Skip to content
Search Canton

Canton, Massachusetts · Saved source text

Article 25 - MA03104 Old Shepard St Dam Canton Design Report - Signed

Town Meeting · Town Meeting archive year 2018 · Record 904b10b81f0834c9d8

Open original municipal record ↗Open interactive reader

Saved text from 116 source pages. Transcription and OCR may contain errors; verify figures and wording against the original. Retrieved 2026-10-15.

Source page 81

Old Shepard Street Dam, NID No. MA03104                                                                                                                                                                                           SA Project No. 052-15-022
Canton, MA                                                                                                                                                                                                    Stephens Associates Consulting Engineers, LLC
Stability Evaluation - Spillway

Calculation:      Calculate the wall stability based on assumption of monolithic structure
          Assume: Calculation for stability per foot of wall.

                                                                                                           Soil stresses and lateral earth pressures
                                                 Top                          Backfill          Total            Pore      Effective           Rankine Effective Horizontal Earth Pressures (psf)
             Layer                          Elevation Thickness                                Stress                 Pressure                    Stress                                       Active                  At-Rest                      Passive
Layer       Number                            (feet)    (feet)                                  (psf)                   (psf)                      (psf)                              Top           Bottom          Top     Bottom          Top          Bottom
Back of Wall/Dam:
Soil       1B                                     107                            6              406                                406               0                                0                  85          0          123          0                    601
Rock       2B                                    101.0                          0.0             1006                               780              226                               85                 85         123         123         601                   601
At Wall Bottom                                   101.0                                          1006                               780              226                               85                 56          90          90         908                   908
At Water Table El.                               113.5                                            0                                 0                0                                 0                              0                      0
Front of Wall/Dam:
Rockfill   1F                                     105                            4                25                                25               0                                 0                 85          0          124           0                  1072
Rock       2F                                    101.0                          0.0              565                               275              290                               79                 79         124         124         1072                 1072
At Wall Bottom                                   101.0                                           565                               275              290                               72                 72         116         116         1168                 1168
At Water Table El.                               105.4                                            0                                 0                0                                0                              0                        0


   116                                    Wall Back           116                                            116                                    Wall Back   116
                                                                                              Wall Back
                                                                                                                                                                                                                                                Wall Back - Active
                                                                                                                                                    Wall
   114                                    Wall Front          114                             Wall Front     114                                    Front
                                                                                                                                                                114
                            0                                                      0                                                  0                                                                                                         Wall Front - Passive
                                                                                                                                                                                           0

   112                                                        112                                            112                                                                                                                                Wall Back - At rest
                                                                                                                                                                112
                                                                                                                                                                                                                                                Wall Front - At Rest
   110                                                        110                                            110
                                                                                                             Elevation (ft.)




                                                                                                                                                                110
                                                       Elevation (ft.)
 Elevation (ft.)




                                                                                                                                                                Elevation (ft.)

   108                                                        108                                            108
                                                                                       406
                                                                                                                                                                108
                                  406                                                                                                 0
                                                                                                                                                                                           0
   106                                                        106                                            106
                                                                          0
                   25                                                    25                                                    0                                106
                                                                                                                                                                                           0
   104                                                        104                                            104                                                                  0        0

                                                                                                                                                                104
   102                                                        102                                            102
                            565          1006                            275             780                                   290        226                   102
   100                                                        100                                            100                                                                                 85
                                                                                                                                                                                                 90116
                                                                                                                                                                                                   124
                                                                                                                                                                                                   123                                   1072 1168
                        0       500 1000 1500                                  0       1000 2000                                   0      1000 2000
                                                                                                                                                          100
                            Total Stress (psf)                                Porewater Pressure                                   Effective Stress (psf)     0                                   200         400      600      800      1000         1200             1400
                                                                                    (psf)
                                                                                                                                                                                                               Horizontal Effective Stress (psf)


Select Lateral Earth Pressure                                                                                                                                                                     NOTES FOR INPUT:
           Earth Pressure type:                                                          0=                                    At-rest          In front of Dam                                   To select type of lateral earth pressure (LEP) used
                                                                                         0=                                    At-rest          Behind Wall/Dam                                   in analysis, use A for active, 0 (zero) for at-rest, P
                                                                                                                                                                                                  for passive, or N for none.
                                                                                                                                                                                                  For passive resistance (Pp), active pressure should
                                                                                                                                                                                                  be used on opposite side and Rp may be used to
                                Reduction factor (Rp) for Passive Resistance (Pp):   1.00                                                                                                         account for strain incompatibility with mobilization
                                NOTE: For full passive resistance reduction factor (Rp) = 1                                                                                                       of active stress.




                                                                                                                                                Page 5 of 13

Source page 82

Old Shepard Street Dam, NID No. MA03104                                                                                     SA Project No. 052-15-022
Canton, MA                                                                                              Stephens Associates Consulting Engineers, LLC
Stability Evaluation - Spillway


                                            Calculate Coefficient of Active Pressure for Earthquakes
Massachusetts Building Code uses pre-determined factor of 0.045. AASHTO calculates the coefficient using Mononobe-Okabe.

Method:    Other - See separate     KAE =   #VALUE! (Calc. requires factors below for AASHTO method)
                                   ΔKAE =  #VALUE!
                                           This section not used for this analysis. See separate sheet.
           A (g) =    0.15                 Site acceleration coefficient, selected from Figure 1-5 in AASHTO manual
           β (deg.) = 0.0       Batter angle of wall back. See AASHTO manual for definition of positive and negative. Set to zero for Rankine con
           θ=         Not Applicable for MBC Metho  Wall or Dam: Dam Note: For MA Dam Regulations: If Wall, use kh = A/2. If Dam, use kh = A
           ψ=         Not Applicable for MBC Method


                                                        Forces on Wall Per Foot of Wall:
                               Sign convention: negative is driving force/moment, positive is resisting force/moment.
    NOTE: LEP is lateral earth pressure                Moment                                                                   Moment
                                             Force        Arm         Moment                                         Force        Arm      Moment
Horizontal:                      Layer       (kips)      (feet)        (kip-ft) Vertical:                            (kips)      (feet)    (kip-ft)
Back LEP above GWT      L1:-     Fill          0.0        10.3            0.0   Weight of spillway and bridge         36.4        12.9      470.2
Back LEP. below GWT     L2:-     Fill         -0.4         2.0           -0.7   components, and overlying
Back LEP below GWT      L3:-     Fill          0.0         3.0            0.0   upstream and downstream
Back LEP from Surcharge L4:-     Fill          0.0         3.0            0.0   water and soil (refer to Sheet 7)
Water on Back           U1h:-    Water         0.0         0.0            0.0
Water on Back           U2h:-    Water        -2.3         6.8          -15.4
Water on Base           U3h:+    Water         0.0         0.0            0.0
Water on Base           U4h:+    Water         0.0         0.0            0.0
Water on Base           U4Ch:+ Water
Water on Crest          U5h:-    Water         0.0         0.0            0.0
Water on Crest          U6h:-    Water         0.0         0.0            0.0
Water on Front          U7h:+    Water         0.0         4.1            0.0
Water on Heel           U10:-    Water        -2.1         2.0           -4.2
Water on Heel        U11:-        Water        -0.5        1.3          -0.7
Water on Toe         U12:+        Water         0.1        2.0           0.2
Water on Toe         U13:+        Water         0.5        1.3           0.7
Front LEP above GWT  L5:+         Soil          0.0        4.3           0.0
Front LEP below GWT  L6:+         Soil          0.2        1.3           0.3       Hydrostatic Uplift (refer to        -8.2      16.0      -131.2
Front LEP below GWT  L7:+         Soil          0.0        0.0           0.0       sheets 7 and 8)
Ice Force on Wall (sheet 9)       Ice          -4.7       12.0         -56.5
Earthquake (sheet 10 Ew:-         Water         0.0        0.0           0.0
Earthquake (sheet 11 Es:-         Soil          0.0        0.0           0.0
Earthquake (sheet 7) Ei:-         Inertia       0.0        0.0           0.0


Sum Horizontal Forces                          -9.1                                Sum Vertical Forces              28.2
Sum Moments From Horizontal Forces                            8.4      -76.4       Sum Moments from Vertical Forces                            339.0




                                                                    Page 6 of 13

Source page 83

Old Shepard Street Dam, NID No. MA03104                                                                                                 SA Project No. 052-15-022
Canton, MA                                                                                                          Stephens Associates Consulting Engineers, LLC
Stability Evaluation - Spillway




CHECK DESIGN BASED ON BEARING SURFACE OF UNIT THICKNESS OF WALL:

SUM MOMENTS:                                                                   262.6           kip-ft       (includes       0       reduction due to arch 3-D effects)

Resist. Mom. (+) = W1+W2+W3+W4+W5+W6+W7+W8+U1v+U2v+U3h+U4h+U5v+U6v+U7+U8+U9+U12+U13+L5+L6+L7+A1+A2 =                                                              471.4

Driv. Mom. (-) = L1+L2+L3+L4+U1h+U2h+U3v+U4v+U5h+U6h+U10+U11+Ew+Es+Ice =                                    (includes reduction due to arch 3-D effects)          -208.8
                                                                                                                                          Check sum =              262.6

CHECK SAFETY FACTOR AGAINST SLIDING ALONG BASE:                                                                            Sliding FS RESULT
                                                                  Resisting Force:               21.22                       FS=:        2.3



ESTIMATE CENTROID AND MOMENT OF INTERTIA OF SPILLWAY FOOTING FOR BEARING PRESSURE ESTIMATE:
                                                              Moment of inertia about centroid-x:
Componen x, ft     z, ft. area, sf CM-x, ft    A * CM-x, ft^3  Icm, ft^4 A*d^2, ft^4 ICOMBINED, ft^4
   A      11.92     8.0      95       6.0            568         1128       6145        7273
   B      11.92     8.0      95       6.0            568         1128       6145        7273
   C       9.58    38.5     369      16.7           6165         2824       2733        5557
   D       6.92    32.5     225      25.0           5610          896      27059       27955
   E      22.50    23.3     523      11.3           5885        22069       3918       25988
   F      22.50     8.3     186      11.3           2088         7831       1390        9221
                  Σarea =  1493    ΣA * CM-x =     20885                 ΣIcombined = 83267 ft^4
                                             Centroid-x =               14.0   ft                  ΣIcombined/length =    1190      ft^4/ft
                    Resultant = (Σmoments / Σvertical forces) =         9.3    ft                        Σarea/length =    21       ft^2/ft
              e = eccentricity = Centroid-x - Resultant =               4.7    ft

                                                                                                                                Downstream bridge approach toe




                                                                                                                                   Centroid-x (center of
                                                                                                                                   mass in x-direction



                                                                                                                                 Upstream bridge approach heel


                                                                                                                    Upstream spillway heel


ESTIMATE FOOTING BEARING PRESSURE:
                                                                               Bearing Pressure RESULTS                   y = distance from
                                                                                                                                               Bearing Pressure, ksf
Bearing Pressure = Q/A + M*y/I                                                            Location                          centroid-x, ft.
where:        Q = sum of vertical forces =            28.2        kips/ft       Downstream bridge approach toe                   14.0                      2.9
                         B = footing width =          29.4        ft.                        Centroid-X                           0.0                       1.3
   e = Centroid-x - (Σmoments / Σvertical forces) =   4.7         ft.               Upstream bridge approach heel                 -8.5                      0.4
   M = Sum of moments about centroid-x =              131         k-ft/ft              Upstream spillway Heel                    -15.4                     -0.4




                                                                                Page 7 of 13

Source page 84

Project: Numbe               052-15-022            Sheet     8    of                 13
                                                                                                                             Name:                Old Shepard Street Dam, NID No. MA03104
Original Work:                                                                                                                                                   Canton, MA
By:                    NAO                Date:       November 15, 2016                                                      Subject                          Spillway Stability
Ckd. By:               JET                Date:       November 15, 2016                                                                          Weight of Spillway and Bridge Components

Estimate Weight, Forces and Moments of Spillway and Bridge components per linear foot

Convert soil/water/structure weight, forces and moment on spillway and bridge to force/moment per linear foot
Sign convention: negative is driving force/moment, positive is resisting force/moment.
Unit weight for concrete is                                 0.15 kips/CF               Point of rotation for moments is downstream toe of bridge abutments, El.                     101      ft.
Unit weight for soil beneath base slab                     0.135 kips/CF               Assume weight distributed over tributary width of                                             70      ft
Unit weight for soil above bridge abutment footings        0.135 kips/CF               For moments due to horizontal forces, earthquake acceleration is                             0.15     g
Unit weight of water                                      0.0624 kips/CF               Downstream water elevation                                                                  105.4     ft

Table of Weights and Moments for Spillway and Bridge components
                                                                                         Dimensions, feet                                                                                     M @ d/s toe of
                                                                                                                                                Vol.,                     M due to horiz.
                                                   x (dist. from upstream toe of spillway base slab) y (Elevations in NGVD 1929) z (left-right) cubic         Weight,                           bridge abut.
              Component                   Quant.                                                                                                                          forces in EQ, k-
                                                                                             CM-d/s                                                            kips                             due to vert.
                                                     u/s        d/s    avg width CM-u/s               bottom top height CM-y avg depth feet                                       ft
                                                                                               toe                                                                                               forces, k-ft
Pier                                                                                                                                                                32              -44                  833
     stem - rectangular portion               2     1.5       4.5        3.0       3.0       26.4    105.0   116.8 11.75     110.9         1.5        106     16            -23                419
     stem - triangular portion                2     4.5       7.0        1.3       5.3       24.1    105.0   116.8 11.75     108.9         1.5         44      7             -8                159
     stoplog bumpout - rect. u/s              4     1.5       2.2        0.7       1.8       27.6    105.0   115.5 10.5      110.3         0.5         14      2             -3                 58
     stoplog bumpout - rect. d/s              4     2.7       4.5        1.8       3.6       25.8    105.0   115.5 10.5      110.3         0.5         39      6             -8                149
     stoplog bumpout - triangular             4     4.5       7.0        1.3       5.3       24.1    105.0   115.5 5.25      108.5         0.5         13      2             -2                 47
Spillway abutment                                                                                                                                                   102             -97                 2577
     stem                                     2     1.5       8.2        6.7       4.8       24.6    105.0   116.8 11.75     110.9          2         313     47            -70               1155
     footing                                  2     0.0       6.9        6.9       3.5       26.0    101.0   105.0   4       103.0         5.5        304     46            -14               1185
     stoplog bumpout - rect. u/s              2     1.5       2.2        0.7       1.8       27.6    105.0   115.5 10.5      110.3         0.5          7      1             -1                 29
     stoplog bumpout - rect. d/s              2     2.7       8.2        5.5       5.4       24.0    105.0   115.5 10.5      110.3         0.5         58      9            -12                208
Base slab                                                                                                                                                           238             -84                 4952
     slab                                     1     0.0       17.5      17.5       8.8       20.7    103.0   105.0      2    104.0        21.5        753     113           -51               2333
     u/s lip - rectangular portion            1     0.0        2.5       2.5        1.3      28.2    101.0   103.0      2    102.0        21.5        108      16            -2                454
     u/s lip - triangular portion             1     2.5        4.5       1.0        3.2      26.3    101.0   103.0      1    102.3        21.5         22       3            -1                 85
     d/s lip                                  1    16.5       17.5       1.0       17.0      12.4    101.5   103.0     1.5   102.3        21.5         32       5            -1                  60
     soil beneath slab - triangular           1     2.5        4.5       1.0        3.8      25.6    101.0   103.0      1    102.3        21.5         22       3            -1                  74
     soil beneath slab - rect.                1     4.5       16.5      12.0       10.5      18.9    101.0   103.0      2    102.0        21.5        516      70           -10                1318
     soil beneath d/s lip                     1    16.5       17.5       1.0       17.0      12.4    101.0   101.5     0.5   101.3        21.5         11       1             0                  18
     soil above u/s toe                       1    0.0        1.5        1.5        0.8      28.7    105.0   107.0      2    106.0        32.5        98       13           -10                377
     water weight above d/s part of sla       1    7.0        17.5      10.5       12.3      17.2    105.0   105.4     0.4   105.2        21.5        90      14             -9                233
Bridge abutment                                                                                                                                                     591             -567                6654
     footing                                  2     6.9       29.4      22.5       18.2      11.3    101.0   103.5 2.5       102.3          8         900 135               -25               1519
     stem - rectangular portion               2     8.2       28.2      20.0       18.2      11.3    103.5   114.3 10.75     108.9        1.25        538  81               -95                907
     stem - triangular portion                2     8.2       28.2      20.0       18.2      11.3    103.5   114.3 10.75     107.1        2.25        968 145              -132               1633
     soil above sloped back of footing        2     8.2       28.2      20.0       18.2      11.3    103.5   116.0 12.5      109.8        2.25       1125 152              -199               1709
     soil above footing heel                  2     8.2       28.2      20.0       18.2      11.3    103.5   116.0 12.5      111.8         1          500  68              -110                759
     conc. fill above footing toe             2     8.2       28.2      20.0       18.2      11.3    103.5   105.0 1.5       104.5        1.25         75  10                -5                114
     water weight above footing toe           2     8.2       28.2      20.0       18.2      11.3    105.0   105.4 0.4       105.3        1.25         20   1               N/A                 14
Bridge approach and retaining walls                                                                                                                                 ###            -1538               16276
     u/s footing                              1     6.9       14.9       8.0       10.9      18.5    101.0   103.5     2.5   102.3        31.5       630       95           -18               1748
     u/s stem - rectangular portion           1     8.2        9.1       0.9        8.6      20.8    103.5   116.0    12.5   109.8        31.5        361      54           -71               1126
     Copyright © 2016 Stephens Associates C   1     9.1       13.9       2.4       10.7      18.7    103.5   116.0    12.5   107.7        31.5        952     143          -143               2672
     u/s soil above sloped back of wal        1     9.1       13.9       2.4       12.3      17.1    103.5   116.0    12.5   111.8        31.5        952     128          -209               2198
     u/s soil above footing heel              1    13.9       14.9       1.0       14.4      15.0    103.5   116.0    12.5   109.8        31.5        394      53           -70                797
     u/s soil above footing toe               1     6.9        8.2       1.3        7.5      21.9    103.5   114.0    10.5   108.8         25         328      44           -51                969
     rect. soil between ret. walls            1    14.9       21.4       6.5       18.2      11.3    101.0   116.0     15    108.5        31.5       3071     415          -466               4664
     d/s footing                              1    21.4       29.4       8.0       25.4      4.0     101.0   103.5     2.5   102.3        31.5        630      95           -18                378
     d/s stem - rectangular portion           1    27.3       28.2       0.9       27.7      1.7     103.5   116.0    12.5   109.8        31.5        361      54           -71                 92
     d/s stem - triangular portion            1    22.4       27.3       2.4       25.6      3.8     103.5   116.0    12.5   107.7        31.5        952     143          -143                539
     d/s soil above sloped back of wal        1    22.4       27.3       2.4       24.0      5.4     103.5   116.0    12.5   111.8        31.5        952     128          -209                692
     d/s soil above footing heel              1    21.4       22.4       1.0       21.9      7.5     103.5   116.0    12.5   109.8        31.5        394      53           -70                399
     d/s soil above footing toe               1    28.2       29.4       1.3       28.8      0.6     103.5   110.0     6.5   106.8        31.5        256      35           -30                 22
Bridge deck                                                                                                                                                         142             -305                1601
     slab                                     1     8.2       28.2      20.0       18.2      11.3    114.5 116.0 1.5         115.3        27.5        825     124        -265                 1392
     curb u/s                                 1     8.2        9.2       1.0        8.7      20.8    114.5 116.8 2.25        115.6        27.5         62      9          -20                  193
     curb d/s                                 1    27.17     28.17        1       27.67      1.75    114.5 116.8 2.25        115.6        27.5         62      9          -20                   16
TOTALS                                                                                                                                                        2546 kips -2666       k-ft      32914      k-ft
TOTALS, divided by tributary width                                                                                                                             36 k/ft    -38      k-ft/ft      470     k-ft/ft
                                                                                                                                                    661.2
Table of Uplift Forces (use uplift pressure estimated by creep theory, on separate sheet)
                                                        x (upstream-downstream direction)               y (Uplift pressure, ksf)       z (left-right) Area,    Uplift                        M @ d/s toe of
              Component                   Quant.                                        CM-d/s                                                          sq.    force,                          bridge abut.
                                                    u/s       d/s   avg width CM-u/s                          U/S     D/S               avg depth
                                                                                          toe                                                          feet     kips                         due to uplift, k-
Spillway base slab, upstream of sheet piles                                                                                                                                                         ft
     Rectangular portion                        1         0.0  1.3       1.3       0.6       28.8             0.78 0.78           32.5     40.6 -32                                           -912
     Triangular portion (not used, assume that uplift pressure at u/s side of sheet piles same as at u/s toe of slab)
Spillway base slab, downstream of sheet piles
     Rectangular portion                        1         1.3 17.5      16.3       9.4       20.0             0.27 0.27           32.5    528.1 -145                        -2906
     Triangular portion                         1         1.3 17.5      16.3       6.7       22.8             0.21 0.00           32.5    528.1 -54                         -1233
Bridge abutments, downstream of base slab
     Rectangular portion                        2        17.5 29.4      11.9      23.5        6.0             0.27 0.27            5      119.2 -33                          -195
Bridge approaches and abutments, u/s of sheet piles
     Rectangular portion                        1         6.9  8.2       1.3       7.5       21.9             0.73 0.73           34.5     43.1 -31                          -685
     Triangular portion (not used, assume that uplift pressure at u/s side of sheet piles same as at u/s toe of slab)
Bridge approaches and abutments, d/s of sheet piles
     Rectangular portion                        1         8.2 29.4      21.3      18.8       10.6             0.27 0.27           34.5    733.1 -201                        -2139
     Triangular portion                         1         8.2 29.4      21.3      15.3       14.2             0.21 0.00           34.5    733.1 -79                         -1113
TOTALS                                                                                                                                           -575 kips                  -9184   k-ft
TOTALS, divided by tributary width                                                                                                                -8 k/ft                    -131 k-ft/ft
Copyright © 2016 Stephens Associates Consulting Engineers LLC
Revisions:
By:                                         Date:
By:                                         Date:
SACE 00-1 (v. 1) 1/00                                                                                                 www.stephensengineers.comtreet, Wilmington, MA 01887 (978) 988-2115

Source page 85

Project: Number:            052-15-022             Sheet 9 of           13
                                                          Name:         Old Shepard Street Dam, NID No. MA03104
Original Work:                                                                         Canton, MA
By:         NAO             Date: November 15, 2016 Subject:                       Spillway Stability
Checked By:     JET         Date: November 15, 2016                       Hydrostatic Uplift Pressure Estimate


    Estimate hydrostatic uplift pressures beneath spillway by Line of Creep method (FERC 2016 page 3-9)
      Assume tension crack from top of soil to top of sheet piles.
      Model seepage drop from top of sheet piles (point C) upstream, around sheet piles, to toe of slab downstream (po
      Assume uplift pressure under bridge abutment footings downstream of slab based on tailwater elevation




                                                 A
                  Tension crack from A to C
                                                B                                        F
                                                                E

                                                 C                                 Line of seepage (aka "creep")

                                                     D
    Elevation of top of slab, ft                             =   105.0
    Vert. dist. from top to bot. of slab u/s, ft.            =     4.00
    Horiz. dist. from slab bot. to sheet piles, ft.          =     1.25
    Horiz. dist. from sheet piles to slab d/s toe, ft.       =   16.25
    Elevation of bottom of slab u/s, ft                      =   101.0
    Elevation of bottom of slab d/s (modeled), ft            =   101.0
    Sheet pile bottom elevation, ft.                         =     91.0
    Distance from C to D, ft.                                =     10.0
    Distance from D to F, ft.                                =     19.1
    Unit weight of water, kcf                                =   0.062
    Headwater El., ft                                HW =        113.5
    Tailwater El., ft                                TW =        105.4
    Total Creep distance, ft                         LT      =     29.1
    Pressure location                             A - u/s  top B - u/s bot C - u/s top   D - bot   E - d/s top F - d/s bot
                                                      slab         slab    sheet piles sheet piles sheet piles    slab
    Creep dist. to pt. of interest, ft.LP    =         0.0          0.0        0.0        10.0        17.3        29.1
    Point El., ft                      HP =         105.0        101.0       101.0        91.0       101.0       101.0
    Seepage                                  =         8.1          8.1        8.1         5.3         3.3         0.0
    potential
    Position                                 =         0.4          4.4        4.4        14.4         4.4         4.4
    potential
    Uplift pressure, ksf                     =      0.530        0.780       0.780       1.230       0.480       0.275
    = γw * (Seepage + Position)

Copyright © 2016 Stephens Associates Consulting Engineers LLC
Revisions:
By:                               Date:
By:                               Date:
SACE 00-1 (v. 1) 1/00                www.stephensengineers.com 68 Main Street, Wilmington, MA 01887 (978) 988-2115

Source page 86

Project: Number:            052-15-022             Sheet 10 of           13
                                                          Name:         Old Shepard Street Dam, NID No. MA03104
Original Work:                                                                         Canton, MA
By:         NAO            Date: November 15, 2016 Subject:                        Spillway Stability
Checked By:     JET        Date: November 15, 2016                        Hydrostatic Uplift Pressure Estimate


    Estimate hydrostatic uplift pressures beneath bridge approaches by Line of Creep method
      Assume linear uplift pressure beneath bridge approaches from upstream to downstream.




                                                                A
                        Tension crack from A to C
                                                                B
                                                                          E                                   F

                                                            C
                                                                                          Line of seepage (aka "creep")
                                                                    D


    Elevation of top of slab, ft                             =   105.0
    Vert. dist. from top to bot. of slab u/s, ft.            =     4.00
    Horiz. dist. from slab bot. to sheet piles, ft.          =     1.25
    Horiz. dist. from sheet piles to slab d/s toe, ft.       =   21.25
    Elevation of bottom of slab u/s, ft                      =   101.0
    Elevation of bottom of slab d/s (modeled), ft            =   101.0
    Sheet pile bottom elevation, ft.                         =     91.0
    Distance from B to D, ft.                                =     10.1
    Distance from D to F, ft.                                =     23.5
    Unit weight of water, kcf                                =   0.062
    Headwater El., ft                                HW =        113.5
    Tailwater El., ft                                TW =        105.4
    Total Creep distance, ft                         LT      =     37.6
    Pressure location                             A - u/s  top B - u/s bot C - u/s top   D - bot   E - d/s top F - d/s bot
                                                      slab         slab    sheet piles sheet piles sheet piles    slab
    Creep dist. to pt. of interest, ft.LP    =         0.0          4.0        4.0        14.1        21.6        37.6
    Point El., ft                      HP =         105.0        101.0       101.0        91.0       101.0       101.0
    Seepage                                  =         8.1          7.2        7.2         5.1         3.4         0.0
    potential
    Position                                 =         0.4          4.4        4.4        14.4         4.4         4.4
    potential
    Uplift pressure, ksf                     =      0.530        0.726       0.726       1.215       0.489       0.275
    = γw * (Seepage + Position)

Copyright © 2016 Stephens Associates Consulting Engineers LLC
Revisions:
By:                               Date:
By:                               Date:
SACE 00-1 (v. 1) 1/00                www.stephensengineers.com 68 Main Street, Wilmington, MA 01887 (978) 988-2115

Source page 87

Project: Number:             052-15-022              Sheet 11 of 13
                                                          Name:          Old Shepard Street Dam, NID No. MA03104
Original Work:                                                                          Canton, MA
By:         NAO            Date: November 15, 2016 Subject:                          Spillway Stability
Checked By:     JET        Date: November 15, 2016                     Case IIA: Unusual Loading Combination -- Ice
                                                                                    Estimate Ice Force

    Case IIA: Unusual Loading Combination -- Ice

 Regulations do not specify methodology for modeling ice loads on the dam.
 FERC Chapter 3 recommends an ice pressure of 5 ksf be applied to the contact surface of the structure in contact
 with the ice, based on the expected ice thickness, at the normal pool elevation. SA estimated ice thickness using
 the modified Stefan equation as described in USACE EM 1110-2-1612 Ice Engineering and ERDC/CRREL
 Technical Note 04-3, as shown below:




 According to the equation, ice thickness is estimated as a function of accumulated freezing degree days (AFDD)
 and a coefficient, C. AFDD is based on air temperature and is calculated starting with the first sustained freezing
 period of each winter. SA estimated peak AFDD for each winter using daily temperature data measured at Blue Hill
 Observatory, Canton, MA from 1893 to 2012. Because the observatory is at El. ~635 ft, about 500 ft. higher than
 Old Shepard Street Dam and air temperature typically decreases with increasing elevation, we adjusted (increased)
 the observatory-measured daily temperatures by the adiabatic temperature rate of change with elevation, which is
 an increase of about 2.7 degrees F for an elevation drop of about 500 ft. AFDD for the 120 winters ranged from 33
 to 886 degree-days F, with an average of 291 degree-days F and a value of 633 degree-days F at the 95th
 percentile.

 The C coefficient represents conditions at the dam that influence thickness of the ice sheet. Predicted ice thickness
 varies proportionally with C. We estimated that the Pond and Dam may be between a "sheltered small river" and
 "average lake with snow", for which C values above range from 0.21 to 0.7. SA selected a C value of 0.45 at the
 middle of this range.

 The ERDC/CRREL Technical Note 04-3 process for estimating ice thickness based on AFDD indicates that
 "generally, the mean thickness and the thickness at the +/- 95% confidence limits are required for design purposes."
 SA estimated the annual peak ice thicknesses using C =0.45 and ranked the thickness to estimate the mean and
 95th percentile thickness.

            Design AFDD at 95th Percentile                633 deg. days F
            Design C coefficient:                              0.45
            Design Ice thickness at 95th Percentile            11 in.
            Design Ice Pressure                                5 ksf
            Design Ice Load                                   4.7 k/ft

Copyright © 2016 Stephens Associates Consulting Engineers LLC
Revisions:
By:                               Date:
By:                               Date:
SACE 00-1 (v. 1) 1/00                www.stephensengineers.com 68 Main Street, Wilmington, MA 01887 (978) 988-2115

Source page 88

Project: Number:             052-15-022               Sheet 12 of   13
                                                          Name:          Old Shepard Street Dam, NID No. MA03104
Original Work:                                                                           Canton, MA
By:         NAO              Date: November 15, 2016 Subject:                         Spillway Stability
Checked By:     JET          Date: November 15, 2016                      Case III: Extreme Loading Combination
                                                                                 Earthquake Water Forces

   Case III: Extreme Loading Combination -- Normal Operating with Earthquake
   b. Estimate earthquake water forces
   Above ground surface, apply hydrodynamic forces from reaction of reservoir water on spillway using Westergaard
   formula as presented in USACE EM 1110-2-2100 (2005). Below ground surface, use hydrostatic water loads from
   load case I.

    Change in water forces above ground surface from earthquake:
                                                                                  Upstream             Downstream

                                                                         PE   =     -0.231   k/ft        -0.001

                                                                         kh   =     -0.150               -0.150

                                                                         γw   =     0.062    kcf          0.062

                        (height of water above ground surface            h    =      6.5     ft            0.4
                        and below spillway crest)



    The reference states that the line of action of the water force is
    0.4h above ground surface                                                 =      2.6     ft            0.2

    Elevation of ground surface                                               =     107.0    ft           105.0

    Elevation of hydrodynamic resultant                                       =     109.6    ft           105.2

    Elevation of toe of spillway                                              =     101.0    ft           101.0

    Moment arm about spillway toe                                             =      8.6     ft            4.2

    Moment (negative is driving, positive is resisting)                       =      -2.0    k-ft          0.0




Copyright © 2016 Stephens Associates Consulting Engineers LLC
Revisions:
By:                                Date:
By:                                Date:
SACE 00-1 (v. 1) 1/00                 www.stephensengineers.com 68 Main Street, Wilmington, MA 01887 (978) 988-2115

Source page 89

Project: Number:              052-15-022             Sheet 13 of       13
                                                          Name:           Old Shepard Street Dam, NID No. MA03104
Original Work:                                                                           Canton, MA
By:         NAO            Date: November 15, 2016 Subject:                          Spillway Stability
Checked By:     JET        Date: November 15, 2016                                Earthquake Soil Forces


    Case III: Extreme Loading Combination -- Normal Operating with Earthquake
    c. Estimate earthquake soil forces
   The Regulations do not specify a soil loading method for Case III.
   Apply earthquake forces from soil backfill on on the upstream and downstream sides of the spillway using Wood's
   method as described in ITL-92-11 (1992) and USACE EM 1110-2-2100 (2005). This method assumes the soil
   backfill does not yield, and responds in an elastic manner. The change in soil forces from the earthquake
   increases (i.e. adds to) the static driving forces and moments on the upstream side, and decreases the static
   resisting forces and moments on the downstream side. On the downstream side, the force and moment reduction
   are limited to the values of static soil force and moment (since seismic soil cannot apply tensile stress to spillway).

    Change in horizontal soil force from earthquake:




                                                                     Upstream             Downstream         Combined
                                                           Fsr   =       -0.2   k/ft          -0.2             -0.4
                                                           γ     =      0.038   kcf          0.073
                                                           h     =        6.0   ft             4.0
                                                           kh    =     -0.150   --          -0.150

    The reference states that the line of action of
    the dynamic soil force is 0.63*h above base of               =       3.8    ft             2.5
    Elevation of toe of wall                                     =     101.0    ft           101.0
    Elevation of dynamic soil resultant                          =     104.8    ft           103.5
    Moment arm about spillway toe                                =       3.8    ft             2.5
    Moment (negative is driving, positive is resisting)          =      -0.8    k-ft          -0.4               -1.2




Copyright © 2016 Stephens Associates Consulting Engineers LLC
Revisions:
By:                               Date:
By:                               Date:
SACE 00-1 (v. 1) 1/00                www.stephensengineers.com 68 Main Street, Wilmington, MA 01887 (978) 988-2115

Source page 90

REPAIR DESIGN REPORT
                     OLD SHEPARD STREET DAM
                     CANTON, MASSACHUSETTS




                     STABILITY EVALUATION

                    EXISTING UPSTREAM SLOPE




SA No. 052-15-022

Source page 91

Project: Number:                  052-15-022             Sheet 1 of          6
                                                             Name:               Old Shepard Street Dam, NID No. MA03104
Original Work:                                                                                  Canton, MA
By:          NAO             Date: November 15, 2016 Subject:                            Upstream Slope Stability
Checked By:      JET         Date: November 15, 2016

 Purpose: Evaluate stability of Old Shepard Street Dam upstream slope.

 Method and Model Cross-Section:
 - Upstream slope consists of dumped rip-rap placed against an upstream stone masonry wall. SA modeled the geometry
 to evaluate global stability since the riprap buttresses the upstream wall against sliding and overturning.
 - Evaluate slope stability using Stabl6, with random search routine for critical failure surface (i.e. lowest Factor of Safety,
 FS). SA found that Janbu "irregular" trial failure surfaces made up of line segments resulted in lower Factor of Safety than
 circular trial failure surfaces.
 - Geometry from topographic survey, results of borings, site observations and interviews with DPW personnel.
 - Assume upstream stone masonry wall between embankment and upstream sediment/rip-rap. Assume upstream stone
 masonry wall is mortared, based on SA seepage evaluation.
 - We understand from discussion with DPW personnel that to buttress upstream wall, they dumped rip-rap into pond from
 road, which settled into pond sediments. Assume that riprap and pond sediments formed a matrix of the two materials.
 - Embankment phreatic surface from seepage analysis.

 Material Properties:
        Material                                          Unit weight, pcf         Cohesion, psf         Friction angle, deg.
        1. Impoundment sediment                                 100                     0                         27
        2. Rip-rap                                              140                     0                         45
        3. Stone masonry wall                                   150                    100                        45
        4. Embankment fill, 0 to 6 ft. bgs                      125                     0                         40
        5. Embankment fill, 6 to 12 ft. bgs                     125                     0                         30
        6. Silty Sand and Gravel                                140                     0                         45

  Load Cases:
  - Use slope stability load cases and Factors of Safety from Regulations section 10.14(9)(c).
  - For each load case (except for earthquake), apply traffic surcharge load. Use traffic surcharge of 4.1 ft. of fill based on
  interpolation of AASHTO LRFD Bridge Design Specifications (2012) Table 3.11.6.4-2 for 7-ft. high wall parallel to traffic,
  with back face of wall within 1 ft. horizontally of traffic load.
  - End of construction: Assume steady seepage at normal pool. Add traffic surcharge.
  - Sudden drawdown from maximum pool: Assume impoundment dewatered to El. 107 ft. Embankment water levels based
  on 100-year flood seepage analysis. Add traffic surcharge.
  - Sudden drawdown from spillway crest/top of gates (i.e. top of stoplogs): Assume impoundment dewatered to El. 107 ft.
  Embankment water levels based on normal pool seepage analysis. Add traffic surcharge.
  - Steady seepage with maximum storage pool: Embankment water levels based on 100-year flood seepage analysis. Add
  traffic surcharge.
  - Earthquake: Embankment water levels based on normal pool seepage analysis. Use EQ acceleration = 0.15 g, per
  Regulations. No traffic surcharge.

  Results:

                                                                                 Embankment                  1     Model
    Load case                                                                                    Required FS
                                                                                Phreatic Surface               Estimated FS
    End of construction, with traffic                                             Normal Pool        1.3            1.9
    Sudden drawdown from Maximum Pool, with traffic                                   SDF           > 1.1           1.7
    Sudden drawdown from Spillway Crest/Top of Gates, with traffic                Normal Pool        1.2            1.8
    Steady seepage with maximum storage pool, with traffic                            SDF            1.5            1.9
    Earthquake (no traffic surcharge)                                             Normal Pool       > 1.0           1.2
    NOTES: 1. Required Factors of Safety (FS) are from Regulations section 10.14(9)(c), for upstream slope stability analysis.


Copyright © 2016 Stephens Associates Consulting Engineers LLC
Revisions:
By:                                  Date:
By:                                  Date:
SACE 00-1 (v. 1) 1/00                        www.stephensengineers.com       668 Main Street, Wilmington, MA 01887 (978) 988-2115

Source page 92

Project: Number:                       052-15-022             Sheet: 2 of                                   6
                                                     Name:                    Old Shepard Street Dam, NID No. MA03104
Original Work:                                                                               Canton, MA
By:           NAO   Date:    11/15/2016                 Subject:                       Upstream Slope Stability
Checked By: JET     Date:    11/15/2016




                                                                                                                   Stephens Associates
                                                                                                                                       Consulting Engineers
Revisions:
                                                                                                                                      Structural
By:                         Date:                                                                                    Insightful, Cost-
                                                                                                                     Saving Solutions for
                                                                                                                                   Geotechnical
                                                                                                                     Buildings and
By:                         Date:                                                                                        Hydrology & Hydraulics
                                                                                                                     Infrastructure

                                                        60 Northrup Dr., Brentwood, NH 03833; Phone (603)772-1417; Fax (603)772-1418 668
                             www.stephensengineers.com Main Street, Ste. 250, Wilmington, MA 01887; Phone (978)988-2115; Fax (978)988-2117

Source page 93

Project: Number:                       052-15-022             Sheet: 3 of                                   6
                                                     Name:                    Old Shepard Street Dam, NID No. MA03104
Original Work:                                                                               Canton, MA
By:           NAO   Date:    11/15/2016                 Subject:                       Upstream Slope Stability
Checked By: JET     Date:    11/15/2016




                                                                                                                   Stephens Associates
                                                                                                                                       Consulting Engineers
Revisions:
                                                                                                                                      Structural
By:                         Date:                                                                                    Insightful, Cost-
                                                                                                                     Saving Solutions for
                                                                                                                                   Geotechnical
                                                                                                                     Buildings and
By:                         Date:                                                                                        Hydrology & Hydraulics
                                                                                                                     Infrastructure

                                                        60 Northrup Dr., Brentwood, NH 03833; Phone (603)772-1417; Fax (603)772-1418 668
                             www.stephensengineers.com Main Street, Ste. 250, Wilmington, MA 01887; Phone (978)988-2115; Fax (978)988-2117

Source page 94

Project: Number:                       052-15-022             Sheet: 4 of                                   6
                                                     Name:                    Old Shepard Street Dam, NID No. MA03104
Original Work:                                                                               Canton, MA
By:           NAO   Date:    11/15/2016                 Subject:                       Upstream Slope Stability
Checked By: JET     Date:    11/15/2016




                                                                                                                   Stephens Associates
                                                                                                                                       Consulting Engineers
Revisions:
                                                                                                                                      Structural
By:                         Date:                                                                                    Insightful, Cost-
                                                                                                                     Saving Solutions for
                                                                                                                                   Geotechnical
                                                                                                                     Buildings and
By:                         Date:                                                                                        Hydrology & Hydraulics
                                                                                                                     Infrastructure

                                                        60 Northrup Dr., Brentwood, NH 03833; Phone (603)772-1417; Fax (603)772-1418 668
                             www.stephensengineers.com Main Street, Ste. 250, Wilmington, MA 01887; Phone (978)988-2115; Fax (978)988-2117

Source page 95

Project: Number:                       052-15-022             Sheet: 5 of                                   6
                                                     Name:                    Old Shepard Street Dam, NID No. MA03104
Original Work:                                                                               Canton, MA
By:           NAO   Date:    11/15/2016                 Subject:                       Upstream Slope Stability
Checked By: JET     Date:    11/15/2016




                                                                                                                   Stephens Associates
                                                                                                                                       Consulting Engineers
Revisions:
                                                                                                                                      Structural
By:                         Date:                                                                                    Insightful, Cost-
                                                                                                                     Saving Solutions for
                                                                                                                                   Geotechnical
                                                                                                                     Buildings and
By:                         Date:                                                                                        Hydrology & Hydraulics
                                                                                                                     Infrastructure

                                                        60 Northrup Dr., Brentwood, NH 03833; Phone (603)772-1417; Fax (603)772-1418 668
                             www.stephensengineers.com Main Street, Ste. 250, Wilmington, MA 01887; Phone (978)988-2115; Fax (978)988-2117

Source page 96

Project: Number:                       052-15-022             Sheet: 6 of                                   6
                                                     Name:                    Old Shepard Street Dam, NID No. MA03104
Original Work:                                                                               Canton, MA
By:           NAO   Date:    11/15/2016                 Subject:                       Upstream Slope Stability
Checked By: JET     Date:    11/15/2016




                                                                                                                   Stephens Associates
                                                                                                                                       Consulting Engineers
Revisions:
                                                                                                                                      Structural
By:                         Date:                                                                                    Insightful, Cost-
                                                                                                                     Saving Solutions for
                                                                                                                                   Geotechnical
                                                                                                                     Buildings and
By:                         Date:                                                                                        Hydrology & Hydraulics
                                                                                                                     Infrastructure

                                                        60 Northrup Dr., Brentwood, NH 03833; Phone (603)772-1417; Fax (603)772-1418 668
                             www.stephensengineers.com Main Street, Ste. 250, Wilmington, MA 01887; Phone (978)988-2115; Fax (978)988-2117

Source page 97

REPAIR DESIGN REPORT
                         OLD SHEPARD STREET DAM
                         CANTON, MASSACHUSETTS




                         STABILITY EVALUATION

           EXISTING DOWNSTREAM STONE MASONRY RETAINING WALL




SA No. 052-15-022

Source page 98

Old Shepard Street Dam, NID No. MA03104                                                                                           Stephens Associates Consulting Engineers
Canton, MA                                                                                                                                      SA Project No. 052-15-022
Stability Evaluation - Downstream Stone Masonry Retaining Wall

Representative Calculation                                                                                                                              By:         N. Olson
Case II: Unusual Loading Combination - Flood Discharge, with Truck Load                                                                                 Date:     11/15/2016
                                                                                                                                                      Checked By:   J. Turner
                                                                                                                                                        Date:     11/15/2016

Problem Geometry Defined:
Dist. (ft)             2               4            6                8           10         12                   14             16           18           20         22
  Purpose: Evaluate sliding and overturning stability of existing Old Shepard Street Dam downstream stone masonry retaining wall.                                        Approx.
   Approx.
  Assumptions:   Analysis of new retaining wall cast against existing stone block wall and on top of existing concrete slab.                                             El. (ft)
  - Assume
    El. (ft.) wall extends
                 Dowels    willfrom   top El.and
                                 be drilled    116. ft. to aninto
                                                   epoxied      unknown      bottom
                                                                     stone block    wallEl.tobelow  downstream
                                                                                              use weight   of stone(d/s) ground
                                                                                                                     block   wall tosurface, however, critical model bottom El.
                                                                                                                                      resist overturning
  for wall stability
                 andissliding.
                       at d/s ground       surfaceFS
                                  The required      (El.for109  ft., aka "base").
                                                             earthquake     loading Use      model
                                                                                       is >1.0       wall bottom
                                                                                                 at normal          El. 109 ft.for this case is surface
                                                                                                            pool. Loading
  - Actual
        110 widthsurcharge
                   of wall is +unknown,
                                  truck load however,    SA probed
                                                + earthquake            up topool.
                                                                  at normal     3 ft. into
                                                                                        Truckvoids
                                                                                                loadbetween
                                                                                                      modeledwall
                                                                                                                asstones    at various
                                                                                                                    two point    loads onlocations
                                                                                                                                           back of near
                                                                                                                                                   wall bottom of wall 110
  Therefore, model     wall as
                 and input   as 4negative
                                    ft. wide anchor
                                               at base.loads.
                                                           Assume wall is 1 ft. wider at base than at top.
  - Boring SA-1 (downstream side of road, ~15 ft. from west end of wall) encountered medium dense fill within the top 8 ft. below the embankment
  crest (El. 116 ft.), and loose to very loose fill from about 8 to 12 ft. below embankment crest. Boring SA-2 (upstream side of road, ~40 ft. from
  west end of wall), was similar, however, the change from medium dense to very loose fill was about 6 ft. below the embankment crest.
  - Estimate average friction angle behind wall of 40 degrees, based                     on SPT-N
                                                                                    Existing          correlation= with
                                                                                                wall thickness     3.5 friction angle for medium dense to dense upper fill.
  Assume unit weight of 125 pcf.Assume new wall stem                                ft at top (assumed based on
  - Assume sliding of wall along thickness
                                         "internal" horizontal
                                                    = 3.0 ft at topjoints (i.e. sliding   of stone
                                                                                    upstream         masonry on stone masonry). Assume that wall repairs will, at
                                                                                                  wall)
  minimum, include mortaring of joints. Estimate sliding friction angle of 35 degrees between                     Creststone
                                                                                                                          El. ≈masonry,
                                                                                                                                 107 ft. including  at base of wall.
                                                                                                                                           Bolivar Street
  - Use active soil pressures upstream. No downstream              (2,107)
                                                                        soil pressure, since model wall does not extend below d/s ground surface.
  - Based on seepage evaluation results, water level behind wall (upstream) and tailwater (downstream)              (8.5,107)        are each below wall bottom.
        105 Criteria:
  Stability                                                                                                                                                              105
  - Use Regulations section 10.14 (k) sliding Factors of Safety (FS) for significant hazard dam (Usual FS= 3, Unusual FS= 2, Extreme FS> 1)
  - Regulations does not have requirements for overturning, but notes that that recommended safety factors also apply to "stress at the rock-
  concrete interface and in the foundation."
  - Judge that the soil at base of wall has an allowable bearing pressure of 3 ksf (i.e. ultimate bearing pressure of 6 ksf with FS = 2). For
  comparison, the 1956 BridgeProposed   Drawings indicate "Maximum Soil Pressure 4,780 psf"
  Load Cases:
                                      Concrete
  Consider loading combinations from Regulations:
  - Case I: Usual Loading Combination      Wall- Normal Operating Condition - SA judged this condition to be not applicable, because SA 's seepage
  evaluation shows the normal pool phreatic surface in the embankment to be below the wall base. In SA's judgment, therefore, wall failure during
  Normal100Operating Condition is unlikely to cause dam breach.                                                                                                          100
  - Case II: Unusual Loading Combination - Flood Discharge, with truck load.
  o Water levels: Analyze for floods up to and including flood resulting from 100-year storm (water levels from SA seepage model, using water
                                                                                                                           Silty Sand and
      levels from SA hydraulic model    Existing
                                              for Old Shepard Street Dam Emergency       Existing   Action Plan, 2012). Based on SA's seepage model, the 100-year flood
                                                                                                         Stone             Gravel Fill
      model phreatic surface is El.109,Concrete  equal to   the  bottom   of  the  downstream       wall. Therefore,   assume      no water pressures on back or base of the
      wall.                                                                                  Block      Wall
  o Traffic surcharge load: Use traffic     Wall surcharge of 4.1 ft. of fill based on interpolation of AASHTO LRFD Bridge Design Specifications (2012) Table
      3.11.6.4-2 for 7-ft. high wall parallel to traffic, with back face of wall within 1 ft. horizontally of trafficAssumed                  Groundwater
                                                                                                                                    load. Conservatively    El. 97, vertical load
                                                                                                                                                          disregard
      on wall back batter from truck load.                                                                                         Normal Pool
  - Case IIA: Unusual Loading Combination - Ice (Not applicable)
  - Case III: Extreme Loading Combination       - Normal Operating
                                           (0,96)        (2,96)    with Earthquake. Use EQ acceleration = 0.15 g, per Regulations. Apply active
       95
  earthquake   force Assume
                     by Mononobe-Okabe
                                new wall toe =method.                               ~83 deg.       (10,96)                                   95
  Model Embankment           thick (excerpt of SA Design Report figure, shown in reverse of diagram of spreadsheet variables) Refer to SA Design
                     1.0 ft.Section
  Report for complete figure.                                                                      (10,95)         El. ≈ 95 ft.
                                       (0,95)

                  Top of Concrete Slab -          Assume new wall base
                                                  = 5 ft at bottom   Existing wall thickness = 5 ft at                   GlacialDownstream
                                                                                                                                 Till      stone masonry wall
                  Assumed Ground
                  surface El. 95 ft.                                 bottom (assumed based on
                                                                     upstream wall)



         90                                                                                                                                                            90




Dist. (ft)              2            4            6             8           10      12                    14            16           18              20           22




                                                                                   Page 1 of 6

Source page 99

Old Shepard Street Dam, NID No. MA03104                                        Stephens Associates Consulting Engineers
Canton, MA                                                                                   SA Project No. 052-15-022
Stability Evaluation - Downstream Stone Masonry Retaining Wall

Spreadsheet Program Variables Defined:




                                                                 Page 2 of 6

Source page 100

Old Shepard Street Dam, NID No. MA03104                                                               Stephens Associates Consulting Engineers
Canton, MA                                                                                                          SA Project No. 052-15-022
Stability Evaluation - Downstream Stone Masonry Retaining Wall


                                                       Wall/Dam and Problem Geometry:
                                                Location
  Point                                       El.   Position                         Batter
  Desig.             Description              (Y)      (X)        Length         Vert.:   Angle   Factors
                                                       (feet)                   1 Horiz. (deg.)                         Remarks
    D      Crest      Front:                 116.0       0.0
    E                 Back:                  116.0       3.0                      0.0      0.0
    B      Base       Front:    Top          109.0       0.0
    A                           Bottom       109.0       0.0
    G                 Back:     Top          109.0       4.0           4.0                                  Width of base
    H                           Bottom       109.0       4.0                      0.0      0.0              Batter of foundation surface
    C      Toe meets stem                    109.0       0.0           0.0        0.0      0.0              Stem front batter
    F      Heel meets stem                   109.0       4.0           0.0        7.0      8.1              Stem back batter
Water elevation at back                      109.0
Water elevation at toe/face                  109.0
Anchor Number 1 Force Loc.                    0.0        0.0                               0.0              Angle from horizontal, deg.
Anchor Number 1 Force Magnitude                                                                      0      Anchor force, kips
Anchor Number 2 Force Loc.                    0.0        0.0                               0.0              Angle from horizontal, deg.
Anchor Number 2 Force Magnitude                                                                      0      Anchor force, kips
Reduction factor for piezometric head at toe =                                                      1.00    x head to account for losses
Reduction factor for piezometric head at heel =                                                     1.00    x head to account for losses
Length of Tension Crack on Dam Base at heel =                                                             ft.
Unit weight of Wall =                                                                              150.00 pcf
Arching Effects of Wall as percent reduction of driving forces=                                     0.00  x 100 = % reduction
Earthquake Effects?                                                                                  no   Yes or No
Earthquake effects calculated using Mass Bld. Code (MBC) or AASHTO                                AASHTO
Ice Force on Reservoir side of Wall (per foot of Wall) =                                            0.00  Kips                1 ft thick

                                                 Subsurface Profile:
                     Top     Top                     Unit Wt.           Wall Friction                          Rankine Earth Pressure
            Layer Elevation Depth     Phi     Su      (pcf)   Srchrg.      Factors                                   Coefficient
  Layer    Number (feet)    (feet) (degrees) (psf)  Tot. Sat.   (psf) Delta/Phi Su alpha                       Ka       Ko        Kp
Back of Wall/Dam:
Soil          1B        116.0       0.0        40         0      125              513      1                   0.22         0.36           4.60
N/A           2B        109.0       7.0        40         0      125              513                          0.22         0.36           4.60
At Wall Bottom          109.0       7.0        35         0                       513                          0.27         0.43           3.69
At Water Elevation      109.0       7.0        40         0      125              513                          0.22         0.36           4.60
Front of Wall/Dam:
N/A           1F        109.0       0.0        40         0      125               0                           0.22         0.36           4.60
N/A           2F        109.0       0.0        40         0      125               0                           0.22         0.36           4.60
At Wall Bottom          109.0       0.0        35         0                        0       1                   0.27         0.43           3.69
At Water Elevation      109.0       0.0        40         0      125               0                           0.22         0.36           4.60

Calculation:      Calculate the wall stability based on assumption of monolithic structure
          Assume: Calculation for stability per foot of wall.




                                                                  Page 3 of 6

Source page 101

Old Shepard Street Dam, NID No. MA03104                                                                                                                                                          Stephens Associates Consulting Engineers
Canton, MA                                                                                                                                                                                                     SA Project No. 052-15-022
Stability Evaluation - Downstream Stone Masonry Retaining Wall

                                                                                               Soil stresses and lateral earth pressures
                                          Top     Backfill                        Total             Pore      Effective            Rankine Effective Horizontal Earth Pressures (psf)
             Layer                     Elevation Thickness                        Stress         Pressure      Stress            Active                At-Rest                Passive
Layer       Number                       (feet)    (feet)                          (psf)            (psf)       (psf)        Top      Bottom       Top      Bottom        Top        Bottom
Back of Wall/Dam:
Soil       1B                                116                       7           513                              0              513                            111          302             183               496    2357                       6381
N/A        2B                               109.0                     0.0          1388                             0             1388                            302          302             496               496    6381                       6381
At Wall Bottom                              109.0                                  1388                             0             1388                            302          376             592               592    5120                       5120
At Water Table El.                          109.0                                  1388                             0             1388                            302                          496                      6381
Front of Wall/Dam:
N/A        1F                                109                       0               0                            0               0                             111          302               0                0          0                      0
N/A        2F                               109.0                     0.0              0                            0               0                              0            0                0                0          0                      0
At Wall Bottom                              109.0                                      0                            0               0                              0            0                0                0          0                      0
At Water Table El.                          109.0                                      0                            0               0                              0                             0                           0


    117                              Wall Back             117                                  117                                Wall Back        117
                                                                                  Wall Back
                                                                                                                                                                                                                             Wall Back - Active


    116                       513    Wall Front            116           0                      116                        513     Wall Front       116                            111     183
                                                                                  Wall Front                                                                                                                                 Wall Front - Passive



    115                                                    115                                  115                                                 115                                                                      Wall Back - At rest



                                                                                                                                                                                                                             Wall Front - At Rest
    114                                                    114                                  114                                                 114
                                                                                                Elevation (ft.)




                                                                                                                                                Elevation (ft.)
                                                  Elevation (ft.)
 Elevation (ft.)




    113                                                    113                                  113                                                 113

    112                                                    112                                  112                                                 112

    111                                                    111                                  111                                                 111

    110                                                    110                                  110                                                 110

    1090                                  1388             1090          0                      1090                               1388             1090                0                                  302           496               592


    108                                                    108                                  108                                                 108
                   0     500 1000 1500                               0       1000 2000                             0      1000 2000                                0         100         200         300         400   500           600                700
                       Total Stress (psf)                           Porewater Pressure                             Effective Stress (psf)
                                                                                                                                                                                         Horizontal Effective Stress (psf)
                                                                          (psf)

Select Lateral Earth Pressure                                                                                                                                               NOTES FOR INPUT:                                        To
           Earth Pressure type:                                              N=                                   None     In front of Dam                                  select type of lateral earth pressure (LEP) used in
                                                                             A=                                   Active   Behind Wall/Dam                                  analysis, use A for active, 0 (zero) for at-rest, P for
                                                                                                                                                                            passive, or N for none.
                                                                                                                                                                            For passive resistance (Pp), active pressure should be
                                                                                                                                                                            used on opposite side and Rp may be used to account
                         Reduction factor (Rp) for Passive Resistance (Pp):    0.33                                                                                         for strain incompatibility with mobilization of active
                         NOTE: For full passive resistance reduction factor (Rp) = 1                                                                                        stress.




                                                                                                                                 Page 4 of 6

Source page 102

Old Shepard Street Dam, NID No. MA03104                                                                      Stephens Associates Consulting Engineers
Canton, MA                                                                                                                 SA Project No. 052-15-022
Stability Evaluation - Downstream Stone Masonry Retaining Wall



                                          Calculate Coefficient of Active Pressure for Earthquakes
Massachusetts Building Code uses pre-determined factor of 0.045. AASHTO calculates the coefficient using Mononobe-Okabe.

Method:     AASHTO                  KAE =     0.26        (Calc. requires factors below for AASHTO method)
                                    ΔKAE =    0.04
            A (g) =    0.15                   Site acceleration coefficient, per Regulations
            β (deg.) = 0.0         Batter angle of wall back. Set to zero, since Rankine soil conditions used.
            θ=         4.29                            Wall or Dam: Dam Note: For MA Dam Regulations: If Wall, use kh = A/2. If Dam, use kh = A
            ψ=         3.60



                                                            Forces on Wall Per Foot of Wall:
    NOTE: LEP is lateral earth pressure                    Moment                                                               Moment
                                                 Force       Arm      Moment                                           Force      Arm     Moment
Horizontal:                        Layer          (kips)    (feet)    (kip-ft)      Vertical:                          (kips)    (feet)   (kip-ft)
Back LEP above GWT        L1:-     Fill          -0.666      2.3       -1.6         Wall Section         W1=:+          0.0       2.0       0.0
Back LEP. below GWT       L2:-     Fill            0.0       2.3        0.0         Wall Section         W2=:+          0.0       2.7       0.0
Back LEP below GWT        L3:-     Fill            0.0       3.5        0.0         Wall Section         W3=:+          0.0       0.0       0.0
Back LEP from Surcharge   L4:-     Fill            -0.8       3.5      -2.7         Wall Section         W4=:+          0.0       2.0       0.0
Water on Back             U1h:-    Water           0.0       0.0        0.0         Wall Section         W5=:+          0.5       3.3       1.8
Water on Back             U2h:-    Water           0.0       0.0        0.0         Wall Section         W6=:+          3.2       1.5       4.7
Water on Base             U3h:+    Water           0.0       0.0        0.0         Soil on Heel         W7:+           0.0       4.0       0.0
Water on Base             U4h:+    Water           0.0       0.0        0.0         Soil on BackBatter   W8:+           0.4       3.7       1.6
Water on Base             U4Ch:+   Water                                            Soil on toe          W9:+           0.0       0.0       0.0
Water on Crest            U5h:-    Water          0.0       0.0         0.0         Water on Back        U1v:+          0.0       0.0       0.0
Water on Crest            U6h:-    Water          0.0       0.0         0.0         Water on Back        U2v:+          0.0       4.0       0.0
Water on Front            U7h:+    Water          0.0       0.0         0.0         Water on Crest       U5v:+          0.0       0.0       0.0
Water on Heel             U10:-    Water          0.0       0.0         0.0         Water on Crest       U6v:+          0.0       0.0       0.0
Water on Heel             U11:-    Water          0.0       0.0         0.0         Water on Front       U7v:+          0.0       0.0       0.0
Water on Toe              U12:+    Water          0.0       0.0         0.0         Water on Toe         U8:+           0.0       0.0       0.0
Water on Toe              U13:+    Water          0.0       0.0         0.0         Water on Heel        U9:+           0.0       0.0       0.0
Front LEP above GWT       L5:+     Soil           0.0       0.0         0.0
Front LEP below GWT       L6:+     Soil           0.0       0.0         0.0         Hydrostatic Uplift   U3v=:-         0.0       0.0        0.0
Front LEP below GWT       L7:+     Soil           0.0       0.0         0.0         Hydrostatic Uplift   U4v=:-         0.0       1.3        0.0
Ice Force on Wall         Ice:-    Ice            0.0       -0.5        0.0         Hydrostatic Uplift   U4Cv=:-        0.0       0.0        0.0
Earthquake                Ew:-     Water                                            Anchor 1             A1v:+          0.0       0.0        0.0
Earthquake                Es:-     Active Soil    0.0        0.0        0.0         Anchor 2             A2v:+          0.0       0.0        0.0
Earthquake                Ei:-     Inertia        0.0        0.0        0.0
Anchor 1                  A1h:+    Anchor         0.0      -109.0       0.0
Anchor 2                  A2h:+    Anchor         0.0      -109.0       0.0
Sum Horizontal Forces                             -1.4                              Sum Vertical Forces                 4.1
Sum Moments From Horizontal Forces                                      -4.3        Sum Moments from Vertical Forces                               8.1




                                                                      Page 5 of 6

Source page 103

Old Shepard Street Dam, NID No. MA03104                                                                                Stephens Associates Consulting Engineers
Canton, MA                                                                                                                           SA Project No. 052-15-022
Stability Evaluation - Downstream Stone Masonry Retaining Wall




CHECK DESIGN BASED ON BEARING SURFACE OF UNIT THICKNESS OF WALL:

SUM MOMENTS:                                                          3.8           kip-ft         (includes           0          % reduction due to arch 3-D effects)

Resist. Mom. (+) = W1+W2+W3+W4+W5+W6+W7+W8+U1v+U2v+U3h+U4h+U5v+U6v+U7+U8+U9+U12+U13+L5+L6+L7+A1+A2 =                                                              8.1

Driv. Mom. (-) = L1+L2+L3+L4+U1h+U2h+U3v+U4v+U5h+U6h+U10+U11+Ew+Es+Ice =                             (includes reduction due to arch 3-D effects)                 -4.3
                                                                                                                                   Check sum =                     3.8

CHECK LOC. OF RESULTANT AS DISTANCE FROM LOCATION A:
                                                                                                   Resultant Location RESULT
                                           Foundation material : Soil                               LOWER            CALC'D         HIGHER
                                                                                                    MIDDLE                          MIDDLE
                                                                                            1.3          0.9         2.7
                                           Lower and higher middles based on 1/6 base length for soil, 1/4 base length for rock
                                           Eccentricity (e):      -1.1

CHECK SAFETY FACTOR AGAINST SLIDING ALONG BASE:
                                                                                                       Sliding FS RESULT
                                                      Resisting Force:                 2.88             FS=:          2.0



CHECK MAXIMUM BEARING PRESSURE (ksf):                                                              Bearing Pressure RESULT
                                                                                                       TOE            AVG.           HEEL
                                                                                                       2.7            1.0             -0.6
ANALYSIS:
ADD CONCRETE-ROCK BOND OF :                                      0 psi =                     0.0 ksf
                                                                                         Sliding FS RESULT (with adhesion)
                                                      This section
                                                      Resisting    not used for this project
                                                                Force:                  2.9             FS=:                2.0

REQUIRED ROCK BOND:                        FOR FS =              2                           0.0             ksf =                           0.0 psi




                                TABLE: SLIDING AND BEARING PRESSURE RESULTS FOR ALL LOAD CASES

                                                                                                                   Bearing pressure (ksf)
                                 Spillway Discharge    Impoundment                                      FS Sliding
          Load Case                                                     Tailwater El. (ft.)                   Required         Estimated
                                        (cfs)           Water El. (ft.)
                                                                                          Required Estimated (allowable)    Toe       Heel
            Normal                                                                 Not Applicable
             Flood                       610                116.5              108.4                  4.3                   1.7         0.4
                                                                                              2.0
         Flood + Truck                   610                116.5              108.4                  2.0       < 3 ksf     2.7        -0.6
          Earthquake                      10                113.5              105.4          1.0     2.1                   1.9         0.2




                                                                      Page 6 of 6

Source page 104

REPAIR DESIGN REPORT
                            OLD SHEPARD STREET DAM
                            CANTON, MASSACHUSETTS




                                    APPENDIX C

                    OPERATION AND MAINTENANCE (O&M) MANUAL




SA No. 052-15-022           1/12/2018       Page C-1 of 12

Source page 105

OPERATION AND MAINTENANCE (O&M) MANUAL
                  OLD SHEPARD STREET DAM, NID # MA03104
                        CANTON, MASSACHUSETTS
Summary

The purpose of this Operation and Maintenance (O&M) Manual (“Manual”) is to guide the Town in operating
and maintaining Old Shepard Street Dam, to address requirements of the Massachusetts Dam Safety Regulations
(302 CMR 10), and to support permit applications for Dam repairs and improvements. Key items are as follows:

•   The Dam requires no routine operations during normal flows or floods.
•   Operable water control structures at the Dam consist of 3-openings in the spillway controlled by stoplogs.
    Maintain stoplogs in-place prior to and during floods. Removing stoplogs prior to or during floods increases
    flow to Massapoag Brook, potentially increasing downstream flooding.
•   The spillway also serves as a low-level outlet. Stoplogs can be removed from one or more openings of the
    spillway to lower or dewater the impoundment for inspection, maintenance and/or repair.
•   Rates of dewatering and refilling the impoundment are restricted by Regulations. Procedures and schedules
    for dewatering and refilling are described below.
•   Removing stoplogs from the spillway can be used to lower the impoundment in emergency during typical,
    non-flood flows to attempt to mitigate dam breach. Operating the spillway during floods does not
    significantly lower the impoundment, and stoplogs should therefore not be removed during floods or flood-
    related emergencies. Refer to Old Shepard Street Dam Emergency Action Plan (EAP) for emergency
    procedures.
•   The Town should regularly monitor and maintain the Dam, and maintain records of operation, monitoring
    and maintenance.
•   A diversion channel is located at the southern end of the impoundment that diverts a portion of the inflow
    from Massapoag Brook into Silk Mill Pond (the impoundment), with the remaining portion of flow
    bypassing the pond and continuing west under Messinger Street to Beaver Meadow Brook and Bolivar Pond.
    There is also an auxiliary outlet from the impoundment that discharges back to the diversion channel. These
    components should be maintained to maintain the flow spilt and hydraulic performance of the system.

These items are discussed in more detail on the following pages, and should be thoroughly and completely read
and understood as part of training.
.

Fair Weather and Dewatering Operation

The operational components of Old Shepard Street Dam consist of concrete spillway with three openings
controlled by stoplogs. Fair-weather operations include the following:

•   Maintain stoplogs at ±El. 113.25 ft. (about 3.5 ft. below the top of spillway concrete). Impoundment
    elevation is indicated by a staff gage located on the right (looking downstream) side of the spillway.
•   The spillway can be operated (stoplogs removed) to lower the impoundment water level (dewater) during
    typical, non-flood inflow for inspection, maintenance, and/or repair of the Dam.




052-15-022                            1/12/2018              Page 1 of 5

Source page 106

•   For non-emergency dewatering:
    o Remove stoplogs incrementally from one of the three stoplog bays.
    o Remove the top stoplog at the start of dewatering and record the impoundment elevation at the spillway
        staff gage. Once the impoundment level has lowered by the height of one stoplog (9 in., or 0.75 ft.),
        remove an additional stoplog. Repeat until the desired water elevation is reached.
    o Stoplogs can be removed manually using the stoplog pullers or chains. Alternatively, a backhoe or other
        lifting equipment may be used.
    o Monitor dam during dewatering as described below.

•   To refill impoundment:
    o Replace all stoplogs in 2 of the 3 openings of the spillway (if stoplogs were removed). Replace stoplogs
        in the 3rd opening incrementally, as described below.
    o To maintain downstream flow during refilling, replace one stoplog once the depth of flow over the
        previous stoplog is 1.0 ft. or greater.
    o If inflow is too low for 1.0 ft. of flow over stoplogs, partially insert a stoplog, leaving a gap of 3 in.
        above the previous stoplog such that water flows through the 3-in. gap between stoplogs. Once the pond
        level rises to the top of the top stoplog, seat the top of stoplog to close the gap such that water no longer
        discharges between stoplogs.
    o Repeat the steps above until the pond level is above El. 113.25, at which point remaining stoplogs can
        be replaced.
    o Generally, inflow to the pond of about 3 cfs (roughly equal to 3 in. of flow above stoplogs in one bay)
        is needed to refill the impoundment.

Flood Operation

The Dam requires no routine operations during floods. Maintain stoplogs at elevation cited above. Removing
stoplogs during or prior to floods increases flow to Massapoag Brook, increasing downstream flooding. Monitor
Dam and diversion channel as described below.

Emergency Operation

Refer to Old Shepard Street Dam Emergency Action Plan (EAP) for emergency procedures. The EAP
recommends the following operations during an Emergency:
• If failure of the dam is imminent or has occurred (Condition Red in the EAP), do not remove stoplogs;
• During a fair-weather Emergency where a hazardous situation at the Dam is developing that could cause
    Dam failure (Condition Yellow in the EAP), dewatering the impoundment by removing stoplogs may
    mitigate dam breach if the impoundment can be lowered sufficiently before the breach develops. Refer to
    EAP for additional information. If removing stoplogs to mitigate dam breach, remove all logs without delay
    between logs described above. We estimate that, during fair weather, the impoundment would be
    substantially drained (inflow about equal to outflow with stoplogs removed) about 1 hour after commencing
    stoplog removal.
• During a flood-related (high inflow) emergency, removing stoplogs does not significantly lower the
    impoundment but may exacerbate downstream flooding. Do not remove stoplogs in advance of or during
    flooding.




Operation and Maintenance Manual
Old Shepard Street Dam, Canton, MA
052-15-022                        1/12/2018                     Page 2 of 5

Source page 107

Monitoring Procedures

When to Monitor:

A professional engineer experienced in dam engineering retained by the Town, the Town Engineer or other
DPW personnel trained and experienced in dam monitoring should monitor the dam regularly as follows:
• Every three months during fair weather;
• During wet weather:
   o Once daily while predicted or actual precipitation exceeds 4 in. in 24 hours according to the National
       Weather Service local forecast1 or the Town’s retained weather forecasting service;
   o Once daily when a Flood Watch is issued by the National Weather Service;
   o Once every 4 hours while predicted or actual precipitation exceeds 5 in. in 24 hours;
   o Once every 4 hours while Flood Warning is issued by the National Weather Service;
   o Hourly if the impoundment overtops the embankment but the overtopping does not cause progressive
       erosion;
   o Continuous observation if an Emergency is identified (e.g. progressive erosion - refer to Emergency
       Action Plan).
   o If Town personnel note any of the deficiencies listed below under “What to Monitor”, monitor Dam
       continuously until flooding recedes or otherwise instructed by Town’s dam engineer; and
• Once immediately after each storm where precipitation exceeds 4 in. over 48 hours;
• Once immediately if earthquake-related ground shaking is felt by Town personnel or reported by residents;
• During dewatering (emergency or non-emergency), hourly by the Town Engineer (a Registered Professional
   Engineer) for the first four hours after the start of drawdown. Thereafter, once every 24 hours by the Town
   Engineer or trained Town DPW personnel until drawdown is completed.
• As a Significant Hazard dam, a visual inspection (Phase I) should be made every five years by a Professional
   Engineer registered in the Commonwealth of Massachusetts experienced in dam engineering, per
   Regulations 302 CMR 10.10 (2).

What to Monitor:

A professional engineer engaged by the Town, or Town personnel trained and experienced in dam monitoring
should monitor the Dam as follows:
• Observe embankment upstream slope (in impoundment where visible), crest, downstream slope and stone
   masonry walls, toe, spillway, stoplogs, downstream area, and inlet and outlet of bridge/culvert beneath Old
   Shepard. Observe diversion channel, including inlet to Silk Mill Pond and Messinger Street culvert.
• Observe water elevations at downstream culverts and properties for potential flooding when operating the
   Dam;
• Record observations on the attached Owner’s Abbreviated Monitoring Checklist. The purpose of the
   checklist is to guide the Town in routine monitoring of the Dam and for the convenience of the Town’s dam
   engineer in responding to Emergency. An original of the checklist should be kept by the Town such that
   photocopies can be used and hand-annotated as needed.
• Photograph the Dam, the staff gage at the spillway, Messinger Street culvert, and the diversion channel.
   Photographs should show both large portions of the Dam as well as close-up view of specific features/issues
   and include date and time stamps;

1
    www.weather.gov/nerfc/forecastprecipitation




Operation and Maintenance Manual
Old Shepard Street Dam, Canton, MA
052-15-022                        1/12/2018                 Page 3 of 5

Source page 108

•   Check for the following deficiencies:
    o Signs of erosion on upstream slope, crest, downstream slope, and toe of embankment wall, particularly
       if floodwater is overtopping crest;
    o Overgrown vegetation;
    o Debris blocking spillway, Old Shepard Street bridge, diversion channel, inlet to Silk Mill Pond, or
       Messinger Street culvert. Remove blockages;
    o Concrete deterioration and/or damage, e.g. surface erosion, spalling, significant new cracking, opening
       of joints, etc.
    o If any of the following deficiencies is observed, contact MADEP DCR ODS and a Professional
       Engineer experienced in dam engineering for further evaluation immediately.
        Uncontrolled seepage at embankment, stone masonry retaining wall of embankment downstream
            face, and/or near downstream side of the retaining wall. Turbid (muddy or cloudy) seepage indicates
            greater concern than clear seepage.
        Boils in vicinity of toe or downstream;
        Sinkholes and whirlpools on the upstream face;
        Progressive erosion of soil or rip-rap, undermining of asphalt, dislodged stone masonry, etc. if
            floodwater is overtopping the embankment;
        Signs of obvious settlement, movement, depressions, holes, or cracking of upstream slope, crest
            (road surface), toe or downstream of embankment, spillway, or bridge;

Document observations using photocopies of the Owner’s Abbreviated Monitoring Checklist (Attached).
Compare monitoring results with previous monitoring, inspections, and photos and implement maintenance,
repair and/or emergency notifications, as required. If deficiencies appear to be worsening, consult Registered
Professional Engineer and keep MADEP DCR ODS appraised.

Emergency Action:

If any of the above deficiencies are observed during flooding, evaluate severity and classify Emergency in
accordance with the Old Shepard Street Dam Emergency Action Plan, and enact the notification procedures in
that EAP.

Maintenance

Address deficiencies identified by monitoring described above, and perform routine maintenance as follows:

Seasonal Maintenance:

Perform the following routine seasonal maintenance in conjunction with seasonal monitoring. In non-
emergencies, perform vegetation control before monitoring and other maintenance for improved visibility of
dam features.

•   Mow/cut vegetation; remove trees/brush on and within 25 ft. of embankment, and structures (e.g. spillway,
    low-level outlet, bridge, concrete and stone masonry retaining walls, downstream rip-rap, etc.);
•   Fill holes (e.g. animal burrows, etc.); remove animals creating holes as needed;
•   Remove debris and flow obstructions at the spillway, Old Shepard Street bridge, inlet to Silk Mill Pond
    from the diversion channel, auxiliary outlet from the Pond back to the diversion channel, and Messinger
    Street culvert.
•   Replace, repair or secure missing, leaking, deteriorated or unsecured stoplogs and stoplog pullers.


Operation and Maintenance Manual
Old Shepard Street Dam, Canton, MA
052-15-022                        1/12/2018                  Page 4 of 5

Source page 109

Annual Maintenance:

In addition to seasonal maintenance, perform the following annually:
• Replace missing riprap and/or sand and gravel bedding;
• Perform road repairs as needed (e.g. pothole repair, crack filling, etc.);
• Smooth surficial erosion of grassy areas and reseed with hardy grass. If significant erosion (e.g. on slopes,
    at downstream toe, etc.) is noted, consult Town’s Dam Engineer for repair procedure;
• Prepare surface and repaint peeling and rusting metal components as needed (e.g. bar grating, railing,
    fences etc.). Repair or replace deteriorated and corroded components as needed;
• Repair voids and repoint mortar of stone masonry as needed;
• Test and update the Emergency Action Plan as detailed in the EAP.

References

References Specific to Old Shepard Street Dam:
Stephens Associates Consulting Engineers, LLC (SA) (2012), “Old Shepard Street Dam, aka Shepard Street
Dam, Phase I Inspection/Evaluation Report,” September 14, 2012. (2012 Old Shepard Street Dam Phase I
Report).

Stephens Associates Consulting Engineers, LLC (2012) “Emergency Action Plan, Old Shepard Street Dam,
Canton, Massachusetts.”

Stephens Associates Consulting Engineers, LLC (SA) (2007), “Old Shepard Street Dam, aka Shepard Street
Dam, Phase I Inspection/Evaluation Report,” July 30, 2007. (2007 Old Shepard Street Dam Phase I Report).

Other References:
Massachusetts Department of Conservation and Recreation, Office of Dam Safety (2010b) “Policy on Trees on
Dams,” http://www.mass.gov/dcr/pe/damSafety/DamSafety-PolicyonTrees.htm, accessed by SA on February
24, 2010.

MA DCR ODS (2017), “302 CMR 10.00 Dam Safety,” Commonwealth of Massachusetts Department of
Conservation and Recreation, Office of Dam Safety, February 10, 2017 (Regulations).

Federal Emergency Management Agency (FEMA) (2005). “Impacts of Animals on Earthen Dams,” FEMA 473,
September, 122 pp.

Federal Emergency Management Agency (FEMA) (2005). “Impacts of Plants on Earthen Dams,” FEMA 534,
September, 115 pp.

Federal Emergency Management Agency (FEMA) (2005). “Dam Owner’s Guide to Plant Impact Plants on
Earthen Dams,” FEMA L-263, September, 16 pp.

Federal Emergency Management Agency (FEMA) (1987). “Dam Safety: An Owner’s Guidance Manual,”
FEMA 145, July, 117 pp.

Attachments
   • Owner’s Abbreviated Monitoring Checklist



Operation and Maintenance Manual
Old Shepard Street Dam, Canton, MA
052-15-022                        1/12/2018                  Page 5 of 5

Source page 110

OWNER'S ABBREVIATED MONITORING CHECKLIST


  NAME OF DAM: Old Shepard Street Dam, Canton, MA                         STATE ID #: 6-11-50-2

  MONITORING DATE:                                                        NID ID #:   MA03104


                              TABLE OF CONTENTS                                                            SUMMARY


           DAM FEATURE                                        SHEET                   MONITORING DATE:

           TABLE OF CONTENTS/SUMMARY                             1                         MONITORED BY:
                              Near bridge: concrete gravity walls; right of bridge: stone masonry wall
           EMBANKMENT CREST                                      2                         TEMP/WEATHER:

           EMBANKMENT UPSTREAM SLOPE                             3                    SPILLWAY
                                                                                      STAFF GAGE EL.:
           EMBANKMENT DOWNSTREAM WALLS                           4
                                                                                      MAINTENANCE PERFORMED/DATE:
           EMBANKMENT DOWNSTREAM SLOPE                           5

           PRIMARY SPILLWAY                                      6




Template date: 1/12/2018                                              Page 1 of 6

Source page 111

OWNER'S ABBREVIATED MONITORING CHECKLIST


  NAME OF DAM: Old Shepard Street Dam, Canton, MA                            STATE ID #:       6-11-50-2

  MONITORING DATE:                                                           NID ID #:         MA03104


                                                            EMBANKMENT (CREST)




                                                                                                                                               MONITOR
                                                                                                                                      ACTION




                                                                                                                                                         REPAIR
                                                                                                                                        NO
      AREA                     CONDITION                                                      OBSERVATIONS


                SURFACE TYPE                               Near bridge: concrete gravity walls; right of bridge: stone masonry wall

                SURFACE CRACKING
                SINKHOLES, EROSION
  CREST         VERTICAL ALIGNMENT (DEPRESSIONS)
                HORIZONTAL ALIGNMENT
                RUTS AND/OR PUDDLES
                VEGETATION (PRESENCE/CONDITION)
                PIPE DRAINS (outlet at DS fence post
                footing and stone masonry wall)
                CONTACT (e.g. with concrete walls, fence
                post footing, etc.
                FENCE




  ADDITIONAL COMMENTS:




Template date: 1/12/2018                                                Page 2 of 6

Source page 112

OWNER'S ABBREVIATED MONITORING CHECKLIST


  NAME OF DAM: Old Shepard Street Dam, Canton, MA                     STATE ID #:       6-11-50-2

  MONITORING DATE:                                                    NID ID #:         MA03104


                                                EMBANKMENT (UPSTREAM SLOPE)




                                                                                                                                        MONITOR
                                                                                                                               ACTION




                                                                                                                                                  REPAIR
                                                                                                                                 NO
      AREA                  CONDITION                                                  OBSERVATIONS


                SLIDE, SLOUGH, SCARP                Near bridge: concrete gravity walls; right of bridge: stone masonry wall
                RIP-RAP SLOPE PROTECTION
                SINKHOLE/ANIMAL BURROWS
  U/S           CONTACT WITH CONCRETE WALLS
  SLOPE         EROSION
                UNUSUAL MOVEMENT
                VEGETATION (PRESENCE/CONDITION)




  ADDITIONAL COMMENTS:




Template date: 1/12/2018                                         Page 3 of 6

Source page 113

OWNER'S ABBREVIATED MONITORING CHECKLIST


  NAME OF DAM: Old Shepard Street Dam, Canton, MA                     STATE ID #:       6-11-50-2

  MONITORING DATE:                                                    NID ID #:         MA03104


                                               EMBANKMENT DOWNSTREAM WALLS




                                                                                                                                        MONITOR
                                                                                                                               ACTION




                                                                                                                                                  REPAIR
                                                                                                                                 NO
      AREA                  CONDITION                                                  OBSERVATIONS


                WALL TYPE                           Near bridge: concrete gravity walls; right of bridge: stone masonry wall
                WALL ALIGNMENT
                WALL CONDITION
  D/S WALLS     SEEPAGE OR LEAKAGE
                CONTACT/INTERSECTION WITH
                ADJACENT WALLS
                EROSION/SINKHOLES BEHIND WALL
                ANIMAL BURROWS
                UNUSUAL MOVEMENT
                WET AREAS AT TOE OF WALL
                CONDITIONS OF JOINTS
                DOWNSTREAM REVETMENT
                VEGETATION
                PIPE DRAINS


  ADDITIONAL COMMENTS:




Template date: 1/12/2018                                         Page 4 of 6

Source page 114

OWNER'S ABBREVIATED MONITORING CHECKLIST


 NAME OF DAM: Old Shepard Street Dam, Canton, MA                     STATE ID #:        6-11-50-2

 MONITORING DATE:                                                    NID ID #:          MA03104


                                              EMBANKMENT (DOWNSTREAM SLOPE)

 AREA




                                                                                                                                       MONITOR
                                                                                                                              ACTION




                                                                                                                                                 REPAIR
                                                                                                                                NO
 INSPECTED                  CONDITION                                                  OBSERVATIONS


                WET AREAS (NO FLOW)                Near bridge: concrete gravity walls; right of bridge: stone masonry wall
                SEEPAGE
                SLIDE, SLOUGH, SCARP
 D/S            RIP-RAP SLOPE PROTECTION
 SLOPE          SINKHOLE/ANIMAL BURROWS
                EROSION
                UNUSUAL MOVEMENT
                VEGETATION (PRESENCE/CONDITION)




 ADDITIONAL COMMENTS:




Template date: 1/12/2018                                         Page 5 of 6

Source page 115

OWNER'S ABBREVIATED MONITORING CHECKLIST


  NAME OF DAM: Old Shepard Street Dam, Canton, MA                          STATE ID #:       6-11-50-2

  MONITORING DATE:                                                         NID ID #:         MA03104


                                                             PRIMARY SPILLWAY




                                                                                                                                               MONITOR
                                                                                                                                      ACTION




                                                                                                                                                         REPAIR
                                                                                                                                        NO
      AREA                     CONDITION                                                      OBSERVATIONS


                SPILLWAY TYPE                              Near bridge: concrete gravity walls; right of bridge: stone masonry wall

                SPILLWAY CONDITION
                UNUSUAL MOVEMENT
  SPILLWAY      D/S TRAINING WALLS (bridge abutments)
                U/S WINGWALLS (concrete retaining walls)
                APPROACH AREA
                DISCHARGE AREA
                STOPLOGS
                RAILING AND BAR GRATING
                DEBRIS




  ADDITIONAL COMMENTS:




Template date: 1/12/2018                                               Page 6 of 6

Source page 116

REPAIR DESIGN REPORT
                           OLD SHEPARD STREET DAM
                           CANTON, MASSACHUSETTS




                                  APPENDIX D

               DESIGN DRAWINGS AND TECHNICAL SPECIFICATIONS

               (SUBMITTED SEPARATELY, ATTACHED BY REFERENCE)




SA No. 052-15-022         1/12/2018       Page D-1 of 1