TAX IMPACT FROM DEBT EXCLUSIONS
                     (based on home assessed for X490,000)

     $140

     $120 -''

     $100

      $80
                                                                  ■ Pool ($5.9 million)
'~    $60
                                                                  ■ Current Projects
      $40                                                                                     ~

      $20                                                                                 .I

       $~
                                                                                          i
                FY   FY   FY   FY   FY   FY   FY   FY   FY   FY
                19   20   21   22   23   24   25   26   27   28

Source page 2

$5.9 MILLION BORROWED FOR POOL OVER 20 YEARS


                                                                                       $3,824,234,297     $490,310                                $3,824,234,297     $490,310
        $5,900,000            $5,900,000      4.00%       ANNUAL         61.2427%       IMPACT ON        IMPACT ON     Current      61.2427%       IMPACT ON        IMPACT ON
FISCAL    BONDS             PRINCIPAL         BOND         DEBT          residential   RESIDENTIAL      RESIDENTIAL      Debt       residential   RESIDENTIAL      RESIDENTI
 YEAR OUTSTANDING           PAYMENT         INTEREST      SERVICE          levy %        TAX RATE         TAX BILL    Exclusions      levy %        TAX RATE         TAX SILL

 2021          $5,900,000       $295,000      $236,000      $531,000       $325,199         $0.09          $42         $1,122,805     $687,636        $0.18            $88
 2022          $5,605,000       $295,000      $224,200      $519,200       $317,97?         $0.08          $41         $1,025,822     $628,241        $0.16            $81
 2023          $5,310,000       $295,000      $212,400      $507,400       $310,745         $0.08          $40           $798,028     $488,734        $0.13            $63
 2024          $5,015,000       $295,000      $?00,600      $495,600       $303,519         $0.08          $39           $594,714     $364,219        $0.10            $47
 2025          $4,720,000       $295,000      $188,800      $483,800       $296,292         $0.08          $38           $243,102     $148,882        $0.04            $19
 2026          $4,425,000       $295,000      $177,000      $472,000       $289,066         $0.08          $37           $238,248     $145,910        $0.04            $19
 2027          $4,130,000       $295,000      $165,200      $460,200       $281,839         $0.07          $36           $233,394     $142,937        $0.04            $18
 2028          $3,835,000       $295,000      $153,400      $448,400       $274,612         $0.07          $35           $228,540     $139,964        $0.04            $18
 2029          $3,540,000       $295,000      $141,600      $436,600       $267,386         $0.07          $34           $223,686     $136,991        $0.04            $18
 2030          $3,245,000       $295,000      $129,800      $424,800       $260,159         $0.07          $33           $218,832     $134,019        $0.04            $17
 2031          $2,950,000       $295,000      $118,000      $413,000       $252,932         $0.07          $32           $213,978     $131,046        $0.03            $17
 2032          $2,655,000       $295,000      $106,200      $401,200       $245,706         $0.06          $32           $209,124     $128,073        $0.03            $1G
 2033          $2,360,000       $295,000       $94,400      $389,400       $238,479         $0.06          $31           $204,270     $125,100        $0.03            $16
 2034          $2,065,000       $295,000       $82,600      $377,600       $231,252         $0.06          $30           $199,416     $122,128        $0.03            $16
 2035          $1,770,000       $295,000       $70,800      $365,800       $224,026         $0.06          $29           $194,562     $ll 9,155       $0.03            $15
 2036          $1,475,000       $295,000       $59,000      $354,000       $216,799         $0.06          $28           $189,708     $116,182        $0.03            $15
 2037          $1,180,000       $295,000       $47,200      $342,200       $209,573         $0.05          $27           $184,854     $113,210        $0.03            $15
 2038            $885,000       $295,000       $35,400      $330,400       $?02,346         $0.05          $26                 $0            $0       $0.00            $0
 2039            $590,000       $295,000       $23,600      $318,600       $195,119         $0.05          $25                 $0            $0       $0.00            $0
 2040            $295,000       $295,000       $11,800      $306,800       $187,893         $0.05          $24                 $0            $0       $0.00            $0

                               X5,900,000    $2,478,000   $8,378,000 i   $5,130,913         $1.34          $658        $6,323,082   $3,872,426        $1.01           $496

  20    Average cost/year       $295,000      $123,900      $418,900                         $0.07         $33                                        $0.05            $25




        Debt exclusions.xlsx                                                           Pool - 20 yrs                                                          4/12/2019

Source page 3

BOLIVAR POOL PROJECT COSTS

CONSTRUCTION                            $5,146,639
DESIGN                                         $403,950
OPM SERVICES                                $222,670
SOFT COSTS                                     $48,000
FF&E                                              $50,000
CONTINGENCY                                $458,460
SUBTOTAL                                   $6,329,719
RETAINING WALL                             $118,000
TOTAL COSTS                               $6,447,719
LESS FUNDING ON HAND               ($340,000)

TOTAL PROJECT COSTS                          $6,107,719

[Original embedded text, retained for comparison]
BOI.IVAR POOL PROJECT COSTS


CONSTRUCTION                  $5,146,639
DESIGN                          $403,950
OPM SERVICES                    $222,670
SOFT COSTS                      $48,000
FF&E                            $50,000
CONTINGENCY                    $458,460
SUBTOTAL                      $6,329,719
RETAINING WALL                 $118,000
TOTAL COSTS                   $6,447,719
LESS FUNDING ON HAND          ($340,000)
TOTAL PROJECT COSTS           $6,107,719

Source page 4

Bolivar Pool

      PROJECT BUDGET STATUS REPORT


DRAFT - 4/1/19
DESCRIPTION                                                                                                                  Project Budget
                                                                                                              Original            Revised         Current

Ol CONSTRUCTION /HARD COSTS
    OS-001-01 4/1/19 RLB Estimated Construction Cos[ Rev2                                                 5     5,146,639 $             -     5     5,146,639
                                                                                           Subtota~ECC    S     5,146,639                     5     5,146,639

                                                                 TOTAL CONSTRUC710N /HARD CO5T5           $     5,146,639     S               $     5,146,639

02 SOFT COSTS
   OPM Services
    02-001-01 OPM Services -Pre-Town Meeting                                                              $        69,930 $             -     $        69,930
    02-001-02 OPM Services -Post-Town Meeting                                                             $       136,240 $             -     $      136,240
    02-001-03 OPM - Independent Cost Estimator(budget hold number)                                        5         15,000 5            -     $        15,000
    02-001-04   OPM -Reimbursable Expenses(budget hold number)                                            $          1,500 S            -     S         1,500
                                                                                 Subtotal OPM Soft Cost   $       222,670 S             -     5      222,670

   Designer Services
    02-002-01 Design Services-Feasibility/Programming/Schematic Design                                    5         47,700 $            -     5       47,700
    02-002-02 Design Services -Design Development                                                         $         70,150 $            -     $        70,150
    02-002-03 Design Services - Construction Documents                                                    5       101,600 $             -     $      101,600
    02-002-04 Design Services-Bid/Award                                                                   $          9,800 $            -     $         9,800
    02-002-OS   Design Services -Construction Administration/Project Closeout                             S        85,000 $             -     5       85,000
    02-002-06 Design Services -Site Surveys                                                               $          8,500 5            -     5         8,500
    02-002-07 Design Services-Geotechnical Investigation Services                                         $         17,550 $            -     $        17,550
    02-002-OS Design Services-HazMat-Investigation/Testing/Reporting                                      5         15,400 5            -     $        15,400
    02-002-09 Design Services - HozMat-Abatement Design (budget hold number)                              $          5,000 S            -     5         5,000
    02-002-10 Design Services -Aquatics Permitting -Department of Health                                  S          4,850 $            -     $         4,850
    02-002-11 Design Services -Site Permitting -Resource Area/Wetlands Delineation                        $          2,500 $            -     5         2,500
    02-002-12 Design Services -Site Permitting -Soil Evaluation for 5tormwater                            $          4,000 $           -      $         4,000
    02-002-13 Design Services -Site Permitting -Site Plan Permit Set                                      $          4,500 $           -      S         4,500
    02-002-14 Design Services -Site Permitting- Stormwater Mgmt System Design Engr Report                 $          5,500 $            -     $         5,500
    02-002-15 Design Services -Site Permitting -Draft Stormwater Poolution Prevention Plan                $          6,900 $           -      S         6,900
    02-002-16 Design Services -Site Permitting -Permit Application Coord &Permit Processing               $          5,000 $           -      $         5,000
    02-002-17 Design Services-G2phics Rendering                                                           $          4,500 $           -      S         4,500
    02-002-18 Design Services - FF&E Coordination                                                         $          5,500 5           -      $         5,500
    02-002-19   Design -Reimbursable Expenses(budget hold number)                                         S              -   S         -      S             -
                                                                           SubtotalDesignerSoft Cost      5       403,950 $            -      5      403,950

   Other anticipated Owner Soft Costs
    02-003-01   Utility Back charges(budget hold number)                                                  $        20,000 $            -      $       20,000
    02-003-02 Environmental Remediation (budget hold number)                                              $              -   $         -      S             -
    02-003-03 Construction Testing (budget hold number)                                                   $        10,000 S            -      5       10,000
    02-003-04   Owner's Insurance (budget hold number)                                                    $        10,000 S            -      S       10,000
    02-003-04 Pre-Construction Permit Fees(BRC has said all Town permitfees will be waived)               $              -   $         -      5             -
    02-003-OS   BidD Document Management(budget hold numbe~J                                              $          3,000 5           -      $        3,000
    02-003-06 Pre-Condition Survey(budget hold number)                                                    S          5,000 S           -      S        5,000
                                                           Subtotal Other Anticipated Owner Soft Costs    5        48,000    5         -      S       48,000

                                                                                    SOFT COSTS TOTAL      S       674,620    S         -      S      674,620

03 FF&E
   FF&E                                                                                                                      $         -      5
    03-001-01   FF&E(budget hold number; has not been vetted with Rec Dept)                               $        50,000 $            -      $       50,000
                                                                                         Subtotal FF&E    5        50,000 5            -      S       50,000

                                                                                           TOTAL FF&E     S        50,000    S         -      S       50,000

04 CONTINGENCIES
    04-001-OS   Owner's Construction Contingencies(7.5% of ECCJ (budget hold number)                      $       385,998 S            -      S      385,998
    04-002-01   Owner's Soft Cost/ FF&E(10% ofSoft Costs/FF&EJ (budget hold number)                       $        72,462 $            -      S       72,462
                                                                                 Subtotal Contingencies   $       458,460                     $      458,460

                                                                                 TOTAL CONTINGENCIES      S       458,460    S                S      458,460

SUMMARY
        Ol      Construction Cost/Hard Cost                                                               $     5,146,639 $            -      $     5,146,639
       02       Soft Costs                                                                                5       674,620 $            -      $      674,620
       03       FF&E                                                                                      $        50,000 $            -      $       50,000
       04       Contingencies                                                                             $       458,460    5                $      458,460

Source page 5

.~
                                 .~




                                                                                                                           '               ':3       ~ I ~t
                                        ~ _~y f
                                                                               1 ~
                                                                                                                                    ...'




                                                                                                                                                                         y Pt
                                                                                                                            C ~,,~~ ,            a

                                                                                                                                                                          i     4    ~~
  ~,                                                            ..                          -       -                 -;                                      .,
                                                           ~~7rr           ~                                    -
                         _                                 ►ra1'~'liir..                                                                                  ,~        ~~r~ ,w~-"rte
                                                   ~ ~ ~.        --
                                                         ~• ^~                                          sue.-          ~   !~   ~~ .'-_ ,                 -~~



                                 ~f~~                            y'



                                        ~~ ~ '''

 ~~                                                                  ~
  t

                                                                                 ~/   ---       ■

                                     _ __
                                                       c
  s~                 _       -   -

~ - ~.-
                                                                                                                                                                    ~~
                                                                                                                                                                   :.-


                                                                 .~                                                                                                             .`

                                                                                                                     ~.
                                                   ~ (—i                                                            ,~ ~ <_
                                                                                                                            ,~




          F_~~+
          ~ r
                ,~       r


          ~,~~, f~

Source page 6

}
     •~                                     _                ~ F
                                                                                       may.                                                                     :y :.   .1




                                                        i^               h'                                                   a   ~~~




                                                                                                                                                't



~~                                                ^~ `                            T—
                                                                       r~A                                        ~-fs
                              ~,~',.
                                   1
                                              n
                                                                                                              i
                               _ 111, ~   -- ,~                    ~~__>


                  ;~"'
                    r,/                `~                                                                                               - - -   -            yam~       ~
                  r




          ^~~'~                                                                                                          ~~
                    ,.a   ~                                                   ~                                               ~~il`         !        I   R




''-
~'




                                                .,.,,                                                   ~~
                                                                   —
                                                                       ~-_~`. ~~ ~
                                                                                 ~~
                                                                                  ~'
                                                  r
                                                                                                     ~ • ~r
                                                                                              ~,~•

Source page 7

.R             =~
                      4 ....~,.
                                                   t                        .~
                                                  s                                            J',
                                                                                                                    R~.   rr~

                                        ~~



                  ~                     ~-.                      _'              ~
                                                                                                         r
                                                                                                         !      T          ti




        t-~           ~
                                                                                     ..

                                                                      "~                                 Z "•
                                                                                                         :


                                                                                          ~f
              _   _        -        -                  ,; _•s
                                              P    ~    7
                                                                                                                    ~4
                                                                                                                     R




                               ~~                                                              ~~    l
                                                        ,
                                                        ^


                                                                                                     '
                                                                                                     t
                                                                                                     T
.~~i~




                                                                                                                                ~'1



                                                                                                                                y   ~


                                                                                                                                    t

Source page 8

SCHEMATE DESGN COSTESTMATE -REVSDN 2                         @1 APRIL 2019

TOWN OF CANTON -BOLWAR POOL FACLITY

CANTON,MA

Rider
RLB (iaveie
Bucknall

[Original embedded text, retained for comparison]
SCHEMATIC DESIGN COST ESTIMATE – REVISION 2   01 APRIL 2019


TOWN OF CANTON – BOLIVAR POOL FACILITY

CANTON, MA

Source page 9

Town of Canton - Bolivar Pool Facility
Schematic Design Cost Estimate - Revision 2

Project Details

 Description


 Basis of Estimate
     This estimate has been prepared at the request of CHA Consulting and is to provide a Schematic Design Cost
     Estimate for the proposed pool facility renovation project, located at Bolivar Street in Canton, MA.

     The estimate is based upon measured quantities and built-up rates prepared from the Schematic Design drawings
     issued to RLB on March 20 and 26, 2019, prepared by CHA Consulting.

     Where information was insufficient, assumptions and allowances were made based wherever possible on
     discussions with the architect and engineers.

     It is assumed that the project will be competitively bid by four to six general contractors and that the awarded
     contractor and all subcontractors will be required to pay prevailing wage rates. It is also expected that the project
     will be competitively bid by four to six subcontractors where filed sub-bids are required.

     Unit pricing is based on April 2019 costs. A Design / Estimating Contingency of 10% has been included.
     Construction cost escalation is included in the estimate at 5.0% and assumes a Q3 2019 construction start.

 Items Specifically Included
     . Please refer to Estimate Detail.

 Items Specifically Excluded
     . Hazardous materials abatement, unless noted otherwise.
     . Deep foundation systems
     . Costs associated with phasing the construction work, including out of hours work.
     . Furniture, Fittings and Equipment (FF&E).
     . Murals and works of art.
     . Work outside the site boundaries unless noted otherwise.
     . Special testing & inspections
     . Utility tap fees and charges
     . Permits & plan review fees
     . Owner's / Construction contingency.
     . Land and legal costs.
     . Architectural, Engineering and other professional fees.
     . Geotechnical, traffic and all other studies.
     . Items marked as "Excl." in the estimate.
     . Escalation beyond Q1 2020.

 Documents
     . Please refer to Basis of Estimate.




BOS19010-3                                                                                                          Page 1 of 41

Source page 10

Town of Canton - Bolivar Pool Facility
Schematic Design Cost Estimate - Revision 2
                                                                                       GFA: Gross Floor Area
Location Summary                                                                   Rates Current At April 2019

 Location                                                                 GFA SF      Cost/SF    Total Cost

 BD     BASE DESIGN
    A        Site Demolition                                                                        110,556
    B        Aquatic                                                                              2,980,959
    C        Pool Deck                                                                              375,509
    D        Bathhouse                                                     2,238        505.72    1,131,792
    E        Site Improvements                                                                      547,823
                                                       BD - BASE DESIGN    2,238     $2,299.66   $5,146,639
 ALT    ALTERNATES
    E1 Alt 1 - Asphalt paving ILO Gravel Parking Lot                                                126,959
    E2 Alt 2 - Soft surface to Splashpad                                                             53,134
    E3 Alt 3 - Main pool Starting Blocks                                                             41,219
    E4 Alt 4 - Shade Structure                                                                       30,138




BOS19010-3                                                                                            Page 1 of 1

Source page 11

Town of Canton - Bolivar Pool Facility
Schematic Design Cost Estimate - Revision 2
Summary - Site Demolition
BD BASE DESIGN
A Site Demolition                                                        Rates Current At April 2019

 Description                                                         %      Cost/SF    Total Cost

 02 Existing Conditions
    G1020    Site Demolition and Relocations                                               62,366
                                               Existing Conditions                        $62,366
 04 Masonry
    B2010    Exterior Walls                                                                  5,761
                                                         Masonry                           $5,761
 31 Earthwork
    G2020    Parking Lots                                                                  11,700
                                                        Earthwork                         $11,700
                                                SITE DEMOLITION                           $79,827




BOS19010-3                                                                                 Page 2 of 41

Source page 12

Town of Canton - Bolivar Pool Facility
Schematic Design Cost Estimate - Revision 2
Summary - Site Demolition



 Description                                                                  %       Cost/SF   Total Cost

 MARGINS & ADJUSTMENTS
 Allowance for Winter Conditions                                              1.5 %                $1,197
 General Conditions / General Requirements                                    9.5 %                $7,697
 Bonds & Insurances                                                           2.8 %                $2,440
 Overhead & Profit                                                            5.0 %                $4,558
 Design / Estimating Contingency                                             10.0 %                $9,572
 Escalation to Mid-Point of Construction (Feb 2020)                           5.0 %                $5,265

                                                      ESTIMATED TOTAL COST                       $110,556




BOS19010-3                                                                                         Page 3 of 41

Source page 13

Town of Canton - Bolivar Pool Facility
Schematic Design Cost Estimate - Revision 2
Details - Site Demolition
BD BASE DESIGN
A Site Demolition                                                                                   Rates Current At April 2019

 Description                                                                               Unit       Qty     Rate      Total

 02 Existing Conditions
    G1020       Site Demolition and Relocations
    84       Demolish existing one story bath house                                         SF    1,063.00    10.00    10,630
    219      Demolish existing paved walkway                                                SF     387.00      1.50        581
    216      Demolish existing concrete steps                                               SF      65.00      6.00        390
    87       Demolish existing concrete deck - assume 5" thick                              SF    9,090.00     2.50    22,725
    88       Remove and dispose of existing concrete retaining wall                         LF      33.00     75.00     2,475
    217      Remove and dispose of existing wood retaining wall                             LF      43.00     20.00        860
    90       Remove and dispose of existing pool fencing                                    LF     557.00     15.00     8,355
    91       Remove and dispose of existing jersey barrier wall                             LF      91.00     50.00     4,550
    222      Removal of existing parking sign pole                                          EA        2.00   100.00        200
    221      Removal of existing boulders                                                   EA        5.00   200.00     1,000
    92       Removal of existing tree stumps only                                           EA        2.00   300.00        600
    199      Allowance for miscellaneous demolition not indicated on plan                  Item                        10,000
                                                     Site Demolition and Relocations                                  $62,366
                                                                  Existing Conditions                                 $62,366
 04 Masonry
    B2010       Exterior Walls
    1        12" Ground face CMU Exterior wall                                              SF     128.02     45.00     5,761
                                                                        Exterior Walls                                 $5,761
                                                                              Masonry                                  $5,761
 31 Earthwork
    G2020       Parking Lots
    89       Lower parking area to offset fill within 100 yard floor plain - as per         CY     260.00     45.00    11,700
             CHA
                                                                            Parking Lots                              $11,700
                                                                            Earthwork                                 $11,700
                                                                   SITE DEMOLITION                                    $79,827




BOS19010-3                                                                                                            Page 4 of 41

Source page 14

Town of Canton - Bolivar Pool Facility
Schematic Design Cost Estimate - Revision 2
Summary - Aquatic
BD BASE DESIGN
B Aquatic                                                                    Rates Current At April 2019

 Description                                                             %      Cost/SF    Total Cost

 01 General Requirements
    GC       General Conditions                                                                  5,000
                                               General Requirements                            $5,000
 02 Existing Conditions
    G1020    Site Demolition and Relocations                                                   53,492
                                                 Existing Conditions                          $53,492
 04 Masonry
    B2010    Exterior Walls                                                                      5,761
                                                            Masonry                            $5,761
 22 Plumbing
    F2010    Building Elements Demolition                                                      20,000
                                                           Plumbing                           $20,000
 31 Earthwork
    G2040    Site Development                                                                  45,680
                                                          Earthwork                           $45,680
 32 Exterior Improvements
    D2090    Other Plumbing Systems                                                            40,000
    G2040    Site Development                                                               1,982,465
                                               Exterior Improvements                       $2,022,465
 33 Utilities
    D2090    Other Plumbing Systems                                                                Incl.
    G3090    Other Site Mechanical Utilities                                                       Incl.
                                                             Utilities                             Incl.
                                                           AQUATIC                         $2,152,398




BOS19010-3                                                                                     Page 5 of 41

Source page 15

Town of Canton - Bolivar Pool Facility
Schematic Design Cost Estimate - Revision 2
Summary - Aquatic



 Description                                                                  %       Cost/SF   Total Cost

 MARGINS & ADJUSTMENTS
 Allowance for Winter Conditions                                              1.5 %               $32,287
 General Conditions / General Requirements                                    9.5 %              $207,546
 Bonds & Insurances                                                           2.7 %               $65,786
 Overhead & Profit                                                            5.0 %              $122,901
 Design / Estimating Contingency                                             10.0 %              $258,091
 Escalation to Mid-Point of Construction (Feb 2020)                           5.0 %              $141,950

                                                      ESTIMATED TOTAL COST                      $2,980,959




BOS19010-3                                                                                         Page 6 of 41

Source page 16

Town of Canton - Bolivar Pool Facility
Schematic Design Cost Estimate - Revision 2
Details - Aquatic
BD BASE DESIGN
B Aquatic                                                                                         Rates Current At April 2019

 Description                                                                    Unit       Qty           Rate         Total

 01 General Requirements
    GC          General Conditions
    252      Mock-up                                                             LS        1.00      5,000.00         5,000
                                                          General Conditions                                        $5,000
                                                     General Requirements                                           $5,000
 02 Existing Conditions
    G1020       Site Demolition and Relocations
    94       Demolish existing outdoor main pool                                 SF    3,887.00         12.00       46,644
    128      Demolish existing outdoor kiddie pool                               SF     444.00          12.00         5,328
    204      Demolish existing shelter canopy                                    SF     304.00           5.00         1,520
                                          Site Demolition and Relocations                                          $53,492
                                                          Existing Conditions                                      $53,492
 04 Masonry
    B2010       Exterior Walls
    1        12" Ground face CMU Exterior wall                                   SF     128.02          45.00         5,761
                                                               Exterior Walls                                       $5,761
                                                                    Masonry                                         $5,761
 22 Plumbing
    F2010       Building Elements Demolition
    118      Demolish existing mechanical equipment (Main pool)                  LS        1.00     20,000.00       20,000
                                             Building Elements Demolition                                          $20,000
                                                                   Plumbing                                        $20,000
 31 Earthwork
    G2040       Site Development
    192      Excavation of Main pool                                             CY     466.00          15.00         6,990
    193      Remove and dispose excavated materials                              CY     466.00          30.00       13,980
    244      Extra over cost for rock excavation - allow 15%                     CY      70.00         100.00         7,000
    194      Prepare and compact subgrade                                        SF     533.00           0.30            160
    215      Imported gravel backfill                                            CY     174.00          50.00         8,700
    251      Gravel fill to Main pool - allow 12" thick                          CY     177.00          50.00         8,850
                                                            Site Development                                       $45,680
                                                                   Earthwork                                       $45,680
 32 Exterior Improvements
    D2090       Other Plumbing Systems
    96       Main drains (Main pool)                                             EA        4.00                         Incl.
    196      Main drains (Splashpad)                                             EA        3.00                         Incl.


BOS19010-3                                                                                                          Page 7 of 41

Source page 17

Town of Canton - Bolivar Pool Facility
Schematic Design Cost Estimate - Revision 2
Details - Aquatic
BD BASE DESIGN
B Aquatic (continued)                                                                         Rates Current At April 2019

 Description                                                                Unit       Qty           Rate         Total

    110      Surge tank (Main pool) - 16' x 8' x 8' deep                     LS        1.00     20,000.00       20,000
    134      Surge tank (Splashpad) - 16' x 8' x 8' deep                     LS        1.00     20,000.00       20,000
                                                  Other Plumbing Systems                                       $40,000
    G2040       Site Development
    248      Main pool, including concrete wall and floor, mechanical        LS        1.00   1,200,000.00   1,200,000
             component, pipings, valves, etc
    101      Main pool wall - allow 8" thick, including formwork and         SF     230.00                          Incl.
             reinforcement
    102      Concrete to Main pool floor - allow 8" thick,, including        SF    5,332.00                         Incl.
             formwork and reinforcement
    198      Concrete to Main pool stair - 6'-10" wide, including           FT/R       4.00                         Incl.
             formwork and reinforcement
    103      Beach entry ramp (Main pool)                                    LS        1.00                         Incl.
    106      Pool piping (Main pool)                                         LS        1.00                         Incl.
    107      Pool piping labor (Main pool)                                   LS        1.00                         Incl.
    209      Thicken slab under waterslide                                  Item                                     500
    203      Waterproofing membrane to wall and floor - assume not           SF    5,562.00                        Excl.
             required
    109      Accent tiling to Main pool wall                                 SF     230.00          25.00         5,750
    168      Accent tiling to Main pool floor and stair                      SF     533.00          25.00       13,325
    111      Diamond Brite finish to main pool                               SF    5,562.00         12.50       69,525
    104      Pool accessories - Metal railing to Main pool stair             LF      20.00         120.00         2,400
    115      Pool accessories - Grab rail with recessed steps (Main          EA        5.00       1,200.00        6,000
             pool)
    105      Pool accessories - Stainless steel gutter for pool deck         LF     401.00         285.00      114,285
             trench drain
    112      Pool accessories - New water slide (Main pool) - as per         EA        1.00     20,000.00       20,000
             CHA
    113      Pool accessories - Starting blocks sleeves (Main pool) - as     EA        6.00       1,000.00        6,000
             per CHA
    259      Pool accessories - Ladders (Main pool)                          EA        5.00        500.00         2,500
    197      Pool accessories - Lane divider line (Main pool) - by Owner     LF     508.00                         Excl.
    114      Pool accessories - Lifeguard chairs (Main pool) - by Owner      EA        1.00                        Excl.
    195      Pool accessories - Exterior signage                            Item                                     500
    116      Ancillary deck equipment (Main pool) - as per CHA               LS        1.00     40,000.00       40,000
    250      Splashpad, including concrete wall and floor, mechanical        LS        1.00    500,000.00      500,000
             component, pipings, valves, etc
    130      Concrete to Splashpad floor - allow 6" thick, including form    SF    1,482.00                         Incl.
             and reinforcement
    249      Concrete to Splashpad wall                                      SF     313.00                          Incl.


BOS19010-3                                                                                                      Page 8 of 41

Source page 18

Town of Canton - Bolivar Pool Facility
Schematic Design Cost Estimate - Revision 2
Details - Aquatic
BD BASE DESIGN
B Aquatic (continued)                                                                          Rates Current At April 2019

 Description                                                                    Unit    Qty           Rate         Total

    129      Gravel subbase to Splashpad - allow 6" thick                        CY    28.00         60.00         1,680
    117      ADA access lift (none indicated)                                    LS     1.00                        Excl.
                                                        Site Development                                     $1,982,465
                                                  Exterior Improvements                                      $2,022,465
 33 Utilities
    D2090       Other Plumbing Systems
    119      Pool mechanical - Filter system (Main pool)                         EA     1.00                         Incl.
    137      Pool mechanical - Filter system (Splashpad)                         EA     1.00                         Incl.
    120      Pool mechanical - Chemical equipment (Main pool)                    LS     1.00                         Incl.
    138      Pool mechanical - Chemical equipment (Splashpad)                    LS     1.00                         Incl.
    121      Pool mechanical - Pumps/ VFDs/ Strainers (Main pool)                LS     1.00                         Incl.
    139      Pool mechanical - Pumps/ VFDs/ Strainers (Splashpad)                LS     1.00                         Incl.
    122      Pool mechanical - Valves/ Pipe/ Fittings (Main pool)                LS     1.00                         Incl.
    140      Pool mechanical - Valves/ Pipe/ Fittings (Splashpad)                LS     1.00                         Incl.
    123      Pool mechanical - Water make up system (Main pool)                  EA     1.00                         Incl.
    142      Pool mechanical - Water make up system (Splashpad)                  EA     1.00                         Incl.
    124      Pool mechanical - Pipe supports (Main pool)                         EA    35.00                         Incl.
    143      Pool mechanical - Pipe supports (Splashpad)                         EA    20.00                         Incl.
    125      Pool mechanical - Backwash pit (Main pool)                          LS     1.00                         Incl.
    141      Pool mechanical - UV system (Splashpad)                             EA     1.00                         Incl.
    126      Pool mechanical - Miscellaneous pool equipment (Main                LS     1.00                         Incl.
             pool)
    127      Pool mechanical - Start up and training (Main pool)                 LS     1.00                         Incl.
    144      Pool mechanical - Start up and training (Splashpad)                 LS     1.00                         Incl.
                                                Other Plumbing Systems                                               Incl.
    G3090       Other Site Mechanical Utilities
    97       Underdrain piping (Main pool)                                       LS     1.00                         Incl.
    136      Underground piping (Splashpad)                                      LS     1.00                         Incl.
                                          Other Site Mechanical Utilities                                            Incl.
                                                                    Utilities                                        Incl.
                                                                AQUATIC                                      $2,152,398




BOS19010-3                                                                                                       Page 9 of 41

Source page 19

Town of Canton - Bolivar Pool Facility
Schematic Design Cost Estimate - Revision 2
Summary - Pool Deck
BD BASE DESIGN
C Pool Deck                                                                 Rates Current At April 2019

 Description                                                            %      Cost/SF    Total Cost

 04 Masonry
    B2010    Exterior Walls                                                                     5,761
                                                            Masonry                           $5,761
 22 Plumbing
    G3090    Other Site Mechanical Utilities                                                  30,000
                                                           Plumbing                          $30,000
 26 Electrical
    G4020    Site Lighting                                                                      2,000
                                                           Electrical                         $2,000
 32 Exterior Improvements
    G2040    Site Development                                                                233,375
                                               Exterior Improvements                        $233,375
                                                        POOL DECK                           $271,136




BOS19010-3                                                                                   Page 10 of 41

Source page 20

Town of Canton - Bolivar Pool Facility
Schematic Design Cost Estimate - Revision 2
Summary - Pool Deck



 Description                                                                  %       Cost/SF   Total Cost

 MARGINS & ADJUSTMENTS
 Allowance for Winter Conditions                                              1.5 %                $4,067
 General Conditions / General Requirements                                    9.5 %               $26,144
 Bonds & Insurances                                                           2.7 %                $8,287
 Overhead & Profit                                                            5.0 %               $15,482
 Design / Estimating Contingency                                             10.0 %               $32,512
 Escalation to Mid-Point of Construction (Feb 2020)                           5.0 %               $17,881

                                                      ESTIMATED TOTAL COST                       $375,509




BOS19010-3                                                                                        Page 11 of 41

Source page 21

Town of Canton - Bolivar Pool Facility
Schematic Design Cost Estimate - Revision 2
Details - Pool Deck
BD BASE DESIGN
C Pool Deck                                                                                         Rates Current At April 2019

 Description                                                                            Unit       Qty       Rate       Total

 04 Masonry
    B2010       Exterior Walls
    1        12" Ground face CMU Exterior wall                                           SF     128.02      45.00       5,761
                                                                      Exterior Walls                                  $5,761
                                                                           Masonry                                    $5,761
 22 Plumbing
    G3090       Other Site Mechanical Utilities
    152      Deck trench drains (Stainless steel gutter measured separately) -           LF     500.00      60.00     30,000
             quantity provided by CHA
                                                 Other Site Mechanical Utilities                                     $30,000
                                                                           Plumbing                                  $30,000
 26 Electrical
    G4020       Site Lighting
    79       Allowance for exterior lighting - Pool deck                                 EA        1.00   2,000.00      2,000
                                                                       Site Lighting                                  $2,000
                                                                           Electrical                                 $2,000
 32 Exterior Improvements
    G2040       Site Development
    153      Concrete deck - 5" thick, sealed, light broom finish, including             SF    9,500.00     11.00    104,500
             formwork and reinforcement (quantity provided by CHA)
    145      Concrete ramp to pool deck, including formwork and                          SF     207.00      15.00       3,105
             reinforcement
    146      Concrete stair to pool deck, 12'-5" wide                                   FT/R       6.00   1,600.00      9,600
    169      Metal railings to ramp and stairs                                           LF     133.00     360.00     47,880
    147      Retaining wall (north pool side) - 4' height - not required                 LF     189.00                   Excl.
    148      Retaining wall (spray pad/ ramp/ stairs) - 5' height - not required         LF      28.00                   Excl.
    149      Retaining wall (south side) - 3' height - not required                      LF     190.00                   Excl.
    150      Perimeter pool fencing - 8' height black vinyl coated chain link            LF     574.00      85.00     48,790
             fence
    151      Fence gate - single leaf swing gate                                         EA        2.00   1,000.00      2,000
    167      Fence gate - double leaf swing gate                                        Pair       2.00   2,000.00      4,000
    170      Fence gate - 12' slide gate                                                 EA        2.00   3,500.00      7,000
    154      Bond deck reinforcement to pool shell - Install bare copper wire            EA        5.00    900.00       4,500
             jumpers to deck - as per CHA




BOS19010-3                                                                                                           Page 12 of 41

Source page 22

Town of Canton - Bolivar Pool Facility
Schematic Design Cost Estimate - Revision 2
Details - Pool Deck
BD BASE DESIGN
C Pool Deck (continued)                                                                   Rates Current At April 2019

 Description                                                                      Unit   Qty       Rate       Total

    190      Allowance for awning canopy to ticket area                            LS    1.00   2,000.00      2,000
                                                              Site Development                             $233,375
                                                          Exterior Improvements                            $233,375
                                                                   POOL DECK                               $271,136




BOS19010-3                                                                                                 Page 13 of 41

Source page 23

Town of Canton - Bolivar Pool Facility
Schematic Design Cost Estimate - Revision 2
Summary - Bathhouse
BD BASE DESIGN                                                          GFA: 2,238 SF Cost/SF: $365.15
D Bathhouse                                                                    Rates Current At April 2019

 Description                                                            %         Cost/SF    Total Cost

 01 General Requirements
    GC       General Conditions                                                    2.23/SF         5,000
                                               General Requirements               $2.23/SF       $5,000
 03 Concrete
    A1010    Standard Foundations                                                 36.60/SF       81,900
    A1030    Slab on Grade                                                         9.05/SF       20,250
                                                            Concrete             $45.64/SF     $102,150
 04 Masonry
    B2010    Exterior Walls                                                       45.40/SF      101,598
    C1010    Partitions                                                           27.05/SF       60,530
                                                            Masonry              $72.44/SF     $162,128
 06 Wood, Plastics, and Composites
    B1020    Roof Construction                                                    23.99/SF       53,694
    B2010    Exterior Walls                                                        5.23/SF       11,701
    C1030    Fittings                                                              1.50/SF         3,357
    E2010    Fixed Furnishings                                                     3.31/SF         7,400
                                      Wood, Plastics, and Composites             $34.03/SF      $76,152
 07 Thermal and Moisture Protection
    A1010    Standard Foundations                                                  0.22/SF            495
    A1030    Slab on Grade                                                         0.45/SF         1,013
    B2010    Exterior Walls                                                        4.11/SF         9,195
    B3010    Roof Coverings                                                       19.99/SF       44,746
    D2040    Rain Water Drainage                                                   1.39/SF         3,105
                                      Thermal and Moisture Protection            $26.16/SF      $58,554
 08 Openings
    B2020    Exterior Windows                                                      0.40/SF            900
    B2030    Exterior Doors                                                        6.66/SF       14,900
    C1020    Interior Doors                                                        2.01/SF         4,500
                                                           Openings               $9.07/SF      $20,300
 09 Finishings
    C3010    Wall Finishes                                                         5.46/SF       12,226
    C3020    Floor Finishes                                                       10.84/SF       24,255
    C3030    Ceiling Finishes                                                      9.92/SF       22,194
                                                           Finishings            $26.22/SF      $58,675




BOS19010-3                                                                                      Page 14 of 41

Source page 24

Town of Canton - Bolivar Pool Facility
Schematic Design Cost Estimate - Revision 2
Summary - Bathhouse
BD BASE DESIGN                                                                       GFA: 2,238 SF Cost/SF: $365.15
D Bathhouse (continued)                                                                     Rates Current At April 2019

 Description                                                                         %         Cost/SF    Total Cost

 10 Specialties
    C1030    Fittings                                                                           7.60/SF       17,000
                                                                      Specialties              $7.60/SF      $17,000
 21 Fire Suppression
    D4010    Sprinklers                                                                                          Excl.
                                                                Fire Suppression                                 Excl.
 22 Plumbing
    D2010    Plumbing Fixtures                                                                 28.24/SF       63,200
    D2020    Domestic Water Distribution                                                       21.72/SF       48,600
    D2030    Sanitary Waste                                                                    16.09/SF       36,000
    D2090    Other Plumbing Systems                                                             4.47/SF       10,000
                                                                        Plumbing              $70.51/SF     $157,800
 23 Heating, Ventilating, and Air Conditioning
    D3010    Energy Supply                                                                      1.00/SF         2,238
    D3020    Heat Generating Systems                                                                             Excl.
    D3040    Distribution Systems                                                              11.00/SF       24,618
    D3060    Controls & Instrumentations                                                        2.00/SF         4,476
    D3070    Systems Testing & Balancing                                                        0.50/SF         1,119
    D3090    Other HVAC Systems & Equipment                                                     2.23/SF         5,000
                                        Heating, Ventilating, and Air Conditioning            $16.73/SF      $37,451
 26 Electrical
    D5010    Electrical Service & Distribution                                                 10.00/SF       22,380
    D5020    Lighting and Branch Wiring                                                        13.00/SF       29,094
    D5090    Other Electrical Systems                                                           3.01/SF         6,738
    G4020    Site Lighting                                                                      0.89/SF         2,000
                                                                        Electrical            $26.90/SF      $60,212
 27 Communications
    D5030    Communications & Security                                                          9.69/SF       21,690
                                                                Communications                 $9.69/SF      $21,690
 28 Electronic Safety and Security
    D5030    Communications & Security                                                          6.07/SF       13,595
                                                   Electronic Safety and Security              $6.07/SF      $13,595
 31 Earthwork
    A1010    Standard Foundations                                                               7.13/SF       15,966



BOS19010-3                                                                                                   Page 15 of 41

Source page 25

Town of Canton - Bolivar Pool Facility
Schematic Design Cost Estimate - Revision 2
Summary - Bathhouse
BD BASE DESIGN                                              GFA: 2,238 SF Cost/SF: $365.15
D Bathhouse (continued)                                            Rates Current At April 2019

 Description                                                %         Cost/SF    Total Cost

    A1030    Slab on Grade                                             4.71/SF       10,535
                                                Earthwork            $11.84/SF      $26,501
                                              BATHHOUSE            $365.15/SF      $817,208




BOS19010-3                                                                          Page 16 of 41

Source page 26

Town of Canton - Bolivar Pool Facility
Schematic Design Cost Estimate - Revision 2
Summary - Bathhouse



 Description                                                                  %       Cost/SF   Total Cost

 MARGINS & ADJUSTMENTS
 Allowance for Winter Conditions                                              1.5 %               $12,259
 General Conditions / General Requirements                                    9.5 %               $78,800
 Bonds & Insurances                                                           2.7 %               $24,977
 Overhead & Profit                                                            5.0 %               $46,662
 Design / Estimating Contingency                                             10.0 %               $97,991
 Escalation to Mid-Point of Construction (Feb 2020)                           5.0 %               $53,895

                                                      ESTIMATED TOTAL COST            $505.72   $1,131,792




BOS19010-3                                                                                        Page 17 of 41

Source page 27

Town of Canton - Bolivar Pool Facility
Schematic Design Cost Estimate - Revision 2
Details - Bathhouse
BD BASE DESIGN                                                                               GFA: 2,238 SF Cost/SF: $365.15
D Bathhouse                                                                                         Rates Current At April 2019

 Description                                                                         Unit       Qty          Rate       Total

 01 General Requirements
    GC          General Conditions
    252      Mock-up                                                                  LS        1.00     5,000.00       5,000
                                                              General Conditions                         $2.23/SF     $5,000
                                                          General Requirements                           $2.23/SF     $5,000
 03 Concrete
    A1010       Standard Foundations
    16       Concrete strip footing, complete - allow 2' x 1' deep                    LF     258.00         70.00     18,060
    17       Concrete frost wall, complete - allow 1'- 4" thick                       SF     774.00         60.00     46,440
    21       Interior concrete retaining wall - allow 1'-4" thick                     SF     216.00         60.00     12,960
    220      Concrete pad footing, complete - allow 2' x 2' x 1' deep                 EA        8.00       300.00       2,400
    225      Concrete piers, complete - allow 1' x 1'                                 LF      24.00         85.00       2,040
                                                          Standard Foundations                         $36.60/SF     $81,900
    A1030       Slab on Grade
    15       Concrete slab on grade, complete; 5" thick                               SF    2,025.00        10.00     20,250
                                                                    Slab on Grade                        $9.05/SF    $20,250
                                                                        Concrete                       $45.64/SF    $102,150
 04 Masonry
    B2010       Exterior Walls
    1        12" Ground face CMU Exterior wall                                        SF    2,257.71        45.00    101,598
                                                                    Exterior Walls                     $45.40/SF    $101,598
    C1010       Partitions
    4        8" CMU Interior partition                                                SF    1,882.00        25.00     47,050
    5        4" CMU Interior partition                                                SF     674.00         20.00     13,480
                                                                        Partitions                     $27.05/SF     $60,530
                                                                         Masonry                       $72.44/SF    $162,128
 06 Wood, Plastics, and Composites
    B1020       Roof Construction
    22       Wood roof framing including trusses, rafters and decking                 SF    2,983.00        18.00     53,694
                                                               Roof Construction                       $23.99/SF     $53,694
    B2010       Exterior Walls
    28       Exterior wood stud framing to gable, 2" x 6"                             SF     599.00         12.00       7,188
    29       Plywood sheathing to gable                                               SF     599.00          2.00       1,198
    34       Allowance for roof trim                                                  LF     221.00         15.00       3,315
                                                                    Exterior Walls                       $5.23/SF    $11,701




BOS19010-3                                                                                                           Page 18 of 41

Source page 28

Town of Canton - Bolivar Pool Facility
Schematic Design Cost Estimate - Revision 2
Details - Bathhouse
BD BASE DESIGN                                                                             GFA: 2,238 SF Cost/SF: $365.15
D Bathhouse (continued)                                                                           Rates Current At April 2019

 Description                                                                       Unit       Qty          Rate       Total

    C1030       Fittings
    50       Allowance for miscellaneous wood blocking and rough carpentry          SF    2,238.00         1.50       3,357
                                                                        Fittings                       $1.50/SF     $3,357
    E2010       Fixed Furnishings
    53       Casework to concessions - Solid counter top                            LF      16.00        250.00       4,000
    218      Casework to concessions - Wall cabinet                                 LF        7.00       200.00       1,400
    54       Allowance for built-in casework to First Aid                          Item                               2,000
                                                              Fixed Furnishings                        $3.31/SF     $7,400
                                               Wood, Plastics, and Composites                        $34.03/SF     $76,152
 07 Thermal and Moisture Protection
    A1010       Standard Foundations
    235      Rigid insulation - not required                                        SF     990.00                      Excl.
    236      Air and vapor barrier                                                  SF     990.00          0.50          495
                                                        Standard Foundations                           $0.22/SF        $495
    A1030       Slab on Grade
    237      Rigid insulation - not required                                        SF    2,025.00                     Excl.
    238      Air and vapor barrier                                                  SF    2,025.00         0.50       1,013
                                                                 Slab on Grade                         $0.45/SF     $1,013
    B2010       Exterior Walls
    30       Cementitious wall siding to gable                                      SF     599.00         15.00       8,985
    31       Building wrap                                                          SF     599.00          0.35          210
    33       Allowance for building insulation                                      SF    2,856.00                     Excl.
                                                                  Exterior Walls                       $4.11/SF     $9,195
    B3010       Roof Coverings
    23       Asphalt shingles                                                       SF    2,983.00        11.00     32,813
    24       Roof sheathing                                                         SF    2,983.00                      Incl.
    25       Allowance for roof blocking                                            SF    2,983.00         1.00       2,983
    26       Allowance for roof flashings                                           SF    2,983.00         0.50       1,492
    27       Allowance for vapor barrier, weather backing etc                       SF    2,983.00         2.50       7,458
                                                                Roof Coverings                       $19.99/SF     $44,746
    D2040       Rain Water Drainage
    57       Allowance for gutters                                                  LF     127.00         15.00       1,905
    58       Allowance for downspouts                                               LF      60.00         20.00       1,200
                                                            Rain Water Drainage                        $1.39/SF     $3,105
                                               Thermal and Moisture Protection                       $26.16/SF     $58,554




BOS19010-3                                                                                                         Page 19 of 41

Source page 29

Town of Canton - Bolivar Pool Facility
Schematic Design Cost Estimate - Revision 2
Details - Bathhouse
BD BASE DESIGN                                                                              GFA: 2,238 SF Cost/SF: $365.15
D Bathhouse (continued)                                                                            Rates Current At April 2019

 Description                                                                        Unit       Qty          Rate       Total

 08 Openings
    B2020       Exterior Windows
    14       Glazed aluminum window                                                  SF        9.00       100.00          900
                                                             Exterior Windows                           $0.40/SF        $900
    B2030       Exterior Doors
    6        Single leaf fiberglass door, including frame finish and hardware        EA        7.00     1,300.00       9,100
    7        Double leaf fiberglass door, including frame finish and hardware       Pair       1.00     2,500.00       2,500
    9        Overhead roller shutter door to concession serving hatch                SF      15.00        100.00       1,500
    10       Aluminum louvers including fluoropolymer custom color finish            SF      20.00         90.00       1,800
                                                                 Exterior Doors                         $6.66/SF    $14,900
    C1020       Interior Doors
    8        Single leaf solid web core steel door, 1-3/4" thick, including          EA        3.00     1,500.00       4,500
             frame finish and hardware
                                                                   Interior Doors                       $2.01/SF     $4,500
                                                                         Openings                       $9.07/SF    $20,300
 09 Finishings
    C3010       Wall Finishes
    239      Prepare and apply epoxy paint to interior CMU walls                     SF    6,113.00         2.00     12,226
                                                                  Wall Finishes                         $5.46/SF    $12,226
    C3020       Floor Finishes
    11       Epoxy resin flooring with integral base                                 SF    1,151.00        20.00     23,020
    12       Concrete sealer                                                         SF     686.00          1.80       1,235
                                                                 Floor Finishes                       $10.84/SF     $24,255
    C3030       Ceiling Finishes
    13       Suspended ceiling system, including furring to underside of             SF     788.00         15.00     11,820
             truss, cementitious backerboard, reinforcing mesh, 2-coat
             sealing system and colored sealer
    253      5/8" painted gypsum board sheathing under roof deck                     SF    1,729.00         6.00     10,374
                                                               Ceiling Finishes                         $9.92/SF    $22,194
                                                                      Finishings                      $26.22/SF     $58,675
 10 Specialties
    C1030       Fittings
    18       Floor mounted toilet partitions, solid phenolic, standard               EA        6.00     1,200.00       7,200
    19       Floor mounted toilet partitions, solid phenolic, accessible             EA        2.00     1,500.00       3,000
    20       Wall mounted urinal screen                                              EA        1.00       550.00          550
    46       Swimsuit dryer - not required                                           EA        2.00                     Excl.
    47       Shower rail and curtain                                                 EA      10.00         80.00          800


BOS19010-3                                                                                                          Page 20 of 41

Source page 30

Town of Canton - Bolivar Pool Facility
Schematic Design Cost Estimate - Revision 2
Details - Bathhouse
BD BASE DESIGN                                                                              GFA: 2,238 SF Cost/SF: $365.15
D Bathhouse (continued)                                                                            Rates Current At April 2019

 Description                                                                        Unit       Qty          Rate       Total

    48       Infant changing table                                                   EA        1.00       400.00          400
    49       ADA Grab bar set                                                        EA        3.00       250.00          750
    255      Mirrors to vanity sinks - allow 24" x 36"                               EA        9.00       200.00       1,800
    51       Allowance for interior signage - not required                           SF    2,238.00                     Excl.
    52       Allowance for exterior signage                                         Item                               2,500
                                                                         Fittings                       $7.60/SF    $17,000
                                                                     Specialties                        $7.60/SF    $17,000
 21 Fire Suppression
    D4010       Sprinklers
    93       Allowance for sprinkler system                                          SF    2,238.00                     Excl.
                                                                     Sprinklers                                         Excl.
                                                               Fire Suppression                                         Excl.
 22 Plumbing
    D2010       Plumbing Fixtures
    35       Urinal                                                                  EA        2.00     1,200.00       2,400
    36       Water closet - Standard                                                 EA        6.00     1,600.00       9,600
    37       Water closet - ADA                                                      EA        3.00     1,600.00       4,800
    38       Vanity sink with faucet (quantity provided by CHA)                      EA        9.00     1,600.00     14,400
    39       Janitors sink with faucet                                               EA        1.00     1,500.00       1,500
    40       Allowance for sink with faucet to Concessions & First Aid               EA        2.00     2,000.00       4,000
    41       Shower with trim                                                        EA      10.00      2,500.00     25,000
    42       Hose bid - Internal                                                     EA        2.00       500.00       1,000
    43       Hose bib - External                                                     EA        1.00       500.00          500
                                                              Plumbing Fixtures                       $28.24/SF     $63,200
    D2020       Domestic Water Distribution
    55       Allowance for domestic water distribution including piping, water       EA      36.00      1,350.00     48,600
             heaters, insulation etc.
                                                 Domestic Water Distribution                          $21.72/SF     $48,600
    D2030       Sanitary Waste
    56       Allowance for sanitary waste system including piping, drains,           EA      36.00      1,000.00     36,000
             clean-outs etc
                                                              Sanitary Waste                          $16.09/SF     $36,000
    D2090       Other Plumbing Systems
    59       Allowance for natural gas system - not required                        Item                                Excl.
    60       Allowance for Sub-Contractor's GC/GR                                    LS        1.00    10,000.00     10,000
                                                         Other Plumbing Systems                         $4.47/SF    $10,000
                                                                      Plumbing                        $70.51/SF    $157,800


BOS19010-3                                                                                                          Page 21 of 41

Source page 31

Town of Canton - Bolivar Pool Facility
Schematic Design Cost Estimate - Revision 2
Details - Bathhouse
BD BASE DESIGN                                                                             GFA: 2,238 SF Cost/SF: $365.15
D Bathhouse (continued)                                                                           Rates Current At April 2019

 Description                                                                       Unit       Qty          Rate       Total

 23 Heating, Ventilating, and Air Conditioning
    D3010       Energy Supply
    62       Allowance for air conditioning system                                  SF    2,238.00                     Excl.
    65       Allowance for dampers, registers, grilles etc                          SF    2,238.00         1.00       2,238
                                                               Energy Supply                           $1.00/SF     $2,238
    D3020       Heat Generating Systems
    61       Allowance for heat generating system                                   SF    2,238.00                     Excl.
                                                     Heat Generating Systems                                           Excl.
    D3040       Distribution Systems
    63       Allowance for ventilation systems                                      SF    2,238.00         8.00     17,904
    64       Allowance for galvanized ductwork                                      SF    2,238.00         3.00       6,714
                                                         Distribution Systems                        $11.00/SF     $24,618
    D3060       Controls & Instrumentations
    66       Allowance for controls                                                 SF    2,238.00         2.00       4,476
                                                  Controls & Instrumentations                          $2.00/SF     $4,476
    D3070       Systems Testing & Balancing
    67       Allowance for testing and balancing                                    SF    2,238.00         0.50       1,119
                                                 Systems Testing & Balancing                           $0.50/SF     $1,119
    D3090       Other HVAC Systems & Equipment
    68       Allowance for rigging and handling                                    Item                               2,500
    69       Allowance for testing and commissioning - assumed not                 Item                                Excl.
             required
    70       Allowance for Sub-Contractor's GC/GR                                   LS        1.00     2,500.00       2,500
                                          Other HVAC Systems & Equipment                               $2.23/SF     $5,000
                                  Heating, Ventilating, and Air Conditioning                         $16.73/SF     $37,451
 26 Electrical
    D5010       Electrical Service & Distribution
    71       Allowance for electrical distribution system including                 SF    2,238.00        10.00     22,380
             panelboards, feeders, mechanical connections etc
                                               Electrical Service & Distribution                     $10.00/SF     $22,380
    D5020       Lighting and Branch Wiring
    72       Allowance for lighting fixtures including switches, controls and       SF    2,238.00        10.00     22,380
             wiring
    73       Allowance for secondary branch power including receptacles,            SF    2,238.00         3.00       6,714
             wiring etc
                                                    Lighting and Branch Wiring                       $13.00/SF     $29,094
    D5090       Other Electrical Systems
    74       Allowance for grounding and bonding                                    SF    2,238.00         1.00       2,238

BOS19010-3                                                                                                         Page 22 of 41

Source page 32

Town of Canton - Bolivar Pool Facility
Schematic Design Cost Estimate - Revision 2
Details - Bathhouse
BD BASE DESIGN                                                                            GFA: 2,238 SF Cost/SF: $365.15
D Bathhouse (continued)                                                                          Rates Current At April 2019

 Description                                                                      Unit       Qty          Rate       Total

    75       Allowance for Sub-Contractor's GC/GR                                  LS        1.00     4,500.00       4,500
                                                      Other Electrical Systems                        $3.01/SF     $6,738
    G4020       Site Lighting
    78       Allowance for exterior lighting - Bathhouse                           EA        4.00       500.00       2,000
                                                                  Site Lighting                       $0.89/SF     $2,000
                                                                     Electrical                     $26.90/SF     $60,212
 27 Communications
    D5030       Communications & Security
    81       Allowance for public address infrastructure (Head-end                Item                               1,500
             equipment by Owner) - as per CHA
    82       Allowance for tel/data infrastructure (Head-end equipment by          SF    2,238.00         5.00     11,190
             Owner)
    166      Allowance for WiFi installation                                      Item                               2,000
    258      Allowance for radio control system - as per CHA                       LS        1.00     7,000.00       7,000
                                                   Communications & Security                          $9.69/SF    $21,690
                                                               Communications                         $9.69/SF    $21,690
 28 Electronic Safety and Security
    D5030       Communications & Security
    83       Allowance for fire alarm system                                       SF    2,238.00         2.50       5,595
    85       Allowance for security camera                                         EA        4.00     2,000.00       8,000
                                                   Communications & Security                          $6.07/SF    $13,595
                                                 Electronic Safety and Security                       $6.07/SF    $13,595
 31 Earthwork
    A1010       Standard Foundations
    224      Excavate for building foundations                                     CY     172.00         15.00       2,580
    231      Extra over cost for rock excavation - allow 15%                       CY      26.00        100.00       2,600
    226      Remove excavated materials from site                                  CY     172.00         30.00       5,160
    227      Prepare and compact subbase                                           SF     548.00          2.00       1,096
    228      Imported backfill                                                     CY     151.00         30.00       4,530
                                                        Standard Foundations                          $7.13/SF    $15,966
    A1030       Slab on Grade
    229      Excavate for slab on grade                                            CY      69.00         15.00       1,035
    232      Extra over cost for rock excavation - allow 15%                       CY      11.00        100.00       1,100
    230      Remove excavated materials from site                                  CY      69.00         30.00       2,070
    233      Prepare and compact subbase                                           SF    2,025.00         2.00       4,050




BOS19010-3                                                                                                        Page 23 of 41

Source page 33

Town of Canton - Bolivar Pool Facility
Schematic Design Cost Estimate - Revision 2
Details - Bathhouse
BD BASE DESIGN                                                          GFA: 2,238 SF Cost/SF: $365.15
D Bathhouse (continued)                                                        Rates Current At April 2019

 Description                                                     Unit      Qty          Rate       Total

    234      Granular fill below slab on grade                    CY     38.00         60.00       2,280
                                                 Slab on Grade                      $4.71/SF    $10,535
                                                    Earthwork                     $11.84/SF     $26,501
                                                 BATHHOUSE                       $365.15/SF    $817,208




BOS19010-3                                                                                      Page 24 of 41

Source page 34

Town of Canton - Bolivar Pool Facility
Schematic Design Cost Estimate - Revision 2
Summary - Site Improvements
BD BASE DESIGN
E Site Improvements                                                         Rates Current At April 2019

 Description                                                            %      Cost/SF    Total Cost

 04 Masonry
    B2010    Exterior Walls                                                                     5,761
                                                           Masonry                            $5,761
 22 Plumbing
    D2010    Plumbing Fixtures                                                                  6,000
    D2020    Domestic Water Distribution                                                        2,700
                                                          Plumbing                            $8,700
 26 Electrical
    G4010    Electrical Distribution                                                             Excl.
    G4020    Site Lighting                                                                      2,000
                                                          Electrical                          $2,000
 31 Earthwork
    G1030    Site Earthwork                                                                  152,151
    G2020    Parking Lots                                                                     19,075
    G2030    Pedestrian Paving                                                                  1,979
                                                         Earthwork                          $173,205
 32 Exterior Improvements
    G2020    Parking Lots                                                                       8,572
    G2030    Pedestrian Paving                                                                10,147
    G2040    Site Development                                                                   7,500
    G2050    Landscaping                                                                      20,000
                                              Exterior Improvements                          $46,219
 33 Utilities
    G3010    Water Supply                                                                     29,450
    G3020    Sanitary Water                                                                     7,500
    G3030    Storm Sewer                                                                     122,720
    G4010    Electrical Distribution                                                             Excl.
                                                            Utilities                       $159,670
                                              SITE IMPROVEMENTS                             $395,555




BOS19010-3                                                                                   Page 25 of 41

Source page 35

Town of Canton - Bolivar Pool Facility
Schematic Design Cost Estimate - Revision 2
Summary - Site Improvements



 Description                                                                  %       Cost/SF   Total Cost

 MARGINS & ADJUSTMENTS
 Allowance for Winter Conditions                                              1.5 %                $5,933
 General Conditions / General Requirements                                    9.5 %               $38,141
 Bonds & Insurances                                                           2.8 %               $12,090
 Overhead & Profit                                                            5.0 %               $22,586
 Design / Estimating Contingency                                             10.0 %               $47,431
 Escalation to Mid-Point of Construction (Feb 2020)                           5.0 %               $26,087

                                                      ESTIMATED TOTAL COST                       $547,823




BOS19010-3                                                                                        Page 26 of 41

Source page 36

Town of Canton - Bolivar Pool Facility
Schematic Design Cost Estimate - Revision 2
Details - Site Improvements
BD BASE DESIGN
E Site Improvements                                                                               Rates Current At April 2019

 Description                                                                        Unit        Qty        Rate       Total

 04 Masonry
    B2010       Exterior Walls
    1        12" Ground face CMU Exterior wall                                       SF      128.03       45.00       5,761
                                                                 Exterior Walls                                     $5,761
                                                                       Masonry                                      $5,761
 22 Plumbing
    D2010       Plumbing Fixtures
    45       Water fountain - ADA                                                    EA         2.00   3,000.00       6,000
                                                             Plumbing Fixtures                                      $6,000
    D2020       Domestic Water Distribution
    256      Allowance for domestic water distribution including piping, etc.        EA         2.00   1,350.00       2,700
                                                  Domestic Water Distribution                                       $2,700
                                                                      Plumbing                                      $8,700
 26 Electrical
    G4010       Electrical Distribution
    76       Transformer (by Utility Co.)                                            LS         1.00                   Excl.
                                                         Electrical Distribution                                       Excl.
    G4020       Site Lighting
    80       Allowance for exterior lighting - Parking                               EA         1.00   2,000.00       2,000
                                                                   Site Lighting                                    $2,000
                                                                       Electrical                                   $2,000
 31 Earthwork
    G1030       Site Earthwork
    201      Construction entrance                                                   EA         1.00   5,000.00       5,000
    202      Construction fence                                                      LF      990.00       15.00     14,850
    200      Fine grading                                                            SF    44,540.00       0.15       6,681
    241      Fill to proposed level                                                  CY     1,866.00      35.00     65,310
    242      Cut to proposed level                                                   CY     2,411.00      10.00     24,110
    243      Extra over cost for rock excavation - allow 15%                         CY      362.00      100.00     36,200
                                                                 Site Earthwork                                   $152,151
    G2020       Parking Lots
    157      Excavate for parking lot - refer to Earthwork                           CY      429.90                     Incl.
    182      Remove and dispose excavated materials - refer to Earthwork             CY      429.90                     Incl.
    183      Prepare and compact subgrade                                            SF    21,582.00       0.30       6,475
    156      Gravel paving                                                           CY      420.00       30.00     12,600
                                                                   Parking Lots                                    $19,075


BOS19010-3                                                                                                         Page 27 of 41

Source page 37

Town of Canton - Bolivar Pool Facility
Schematic Design Cost Estimate - Revision 2
Details - Site Improvements
BD BASE DESIGN
E Site Improvements (continued)                                                                 Rates Current At April 2019

 Description                                                                      Unit        Qty        Rate       Total

    G2030       Pedestrian Paving
    174      Excavate for concrete sidewalk - refer to Earthwork                   CY       74.00                     Incl.
    175      Remove and dispose excavated materials - refer to Earthwork           CY       74.00                     Incl.
    176      Prepare and compact subgrade                                          SF     1,398.00       0.30          419
    177      Gravel subbase - allow 6" thick                                       CY       26.00       60.00       1,560
                                                           Pedestrian Paving                                      $1,979
                                                                     Earthwork                                  $173,205
 32 Exterior Improvements
    G2020       Parking Lots
    208      Bituminous concrete pavement comprising of 2-1/2" top course          SY       90.60       30.00       2,718
             and 1-1/2" binder course to handicap spaces
    178      Concrete curb                                                         LF      150.00       30.00       4,500
    179      Line marking - Parking line                                           LF       90.30        2.00          181
    180      Line marking - Striping                                               LF      109.00        2.50          273
    181      Line marking - ADA symbol                                             EA         3.00     300.00          900
                                                                   Parking Lots                                   $8,572
    G2030       Pedestrian Paving
    171      Concrete sidewalk - allow 5" thick, including formwork and            SF     1,398.00       7.00       9,786
             reinforcement
    172      Concrete accessible ramp                                              SF      103.00        3.50          361
    173      Pavement curb - included with Parking                                 LS         1.00                    Incl.
                                                           Pedestrian Paving                                     $10,147
    G2040       Site Development
    135      Pool accessories - Bench seating (Main pool) - by Owner               LF       48.00                    Excl.
    133      Pool accessories - Bench seating (Splashpad) - by Owner               LF       16.00                    Excl.
    164      Allowance for new signage at entry (as per CHA)                      Item                              7,500
                                                            Site Development                                      $7,500
    G2050       Landscaping
    155      Lawn restoration - as per CHA                                         SF    10,000.00       2.00     20,000
                                                                   Landscaping                                   $20,000
                                                      Exterior Improvements                                      $46,219
 33 Utilities
    G3010       Water Supply
    212      Allowance for water supply line                                       LF      309.00       50.00     15,450
    213      Connection to existing system                                         EA         1.00   5,000.00       5,000
    240      Trenching and backfill                                                LF      309.00       20.00       6,180



BOS19010-3                                                                                                       Page 28 of 41

Source page 38

Town of Canton - Bolivar Pool Facility
Schematic Design Cost Estimate - Revision 2
Details - Site Improvements
BD BASE DESIGN
E Site Improvements (continued)                                                                Rates Current At April 2019

 Description                                                                        Unit     Qty        Rate       Total

    245      Extra over cost for rock trenching - allow 15%                          LF     47.00      60.00       2,820
                                                                  Water Supply                                   $29,450
    G3020       Sanitary Water
    160      Connect new building to existing line                                   LS      1.00    7,500.00      7,500
                                                                 Sanitary Water                                   $7,500
    G3030       Storm Sewer
    161      Relocate existing storm line - 24" diameter HDPE                        LF    111.00      50.00       5,550
    162      Storm manholes                                                          EA      3.00    4,000.00     12,000
    163      Storm drain - 12" diameter                                              LF    117.00      30.00       3,510
    205      Allowance for underground detention / recharge system (as per           LS      1.00   75,000.00     75,000
             CHA)
    206      Allowance for bioretention system (as per CHA)                          LS      1.00   20,000.00     20,000
    246      Trenching and backfill                                                  LF    228.00      20.00       4,560
    247      Extra over cost for rock trenching - allow 15%                          LF     35.00      60.00       2,100
                                                                   Storm Sewer                                  $122,720
    G4010       Electrical Distribution
    207      Overhead electrical cable (by Utility Co.)                              LF    116.00                   Excl.
    159      Relocate existing electrical pole - by Owner                            EA      1.00                   Excl.
    165      Allowance for connection to relocated pole - by Owner                   LS      1.00                   Excl.
                                                          Electrical Distribution                                   Excl.
                                                                        Utilities                               $159,670
                                                          SITE IMPROVEMENTS                                     $395,555




BOS19010-3                                                                                                      Page 29 of 41

Source page 39

Town of Canton - Bolivar Pool Facility
Schematic Design Cost Estimate - Revision 2
Summary - Alternate 1
ALT ALTERNATES
E1 Alt 1 - Asphalt paving ILO Gravel Parking Lot                                    Rates Current At April 2019

 Description                                                                    %      Cost/SF    Total Cost

 04 Masonry
    B2010    Exterior Walls                                                                             5,762
                                                                     Masonry                          $5,762
 31 Earthwork
    G2020    Parking Lots                                                                             15,390
                                                                   Earthwork                         $15,390
 32 Exterior Improvements
    G2020    Parking Lots                                                                             70,519
                                                        Exterior Improvements                        $70,519
                              ALT 1 - ASPHALT PAVING ILO GRAVEL PARKING LOT                          $91,671




BOS19010-3                                                                                           Page 30 of 41

Source page 40

Town of Canton - Bolivar Pool Facility
Schematic Design Cost Estimate - Revision 2
Summary - Alternate 1



 Description                                                                  %       Cost/SF   Total Cost

 MARGINS & ADJUSTMENTS
 Allowance for Winter Conditions                                              1.5 %                $1,375
 General Conditions / General Requirements                                    9.5 %                $8,839
 Bonds & Insurances                                                           2.8 %                $2,802
 Overhead & Profit                                                            5.0 %                $5,234
 Design / Estimating Contingency                                             10.0 %               $10,992
 Escalation to Mid-Point of Construction (Feb 2020)                           5.0 %                $6,046

                                                      ESTIMATED TOTAL COST                       $126,959