Canton, Massachusetts · Saved source text
Article 12 Motion 10
Saved text from 43 source pages. Transcription and OCR may contain errors; verify figures and wording against the original. Retrieved 2026-10-15.
Source page 41
Massachusetts Department of Conservation and Recreation, Office of Dam Safety (2013), Letter• to Sanborn,
Head &Associates, Inc., "Re: Auxiliary Spillway Culvert Infiltration," May 23, 2013.
Sanborn, Head &Associates, Inc.(2013), Letter to Massachusetts Department of Conservation and
Recreation, Office of Dam Safety,"Summary of Observations at Auxiliary Culvert," May 13, 2013
Massachusetts Department of Conservation and Recreation, Office of Dam Safety (2013), Letter to Sanborn,
Head &Associates, Inc., "Auxiliary Spillway Conduit Infiltration," March 20, 2013.
Massachusetts Department of Conservation and Recreation, Office of Dam Safety (2013), "Certificate of
Compliance with Dam Safety Permit," issued to KRN Aire Trust, January 31, 2013.
Sanborn, Head &Associates, Inc. (2012), "Chapter• 253 Permit Closure Report, Reservoir Pond Dam,"
December 21, 2012.
Sanborn, Head &Associates,Inc. (2012),"Phase I Inspection/Evaluation Report," December 17, 2012.
Sanborn, Head &Associates, Inc.(2012), Letter to Massachusetts Department of Conservation and
Recreation, Office of Dam Safety, "Reservoir Fill Plan -Chapter 253 Permit Condition (i), Reservoir
Pond Dam - MA#00166," August 30, 2012.
Massachusetts Department of Conservation and Recreation, Office of Dam Safety (2012), "M.G.L. Chapter
253 Dam Safety Permit," issued to Sanborn, Head &Associates,Inc. on behalf of Canton
Development Properties, LLC, Apri123, 2012.
Sanborn, Head &Associates,Inc.(2012), Letter to Town of Canton,"Response to Comments, Letter from
Town of Canton, dated March 8, 2012," April 17, 2012.
Sanborn, Head &Associates, Inc.(2012), "Reservoir Pond Dam Chapter• 253 Permit Application Revised
Apri12012," revised design drawings April 17, 2017.
Town of Canton (2012), Letter to Sanborn, Head &Associates, Inc. "General response to comments by
Sanborn, Head sent to ODS February 24, 2012," March 8, 2012.
Massachusetts Department of Conservation and Recreation, Office of Dam Safety (2011) Letter to Sanborn,
Head &Associates and Canton Development Properties, LLC,"Dam Design Repair Review
Comments," December 7, 2011.
Massachusetts Department of Conservation and Recreation, Office of Dam Safety (2011)Letter to Town of
Canton, "Reservoir Pond Dam," December 7, 2011.
Stephens Associates Consulting Engineers, LLC(2011), Letter to Town of Canton, "Specification Review and
Further comments to Design and Analysis, Reservoir Pond Dam," September 30, 2011.
Stephens Associates Consulting Engineers, LLC (2011), Letter to Town of Canton,"Review of Revised
Design Drawings and Phase II Report, Reservoir Pond Dam," September 9, 2011.
Sanborn, Head &Associates, Inc.(2011), "Reservoir Pond Dam Chapter 253 Permit Application Revised
August 2011," revised design drawings Issued for Review August 25, 2011.
Sanborn, Head &Associates,Inc.(2011),"Bid Item Definitions," Revised August 16, 2011.
Stephens Associates
Consulting Engineers
rv9nm~~.c~- SUuclural
"~S"'`°'~ Geotechnical
SA Project No. 052-16-023A 1/31/2017 p. A-2 of 4 ~trJrasOucWre
°`B""`~~~'' Hydrology&HydraulicsSource page 42
Sanborn, Head &Associates, Inc.(2011), untitled specifications, undated, but accompanying Bid Item
Definitions dated August 16, 2011, received by SA on September 23, 2011.
Stephens Associates Consulting Engineers, LLC (2011), Letter to Town of Canton,"Review of Chapter 253
Permit Application, Reservoir Pond Dam," June 21, 2011,
Sanborn, Head &Associates, Inc.(2011),"Chapter 253 Permit Application, Reservoir Pond Dam," April 22,
2011.
Sanborn, Head &Associates, Inc.(2011)"Poor Condition Follow-up Inspection", March 23, 2011.
Town of Canton (2010)"Agreement For Repair of Reservoir Pond Dam and Conveyance of Reservoir Pond
Dam and Reservoir Pond", between the Town and Canton Development Properties, LLC,September
21, 2010.
Sanborn, Head &Associates,Inc.(2010),"Phase II Inspection and Investigation Report, Reservoir Pond
Dam," February 26, 2010.
Sanborn, Head &Associates, Inc.(2009), Letter to Massachusetts Department of Conservation and
Recreation, Office of Dam Safety,"Update on Status of Engineering Analyses," October• 14, 2009.
Sanborn, Head &Associates, Inc.(2009)"Poor Condition Follow-up Inspection", June 15, 2009.
Massachusetts Department of Conservation and Recreation, Office of Dam Safety (2009), "Certificate of Non-
Compliance and Dam Safety Order," issued to Canton Development Properties, LLC, May 27.
Sanborn, Head &Associates, Inc.(2007),"Phase I Inspection/Evaluation Report, Reservoir Pond Dam," June
1 1 & 20, 2007.
Additional documents referenced elsewhere, but neither received nor reviewed by SA:
Sanborn, Head &Associates,Inc.(2014), "Preliminary Auxiliary Spillway Repair Plan," July 2014, as
referenced in letter from SHA to ODS of September 19, 2014.
Sanborn, Head &Associates, Inc.(2013) Letter to Massachusetts Department of Conservation and Recreation,
Office of Dam Safety, "Observations at Auxiliary culvert -Monthly Report No.4 -September 2013,"
October 4, 2013, as referenced in SHA November 1, 2013 Letter to ODS.
Sanborn, Head &Associates, Inc.(2014)correspondence to Massachusetts Department of Conservation and
Recreation, Office of Dam Safety regarding Auxiliary Spillway Culvert Infiltration, September 27,
2013, as referenced in letter fi•om SHA to ODS of September 19, 2014.
Sanborn, Head &Associates, Inc. (2012)"Response to Comments -Chapter 253 Permit Application,"
prepared for Canton Development Properties, LLC,February 24, 2012, as referenced in Chapter 253
Dam Safety Permit of Apri123, 2012.
Sanborn, Head &Associates, Inc.(2010)"Poor Condition Follow-up Inspection", July 16, 2010, as referenced
by SHA Phase I Inspection/Evaluation Report of December 17, 2012.
Stephens Associates
Consulting Engneers
h~nm~~,c~~. SUuclural
~`~S°""°'~ Geoiechnical
SA Project No.052-16-023A 1/31/2017 p. A-3 of 4 hhaSYudue~d Hydrology&HydraulicsSource page 43
Massachusetts Department of Conservation and Recreation, Office of Dam Safety (2006),"Approval of Dam
Registration Letter and Certificate of Registration," March 31, 2006, as referenced by SHA Phase I
Inspection/Evaluation Report of December• 17, 2012.
GZA GeoEnvironmental, Inc.(2003),"Dam Investigation and Evaluation, Reservoir Pond Dam,Canton,
Massachusetts," September 8, 2003, as referenced by SHA Phase II Inspection and Investigation
Report of February 26, 2010.
Massachusetts Department of Environmental Management(DEM)(1999), "Notice of Inspection and DAM
Detail," October 26, 1999, as referenced by SHA Phase II Inspection and Investigation Report of
February 26, 2010.
Stephens Assceiates
Consulting EnAneers
hsynm~~.c~~ Structural
~"'~$0R"01~ Geotechnical
SA Project No. 052-16-023A 1/31/2017 p. A-4 of 4 "`~"`~9~"
NlrastrucNre H ydrology&Hydraulics