MUNICIPAL FY14 CAPITAL REQUESTS part 1 of 3
Saved text from 58 source pages. Transcription and OCR may contain errors; verify figures and wording against the original. Retrieved 2026-10-15.
Source page 1
11/12/2012 22:24 7818309642 COA! : PAGE 02/03
TOWN OF CANTON
FORM B - FISCAL 2014
CAPITAL PROJECT / EQUIPMENT REQUEST
DEPARTREVT:
at4ed.:} AolP 4
PROJEQ1/ EQUIPMENT TITLE,:
600
IQIAL PROJECT QUIPMENT COST:
.
,AVIRAZIVIR=8111.4.,
00 °
DESCR T ON: 1
ZZI
O ff
,I1994,PMFORVIAZIIIDAta
PURPO E AND JUSTIFICATION:
0 e4Grat,la& 6) /a/
1,.E.E.E-ASS.I.E.11r1ON,: (Check all that apply) pepartment9I Priority Ranktnq:
Required for Safety Please rank this request out of your total
,quired by Law or Mandate requests for this year: (#1 as top priority)
— Improve/Expand Service or Increase Efficiency (#) OF (#)
lanned Project or Replacement E e ted Useful Life: (check one)
_Unplanned Project or Replacement or More Yrs 5 to 9 Years
New Project/Item (not on last year's 5-Yr. Plan) 10 to 19 Years 3 to 4 Years
r.RRIMINSIIIK04061,
t.iststpl : (Check one) Revetri c (Check one)
Will Reduce Cost by $,
Will Produce Add! Revenue by $
No Impact Revenue Neutral (no impact)
Will Increase Cost by $ will Decrease Revenue by $
,14VPAPIPALei,
OTHER COMMENTS OR INFORMATION: (Attach supporting documentati n)
4'4-Z cAK
CM419
FORMS FISCAL 2014
(MC U4),A (L4?-6- YCJLSource page 2
Decemeber 19, 2012 CANTON SENIOR CENTER BUILDING RENOVATIONS COMMITTEE ADDITIONAL COSTS $ 73,050.00 Architect (Phase 2) Construction Documents, Bid Documents, Bidding, Construction administration $ 26,000.00 Clerk of the Works ($1,000 per week, 26 Weeks $ 5,000.00 Data ($50,000 in budget to low) $ 100,000.00 FF&E $ 15,000.00 Commercial stove (Discussion with COA is needed) Will change program design on kitchen $ 10,000.00 3 heating ovens $ 2,000.00 Dishwasher $ 15,000.00 Fireplace $ 5,000.00 Refrigerator $ 40,000.00 Canope 20' x 16' Program discussion with COA and BOS $ 291,050.00 Total $ 14,500.00 Contingency 5% $ 305,550.00 Total Project $ 1,374,325.84 Architects Projected costs $ 1,679,875.84 Total of Senior Center $ (450,000.00) Available Revenue $ 1,229,875.84 Revenue needed at Town Meeting
Source page 3
Canto' ,,enior Center Basic L._.,ding Repair Former Knights of Colt.,. Jus Building
Town of Canton - Bldg Renovation Committee Renovations 500 Pleasant Street
De artment of A: n:
Item and Description
Canton MA 02021
.
Unit Unit Price Quantity Total Cost Notes -
1- Gen eral Conditions
Site Supervisor wk $2,500.00 24 $60,000.00 6 months
Project Manager hr $150.00 120 $18,000.00 5 hours per week
Temporary Protection Building Perimeter ea $100.00 24 $2,400.00 per opening- estimated
Dumpsters ea $750.00 12 $9,000.00 bi-weekly
Supervision Office/Trailer wk $100.00 18 $1,800.00
Temp Toilet wk $150.00 18 $2,700.00
Staging Is $0.00 0 $0.00 by sub contractor as needed
Final Clean-up Is $1,920.00 1 $1,920.00 4m1d=32x50=1600 + 20%= 1920
$95,820.00
2- Demolition Envelope Base
Excavate at perimeter If $28.75 320 $9,200.00 2 men 3 days = 2x8x3x75= 3600 + at 1000/wk = 4600 x 2 bkfl
VAT Abatement sf $4.00 6000 $24,000.00
Abatement Documentation + Administration Is $2,500.00 0 $0.00 In Arch Cpontract
Abatement Testing + Verification Is $1,000.00 0 $0.00 In Arch Contract
Remove Faux Brick Front Façade sf $2.00 650 $1,300.00 2 men 1 day = 2x8x75=1200
Remove chimney Is $500.00 1 $500.00
Remove ext doors ea $100.00 5 $500.00
Remove Existing windows ea $100.00 7 $700.00
Demo Kitchen Equipment and Hood Is $560.00 1 $560.00 2m 1D = 16 x 75 = 560
Remove Interior Wood Partitions sf $2.57 1280 $3,289.60
Remove Interior CMU Partitions sf $3.05 688 $2,098.40
Remove front Entry Marquee Is $4,900.00 1 $4,900.00 4M 10 = 32 x 75= 2400 + machine 1250 + disposal 1000
toilet rooms demo floor Is $1,200.00 1 $1,200.00 2M 1 d = 32 x 75=
toilet rooms demo wall Is $1,200.00 1 $1,200.00 2m 1 d = 16 x 75=
Ext Connect to sewer Is $10,000.00 1 $10,000.00
Sawcut interior concrete slab to reach waste LF $25.00 56 $1,400.00
Remove conc slab for plmbg removal and new constrc SF $12.50 112 $1,400.00
Make exterior at doors accessible ea $1,200.00 5 $6,000.00
$68,248.00
3 - Concrete
New floor slab - dowel reinforcement between new am EA $51.00 64 $3,264.00
New floor slab - slab on grade concrete CY $286.45 2 $572.90 20 sf at .3 cf = 20 cf = 1 CY
New floor slab - smooth finish to match existing and pi Is $1,250.00 1 $1,250.00
Concrete Total $5,086.90
4-Masonry
Richard Alvord Architects
12/19/2012 Design Development 1Source page 4
Cantor s,enior Center Basic L....poling Repair Former Knights of Colu. .us Building
Town of Canton - Bldg Renovation Committee Renovations 500 Pleasant Street
Deiartment of A- in•_ Canton MA 02021
Item and Description Unit Unit Price Quantity Total Cost Notes
FSB stablize existing masonry cmu Is $19,600.00 1 $19,600.00 4M 5D at 110 = 17600+ 2000 materials
FSB New Interior Masonry Openings ea $1,750.00 5 $8,750.00
FSB New Wide Interior Masonry Openings ea $3,500.00 2 $7,000.00
FSB New Exterior Masonry Openings ea $1,750.00 17 $29,750.00
$65,100.00
5 Metals
-
Metals Total $0.00 Lintels in Masonry
6 Wood, Plastics and Composites
-
Tiedown Trusses/hurricsane ties ea $32.00 45 $1,440.00 both sides- labor .25 hr ea = 15 + tie $1 = 16 each x 2
Tiedown lowe roof framing ea $32.00 134 $4,288.00 both sides- labor .25 hr ea = 15 + tie $1 = 16 each x 2
New Partitions Steel Studs Only LF $8.25 500 $4,125.00
Soffits replace sf $19.00 430 $8,170.00
fascia repair If $16.50 120 $1,980.00
new partition at toilet rooms If $75.00 40 $3,000.00
Exterior Perimeter Interior Wall Repair SF $1.50 2528 $3,792.00
general repairs sf $1.50 4000 $6,000.00
Wood, Plastics and Trim Total $32,795.00
7 -Thermal and Moisture Protection
Roof insulation at main room sf $2.00 3120 $6,240.00
Roof Insulation Spray in sf $12.00 2570 $30,840.00
new insulation system below grade sf $25.00 1280 $32,000.00 320 If x 4=
Rubber Roof Patch at HVAC sf $35.00 250 $8,750.00
Roof Patch Asphalt at Ducts sf $50.00 150 $7,500.00 Oincludes some wood structure restoration
Thermal and Moisture Protection Total $85,330.00
FSB EIFS system sf $24.00 2895 $69,480.00
EIFS Total $69,480.00
Richard Alvord Architects
12/19/2012 Design Development 2Source page 5
Canto'. ,enior Center Basic iding Repair Former Knights of Colt,. .us Building
Town of Canton - Bldg Renovation Committee Renovations 500 Pleasant Street
De artment of A: in:
Canton MA 02021
Item and Description Unit Unit Price Quantity Total Cost Notes
8- Openings
new ext doors Steel with frame ea $2,400.00 3 $7,200.00 Furnish and Install, special condition
Exterior French Doors ea $4,000.00 1 $4,000.00
New Entrance Doors ea $3,250.00 1 $3,250.00
New Entrance Storefront sf $75.00 42 $3,150.00
Vestibule Door ea $2,250.00 1 $2,250.00
Vestibule Framing sf $55.00 42 $2,310.00
Auto Door opener ea $2,500.00 2 $5,000.00
New Windows A ea $1,180.00 9 $10,620.00 Furnish $480.00 +Install$250 + special condition $250 + Patch $200
New Windows B ea $1,225.00 8 $9,800.00 Furnish $525.00 +Install$250 + special condition $250 + Patch $200
New Windows C ea $1,005.00 2 $2,010.00 Furnish $305.00 +Install$250 + special condition $250 + Patch $200
new int doors ea $1,250.00 30 $37,500.00
Openings Total $87,090.00
9- Finishes
main room ceiling and grid sf $4.00 3040 $12,160.00
Ceiling and grid kitchen sf $5.00 262 $1,310.00
toilet room ceiling and grid sf $4.00 420 $1,680.00
GWB ceiling paint and patch sf $4.00 1860 $7,440.00
GWB 5/8" on new Steel studwalls sf $1.75 8424 $14,742.00
wall tile toilet rooms sf $9.50 240 $2,280.00
floor tile toilet rooms sf $8.90 420 $3,738.00
New Floor Tile Kitchen sf $8.90 270 $2,403.00
New Floor At Companion Toilet sf $8.90 80 $712.00
New Floor at Staff Toilet sf $8.90 46 $409.40
Floor Prep sf $1.50 5150 $7,725.00
new VCT other rooms sf $3.38 5000 $16,900.00
Finishes Total $71,499.40
FSB (1 prime/ 2 Finish Coats) Low VOC paint - walls sf $3.65 10952 $39,974.80 interior partitions 8424 +m perimeter 2528 = 10,952
Painting Total $39,974.80
10 - Specialties
Accordion Doors sf $33.50 256 $8,576.00
Folding Acoustic Panel Partition sf $59.00 288 $16,992.00
Reinforce for acoustic folding doors al $7,500.00 1 $7,500.00
toilet partitions mens If $805.00 3 $2,415.00 805 per stall X 3 =2415
toilet partitions womens If $805.00 4 $3,220.00 805 per stall
Toilet accessories Is $2,784.00 1 $2,784.00 TP Disp 8 (280) Hand Fan 4(22001 Soap Dispenser 41240) hooks 4(64)
Specialties Total $41,487.00
12- Furnishings
Richard Alvord Architects
12/19/2012 Design Development 3Source page 6
Canto,. ,enior Center Basic ._ ..iding Repair Former Knights of Col, Jus Building
Town of Canton - Bldg Renovation Committee Renovations 500 Pleasant Street
De artment of A:. n:
Canton MA 02021
Item and Description Unit Unit Price Quantity Total Cost Notes
Closet Pole and Shelf ea $550.00 2 $1,100.00 pole shelf wood furnish and install
pull down shades for windows ea $35.00 32 $1,120.00
kitchen cabinets standard - lowers If $400.00 46 $18,400.00
kitchen cabinets standard - uppers If $250.00 12 $3,000.00
kitchen countertops sf $110.00 90 $9,900.00
Furnishings Total $33,520.00
13- Special Construction
Fiber Optic Service Is $25,000.00 1 $25,000.00
Data Wiring al $10,000.00 1 $10,000.00
Telephone Wiring/ System al $15,000.00 1 $15,000.00
Special Construction total $50,000.00
15700 HVAC
FSB Remove HVAC Ducts - and machines sf $2.00 6108 $12,216.00
Complete new system $17.50 6108 $106,890.00 15-20 PER SF
$119,106.00
FSB 15300 FIRE PROTECTION
Police Detail ea $720.00 2 $1,440.00
Water Service from street Is $35,000.00 1 $35,000.00
Distribution and Heads sf $7.50 6108 $45,810.00
$82,250.00
15400- Plumbing
FSB Plumbing remove existing Is $4,800.00 1 $4,800.00 2M 4D = 2x8x4x75
new fixtures at mens toilet room ea $2,500.00 5 $12,500.00
new fixtures at womens toilet room ea $2,500.00 5 $12,500.00
Coffee bar ea $1,500.00 1 $1,500.00
Drinking Fountain ea $4,500.00 1 $4,500.00
new toilet fixtures at small toilet room ea $2,500.00 2 $5,000.00
Companion Room Fixtures ea $2,500.00 2 $5,000.00
new water heater toilet rooms ea $4,500.00 1 $4,500.00
new water heater kitchen $4,500.00 1 $4,500.00
new water heater sm toilet room ea $4,500.00 1 $4,500.00
Kitchen Sink ea $2,500.00 1 $2,500.00
Plumbing Total $61,800.00
16000 Electrical
FSB Remove Electrical remove service sf $2.00 6108 $12,216.00
All new electrical service, ciruitry lighting etc SF $15.00 6107 $91,605.00
Electrical Total $103,821.00
Richard Alvord Architects
12/19/2012 Design Development 4Source page 7
Canto, -en ior Center Basic ding Repair Former Knights of Coll.....Jus Building
Town of Canton - Bldg Renovation Committee Renovations 500 Pleasant Street
De•artment of Ain
Canton MA 02021
Item and Description Unit Unit Price Quantity Total Cost Notes
SUMMARY FSB GC Mark-up
1- General Conditions $95,820.00 $54,153.18
2- Demolition Envelope Base $68,248.00
3 - Concrete $5,086.90 —
FSB 4-Masonry $65,100.00 —
Filed Sub Bid GC Mark-up $6,510.00 _-
5-Metals $0.00
6- Wood, Plastics and Composites $32,795.00
FSB 7 -Thermal and Moisture Protection EIFS $69,480.00 '-
FSB GC Mark-up $6,948.00
7 -Thermal and Moisture Protection $85,330.00 —
8 - Openings $87,090.00
9 - Finishes $71,499.40 —
FSB Painting $39,974.80
FSB Painting
Painting GC Mark-up $3,997.48 r-
10 -Specialties $41,487.00 --
12- Furnishings $33,520.00
13- Special Construction $50,000.00
FSB 15700 HVAC $119,106.00
FSB HVAC GC Mark-up $11,910.60
FSB 15300 FIRE PROTECTION $82,250.00 --
fsb Fire Protection GC Mark-up $8,225.00 ----
FSB 16400- Plumbing $61,800.00 -
PSB Plumbing GC Mark-up $6,180.00
FSB 16000 Electrical $103,821.00
Electrical FSB GC Mark-up $10,382.10
sub $1,166,561.28
0H+P 10% $116,656.13 V
-
sub $1,283,217.41 -"
Bond 2% $25,664.35
Sub $1,308,881.76 -/
Contingency 5% $65,444.09 /
total Project $1,374,325.84
Building Area 6108
Cost per SF $225.00
Richard Alvord Architects
12/19/2012 Design Development 5Source page 8
Canto t, .enior Center Basic Repair Former Knights of Colu...aus Building
Town of Canton — Bldg Renovation Committee Renovations 500 Pleasant Street
De artment of A n:
Canton MA 02021
Item and Description
: Unit Unit Price Quantity Total Cost Notes
ELECTIVES
Add "Fireside Room"
Remove Partition If $90.00 16
- -$1,440.00
Special Partion Construction al $2,000.00 1 $2,000.00
Add Built-in book shelves ea $3,500.00 2 $7,000.00
Mantle ea $2,500.00 1 $2,500.00
Stone Hearth sf $150.00 6 $900.00
Gas Fireplace ea $550.00 1 $550.00
Gas Pipe al $2,500.00 1 $2,500.00 includes instal fire log
$14,010.00
Richard Alvord Architects
12/19/2012 Design Development 6Source page 9
TOWN OF CANTON
FORM B - FISCAL 2014
CAPITAL PROJECT / EQUIPMENT REQUEST
....111■
177, 810
DEPARTMENT: SUBMITTED BY:
Public Works Michael Trotta
PROJECT / EQUIPMENT TITLE:
Fueling Equipment Upgrade
imp=
TOTAL PROJECT / EQUIPMENT COST:
$75,000
pumszamar
DESCRIPTION:
Replace fuel pumps, electronic controls, and monitoring system on the existing fuel island at
the Public Works Garage
PURPOSE AND JUSTIFICATION:
The fleet fueling and monitoring system does not meet revised MA EP code requirements.
The fuel dispensers do not have a leak sensor, there is no emergency off switch for the fuel
island, and the high level alarm for tanks must be made visual from outside. This project will
upgrade the fuel dispensing system to meet code and also upgrade outdated SCADA software
control and fuel use reporting system.
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking:
x Required for Safety Please rank this request out of your total
x Required by Law or Mandate requests for this year: (#1 as top priority)
Improve/Expand Service or Increase Efficiency 1 (#) OF 9 (#)
Planned Project or Replacement Expected Useful Life: (Check one)
Unplanned Project or Replacement 20 or More Yrs 5 to 9 Years
x New Project/Item (not on last year's 5-Yr. Plan) x 10 to 19 Years 3 to 4 Years
Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
Will Reduce Cost by $ Will Produce Addl Revenue by $
x No Impact x Revenue Neutral (no impact)
Will Increase Cost by $ Will Decrease Revenue by $
i■
Iwr
OTHERC s liMENTS OR INFORMATION: (Attach supporting documentation)Source page 10
Northeastern Petroleum Service and Supply Inc.
Ip b mEturi
37 Brookley Road 0 Jamaica Plain, MA 02130 r
617-522-8390-8391-8392
Industrial Measurement and Control Division
617-522-6060-6061 Page of
QUOTATION & CONTRACT FORM
To: Town of Canton —DPW No. 102912
801 Washington Street In reply, refer to this number
Canton, MA 02021
Date: 10-29-12
'Attention Of: William J. Walsh Jr.
Your Inquiry: Fueling Equipment Upgrade
Gentlemen:
We are pleased to submit quotation on our interpretation of your requirements, subject to
printed on reverse side of this proposal. terms and conditions
Thank you on the opportunity to quote you on upgrading your existing fueling facility. The
quote will be divided into three sections.
Section I, will be cover replacing your existing obsolete Topkat fuel management system with a
Fuelmaster fuel management system. We will also include adding a dispenser leak sensor for the
gasoline and diesel dispensers. The existing dispensers do not have a leak sensor. This will
bring the dispensers up to code. Also there is no existing emergency shut off switch for the
fueling island. We will add one to bring fueling island up to code.
Section II will cover replacing your existing obsolete Gasboy dispensers with Dresser Wayne
dispensers. This section will also include decommissioning your existing phase two vapor
recovery system. The DEP now allows sites that arc replacing their dispensers to decommission
their phase two vapor recovery equipment and use standard nozzles and hoses.
Section III will cover replacing your existing Veeder Root system with a new Veeder Root
TLS300C system. The new console will allow for network connection. We will remove. the
existing Veeder Root hi level alarm from the tank area. It does not meet code being installed in a
hazardous area. We will provide a new hi level alarm with signage and install it on the outside
of the maintenance building.
See Next Page For Section I
o Northeastern Petroleum Service and Supply Inc.
PURCHASER 0 Industrial Measurement and Control Div.
By
DULY AUTHONIZED AGENT
Date Paul McMahon, Sales Manager
TITLE
Terms and Conditions printed on reverse side of this sheet, and any attachment hereto, constitute a part of this
quotation and contract,Source page 11
MEAIDEII
Northeastern Petroleum Service and Supply Inc.
37 Brookley Road 0 Jamaica Plain, MA 02130
617-522-8390-8391-8392
Industrial Measurement and Control Division
617-522-6060-6061 Page of
QUOTATION & CONTRACT CONTINUATION SHEET
SECTION I, FUELMASTER FUEL MANAGEMENT SYSTEM
Thank you for this opportunity to quote you on a FuelMaster AIM2 fuel management system.
The AIM2 system uses AIM modules that are connected to your vehicles on board computer.
The module identifies the vehicle, captures the odometer reading, and many engine codes., It is
automatic and theft proof. It does not require operator interaction, although an operator ID
number can be entered on the key pad of the reader pedestal if operator tracking is desired. The
AIM2 system will also work with keys. The keys can be replaced with AIM2 modules as your
budget allows.
The cost for the standard black keys are $4.20 each. The cost for the colored keys are $4.40 each
and are available in blue, green, orange, and red. Please determine how many keys will be
needed and add the cost to the Fuelmaster quote. I recommend purchasing keys for the vehicles
you intend to use AIM modules on, The installation of the AIM modules could take awhile,
depending on how quick your mechanic installs them. In the mean time the vehicles could fuel
immediately using the keys.
The cost for the AIM 2.4 modules for single tank vehicles are $250.00 each. The cost for two
tank vehicles is $325.00. Please determine how many vehicles will be outfitted with AIM 2.4
modules and add to the above Fuelmaster quote.
Fuelmaster will send a factory representative to train your mechanic on installing AIM modules
on ten vehicles of your choice.
If you decide to just start with a key system only, but have the system AIM2 ready, then deduct
$2,995.00 from the Fuelmaster quote for factory AIM2 training. The training can be ordered and
scheduled at a later time. If you only want a key system and not AIM ready, then deduct an
additional $2,227.00 from the quote,
Please See The Next Page Far The Fuelmaster QuoteSource page 12
Northeastern Petroleum Service and Supply Inc.
37 Brookley Road * Jamaica Plain, MA 02130
617-522-8390-8391-8392
Industrial Measurement and Control Division
617-522-6060-6061 Page of
QUOTATION & CONTRACT CONTINUATION SHEET
FUELMASTER EQUIPMENT
QTY. DESCRIPTION
NET TOTAL
1 FuelMaster FMU 3500 Plus Prokee / RF Tag Fuel Management $17,621.00
System, The following is included with the system:
1 — FM1J 3500 Plus Prokee/RF tag Master Unit
1 — Windows Plus software ( Access )
1 — Prokee encoder
1 — Network card.
1 — AIM2 Installation Training
2 — Additional hose controllers
1 — Start Up & software training
Note: Please determine how many keys and AIM2 modules
are required and add to the above price,
2 Veeder Root dispenser leak sensors for each gas & diesel dispenser. $760.00
1 OPTIONAL — Fuelmaster Sequel server software instead of the $346.00
standard Windows Access software,
9 If you do not replace your existing dispensers at this time, you will $788,00
need to purchase a pulse transmitter for the gasoline and diesel
dispenser, The cost is $294.00 each.
NOTE: Your IT person will need to be on site when the software is installed and when the start
up is scheduled. IT Will need to provide us with an IP address for the work station PC that the
software will be connected to. Also he will need to provide us with an available network switch
that is tied in with your network. We will use this to connect our CAT6 cable to.
See Next Page For Ft-On:aster Electrical QuoteSource page 13
Northeastern Petroleum Service and Supply Inc.
p
&I r MEl
n
37 Brooldey Road 0 Jamaica Plain, MA 02130 9m, um!
617-522-8390-8391-8392
Industrial Measurement and Control Division
617-522-6060-6061 Page of
QUOTATION & CONTRACT CONTINUATION SHEET
SECTION I, FUELMASTER ELECTRICAL QUOTE
Mount the new Fuelmaster reader in the center of the island. Utilize the trench on the island (if
the town saw cuts and prepare one) to install new rigid conduits to each of the dispensers, or
install two rigid conduits from the reader to each dispenser mounted on top of the concrete with
unistrut supports.
Eliminate the wiring to the Topkat console on top of the dispensers.
Extend from the new Veeder Root console ifl the back garage office with two 18 gauge shielded
cables to the new dispenser sump leak sensors located in each dispenser sump.
Extend from the new Veeder Root console a category 6 shielded cable for communication to
your network work stations. Terminate the cable in the garage back office with a *surface box
ready for the town's IT person to connect it to the town's network,
Provide all required explosion proof fittings for the island.
Furnish and install four isolation relays to prevent back feeds to the fuel pumps.
Install new shielded cables from the reader to each dispenser hose for pulse control.
Emergency shut down means for the fuel island. Furnish and install two six pole relays and
enclosure at the wiring box located where the wires go to the fuel island, Run all power and
neutral wires which feed the dispensers, fuel management reader, and submersible pumps
through the relays. In the event of an emergency all power feeding the island will be
disconnected, Furnish and install an all weather proof panic push button control on the side of
the garage facing the fuel island. This button when pushed will disconnect all power. Furnish
and install instructional signs on both sides of each dispenser and at the push button location.
All work will be done in conjunction with an electrical perinit.
This quote is based upon the reuse of existing conduit raceways or using new conduit raceways
installed by the town.
The cost for the above work is $12,026.30
TOTAL FOR SECTION I, LESS KEYS, AIM MODULES, PULSERS & OPTIONS
$30,407.00
See Next Page For Section IISource page 14
EMUE ii
Northeastern Petroleum Service and Supply inc.
37 Brookley Road o Jamaica Plain, MA 02130
617-522-8390-8391-8392
EL
....1t(13101
Industrial Measurement and Control Division
617-522-6060-6061 Page of
QUOTATION & CONTRACT CONTINUATION SHEET
SECTION II, DRESSER WAYNE DISPENSERS EQUIPMENT
QTY. DESCRIPTION
NET TOTAL
Dresser Wayne, twin hose, mechanical registration, gasoline
dispenser. The following is included for each hose: $10,952.00
1 - Pulse transmitter 10-1
I — Automatic hi speed nozzle
I — Hose 3/4 X 15'
1 — Breakaway with whip hose
1 - Swivel
1 — OPW hi hose retriever
1 — Emergency shut off shear valve with fusible link shut off
Note: The DEP now allows sites that are replacing their dispensers
to decommission their phase two vapor recovery equipment and use
standard nozzles and hoses. We will decommission the gasoline
phase two equipment and provide the proper paper work for you to
submit to the DEP. We will have a state certified third party
contractor perform the necessary tests for decommissioning the
system. The above price includes removing the existing dispenser
and installing the new dispenser and accessories. Also we will
remove the existing vapor assist pump and related piping. We will
reuse the existing piping. If for any reason we cannot, we will stop
" the job and re quote. Electrical work is quoted separate on the next
page.
1
Dresser Wayne, twin hose, mechanical registration, diesel dispenser.
$9901.22
The following equipment is also included for each hose:
1 - Pulse transmitter 10-1
1 — Automatic hi speed nozzle.
1 _Hosel" X 15'
1 — OPW hi hose retriever
I — Breakaway with whip hose
1 - Swivel
• 1 — Emergency shut off shear valve with fusible
link shut off
NOTE: The above price includes removing the existing dispenser
and installing the new dispenser and accessories. We will reuse the
existing piping. If for any reason we cannot, we will stop the job
and re quote. Electrical work is quoted separate on the next page.
See Next Page For Section II, Electrical QuoteSource page 15
1.11 M OL
Northeastern Petroleum Service and Supply Inc.
37 Brooldey Road 0 Jamaica Plain, MA 02130 E11):
MUr
6 17-522-8390-8391-8392
Industrial Measurement and Control Division
617-522-6060-6061 Page of
QUOTATION & CONTRACT CONTINUATION SHEET
SECTION II, DISPENSER ELECTRICAL QUOTE
Disconnect the conduits and wiring to both dispensers.
Furnish and provide two explosion proof junction boxes for the power wiring. Extend up to the
power control boxes in the new dispensers.
Modify the pulsar and sump sensor conduits and extend the conduits and wiring to the new
controls.
All work to be done in conjunction with an electrical permit.
This quote is based upon the reuse of existing underground raceways.
The cost for the above work is $3,272,50
NOTE: This quote is based upon the dispenser being replaced at the same time that the new
Fuehnaster reader is being installed. If the dispensers are done at a later date then please
increase quote by $2,300.00.
TOTAL FOR SECTION II
324,125.50
See Next Page For Section IIISource page 16
?. t 131131311
Northeastern Petroleum Service and Supply Inc.
37 Brookley Road o Jamaica Plain, MA 02130 .11.11 UM-1M -
617-522-8390-8391-8392
Industrial Measurement and Control Division
.617-522-6060-6061 Page of
QUOTATION & CONTRACT CONTINUATION SHEET
SECTION III, VEEDER ROOT IN TANK LEVEL MONITORING SYSTEM EQUIPMENT
QTY. DESCRIPTION
NET TOTAL
1 Veeder Root TLS300C in tank level monitoring system. The system $11,952.00
Will include the following:
1 — TLS300C console with built in printer
2 — Mag Plus level probes
1 — Gasoline float kit for ethanol mix
1 — Diesel float kit
2 — Interstitial leak sensors
1 — Ethernet module
I — Hi level alarm and acknowledgement switch
2 — Probe 4" cap & ring kits
2 — Interstitial 2" leak sensor cap & ring kit
1 — Probe install, start up, and training
SECTION III, VEEDER ROOT ELECTRICAL
Remove the existing Veeder Root console and all cables going to the probes, and sensors on the
above ground tanks.
Install the new Veeder Root console in the same location. Reconnect the power and control
raceways.
Replace the explosion proof ey fittings at the tank site and inside the building for this conduit.
Replace the explosion proofjunction box at this site. Modify the conduits.
Install four 18 gauge shielded cables, two for the sensors and two for the probes.
Reconnect the probes & sensors. Tie into control cabinet.
Remove the high level alarm and acknowledgement switch, which do hot belong in the
explosion proof area. Mount both units On the maintenance building facing the tanks for easy
visual. Provide signs at both filling ports directing them to the high level control switch.
The cost for the above work is $7,245.70
TOTAL FOR SECTION III
$19,197.70
GRAND TOTAL FOR SECTIONS I, II, & III
.$73,730.20
Thank you for this opportunity to be of service. I look forward to meeting your needs.Source page 17
high quality
Designed as a
and cost effective tank
monitoring system.
This system is for non-retail, commercial
industrial, and municipal tank owners. The
TLS-300C two tank configurable console
offers the ultimate flexibility in one to two
tank inventory control, and in-tank leak
detection systems.
Veeder-Root's TLS-300C tank monitoring
system can be configured to provide in-tank
leak detection for underground storage tank
(UST) applications: with either one to two
leak detection series 8463 0.1 GPH
Mag Plus Magnetostrictive Probes, or one to
two 8463 Mag Plus Magnetostrictive
Inventory Measurement Probes to support
above ground storage tank (AST) Features
applications. • System monitors up to two tanks • Alarm relays can trigger alarm/
• RS-232 Communication Interface with security devices
Additional configurable options are de- Auxiliary Port provides two 25-pin • Two built-in inputs provide for solid-
signed to provide printed documentation D-connectors for data transmission to state or switch input from external
and remote monitoring flexibility. The op- computers or point-of-sale terminals devices
tional integral printer provides fast, quiet • Automatic continuous leak sensing: • Two built-in output relays provide for
continuous printouts. The optional SiteFax tank interstitial space; piping sump outputs to overfill alarms and
option can be programmed to transmit leak
• Audible alarm and display indicate external audible and visual warning
detection and inventory reports, as well as
leak location devices
real-time alarm reporting to fax machines
or other communications devices. • In-tank warnings and alarms are • Either relay can shut down the
activated for the following conditions: submersible if power to the monitor
Standard features include back-up genera- leak, overfill, low product, sudden is lost or a leak is detected
tor capabilities, as well as capacity to loss, high water, delivery needed, test • Emergency generator applications are
accept up to eight Veeder-Root Series 7943 failure, tank test not performed selectable via programming
float-switch sensors. This high quality, low • Accepts up to eight interstitial / • One system handles a mix of standard
cost family of sensors includes interstitial containment float sensors and emergency generator tanks
leak sensors for steel and fiberglass tanks, • Interstitial and piping sump warnings • Records generator activity
piping sump sensors, hydrostatic sensors, and alarms are activated for the
and discriminating dispenser pan and • Complete inventory reports before
following conditions: fuel presence,
containment sump sensors. and after generator operation
low liquid, high liquid
IL-ROOTSource page 18
simplifies inventory
Technology that
management and saves valuable time..
Configurable Features Descriptions and Part Numbers
• Continuous Statistical Leak Detection
Console Form Number: 848590-521
for in-tank leak detection without tank
Description: TLS-300C 0-2 Tank Configurable Console with
shutdown
Integral Printer
• Integral printer, which documents
inventory leak detection, alarms and Console Form Number: 848590-511
setup information Description: TLS-300C 0-2 Tank Configurable Console without
Integral Printer
• SiteFax modem for remote manage-
ment of leak detection and inventory Software Enhancement Modules*: 330161-001 330161-003
alarms and reports Description: Static In-Tank Testing CSLD
• One or two Veeder-Root Magnetostric- Optional Site Fax Modem: 331398-001
tive Probes for 0.1 GPI-I in-tank leak Description: Site Fax Modem Kit for.TLS-300 Series Consoles
detection with 4" float kit and 5" cable
Optional Ethernet/IP Card: 330020-424
• One or two Veeder-Root Inventory
Description: Ethernet/IF Kit for TLS-300 Series Consoles
Only Probes for inventory control with
4" float kit and 5" cable
The following probes and sensors are compatible with the
TLS-300C Monitoring System:
FORM NO. DESCRIPTION
847390-1)0( 0,1 GPH Magnetostrictive Probe
847391-XXX 0.1 GPH Magnetostrictive Probe for Alternative Fuels
847390-3M Magnetostrictive Probe for Inventory Measurement
846390-1XX 0.1 GPH Mag Plus Magnetostrictive Probe
846391-1/4>0< 0,1 GPH Mag Plus MagnetostrIctive Probe for Alternative Fuels
846391-3/6M Mag Plus Magnetostrictive Probe for Inventory Management
847398-XXX Retrofit Mag Plus Probe for standard Mag Probe
847399-XV Retrofit Mag Plus Probe for standard Mag Probe
794390-40X Interstitial Sensor for Fiberglass Tanks
794390-420 Interstitial Sensor for Steel Tanks
794390-20X Piping Sump Sensor
794380-301 Single-Point Hydrostatic Sensor
794380-302 Dual-Point Hydrostatic Sensor
794380-322 Discriminating Dispenser Pan Sensor
794380-352 Discriminating Containment Sump Sensor
Please refer to the Veeder-Root Price List for required probe and sensor lengths
and corresponding 3-digit Form Number suffix.
For more information call
1-888-561-7942
© 2006 Veeder-Root Company
VEEDER-ROOT 125 Powder Forest Drive • Simsbury, CT 06070 • USA
Telephone: 860-651-2700 • Fax : 860-651-2719 www.veeder.com
NrR 13668 P/N 0576047-052 Rev.D VR 4/2006 Printed in USASource page 19
„
,
L
1/03. 6E7(1
FuelMasterq Fuel Management Unit (FMU) I Automotive Information Module (AIM2.)
zci4z
Autonomous Fuel Control & Accounting System
Our patented Automotive Information Module (AIM2 0P) makes integra-
tion of technological innovations an easy process. With our new expansion
capabilities, you can now have next-generation electronic technology in
this year's system!
System's Components and Features:
• OBD 11 (On-board diagnostics) port interface for real-time maintenance and vehicle
computer data acquisition (odometer, engine hours, idle time, engine error codes, etc.)
• Utilizes Flash technology for memory and upgrade capabilities
• Program real-time changes to the vehicle AIM while pumping your fuel
• No external programming accessories needed
• Ingress/egress security monitoring via gate control
• Built-in self-diagnostics of Fuelillastert components including fuel island hardware
• Rugged weather-proof design
• Easy installation and greatly reduced maintenance time
• Designed to take the driver "out-of-the-loop" and reduce mechanic's time and labor
• Modern state-of-the-art RF radio communications to the fuel island
• Passive capture of vehicle ID, current mileage, date, time, fuel quantity, fuel type,
engine hours, PTO hours and much more
• Complete control and comprehensive security over fuel dispensers and fuel dispensed
• Implements advanced RFID tag technologies
• Wireless vehicle record updates
• AIM2g' is ETL listed, GSA approved and meets FCC and IC (Canada) requirements
\ • r ) ,/
‘
: !j jrr ) ) - )j : j;;J:! -L . •. 0Source page 20
•
-••■
•
NT, STEP 1: The driver inserts the
fuel nozzle in the vehicle.
STEP 2: RFID Tag on the
fuel nozzle is interrogated by
AIM2 mounted in the vehicle.
STEP 4: The FMU evaluates this data,
turns on the fuel dispenser and records
fuel transaction data. The FMU ends the
STEP 3: The AIM2 transmits RFID tag
data, vehicle data and OBD II data to the
FMU.
r transaction immediately when the pre-
authorized quantity of fuel is dispensed
or when the nozzle is removed.
AIM20, the next generation of automated fuels accounting technology, need to be mounted in or around fuel dispensing equipment and/or fuel
offers an "on-board" vehicle computer interface and reduces installation nozzles. AIM2 = RFID tag technologies are C.A.R.B. (California Air
time for a customer's mechanics. Syn-Tech took the driver out of the Resources Board) approved for Stage I and Stage U vapor recovery
fueling process when it introduced its first AIM unit several years ago, systems.
requiring no data entry by the driver. AIM2 t not only keeps the driver out
of the fueling process but also takes the mechanic out of the maintenance Passive vehicle maintenance data collection at fleet maintenance facili-
process. AIM2' is truly a passive experience for both the driver and the ties eliminates the need to physically connect the vehicle to diagnostics
mechanic. Installation is Simple; however, Syn-Tech offers a complete equipment to ascertain vehicle health and safety.
turnkey installation package to all AIM2t customers.
For added security, AIM2g. continuously communicates with the nozzle
AIM2A' technologies, which are protected under U.S. Patent No. mounted RFID tag after the driver inserts the nozzle. The FMU ends the
5,923,572, provide a major improvement in fueling automation by elimi- transaction immediately when the nozzle is removed. This completely
nating the need to supply power to the fuel nozzle. Coupled with wireless eliminates fuel theft
transmission of data to and from the vehicle, Syn-Tech has introduced the
ultimate "hands off' system to the fueling process. AIM2* enables multiple points of highly accurate data capture via the
fuel island, maintenance facility or gate controller to provide real-time
AIM2 g and the RFID tag technologies are certified to UL 913 and UL diagnostics and prognostics.
1238 (U.S.) and CSA C22.2 157A (Canada). In addition, it is listed as
intrinsically safe by ETL. AIM21 and its radio technologies comply Syn-Tech is the industry leader in RF technology. If you're looking for a
with FCC regulations as defined in Part 15 Class A of FCC requirements truly passive system, there's only one place to find it: Fuellifasten ,
(U.S.) and with IC ES003 requirements (Canada). No safety barriers
'/ -
Syn Tech Systems, Inc. • 100 Four Points Way, Tallahassee, FL 32305 • (850) 878-2558 • (800) 888-9136 • FAX (850) 877-9327 • marketing@syntech-fuelmaster.com
-Source page 21
, Dresser Wayne Reliance G6200 Series
Mecharaca: [spsnsers
, - rigneriOW
-
■
••nt
:
Fueling capa Mitres you can depen on down the road
Keeping your fleet on the move depends on reliable, fast access to fuel. Time spent waiting for
an available dispenser or struggling with slow or inefficient fueling equipment can negatively
impact your productivity. And any downtime caused by maintenance or repair issues not only
increases inefficiencies, it raises your Total Cost of Ownership.
Dresser Wayne delivers fueling equipment you can count on to deliver consistent performance
today and tomorrow. We've built the Reliance G6200 Series Mechanical Fleet Dispenser for
reliability and durability by combining time-proven components with a durable cabinet. It stands
up to years of rugged use in the harshest conditions.
SupeNor performance gets veNclIes on the road faster
Engineered for fast fueling capabilities, the Reliance 06200 dispenser: offers high flow rates
up to 22 GPM*. Large capacity inlet/outlet castings, one-inch internal filters and discharge
connections provide superior flow performance. The one horsepower motor on suction models
offers extra capacity which extends the life of the motor. Plus, the micro-accurate positive
displacement two-piston meter is weights and measures sealable and provides precise
measurement at any flow rate.
*Flow rates are maximum test rates at discharge. Actual rates will depend upon application and accessories,Source page 22
TOWN OF CANTON
FORM B - FISCAL 2014
CAPITAL PROJECT / EQUIPMENT REQUEST
DEPARTMENT: SUBMITTED BY:
Public Works Michael Trotta
PROJECT / EQUIPMENT TITLE:
Truck 17
TOTAL PROJECT / EQUIPMENT COST:
$191,000
DESCRIPTION:
Replace Highway Division Truck 17, a 1994 L-8000 Sterling, with a new or current model year
7300 International Truck equipped with a Swaploader, bodies, and plow.
PURPOSE AND JUSTIFICATION:
Truck 17 is the catch basin truck. The recommended replacement schedule is 60,000 miles or
ten years. The truck has over 80,000 miles of use. The cleaning bucket and dump body are in
good condition and can be recycled onto the new Swaploader. The new truck and swaploader
would allow additional uses for Truck 17 such as bulk material hauling, sanding, and snow
plowing.
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking:
Required for Safety Please rank this request out of your total
Required by Law or Mandate requests for this year: (#1 as top priority)
Improve/Expand Service or Increase Efficiency 2 (#) OF 9 (#)
x Planned Project or Replacement Expected Useful Life: (Check one)
Unplanned Project or Replacement 20 or More Yrs 5 to 9 Years
New Project/Item (not on last year's 5-Yr. Plan) x 10 to 19 Years 3 to 4 Years
Impact to Dept. Operating Bu get: (Check one Revenue Impact: (Check one)
Will Reduce Cost by $ Will Produce Addl Revenue by $
x No Impact x Revenue Neutral (no impact)
Will Increase Cost by $ Will Decrease Revenue by $
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)Source page 23
SWAPLOADER WITH BODIES & PLOW
NAVISTAR INC / INTERNATIONAL TRUCK
GREATER BOSTON POLICE COUNCIL
2011 COOPERATIVE PROCUREMENT CONTRACT
# GBPC 2011-INTERNATIONAL
201 2013 INTERNATIONAL 7300 35,000 lb. CAB & CHASSIS 73,367.00
OPTIONAL EQUIPMENT:
HEM #1 DESCRIPTION COST
205. MaxxForce DT-HT 285 HP Upgrade 7400 $ 5,105.00
233. T-Bar Type Shift Control $ 385.00
235. 14,000 lb. Front Axle with 12R22.5 - 16 PR Tires with Fender Extensions $ 1,325.00
250. 30,000 lb. Rear Axle with Cast Brake Shoes $ 3,721.00
261. Air Conditioning $ 859.00
262. Inside/Outside Engine Air-Intake with in-Cab Control $ 249.00
272. Engine Compression Brake - Medium Duty Engine $ 1,32200
274. Driver Controlled Differential Locking $ 986.00
287. Heavy Duty .472" Hub Piloted Disc Wheels - Front Axle $ 192.00
288. Heavy Duty .472" Hub Piloted Disc Wheels - Rear Axle $ 311.00
289. Powder Coated Wheels $ 72.00
290. LED Lights ILO Standard Lighting $ 276.00
291. Heavy Duty 140 Amp Alternator $ 157.00
304. Twelve (12) Foot Stationary Rack Body $ 7,500.00
306. Stationary Steel Headboard for Rack Body
, $ 800.00
307. Diamond Plate Steel Flooring for Rack Body - $ 50.00 per foot $ 600.00
317. Plate Mounted Pintle Hook with Trailer Plug $ 850.00
374. Automatic Transmission Mounted Central Hydraulic System $ 6;500.00
412. Heavy Duty Power Tilt Quick Hitch with lights and control valve $ 7,500.00
415. Heavy Duty 11' Power Reversing Trip Edge Plow $ 9,500.00
419. Power Reverse Hydraulics with Controls $ 1,000.00
426. Quick Hitch Attachment for Snow Plow $ 1,500.00
435. 10 ft. chassis mounted Spreader $ 11,700.00
437. Stainless Steel Spreader - Upgrade: for 10 Ft. Spreader $ 5,500.00
439. Manual Spreader Fluid Control Valve, Plumbed $ 2,000.00
443. Sander Spill Shields $ 1,000.00
446. 4" Flood Light for Spreader $ 200.00
472. Saltmiser SM-2 Spreader Control System $ 3,300.00
504. Hook loader for 10' to 14' Bodies, 24,000 lbs. Capacity $ 25,500.00
509. 3 Hook loader Skid for Mounting Optional Bodies $ 2,500.00 each $ 7,500.00
510. Custom Support Legs for Specialized Bodies $ 2,500.00
547. LED Strobe System: Two Strobe Lights Mounted in Front Corners of Body and
Two Rear Mounted Strobe Lights with Brake and Turn Signals $ 2,500.00
Polymer rear fenders $ 600.00
TOTAL DELIVERED PRICE -2012 CONTRACT $ 186,377.00
2013 Contract Increase (2%) Plus "OBD" On Board Diagnostics ($ 650.00) $ 4,377.00
TOTAL DELIVERED PRICE -2013 CONTRACT $ 190,754.00
SERVICING INTERNATIONAL DEALER
TAYLOR & LLOYD, INC.
8 RAILROAD AVE.
BEDFORD, MA 01730
781-275-9290 October 22. 2012
by Michael L. Fronk Date
MUNICIPALITY:
TOWN OF CANTON - D.P.W.
801 WASHINGTON ST
CANTON, MA 02021Source page 24
t - JH
An EFCO Company
\ ••■
"11OC4[...L 12p Li,HL U.S.A. LTD.
, tee.mac
111177 [S:3 C-11201.0i
Se.
c Gsp pms
r,
—,13M„Wcasa. :CZ ,Mr41
, -
100% in Cab Operation
e Ground Level Loadling & Unloading
. Switch Applications in Less Than 3 Minutes
o True Dumping, Capabilities
o Able To Share Hydraulic System
o
Eliminate Seasonal Trucks
o Increased Productivity
o 4-Year ALL Parts Er.1 -Year Labor Warranty
SwapLoader has been building the highest quality
hook-lift hoists since the late 1980's. Our goal from
day one was to build the toughest piece of equipment
on the market. A family of hoists guaranteed to lift
rated capacity (with all stated body lengths) and will
out live multiple chassis. Now that's a serious business
investment you can hang your hat on!
UNLIMITED VERSATILITY AND ADDED VALUE WITH
INTERNATIONAL TRUCKS & SWAPLOADER!Source page 25
TOWN OF CANTON
FORM B - FISCAL 2014
CAPITAL PROJECT / EQUIPMENT REQUEST
DEPARTMENT: SUBMITTED BY:
Finance Dept / Information Systems Division Louis Jutras
PROJECT / EQUIPMENT TITLE:
Desktop computer systems
TOTAL PROJECT / EQUIPMENT COST:
$18,000
DESCRIPTION:
Computer upgrades. 17 systems at $650 each, 3 Engineering computers at $1,489 each & 3
systems for IT costing $989 each.
PURPOSE AND JUSTIFICATION:
This request covers our on-going PC replacement program. Last year we installed 30 Windows
7 systems in various offices. This purchase will allow the upgrade / replacement of the
remaining computers in Town Hall. This request will cover 23 desktop systems in Engineering,
MIS, Town Clerks, Building, DPW, HR, Planning, and Water.
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking:
Required for Safety Please rank this request out of your total
Required by Law orMandate requests for this year: (#1 as top priority)
Improve/Expand Service or Increase Efficiency 1 (#) OF 8 (#)
x Planned Project or Replacement Expected Useful Life: (Check one)
Unplanned Project or Replacement 20 or More Yrs x 5 to 9 Years
New Project/Item (not on last year's 5-Yr. Plan) 10 to 19 Years 3 to 4 Years
Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
Will Reduce Cost by $ Will Produce Addl Revenue by $
x No Impact x Revenue Neutral (no impact)
Will Increase Cost by $ Will Decrease Revenue by $
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
FORM B - FISCAL 2014Source page 26
ARetroFit tech no ogles
Quotation NOTICE: Due to the recent flooding in Thailand, Hard Disk
Drive (HDD) manufacturing has been severely impacted.
This situation is beyond RetroFit's control, and as a result,
455 Fortune Blvd. Milford, MA 01757 pricing and availability of HDD items on this quote are
subject to change without notice.
To Louis Jutras Tel 781 575 6607
- - Quote No 72864
Date 10/30/12
Co Town Of Canton
From Walter Gallagher (P) 508 244 2428 (F) 508 478 2040 (E) WGallagher@retrofit.com
- - - -
Project
Qty Mfg Part No. OEM Description Unit Price Ext Price
17 B919213 HP ITC47 desktop: 6200 pro i5-2400, 4GB/250 HP 649.44 11,040.48
LE1901w 19-Inch wide LCD Monitor HP LCD Speaker
Bar
XL506AV HP HP Compaq 6200 Pro Small Form Factor PC
XL522AV HP Single Unit (SFF) Packaging
NQ592AV HP E-Star 5.0 (cat C) label
XL515AV HP Power supply - HP Compaq 6200 Pro Small Form
Factor
XL682AV [ ITEM-NOT-FOUND ]
BW859AV HP Processor - Intel@ Core i5-2400 Processor
(3.10GHz,6M Cache)
BU921AV HP 1st hard drive - 250GB 7200RPM SATA-6G 1st Hard
BU983AV HP Keyboard - HP USB Standard Keyboard
VL506AV HP Mouse - HP USB Optical Mouse
BU947AV HP Optical drive - HP SATA SuperMulti DVD Writer Drive
XJ541AV HP 3/3/3 SFF Warranty 3 years parts and labor
XJ535AV HP HP Compaq 620X Pro Country Kit
NK570AA#ABA HP HP LE1901w 19-inch Widescreen LCD Monitor
NQ576AA HP HP LCD Speaker Bar - Speaker
INSTALLATION not included unless itemized above. Subtotal $11,040.48
PRICES SUBJECT TO CHANGE AT ANY TIME. Shipping $0.00
QUOTE MAY INCLUDE PROMOTIONAL PRICING VALID THROUGH THE END OF THE CURRENT MONTH. GRAND TOTAL $11,040.48
PRICES MAY CHANGE IF ORDER IS RECEIVED AFTER THE END OF THE CURRENT MONTH.
Fax Orders to Sales: 508.478.2040
Please attach this quote when submitting the Purchase Order.
Typographical Errors - RetroFit cannot be held bound or held responsible for typographical errors or omissions.
RetroFit is an approved vendor on state contracts ITC47, 0FF27, ITS43 TECH SQL and ERATE
Vendor No: VC6000169064 Page 1 of 1Source page 27
HP Public Sector Online Store Page 1 of 5
Public Sector home > Workstations > HP Z420 Workstation > Configurable - HP Z420 Workstatic
LJ449AV -Configurable- HP Z420 Microsoft® Windows@ Workstation
Workstations
LJ449AV -Configurable- HP Z420 Microsoft® Windows® Workstation
System price: $1,488.47 Add To Cart » I
From: $1,133.50
» Business lease cost /month$4,621.70
» Shipping and tax details
» Product
overview
Current selection: MA - COMMONWEALTH OF MASSACHUSETTS (WSCA/NASPO)
Customize your configuration:
Product
Maximum number of Group PCI=1 Maximum number of Group PCIe=5 Maximum number of Group SATA=6 Maxi
HP Z420 Workstation
Operating systems
Windows@ 7 Professional 64 [QD971AV#ABA]
Additional operating system
No Item Selected
Chassis configuration
HP Z420 600W 90% Efficient Chassis
Processor
» Help me choose a processor
Intel@ Xeon0 E5-1607 3.00Ghz 10MB 1066 4C Processor [A2H75AV]
Country kit
HP Z420 Localization Kit
Thermal kit
HP Processor Air Cooling Kit [A7E48AV]
Cooling requirements
To improve acoustics we recommend the Front Memory Duct on configurations with 32GB or higher. Required f
El HP Z420 Front Memory Duct (To improve acoustics we recommend the Front Memory Duct on configurations with
El HP Z420 Fan and Front Card Guide Kit [ QE150AV] [Add $7.70]
Graphics
» Help me choose graphics
NVIDIA Quadro 600 1GB Graphic Card [QE172AV]
2nd video/graphics card
No Item Selected
3rd video/graphics card
No Item Selected
http://gem.compaq.com/gemstore/configuration.asp?page—configure&ProductLineId=2&... 10/17/2012Source page 28
HP Public Sector Online Store Page 2 of 5
Memory
6GB DDR3-1600 ECC (3x2GB) Unbuffered RAM [B0Q75AV]
1st hard drive
» Help me choose a hard drive
For SAS HDD, Must order SAS controller
250GB 7200 RPM SATA 1st Hard Drive [QE194AV]
2nd hard drive
For all SATA HDDs HDD1 must be SATA or SSD SATA
No Item Selected
3rd hard drive
Hard Drive 2 must be SATA. For SAS HDD, must order SAS controller.
No Item Selected
4th hard drive
Hard Drive 2 must be SATA. For SAS HOD, must order SAS controller.
No Item Selected
High Performance GPU Computing
No Item Selected
Optical drive
HP 16X SuperMulti DVDRW SATA 1st ODD [QE236AVI
2nd optical drive
Cannot order if Optical drive 1 is NO OPTICAL.
No Item Selected
RAID configuration
» Help me choose a RAID setting
No Item Selected
Controller
No Item Selected
Keyboard
HP USB Standard Keyboard [QE234AV#ABA]
Mouse
HP USB Optical Scroll Mouse (QE218AV]
Label
LI Autodesk AutoCAD Certification Label [ A2R01AV] [Add $0.77]
Network card
No Item Selected
Restore CD
Supported only with matching Operating System
LI No Recovery Media Included (Not supported when either Win7 32 or Win7 64 Recovery Restore CD's is ordered.)
LI Windows 7 32 Bit Factory Image Recovery (Supported on Windows Operating System.) [ QE248AV] [Add $7.70]
151 Windows 7 64 Bit Factory Image Recovery (Supported on Windows Operating System.) [ QE249AV] [Add $7.70]
Audio
El HP Thin USB Powered Speakers [ FX629AV] [Add $15.40]
http://gem.compaq.com/gemstore/configuration.asp?page—configure&ProductLineId=2&... 10/17/2012Source page 29
HP Public Sector Online Store Page 3 of 5
O Creative Recon3D PCIe Audio Card [ BOU65AV] [Add $77.00]
Additional accessories
O HP Chassis in Desktop Configuration [ QE148AV] [Add $0.77]
111 HP 22-In-1 Media Card Reader [ QE212AV] [Add $30.80]
El HP Z420 Handle in Top Optical Bay (Not supported with second Blu-RAY or No Included ODD.) [ QE151AV] [Adc
0 HP eSATA 2 port PCI Bulkhead Kit [ QE157AV] [Add $23.10]
El HP Serial Port Adapter Kit [ A2H73AV] [Add $7.70]
El HP IEEE 1394b FireWire PCIe Card [ QE149AV] [Add $61.60]
Security accessories
No Item Selected
Packaging
HP Single Unit Packaging
Application software
No Item Selected
Warranty
HP 3/3/3 Warranty [B2L49AV#ABA]
China CCC Compliance
No Item Selected
Recommended supplies and accessories
Any hardware options below will not be factory installed
Recommended HP Business Monitors
• HP LV1911 18.5-inch LED Backlit LCD Monitor [ A5V72AA#ABA] [Add $161.10]
0 HP Promo Compaq LA2206xc 21.5-inch Webcam LCD Monitor [ LW490A8#ABA] [Add $209.00]
El HP Promo Compaq LE2202x 21.5-inch LED Backlit LCD Monitor [ LL649A8#ABA] [Add $164.00]
Recommended HP Performance Monitors
I-1HP Promo ZR2040w 20-inch LED Backlit IPS Monitor [ LM975A8#ABA] [Add $189.00]
• HP Promo ZR2240w 21.5-inch LED Backlit IPS Monitor [ XW475A8#ABA] [Add $259.00]
H HP Promo ZR2440w 24-inch LED Backlit IPS Monitor [ XW477A8#ABA] [Add $399.00]
El HP Promo LP2480zx 24-inch LCD Monitor [ GV546A8#ABA] [Add $2,349.00]
H HP Promo ZR2740w 27-inch LED Backlit IPS Monitor [ XW476A8#ABA] [Add $729.00]
LII HP Promo ZR3Ow 30-inch S-IPS LCD Monitor [ VM617A8#ABA] [Add $1,299.00]
View all HP Business Monitors
» Need help choosing a monitor?
No Item Selected
Recommended HP Performance Monitors
hitp://gem.compaq.com/gemstore/configuration.asp?page=configure&ProductLineId=2&... 10/17/2012Source page 30
HP Public Sector Online Store Page 4 of 5 O HP Promo ZR2040w 20-inch LED Backlit IPS Monitor [ LM975A8#ABA] [Add $189.00] O HP Promo ZR2240w 21.5-inch LED Backlit IPS Monitor [ XW475A8#ABA] [Add $259.00] 0 HP Promo ZR2440w 24-inch LED Backlit IPS Monitor [ XW477A8#ABA] [Add $399.00] El HP Promo LP2480zx 24-inch LCD Monitor [ GV546A8#ABA] [Add $2,349.00] LI HP Promo ZR2740w 27-inch LED Backlit IPS Monitor [ XW476A8#ABA] [Add $729.00] 0 HP Promo ZR3Ow 30-inch S-IPS LCD Monitor [ VM617A8#ABA] [Add $1,299.00] View all HP Business Monitors » Need help choosing a monitor? No Item Selected Recommended HP Performance Monitors O HP Promo ZR2040w 20-inch LED Backlit IPS Monitor [ LM975A8#ABA] [Add $189.00] O HP Promo ZR2240w 21.5-inch LED Backlit IPS Monitor [ XW475A8#ABA] [Add $259.00] LI HP Promo ZR2440w 24-inch LED Backlit IPS Monitor [ XW477A8#ABA] [Add $399.00] 171 HP Promo LP2480zx 24-inch LCD Monitor [ GV546A8#ABA] [Add $2,349.00] CI HP Promo ZR2740w 27-inch LED Backlit IPS Monitor [ XW476A8#ABA] [Add $729.00] 0 HP Promo ZR3Ow 30-inch S-IPS LCD Monitor [ VM617A8#ABA] [Add $1,299.00] View all HP Business Monitors » Need help choosing a monitor? No Item Selected Recommended HP Performance Monitors IIHP Promo ZR2040w 20-inch LED Backlit IPS Monitor [ LM975A8#ABA] [Add $189.00] 0 HP Promo ZR2240w 21.5-inch LED Backlit IPS Monitor [ XW475A8#ABA] [Add $259.00] LI HP Promo ZR2440w 24-inch LED Backlit IPS Monitor [ XW477A8#ABA] [Add $399.00] El HP Promo LP2480zx 24-inch LCD Monitor [ GV546A8#ABA] [Add $2,349.00] 0 HP Promo ZR2740w 27-inch LED Backlit IPS Monitor [ XW476A8#ABA] [Add $729.00] 0 HP Promo ZR3Ow 30-inch S-IPS LCD Monitor [ VM617A8#ABA] [Add $1,299.00] View all HP Business Monitors » Need help choosing a monitor? No Item Selected Enjoy the benefits of partner products... El A865707 - APC Essential 6 Outlet Surge Arrest [INFO] [ P66] [Add $10.23] El (A798663) - APC Power Saving Back-UPS Pro 1500 [INFO] [ BR1500G] [Add $288.30] 0 A534596 - Cables To Go 2m USB 2.0 NB Cable - Black (6.5ft) [INFO] [ 28102] [Add $9.29] http://gem.compaq.com/gemstore/configuration.asp?page=configure&ProductLineId=2&... 10/17/2012
Source page 31
HP Public Sector Online Store Page 5 of 5
O (A888325) C2G USB to VGA Adapter Up To 1920 x 1080 [INFO] [ 30545] [Add $67.88]
O (A783646) Logitech MK710 Cordless Desktop Keyboard and Mouse [INFO] [ 920-002416] [Add $92.99]
Di A857177 - Targus USB 3.0 Dual Video Docking station [INFO] [ACP7OUSZ] [Add $185.99]
Warranty and service options
»Info on services
No Item Selected
Additional graphics (not factory installed)
No Item Selected
Additional memory
No Item Selected
Additional hard drives/controllers (not factory installed)
No Item Selected
Additional processor (not factory installed)
No Item Selected
Additional input devices (not factory installed)
No Item Selected
Other workstation options (not factory installed)
No Item Selected
Software (not factory installed)
No Item Selected
HP Collaboration Tools (not factory installed)
No Item Selected
Add To Cart » I
System price: $1,488.47
From: $1,133.50
» Business lease cost /month$4,621.70
» Shipping and tax details
» Product overview
» return to original page
Privacy statement Limited warranty statement Using this site means you accept its terms Feedback to Government an(
(>2012 Hewlett-Packard Development Company, L.P.
http://gem.compaq.com/gemstore/configuration.asp?page=configure&ProductLineId=2&... 10/17/2012Source page 32
TOWN OF CANTON
FORM B - FISCAL 2014
CAPITAL PROJECT / EQUIPMENT REQUEST
DEPARTMENT: SUBMITTED BY:
Finance Dept / Information Systems Division Louis Jutras
-
PROJECT / EQUIPMENT TITLE:
Virtual environment
TOTAL PROJECT / EQUIPMENT COST:
$135,000
=29
DESCRIPTION:
Server virtualization, storage installation, switch upgrades, software licenses, and professional
services
.1113=121211.172,
PURPOSE AND JUSTIFICATION:
During the past 5 years the industry has embarked on a process to consolidate servers and
impliment a virtual infrastructure. This conversion will cut down on the number of physical
servers, lower power consumption, and save on cooling costs.
NEED CLASSIFICATION: (Check all that apply) Departmental Priority Ranking:
Required for Safety Please rank this request out of your total
Required by Law or Mandate requests for this year: (#1 as top priority)
Improve/Expand Service or Increase Efficiency 2 (#) OF 8 (#)
Planned Project or Replacement Expected Useful Life: (Check one)
x Unplanned Project or Replacement 20 or More Yrs x 5 to 9 Years
New Project/Item (not on last year's 5-Yr. Plan) 10 to 19 Years 3 to 4 Years
Impact to Dept. Operating Budget: (Check one) Revenue Impact: (Check one)
x Will Reduce Cost by $ 4,000 Will Produce Addl Revenue by $
No Impact Revenue Neutral (no impact)
Will Increase Cost by $ Will Decrease Revenue by $
OTHER COMMENTS OR INFORMATION: (Attach supporting documentation)
FORM B - FISCAL 2014Source page 33
44 Norfolk Avenue
S. Easton, MA 02375
FAX : 508-238-1146
ITS43 & ITC47 MA State Certified
Project Overview:
The Town of Canton has asked Hub Technical to propose a solution to create a new
virtualized infrastructure. This new environment will be the basis for building and
migrating the client's new and current environment to a highly manageable and
redundant infrastructure. The solution to be provided will also allow the customer to
create new servers without the cost of purchasing additional hardware. The quantity of
virtual servers that can be created are limited by available resources, however this
solution will provide both scalability and redundancy
Hub Technical is proposing the following solution:
Server hardware will be based on proven HP Proliant Server technology consisting of
two DL360 Gen 8 Servers with (two) eight core processors, 128GB of memory
(expandable), four onboard 1GB network adapters, and four PCIe1GB network adapters.
Utilizing VMware virtualization software in conjunction with the proposed hardware
solution will allow the customer to create server templates, move virtual servers between
physical servers, allow for automatic failover in the event of a physical server failure,
pool resources and if additional resources are available, providing the ability to create
new servers in minutes rather than hours.
Storage will consist of an HP P6300 SAN. With built in virtualization, the EVA P6300 is designed
to improve capacity utilization and be easy to manage. HP P6300 Command View includes Thin
Provisioning, which helps reduce the storage capacity required, to help reduce the number of
disks needed, and thus reduce power and cooling costs. EVA P6300 also offers robust local and
remote replication capabilities with HP P6300 Business Copy and HP P6300 Continuous
Access software. P6300 Business Copy also support Dynamic LUN and RAID migration, where
in one step, the user can change the characteristics of an existing LUN, such as size, RAID
type, disk type while the host I/O operation is active. This feature is useful, for example, to move
data to more space efficient storage tiers or to move a heavily accessed LUN to a different disk
group to improve performance.
It is highly recommended that the HP P6300 Command View software reside on a dedicated
physical server.
INIT:
2Source page 34
: ay _ 44 Norfolk Avenue | S. Easton, MA 02375 FAX : 508-238-1146 ITS43 & ITC47 MA State Certified Scope of Work: 1. Inventory hardware 2. Install and configure two ProLiant DL360 Gen 8 Servers 3. Update Bios and ILO firmware to latest revision 4. Configure ILO on two servers 5. Install and configure Command View software 6. Install and configure P6300 SAN 7. Configure necessary LUN’s on the P6300 8. Install and configure VMware vSpehere 5.1 on two physical servers 9. Configure virtual switches on vMware Hosts 10. Configure ISCSI on vMware Hosts 11.Present LUN’s to the assigned Hosts 12. Install vCenter Server 13.Add Hosts to vCenter Server 14. Create one virtual server. a. Build one Windows Server 2008 R2 b. Install all upgrades and patches c. Convert server into vMware template 15.Set up DRS, VMotion, and VMware for the virtual servers 16. Test failover of physical hosts 17. Train users in HP ILO 18. Train users on VMware basics 19. Train users on P6300 basics INIT:
Source page 35
44 Norfolk Avenue
S. Easton, MA 02375
FAX: 508-238-1146
ITS43 & ITC47 MA State Certified
Project Type: Fixed
HUB Technical has proposed a fixed price based upon the scope of work detailed within this
proposal. Should there be any additional labor or parts required not included in this
SOW, a "Change of Scope" SOW will be generated.
Project Timeline:
To be determined by client and HUB Technical
Project Milestones:
1. Inventory of all hardware
2. Installation and configuration of Servers and Storage
3. Installation and configuration VMware
4. Test and verify
5. Client Training
6. Project Sign Off
Project Documents:
Software licensing
Any usernames and passwords used for this project
INIT:
4Source page 36
44 Norfolk Avenue
S. Easton, MA 02375
FAX: 508-238-1146
ITS43 & ITC47 MA State Certified
Assumptions
HUB Technical is solely responsible for items listed in section IV of this statement of work. Any
additional requests not listed in section IV will incur a change of scope and will be billed per
procedures listed in section VII. Items listed below are a courtesy summary of tasks that the
Client may need to perform for successful completion of the project.
1. The Customer shall designate a point of contact for all project
communications who has the authority to act on all aspects of this project.
2. The Customer shall arrange for site access for HUB Technical Services
installation personnel according to the agreed schedule. This will include
arranging for afterhours access (as needed and agreed upon), access
badges, security escorts, or other arrangements in accordance with the
Customer's corporate security policies.
3. As needed, the Customer shall provide coordination between HUB
Technical Services and any 3rd party vendors.
4. Hub Technical is not responsible for any hardware required for installation
in non standard configurations (server racks, network racks, etc.) that do
not meet current ANSII specifications.
5. The customer is responsible for all software and licensing for this project
other than what is listed under "Appendix".
6. The customer is responsible for supplying all power and power connections
required for the hardware listed in the "Appendix".
7. The customer is responsible for having complete and successful backups of
all data prior to the project start. Hub Technical is not responsible for the
loss of data under any circumstances.
8. All physical servers that are to be migrated must be free of all errors prior to
virtual migration. The customer is aware that any issues with the physical
servers will be replicated to virtual servers.
INIT:
5Source page 37
44 Norfolk Avenue
S. Easton, MA 02375
FAX: 508-238-1146
ITS43 & ITC47 MA State Certified
9. The customer is required to supply all cabling not included in the
"Appendix".
10.The customer is responsible for supplying Administrator Access to servers
and equipment necessary for the implementation of this project.
11.The customer is responsible for third party support for all applications
involved in the migration.
12.The customer is responsible for identifying any and all applications as to
whether they are compatible with VMware virtualization.
13.The customer is aware that there may be downtime associated with this
project.
14. Labor hours are based on a work schedule of Monday through Friday,
8:30am — 5:30pm any work outside of these times will be considered over
time and subject to different labor rates.
15.The customer is responsible for sufficient port density on the existing
network if no switching is selected.
16.If the customer installs more than five physical servers then a licensed
version of Microsoft SQL standard will be required.
17.Hub Technical is not responsible for any server, file or application
migrations including but not limited to Microsoft Exchange and other
customer applications.
18.SAN storage is represented as "Raw Storage". Hub Technical is not
responsible for actual useable data. Any and all references to storage
capacities are approximations.
INIT:
6Source page 38
44 Norfolk Avenue .
S. Easton, MA 02375
FAX: 508-238-1146
ITS43 & ITC47 MA State Certified
Appendix
Materials and Pricing:
PC Qty Part # Price Ext. Price
ProLiant DL Servers
2 HP ProLiant DL360p Gen8 Server 654081-B21 $8375.96 $16751.92
Intel@ Xeon@ E5-2660 (2.20GHz/8-
654784-L21
core/95W)
HP 64GB (4x16GB) Dual Rank x4
P03-12800R (DDR3-1600) 672631-64G
Registered CAS-11 Memory
Intel@ Xeon@ E5-2660 (2.20GHz/8-
654784-B21
core/95W)
HP 64GB (4x16GB) Dual Rank x4
P03-12800R (DDR3-1600) 672631-64G
Registered CAS-11 Memory
HP Insight Control including 1yr 24x7
Support ProLiant ML/DL/BL-bundle 582765-821
Single Server License
Integrated Lights Out 4 KO 4) Included
HP Embedded P420i Smart Array
Included
Controller
HP 8-Bay Small Form Factor Drive
Included
Cage
HP 300GB 6G SAS 10K rpm SFF
(2.5-inch) SC Enterprise 3yr 652564-B21
Warranty Hard Drive
HP 300GB 6G SAS 10K rpm SFF
(2.5-inch) SC Enterprise 3yr 652564-B21
Warranty Hard Drive
HP 512MB FBWC for P-Series Smart
661069-B21
Array
HP NC365T 4-port Ethernet Server
593722-B21
Adapter
HP Ethernet 1GbE 4-port 331FLR
684208-B21
Adapter
HP 9.5mm SATA DVD ROM Drive 652238-821
2 HP 750W Common Slot Platinum
656363-2PS
Plus Hot Plug Power Supplies
2 HP 1.83m 10A C13-UL US Power
AF556A-XX2
Cords
INIT:Source page 39
44 Norfolk Avenue
S. Easton, MA 02375
FAX : 508-238-1146
ITS43 & ITC47 MA State Certified
HP 4GB SDHC Flash Media Kit 580387-B21
HP 1U SFF BB Gen8 Rail Kit 663201-B21
HP Care Pack, 5 Years, 4 Hours,
2 U8082E $1598.40 $3196.80
24x7 ProLiant DL360
Additional Switching
2 HP E3500-24 Switch J9470A#ABA $1616.34 $3232.68
HP Rack
HP Universal rack 10642 G2 crated
1 AF003A $1191.20 $1191.20
rack
P6300 SAN
1 HP P6350 EVA FC/1 GbE SFF QK742B
$42049.25 $42049.25
Combo Fld Kit
18 HP M6625 600GB 6G SAS 10K 2.5in AW611A
Included
HDD
8 HP Ethernet 14ft CAT5e RJ45 M/M C7536A Included
Cable
1 HP P6300 CV v10.1 E-Software T5494IAE Included
Suite
1 HP P6300 Business Copy SW E-LTU TA826AAE Included
1 HP 3y Support Plus 24 SVC HA110A3 Included
1 Business Copy P6300 EVA Unlimited HA110A3 Q1Z Included
SWSup
18 P6300/P6500 HDD Support HW HA110A3 Q26 Included
Supp
1 P6300 EVA Dual Cntrl CV Combo Kit HA110A3 099 Included
JWSupp
2 HP 24A High Voltage US/JP Modular 252663-D72 Included
PDU
"I HP Installation Service HA113A1 Included
1 HP Installation EVA4400 and P6300 HA113A1 58D Included
SVC
2 ProLiant Add On Options Installation HA113A1 5BW Included
SVC
18 EVA Disk Drive Installation HA113A1 5FL Included
VMware Licensing
VSPHERE 5 ENTERPRISE FOR 1
4 VS5-ENT-C $2607.25 $10429.00
PROCESSOR
PROD SNS VSPHERE V5 VS5-ENT-3P-SSS-C $1940.90 $7763.60
4
ENTERPRISE FOR 3YR
VCENTER SERVER V5 STANDARD $4532.50 $4532.50
1 VCS5-STD-C
PER INSTANCE
INIT:
8Source page 40
44 Norfolk Avenue
>. Easton, MA 02375
FAX: 508-238-1146
ITS43 & ITC47 MA State Certified
PROD SNS VCENTER
1 VCS5-STD-3P-SSS-C $3365.75 $3365.75
STANDARD FOR 3YR SERVER V5
Microsoft Licensing
WINSVRSTD 2012 ENG OLP NL
10 P73-05853 $690.05 $6900.50
LCLGOV 2PROC
WINSVRCAL 2012 ENG OLP NL
200 R18-04293 $22.90 $4580.00
LCLGOV USRCAL
APC UPS
APC Smart-UPS 3000VA RM 2U
LCD 120V
1 SMT3000RM2U $1270.90 $1270.90
L5-30P 30A outlet will be required
Rack PDU, Basic, 1U, 15A, 120V,
2 AP9562 $80.95 $161.90
(10)5-15
Veeam Backup Software
Veeam Management Suite
Enterprise for VMware (includes
4 V-MGTSEVS-AP000-00-A $1162.50 $4650.00
Backup & Replication Enterprise +
Veeam ONE) Tier A
2 additional year of Premium
maintenance prepaid for Veeam
4 Management Suite Enterprise for V-MGTSEVS-AP2PP-00-A $534.75 $2139.00
VMware (includes first year 24/7
uplift) Tier A
Travel HUB-TRV
Installation and HUB-INST $23125.00 $23125.00
1
Configuration
1 Project Management HUB-PRM Included
1 Documentation / Training HUB-DOC Included
Quotation Valid for Thirty (30) Days
Tax, Freight, Insurance, Delivery,
Total $135340.00
Setup Fees, Cabling and Cabling
Services Not Included unless
otherwise noted. Not responsible for
mathematical errors. Fixed priced
projects are invoiced in full and are not
eligible for labor rebate.
INIT: