LA
TOWN OF CANTON
FORM B — FISCAL 2027
CAPITAL PROJECT / EQUIPMENT REQUEST
DEPARTMENT: SUBMITTED BY:
Central Maintenance
Robert J. Martin
PROJECT / EQUIPMENT TITLE: TOTAL PROJECT / EQUIPMENT COST:
(Must be at least $5,000):
Any contingency should be explained below
FD1 Boiler Replacement
§ 250,000.00
DESCRIPITION:
What is the request for? Example: 4 police cruisers. What are the funding sources (if more than one)?
This request is to replace the existing 2005 Burnham Oil Fired Hot water boiler with 3 50 MBH Gas
]
jared high efficiency boilers with sizing engineered to maximize efficiency. The prior request for
|FY¥2026 in the amount of $350,000 was partially funded in the amount of $100,000.
| PURPOSE AND JUSTIFICATION:
} Why the department needs this item. If additional space is needed for justification, please add a second page.
|, Does this further the Town’s Green Policy? Examples: We reviewed the ‘greener’ options; however, the internal combustion engines
remain a requirement for patrol vehicles that must run for longer periods without the ability to charge. We do have hybrid vehicles in
the fleet where the role is applicable.
iThis boiler is entering the later stages of its expected service life and component failures are more
likely to occur. There is no backup heating system in the event of an equipment failure at the Fire
[Station Headquarters. Replacement with a dual boiler system provides an additional safety margin.
NEED CLASSIFICATION: (Check all that apply) Department Priority Rank:
(Please rank this request out of your total requests for
: v1 Required for Safety this year: #1 as top priority)
; oO Required by Law or Mandate
Priority # 1 oof# 1
f | Improve/Expand Service or Increased Efficiency
H
Expected Useful Life:
a
: Planning Classification: 10 to 19 Years:
i Planned project or replacement (on the prior year's 5-
* If not planned, please explain in justification
.| |lmpact on Dept. Operating Budget: Impact to Dept. Revenue:
[Decreea by § 20,000.00 No Impact by § 0.00
For motorized equipment: Was an electric or hybrid option considered? Please explain below
‘i OTHER COMMENTS OR INFORMATION: (Attach supporting documentation including quote)
I
| ‘Engineering and construction cost estimate for this project from BLW Engineering is from March
¢ Coane and may need additional funding. A 20% decrease in heating fuel costs is expected.
SUBMITSource page 2
March 14, 2024 Mr. Brian Lynch Director of Facilities and Grounds Facilities and Grounds Division Town of Canton 79 Pleasant Street Canton, MA 02201 RE: — Boiler Room Renovations Fire Station No. 1 Dear Mr, Lynch: tn accordance with your request, BLW Engineers, Inc. (BLW) is pleased to submit a Scope of Services and Proposed Fee to provide Mechanical and Electrical Engineering Services at the above referenced facility. Scope of Services Construction Document Services will include the preparation of plans and specifications for the mechanical and electrical systems associated with a portion of the roof replacement project, in accordance with the following: © Mechanical design shall include demolition of existing boilers, associated piping, pumps, expansion tank and controls and replace with condensing type boilers, pumps, piping, insulation, water specialties, controls, etc. e Plumbing design to revisions to the gas piping and protected water system for cold water makeup piping for the new boilers. Existing domestic hot water system to remain. e Electrical design to provide power the new boiler and associated equipment. e BLW will provide required fieldwork for verifying existing conditions. e BLW will attend all required meetings as requested by Town of Canton for the development of the project plans and specifications. e Allsystems design shall conform to Massachusetts State Building Code. Bidding Services will include attendance at the pre-bid conference; answering of contractor questions during the bid process, issuance of any necessary addenda; and review the bid results for recommendation of the lowest responsible general bidder. Construction Administration Services will include shop drawing review; answering of contractor questions; prepare any project directives; attend all construction meetings with meeting minutes; review any change orders; construction site visits during construction with field written field reports; and provide final punchlist inspections with reports at the end of the project for each discipline. . Record Drawings for cach discipline shall be provided to the owner at the completion of the project by the Contractor. BLW will provide electronic files of the mechanical and electrical systems design to the BLW ENGINEERS, INC. CONSULTANTS 311Great Road, Post Office Box Littleton, Massachusetts 01460 Let: 978.486.4301 Fax: 978.428.0067
Source page 3
Contractor for the production of Record Drawings and will subsequently review “as-built” drawings prepared by the contractor. Assumptions ° BLW will generate electronic format backgrounds for the mechanical and electrical design of the proposed project. e® BLW will provide reproducible contract documents for public bid. BLW has not included reproduction costs or time for bid document distribution to contractors in this proposal. »® Environmental Consulting services are not included in this proposal. ® Structural Engineering services are not included in this proposal. ° LEED documentation and Energy Modeling are not included in this proposal. e Commissioning is not included in this proposal. o Attendance at bid openings is included in this proposal. e Acoustical related services have not been included in this proposal. Proposed Fee Boiler Room Renovations Construction Documents $ 19.200.00 Bidding $ 1,200.00 Construction Administration $ 6,000.00 Total | $ 26,400.00 Invoices for the above stated construction documents fee would be submitted monthly, based on a lump sum, percent complete basis by task. Reimbursable expenses will be invoiced at cost plus ten percent. Thank you for the opportunity to present this proposal, If you have any questions or need additional information, please feel free to contact our office, Very truly yours, Accepted: BLW Engineers, Inc. Facilities and Grounds Division Town of Canton Kenneth R Beck Ken Beck, Principal date: PE, LEED AP, MCPPO, CPHC BLW ENGINEERS, INC, CONSULTANTS 311Great Road, Post Office Box Littleton, Massachusetts 01460 Tel: 978.486.4301 Fax: 978.428.0067
Source page 4
BLW)ENGINEERS Cost Estimate BLW ENGINEERS, INC. 311 Great Road, Post Office Box 1551, Littleton, Massachusesetts 01460 tel 978.486.4301 fax 978.428.0067 e-mail Info@blwengineers.com Construction Cost Estimate Project phase: Schematic Project: Boiler Replacement Sheet Trade Specification Section: 220000/230000/ Fire Station No. 1 1 of 1 260000 Canton, MA Date By: KRB Checked By: KRB Project Number: 4 03.14.24 Material Labor Description Qty |Units| Unit Cost Total Unit Cost Total Total | Boiler Replacement 00 10 00 - General Conditions a nT 30,000 03 30 00 - CONCRETE a sateen Pad Extension 4 LS 750 750 750 750 1,500 22 00 00 - PLUMBING Demolition 4 EA 2,500 2,500 2,500 Piping, Valves & Insulation 4 EA 7,500 7,500 17,500 17,500 25,000 Vent Piping/Combustion Air Piping 4 EA 4,000 4,000 8,000 8,000 12,000 23 00 00 - HVAC Demolition | L 1 | EA 7,500 7,500 7,800 |f Condensing Boilers - 600 MBH input 3 EA 10,000 30,000 3,000 9,000 39,000 Boiler Pumps 3 EA 1,750 §,250 1,250 3,750 9,000 Building Pumps 2 EA 2,500 5,000 2,500 5,000 10,000 Domestic Water Pumps 1 EA 1,500 4,500 1,250 1,250 2,750 Water Specialties | 1 EA 4,000 4,000 §,000 5,000 9,000 Piping, Insulation & Valves 4 LS 12,500 12,500 25,000 25,000 37,500 Automatic Temperature Controls 4 EA 25,000 25,000 25,000 Commissioning | 1 EA 2,500 2,500 2,500 Testing and Balancing 4 EA 2,500 2,500 2,500 | 26 00 00 - ELECTRICAL _| Demolition | 1 | EA 2,500 2,500 2,500 Boiler Room Power Wiring 4 EA 4,000 4,000 8,000 8,000 42,000 Subtotal $ 74,500 $ 125,750 |] $ 230,250 15% Overhead & Profit $ 34,538 Subtotal $ 264,788 15% Contingency $ 34,538 TOTAL $ 299,325
Source page 5
TOWN OF CANTON FORM B — FISCAL 2027 CAPITAL PROJECT / EQUIPMENT REQUEST DEPARTMENT: SUBMITTED BY: Central Maintenance Robert J. Martin PROJECT / EQUIPMENT TITLE: TOTAL PROJECT / EQUIPMENT COST: (Must be at least $5,000): NEW: American Legion Function Hall 4 ton AC - : Any contingency should be explained below system replacement $ 13,800.00 DESCRIPITION: What is the request for? Example: 4 police cruisers. What are the funding sources (if more than one)? This request is to replace the 4 ton AC air conditioning unit serving the function hall at the American Legion 950R Washington Street. _| PURPOSE AND JUSTIFICATION: Why the department needs this item. If additional space is needed for justification, please add a second page. -| Does this further the Town’s Green Policy? Examples: We reviewed the ‘greener’ options; however, the internal combustion engines _| remain a requirement for patrol vehicles that must run for longer periods without the ability to charge. We do have hybrid vehicles in the fleet where the role is applicable. The existing AC unit and associated ducting are losing refrigerant annually and in addition to frequent service calls, freeze ups and leaking condensate are risking damage to the recently remodeled function hall ceiling and hardwood flooring. NEED CLASSIFICATION: (Check all that apply) Department Priority Rank: (Please rank this request out of your total requests for this year: #1 as top priority) im Required for Safety [_] Required by Law or Mandate Priority #2 of # 12 Improve/Expand Service or Increased Efficiency Fa Expected Useful Life: Planning Classification: 10 to 19 Years New project/item * If not planned, please explain in justification Impact on Dept. Operating Budget: Impact to Dept. Revenue: No Impact by $ 9.00 No Impact by § 0.00 For motorized equipment: Was an electric or hybrid option considered? Please explain below OTHER COMMENTS OR INFORMATION: (Attach supporting documentation including quote) «| Cost estimate includes replacement of condensing unit, A coil, addition of a condensate catch pan, ;| replacement of some supply and return air ductwork, and addition of duct insulation . SUBMIT
Source page 6
~WViartin, Robert a Sa Ss is SN From: Laura Bowser <laurabowser2212@gmail.com> Sent: Tuesday, August 26, 2025 8:01 AM To: Martin, Robert Subject: . Fwd; 4 Ton condenser -Armando Ctr Follow Up Flag: Follow up Flag Status: Flagged CAUTION: This email originated from outside your organization. Exercise caution when opening attachments or on clicking links from unknown senders. norercenen Forwarded message --------- From: Laura Bowser <laurabowser2212@gmail.com> Date: Tue, Jul 15, 2025, 8:07 AM Subject: 4 Ton condenser -Armando Ctr To: <Rmartin@town.canton.ma.us> Rob, ~ Enclosed please find quote to replace old 2nd floor condenser due to the ongoing issues with the compressor running really hot for the second floor unit.. We will pump down and evacuate the old unit. We will then install a new 4-ton All style 14 seer R407c dry condensing unit. We will test the unit with nitrogen, and run vacuum pump for the unit. The unit will be charged with r407c which replaces R22 Freon. We will then start and test unit. Please feel free to contact me with any concerns or questions. Total cost is: $3850.00 Thank you. Laura Bowser Solar Tech Corp Verbel w Soler Tech £600 cHeer metar (CHvGHEes) # 5,200 ml
Source page 7
EQUEST FOR PROPOSAL (RFP) VS SYSTEM REPLACEMENT — 4-TON SPLIT SYSTEM WITH ATTIC DUCTWORK royect Location: Canton, Massachusetts roject Type: Air Conditioning System Replacement with Full Ductwork Replacement ate Issued: roposal Due Date: PROJECT OVERVIEW he Owner is seeking proposals from qualified HVAC contractors for the removal and 2placement of an existing 4-ton air conditioning system and complete ductwork system erving an approximately 3,000 sq. ft. function room. Work includes replacement of attic uctwork, installation of a new split-system condenser and air handler, associated ontrols, and commissioning. he intent of this RFP is to obtain itemized cost proposals, a defined scope of work, and chedule commitments from qualified and licensed contractors. "TE CONDITIONS Location: Canton, Massachusetts Function room size: approx. 3,000 sa. ft. Indoor air handler with outdoor condenser Existing ductwork located in attic space and to be fully replaced PAeTS Attic is accessible but may have limited working height ) HI 63 Current system to be removed and properly disposed of 1. REQUESTED WORK SCOPE LAgot \. HVAC SYSTEM Rev wee B xtor 4 HVAC MECARNIC 20H |, owt Remove existing condenser and air handler . ‘ 104 Provide and install a new 4-ton split system (air handler + condenser) poem 0 Provide refrigerant line set, drain connections, and necessary controls S Perform system startup, balancing, and commissioning a 625: Provide documentation of final system Specifications and test results Ape. Lagoeet. «>! Final unit sizing shall be verified via Manual J load calculation or commercial :quivalent. Contractor must confirm system tonnage based on occupancy, insulation avels, and ceiling height. g ners Prev weog 4 75.%? aH th LAGE |. DUCTWORK (INSULATED - ATTIC) ( S#PAeaxTG PROTECT @ 2 #1 307.20 eRed—witwe # PARTS
Source page 8
Remove and dispose of existing ductwork
tall R-6 to R-8 insulated supply and return ductwork, approximately 200-300 linear
‘eu
Provide hangers, supports, sealants, fittings, boots, grilles/registers (as needed)
Install balancing dampers for branch lines
Seal and tesi all ductwork to industry standards
esign intent target:
Estimated linear footage: 220-300 ft (to be verified during site visit)
Airflow distribution to suppori a single 3,000 sq. ft. conditioned space
Duct leakage should meet or exceed current MA code requirements
. ANCILLARY WORK
Include all necessary permits and inspections
Electrical or control upgrades as required C NONE )
System testing and air balancing
Final cleanup and removal of debris
Warranty details for both equipment and installation
.. vJBMITTAL REQUIREMENTS
‘lease submit the following:
. Detailed, itemized cost breakdown for:
- HVAC equipment
~ Ductwork (material + labor)
- Electrical/control work
- Permit and disposal fees
- Optional add-alternates or value engineering options
', Proposed schedule and project duration
}. Confirmation of warranty terms
|. Proof of licensing and insurance
}, References for similar projects
}. Load calculation methodology (Manual J or equivalent)
», BUDGETARY ESTIMATE (FOR REFERENCE)
hh following figures represent a preliminary estimate for planning purposes only.
Sontractors should provide their own verified pricing.
vategory Estimated Range Quobe Foc 4 TO J
{VAC equipment & installation $10,500 — $16,000 Co UNIT
3,490Source page 9
ncillary costs (permits, disposal, ‘-~»missioning) $2,100 — $4,750 sumated Total Project Cost $20,850 — $34,250 ecommended target budget: 22,000 — $28,000 . SELECTION CRITERIA roposals will be evaluated based on: Completeness and clarity of bid Total estimated cost and value Schedule and project duration Experience with similar projects Compliance with specification Equipment warranty and post-installation support . SITE VISIT . a visit is strongly recommended to verify conditions and measurements. ‘leuse coordinate availability with: rontact Name: 'hone / Email: 1, PROPOSAL SUBMISSION submit proposals by: send to: ‘ormat accepted: PDF or printed hard copy ). CONTACT INFORMATION FOR QUESTIONS *rimary Contact: ‘mail: *hone: ‘ND OF REQUEST FOR PROPOSAL ‘hank you for your interest in this project. We look forward to reviewing your proposal.
Source page 10
GOODMAN 4 Ton 13.4 SEER2 R-32 Air Conditioning System With Multi-Position Air Handler $4-952-26 $4,163.00 (You save $789.20) Buy now and pay later with PayPal. Learn more weyers ery 0 Reviews Brand: Goodman SKU: GLXS3BN4810, AMST48CUI3 Condition: New Shipping: Free Shipping Starting at $145/mo or 0% APR. See what you can spend with afffem). als
Source page 11
Quantity: [=] 1 Add To Cart Add To My Wish List Description Warranty Information GOODMAN 4 Ton 13.4 SEER2 R-32 Air Conditioning System with Multi-Position Air Handler Experience reliable cooling comfort with this Goodman 4-ton R-32 13.4 SEER2 air conditioning system. This complete matched system combines a high-efficiency air conditioner outdoor unit with a versatile multi-position air. handler. Designed for dependable cooling performance, this system delivers energy efficiency, quiet operation, and reliable comfort with environmentally-friendly R-32 refrigerant. Technical Specifications Air Conditioner a Air Handler Air Conditioner — GLXS3BN4810 Specifications Specification Value Manufacturer ‘ Goodman ModelNumber SS eusswaig : ae recent ene foe cnet ee nee mati emer Ae eee En Me dtm mee nT cine mennennacene be oe ee ttecnet one na neettey ehaenennne ne ee tame “roduttype = SsSsS*~*~SsSss in ontonerCondenser ong wee ae event en ne ne sa eee ee eee tek ee ne ee cooling Capacity 48,000 BTUsh SEER2 Rating 13.4 — ~ wo wee feet a cee ee eet te ene ete pee tetera oe “voiecsem cha bin cee nem in eit ee ee ao ve eee ce re pete nee atten nnn nih ren eoae faa ae ‘Compressor Type - scroll Voltage/Phase/Frequency 208/230V-1-60Hz 25.64 Min Circult Ampacity Max Overcurrent Protection 45 A Sound Level 71,0 dBA 3/5
Source page 12
Specification Value Liquid Line Size Ys Suction Line Size : 1%" Dimensions (WxDxH) 29" x 29" x 39,5" Shipping Weight 188 Ibs Comprehensive Warranty Protection 10 Year Parts Warranty 10 Year Compressor Warranty Note: Warranty terms and conditions apply. Unit must be registered within 60 days of installation for full coverage. Professional Installation Required Certified HVAC technician installation ensures optimal performance, safety compliance, and full warranty protection. C ) DOE Compliant for Northern Regions This complete R-32 13.4 SEER2 air conditioning system meets Department of Energy efficiency requirements for residential HVAC installations in Northern U.S. climate zones V y, Important: Check state and local codes and ordinances before purchasing, Product availability and compliance requirements may vary by region, Related Products 415
Source page 13
TOWN OF CANTON FORM B - FISCAL 2027 CAPITAL PROJECT / EQUIPMENT REQUEST DEPARTMENT: SUBMITTED BY: ‘Central Maintenance ; Robert J. Martin PROJECT / EQUIPMENT TITLE: TOTAL PROJECT / EQUIPMENT COST: Must be at least $5,000): Any contingency should be explained below DPW Highway Garage Roof Replacement $ 197,800.00 DESCRIPITION: What is the request for? Example: 4 police cruisers. What are the funding sources (if more than one)? Replacement of DPW Highway Garage Roof PURPOSE AND JUSTIFICATION: Why the department needs this item. If additional space is needed for justification, please add a second page. Does this further the Town’s Green Policy? Examples: We reviewed the ‘greener’ options; however, the internal combustion engines remain a requirement for patrol vehicles that must run for longer periods without the ability to charge. We do have hybrid vehicles in the fleet where the role is applicable. The DPW highway garage roof is a low slope membrane roof which was installed in 2014. Some areas of the roof have had leaks, primarily adjacent to the edges and at pipe and exhaust perforations. Replacement of this roof would allow an inspection of the steel deck structure and revision of problematic edge details. NEED CLASSIFICATION: (Check all that apply) Department Priority Rank: ; (Please rank this request out of your total requests for [_] Required for Safety this year: #1 as top priority) [_] Required by Law or Mandate Priority# 3 of # 22 Improve/Expand Service or Increased Efficiency Fa Expected Useful Life: Planning Classification: 10 to 19 Years Planned project or replacement (on the prior year's 5- * If not planned, please explain in justification Impact on Dept. Operating Budget: Impact to Dept. Revenue: No Impact by § 9.00 No Impact by § 0.00 For motorized equipment: Was an electric or hybrid option considered? Please explain below OTHER COMMENTS OR INFORMATION: (Attach supporting documentation including quote) Several areas of this roof have shown signs of shrinkage along seams during annual roof inspections, this is a signal of impending widespread failure. This is primarily due to UV Exposure. SUBMIT
Source page 14
Scollins, William From: Sent: To: Cc: Subject: Attachments: Randy, Martin, Robert Monday, December 29, 2025 2:02 PM Scollins, William Doody, Charles E. Backup items for Central Maintenance Capital Request #3 DPW Highway Garage Roof Eagleview - Canton DPW.pdf; 25-12-240 Canton DPW.docx Please include the attached files to Central Maintenance capital request #3 DPW Highway Garage roof. The Cost breakdown is: $160,000 sarnafil membrane roofing replacement $24,000 15% contingency $ 13,800 (Unit Heater exhaust kits (8) at $500 material and $1000 labor Each plus 15%) New gutters, downspouts, and revisions to pitch of roof are included in 160K est. Total should be revised to $197,800. Thanks, Robert Y. Martin Supervisor Central Maintenance Town of Canton, MA RMartin@Town.Canton.MA.US (617) 462-3022
Source page 15
wae l December 29, 2025 RRS Town of Canton Rowland Roofing Systems, Inc. Central Maintenance Mr. Robert Martin RE: DPW Facility 150 Bolivar Street Canton, MA 02021 The following is a budget quote for the replacement of the two front roof levels on the Highway Garage noted as Areas E and F on page seven of the attached survey. The budget quote is based on a visual inspection, core samples and Eagleview aerial survey. The existing roof assembly from the deck up is as follows: steel deck, minor residue from previous asphalt built-up roof system, 3 inch polyiso insulation, Sarnafil PVC membrane mechanically fastened, PVC clad edge metal, gutters and downspouts. Scope of Budget Quote Provide all required samples, submittals, certificate of insurance, town building permit, performance and payment bonds, certified payroll sheets, close out documents. Erect and maintain OSHA required perimeter flag lines and tie off points. Perform an infrared moisture survey to include a report and map of any wet areas. Remove and properly dispose of the existing PVC membrane, edge metal, gutters and downspouts. Include the cost of 300 square feet of insulation replacement in the base bid. Replace any wet additional 3 inch insulation in kind on an additional unit cost basis. Provide and install a one-half inch high density polyiso cover board. Provide and install a tapered cricket in the area of ponding water in the front right corner. Mechanically fasten the cover board in the required pattern. Provide and install pressure treated perimeter wood nailers. Provide Sika Sarnafil S327 60 mil white PVC to be installed in a mechanically attached system. Provide and install PVC membrane flashings at the existing roof top penetrations. Provide and install PVC walkway pads at the access ladder and step up to the upper roof level. Fabricate and install Sarnaclad PVC coated perimeter edge metal. Provide and install seven inch industrial .040 aluminum gutters and downspouts. Provide a membrane manufacturer’s twenty year system warranty. Clean the jobsite of all work-related debris. Budget Cost of Above Stated Work - $ 160,000.00 Unit Cost for Insulation Replacement - $ 5.00 per square foot. ( Add or deduct ) Respectfully submitted by, Peter Hosmer 15 Marshall Street, Canton, MA 02021 (617) 362-8337 © www.rowlandrs.com
Source page 16
Wae EAGLEVIEW. Premium Report 12/26/2025 Report: 68624270 In this 3D model, facets appear as semi-transparent to reveal overhangs. Building: 1 PREPARED FOR Contact: Peter Hosmer Company: Rowland Roofing Systems Inc. Address: 15 Marshall Street-Suite C Canton, MA 02021 Phone: 617-362-8337 TABLE OF CONTENTS Length Diagram. Pitch Diagram... Area Diagram .... Notes Diagram... Penetrations Diagram Report Summary MEASUREMENTS Total Roof Area =13,401 sq ft Total Roof Facets =6 Predominant Pitch =0/12 Number of Stories <=1 Total Ridges/Hips =0 ft Total Valleys =0 ft Total Rakes =84 ft Total Eaves =164 ft Estimated Attic=2,731 sq ft Total Penetrations =19 Total Penetrations Perimeter = 111 ft Total Penetrations Area = 51 sq ft Measurements provided by www.eagleview.com Certified Accurate www.eagleview.com/Guarantee.aspx © 2008-2025 Eagle View Technologies, Inc. and Pictometry International Corp. - All Rights Reserved ~ Protected by European Patent Application No. 10162199.3 — Covered by one or more of U.S. Patent Nos. 8,078,436; 8,145,578; 8,170,840; 8,209,152; 8,515,125; 8,825,454; 9,135,737; 8,670,961; 9,514,568; 8,818,770; 8,542,880; 9,244,589; 9,329,749; 9,599,466. Other Patents Pending.
Source page 17
Wa EAGLEVIEW. Premium Report 12/26/2025 Canton, MA 020 Report: 686 IMAGES The following aerial images show different angles of this structure for your reference. Top View Se WN \ rw, ¥ : ‘ aes SS © 2008-2025 Eagle View Technologies, Inc. and Pictometry International Corp. — All Rights Reserved ~ Protected by European Patent Application No. 10162199.3 — Covered by one or more of U.S. Patent Nos. 8,078,436; 8,145,578; 8,170,840; 8,209,152; 8,515,125; 8,825,454; 9,135,737; 8,670,961; 9,514,568; 8,818,770; 8,542,880; 9,244,589; 9,329,749; 9,599,466. Other Patents Pending. PAGE 1
Source page 18
ae EAGLEVIEW. Premium Report 0 Bolivar St, Canton, MA IMAGES North Side 5 06/01/2017, © 2008-2025 Eagle View Technologies, Inc, and Pictometry International Corp. — All Rights Reserved — Protected by European Patent Application No. 10162199.3 ~ Covered by one or more of U.S. Patent Nos. 8,078,436; 8,145,578; 8,170,840; 8,209,152; 8,515,125; 8,825,454; 9, 135,737; 8,670,961; 9,514,568; 8,818,770; 8,542,880; 9,244,589; 9,329,749; 9,599,466. Other Patents Pending. PAGE 2
Source page 19
See AGLEVIEW. Premiumn Report 160 Bolivar St, Canton, MA 0202 Report: 68624270 IMAGES East Side West Side <6 Rey a~ © 2008-2025 Eagle View Technologies, Inc. and Pictometry International Corp. ~ All Rights Reserved ~ Protected by European Patent Application No. 10162199.3 ~ Covered by one or more of U.S. Patent Nos. 8,078,436; 8, 145,578; 8,170,840; 8,209,152; 8,515,125; 8,825,454; 9, 135,737; 8,670,961; 9,514,568; 8,818,770; 8,542,880; 9,244,589; 9,329,749; 9,599,466. Other Patents Pending, PAGE 3
Source page 20
Pi i Ri rt WAS EAGLEVIEW. remium Report 0 Bolivar St, Canton, MA 020 Report: 68624270 LENGTH DIAGRAM Total Line Lengths: Valleys = 0 ft Flashing = 203 ft Ridges = 0 ft Rakes = 84 ft Step flashing = 14 ft Hips = 0 ft Eaves = 164 ft Parapets = 616 ft 7o | «co | x 3 2 76 - | co |} | si 1 a \ iS 1 ! 118 pw! BI = — 20 rs eo le ™ - = N s ry W Note: This diagram contains segment lengths (rounded to the nearest whole number) over 5.0 Feet. In some cases, seqment labels have been removed for readability. Plus signs preface some numbers to avoid confusion when rotated (e.g. +6 and +9). © 2008-2025 Eagle View Technologies, Inc. and Pictometry International Corp, ~ All Rights Reserved — Protected by European Patent Application No. 10162199.3 — Covered by one or more of U.S. Patent Nos. 8,078,436; 8,145,578; 8,170,840; 8,209,152; 8,515,125; 8,825,454; 9,135,737; 8,670,961; 9,514,568; 8,818,770; 8,542,880; 9,244,589; 9,329,749; 9,599,466. Other Patents Pending. PAGE 4
Source page 21
WaSEAGLEVIEW. Bea ifurmifenart
12/26/2025
160 Bolivar St, Canton, MA 02 Report: 68624270
PITCH DIAGRAM
Pitch values are shown in inches per foot, and arrows indicate slope direction. The predominant pitch on this roof is 0/12
| |
|
| «+ | |
| | |
||
| | ; |
|
=
|
| |
| F |
| i
|
|
sealed |
rad |
| | e3 fj i
| | |
|
Bead
| | n
| | N<ls s
| we
Note: This diagram contains labeled pitches for facet areas larger than 20.0 square feet. In some cases, pitch labels have been
removed for readability. Blue shading indicates a pitch of 3/12 and greater. Gray shading indicates flat, 1/12 or 2/12 pitches. If
present, a value of "F" indicates a flat facet (no pitch).
© 2008-2025 Eagle View Technologies, Inc. and Pictometry International Corp. ~ All Rights Reserved — Protected by European Patent Application No. 10162199.3 ~ Covered by one or more of U.S. Patent Nos. 8,078,436; 8,145,578; 8,170,840;
8,209,152; 8,515,125; 8,825,454; 9, 135,737; 8,670,961; 9,514,568; 8,818,770; 8,542,880; 9,244,589; 9,329,749; 9,599,466. Other Patents Pending.
PAGE 5Source page 22
See AGLEVIEW. Presall aspott 160 Bolivar St, Canton, MA 02021 Report: 68624270 AREA DIAGRAM Total Area = 13,401 sq ft, with 6 facets. 1162 } 7427 825 1167 | 509 2309 Note: This diagram shows the square feet of each roof facet (rounded to the nearest Foot). The total area in square feet, at the to} of this page, is based on the non-rounded values of each roof facet (rounded to the nearest square foot after being totaled). © 2008-2025 Eagle View Technologies, Inc. and Pictometry International Corp. — All Rights — Protected by Patent Applic No, 10162199.3 ~ Covered by one or more of U.S. Patent Nos. 8,078,436; 8,145,578; 8,170,840; 8,209, 152; 8,515,125; 8,825,454; 9, 135,737; 8,670,961; 9,514,568; 8,818,770; 8,542,880; 9,244,589; 9,329,749; 9,599,466, Other Patents Pending. PAGE 6
Source page 23
SAS EAGLEVIEW. Premium Report 12/26/2025 iso Bova canon MRO Re 68520270 | NOTES DIAGRAM Roof facets are labeled from smallest to largest (A to Z) for easy reference. © 2008-2025 Eagle View Technologies, Inc. and Pictometry International Corp. — All Rights Reserved ~ Protected by European Patent Application No. 10162199.3 ~ Covered by one or more of U.S. Patent Nos. 8,078,436; 8,145,578; 8,170,840; 8,209, 152; 8,515,125; 8,825,454; 9,135,737; 8,670,961; 9,514,568; 8,818,770; 8,542,880; 9,244,589; 9,329,749; 9,599,466. Other Patents Pending, PAGE 7
Source page 24
WaeEEA GLEVIEW. Premium Report 12/26/2025 160 Bolivar St, Canton, MA 02021 Report: 68624270 PENETRATIONS NOTES DIAGRAM Penetrations are labeled from smallest to largest for easy reference. Total Penetrations = 19 Total Penetrations Area = 51 sq ft Total Penetrations Perimeter = 111 ft Total Roof Area Less Penetrations = 13,350 sq ft 120 70 160 |}0 3 N <. s wt © 2008-2025 Eagle View Technologies, Inc. and Pictometry International Corp. — All Rights Reserved — Protected by European Patent Application No, 10162199,3 ~ Covered by one or more of U.S. Patent Nos, 8,078,436; 8,145,578; 8,170,840; 8,209,152; 8,515,125; 8,825,454; 9,135,737; 8,670,961; 9,514,568; 8,818,770; 8,542,880; 9,244,589; 9,329,749; 9,599,466. Other Patents Pending. PAGE 8
Source page 25
See AGLEVIEW. Premium Report 12/26/2025 160 Bolivar St, Canton, MA 02021 Report: 68624270 REPORT SUMMARY All Structures Areas per Pitch Roof Pitches | 0/12 1/12 3/12 | 5/12 | | 7 | ‘oof | | Area (sq ft) 10561.5 1167.1 | 509.2 1162.4 | % of Roof ; 78.8% 8.7% [ 3.8% | 82% | The table above lists each pitch on this roof and the total area and percent (both rounded) of the roof with that pitch. Structure Complexity Simple Normal Complex Waste Calculation NOTE: This waste calculation table is for asphalt shingle roofing applications. All Values in) table below only include roof areas of 3/12 pitch or greater. For total measurements of all pitches, please refer to the Lengths, Areas, and Pitches section below, Waste % © 0% | 1% | 4% | 6% 8% | 11% 16% 21% = | 26% Area (Sq ft) 1672 | 1689 © 1739 | 1773 1806 1856 | 1940 | 2024 2107 Squares * 17.00 17.00 17.66 18.00 | 18.33 18.66 19.66 | 2033 | 21.33 Measured Suggested * Squares are rounded up to the 1/3 of a square Additional materials needed for ridge, hip, and starter lengths are not included in the above table. The provided suggested waste factor is intended to serve as a guide—actual waste percentages may differ based upon several variables that EagleView does not control. These waste factor variables include, but are not limited to, individual installation techniques, crew experiences, asphalt shingle material subtleties, and potential salvage from the site. Individual results may vary from the suggested waste factor that EagleView has provided. The suggested waste is not to replace or substitute for experience or judgment as to any given replacement or repair work. Penetrations 1-12 13-15 16 17-19 Area (sq ft) 1 2.2 5 9 Perimeter (ft) 4 6 9 12 Any measured penetration smaller than 3.0x3.0 Feet may need field verification. Accuracy is not guaranteed. The total penetration area is not subtracted from the total roof area. © 2008-2025 Eagle View Technologies, Inc, and Pictometry International Corp, ~ All Rights Reserved ~ Protected by European Patent Application No. 10162199.3 - Covered by one or more of U.S. Patent Nos. 8,078,436; 8,145,578; 8,170,840; 8,209, 152; 8,515,125; 8,825,454; 9,135,737; 8,670,961; 9,514,568; 8,818,770; 8,542,880; 9,244,589; 9,329,749; 9,599,466, Other Patents Pending. PAGE 9
Source page 26
ae EAGLEVIEW. Premium Report 12/26/2025 160 Bolivar St, Canton, MA 02021 Report: 68624270 All Structures Totals Lengths, Areas and Pitches Property Location Ridges = 0 ft (0 Ridges) Longitude = -71.1416146 Hips = 0 ft (0 Hips). Latitude = 42,1522169 | Valleys = 0 ft (0 Valleys) Notes Rakes' = 84 ft (6 Rakes) This was ordered as a commercial Eaves/Starter* = 164 ft (3 Eaves) property. There were no changes to Drip Edge (Eaves + Rakes) = 248 ft (9 Lengths) the structure in the past four years. Parapet Walls = 616 (10 Lengths). . Flashing = 203 ft (7 Lengths) ay Step flashing = 14 ft (1 Lengths) Total Penetrations Area = 51 sq ft Total Roof Facets = 6 Total Roof Area Less Penetrations = 13,350 sq ft Total Penetrations =19 Total Penetrations Perimeter = 111 ft Predominant Pitch = 0/12 Total Area (All Pitches) = 13,401 sq ft Parapet Wall Area Table Wall Height (ft) 1 2 3 4 5 6 Z Vertical Wall Area 616 1232 1848 2464 3080 3696 4312 This table provides common parapet wall heights to aid you in calculating the total vertical area of these walls. Note that these values assume a 90 degree angle at the base of the wall. Allow for extra materials to cover cant strips and tapered edges. Online Maps Online map of property http://maps.google.com/maps?f=d&source=s_d&saddr=15+Marshall+Street- Suite+C,Canton,MA,02021&daddr=160+Bolivar+St,Canton,MA,02021 .t — Rakes are defined as roof edges that are sloped (not level). + Eaves are defined as roof edges that are not sloped and level. © 2008-2025 Eagle View Technologies, Inc. and Pictometry International Corp. ~ All Rights Reserved ~ Protected by European Patent Application No. 10162199.3 ~ Covered by one or more of U.S. Patent Nos. 8,078,436; 8,145,578; 8,170,840; 8,209,152; 8,515,125; 8,825,454; 9,135,737; 8,670,961; 9,514,568; 8,818,770; 8,542,880; 9,244,589; 9,329,749; 9,599,466. Other Patents Pending. PAGE 10
Source page 27
SeEEA GLEVIEW. Legal Notice and Disclaimer 12/26/2025 160 Bolivar St, Canton, MA 02021 Rep IMPORTANT LEGAL NOTICE AND DISCLAIMER 68624270 Notice and Disclaimer No Warranty: The Copyrighted Materials are provided to you “as is," and you agree to use it at your own risk. EagleView Technologies makes no guarantees, representations or warranties of any kind, express or implied, arising by law or otherwise, including but not limited to, content, quality, accuracy, completeness, effectiveness, reliability, fitness fora particular purpose, usefulness, use or results to be obtained from the Copyrighted Materials. Contractors agree to always conducta preliminary site survey to verify Roof Report ordered. In the event ofan error in a Report, your sole remedy will be a refund of the fees paid by you to obtain this Report. MBS EAGLEVIEW © 2008-2025 Eagle View Tech ; Inc. and Pictometry ional Corp. ~ All Rights Ré — Covered by one or more of U.S. Patent Nos, 8,078,436; 8,145,578; 8,170,840; 8,209, 152; 8,515,125; 8,825,454; 9,135,737; 8,670,961; 9,514,568; 8,818,770; 8,542,880; 9,244,589; 9,329,749; 9,599,466. Other Patents Pending.
Source page 28
ON9iNa } in ova h E Stina té The estimated total cost to replace a Sarnafil roof (a type of single-ply PVC membrane) and insulation on a 10,000 square foot commercial building in Massachusetts is approximately $70,000 to $150,000. This price range accounts for the membrane, insulation, tear-off, and labor, with specific costs depending heavily on project-specific factors. Cost Breakdown The overall cost per square foot for a single-ply membrane commercial roof system (like Sarnafil) typically ranges from $7 to $15 per square foot in Massachusetts. Materials (Sarnafil PVC membrane, insulation, fasteners, etc.): $4 - $8 per square foot Labor: $3 - $7 per square foot (or higher, depending on complexity) Tear-off and Disposal (of existing roof layers): $1 - $3 per square foot Additional Costs (permits, structural repairs, accessibility, etc.): Varies by project For a 10,000 sq. ft. building, the total estimated cost can be itemized as follows: Materials, Labor, and Tear-off: $50,000 to $1 50,000 Contingencies (Deck repairs, etc.): This is a significant variable cost that can only be determined after a professional inspection. Key Factors Affecting the Cost Insulation Type and Thickness: The type and R-value (thermal resistance) of the insulation used is a key cost driver, and building energy codes often mandate a minimum R-value. Roof Condition and Tear-off: If the existing roof is damaged, especially the underlying deck, repairs will add significantly to the cost. Massachusetts building codes may also require a full tear-off if there are already multiple layers. Roof Complexity and Accessibility: A simple, flat, open roof is cheaper to replace than a complex one with many penetrations (HVAC units, skylights, vents) or limited access, which requires more specialized labor and equipment. Labor Rates: Labor costs in Massachusetts are a significant portion of the total project expense, influenced by high insurance costs and the complexity of the job.
Source page 29
The total cost to replace parapet wall flashing and caps for a 10,000 square foot commercial building generally ranges from approximately $12,000 to $50,000, with costs primarily based on the total linear footage of the parapet wall and the materials used. The building's square footage is less relevant than the perimeter (linear footage) of the parapet walls. Cost Breakdown Costs are calculated per linear foot (lin. ft.) for materials and labor. Item Cost Per Linear Foot (Installed) Total Estimated Range Flashing $8 - $32 per lin. ft. Coping Caps $10 - $70 per lin. ft. Total Combined ~$18 - $102+ per lin. ft. ~$1 2,000 - $50,000 ; 4 Average Perimeter: Assuming a 10,000 sq. ft. square building (approx. 100 ft. x 100 ft.), the perimeter is 400 linear feet. +400 PocPouND + Fo er HGH . . . STEM UF Total Estimated Cost (for 400 lin. ft.): (400 lin. ft. * $18/lin. ft.) to (400 lin. ft. * $102+Ain. ft.). Key Cost Factors Material Type: The primary cost driver. Aluminum flashing is a cost-effective option ($8—$15/lin. ft. installed), while galvanized steel is a bit more ($10-$20/lin. ft.). Concrete coping caps are generally the most affordable caps ($10—$30/lin. ft), whereas custom metal or stone can be more expensive ($20-$70/lin. ft.). Labor: Labor typically accounts for 40-50% of the total cost and can range from $50— $100 per hour, depending on expertise and region. Accessibility: Projects on multi-story buildings may require scaffolding or lifts, increasing labor costs by 15-30%. GureD Bais / Pitot Pans Zook DRAIN peeY¥ > VENT DETAILS FOR 7 LT2S
Source page 30
TOWN OF CANTON FORM B — FISCAL 2027 CAPITAL PROJECT / EQUIPMENT REQUEST DEPARTMENT: SUBMITTED BY: Central Maintenance . Robert J. Martin PROJECT / EQUIPMENT TITLE: TOTAL PROJECT / EQUIPMENT COST: ( $5,000): NEW: Replace 2004 Kubota Tractor Must 2c at ipast 95,000 Any contingency should be explained below $ 41,395.00 DESCRIPITION: What is the request for? Example: 4 police cruisers. What are the funding sources (if more than one)? Replace 2004 Kubota B7800 tractor with Kubota L3302HST with Pallet Lifting Forks, Rear mount excavator, and 66" front loading bucket. PURPOSE AND JUSTIFICATION: Why the department needs this item. If additional space is needed for justification, please add a second page. Does this further the Town’s Green Policy? Examples: We reviewed the ‘greener’ options; however, the internal combustion engines remain a requirement for patrol vehicles that must run for longer periods without the ability to charge. We do have hybrid vehicles in the fleet where the role is applicable. This is the closest equivalent replacement of our current tractor, with the addition of pallet lifting forks to assist in loading and unloading of materials and stock. Whenever we receive bulk materials to be stored in the barn, we will be able to place them without hand labor, preventing injury. NEED CLASSIFICATION: (Check all that apply) Department Priority Rank: , (Please rank this request out of your total requests for Required for Safety this year: #1 as top priority) [__] Required by Law or Mandate Priority # 4 of # 12 Improve/Expand Service or Increased Efficiency Fa Expected Useful Life: Planning Classification: 20 + Years New project/item * If not planned, please explain in justification Impact on Dept. Operating Budget: Impact to Dept. Revenue: No Impact by $ 0.00 No Impact by $ 0.00 For motorized equipment: Was an electric or hybrid option considered? Please explain below OTHER COMMENTS OR INFORMATION: (Attach supporting documentation including quote) Web quote # 2921433 SUBMIT
Source page 31
NORFOLK 5 Cushing Drive 846 Bronco Highway 45 North Main Street . PoweER Wrentham, MA 02093 Burrillville, RI 02830 Carver, MA 02330 | } EourPMENT Tel: (508) 384-0011 Tel: (401) 710-9911 Tel: (774) 213-9190 Q Fax: (508) 384-8667 Fax; (401) 710-9466 Fax: (508) 465-0931 www.norfolkpower.com “Please remit payment to Wrentham address*** info@norfolkpower.com ry ranch Ship To: IN STORE PICKUP Ql - WRENTHAM Date Time Page 11/19/2025 12:53:24 (0) 1 Account No Phone No Est No 90 CANTOO25 7813891813 Q23284 Ship Via Purchase Order Invoice To: TOWN OF CANTON 801 WASHINGTON sT Tax ID No CANTON MA 02021 Salesperson ISABELLE BARTOLUCCE IRB EQUIPMENT ESTIMATE - NOT AN INVOICE Description ** QUOTE ** EXPIRY DATE: 12/19/2025 Amount New KUBOTA L3302HST 4WD Compact Tractor - 2 Post Foldable RO 26585 .00 * * *ADD* * * F-TIRE 27X8.50-15 R14T GOODYEAR SST R-TIRE 15-19.5 R14T Goopy, seule L6830 - DROP DRAWBAR: L6821 - DRAWBAR CLEV: LR430 - TELESCOPIC STA New KUBOTA LA526 FRON * * kADDE # * 2248 - 66" QA BUCKE TLL756 - 66" BOLT ON 7200.00 New KUBOTA BH +k TNCLUDIN BH4988 SURI BTLOS1A - B BHI976 - 6 L9467 - R Authoriza: **“All new equipment quotes valid for 45 days unless stated otherwise.** Thank You For Your Business! WHOLEGOODS RETURN POLICY: All new equipment comes wih a written manufadurer's warranty. Any defects in material workmanship ara subject to repair according to the manufacturer's warranly, Unless directed by the manufacturer, equipment ‘will not be replaced. Equipment retumed within seven (7) business days in new unused condition may be exchanged of refunded for the full amount. Equipment retumed within seven business days and has been used must be in resalable condition is Subject to a thirty percent (30%) restacking fee. No retums or exchanges after seven (7) business days. All special orders are subject to a twenty percent (20%) cancellation fee once the order is placed. PARTS POLICY: Customer must provide the exact model and serial numbers for all parts orders. No ratums, refunds or exchanges on non-stocked parts. Customer must leava a credit card on file, authorizes Norfolk Pawer Equipment Inc. and/or Norfak Rental Company, Inc. to charge customer's credit card for all charges herein. Customer will be charged a twenly-five percent (25%) restocking fee on all returned parts. All ordered parts must be prepaid jn full al the time of order. No retuns, refunds or exchanges after ten (10) business days, and all retumed parts must be in new and unused condition, wilh all original packaging included, along with the original receipt. No relums, refunds or exchanges on electrical items. Freight costs are nonrefundable.
Source page 32
NorrFo.iK 5 Cushing Drive 846 Bronco Highway 45 North Main Street POWER Wrentham, MA 02093 Burrillville, RI 02830 Carver, MA 02330 EQUIPMENT Tel: (508) 384-0011 Tel: (401) 710-9911 Tel: (774) 213-9190 Q Fax: (508) 384-8667 Fax: (401) 710-9466 Fax: (508) 465-0931 www.norfolkpower.com **Please remit payment to Wrentham address** info@norfolkpower.com Branch Ship To: IN STORE PICKUP 01 - WRENTHAM Date Time Page 11/19/2025 14:33:24 (0) 1 Account No Phone No Est No O1 CANTOO25 7813891813 Q23284 Ship Via Purchase Order Invoice To: TOWN OF CANTON 801 WASHINGTON ST Tax ID No CANTON MA 02021 Salesperson ISABELLE BARTOLUCCI IRB EQUIPMENT ESTIMATE - NOT AN INVOICE Description ** QUOT E ** EXPIRY DATE: 12/19/2025 Amount New KUBOTA L3302H8T 4WD Compact Tractor - 2 Post Foldable RO 26585.00 * * FADD* * * F-TIRE 27X8.50-15 R14T Goo R-TIRE 15-19.5 R14T GOOD L6830 - DROP DRAWBAR: L6821 - DRAWBAR CLEVIS } 18430 - TELESCOPIC STAR New KUBOTA LA526 FRO * * KADD* * oe L2248 - 66" QA BUCKE! TLL756 - 66" BOLT ON 7200.00 New KUBOTA BH, *#* * TINCLUDI. BH4988 SUB: BTIi951A - BA BHI976 - 6 L9467 - Rt Authoriza **All new equipment quotes valld for 48 days unless stated otherwise. Thank You For Your Business! WHOLEGOOOS RETURN POLICY: All new equipment comes with a written manufacturer's warranty. Any defects in material workmanship are subject ta repair according to the manufacturer's warranty. Unless directed by the manufacturer, equipment will not be replaced. Equipment relumed within seven (7) business days in new unused condition may be exchanged or refundad for the full amount. Equipment relumad within sevan business daye and has boen used must be in recalable condition is subject to # thirty percent (30%) restocking fee. No retums of exchanges afer séven (7) business days. All special orders ate subject to a twenty percent (20%) cancellation fee once the order is placed. PARTS POLICY: Custorner must provide the exact model and serial numbars for all parts orders. No relumns, refunds or exchanges on non-stocked parts. Customer must leave a credit card on fie, authorizes Norfolk Power Equipment Ino. endfor Norfotk Rental Compsny, Inc. to charge customer's credit card for all charges herein, Customer will bo charged a twenty-five percent (25%) restocking foe on all retuned parts. All orderad partsmust be prepaid in full at tha time of order. No returns, rafunds or ‘exchanges afler ten (10) business days, and all retumed parts must be in new and unused condition, with all original packaging included, along with the original receipt. No relums, refunds or exchanges on electrical Lems, Freight costs are nonrefundable,
Source page 33
L Series Your Build L3302HST Build Summary L3302HST *** EQUIPMENT IN STANDARD MACHINE * * * DIESEL ENGINE Model # D1803-CR-E4-LB2 Tier 4 Final Engine Common Rail Direct Injection w/ Diesel Particulate Filter Electronic Throttle 3 Cyl. 111.4 cu, in. + 31.4 Net Eng. HP + 26.2 PTO HP @ 9700 Eng. rpm ~~ 490 CCA Battery Charging Output 40 Amps HYDRAULICS Open Center — Gear Type Tandem Pump 6.3 gpm Remote/3 Pt. Hitch 3.8 gom for Power Steering 10.1 Total gom Cat | 3-point Hitch At lift Point 1998 fb. 24” Behind 1435 Ib. FRONT AXLE Integral Power Steering Bevel Gear, 4WD Cast lron Tread Spacing, Nonadjustable DRIVE TRAIN Hydrostatic Drive 3 Speed L-M-H Multiple Wet Disc Brakes Clutch — Dry Type Single Stage Differential Lock Rear Axle — Spur Gear *,_ vianufacturer Estimate DASH INSTRUMENTS Tachometer . Fuel Gauge Temperature Gauge LCD Display for Hour Meter and Warning Messages FLUID. CAPACITY Fuel Tank 11.1 gal. Cooling System 6.3 qts. Crankcase 7.1 qts. Transmission and 6.2 gal Hydraulics Front Axle 4.8 gts. DIMENSIONS Overall Height w/ROPS 91.7" Overall Length w/8pt 116.3" Wheel Base 63.3" Crop Clearance 13.6" POWER TAKE OFF Live Continuous Running 540 Rear PTO ~ 1 Speed Speed - 540 @ 2580Eng. rpm SAE Std 1 3/8” Six Spline SAFETY EQUIPMENT Foldable ROPS w/ Retractable Seat Belt PTO Shield Safety Start Switches Turn Signals / Hazard Lights Mechanical Wet Disc Brakes Parking Brakes SMV Sign Electric Key Shut-off Parking Brake Indicator on Dash Operator Presence Control System OPERATOR STATION Color Coded Controls Wide Platform Steps High Back Seat with Adjustable Suspension w/ Water Drain Hole Tool Box Cup Holder Left Hand Fender Grin DALE: 11/2/2025 MORE INFO WEB QUOTE 2921433 $45,239 Estimated Net Price
Source page 34
Buttons for DPF TIRES AND WHEELS Front 7.00 x 16 R4 41.2x24R1
Source page 35
ANDAKD EQUIPMEN] INGLUDED 02HST 4WD TRA W/HYD TRANS/FOLD ROPS s SY FRONT - 7.2-16 R1 Goodyear Power Torque m =REAR ~ 11.2-24 R41 Titan Hi Power Lug 2.94"offset ALR8866D,ALRS . | $1,692 3ase Model Price $23,488 IBOTA ADD-ONS 30P DRAWBAR BL6820 9 2LESGOPIG STABILIZER KIT 907 L8430 LEVIS KIT FOR L-MX DROP DRAWBARS LMX6800 56 8" QUICK ATTACH BUCKET 888 L2248 FRONT LOADER W/GRILL GUARD/QG $6,045 LA526 6" PALLET FORKS AND FRAME 1,919 K9048,L2238 7.7 FT BACKHOE $0,517 BH77 3UBFRAME KIT 8 3076 BH4988 3UBBER STABILIZER FLIP PAD (QTY OF 2) 19467 5332 RICING SUMMARY
Source page 36
ind Pride Add-Ons + $0 x. - . See Dealer for Pricing eat" See Dealer for Pricing TAL PDI See Dealer for Pricing abor/Assembly See Dealer for Pricing rtal MSRP $45,239 stimated Net Price $45,239 his List Price configuration program is for informational purposes only. Price on this sales quote is an stimate and is subject to being increased. Payment assumes the MSRP of your selected equipment and ccessories, the length of term you have selected and any applicable special A.P.R. program. Not Included: faxes, shipping; handling, surcharges, assembly charges, destination, freight and/or delivery charges. lot all models are available to order. Contact your dealer for available inventory stock or future vailability.
Source page 37
TOWN OF CANTON FORM B — FISCAL 2027 CAPITAL PROJECT / EQUIPMENT REQUEST DEPARTMENT: SUBMITTED BY: Central Maintenance Robert J. Martin PROJECT / EQUIPMENT TITLE: TOTAL PROJECT / EQUIPMENT COST: (Must be at least $5,000): Any contingency should be explained below Police Department Headquarters Exterior Repairs § 89,157.00 . DESCRIPITION: What is the request for? Example: 4 police cruisers. What are the funding sources (if more than one)? Police Department Headquarters replacement of Cedar Shingles, Trim Repairs and Painting of Exterior Trim. PURPOSE AND JUSTIFICATION: Why the department needs this item. If additional space is needed for justification, please add a second page. ‘| Does this further the Town’s Green Policy? Examples: We reviewed the ‘greener’ options; however, the internal combustion engines remain a requirement for patrol vehicles that must run for longer periods without the ability to charge. We do have hybrid vehicles in the fleet where the role is applicable. - The Police Department Headquarters was remodeled and extensively renovated in 2004. The cedar shingles on the south and west sides of the building are curling and coming loose from the building. Many windowsills and trim areas are degrading, and all trim is in need of repair and painting. NEED CLASSIFICATION: (Check all that apply) Department Priority Rank: , (Please rank this request out of your total requests for [_] Required for Safety this year: #1 as top priority) im Required by Law or Mandate Priority # 5 of # 11 LV] Improve/Expand Service or Increased Efficiency iv] : Expected Useful Life: Planning Classification: 10 to 19 Years | New project/item * If not planned, please explain in justification (Impact on Dept. Operating Budget: Impact to Dept. Revenue: . [No Impact by $ 9.00 No Impact by $9.00 For motorized equipment: Was an electric or hybrid option considered? Please explain below | OTHER COMMENTS OR INFORMATION: (Attach supporting documentation including quote) | Once exterior repairs are made, the town should consider a sealant or UV protection to prevent these ’}shingles from drying out prematurely. SUBMIT
Source page 38
BRIAN J. HERNON B&T CONSTRUCTION LICENSED AND INSURED 318 CEDAR STREET DEDHAM, MA 02026 LICENSE NO. 088550 (617) 828-3263 November 14, 2025 Rob Martin c/o Canton DPW Canton, MA 02021 Re: SHINGLE SIDING REPLACEMENT FOR FRONT WALL OF CANTON POLICE STATION * Strip existing white cedar sidewall shingles after site prep * Repait any damaged sheathing or trim (sheathing $4.50 per lineal foot) (window trim $5.50 per lineal foot) ¢ Install TYVEK brand “breathable” underlayment to all exposed sheathing * Install white cedar “A” grade shingles to wall using stainless steel nails per manufacturers specifications * Shingles to be spaced to match existing sidewalls (existing courses are set at approximately 5 1/2 inches) NOTE: Site prep includes setting up staging, protecting plants and bushes with tarps during shingle stripping Removing all debris There would be an on-site trailer or dumpster through the duration of job as well as a jab site toilet Job duration - 6-8 working days Ent@< SIV€é JOB PRICE $25,200 7 sy Eeepeirs 15 SY Shingles. @M 690 per @ 1680 Per lo windows. @* 2.° per gill #11760 sz © 409s **" er SS oe
Source page 39
OMS Ver, 0004.18.01 (Current) town of canton police Product availability and pricing subject to change. town of canton police Quote Number: KGC7R5G UNIT SUMMARY The following is a schedule of the windows and doors for this project. For additional unit details, please see Line Item Quotes. Additional charges, tax or Terms and Conditions may apply. Detail pricing is per unit. NUMBER OF LINES: 1 TOTAL UNIT QTY: 1 EXT NET PRICE: USD 2,295.55 LINE MARK UNIT PRODUCT LINE ITEM NET PRICE Qry EXTENDED NET PRICE 1 Ultimate Double Hung G2 2,295.55 a 2,295.55 RO 43” X 86 1/2” Entered as RO 43" X 86 1/2" OMS Ver. 0004.18.01 (Current) Processed on: 11/19/2025 10:46:43 AM Page 1of5 For product warranty information please visit, www.marvin.com/support/warranty
Source page 40
OMS Ver, 0004.18.01 (Current) Product availability and pricing subject to change. LINE ITEM QUOTES town of canton police town of canton police Quote Number: KGC7R5G The following is a schedule of the windows and doors for this project. For additional unit details, please see Line Item Quotes. Additional charges, tax or Terms and Conditions may apply. Detail pricing is per unit. . For product warranty information please visit, www.marvin.com/support/warranty Line #1 Mark Unit: | Net Price: | 2,295.55 Qty: 1 Ext, Net Price: jjl|_ USD 2,295.53) + gibt Stone White Clad Exterior MARVIN SS Bare Pine Interior \ Ultimate Double Hung G2 Rough Opening 43" X 86 1/2" Top Sash Stone White Clad Sash Exterior na Bare Pine Sash Interior IG Low £2 w/Argon Black Stainless Steel Perimeter Bar GBG - Contour Rectangular 4W4H Stone White Ext - White Int Ogee Interior Glazing Profile a Bottom Sash ° Stone White Clad Sash Exterior Bare Pine Sash Interior IG Low E2 w/Argon AS Black Stainless Steel Perimeter Bar ’ “en GBG - Contour aipetee psiRO Rectangular 2W1H RO 43" X 86 1/2" Stone White Ext - White [nt Egress Information Ogee Interior Glazing Profile. . « . " Beige Interior Weather Strip Package Width: 38 13/32" Height: 37 41/64 White Exterior Weather Strip Package Net Clear Opening: 10.04 SqFt White Sash Lock Urecton 03 Information White Top Sash Strike Plate Assembly Color Solar Heat Gain Coefficient: 0.27 Extruded Aluminum Screen hed ‘i : Stone White Surround Visible Light Transmittance: 0.46 Bright View Mesh Condensation Resistance: 55 ek CPD Number: MAR-N-425-23487-00002 49 6" ane Combo Ship Loose Performance Grade iting Fi Licensee #1127 Naiting Fin u stabil ices Suh h AAMAJWDMACSA 101/1.S.2/A440-17 Note: Unit Availability and Price is Subject to Change LC-PGSO 1149X2223 mm (45.3X87.5 in) Water Resistance: 7.52 psf LC-PGS50 DP +50/-50 FL47635 Project Subtotal Net Price: USD 2,295.55 6.250% Sales Tax: USD 143.47 Project Total Net Price: USD 2,439.02 OMS Ver. 0004.18.01 (Current) Processed on: 11/19/2025 10:46:43 AM Page 2 of 5