway (Near RM31)
>Interior Vandal Dome at right end of Hallway (Near RM39
* Lower Level:
> Interior Vandal Dome at Left Far Hall looking at Elevators
> Interior Vandal Dome outside RM510 looking at Stairwell
> Interior WDR Vandal Dome At Middle Entrance Reader Looking at Outside Doors
> Move Existing Reader Camera to opposite side to look at reader doors
> Interior WDR Vandal Dome in Stairwell looking at Right Side Exit Doors
*Exterior Cameras
> Exterior camera off Right Rear Gym Corner for view of Parking Area
> Exterior CameraNear Middle Rear Entry Way looking at Walkway
> Move Existing Exterior camera at Middle Rear Door to other side
*Add New 16 Ch DVR for New Cameras
Please Provide Purchase Order Sub Total
Date:
Sales Tax (0.0%)
Acceptance of Proposal.
Because of Changing Market Pricing for copper, wire pricing may be changed to reflect
these new higher prices. Please note this price does not include permit fees unless noted on
TOTAL
estimate. Estimate Valid for 30 Days.