FY 2014 CAPITAL BUDGET PRIORITY SUMMARY rev 12 13 12 (prioritized)


                                                       (1)          (2)      (3)     (4)        (5)        TOTAL
CASH CAPITAL
Building Repairs/                   $311,338 $118,372               $0 $17,779       $0    $175,187      $311,338
Improvements

Grounds Improvement                   $24,210    $16,000            $0       $0      $0      $8,210       $24,210

Technology                          $433,638     $17,575        $95,356 $48,500 $140,800   $131,407      $433,638

Program Improvement                  $492,156          $0 $115,915           $0      $0    $376,241      $492,156

Furniture & Fixtures                  $75,855          $0                 $5,503      $0    $70,352       $75,855

Vehicle Replacement                   $37,900          $0           $0       $0       $0    $37,900        $37,900

Extraordinary Maintenance             $90,393      $8,000           12       12      12     $82,393        $90,393

TOTAL CASH CAPITAL                 $1,465,490 $159,947 $211,271 $71,782 $140,800           $881,690    $1,465,490

TOTAL OF PRIORITIES 1,2,3            $443,000
TARGET                               $443,000




LONG TERM DEBT
Bldg. Improvements                 $1,386,075              $0       $0                $0         $0                $0

TOTAL OF PRIORITIES 1,2,3                  $0 to be determined
TARGET                               $112,000

(1) Safety, health,environmental or mandated issues
(2) Critical to instructional program
(3) Critical to non-instructional program
(4) Possible eligibility for Building IMP/Long term debt
(5) Important but not critical




                                                                                                      12/26/2012

Source page 2

FY 2014 CAPITAL BUDGET REQUESTS
                BUILDING REPAIRS/IMPROVEMENTS (CASH)

HANSEN
 Bathroom partitions                           1   $19,372



SYSTEMWIDE
 HVAC                                          1   $99,000
 Hot water pump motor replacement-GMS          3   $17,779
    (fund from leftover capital-$17,221)

  GRAND TOTAL BUILDING REPAIRS/IMPROVEMENTS                  $136,151


                             GROUNDS IMPROVEMENT

  Hansen School retaining wall repairs         1              $16,000

  GRAND TOTAL GROUNDS /IMPROVEMENTS                           $16,000




12/26/2012

Source page 3

TOWN OF CANTON
                                     FORM - FISCAL 2014
                       CAPITAL PR 3ECT / EQUIPMENT EQUEST

 DEPARTMENT:                                              SUBMITTED BY:
                  Hansen School                                      Brian Lynch



 PROJECT / EQUIPMENT TITLE:
                                         Bathroom partitions



 TOTAL PROJECT / EQUIPMENT COST:
                                                $19,372


  DESCRIPTION:
Install new solid phenolic floor mounted overhead braced partitions.




 PURPOSE AND JUSTIFICATION:
The original metal partitions are falling apart)and are in poor condition. This is a safety




 NEED CLASSIFICATION: (Check all that apply)            Departmental Priority Ranking:
  x Required for Safety                                   Please rank this request out of your total
     Required by Law or Mandate                           requests for this year: (#1 as top priority)
     Improve/Expand Service or Increase Efficiency          (#) OF                    (#)

     Planned Project or Replacement                     Expected Useful Life: (Check one)
     Unplanned Project or Replacement                   x20 or More Yrs         5 to 9 Years
     New Project/Item (not on last year's 5-Yr. Plan)     10 to 19 Years        3 to 4 Years


 Impact to Dept. Operating Budget: (Check one)          Revenue Impact: (Check one)
     Will Reduce Cost by $                                Will Produce Addl Revenue by $
     No Impact                                            Revenue Neutral (no impact)
     Will Increase Cost by $                              Will Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

Source page 4

New England School Services, Inc.
 98 Hicks Avenue
                                                                         QUOTAT1
                                                                         Quote Number: Hansen partitions
-Medford, MA 02155                                                       Quote Date:   Nov 2, 2012
                                                                         Page:         1

Voice: 617-776-4700
Fax:    781-396-8088




                                                             7-ART:tip


  Canton Public Schools                               960 Washington Street
  960 Washington Street                               Canton, MA 02021
  Canton, MA 02021




                              12/V12                    Net 30 Da s                            HINGWAYN
                               VrAIN                                        Ira&
                                Hansen Elementary School - Remove and dispose of existing partitons. Install new solid
                                 phenolic floor mounted overhead braced partitions in the following
                                 These partitions have been quoted individually for your review.
         2.00                    Boys rooms upper and lowerrs) each restroom
         1.00                    Girls and boys room upper floor




       Doors                                                                                               14,741.50
        Door Hardware                                                           Subtotal
        Restroom Partitions                                                     Sales Tax
         Access Control                                                         Freight

Source page 5

New England School Services9 Inc.
98 Hicks Avenue
                                                                     QUOTATION
                                                                     Quote Number: Hansen partitions
Medford, MA 02155                                                    Quote Date:   Aug 8, 2012
                                                                     Page:         1

ooice: 61.7-776-4700
Fax:    781-396-8088




 Canton Public Schools
 960 Washington Street
 Canton, MA 02021




                                                   : ,N6130.1)6 e-

                             Hansen Elenietitary Schbol -'Remove and dispose of'existing partitons. Install new solid
                             phenolic floor mounted overhead braced partitions in the following
                             These partitions have been quoted individually for your review.
        2.00                 Boys rooms upper and lowerrs) each restroom




      Doors
       Door Hardware
       Restroom Partitions
        Access Control

Source page 6

TOWN OF CANTON
                                    FORM - FISCAL 2014
                          CAPIT L PROJECT / EQUIPMENT REQUEST

 DEPARTMENT:                                              SUBMITTED BY:
Facilities-all schools                                    Ken Leon/Brian Lynch •


 PROJECT! E13U1PMENT TITLE'
 Cash Capital - Heating, ventilation, air, circulation (HVAC) per ten year capital plan


 TOTAL PROJECT / EQUIPMENT COST:
                                                $99,000

 DESCRIPTION:
Continuation of ten year plan

                                                  -



   PURPOSE AND JUSTIFICATION:                                              •
Implementation proactive preventative maintenance systems for all locations and fund small
HVAC,upgrades and technician within this allocation. This will update equipment/systems;
 \
 mprove energy efficiency; expand life expectancy of existing equipment.


                                       - --- ---- -

 NEED CLASSIFICATION: (Check all that apply)            Departmental Priority Ranking:
  x Required for Safety                                     Please rank this request out of your total
  x Required by Law or Mandate                              requests for this year: (#1 as top priority)
  x Improve/Expand Service or Increase Efficiency                     (#) OF                 (#)

     Planned Project or Replacement                     Expected Useful Life: (Check one)
     Unplanned Project or Replacement                   x 20 or More Yrs      5 to 9 Years
     New Project/Item (not on last year's 5-Yr. Plan)   x 10 to 19 Years      3 to 4 Years


 Impact to Dept. Operating Budget: (Check one)          Revenue Impact: (Check one)
     Will Reduce Cost by $                                  Will Produce Addl Revenue by $
     No Impact                                              Revenue Neutral (no impact)
 —   Will Increase Cost by $                            —   Will Decrease Revenue by $


  OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)




   FORM,B - FISCAL 2014

Source page 7

TEN YEAR REPLACEMENT/REPAIR BUDGET PROJECTION
                                                                                                                       Replacement Schedule Codes
     Property Name: HIGH SCHOOL                                                                                              1 100%    in 1 yr ovr 5 yr
                Date:  2/3/2010                                                                                              2 50%     ovr 2 • ovr 10yr
 Age Of Facility (Yrs)     6                       11/1/2012                                                                 3 33.3% ovr 3 ovr 20yr
                                                                                                                             4 25%      ovr 4 other




                                                                Total Cost       Age       AV§              Replacement years              R/S 1      Year         I   Year          Year        Year           Year
                 Replacement               Qty   Unit Cost
Item                                                                                       Life                       Later                Type l     2014         I   2015          2016        2017           2018
                     Item                                        2010$           Now                    1st'
                                                                                                                                                 ll
                                                                                                       2011     2015      2019     2023      3            $3,846         $3,846        $3,846         $3,846      $3,846
 1     Maintain Boilers                    3          $1,282           $3,846      5              4
                                                                                                  1    2011     2012      2013      2014     1            $1,950         $1,950        $1,950     .   $1,950
                                                                                                                                                                                                       :• •       $1,950
 2     Adjust Bumers                       3            $650           $1,950      1
                                                                                                                          2029               3                $0             $0             $0            $0           $0
 3     Replace DHW Generators              3          $8,450          $25,350      5              8    2013     2021                2037
                                                                                                                2029      2041      2053     2                $0             $0             $0            $0       $4,500
 4     Rebuild DHW Thermostatic            2          $4,500           $9,000          5      12       2017
                                                                                                       2020     2035      2050      2065     2                $0             $0             $0            $0           $0
 5     Rebuild/Replace Primary             2         $14,800          $29,600          5      15
                                                                                                                          2035      2045     5                $0             $0             $D            $0       $1,875
 6     Replace Secondary Circulators        5         $1,875           $9,375          5      10       2015 ,   2025
                                                                                                                2045      2065      2085     6                $0             $0             $0            $0           $0
 7     Replace Tstats                      77           $170          $13,090          5      20       2025
                                                                                                                                    2029     4            $2,000          $2,000        $2,000        $2,000       $8,450
  8    Repair Exhaust fans                 52           $650          $33,800          5       6       2011     2017      2023
                                                                                                                                    2053     4                 $0             $0            $0             $0     $35,750
  9    Replace Exhaust fans                52         $2,750         $143,000          5      12       2017     2029      2041
                                                                                                                2012       2013     2014     1            $11,042        $11,042       $11,042        $11,042     $11,042
 10    Maintain Unit Ventilators           70           $200          $14,000          5       1       2011
                                                                                                                2016       2021     2026     5                 $0             $0            $0             $0     $11,900
 11    Repair Unit Ventilators             70           $850          $59,500          5       5       2011
                                                                                                       2011     2016       2021     2026     5             $4,900         $4,900        $4,900         $4,900      $4,900
 12    Service Univent OA Damper           70           $350          $24,500          5       5
                                                                                                                                    2105     5                 $0             $0            $0             $0          $0
 13    Replace Unit Ventilators            70         $5,750         $402,500          5      25       2030     2055       2080
                                                                                                                2016       2021     2026     5             $2,860         $2,860        $2,660         $2,860      $2,860
 14    Repair Fan Coil Units               22           $650          $14,300          5       5       2011
                                                                                                                2055       2080     2105     5                 $0             $0            $0             $0          $0
 15    Replace Fan Coil Units              22         $3,250          $71,500          5      25       2030
                                                                                                                2014       2017     2020     1               $600             $0            $0             $0          $0
 16    Clean/Repair Kitchen Make-up         1           $600             $600          5       3       2011
                                                                                                                           2050     2065     1                 $0             $0            $0             $0          $0
 17    Replace Kitchen Make-up Air          1         $8,500           $8,500          5      15       2020     2035
                                                                                       5          5    2011     2016       2021     2026     3             $2,000         $2,000        $2,000         $2,000     $14,985
 18    Repair Rooftop Air Handling         18         $2,500          $45,000
                                                                                                                2045       2065     2085     3                 $0               $0          $0            $0            $0
 19     Replace Rooftop Air Handling       18          $9,500        $171,000          5          20   2025
                                                                                                       2049     2089       2129     2169     1                 $0               $0          $0            $0            $0
 20     Controls Upgrade                    1        $15,000          $15,000          1          40
                                                                                                   5   2011     2016       2021     2026     1              $500             $500        $500           $500           $500
 21     Controls Maintenance                1          $2,500          $2,500          5
                                                                                                                                                               $0               $0          $0            $0            $0
 22     Replace Unit Heater                 1          $3,500          $3,500          5          20   2025     2045       2065     2085     1
                                                                                       5          20   2025     2045       2065     2085     1                 $0               $0          $0            $0            $0
 23     Replace Fuel Oil Pumps               1         $4,500          $4,500
                                                                                                                2029       2041     2053     5                 $0               $0          $0            $0        $1,360
  24    Service Fan-powered Terminal        16           $425          $6,800          5          12   2017
                                                                                                                2016       2021     2026     3              $500             $500        $500           $500        $1,748
  25    Repair Indoor Air Handling Units     7           $750          $5,250          5           5   2011
                                                                                                                2045       2065     2085     3                 $0               $0          $0            $0            $0
 .26    Replace Indoor Air Handling          7         $7,500         $52,500          5          20   2025
                                                                                                                           2021     2026                   $2,000          $2,000       $2,000         $2,000      $13,586
 27     Repair A/C Condensing Units         17         $2,400         $40,800          5           5   2011     2016                         3
                                                                                                                2035       2050     2065     3                 $0               $0          $0             $0           $0
 28     Replace A/C Condensing Units        17         $6,500        $110,500          5          15   2020
                                                                                                                           2013     2014     1                 $0               $0          $0             $0           $0
 29     HVAC General Maintenance             1        $12,000          $12,000         5           1   2011     2012
                                                                                                                                    2014     1               $850            $850         $850          $850          $850
 30     Service Emergency Generator          1           $850            $850          5           1   2011     2012       2013
                                                                                                                                    2014     1                 $0               $0          $0             $0           $0
 31     Architect/Engineering Fees          1          $4,000           $4,000         5           1   2011     2012       2013
                                                                                                                                             1             $6,000           $6,000      $6,000         $6,000       $6,000
 32     HVAC Technician                     1          $6,000           $6,000         5           1   2011     2012       2013     2014
                                                                                                                                                               $0               $0          $0             $0           $0
 33     Contingency                         1         $10,000          $10,000         5           1   2011     2012       2013     2014     1
                                                                                                                                                          $38 448         . 38448      $38448         $38         .126102
        Total                                        $143202        $1 354 611




            FY 14 HVAC HS Spreadsheet letter B                                                                  1 of 1

Source page 8

TEN YEAR REPLACEMENT/REPAIR BUDGET PROJECTION
                                                                                                                                         Replacement Schedule Codes
                                        Date:        01-Nov 2012           revised 11/1/2012
                              Project Name:     RODMAN (HIGH SCHOOL "A" BUILDING)                                                           1         100% in 1 yr         4
                                Facility Age:   1948                                                                                        2         50% ovr 2 yr         5
                                                                                                                                            3         33% ovr 3 yr         6

                                                                                                                                                                                   Year    Year     Year      Year     Ye
                      Replacement                 Quantity                Cost per    Total Cost   Age       Avg        Replacement years                       R/S       Infl       15      16       17        18       1
Codes
 Ctgy   Item          Replacement                  Item          (unit)    Item        1998$       Now       Life         1st   Later                           Typ       Rate     2014    2015     2016      2017     201


        MECHANICAL EQUIPMENT
  1                                                      1        EA      $125,000     $125,000      49        56             7    63        119         175         1     3%        $0       $0       $0       $0       $'
         1 Replace Boiler "A"
  1      2 Blow down Steam Traps                       140        EA           $60       $8,400       0          5            5    10         15          20         5     3%        $0       $0       $0       $0       $
  1      3 Replace Univents                             25        EA        $7,500     $187,500      49        49             1    50         99         148         3     3%        $0       $0       $0       $0       $
  1       4 Recalibrate/Replace Tstats                  25        EA          $400      $10,000      12        12             1    13         25          37         3     3%     $400     $400     $400     $400     $40
  1       5 Service Emerg. Gen.                          1        EA          $250         $250       0          1            1     2          3           4         1     3%        $0       $0       $0       $0       $
  1       6    Repair/Calibrate Burner                       2    EA           $200         $400         0       1            1     2          3           4         1     3%    $1,045   $1,045   $1,045   $1,045   $1,04
  1       7    Replace DHW Boiler                            1    EA         $4,100       $4,100         2      12           10    22         34          46         1     3%        $0       $0       $0       $0       $
  1       8    Repalr/Recalibrate Controls                   1    EA          $500         $500       0       , 1             1      2            3         4        1     3%     $652     $652     $652     $652     $65
  1       9    Maintain Boilers                              2    EA         $1,282       $2,564      0          1            1      2            3         4        1     3%     $564     $564     $564     $564     $56
  1      10    Maintain Air Compressor                       1    EA         $6,000       $6,000     11         12            1     13           25        37        1     3%     $250     $250     $250     $250     $25
  1      11    Replace Fuel Oil Pumps                     1       EA         $2,500       $2,500     25         28            3     31           59        87        1     3%       $0       $0        $0      $0       $
  1      12 Relocate Rooftop AH units                    14       EA         $1,800      $25,200     49         49            1     50           99       148        2     3%       $0       $0        $0      $0        $
         13 Architect/Engineer Fees                       1       EA         $2,500       $2,500      1             1         1      2       -    3         4        1     3%       $0       $0        $0       $0       $
  1      14 HVAC technician                               1       EA         $8,000       $8,000         1          1         1      2            3         4         1    3%    $1,500   $1,500   $1,500   $1,500   $1,50
        TOTALS:                                                                         $382,914                                                                                 $4,411   $4,411   $4,411   $4,411   $4,41

        ABBREVIATIONS:
        EA=EACH LF=LINEAL FOOT LS=LUMP SUM SF=SQUARE FOOT SQ=SQUARE(100SF) SY=SQ YARD
        *NOTE: ITEMS WITH AN ASTERISK INDICATE AN AGE NOW THAT IS ESTIMATED OR MODIFIED
                TO MORE ACCURATELY REFLECT EXISTING CONDITIONS AND/OR REPLACEMENT SCHEDULE.


Major Projects in Bold

Source page 9

TEN YEAR REPLACEMENT/REPAIR BUDGET PROJECTION
                                                                                                                         Replacement Schedule Codes
                                   Date:    01-Nov 1998                 revised 1111/12
                         Project Name:     GALVIN MIDDLE SCHOOL                                                             1        100% in 1 yr         4
                           Facility Age:      1971                                                                          2        50% ovr 2 yr         5
                                                                                                                            3        33% ovr 3 yr         6

                                                                                                                                                                  Year       Year       Year        Year
                    Replacement            Quantity          Cost per    Total Cost   Age       Avg        Replacement years                   R/S       Inn        16         17         18          19
Codes
                        Item                Item    (unit)    Item        1998 $      Now       Life        1st Later                          Typ       Rate     2014       2015       2016        2017
 Ctgy Item


      MECHANICAL EQUIPMENT
                                                 2    EA      $88,500     $177,000        27      29           2    31          60       89         1     3%         $0        $0          $0          $0
  1    1 Replace Boilers
                                                 2    EA       $5,200      $10,400        27      29           2    31          60       89         2     3%         $0        $0          $0          $0
  1    2 Replace Primary Circulators
                                                55    EA       $7,500     $412,500        27      27           1    28          55       82         3     3%         $0        $0          $0          $0
  1    3 Repair Univents
       4 Recalibrate/Replace T'stats            75    EA         $200      $15,000        27      27           1    28          55       82         3     3%     $1,000    $1,000      $1,000      $1,000
  1
                                                 1    EA      $40,000      $40,000        27      29           2    31          60       89         1     3%         $0        $0          $0          $0
  1     5 Replace Emerg. Gen.
                                                 2    EA         $200         $400         0       1           1     2           3        4         1     3%     $1,045    $1,045      $1,045      $1,045   $
  1     6 Repair/Calibrate Burner
                                                 1    EA       $3,850       $3,850         3      12           9    21          33       45         1     3%         $0        $0          $0          $0
  1     7 Replace DHW Boiler
                                                 1    EA         $500         $500         0       1           1     2           3        4         1     3%       $672      $672 •      $672 -      $672
  1     8 Repair/Recalibrate Controls
                                                 2    EA       $1,282       $2,564         0       1           1     2           3        4         1     3%     $2,564    $2,564      $2,564      $2,564   $
  1     9 Maintain Boilers
                                                 3    EA         $450       $1,350         0       1           1     2           3        4         1     3%     $1,350    $1,350      $1,350      $1,350   $
  1    10 Maintain RTUs & A/C
                                                 7    EA         $200                                                                                            $1,500    $1,500      $1,500      $1,500   $
  2    11 Maintain Gym RTUs
                                                 1    EA         $250          $250       27       27           1   28          55        82         1     3%      $250      $250        $250        $250
  1    12 Maintain Air Compressor
           Replace adm office condensers                                                                                                                             $0        $0          $0          $0
                                                 2    EA       $2,500        $5,000       27       29           2   31          60        89         1     3%        $0        $0          $0          $0
  1    13 Replace Fuel Oil Pumps
       14 Maintain Rooftop Exhausts             19    EA       $1,800       $34,200       27       27           1   28          55        82         2     3%    $3,600    $3,600      $3,600      $3,600   $
  1
       15 Install HV Unit- Boiler Room           1    EA      $26,000                                                                                                $0        $0          $0          $0
       16 Architect/Engineer Fees                1    EA       $2,500        $2,500         1          1        1     2          3         4         1     3%        $0        $0          $0          $0
  1
                                                 1    EA      $15,000       $15,000         1          1        1     2          3         4         1     3%    $4,000    $4,000      $4,000      $4,000    $
  1    17 HVAC technician
                                                                           $720,514                                                                             $15,981   $15,981     $15,981     $15,981   $1
      TOTALS:
       ABBREVIATIONS:
       EA=EACH LF=LINEAL FOOT LS=LUMP SUM SF=SQUARE FOOT SQ=SQUARE(100SF) SY=SQ YARD
       *NOTE: ITEMS WITH AN ASTERISK INDICATE AN AGE NOW THAT IS ESTIMATED OR MODIFIED
               TO MORE ACCURATELY REFLECT EXISTING CONDITIONS AND/OR REPLACEMENT SCHEDULE.


Major Projects in Bold

Source page 10

TEN YEAR REPLACEMENT/REPAIR BUDGET PROJECTION
                                                                                                                                     Replacement Schedule Codes
                                     Date: revised 11/1/12
                            Project Name: LUCE SCHOOL                                                                                   1        100% in 1 yr         4
                              Facility Age: 1954; major addition, 1999                                                                  2        50% ovr 2 yr         5
                                                                                                                                        3        33% ovr 3 yr         6

                                                                                                                                                                               Year      Year      Year       Year        YeE
Codes                Replacement                Quantity                        Cost per   Total Cost   Age       Avg Replacement years                    R/S        Intl       16        17        18         19          2
 Ctgy Item               Item                    Item    (unit)                  Item       1998$       Now       Life 1st Later                           Typ       Rate      2014      2015      2016       2017        201


      MECHANICAL EQUIPMENT
                                                                                      $0          $0      27        29     2    31          60       89         1      3%         $0        $0        $0        $0          $C




                                                           TT M TW W TT M M T
  1    1 Replace Boilers                              0
  1    2 Replace Primary Circulators                  0                               $0          $0      27        29     2    31          60       89         2      3%         $0        $0        $0        p           Sc
  1    3 Replace Univents                            25                           $7,500    $187,500      27        27     1    28          55       82         3      3%         $0        $0        $0        $0          $C
  1    4 Recalibrate/Replace Tstats                  36                             $200      $7,200      27        27     1    28          55       82         3      3%      $400      $400      $400       $400        $40C
  1     5 Replace Emerg. Gen.                         0'                              $0          $0      27        29     2    31          60       89         1      3%         $0        $0        $0                    $C
  1     6 Repair/Calibrate Burner                     2                           $1,800      $3,600       0         1     1     2           3        4         1      3%     $1,045    $1,045    $1,045    $1,0:(5)    $1,04:
  1     7 Replace DHW Boiler                          1                           $3,850      $3,850       3        12     9    21          33       45         1      3%         $0        $0        $0        $0          $C
  1     8 Repair/Recalibrate Controls                 1                             $500        $500       0         1     1     2           3        4         1      3%     $1,100    $1,100    $1,100    $1,100      51,10C
  1     9 Maintain Boilers                            2                           $1,282      $2,564       0         1     1     2           3        4         1      3%     $2,564    $2,564    $2,564    $2,564      $2,564
  1    10 Maintain RTUs & A/C                         4                             $500      $2,000       0         1     1     2           3        4         1      3%     $1,500    $1,500    $1,500    $1,500      $1,50(
  1    11 Maintain Air Compressor                     1                           $9,000      $9,000      27        27     1    28          55       82         1      3%       $250      $250      $250      $250        $25(
  1    12 Replace Fuel Oil Pumps                      2                           $2,500      $5,000      27        29     2    31          60       89         1      3%         $0        $0        $0        $0           $(
  1    13 Maintain Rooftop Exhausters                16                             $100      $1,600      27        27     1    28          55       82         2      3%     $1,600    $1,600    $1,600    $1,600      $1,60(
       14 Install sprit system-storage areas          1                          $12,975                                                                                          $0        $0        $0        $0           $(
       15 Install Air Handler- Old Boiler Roc         1                          $18,770                                                                                          $0        $0        $0        $0           $(
  1    16 Architect/Engineer Fees                     1                           $2,500       $2,500         1      1     1     2           3         4         1     3%         $0        $0        $0        $0           $C
  1    17 HVAC technician                             1                          $15,000     $15,00p          1      1     1     2           3         4         1     3%     $4,000    $4,000    $4,000    $4,000      $4,00(
      TOTALS:                                                                               $240,314                                                                         $12,459   $12,459   $12,459   $12,459     512,45I
       ABBREVIATIONS:
       EA=EACH LF=LINEAL FOOT LS=LUMP SUM SF=SQUARE FOOT SQ=SQUARE(100SF) SY=SQ YARD
       *NOTE: ITEMS WITH AN ASTERISK INDICATE AN AGE NOW THAT IS ESTIMATED OR MODIFIED
               TO MORE ACCURATELY REFLECT EXISTING CONDITIONS AND/OR REPLACEMENT SCHEDULE


Major Projects in Bold

Source page 11

TEN YEAR REPLACEMENT/REPAIR BUDGET PROJECTION
                                                                                                                                       Replacement Schedule Codes
                                                Date:   01-Nov 1998          revised 11/1/12
                                      Project Name:     HANSEN ELEMENTARY SCHOOL                                                           1        100% in 1 yr     4
                                        Facility Age:     1968                                                                             2        50% ovr 2 yr     5
                                                                                                                                           3        33% ovr 3 yr     6

                                                                                                                                                                             Year      Year      Year         Year
Codes                     Replacement                   Quantity          Cost per   Total Cost   Age       Avg        Replacement years                     R/S Infl          15        16        17           18
 Ctgy   Item                  Item                       Item    (unit)    Item       1998$       Now       Life         1st   Later                         Typ Rate        2014      2015      2016         2017


        MECHANICAL EQUIPMENT
  1      1   Replace Boilers                                 2    EA       $76,500    $153,000      26         32            6    38           70      102         1 3%       $0        $0        $0           $0
  1      2   Replace Primary Circulators                     2    EA        $2,400      $4,800      26         32            6    38           70      102         1 3%       $0        $0        $0           $0
  1      3 Replace Univents                                 35    EA        $7,500    $262,500      26         33            7    40           73      106         3 3%       $0        $0        $0           $0
  1      4   Recalibrate/replace Tstats                     42    EA         $200       $8,400      26         33            7    40           73      106         3 3%     $400     $400      $400         $400       4
  1      5 Service Emerg. Gen.                               1    EA       $22,000     $22,000      26         36           10    46           82      118         1 3%       $0        $0        $0           $0
  1      6   Repair/Calibrate Burner                         2    EA        $1,800      $3,600       0          1            1     2            3        4         1 3%   $1,045    $1,045    $1,045       $1,045     $1,
  1       7 . Replace DHW Boiler                             1    EA        $1,000      $1,000       2          6            4    10           16       22         1 3%       $0        $0        $0           $0
  1       8 Dedicated Kitchen DHIN                           1    EA        $1,200      $1,200       0          2            2     4            6        8         1 3%       $0        $0        $0           $0
  1       9  Repair/Recalibrate Controls                     1    EA          $500        $500       0          1            1     2            3        4         1 3%   $1,800    $1,800    $1,800       $1,800     $1,
  1      10 Maintain Boilers                                 2    EA        $1,282      $2,564       0          1            1     2            3        4         1 3%   $2,564    $2,564    $2,564       $2,564     $2,
  1      11 Maintain Air Compressor                          1    EA        $6,000      $6,000      26         34            8    42           76      110         1 3%     $250      $250      $250         $250       4
  1      12 Replace Fuel Oil Pumps                           2    EA        $1,250      $2,500      26         32            6    38           70      102         1 3%       $0        $0        $0           $0
  1      13 Maintain Rooftop Exhausters                     20     EA       $1,800      $36,000     26         26            1    27           53       79         2 3%    $3,600    $3,600    $3,600       $3,600    $3,
  1      14 Maintain Office RTU, A/C                         1     EA       $5,200       $5,200     26         25            1    26           51       76         1 3%     $600      $600       $600         $600
  1      15 Maintain/Repair AHU, Gym                         1     EA       $1,400       $1,400                                                                              $500     $500       $500         $500      4
         15a Replace library ac unit                         4                                                                                                                 $0        $0        $0. .        $0
  1      16 Replace AHU, Cafeteria                           1     EA      $25,000     $25,000                                                                                 $0        $0        $0 '         $0
  1       16 Architect/Engineer Fees                         1     EA       $2,500      $2,500          1          1         1     2            3        4         1 3%        $0        $0        $0           $0
  1      17 HVAC technican                                   I     EA       $3,000      $3,000          1          1         1     2            3        4         1 3%    $4,000    $4.000    $4,000       $4,000    $4,
        TOTALS:                                                                       $541,164                                                                            $14,759   $14,759   $14,759      $14,759   $14,
        ABBREVIATIONS:

        EA=EACH LF=LINEAL FOOT LS=1...UMR SUM SF=SQUARE FOOT SQ=SQUARE(100SF) SY=SQ YARD

        *NOTE: ITEMS WITH AN ASTERISK INDICATE AN AGE NOW THAT'S ESTIMATED OR MODIFIED
               TO MORE ACCURATELY REFLECT EXISTING CONDITIONS AND/OR REPLACEMENT SCHEDULE.

Major Projects in Bold

Source page 12

TEN YEAR REPLACEMENT/REPAIR BUDGET PROJECTION
                                                                                                                                  Replacement Schedule Codes
                                    Date:   01-Nov 1998          revised 1111/12
                          Project Name:     KENNEDY ELEMENTARY SCHOOL                                                                 1   100% in 1 yr     4
                            Facility Age:    1965                                                                                     2 50% ovr 2 yr       5
                                                                                                                                      3 33% ovr 3 yr       6

                                                                                                                                                                     Year      Year      Year      Year      Yi
Codes               Replacement             Quantity                    Cost per   Total Cost   Age    Avg        Replacement years                 R/S    Intl        15        16        17        18
 Ctgy Item              Item                 Item (unit)                 Item       1998 $      Now    Life         1st   Later                     Typ   Rate       2014      2015      2016      2017      2C

       MECHANICAL EQUIPMENT




                                                    MMTTTTTT MTTTTT T
  1     1 Replace Boilers                       2                        $88,500    $177,000      33      38            5    43         81    119     1     3%         $0        $0        $0        $0        '
  1      2 Repair Primary Circulators           2                         $4,400      $8,800      33      38            5    43         81    119     1     3%         $0        $0        $0        $0        '
  1      3 Replace Univents                    25                         $7,500    $187,500      33      41            8    49         90    131     3     3%         $0        $0        $0        $0
  1      4 Repair/RecalibrateT'stats           36                          $200       $7,200.     33      36            3    39         75    111     3     3%       $400     $400      $400      $400      $41
  1      5 Replace Emerg. Gen.                  1                        $22,000   _ $22,000      33      43           10    53         96    139     1     3%         $0        $0        $0        $0
  1      6 Repair/Calibrate Burner              2                           $200        $400       0       1            1     2          3      4     1     3%     $1,045    $1,045    $1,045    $1,045    $1,0,
  1      7 Replace DHW Boiler                   1                         $3,100      $3,100       2      12           10    22         34     46     1     3%         $0        $0        $0        $0
  1      8 Repair/Recalibrate Controls          1                           $500        $500       0       1            1     2          3      4     1     3%      .$500     $500      $500      $500       $51
  1      9 Maintain Boilers                     2                         $1,282      $2,564       0       1            1     2          3      4     1     3%     $2,564    $2,564    $2,564    $2,564    $2,51
  1     10 Maintain Air Compressor              1                           $200        $200       0       1            1     2          3      4     1     3%       $250      $250      $250      $250      $21
  1     11 Replace Fuel Oil Pumps               2                         $2,000      $4,000      33      38            5    43         81    119     2     3%         $0        $0        $0        $0
  1     12 Maintain Rooftop Exhausters          6                         $1,800     $10,800      33      38            5    43         81    119     5     3%     $1,800    $1,800    $1,800    $1,800    $1,81
  1     13 Office Ventilation                   1                        $15,000     $15,000      33      37            4    41         78    115     1     3%         $0        $0        $0        $0
  1     14 Replace INindow A/C                  6                           $750      $4,500       8      10            2    12         22     32     2     3%         $0        $0        $0        $0        .
  1     15 Maintain Office RTU                  1                           $500                                                                                     $683      $683      $683      $683     $61
  1     16 Replace AHU in Gym                   1                        $16,400                                                                                       $0        $0        $0        $0
  1     17 Replace AHU in Cafeteria             1                        $30,000                                                                                       $0        $0        $0        $0       '
  1     18 Maintain AHU's                       2                           $350                                                                                     $700      $700      $700     $700      $71
  1     19 Replace low limits- Unit Vents      25                           $480     $12,000                                                                           $0        $0        $0        $0
  1     20 Architect/Engineer Fees              1                         $2,500      $2,500      1           1         1     2          3      4     1     3%         $0        $0        $0        $0
  1     21 HVAC technician                      1                         $1,800      $1,800      1           1         1     2          3      4     1     3%     $5,000    $5,000    $5,000    $5,000    $5,01
       TOTALS:                                                                      $459,864                                                                      $12,942   $12,942   $12,942   $12,942   $12,9,
       ABBREVIATIONS:
       EA=EACH LF=LINEAL FOOT LS=LUMP SUM SF=SQUARE FOOT SQ=SQUARE(100SF) SY=SQ YARD
       *NOTE ITEMS WITH AN ASTERISK INDICATE AN AGE NOW THAT IS ESTIMATED OR MODIFIED
              TO MORE ACCURATELY REFLECT EXISTING CONDITIONS AND/OR REPLACEMENT SCHEDULE
Major Projects in Bold

Source page 13

TOWN OF CANTON
                                    •     FORM - FISCAL 2014
                              CAPITAL 'PROJECT / EQUIPMENT REf.L JEST

     DEPARTMENT:                                              SUBMITTED BY:
                             Facilities                                K. Leon/B. Lynch


     PROJECT / EQUIPMENT TITLE:
                     Hot water pump motor replacement - GMS, Hansen, 3FK


     TOTAL PROJECT / EQUIPMENT COST:                           S                  564I AA et-64(5—
                             $70,000 plan 80/0 design - $75,600                                 &ay

     DESCRIPTION:.
    Hot water pump motors to be replaced and provided with new premium efficiency motors,
    variable speed drives and differential pressure controls.




       PURPOSE AND JUSTIFICATION:
    Replace (3) at GMS, (2) at Hansen, and (2) at JFK; will provide energy savings; receive
    Rmbates and pay back of less than five years.
     )
     i




     NEED CLASSIFICATION: (Check all that apply)            Departmental Priority Ranking:
         Required for Safety                                  Please rank this request out of your total
         Required by Law or Mandate                           requests for this year: (#1 as top priority)
      x Improve/Expand Service or Increase Efficiency                   (#) OF                 (#)

      x Planned Project or Replacement                      Expected Useful Life: (Check one)
         Unplanned Project or Replacement                   x 30 or More Yrs      5 to 9 Years
         New Project/Item (not on last year's 5-Yr. Plan)     10 to 19 Years       3 to 4 Years


     Impact to Dept. Operating Budget: (Check one)          Revenue Impact: (Check one)
      x Will Reduce Cost by                                   Will Produce Addl Revenue by $
        No Impact                                             Revenue Neutral (no impact)
        Will Increase Cost by $                               Will Decrease Revenue by $


     OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)




1
      FORM B - FISCAL 2014

Source page 14

LW Engineers, Inc.
  311 Great Road, Post Office Box 1551, Littleton, Massachusetts 01460 t978.486.4301 f 978.428.0067 e Info@blwengineers.com

                                                 Memorandum


DATE:                       November 30, 2011

TO:                         Ken Leon, Canton Public Schools

FROM:                       Ken Beck

SUBJECT:                    School Energy Conservation Measures

COPIES TO:

BLW Engineers has reviewed the engineering studies for mechanical systems upgrades for the
Canton Public Schools and recommends the following Energy Conservation Measures be
considered:

Canton High School
(247,803 sf; 1970/2005)

ECM-1             Kitchen Hood Exhaust Controls ($25,000.00)
                  The recommendation to provide a kitchen hood exhaust system control similar
                  to Melink controls is a low cost energy conservation measure that will provide
                  almost immediate payback and is recommended.

ECM-2             Condensing Boiler ($160,000.00)
                  BLW recommends that Canton consider the addition of a single 100hp gas fired,
                  condensing type boiler to provide high efficiency hot water heating during the
                  shoulder seasons a,s an energy conservation measure that will provide almost
                  immediate paybkk and is recommended.

ECM-2             Indirect Hot Water Heaters ($25,000.00)
                  Should ECM-2 be implemented, BLW recommends that Canton consider
                  utilizing the new condensing boiler for domestic hot water on a year round basis
                  through the installation of indirect storage type water heaters as an energy
                  conservation measure that will provide almost immediate payback and is
                  recommended.


Galvin Middle School
(131,151 sf; 1973)

ECM-1             Improve Boiler Controls ($5,000.00)
                  The recommendation to update the Boiler lead/lag controls is a low cost energy
                  conservation measure that will provide almost immediate payback and is
                  recommended.


                                                        Page 1 of 3

Source page 15

I; LW Engineers, Ince
 311 Great Road, Post Office Box 1551, Littleton, Massachusetts 01460 t 978.486.4301 f 978.428.0067 e Infablwengineers.corn

                                                 Memorandum

ECM-2            Condensing Boiler for DHW ($5,000.00)
                 The recommendation to modify the existing system operation to utilize the
                 existing condensing boiler for the domestic hot water system is a low cost energy
                 conservation measure that will provide almost immediate payback and is
                 recommended.

ECM-3            Condensing Boiler for DHW ($25,000.00)
                 The recommendation to update the controls with a new head end system for
                 remote monitoring/control is a low cost energy conservation measure that will
                 provide almost immediate payback and is recommended. •


                 Hot Water Pump Motor Replacement ($30,000.00)
                 BLW would recommend that all three hot water pump motors be replaced and
                 provided with new premium efficiency motors, variable speed drives and
                 differential pressure controls.


Hansen Elementary School
(60,640 sf; 1969)

ECM-1            Boiler Setpoint Control ($7,500.00)
                 The recommendation to update the Boiler Setpoint Control is a low cost energy
                 conservation measure that will provide almost immediate payback and is
                 recommended.

ECM-2            EMS Zone Scheduling and Remote Interface ($10,000.00)
                 The recommendation to update the time clocks with EMS zone scheduling and
                 remote interface is a low cost energy conservation measure that will provide
                 almost immediate payback and is recommended.

                 Hot Water Pump Motor Replacement ($20,000.00)
                 BLW would recommend that both hot water pump motors be replaced and
                 provided with new premium efficiency motors, variable speed drives and
                 differential pressure controls.


Kennedy Elementary School
(54,800 sf; 1968)

ECM-1            EMS Zone Scheduling and Remote Interface ($10,000.00)
                 The recommendation to update the time clocks with EMS zone scheduling and
                 remote interface is a low cost energy conservation measure that will provide
                 almost irmnediate payback and is recommended.


                                                       Page 2 of 3

Source page 16

BLW Engineers, Ince
  311 Great Road, Post Office Box 1551, Littleton, Massachusetts 01460 t 978.486:4301 f 978.428.0067 e Infablwengineers.com

                                                  Memorandum

                  Hot Water Pump Motor Replacement ($20,000.00)
                  BLW would recommend that both hot water pump motors be replaced and
                  provided with new premium efficiency motors, variable speed drives and
                  differential pressure controls.


Luce Elementary School
(67,225 sf; 1950/1988/2000)

ECM-1             Pneumatic Controls Upgrade ($150,000.00)
                  ECM-2 is for an energy management system installation; due to the scope of
                  work it would probably be in the best interest of the school to abandon
                  pneumatics altogether and provide a fully functional DDC system for the school.

ECM-2             Install Energy Management System ($50,000,00)
                  The recommendation to install a new energy management system has a high
                  first cost but is a conservation measure that will provide almost immediate
                  returns and is recommended. Not being able to adequately control the building
                  results in a tremendous waste of energy.

ECM-3             Hot Water Pump Motor Replacement ($20,000.00)
                  BLW would recommend that both hot water pump motors be replaced and
                  provided with new premium efficiency motors, variable speed drives and
                  differential pressure controls.

ECM-4             Condensing Boiler ($100,000.00)
                  BLW recommends that Canton consider the addition of a single 100hp gas fired,
                  condensing type boiler to provide high efficiency hot water heating during the
                  shoulder seasons as an energy conservation measure that will provide almost
                  immediate payback and is recommended.

ECM-5             Indirect Hot Water Heaters ($20,000.00)
                  Should ECM-4 be implemented, BLW recommends that Canton consider
                  utilizing the new condensing boiler for domestic hot water on a year round basis
                  through the installation of indirect storage type water heaters as an energy
                  conservation measure that will provide almost immediate payback and is
                  recommended.


If there should be any questions regarding this matter, please do not hesitate to contact our
office.




                                                        Page 3 of 3

Source page 17

TOWN OF CANTON
                                    FORM - FrscAL 2014
                       CAPITAL PROJECT / EQ IPMENT REQUEST

  DEPARTMENT:                                            SUBMITTED BY:
           Facilities Department                                    Brian Lynch


  PROJECT / EQUIPMENT TITLE:
                                    Retaining Wall Hansen School •


 TOTAL PROJECT / EQUIPMENT COST:
                                               $16,000


 DESCRIPTION:
Replace 106' of retaining wall at Hansen school




 PURPOSE AND JUSTIFICATION:
The existing wall is in poor condition and is ready to fall over.




 NEED CLASSIFICATION: (Check all that apply)           Departmental Priority Ranking:
  x Required for Safety                                  Please rank this request out of your total
     Required by Law or Mandate                          requests for this year: (#1 as top priority)
     Improve/Expand Service or Increase Efficiency         (#) OF                    (#)

    Planned Project or Replacement                     Expected Useful Life: (Check one)
  x Unplanned Project or Replacement                   x 20 or More Yrs       5 to 9 Years
    New Project/Item (not on last year's 5-Yr. Plan)      10 to 19 Years      3 to 4 Years


 Impact to Dept. Operating Budget: (Check one)         Revenue Impact: (Check one)
     Will Reduce Cost by $                               Will Produce Addl Revenue by $
     No Impact                                           Revenue Neutral (no impact)
     Will Increase Cost by $                             Will Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

Source page 18

Willia                            atsh & Sons inow
                                        1 Greenwood Road
                                        _Canton_ MA 02021
                                        Tel: (781) 828-6439 •
                                                 1 82 -8133
 Proposal Submitted To                     . Phone .                                       Fax
 Town of Canton                  •           HighWay &
 Canton Public School                        Maintenance Dep                      .




lidgatmodiz,lipiptoptipp.A.w.,. , ,,,,,..„,,,...,.„....,:„..,„
                                               ...,.,.. ...: .. ,....„....„..„...„      , .- ..
                                                                              ..„...T.;.;::v.:::;..
                                                                                                      _   .. .   i4Sttfai-N,',;1*
 'Date 0/061121
 *Street                                     Job Location Hansen School
  Washington Street, Canton MA               26  Pecunit Street, Canton

 Labor to Replace 106' Retaining Wall @ Hansen School

 Form & Pour 106' x ,1' x 2' Footings & 106' x 1' x 8' Walls
 #4 Rebar one foot on center
                           TOTAL $11,000.00
EXCLUSIONS
 William J. Walsh & Sons, Inc. is not responsible for the following:
        Concrete (material)            Wire Mesh               Bolts
        Expansion (material)           MA  Sales Tax           Excavator
        Vapor barrier .(material) Concrete Pumps (per 4 hours)
        Sealers/Hardeners (material) Damp Proofing/waterproofing
        Temp Power/Water/Lighting Shoring or reshoring
        Testing                        Police Details
        Shipping & Freight             Permits                 Windows

          Estimate is figured for one mobilization-any additional will be extra
 Please note William J. Walsh & Sons, Inc. has not included labor for iNintertime conditions in
 these prices. Change orders will be requited for any changes tosiie of concrete fOundation.
 This bid may be terminated by the SELLER at any time prior to receipt of written acceptance from
 Buyer and automati, ally tz, minates with 30 days of this propel date. This original proposal with
 the scope of work beds .• be included in full in the final contract if it is accepted.
 P. POSALOr E*                                               PROPOSAL ACCEPTED
          ,         /
        m J. W Js., resident
 DATE: NoVe set 6., 2012 .
 Terms forthe ontract are as follows:
    1. Buyer agrees to pay on a weekly basis for work completed to date. If payment is not
        forthcoming on the due date, SELLER shall have the right upon five days' written notice
        to withdraw its forces, materiel, equipment, etc. from the project and shall not be in
        breach of this contract thereby. BUYER aggress to pay on demand all reasonable
        collection and attorney's fees in the collection of this agreement.

      2. No back charges will be accepted for wither materials or services unless agreed to in
         advarice and signed by an authorized representative of William J. Walsh .& Sons, Inc.
         Also please note change orders are not subject to 10% retention.

Source page 19

Wednesday, November 07, 2012 9:33:51 AM
Printed by:Brian Lynch
Title: Fw: Retaining Wall © Hansen School 11-06-12, : Canton Public...                               Page 1 of 1



   From:             N"Walsh, William" <wwalsh@town.canton.ma.us>        11/6/2012 7:...

   Subject:           Fw: Retaining Wall @ Hansen School 11-06-12,

   To:                   Brian Lynch




   Attachments:               atru nc

  Hello Brian g
  I would ad                  over digging and hauling material to the crusher.
  Thanks
  Billy

  Sent from my Motorola Smartphone on the Now Network from Sprint!


         Original message

  From: MARGARET WALSH <momgret22Avahoo.com >
  To: "Walsh, William" <wwalshAtown.canton.ma.us>
 ,Sent: Tue, Nov 6, 2012 20:40:13 GMT+00:00
  Subject: Retaining Wall @ Hansen School 11-06-12


  Billy,
  Attached is the proposal.
  MPW

  *** This e-mail and any files transmitted with it are confidential and intended solely for the use of the
  individual or entity to whom they are addressed. If you have received this e-mail in error please notify
  the originator of this message. Town of Canton 2000-2012 --

Source page 20

FY 2014 CAPITAL BUDGET REQUESTS
                                    TECHNOLOGY



District:
Infrastructure Upgrade Phase One (of $140,800)                       3   $26,000
NetApp Storage Array                                                 3   $22,500
District Classroom Printers                                          2   $19,995

Schools:
HS and Galvin Wireless Build-phase one                               2   $50,555
CHS Art Lab Computer Upgrade                                         2   $14,500
Adobe Illustrator and PhotoShop Upgrade-submitted by K-12 Art Dir.   2   $10,306

Security:
Rodman Security Additions                                            1   $17,575




GRAND TOTAL TECHNOLOGY                                                             $161,431




  12/26/2012

Source page 21

OF .CAN-TON
                                     FORM B - FISCAL 2014
                        ,C mita P ° elECT / EQUIPMENT FEQUEST
- --- -
  DEPARTMENT:                                                 SUBMITTED BY:                      .
Technology                                                    Mike Wentland


  PRO3ECT / EQUIPMENT TITLE: c
  Phase One: Infrastructure Upgrade ( 0-6'    ivo/
                                             'v      f00


  TOTAL PRO5ECT / EQUIPMENT COST:
                                                  $26,000

  DESCRIPTION:
To upgrade all IDF's backbone switches from 10/100 to 10/100/1000 ethernet with a fiber uplink to local
MDF's
District (9) 48 Port = $16,650, (3) 24 port = $3,318, (12) fiber LC SX Modules = $2,268 Total Hardware
= $22,236
Labor is estimated at $3000             .

  PURPOSE AND 3USTIFICATION:
 Switches are antiquated and lacking in performance and throughput, 10/100/1000 speed will increase
1    )ork performance and connectivity as we move forward in coming years with newer technologies.
 VVIIi also help to better build upon a wireless platform.

                         •


 NEED CLASSIFICATION: (Check all that apply)               Departmental Priority Ranking: (Check one)
    Required for Safety                                     x Top              Moderate
    Required by Law or Mandate                                High             Lowest
 x
 _ Improve/Expand   Service or Increase Efficiency
    Planned Project or Replacement                         Expected Useful Life: (Check one)
    Unplanned Project or Replacement                         20 or More Yrs _x 5 to 9 Years
    New Project/Item (not on last year's 5-Yr. Plan)          10 to 19 Years      3 to 4 Years


  Impact to Dept. Operating Budget: (Check one)            Revenue Impact: (Check one)
      Will Reduce Cost by $                                  Will Produce Addl Revenue by $
   x No Impact                                             x Revenue Neutral (no impact)
      Will Increase Cost by $                              _ Will Decrease Revenue by $


  OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)




   FORM B FISCAL 2009

Source page 22

Raynham, MA 02767
                                IFi
                 Networking Solutions
                                                                                                                          0011189                                                  877-329-0434
                                                                                                                      Version: '1



                                                                                                                                                      _Prepared By.
reparedlor„
                                                                                                                                                      Patrick Donlan
anton Public Schools                                                                                                                            Phone: 508-597-8080
like Wentland                                                                                                                       Email: pdonlan@unsitsupPort.com
30 Washington Street
anton, MA 02021
hone: 7818215060
mail: wentlandm@cantonma.org


                                                                                                                      •                                                                              ..;"1,.,
                                                                                                                                                                  g          ' '-`"            •":

    ;;q1.i'l'A" vr.,-          ..,41Y --,!•- I.      •.                     i`f   ,
                                                                                  .                                                                                                                  e.Ei e
'.?,-
        ork ind             a enig           ,                   ,,,
                                                                                            .5                                         0.   I,   .     4    '

                                                                                                                                                                           34              $62,867.70
                                  , ,       .             a        witc .
                                                                                                                                                                                      5     $5,532.76
                                         4. . .   = ,wi. „c
                                                                                                                                                                 $188 55              41    $7,730.55
                                         ,X121 10 SFP.'                           . i.atidbeiVtOr                                                    ,a.--
                                                                                                                                                                       .

                                                                                                                                                                        -
                                                                                                                                                                $5,669.5.6             1    $5,669.55
                                   HP 8212 zl Switch with Premium Software
                                                                                                                                                                $2,699.55              1    $2,699.55
                                   HP E8200 zl Management Module (Redundant)
                                                                                                                                                                $1,754.55              2    $3,509.10
                                   HP 24-port SFP v2 zl Module
                                                                                                                                                                $1,484.55              6    $8,907.30
                                   HP 24-port Gig-T v2 zl Module
                                                                                                                                                                  $395.55              4     $1,582.20
•                                  HP 875 W zl Power Supply
                                                                                                                                                                  $404.55              8     $3,236.40
-                                  HP X121 1G SFP LC LX Transceiver
                                                                                                                                                                $3,509.55              1     $3,509.55
                                   HP 5406-48G zi Switch
                                                                                                                                                                $1,754.55              1     $1,754.55
                                   HP 12-port Gig-T PoE+/12-port SFP v2 zl Module
                                                                                                                                                                  $899.55              1      $899.55
                                   HP zl Power Supply Shelf
                                                                                                             Networking Materials Subtotal                                                 $107,898.75




ft1.19s
                                                                                                                                                                                           $107,898.75
Aworking Materials                                                                                                                                                                                    $1-,01141.<
                                                              h.. ft a!t•,.                 14,4w-                         .
11124$4.
      .. Mit                                                                                -- eAt4.1-0Wg                       ,
                                                                                                 Apiogip,
                                                                                                                                                                      em
rt,                                                                                   L'•
                  e,4•441.1t
                                                                           5}. e+ •       -• .th
liggitjlet*             4       .4"*""':°. "         me-tirt-NAINA?;:tiVe$44104144.P4a,Iii.W.0 104.:3•P
t'APC
                                                  14N4tstilt.':.%1W-C                 • t.),
xes, shipping, handling and otherfees may apply. We reserve the right to cancel orders arising from pricing or other errors.




                                                                                                                                                     Date




                                                                        q's
                                                                        r                               •'; .• • ti
                                "'; 0 .                                                             •
        —

Source page 23

TOWN OF CANTON
                                      FORM 13 - FISCAL 2014
                         CAPITAL PRO3ECT / EQUIPMENT REQUEST

  DEPARTMENT:                                                SUBMITTED BY:
Technology                                                   Mike Wentland


  PROJECT / EQUIPMENT TITLE:
  NetApp Storage


  TOTAL PROJECT / EQUIPMENT COST:
                                                 $22,500


  DESCRIPTION:
Increase NetApp Storage Array




 PURPOSE AND JUSTIFICATION:
Adding more clients to the Citrix requires more disk space to build Virtual Servers for XenApp to
   )mmodate.




 NEED CLASSIFICATION: (Check all that apply)              Departmental Priority Ranking: (Check one)
     Required for Safety                                  x Top               Moderate
     Required by Law or Mandate                             High              Lowest
     Improve/Expand Service or Increase Efficiency
  x Planned Project or Replacement                       • Expected Useful Life: (Check one)
     Unplanned Project or Replacement                        20 or More Yrs x 5 to 9 Years
     New Project/Item (not on last year's 5-Yr. Plan)        10 to 19 Years    3 to 4 Years



  Impact to Dept. Operating Budget: (Check one)           Revenue Impact: (Check one)
    Will Reduce Cost by $                                    Will Produce Addl Revenue by $
  x No Impact                                             x Revenue Neutral (no impact)
    Will Increase Cost by $                                  Will Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

Source page 24

Bill To                                                                   01111p Iv                                                                            (1.1LIPLCII.ISJI I   r-cLuc I   /B
                        CANTON PUBLIC SCHOOLS                                                    CANTON F           'C SCHOOLS                                                     Quotation #: 2142911
                        960 WASHINGTON STREET                                                                                                                                  Quotation Date: 1019I12-
                                                                                                                                                                               Expiration Date: 11118112
                        CANTON                              MA     02021
 ePlus                                                                                                                                                                       Client Reference:
Quotation ATTN: ACCOUNTS PAYABLE                                                                                                                                                 Account Rep: G HASTINGS

Qty         'P'art Number                          MFG Name                 Description                                                                                                                        Onit Price Extended Pri
12 X290A-R5                                       NETAPP                  DISK DRIVE, 600GB 16K 3G SAS FAS2XXX                                                                                                  1 1,706.13      20,461




 ePlus offersfiexible and easy leasing options for your IT equipment. Use leasing to increase your IT acquisition capability, overcome limited budgets, and manage the lifecycle of :Your assets. Contact an e
              •                                                  Leasin • Coordinator at 1-703-984-8021 or leasin• • e • lus.com to receive a lease uote toda
                                                                                                                                                                                                            , Unless Bill-To company is
Thank youi for your inquiry. Please note the following about this quotation: It will expire on the date stated above. Unless freight amount is indicated, or is zero, freight will be added to the invoice.
exempt froiri Sales Tax, it will be added to the invoice. Extended Warranties and Professional Services are available.
   Customer Acceptance                                                                                   To Place An Order, Please Contact:
                                                                                                                                                                                                             SubTotal:              $20,41
 Signature:                                                             Date:                                    Sales: Melissa Penhale
                                                                                                                                                                                                                   Tax:      TBD if Applio
      Name:                                                             PO #:                                    Phone: 610-495-1231
                                                                                                                                                                                                              Freight:
        Title:                                                    Ship VIA:                                        Fax: 781-615-1401
This quotatdon is confidential for your internal use only.
                                                                                                                  email: mpenhale@eplus.com
This is a solicitation for an offer and is subject to credit approval. No contract is formed unless a
purchase order or other offer is received and accepted by our office. If you accept this quotation             Address: 690 Canton St Ste.214, Westwood MA 02090
                                                                                                                                                                                                                 Total:             $20,41
with the intent to have your chosen leasing company to pay the costs directly, please note that if the
Lessor does not pay ePlus for any reason, you will be responsible for payment to ePlus.
                                                                                                                                                                            ti/if                     /Tv

Source page 25

•   ------       --
                      _ ____. „-......      . ..__. .         ._ _ _                                .
                                                                                           .. „. ..._ ..   •
       --- •                ------ - -----   TOWN SF CANTON
                                           F Ritil    FISCAL 1014                                               i
                                                                                                               1■
                                 CAPITAL PROJECT / EQUX' MENT REQUEST
-- - —
                                                             SUBMITTED BY:
 DEPARTMENT:
                                                             Mike Wentland
Technology


 PROJECT / EQUIPMENT TITLE:
 District Classroom Printers


 TOTAL PROJECT / EQUIPMENT COST:
                                                  $19 995


' DESCRIPTION:
Replace local Ink Printers with Network Laser Printers
CHS=- 25, GMS=25, Elementary Grades 3,4 and 5 30 each school, Rodman 15
Total = 155 Printers                                   ,




  PURPOSE AND JUSTIFICATION:
Grades 3,4,&5 now have 4 workstation areas that were deployed last year. Now we want to outfit each
    '3room with network laser printers as well as all the other classrooms that are using inkjet printers
    ,
vvigith are not cost effective, and are failing




                                                          Departmental Priority Ranking:: (Check one)
  NEED CLASSIFICATION: (Check all that apply)
                                                          x Top            Moderate
      Required for Safety
                                                            High           Lowest
      Required by Law or Mandate
      Improve/Expand Service or Increase Efficiency
                                                           Expected Useful Life: (Check ne)
   x Planned Project or Replacement
                                                             20 or More Yrs   x 5 to 9 Years
      Unplanned Project or Replacement
                                                             10 to 19 Years      3 to 4 Years
      New Project/Item (not on last year's 5-Yr. Plan)


  Impact to Dept. Operating Budget: (Check one)            Revenue Impact: (Check one)
                                                             Will Produce Addle Revenue by $
      Will Reduce Cost by $
                                                           x Revenue Neutral (no impact)
   x No Impact
                                                              Will Decrease Revenue by $.
 —
      Will Increase Cost by $
                                                                                                   ----- -

  OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)




          _        _, z-_    - •_____

Source page 26

I ayout'?
                                                                                                                _ ..
                                                                                                                       0,



  1:70.r.f



    NLINE PRICE QUOTATION                                                      Quote Name: Canton Printer Quote
  Quote Number: 8050966
  Today's Date : 10/1/2012 7:03:17                                      Quote Created Date : 9/28/2012 3:27:37 PM
  PM                                                    Contract: MA - COMMONWEALTH OF MASSACHUSETTS.
  Created By:                                                                     (1/VSCA/NASPO) (ITC44)
  pdonlan@unsitsupport.com

  Product availability and product discontinuation are subject to change without notice. The prices in this quotation
  are valid for 30 days from quote date above. Please include the quote number and contract from this quote on the

   corresponding purchase order.


                                                                  part no             unit price qty ext price
   items/description
                                                                  Base                 $129.00         1 $129.00
   HP LaserJet Pr P1102w Printer
                                                                  CE658A#BGJ
   HP LaserJet Pro P1102w Printer
                                                                  Included
   Yes
  ,HP LaserJet Pro 1102w Printer;                                 Included
   introductory HP Black LaserJet Toner
   cartridge (-1600 pages); power cord;
   Printer documentation and software on
   CD-ROM; Getting Started guide, Support
   flyer, Installation guide, Warranty guide;
   USB cable (AP only)
   No, please purchase USB cable                                  Included
    separately
                                                                   Included
   Up to 19 ppm
    Manual (driver support provided)                               Included
    Up to 5,000 pages per month                                    Included
    One (1) (plus 10-sheet priority feed slot) /                   Included
    One (1) (plus 10-sheet priority feed slot)
    Up to 160 sheets! Up to 160 sheets                             Included
    Up to 100 sheets! Up to 100 sheets                             Included
    Letter, legal, executive, postcards,                           Included
    envelopes (No. 10, Monarch)
                                                                   Included
    8 MB/8 MB
                                                                   Included
    None
    Hi-Speed USB 2.0; VViFi 802.1113/gin                           Included
    Up to 600 x 600 x 2 dpi (1200 dpi effective                    Included
     output)             -
     Microsoft® Windows® 7 (32-bit/64-bit),                        Included



• file://CAUsers\wentlanclm\AppData\Localgemp\fcctemp\tmpQuote8050966.htm
                                                                                                             10/1/2012

Source page 27

TOWN OF CANTON                                                       .
                                     F ei ° M B — FISCAL 2014
                         ,
                        CAPITAL PROJECT / EQUIPMENT REQUEST

                                                             SUBMITTED BY:                                      .
 DEPARTMENT:
                                                                Mike Wentland
Technology                                                                                              •

               •
 PROJECT / EQUIPMENT TITLE:                                        .
 HS Eit MS Wireless Build


                                                                                                .
 TOTAL PROJECT / EQUIPMENT COST:
                                                $50,555

                                                            ,
 DESCRIPTION:
Build out wireless access throughout High School and Middle School

                                                                                       •
                                                                                           •


 PURPOSE AND JUSTIFICATION:
Wireless will be the key connectivity component for BYOD




                                                        Departmental Priority Ranking: (Check one)
  NEED CLASSIFICATION: (Check all that apply)
                                                           x Top                 Moderate           .
     Required for Safety
                                                             High                Lowest
     Required by Law or Mandate
     Improve/Expand Service or Increase Efficiency
                                                           Expected Useful Life: (Check one)
   x Planned Project or Replacement
     Unplanned. Project or Replacement                       20 or More Yrs x 5 to 9 Years
     New Project/Item (not on last year's 5-Yr. Plan)           10 to 19 Years       3 to 4 Years



  Impact to Dept. Operating Budget: (Check one)            Revenue Impact: (Check one)
                                                           Will Produce Addl Revenue by $                           .
     Will Reduce Cost by $
                                                         x Revenue Neutral (no impact)
 _ No Impact
 x •
     Will Increase Cost by $                            _Will Decrease Revenue by $



  OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
$42,000 - Hardware x 10% Installation $4,200

Source page 28

S. Easton, MA 02375
                                                                                                        FAX: 508-238-1146

                                                                                                          ITC47 MA Certified




Statement of Work
Wireless Network Installation
Canton High School and Galvin Middle School

Canton Punt Schools
lvi kis Wantland
(508)802-7415

HUB Technical Contacts:
Nccount Executive: Ed Zak
Phone: 508-238-9887 EXT: 4211
Email: Ezak@hubtechnicalcom

Engineer: Ryan Bates
Email: rbates@hubtechnical.com

Date: 10/25/12
WO#: 61701
Revision*


Confidentiality Notice
The material contained in this document is the property of HUB Technical Services LLC. and is intended only for the person or
entity to which it is addressed and may contain confidential and/or privileged material. Any review, retransmission,
dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the
intended recipient is prohibited without prior permission from HUB Technical Services LLC., 44 Norfolk Ave, South Easton,
MA02375. All Trademarks and Registered Trademarks referenced herein are the property of their respective holders.




                                              ware.

Source page 29

S. Easton, MA 02375
                                                    FAX: 508-238-1146

                                                ITC47 MA State Certified




Table of Contents
                                                                      2
Project Details
                                                                      2
 Project Overview
                                            S                         2
 Scope of Work
                                                                      3
 Project Type
 Project Timeline                                                     3
                                                                      3
 Project Milestones
                                                                      3
 Project Documents
Assumptions                                                           4
Appendix                                                              6
 Materials and Pricing                                                6
                                                                      7
Statement of Work Acceptance
 Payment Schedule Acceptance                                           8

t erms, Conditions, and Procedures                                    9
 Change of Scope Procedures                                          10
 General Terms                                                       10
 Payment Terms                5
                                                                     10
 Terms of Sales for Professional Services                            11
 Terms of Sales for Tangible Products                                12
                                                                     12
 Returns




                                                  INIT:

                                                                       1

Source page 30

S. Easton, MA 02375
                                                                             FAX: 508-238-1146

                                                                         ITC47 MA State Certified




                                    Project    If




Project Overview:
Canton Public Schools has asked HUB Technical Services to provide a solution that will
allow for total wireless coverage for Canton High School and the Galvin Middle School.
HUB Technical will perform the following:

   O Run Ethernet cables for all access points quoted.
   O Install Power-over-Ethernet (PoE) switches in each IDF:
   O Physically mount wireless access points throughout both schools to provide
     coverage.
   O Configure  Ruckus ZoneDirector 3050 for management of all wireless access
     points throughout the district.


Scope of Work:
    1. Pre-Installation Phase
           a. Meet with Canton Public Schools technical staff to determine project phasing and
              available installation dates.
           b. Obtain   IP addresses for ZoneDirector appliance and all PoE switches.
           c. Receive and inventory all hardware at HUB Technical Services warehouse.
           d. Configure ZoneDirector appliance at HUB Technical Warehouse.
           e. Configure DHCP scopes for wireless access points.
    2. Physical Installation — High School
           a. Run Ethernet cables for all wireless access points in pre-designated areas.
           b. Mount all wireless access points.
           c. Mount all PoE switches and ZoneDirector appliance.
    3. Physical Installation — Galvin School
           a. Run Ethernet cables for all wireless access points in pre-designated areas.
           b. Mount all wireless access points.
           c. Mount all PoE switches.
    4. Test wireless signal coverage throughout schools.
    5. Provide overview of basic administration of ZoneDirector appliance to Canton Public
        Schools technical staff.




                                                                                                    2

Source page 31

S. Easton, MA 02375
                                                                            FAX : 508-238-1146

                                                                        ITC47 MA State Certified




Project Type:

HUB Technical has proposed a fixed price based upon the scope of work detailed within this
proposal. Should there be any additional labor or parts required not included in this
SOW, a "Change of Scope" SOW will be generated.

Project Timeline:
To be determined by client and HUB Technical

Project Milestones:
   1. Project manager assigned and project plan signed by customer.
   2. Hardware received and inventoried.
   3. Cables installed and APs mounted.
   4. Switches and ZoneDirector installed
   5. Wireless network tested.
   6. Administrative training provided.

.4oject Documents:
IP Addresses for all network devices.
AP location maps for each school.




                                                                                                   3

Source page 32

S. Easton, MA 02375
                                                                                 FAX: 508-238-1146

                                                                             ITC47 MA State Certified




                                         ssum pti ons

HUB Technical is solely responsible for items listed in the scope section of this statement of
work. Any additional requests not listed in that section will incur a change of scope and will be
billed per change of scope procedures listed below. Items listed in this section are a courtesy
summary of tasks that the Client may need to perform for successful completion of the project.

              1. The Customer shall designate a point of contact for all project
                 communications who has the authority to act on all aspects of this project.

              2. The Customer shall arrange for site access for HUB Technical Services
                 installation personnel according to the agreed schedule. This will include
                 arranging for afterhours access (as needed and agreed upon), access
                 badges, security escorts, or other arrangements in accordance with the
                 Customer's corporate security policies.

              3. As needed, the Customer shall provide coordination between HUB
                 Technical Services and any 3rd party vendors.

              4. Hub Technical is not responsible for any hardware required for installation
                 in non-standard configurations (server racks, network racks, etc.) that do
                 not meet current ANSII specifications.

              5. During the implementation of the proposed project the customer will discuss
                 any modifications to the existing network / infrastructure with HUB Technical
                 before implementing them.

              6. HUB Technical Services has not performed a wireless site survey for
                 Canton Public Schools and therefore cannot guarantee coverage
                 unless a full wireless site survey is performed to determine additional
                 information such as Signal-to-Noise ratio, RF interference, and
                 attenuation barriers. A wireless site survey will help determine access
                 point placement and quality.

              7. This SOW is to be performed during normal business hours of 8:30 AM to
                 5:30 PM, Monday through Friday.




                                                                               INIT:

                                                                                                        4

Source page 33

S. Easton, MA 02375
                                                                   FAX: 508-238-1146

                                                              ITC47 MA State Certified




8. The customer is responsible for all network cables not listed in the
   appendix.

9. There must be appropriate power available in each switch closet to
   accommodate the PoE switches or power injectors.

10.The customer is responsible for the configuration of all devices connecting
   to the wireless network. This includes laptops, desktops, notebooks, and/or
   all handheld devices.

11.This SOW only contains creating the SSID and assigning the appropriate
   encryption keys, NOT 802.1X, MAC, or Web Authentication. If configuration
   is desired, a change of scope will be created for the additional time and
   materials.

12.An item has been added to the appendix to expand the support of the
   ZoneFlex 3050 to allow for control of the APs in the other schools.




                                                                NIT:

                                                                                     5

Source page 34

S. Easton, MA 02375
                                                                                                                                     FAX: 508-238-1146

                                                                                                                             ITC47 MA State Certified




                                                              ppencnx
Materials and Pricing:
                                                                      Part #                                                 Price         Ext. Price
 PC      Qty
rexlv
                                          '91
                                           E-7,41
                                            :41.9.1                                                              114..                            tisA
               opw.                                       VaiRea.4.,
                ZOneFlex dual-band (5 GHz and 2.4 GHz
 33 —             concurrent) 802.11n Wireless Access               901-7982-US00                                   $ 615.00             $ 4,920.00
          8       Point, 19-element smart antenna, dual
 25 =
                           ports, PoE support.
                                                                         J9625A                                     $ 995.00             $ 5,970.00
          6         HP Procuive 2620-24-P0E+ Switch
                                                                                                                       $0.00                  $0.00
                 ZoneDirector 3000, licensed for up to 50
                ZoneFlex Access Points. ZD3000 can be               901-3050-US00
  2       0      upgraded to support up to 500 APs with
                          AP license upgrades.
                                                                     904-3050-0002                                    $0.00                   $0.00
  2       0      Premium Support for ZoneDirector 3050
                                                                                                                  $ 2,795.00             $ 2,795.00
                  License ( upgrade license ) - 50 access           909-0050-ZDOO
          1                       points
                                                                                                                         $ 395.00          $ 395.00
                      PREMIUM SUPPORT FOR                           904-0050-0ZD2
          1               ZONEDIRECTOR 50                                                                                             F.WaSigg.71,
                                                                                                                               !:-7av cf."        .57.,WWW
                snxmirv-
                                                             .At.*;5.,-0
                                                            ositv ,,A1-gr          .31Mq.:Ar2g,MlfpralpsiMP, itrAggf:WMW-                 03P.it10,3*-Z.5:W,f,
        vgfavol ■                                           1144.4s
                                                                      td.ga..1;41-t&g:                       •  -.4t•Msti ii,T.W..,5:KalWA;ArifitagMazAkfa
               dkil,
                 ZoneFlex dual-band (5 GHz and 2.4 GHz
                                                                                                                         $ 615.00        $ 15,990.00
                  concurrent) 802.11n Wireless Access                          901-7982-US00
         26       Point, 19-element smart antenna, dual
                           ports, PoE support.
                                                                                   J9625A                       $ 995.00               $ 2,985.00
          3        HP Procurve 2620-24-P0E+ Switch
                                                                                   J9407B                       $ 55.00                $ 165.00
          3                HP Power Injectors



                                                                                HUB Cabling                              $12,685.00         $12,685.00
          1      Cabling
                                                                                  HUB-TRV
                Travel
                                                                                  HUB-INST                          $ 4,650.00               $ 4,650.00
          1      Installation and Configuration
                                                                                  HUB-PRM                                  Included
          1      Project Management
                                                                                  HUB-DOC                                  Included
          1      Documentation / Training
                      Quotation Valid for Thirty (30) Days                                                                  Total $ 50,555.00
                    Tax, Freight, insurance, Delivery, Setup
                    Fees, Cabling and Cabling Services Not
                     Included unless otherwise noted. Not
                  responsible for mathematical errors. Fixed
                   priced projects are invoiced in full and are
                          not eligible for labor rebate.




                                                                                                                                INIT:

                                                                                                                                                                 6

Source page 35

-.-----         • ^
                                                                        • • -•_   ---••
                          • •• •   • ■
                                     - • _ • --•   ••• ■
                                                       •___ • • __•-
                   -• _




                                                             —' FISCAL' 2,0I4".'           •    1-


                                   PIT 11‘ L 03ECT EQUIPM ENT sEQUEST

  DEPARTMENT:                                                            SUBMITTED BY:
Technology                                                               Mike Wentland


  PROJECT / EQUIPMENT TITLE:
  CHS Art Lab Computer Upgrade


  TOTAL PROJECT I EQUIPMENT COST:
                                                              04,500

  DESCRIPTION:
Upgrade the 9 year old art lab computers




  PURPOSE AN JUSTIFICATION:
The newer Adobe application require more robust computer systems to run the programs. Will increase
    tionality and productivity.




 NEE CLASSIFICATION; (Check all that apply)                            Deoartmental Priority Rankinu: (Check one)
      Required for Safety                                                 Top                  Moderate
      Required by Law or Mandate                                          High                 Lowest
      Improve/Expand Service or Increase Efficiency
  -x Planned Project or Replacement                                    lExnected Useful Lifeg (Check one)
      Unplanned Project or Replacement                                    20 or More Yrs x 5 to 9 Years
      New Project/Item (not on last year's 5-Yr. Plan)                    10 to 19 Years    3 to 4 Years


 Impact to Dept. Operatino Budoet: (Check one)                          evenue Impact: (Check one)        •




     Will Reduce Cost by $                                               Will Produce Addl Revenue by $
  x No Impact                                                          x Revenue Neutral (no impact)
     Will Increase Cost by $                                             Will Decrease Revenue by $


 OTHER COMMENTS OR INFORMATION; (Attach supporting documentation)




     Ffid -

Source page 36

641                                        Kaynnam, !VIA unit
    (0.27       111–I ti)                                                                                                              877-329-0434
         --Networking_Solutio.ns                           _
          •   en,.,•,•-•,1-••••-• •• • -4,1,• I' '




 Prepared For_ _                                                                                        _ Prepared_ By
 Canton Public Schools                                                                                  Brian McDonald
 Mike Wentland                                                                                     -Phone: 508-272-1650
 960 Washington Street                                                                Email: bmcdonald@unsitsupport.com
 Canton, MA 02021
 Phone: 7818215060
 Email: wentlandm@cantonma.org



                                                                                                -41aiP- ia/
                                         HP Business Desktop Pro 4300 Computer
                                         - Intel Core 13 i3-2120 3.3GHz
                                         - Small Form Factor
                                         -4 GB RAM
                                         - 500 GB HDD
                                         - DVD-Writer
                                         - Intel HD 2000 Graphics Card
                                         - Genuine Windows 7 Professional
                                      ,,   DisplayPort
                                           DVI
                                                                                        HP 4300 Subtotal                                   $1,167.08




                                                                           -1
                                                                "rr:RXN1,41,, 7*,


1P4300                                                                                                                                     $1,157.08

)ubotota!
 ax
—47—r-
'hIPP11,19
'iota!
axes, shipping, handling and other fees may apply. We reserve the right to cancel orders arising from pricing or other errors.




iignature                                                                                                   Date




                                                                                       X- 2F
                                                          cd-127c


                                                                               J.T4
                                                                                            e-`47-1Pft.--TAYttvAlAdi
         ''              ) To v.                     °

Source page 37

AbiAtiCiti#•tA': YON
                                •    FRM B FISCAL 2014
                            PETAL ROJECT / EQUIPMENT REQUEST

  DEPART ENT:                                               SUBMITTED BY:
Technology                                                  Mike Wentland


  PRO3ECT / EO IPMENT TITLE:
  Adobe Illustrator and PhotoShop Upgrade


  TOTAL P 03ECT / EQUIPMENT COST:
                                                 $10,306

   ESC IPTION:
Upgrade CHS Art lab to latest version of Adobe Illustrator and PhotoShop




  PURPOSE A D 3USTIFICA TI
Joyce Stenmon writes:
tl
    '- nk that we should go ahead with the Adobe photoshop and Illustrator upgrades as you specified "so
L .students would gain the most up to date experience with current technology used by art
professionals". It's been a few years since we upgraded... I think the newest version of Photoshop is
CS6. We currently have CS3, and I see in your technology proposal that you are requesting Art Lab
Re s lacement Corn suters for FY 2014 - so I do believe we should so with the corn slete acka e."

  NEED CLASSIFICATION: (Check all that apply)            Departmental Priority Rankino: (Check one)
      Required for Safety                                  Top              Moderate
      Required by Law or Mandate                         x High             Lowest
     Improve/Expand Service or Increase Efficiency
  x Planned Project or Replacement                       Expected Useful Life: (Check one)
      Unplanned Project or Replacement                      20 or More Yrs    5 to 9 Years
   ' New Project/Item (not on last year's 5-Yr. Plan)       10 to 19 Years x 3 to 4 Years


  Impact to Dept. Operatino Budget: (Check one)          Revenue Impact: (Check one)
      Will Reduce Cost by $                                 Will Produce Addl Revenue by $
   x No Impact                                           x Revenue Neutral (no impact)
      Will Increase Cost by $                               Will Decrease Revenue by $


  OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)

Source page 38

QL1 I V TION
                                           QUOTE #: 634114761
                                         Customer #: 98601610
                                          Contract #: 10ACV
                                CustomerAgreement #: ITS 42
                                         Quote Date: 10/10/12
Date: 10/10112 9:11:05 PM            Customer Name: MA-K CANTON PUBLIC SCHOOLS

       TOTAL QUOTE AMOUNT:              $10,306.00
                Product Subtotal:        $10,306.00
                               Tax:           $0.00
             Shipping & Handling:             $0.00
                Shipping Method:            Ground            Total Number of System Groups:

                                                                                                                —
                                        SOFTWARE & ACCESSORIES

                                 Product                               Quantity    Unit Price         Total
VL filt-sidttistii,q,yepRgli.NIYEq0kg,00001,:(Aq0,4044),              '25'        - .- . .siit2           '..cidtti
 ELECTRONIC LICENSE CONFIRMATION elec dwnld only (A3458532)             i                   Vi.(i'd   '     lifAio

                      Number of S & A Items: 2                           .S4A.1.6.t 1 Arnou*S1066;00.




           SALES REP:       dan myers                                       PHONE:      888-977-3355

        Email Address:      charles_myers@dell.com                       Phone Ext:     7250403


Please review this quote carefully. You may order online by signing into Premier at www.premier.dell.corn. Click
on the eQuotes link. To order without Premier, go to wunu.dell.comicito.

If you do not have a separate agreement with Dell that applies to your order, please refer to
www.dell.corn/terms as follows:

If purchasing for your internal use, your order will be subject to Dell's Terms and Conditions of
                                                                                      If purchasing
Sale-Direct including Dell's U.S. Return Policy, at www.dell.com/returnpolicv#total.
for resale, your order will be subject to Dell's Terms and Condition of Sale for Persons or Entities
Purchasing to Resell, and other terms of Dell's PartnerDirect program at www.dell.com/partner.
If your order includes services, visit www.dell.com/servicecontracts for service descriptions
and terms.

Quote information is valid for U.S. customers and U.S. addresses only, and is subject to change.
Sales tax on products shipped is based on "Ship To" address, and for downloads is based on
"Bill To" address. Please indicate any tax-exempt status on your PO, and fax your exemption
certificate with seller listed as Dell Marketing LP, to Dell's Tax Department at 800-433-9023.
Please in clude your Customer Number.

For certain products shipped to end-users in California, a State Environmental Fee will be applied.
 or Asset Recovery/Recycling Services, visit wvvvv.dell.com/assetrecoverv.




file://CAUsers\wentlandrn\AppDataTocanemp\fectemp\Quote_634114761.html                                                10/11/2012

Source page 39

OF-CANTO                    -          _        __..„.       „
--                                         TOW                                                               .
                                                     OistAL-i614 .-     '   '       .




                           CART L PROJECT / EQ !MONT REQUEST

                                                              SUBMITTED BY:
  DEPARTMENT:
                                                              Mike Wentland
Technology


     PROJECT / EQUIPMENT TITLE:
     Rodman Security Additions
                                                     _

     TOTAL PROJECT / EQUIPMENT COST:
                                                    071575


 , ESCRIPTION:
Addition 3rd floor security cameras (CHARMS) Floor, Additional exterior building cameras, and relocation
of several existing cameras                                                                                      1
                                                                                                                  I
                                                                                                                 1


  PURP SE AN JUSTIFICATION:
There are currently no exterior cameras in the areas of Pre-School arrival and pickup zones.            I
    're are no cameras of the playground area where the children have to cross to enter.                i
1..,ed floor has no cameras, after school and weekend programs utilize the Rodman gym and if something I
were to happen We would not have the coverage up there. Gym and gym entrance and do not have            ,I
proper coverage, this is the area for Cole Harrington and CHARMS arrival and pickup zones.               I


                                                            Departmental Priority Ranking: (Check one)
     NEED CLASSIFICATION: (Check all that apply)
                                                                                        Moderate
         Required for Safety                                _ Top
                                                            x High                      Lowest
         Required by Law or Mandate
     _
         Improve/Expand Service or Increase Efficiency
                                                            Expected Useful Life: (Check one)
         Planned Project or Replacement
      x Unplanned Project or Replacement                      20 or More Yrs x 5 to 9 Years
                                                               10 to 19 Years               3 to 4 Years
         New Project/Item (not on last year's 5-Yr. Plan)


     Impact to Dept Operating Budget: (Check one)           Revenue Impact: (Check one)
                                                               Will Produce Addl Revenue by $
     _ Will Reduce Cost by $                                 x Revenue Neutral (no impact)
     x No Impact
                                                                Will Decrease Revenue by $
        Will Increase Cost by $
                          ____
                                                (Attach supporting documentation)
     OTHER COMMENTS OR INFORMATION:

Source page 40

_
it0111111U         k1.11111.11%,
                                                                                                                                   efailMr4TMICY
                                                                                                                                   i'ia-'44!)-ArfirinwsCaqiffW
11.7 Was °igton St, Rt. 1
                                                                                                                                   ,




labrirille -MA -02762                                                                                                                                            •   • -••• .   ••••


ww.belpinexo IIi
DP '19-0300 P 508-699-5637 F
-9■  ocapinc.co                                                                           INC.
'ww.facebook.comihelphlic                              . 'ELECTRONIC SECOMMf SIOUrflOPIS           NINUMEMBIUMMINS
                                                                                      Ship To
             NAME / ADDRESS
                                                                                    Administration Building
         Canton Public Schools
                                                                                    960 Washington Street
         Attn: Business Administrator
                                                                                    Canton, MA 02021
         960 Washington Street
         Canton, MA 02021




                                                   Net 30                   CAC                               Additional Cameras
      10/10/2012
                                                                                      DESCRIPTION                                                  QTY
                          ITEM
                                                   SUPPLY AND INSTALL THE FOLLOWING:Add Additional 11 Cameras in the
   NOTES
                                                   following places:
                                                   * Main Level:
                                                   >Interior Vandal Dome at Gym Area Entrance
                                                   >Interior Vandal Dome at Left Side Interior Stairwell
                                                   >Interior 'WDR Vandal Dome Looking at Main Entrance Doors

                                                   * Upper Level:
                                                   >Interior Vandal Dome at left end of Hallway (Near RM31)
                                                   >Interior Vandal Dome at right end of Hallway (Near RM39

                                                   * Lower Level:
                                                   > Interior Vandal Dome at Left Far Hall looking at Elevators
                                                   > Interior Vandal Dome outside RM510 looking at Stairwell
                                                   > Interior WDR Vandal Dome At Middle Entrance Reader Looking at Outside Doors
                                                   > Move Existing Reader Camera to opposite side to look at reader doors
                                                   > Interior WDR Vandal Dome in Stairwell looking at Right Side Exit Doors

                                                   *Exterior Cameras
                                                   > Exterior camera off Right Rear Gym Corner for view of Parking Area
                                                   > Exterior CameraNear Middle Rear Entry Way looking at Walkway
                                                   > Move Existing Exterior camera at Middle Rear Door to other side

                                                   *Add New 16 Ch DVR for New Cameras

   Please Provide Purchase Order                                                                    Sub Total

                                                                       Date:
                                                                                                    Sales Tax (0.0%)
    Acceptance of Proposal.
    Because of Changing Market Pricing for copper, wire pricing may be changed to reflect
    these new higher prices. Please note this price does not include permit fees unless noted on
                                                                                                    TOTAL
    estimate. Estimate Valid for 30 Days.




                                     " Ask about our No Interest Financing Options"