Source page 1

\

LA

TOWN OF CANTON
FORM B — FISCAL 2027
CAPITAL PROJECT / EQUIPMENT REQUEST

DEPARTMENT:                                      SUBMITTED BY:

Central Maintenance
Robert J. Martin

PROJECT / EQUIPMENT TITLE:                                   TOTAL PROJECT / EQUIPMENT COST:
(Must be at least $5,000):

Any contingency should be explained below

FD1 Boiler Replacement

§ 250,000.00

DESCRIPITION:
What is the request for? Example: 4 police cruisers. What are the funding sources (if more than one)?

This request is to replace the existing 2005 Burnham Oil Fired Hot water boiler with 3 50 MBH Gas
]

jared high efficiency boilers with sizing engineered to maximize efficiency. The prior request for
|FY¥2026 in the amount of $350,000 was partially funded in the amount of $100,000.

| PURPOSE AND JUSTIFICATION:

} Why the department needs this item. If additional space is needed for justification, please add a second page.

|, Does this further the Town’s Green Policy? Examples: We reviewed the ‘greener’ options; however, the internal combustion engines
remain a requirement for patrol vehicles that must run for longer periods without the ability to charge. We do have hybrid vehicles in
the fleet where the role is applicable.

iThis boiler is entering the later stages of its expected service life and component failures are more
likely to occur. There is no backup heating system in the event of an equipment failure at the Fire
[Station Headquarters. Replacement with a dual boiler system provides an additional safety margin.

NEED CLASSIFICATION: (Check all that apply)              Department Priority Rank:
(Please rank this request out of your total requests for

:   v1 Required for Safety                                                 this year: #1 as top priority)
;   oO Required by Law or Mandate

                                                                      Priority #   1 oof# 1
f | Improve/Expand Service or Increased Efficiency
H

Expected Useful Life:
a
: Planning Classification:                                                  10 to 19 Years:

i Planned project or replacement (on the prior year's 5-
* If not planned, please explain in justification

.| |lmpact on Dept. Operating Budget:                          Impact to Dept. Revenue:

[Decreea              by § 20,000.00                            No Impact            by § 0.00

 For motorized equipment: Was an electric or hybrid option considered? Please explain below

‘i OTHER COMMENTS OR INFORMATION: (Attach supporting documentation including quote)

I

| ‘Engineering and construction cost estimate for this project from BLW Engineering is from March
¢ Coane and may need additional funding. A 20% decrease in heating fuel costs is expected.

SUBMIT

Source page 2

March 14, 2024

Mr. Brian Lynch

Director of Facilities and Grounds
Facilities and Grounds Division
Town of Canton

79 Pleasant Street

Canton, MA 02201

RE: — Boiler Room Renovations
Fire Station No. 1

Dear Mr, Lynch:

tn accordance with your request, BLW Engineers, Inc. (BLW) is pleased to submit a Scope of Services
and Proposed Fee to provide Mechanical and Electrical Engineering Services at the above referenced
facility.

Scope of Services

Construction Document Services will include the preparation of plans and specifications for the
mechanical and electrical systems associated with a portion of the roof replacement project, in
accordance with the following:

© Mechanical design shall include demolition of existing boilers, associated piping, pumps, expansion
tank and controls and replace with condensing type boilers, pumps, piping, insulation, water
specialties, controls, etc.

e Plumbing design to revisions to the gas piping and protected water system for cold water makeup
piping for the new boilers. Existing domestic hot water system to remain.

e Electrical design to provide power the new boiler and associated equipment.

e BLW will provide required fieldwork for verifying existing conditions.

e BLW will attend all required meetings as requested by Town of Canton for the development of the
project plans and specifications.

e Allsystems design shall conform to Massachusetts State Building Code.

Bidding Services will include attendance at the pre-bid conference; answering of contractor questions
during the bid process, issuance of any necessary addenda; and review the bid results for
recommendation of the lowest responsible general bidder.

Construction Administration Services will include shop drawing review; answering of contractor
questions; prepare any project directives; attend all construction meetings with meeting minutes; review
any change orders; construction site visits during construction with field written field reports; and
provide final punchlist inspections with reports at the end of the project for each discipline. .

Record Drawings for cach discipline shall be provided to the owner at the completion of the project by
the Contractor. BLW will provide electronic files of the mechanical and electrical systems design to the

BLW ENGINEERS, INC.                                                                                                                             CONSULTANTS
311Great Road, Post Office Box Littleton, Massachusetts 01460                          Let: 978.486.4301 Fax: 978.428.0067

Source page 3

Contractor for the production of Record Drawings and will subsequently review “as-built” drawings
prepared by the contractor.

Assumptions
° BLW will generate electronic format backgrounds for the mechanical and electrical design of the
proposed project.

e® BLW will provide reproducible contract documents for public bid. BLW has not included
reproduction costs or time for bid document distribution to contractors in this proposal.

»® Environmental Consulting services are not included in this proposal.

® Structural Engineering services are not included in this proposal.

° LEED documentation and Energy Modeling are not included in this proposal.
e Commissioning is not included in this proposal.

o Attendance at bid openings is included in this proposal.

e Acoustical related services have not been included in this proposal.

Proposed Fee
Boiler Room Renovations
Construction Documents                                  $ 19.200.00
Bidding                                                         $ 1,200.00
Construction Administration                            $ 6,000.00
Total | $ 26,400.00

Invoices for the above stated construction documents fee would be submitted monthly, based on a lump
sum, percent complete basis by task. Reimbursable expenses will be invoiced at cost plus ten percent.

Thank you for the opportunity to present this proposal, If you have any questions or need additional
information, please feel free to contact our office,

Very truly yours,                                                         Accepted:

BLW Engineers, Inc.                                        Facilities and Grounds Division
Town of Canton

Kenneth R Beck

Ken Beck, Principal                                             date:
PE, LEED AP, MCPPO, CPHC

BLW ENGINEERS, INC,                                                                                                                             CONSULTANTS
311Great Road, Post Office Box Littleton, Massachusetts 01460                              Tel: 978.486.4301 Fax: 978.428.0067

Source page 4

BLW)ENGINEERS

Cost Estimate

BLW ENGINEERS, INC.
311 Great Road, Post Office Box 1551, Littleton, Massachusesetts 01460 tel 978.486.4301 fax 978.428.0067 e-mail Info@blwengineers.com

Construction Cost Estimate

Project phase:        Schematic                            Project:         Boiler Replacement                                                           Sheet
Trade Specification Section:         220000/230000/                     Fire Station No. 1                                                            1 of 1
260000                              Canton, MA                                                               Date
By:         KRB       Checked By:            KRB        Project Number:                    4                                                               03.14.24
Material                               Labor
Description                                   Qty |Units| Unit Cost            Total            Unit Cost            Total                 Total
| Boiler Replacement
00 10 00 - General Conditions
a nT                                                                                                                                                        30,000
03 30 00 - CONCRETE
a sateen Pad Extension                        4        LS               750             750              750              750              1,500
22 00 00 - PLUMBING
Demolition                                                          4        EA                                                    2,500            2,500               2,500
Piping, Valves & Insulation                                     4        EA              7,500            7,500           17,500           17,500             25,000
Vent Piping/Combustion Air Piping                              4         EA                4,000              4,000              8,000              8,000               12,000
23 00 00 - HVAC
Demolition           |                    L                      1 | EA                                                    7,500            7,500               7,800 |f
Condensing Boilers - 600 MBH input                     3       EA           10,000         30,000           3,000           9,000            39,000
Boiler Pumps                                                              3         EA                1,750              §,250              1,250              3,750                 9,000
Building Pumps                                             2       EA            2,500           5,000           2,500           5,000            10,000
Domestic Water Pumps                                               1         EA                1,500              4,500              1,250              1,250                 2,750
Water Specialties |                                       1       EA           4,000          4,000          §,000           5,000            9,000
Piping, Insulation & Valves                                     4        LS            12,500           12,500           25,000           25,000             37,500
Automatic Temperature Controls                                 4         EA                                                          25,000            25,000               25,000
Commissioning    |                                               1        EA                                                    2,500            2,500               2,500
Testing and Balancing                                           4        EA                                                    2,500            2,500               2,500
|
26 00 00 - ELECTRICAL                                                                                                                                       _|
Demolition          |                                               1 | EA                                                    2,500             2,500               2,500
Boiler Room Power Wiring                     4     EA        4,000       4,000       8,000       8,000        42,000
Subtotal                                                                                            $      74,500                      $ 125,750 |] $       230,250
15% Overhead & Profit                                                                                                                           $        34,538
Subtotal                                                                                                                                                      $       264,788
15% Contingency                                                                                                                                          $        34,538
TOTAL                            $ 299,325

Source page 5

TOWN OF CANTON
FORM B — FISCAL 2027
CAPITAL PROJECT / EQUIPMENT REQUEST

DEPARTMENT:                                                                         SUBMITTED BY:

Central Maintenance
Robert J. Martin

PROJECT / EQUIPMENT TITLE:                                  TOTAL PROJECT / EQUIPMENT COST:
(Must be at least $5,000):

NEW: American Legion Function Hall 4 ton AC                 -                        :
Any contingency should be explained below

system replacement

$ 13,800.00

DESCRIPITION:

What is the request for? Example: 4 police cruisers. What are the funding sources (if more than one)?

This request is to replace the 4 ton AC air conditioning unit serving the function hall at the American
Legion 950R Washington Street.

_| PURPOSE AND JUSTIFICATION:

Why the department needs this item. If additional space is needed for justification, please add a second page.

-| Does this further the Town’s Green Policy? Examples: We reviewed the ‘greener’ options; however, the internal combustion engines
_| remain a requirement for patrol vehicles that must run for longer periods without the ability to charge. We do have hybrid vehicles in

the fleet where the role is applicable.

The existing AC unit and associated ducting are losing refrigerant annually and in addition to frequent
service calls, freeze ups and leaking condensate are risking damage to the recently remodeled
function hall ceiling and hardwood flooring.

NEED CLASSIFICATION: (Check all that apply)              Department Priority Rank:

(Please rank this request out of your total requests for
this year: #1 as top priority)

im Required for Safety

[_] Required by Law or Mandate                                  Priority #2 of # 12

 Improve/Expand Service or Increased Efficiency
Fa                                                                  Expected Useful Life:
Planning Classification:                                                    10 to 19 Years

New project/item

* If not planned, please explain in justification

Impact on Dept. Operating Budget:                           Impact to Dept. Revenue:
No Impact            by $ 9.00                                  No Impact            by § 0.00

For motorized equipment: Was an electric or hybrid option considered? Please explain below

OTHER COMMENTS OR INFORMATION: (Attach supporting documentation including quote)

«| Cost estimate includes replacement of condensing unit, A coil, addition of a condensate catch pan,
;| replacement of some supply and return air ductwork, and addition of duct insulation .

SUBMIT

Source page 6

~WViartin, Robert

a              Sa     Ss                                                is    SN
From:                                Laura Bowser <laurabowser2212@gmail.com>
Sent:                                  Tuesday, August 26, 2025 8:01 AM
To:                                 Martin, Robert
Subject:                 .                 Fwd; 4 Ton condenser -Armando Ctr
Follow Up Flag:                      Follow up
Flag Status:                            Flagged

CAUTION: This email originated from outside your organization. Exercise caution when opening attachments or on
clicking links from unknown senders.

norercenen Forwarded message ---------

From: Laura Bowser <laurabowser2212@gmail.com>
Date: Tue, Jul 15, 2025, 8:07 AM

Subject: 4 Ton condenser -Armando Ctr

To: <Rmartin@town.canton.ma.us>

Rob,

~ Enclosed please find quote to replace old 2nd floor condenser due to the ongoing issues with the compressor running
really hot for the second floor unit..

We will pump down and evacuate the old unit. We will then install a new 4-ton All style 14 seer R407c dry condensing
unit. We will test the unit with nitrogen, and run vacuum pump for the unit. The unit will be charged with r407c which
replaces R22 Freon. We will then start and test unit. Please feel free to contact me with any concerns or questions.
Total cost is:

$3850.00

Thank you.
Laura Bowser
Solar Tech Corp

Verbel    w    Soler  Tech
 £600

cHeer metar (CHvGHEes)
# 5,200

ml

Source page 7

EQUEST FOR PROPOSAL (RFP)

VS SYSTEM REPLACEMENT — 4-TON SPLIT SYSTEM WITH ATTIC DUCTWORK
royect Location: Canton, Massachusetts

roject Type: Air Conditioning System Replacement with Full Ductwork Replacement

ate Issued:
roposal Due Date:

PROJECT OVERVIEW

he Owner is seeking proposals from qualified HVAC contractors for the removal and
2placement of an existing 4-ton air conditioning system and complete ductwork system
erving an approximately 3,000 sq. ft. function room. Work includes replacement of attic
uctwork, installation of a new split-system condenser and air handler, associated
ontrols, and commissioning.

he intent of this RFP is to obtain itemized cost proposals, a defined scope of work, and
chedule commitments from qualified and licensed contractors.

"TE CONDITIONS
Location: Canton, Massachusetts

Function room size: approx. 3,000 sa. ft.
Indoor air handler with outdoor condenser

Existing ductwork located in attic space and to be fully replaced          PAeTS
Attic is accessible but may have limited working height                           ) HI 63
Current system to be removed and properly disposed of
1. REQUESTED WORK SCOPE
LAgot
\. HVAC SYSTEM          Rev wee B xtor                       4
HVAC MECARNIC     20H      |, owt
Remove existing condenser and air handler .                ‘                 104
Provide and install a new 4-ton split system (air handler + condenser)       poem 0
Provide refrigerant line set, drain connections, and necessary controls               S
Perform system startup, balancing, and commissioning                        a  625:
Provide documentation of final system Specifications and test results    Ape. Lagoeet.
«>! Final unit sizing shall be verified via Manual J load calculation or commercial
:quivalent. Contractor must confirm system tonnage based on occupancy, insulation
avels, and ceiling height.
g ners          Prev weog 4 75.%?      aH th  LAGE

|. DUCTWORK (INSULATED - ATTIC) ( S#PAeaxTG PROTECT @ 2 #1 307.20

eRed—witwe #
PARTS

Source page 8

Remove and dispose of existing ductwork

tall R-6 to R-8 insulated supply and return ductwork, approximately 200-300 linear
‘eu

Provide hangers, supports, sealants, fittings, boots, grilles/registers (as needed)
Install balancing dampers for branch lines

Seal and tesi all ductwork to industry standards

esign intent target:

Estimated linear footage: 220-300 ft (to be verified during site visit)
Airflow distribution to suppori a single 3,000 sq. ft. conditioned space
Duct leakage should meet or exceed current MA code requirements

. ANCILLARY WORK

Include all necessary permits and inspections

Electrical or control upgrades as required   C NONE )
System testing and air balancing

Final cleanup and removal of debris

Warranty details for both equipment and installation

.. vJBMITTAL REQUIREMENTS
‘lease submit the following:

. Detailed, itemized cost breakdown for:
- HVAC equipment
~ Ductwork (material + labor)
- Electrical/control work
- Permit and disposal fees
- Optional add-alternates or value engineering options
', Proposed schedule and project duration
}. Confirmation of warranty terms
|. Proof of licensing and insurance
}, References for similar projects
}. Load calculation methodology (Manual J or equivalent)

», BUDGETARY ESTIMATE (FOR REFERENCE)

hh following figures represent a preliminary estimate for planning purposes only.
Sontractors should provide their own verified pricing.

vategory                      Estimated Range    Quobe Foc 4 TO J
{VAC equipment & installation        $10,500 — $16,000                  Co UNIT

3,490

Source page 9

ncillary costs (permits, disposal,
‘-~»missioning)                     $2,100 — $4,750
sumated Total Project Cost         $20,850 — $34,250

ecommended target budget:
22,000 — $28,000

. SELECTION CRITERIA

roposals will be evaluated based on:
Completeness and clarity of bid

Total estimated cost and value

Schedule and project duration

Experience with similar projects

Compliance with specification

Equipment warranty and post-installation support

. SITE VISIT

. a visit is strongly recommended to verify conditions and measurements.
‘leuse coordinate availability with:

rontact Name:

'hone / Email:

1, PROPOSAL SUBMISSION

submit proposals by:
send to:
‘ormat accepted: PDF or printed hard copy

). CONTACT INFORMATION FOR QUESTIONS

*rimary Contact:
‘mail:
*hone:

‘ND OF REQUEST FOR PROPOSAL
‘hank you for your interest in this project. We look forward to reviewing your proposal.

Source page 10

GOODMAN 4 Ton 13.4 SEER2 R-32 Air Conditioning System With Multi-Position Air Handler
$4-952-26 $4,163.00
(You save $789.20)

Buy now and pay later with PayPal. Learn more

weyers ery 0 Reviews

Brand:                  Goodman

SKU:                  GLXS3BN4810, AMST48CUI3
Condition:             New

Shipping:              Free Shipping

Starting at $145/mo or 0% APR. See what you can spend with afffem).

als

Source page 11

Quantity:             [=]   1

Add To Cart         Add To My Wish List

Description Warranty Information

GOODMAN 4 Ton 13.4 SEER2 R-32 Air Conditioning System with Multi-Position
Air Handler

Experience reliable cooling comfort with this Goodman 4-ton R-32 13.4 SEER2 air conditioning system. This complete
matched system combines a high-efficiency air conditioner outdoor unit with a versatile multi-position air. handler.
Designed for dependable cooling performance, this system delivers energy efficiency, quiet operation, and reliable
comfort with environmentally-friendly R-32 refrigerant.

Technical Specifications

Air Conditioner

a

Air Handler

Air Conditioner — GLXS3BN4810 Specifications

Specification                                          Value

Manufacturer          ‘                                Goodman

ModelNumber                    SS eusswaig         :

ae recent ene foe cnet ee nee mati emer Ae eee En Me dtm mee nT cine mennennacene be oe ee ttecnet one na neettey ehaenennne ne ee tame
“roduttype = SsSsS*~*~SsSss in ontonerCondenser
ong   wee ae event en ne ne sa eee ee eee tek ee ne ee
cooling Capacity                                                        48,000 BTUsh

SEER2 Rating                                                            13.4

— ~ wo               wee          feet a cee ee eet te ene ete pee tetera oe
“voiecsem cha bin cee nem in eit ee ee ao ve eee ce re pete nee atten nnn nih ren eoae faa ae
‘Compressor Type    -   scroll

Voltage/Phase/Frequency                                               208/230V-1-60Hz

25.64

Min Circult Ampacity

Max Overcurrent Protection                                                 45 A
Sound Level                                                             71,0 dBA

3/5

Source page 12

Specification                                                           Value
Liquid Line Size                                                         Ys
Suction Line Size

:                                                                              1%"
Dimensions (WxDxH)                                                 29" x 29" x 39,5"
Shipping Weight

188 Ibs

Comprehensive Warranty Protection

10

Year Parts Warranty

10

Year Compressor Warranty

Note: Warranty terms and conditions apply. Unit must be registered within 60 days of installation for full coverage.

Professional Installation Required

Certified HVAC technician installation ensures optimal performance, safety compliance, and

full warranty protection.

C                                                                                                 )
DOE Compliant for Northern Regions
This complete R-32 13.4 SEER2 air conditioning system meets Department of Energy
efficiency requirements for residential HVAC installations in Northern U.S. climate zones
V                                                                                                 y,

Important: Check state and local codes and ordinances before purchasing, Product availability and

compliance requirements may vary by region,

Related Products

415

Source page 13

TOWN OF CANTON
FORM B - FISCAL 2027
CAPITAL PROJECT / EQUIPMENT REQUEST

DEPARTMENT:                                       SUBMITTED BY:

‘Central Maintenance                                                   ;
Robert J. Martin

PROJECT / EQUIPMENT TITLE:                                     TOTAL PROJECT / EQUIPMENT COST:
Must be at least $5,000):

Any contingency should be explained below

DPW Highway Garage Roof Replacement

$ 197,800.00

DESCRIPITION:
What is the request for? Example: 4 police cruisers. What are the funding sources (if more than one)?

Replacement of DPW Highway Garage Roof

PURPOSE AND JUSTIFICATION:

Why the department needs this item. If additional space is needed for justification, please add a second page.

Does this further the Town’s Green Policy? Examples: We reviewed the ‘greener’ options; however, the internal combustion engines
remain a requirement for patrol vehicles that must run for longer periods without the ability to charge. We do have hybrid vehicles in
the fleet where the role is applicable.

The DPW highway garage roof is a low slope membrane roof which was installed in 2014. Some areas of the
roof have had leaks, primarily adjacent to the edges and at pipe and exhaust perforations. Replacement of
this roof would allow an inspection of the steel deck structure and revision of problematic edge details.

NEED CLASSIFICATION: (Check all that apply)             Department Priority Rank:
;                                                                    (Please rank this request out of your total requests for
[_] Required for Safety                                                this year: #1 as top priority)

[_] Required by Law or Mandate                              Priority# 3 of # 22

 Improve/Expand Service or Increased Efficiency
Fa                                                            Expected Useful Life:

Planning Classification:                                                   10 to 19 Years
Planned project or replacement (on the prior year's 5-

* If not planned, please explain in justification

Impact on Dept. Operating Budget:                         Impact to Dept. Revenue:
No Impact           by § 9.00                               No Impact           by § 0.00

For motorized equipment: Was an electric or hybrid option considered? Please explain below

OTHER COMMENTS OR INFORMATION: (Attach supporting documentation including quote)

Several areas of this roof have shown signs of shrinkage along seams during annual roof inspections,
this is a signal of impending widespread failure. This is primarily due to UV Exposure.

SUBMIT

Source page 14

Scollins, William

From:

Sent:

To:

Cc:

Subject:
Attachments:

Randy,

Martin, Robert

Monday, December 29, 2025 2:02 PM

Scollins, William

Doody, Charles E.

Backup items for Central Maintenance Capital Request #3 DPW Highway Garage Roof
Eagleview - Canton DPW.pdf; 25-12-240 Canton DPW.docx

Please include the attached files to Central Maintenance capital request #3 DPW Highway Garage roof.

The Cost breakdown is: $160,000 sarnafil membrane roofing replacement
$24,000 15% contingency
$ 13,800 (Unit Heater exhaust kits (8) at $500 material and $1000 labor Each plus 15%)

New gutters, downspouts, and revisions to pitch of roof are included in 160K est.

Total should be revised to $197,800.

Thanks,

Robert Y. Martin
Supervisor

Central Maintenance

Town of Canton, MA
RMartin@Town.Canton.MA.US
(617) 462-3022

Source page 15

wae

l

December 29, 2025

RRS

Town of Canton                                                                       Rowland Roofing Systems, Inc.
Central Maintenance

Mr. Robert Martin

RE: DPW Facility
150 Bolivar Street
Canton, MA 02021

The following is a budget quote for the replacement of the two front roof levels on the Highway
Garage noted as Areas E and F on page seven of the attached survey.

The budget quote is based on a visual inspection, core samples and Eagleview aerial survey.

The existing roof assembly from the deck up is as follows: steel deck, minor residue from previous
asphalt built-up roof system, 3 inch polyiso insulation, Sarnafil PVC membrane mechanically
fastened, PVC clad edge metal, gutters and downspouts.

Scope of Budget Quote

Provide all required samples, submittals, certificate of insurance, town building permit, performance
and payment bonds, certified payroll sheets, close out documents.

Erect and maintain OSHA required perimeter flag lines and tie off points.

Perform an infrared moisture survey to include a report and map of any wet areas.

Remove and properly dispose of the existing PVC membrane, edge metal, gutters and downspouts.
Include the cost of 300 square feet of insulation replacement in the base bid.

Replace any wet additional 3 inch insulation in kind on an additional unit cost basis.

Provide and install a one-half inch high density polyiso cover board.

Provide and install a tapered cricket in the area of ponding water in the front right corner.
Mechanically fasten the cover board in the required pattern.

Provide and install pressure treated perimeter wood nailers.

Provide Sika Sarnafil S327 60 mil white PVC to be installed in a mechanically attached system.
Provide and install PVC membrane flashings at the existing roof top penetrations.

Provide and install PVC walkway pads at the access ladder and step up to the upper roof level.
Fabricate and install Sarnaclad PVC coated perimeter edge metal.

Provide and install seven inch industrial .040 aluminum gutters and downspouts.

Provide a membrane manufacturer’s twenty year system warranty.

Clean the jobsite of all work-related debris.

Budget Cost of Above Stated Work - $ 160,000.00

Unit Cost for Insulation Replacement - $ 5.00 per square foot. ( Add or deduct )

Respectfully submitted by,
Peter Hosmer

15 Marshall Street, Canton, MA 02021
(617) 362-8337 © www.rowlandrs.com

Source page 16

Wae EAGLEVIEW.

Premium Report
12/26/2025

Report: 68624270

In this 3D model, facets appear as semi-transparent to reveal overhangs.

Building:                1

PREPARED FOR

Contact:                                Peter Hosmer

Company:                         Rowland Roofing Systems
Inc.

Address:                            15 Marshall Street-Suite C
Canton, MA 02021

Phone:                              617-362-8337

TABLE OF CONTENTS

Length Diagram.
Pitch Diagram...
Area Diagram ....
Notes Diagram...
Penetrations Diagram
Report Summary

MEASUREMENTS

Total Roof Area =13,401 sq ft
Total Roof Facets =6
Predominant Pitch =0/12

Number of Stories <=1

Total Ridges/Hips =0 ft

Total Valleys =0 ft

Total Rakes =84 ft

Total Eaves =164 ft

Estimated Attic=2,731 sq ft

Total Penetrations =19

Total Penetrations Perimeter = 111 ft
Total Penetrations Area = 51 sq ft

Measurements provided by www.eagleview.com

Certified Accurate

www.eagleview.com/Guarantee.aspx

© 2008-2025 Eagle View Technologies, Inc. and Pictometry International Corp. - All Rights Reserved ~ Protected by European Patent Application No. 10162199.3 — Covered by one or more of U.S. Patent Nos. 8,078,436; 8,145,578;
8,170,840; 8,209,152; 8,515,125; 8,825,454; 9,135,737; 8,670,961; 9,514,568; 8,818,770; 8,542,880; 9,244,589; 9,329,749; 9,599,466. Other Patents Pending.

Source page 17

Wa EAGLEVIEW.

Premium Report
12/26/2025

Canton, MA 020

Report: 686

IMAGES

The following aerial images show different angles of this structure for your reference.

Top View

Se WN \

rw,

¥  :   ‘ aes SS

© 2008-2025 Eagle View Technologies, Inc. and Pictometry International Corp. — All Rights Reserved ~ Protected by European Patent Application No. 10162199.3 — Covered by one or more of U.S. Patent Nos. 8,078,436; 8,145,578; 8,170,840;
8,209,152; 8,515,125; 8,825,454; 9,135,737; 8,670,961; 9,514,568; 8,818,770; 8,542,880; 9,244,589; 9,329,749; 9,599,466. Other Patents Pending.

PAGE 1

Source page 18

ae EAGLEVIEW.                                               Premium Report

0 Bolivar St, Canton, MA

IMAGES

North Side

5 06/01/2017,

© 2008-2025 Eagle View Technologies, Inc, and Pictometry International Corp. — All Rights Reserved — Protected by European Patent Application No. 10162199.3 ~ Covered by one or more of U.S. Patent Nos. 8,078,436; 8,145,578; 8,170,840;
8,209,152; 8,515,125; 8,825,454; 9, 135,737; 8,670,961; 9,514,568; 8,818,770; 8,542,880; 9,244,589; 9,329,749; 9,599,466. Other Patents Pending.

PAGE 2

Source page 19

See AGLEVIEW.                                            Premiumn Report

160 Bolivar St, Canton, MA 0202                                              Report: 68624270

IMAGES

East Side

West Side

<6 Rey
a~

© 2008-2025 Eagle View Technologies, Inc. and Pictometry International Corp. ~ All Rights Reserved ~ Protected by European Patent Application No. 10162199.3 ~ Covered by one or more of U.S. Patent Nos. 8,078,436; 8, 145,578; 8,170,840;
8,209,152; 8,515,125; 8,825,454; 9, 135,737; 8,670,961; 9,514,568; 8,818,770; 8,542,880; 9,244,589; 9,329,749; 9,599,466. Other Patents Pending,

PAGE 3

Source page 20

Pi     i     Ri     rt
WAS EAGLEVIEW.                                               remium Report

0 Bolivar St, Canton, MA 020                                                   Report: 68624270

LENGTH DIAGRAM

Total Line Lengths:                                   Valleys = 0 ft                                  Flashing = 203 ft
Ridges = 0 ft                              Rakes = 84 ft                                  Step flashing = 14 ft
Hips = 0 ft                                  Eaves = 164 ft                                Parapets = 616 ft

7o | «co |
x
3
2
76                               -
|   co  |}
|
si
1
a       \          iS
1
!
118
pw!
BI
= —
20
rs
eo             le
™             -
=
N           s
ry                                  W

Note: This diagram contains segment lengths (rounded to the nearest whole number) over 5.0 Feet. In some cases, seqment labels
have been removed for readability. Plus signs preface some numbers to avoid confusion when rotated (e.g. +6 and +9).

© 2008-2025 Eagle View Technologies, Inc. and Pictometry International Corp, ~ All Rights Reserved — Protected by European Patent Application No. 10162199.3 — Covered by one or more of U.S. Patent Nos. 8,078,436; 8,145,578; 8,170,840;
8,209,152; 8,515,125; 8,825,454; 9,135,737; 8,670,961; 9,514,568; 8,818,770; 8,542,880; 9,244,589; 9,329,749; 9,599,466. Other Patents Pending.

PAGE 4

Source page 21

WaSEAGLEVIEW.                                              Bea ifurmifenart

12/26/2025

160 Bolivar St, Canton, MA 02                                                   Report: 68624270

PITCH DIAGRAM

Pitch values are shown in inches per foot, and arrows indicate slope direction. The predominant pitch on this roof is 0/12

| |
|
| «+ |    |
| |    |
||
| |  ;  |
|
=
|
|     |
|  F    |
|     i
     |
|
sealed    |
rad    |
| | e3 fj  i
| |  |
  |
Bead
|  |     n
|  |    N<ls s
|       we

Note: This diagram contains labeled pitches for facet areas larger than 20.0 square feet. In some cases, pitch labels have been

removed for readability. Blue shading indicates a pitch of 3/12 and greater. Gray shading indicates flat, 1/12 or 2/12 pitches. If
present, a value of "F" indicates a flat facet (no pitch).

© 2008-2025 Eagle View Technologies, Inc. and Pictometry International Corp. ~ All Rights Reserved — Protected by European Patent Application No. 10162199.3 ~ Covered by one or more of U.S. Patent Nos. 8,078,436; 8,145,578; 8,170,840;
8,209,152; 8,515,125; 8,825,454; 9, 135,737; 8,670,961; 9,514,568; 8,818,770; 8,542,880; 9,244,589; 9,329,749; 9,599,466. Other Patents Pending.

PAGE 5

Source page 22

See AGLEVIEW.                                           Presall aspott

160 Bolivar St, Canton, MA 02021                                                   Report: 68624270

AREA DIAGRAM

Total Area = 13,401 sq ft, with 6 facets.

1162                         }

7427

825

1167

|                 509

2309

Note: This diagram shows the square feet of each roof facet (rounded to the nearest Foot). The total area in square feet, at the to}
of this page, is based on the non-rounded values of each roof facet (rounded to the nearest square foot after being totaled).

© 2008-2025 Eagle View Technologies, Inc. and Pictometry International Corp. — All Rights            — Protected by             Patent Applic        No, 10162199.3 ~ Covered by one or more of U.S. Patent Nos. 8,078,436; 8,145,578; 8,170,840;
8,209, 152; 8,515,125; 8,825,454; 9, 135,737; 8,670,961; 9,514,568; 8,818,770; 8,542,880; 9,244,589; 9,329,749; 9,599,466, Other Patents Pending.

PAGE 6

Source page 23

SAS EAGLEVIEW.                                              Premium Report

12/26/2025

iso Bova canon MRO Re 68520270 |
NOTES DIAGRAM

Roof facets are labeled from smallest to largest (A to Z) for easy reference.

© 2008-2025 Eagle View Technologies, Inc. and Pictometry International Corp. — All Rights Reserved ~ Protected by European Patent Application No. 10162199.3 ~ Covered by one or more of U.S. Patent Nos. 8,078,436; 8,145,578; 8,170,840;
8,209, 152; 8,515,125; 8,825,454; 9,135,737; 8,670,961; 9,514,568; 8,818,770; 8,542,880; 9,244,589; 9,329,749; 9,599,466. Other Patents Pending,

PAGE 7

Source page 24

WaeEEA GLEVIEW.                                         Premium Report

12/26/2025

160 Bolivar St, Canton, MA 02021                                               Report: 68624270

PENETRATIONS NOTES DIAGRAM

Penetrations are labeled from smallest to largest for easy reference.

Total Penetrations = 19                        Total Penetrations Area = 51 sq ft
Total Penetrations Perimeter = 111 ft           Total Roof Area Less Penetrations = 13,350 sq ft
120
70
160 |}0
3
N <. s
wt

© 2008-2025 Eagle View Technologies, Inc. and Pictometry International Corp. — All Rights Reserved — Protected by European Patent Application No, 10162199,3 ~ Covered by one or more of U.S. Patent Nos, 8,078,436; 8,145,578; 8,170,840;
8,209,152; 8,515,125; 8,825,454; 9,135,737; 8,670,961; 9,514,568; 8,818,770; 8,542,880; 9,244,589; 9,329,749; 9,599,466. Other Patents Pending.

PAGE 8

Source page 25

See AGLEVIEW.                                            Premium Report

12/26/2025

160 Bolivar St, Canton, MA 02021                                              Report: 68624270

REPORT SUMMARY

All Structures

Areas per Pitch
Roof Pitches                            |                0/12                                1/12                                3/12                |                5/12
|                                                                     |
7                |

‘oof |                                                                                             |
Area (sq ft)                               10561.5                    1167.1          |           509.2                     1162.4
| % of Roof        ;                            78.8%                       8.7%            [           3.8%            | 82%            |
The table above lists each pitch on this roof and the total area and percent (both rounded) of the roof with that pitch.

Structure Complexity

Simple                                                            Normal                                                           Complex

Waste Calculation

NOTE: This waste calculation table is for asphalt shingle roofing applications. All Values in) table below only include roof areas of 3/12 pitch or greater.
For total measurements of all pitches, please refer to the Lengths, Areas, and Pitches section below,

Waste % ©      0% |       1%      |      4%      |      6%       8%      |      11%           16%      21% = |      26%

Area (Sq ft)      1672 | 1689 ©      1739 | 1773      1806      1856 | 1940 | 2024           2107

Squares *        17.00           17.00           17.66           18.00 | 18.33           18.66 19.66 | 2033 | 21.33
Measured                                     Suggested

* Squares are rounded up to the 1/3 of a square

Additional materials needed for ridge, hip, and starter lengths are not included in the above table. The provided suggested waste
factor is intended to serve as a guide—actual waste percentages may differ based upon several variables that EagleView does not
control. These waste factor variables include, but are not limited to, individual installation techniques, crew experiences, asphalt
shingle material subtleties, and potential salvage from the site. Individual results may vary from the suggested waste factor that
EagleView has provided. The suggested waste is not to replace or substitute for experience or judgment as to any given
replacement or repair work.

Penetrations                   1-12        13-15          16          17-19
Area (sq ft)                     1           2.2           5            9
Perimeter (ft)                   4             6             9             12

Any measured penetration smaller than 3.0x3.0 Feet may need field verification. Accuracy is not guaranteed. The total
penetration area is not subtracted from the total roof area.

© 2008-2025 Eagle View Technologies, Inc, and Pictometry International Corp, ~ All Rights Reserved ~ Protected by European Patent Application No. 10162199.3 - Covered by one or more of U.S. Patent Nos. 8,078,436; 8,145,578; 8,170,840;
8,209, 152; 8,515,125; 8,825,454; 9,135,737; 8,670,961; 9,514,568; 8,818,770; 8,542,880; 9,244,589; 9,329,749; 9,599,466, Other Patents Pending.

PAGE 9

Source page 26

ae EAGLEVIEW.                                          Premium Report

12/26/2025

160 Bolivar St, Canton, MA 02021                                                 Report: 68624270

All Structures Totals

Lengths, Areas and Pitches                               Property Location
Ridges = 0 ft (0 Ridges)                                  Longitude = -71.1416146
Hips = 0 ft (0 Hips).                                         Latitude = 42,1522169
|                        Valleys = 0 ft (0 Valleys)                                   Notes
Rakes' = 84 ft (6 Rakes)                                     This was ordered as a commercial
Eaves/Starter* = 164 ft (3 Eaves)                            property. There were no changes to
Drip Edge (Eaves + Rakes) = 248 ft (9 Lengths)          the structure in the past four years.
Parapet Walls = 616 (10 Lengths).
.        Flashing = 203 ft (7 Lengths)
ay      Step flashing = 14 ft (1 Lengths)

Total Penetrations Area = 51 sq ft

Total Roof Facets = 6               Total Roof Area Less Penetrations = 13,350 sq ft

Total Penetrations =19             Total Penetrations Perimeter = 111 ft

Predominant Pitch = 0/12
Total Area (All Pitches) = 13,401 sq ft

Parapet Wall Area Table

Wall Height (ft)                 1                  2                 3                  4                  5                  6                  Z
Vertical Wall Area            616              1232             1848             2464             3080             3696             4312

This table provides common parapet wall heights to aid you in calculating the total vertical area of these walls. Note that these
values assume a 90 degree angle at the base of the wall. Allow for extra materials to cover cant strips and tapered edges.

Online Maps
Online map of property

http://maps.google.com/maps?f=d&source=s_d&saddr=15+Marshall+Street-
Suite+C,Canton,MA,02021&daddr=160+Bolivar+St,Canton,MA,02021

.t — Rakes are defined as roof edges that are sloped (not level).
+ Eaves are defined as roof edges that are not sloped and level.

© 2008-2025 Eagle View Technologies, Inc. and Pictometry International Corp. ~ All Rights Reserved ~ Protected by European Patent Application No. 10162199.3 ~ Covered by one or more of U.S. Patent Nos. 8,078,436; 8,145,578; 8,170,840;
8,209,152; 8,515,125; 8,825,454; 9,135,737; 8,670,961; 9,514,568; 8,818,770; 8,542,880; 9,244,589; 9,329,749; 9,599,466. Other Patents Pending.

PAGE 10

Source page 27

SeEEA GLEVIEW.                             Legal Notice and Disclaimer

12/26/2025

160 Bolivar St, Canton, MA 02021                                                       Rep
IMPORTANT LEGAL NOTICE AND DISCLAIMER

68624270

Notice and Disclaimer

No Warranty: The Copyrighted Materials are provided to you “as is," and you agree to use it at your own risk.

EagleView Technologies makes no guarantees, representations or warranties of any kind, express or implied, arising by law or otherwise, including

but not limited to, content, quality, accuracy, completeness, effectiveness, reliability, fitness fora particular purpose, usefulness, use or results to
be obtained from the Copyrighted Materials.

Contractors agree to always conducta preliminary site survey to verify Roof Report ordered. In the event ofan error in a Report, your sole remedy
will be a refund of the fees paid by you to obtain this Report.

MBS EAGLEVIEW

© 2008-2025 Eagle View Tech          ; Inc. and Pictometry          ional Corp. ~ All Rights Ré          — Covered by one or more of U.S. Patent Nos, 8,078,436; 8,145,578; 8,170,840; 8,209, 152; 8,515,125; 8,825,454; 9,135,737; 8,670,961; 9,514,568;
8,818,770; 8,542,880; 9,244,589; 9,329,749; 9,599,466. Other Patents Pending.

Source page 28

ON9iNa }      in ova h  E Stina té
The estimated total cost to replace a Sarnafil roof (a type of single-ply PVC membrane)
and insulation on a 10,000 square foot commercial building in Massachusetts is
approximately $70,000 to $150,000. This price range accounts for the membrane,

insulation, tear-off, and labor, with specific costs depending heavily on project-specific
factors.

Cost Breakdown

The overall cost per square foot for a single-ply membrane commercial roof system (like
Sarnafil) typically ranges from $7 to $15 per square foot in Massachusetts.

Materials (Sarnafil PVC membrane, insulation, fasteners, etc.): $4 - $8 per square
foot

Labor: $3 - $7 per square foot (or higher, depending on complexity)

Tear-off and Disposal (of existing roof layers): $1 - $3 per square foot

Additional Costs (permits, structural repairs, accessibility, etc.): Varies by project
For a 10,000 sq. ft. building, the total estimated cost can be itemized as follows:
Materials, Labor, and Tear-off: $50,000 to $1 50,000

Contingencies (Deck repairs, etc.): This is a significant variable cost that can only be
determined after a professional inspection.

Key Factors Affecting the Cost

Insulation Type and Thickness: The type and R-value (thermal resistance) of the
insulation used is a key cost driver, and building energy codes often mandate a
minimum R-value.

Roof Condition and Tear-off: If the existing roof is damaged, especially the underlying
deck, repairs will add significantly to the cost. Massachusetts building codes may also
require a full tear-off if there are already multiple layers.

Roof Complexity and Accessibility: A simple, flat, open roof is cheaper to replace
than a complex one with many penetrations (HVAC units, skylights, vents) or limited
access, which requires more specialized labor and equipment.

Labor Rates: Labor costs in Massachusetts are a significant portion of the total project
expense, influenced by high insurance costs and the complexity of the job.

Source page 29

The total cost to replace parapet wall flashing and caps for a 10,000 square foot
commercial building generally ranges from approximately $12,000 to $50,000, with
costs primarily based on the total linear footage of the parapet wall and the materials
used. The building's square footage is less relevant than the perimeter (linear footage)
of the parapet walls.

Cost Breakdown

Costs are calculated per linear foot (lin. ft.) for materials and labor.

Item                            Cost Per Linear Foot (Installed)                 Total Estimated Range
Flashing                     $8 - $32 per lin. ft.

Coping Caps              $10 - $70 per lin. ft.

Total Combined          ~$18 - $102+ per lin. ft.                           ~$1 2,000 - $50,000  ; 4

Average Perimeter: Assuming a 10,000 sq. ft. square building (approx. 100 ft. x 100

ft.), the perimeter is 400 linear feet.       +400 PocPouND + Fo er HGH

.             .                .                   STEM UF
Total Estimated Cost (for 400 lin. ft.): (400 lin. ft. * $18/lin. ft.) to (400 lin. ft. *

$102+Ain. ft.).
Key Cost Factors
Material Type: The primary cost driver.

Aluminum flashing is a cost-effective option ($8—$15/lin. ft. installed),
while galvanized steel is a bit more ($10-$20/lin. ft.).

Concrete coping caps are generally the most affordable caps ($10—$30/lin. ft),
whereas custom metal or stone can be more expensive ($20-$70/lin. ft.).

Labor: Labor typically accounts for 40-50% of the total cost and can range from $50—
$100 per hour, depending on expertise and region.

Accessibility: Projects on multi-story buildings may require scaffolding or lifts,
increasing labor costs by 15-30%.

GureD Bais / Pitot Pans
Zook DRAIN   peeY¥ >
VENT DETAILS FOR 7 LT2S

Source page 30

TOWN OF CANTON
FORM B — FISCAL 2027
CAPITAL PROJECT / EQUIPMENT REQUEST

DEPARTMENT:                                      SUBMITTED BY:

Central Maintenance                                                 .
Robert J. Martin

PROJECT / EQUIPMENT TITLE:                                     TOTAL PROJECT / EQUIPMENT COST:
(                   $5,000):
NEW: Replace 2004 Kubota Tractor                        Must 2c at ipast 95,000

Any contingency should be explained below

$ 41,395.00

DESCRIPITION:
What is the request for? Example: 4 police cruisers. What are the funding sources (if more than one)?

Replace 2004 Kubota B7800 tractor with Kubota L3302HST with Pallet Lifting Forks, Rear mount
excavator, and 66" front loading bucket.

PURPOSE AND JUSTIFICATION:

Why the department needs this item. If additional space is needed for justification, please add a second page.

Does this further the Town’s Green Policy? Examples: We reviewed the ‘greener’ options; however, the internal combustion engines
remain a requirement for patrol vehicles that must run for longer periods without the ability to charge. We do have hybrid vehicles in
the fleet where the role is applicable.

This is the closest equivalent replacement of our current tractor, with the addition of pallet lifting
forks to assist in loading and unloading of materials and stock. Whenever we receive bulk materials to
be stored in the barn, we will be able to place them without hand labor, preventing injury.

NEED CLASSIFICATION: (Check all that apply)              Department Priority Rank:
,                                                                   (Please rank this request out of your total requests for
 Required for Safety                                                 this year: #1 as top priority)

[__] Required by Law or Mandate                                  Priority # 4 of # 12

 Improve/Expand Service or Increased Efficiency
Fa                                                                  Expected Useful Life:
Planning Classification:                                              20 + Years

New project/item

* If not planned, please explain in justification

Impact on Dept. Operating Budget:                          Impact to Dept. Revenue:
No Impact           by $ 0.00                               No Impact           by $ 0.00

For motorized equipment: Was an electric or hybrid option considered? Please explain below

OTHER COMMENTS OR INFORMATION: (Attach supporting documentation including quote)

Web quote # 2921433

SUBMIT

Source page 31

NORFOLK               5 Cushing Drive             846 Bronco Highway        45 North Main Street

.                          PoweER                           Wrentham, MA 02093          Burrillville, RI 02830            Carver, MA 02330
|                      }  EourPMENT               Tel: (508) 384-0011               Tel: (401) 710-9911                Tel: (774) 213-9190
Q                             Fax: (508) 384-8667          Fax; (401) 710-9466          Fax: (508) 465-0931
www.norfolkpower.com                                     “Please remit payment to Wrentham address***
info@norfolkpower.com                           ry
ranch
Ship To: IN STORE PICKUP                                                                                        Ql - WRENTHAM
Date                               Time                                              Page
11/19/2025      12:53:24 (0)        1
Account No          Phone No               Est No 90
CANTOO25       7813891813    Q23284
Ship Via                                    Purchase Order

Invoice To: TOWN OF CANTON
801 WASHINGTON sT                         Tax ID No
CANTON MA 02021

Salesperson
ISABELLE BARTOLUCCE                      IRB

EQUIPMENT ESTIMATE - NOT AN INVOICE

Description          ** QUOTE **     EXPIRY DATE: 12/19/2025     Amount

New KUBOTA L3302HST 4WD Compact Tractor - 2 Post Foldable RO        26585 .00
* * *ADD* * *

F-TIRE 27X8.50-15 R14T GOODYEAR SST
R-TIRE 15-19.5 R14T Goopy,    seule
L6830 - DROP DRAWBAR:
L6821 - DRAWBAR CLEV:
LR430 - TELESCOPIC STA

New KUBOTA LA526 FRON
* * kADDE # *

2248 - 66" QA BUCKE
TLL756 - 66" BOLT ON

7200.00

New KUBOTA BH
+k TNCLUDIN
BH4988 SURI
BTLOS1A - B
BHI976 - 6
L9467 - R

Authoriza:

**“All new equipment quotes valid for 45 days unless stated otherwise.**                                                       Thank You For Your Business!

WHOLEGOODS RETURN POLICY: All new equipment comes wih a written manufadurer's warranty. Any defects in material workmanship ara subject to repair according to the manufacturer's warranly, Unless directed by the manufacturer, equipment
‘will not be replaced. Equipment retumed within seven (7) business days in new unused condition may be exchanged of refunded for the full amount. Equipment retumed within seven business days and has been used must be in resalable condition is
Subject to a thirty percent (30%) restacking fee. No retums or exchanges after seven (7) business days. All special orders are subject to a twenty percent (20%) cancellation fee once the order is placed.

PARTS POLICY: Customer must provide the exact model and serial numbers for all parts orders. No ratums, refunds or exchanges on non-stocked parts. Customer must leava a credit card on file, authorizes Norfolk Pawer Equipment Inc. and/or Norfak
Rental Company, Inc. to charge customer's credit card for all charges herein. Customer will be charged a twenly-five percent (25%) restocking fee on all returned parts. All ordered parts must be prepaid jn full al the time of order. No retuns, refunds or
exchanges after ten (10) business days, and all retumed parts must be in new and unused condition, wilh all original packaging included, along with the original receipt. No relums, refunds or exchanges on electrical items. Freight costs are nonrefundable.

Source page 32

NorrFo.iK               5 Cushing Drive              846 Bronco Highway        45 North Main Street

POWER                          Wrentham, MA 02093          Burrillville, RI 02830           Carver, MA 02330
EQUIPMENT               Tel: (508) 384-0011               Tel: (401) 710-9911               Tel: (774) 213-9190
Q                                Fax: (508) 384-8667           Fax: (401) 710-9466           Fax: (508) 465-0931
www.norfolkpower.com                                     **Please remit payment to Wrentham address**
info@norfolkpower.com                             Branch
Ship To: IN STORE PICKUP                                                                           01 - WRENTHAM
Date                          Time                                       Page
11/19/2025     14:33:24 (0)      1
Account No               Phone No                     Est No O1
CANTOO25       7813891813    Q23284
Ship Via                                  Purchase Order

Invoice To: TOWN OF CANTON
801 WASHINGTON ST                                 Tax ID No
CANTON MA 02021

Salesperson
ISABELLE BARTOLUCCI                      IRB

EQUIPMENT ESTIMATE - NOT AN INVOICE

Description          ** QUOT E **      EXPIRY DATE: 12/19/2025     Amount

New KUBOTA L3302H8T 4WD Compact Tractor - 2 Post Foldable RO        26585.00
* * FADD* * *

F-TIRE 27X8.50-15 R14T Goo
R-TIRE 15-19.5 R14T GOOD
L6830 - DROP DRAWBAR:
L6821 - DRAWBAR CLEVIS }
18430 - TELESCOPIC STAR

New KUBOTA LA526 FRO
* * KADD* * oe

L2248 - 66" QA BUCKE!
TLL756 - 66" BOLT ON

7200.00

New KUBOTA BH,
*#* * TINCLUDI.
BH4988 SUB:
BTIi951A - BA
BHI976 - 6
L9467 - Rt

Authoriza

**All new equipment quotes valld for 48 days unless stated otherwise.                                                                 Thank You For Your Business!

WHOLEGOOOS RETURN POLICY: All new equipment comes with a written manufacturer's warranty. Any defects in material workmanship are subject ta repair according to the manufacturer's warranty. Unless directed by the manufacturer, equipment
will not be replaced. Equipment relumed within seven (7) business days in new unused condition may be exchanged or refundad for the full amount. Equipment relumad within sevan business daye and has boen used must be in recalable condition is
subject to # thirty percent (30%) restocking fee. No retums of exchanges afer séven (7) business days. All special orders ate subject to a twenty percent (20%) cancellation fee once the order is placed.

PARTS POLICY: Custorner must provide the exact model and serial numbars for all parts orders. No relumns, refunds or exchanges on non-stocked parts. Customer must leave a credit card on fie, authorizes Norfolk Power Equipment Ino. endfor Norfotk
Rental Compsny, Inc. to charge customer's credit card for all charges herein, Customer will bo charged a twenty-five percent (25%) restocking foe on all retuned parts. All orderad partsmust be prepaid in full at tha time of order. No returns, rafunds or
‘exchanges afler ten (10) business days, and all retumed parts must be in new and unused condition, with all original packaging included, along with the original receipt. No relums, refunds or exchanges on electrical Lems, Freight costs are nonrefundable,

Source page 33

L Series

Your Build
L3302HST

Build Summary

L3302HST

*** EQUIPMENT IN STANDARD MACHINE * * *

DIESEL ENGINE
Model # D1803-CR-E4-LB2
Tier 4 Final Engine
Common Rail Direct Injection
w/ Diesel Particulate Filter
Electronic Throttle
3 Cyl. 111.4 cu, in.
+ 31.4 Net Eng. HP
+ 26.2 PTO HP
@ 9700 Eng. rpm

~~ 490 CCA Battery
Charging Output 40 Amps

HYDRAULICS

Open Center — Gear Type Tandem Pump
6.3 gpm Remote/3 Pt. Hitch

3.8 gom for Power Steering

10.1 Total gom

Cat | 3-point Hitch

At lift Point 1998 fb.

24” Behind 1435 Ib.

FRONT AXLE

Integral Power Steering

Bevel Gear, 4WD

Cast lron

Tread Spacing, Nonadjustable

DRIVE TRAIN

Hydrostatic Drive

3 Speed L-M-H

Multiple Wet Disc Brakes
Clutch — Dry Type Single Stage
Differential Lock

Rear Axle — Spur Gear

*,_ vianufacturer Estimate

DASH INSTRUMENTS
Tachometer              .
Fuel Gauge

Temperature Gauge

LCD Display for Hour Meter
and Warning Messages

FLUID. CAPACITY

Fuel Tank 11.1 gal.
Cooling System 6.3 qts.
Crankcase     7.1 qts.
Transmission and 6.2 gal
Hydraulics

Front Axle        4.8 gts.

DIMENSIONS
Overall Height w/ROPS 91.7"
Overall Length w/8pt 116.3"

Wheel Base             63.3"
Crop Clearance              13.6"
POWER TAKE OFF

Live Continuous Running
540 Rear PTO ~ 1 Speed
Speed - 540 @ 2580Eng. rpm
SAE Std 1 3/8” Six Spline

SAFETY EQUIPMENT

Foldable ROPS w/ Retractable Seat Belt
PTO Shield

Safety Start Switches

Turn Signals / Hazard Lights
Mechanical Wet Disc Brakes
Parking Brakes

SMV Sign

Electric Key Shut-off

Parking Brake Indicator on Dash
Operator Presence Control System

OPERATOR STATION
Color Coded Controls
Wide Platform Steps

High Back Seat with Adjustable Suspension

w/ Water Drain Hole
Tool Box

Cup Holder

Left Hand Fender Grin

DALE: 11/2/2025
MORE INFO
WEB QUOTE 2921433

$45,239

Estimated Net Price

Source page 34

Buttons for DPF

TIRES AND WHEELS
Front 7.00 x 16 R4
41.2x24R1

Source page 35

ANDAKD EQUIPMEN] INGLUDED
02HST 4WD TRA W/HYD TRANS/FOLD ROPS

s

SY

FRONT - 7.2-16 R1 Goodyear Power Torque

m =REAR ~ 11.2-24 R41 Titan Hi Power Lug 2.94"offset                                                              ALR8866D,ALRS
. |     $1,692
3ase Model Price                                                                                                                       $23,488
IBOTA ADD-ONS
30P DRAWBAR
BL6820
9
2LESGOPIG STABILIZER KIT
907                                                                                                                                                        L8430
LEVIS KIT FOR L-MX DROP DRAWBARS
LMX6800
56
8" QUICK ATTACH BUCKET
888                                                                                                                                                        L2248
FRONT LOADER W/GRILL GUARD/QG
$6,045                                                                                                                                   LA526
6" PALLET FORKS AND FRAME
1,919                                                                                                                                                                     K9048,L2238
7.7 FT BACKHOE
$0,517                                                                                                                                    BH77
3UBFRAME KIT
8
3076                                                                                                                                                      BH4988
3UBBER STABILIZER FLIP PAD (QTY OF 2)
19467

5332

RICING SUMMARY

Source page 36

ind Pride Add-Ons                                                                                                                                + $0

x. -       .                                                                                                                 See Dealer for Pricing
eat"                                                                                              See Dealer for Pricing
TAL PDI                                                                                                                     See Dealer for Pricing
abor/Assembly                                                                                                             See Dealer for Pricing

rtal MSRP                                                                                                                                                                                                         $45,239

stimated Net Price                                                                                $45,239

his List Price configuration program is for informational purposes only. Price on this sales quote is an
stimate and is subject to being increased. Payment assumes the MSRP of your selected equipment and
ccessories, the length of term you have selected and any applicable special A.P.R. program. Not Included:
faxes, shipping; handling, surcharges, assembly charges, destination, freight and/or delivery charges.

lot all models are available to order. Contact your dealer for available inventory stock or future
vailability.

Source page 37

TOWN OF CANTON
FORM B — FISCAL 2027
CAPITAL PROJECT / EQUIPMENT REQUEST

DEPARTMENT:                                                   SUBMITTED BY:

Central Maintenance
Robert J. Martin

PROJECT / EQUIPMENT TITLE:                                     TOTAL PROJECT / EQUIPMENT COST:
(Must be at least $5,000):

Any contingency should be explained below

Police Department Headquarters Exterior Repairs

§ 89,157.00        .

DESCRIPITION:
What is the request for? Example: 4 police cruisers. What are the funding sources (if more than one)?

Police Department Headquarters replacement of Cedar Shingles, Trim Repairs and Painting of Exterior
Trim.

PURPOSE AND JUSTIFICATION:
Why the department needs this item. If additional space is needed for justification, please add a second page.

‘| Does this further the Town’s Green Policy? Examples: We reviewed the ‘greener’ options; however, the internal combustion engines

remain a requirement for patrol vehicles that must run for longer periods without the ability to charge. We do have hybrid vehicles in
the fleet where the role is applicable.                               -

The Police Department Headquarters was remodeled and extensively renovated in 2004. The cedar
shingles on the south and west sides of the building are curling and coming loose from the building.
Many windowsills and trim areas are degrading, and all trim is in need of repair and painting.

NEED CLASSIFICATION: (Check all that apply)               Department Priority Rank:
,                                                                           (Please rank this request out of your total requests for
[_] Required for Safety                                                this year: #1 as top priority)

im Required by Law or Mandate                                  Priority # 5 of #   11

LV] Improve/Expand Service or Increased Efficiency
iv]   :                                                     Expected Useful Life:

 Planning Classification:                                                  10 to 19 Years
| New project/item
* If not planned, please explain in justification

(Impact on Dept. Operating Budget:                         Impact to Dept. Revenue:

. [No Impact         by $ 9.00                        No Impact         by $9.00

For motorized equipment: Was an electric or hybrid option considered? Please explain below

| OTHER COMMENTS OR INFORMATION: (Attach supporting documentation including quote)

| Once exterior repairs are made, the town should consider a sealant or UV protection to prevent these
’}shingles from drying out prematurely.

SUBMIT

Source page 38

BRIAN J. HERNON
B&T CONSTRUCTION
LICENSED AND INSURED
318 CEDAR STREET
DEDHAM, MA 02026
LICENSE NO. 088550
(617) 828-3263

November 14, 2025

Rob Martin
c/o Canton DPW
Canton, MA 02021

Re: SHINGLE SIDING REPLACEMENT FOR FRONT WALL OF CANTON POLICE
STATION

* Strip existing white cedar sidewall shingles after site prep

* Repait any damaged sheathing or trim (sheathing $4.50 per lineal foot) (window trim
$5.50 per lineal foot)

¢ Install TYVEK brand “breathable” underlayment to all exposed sheathing

* Install white cedar “A” grade shingles to wall using stainless steel nails per
manufacturers specifications

* Shingles to be spaced to match existing sidewalls (existing courses are set at
approximately 5 1/2 inches)
NOTE:

Site prep includes setting up staging, protecting plants and bushes with tarps during
shingle stripping
Removing all debris

There would be an on-site trailer or dumpster through the duration of job as well as a jab
site toilet

Job duration - 6-8 working days

Ent@< SIVێ            JOB PRICE     $25,200
7 sy  Eeepeirs       15 SY  Shingles. @M 690 per
@ 1680 Per           lo windows. @* 2.°  per gill

#11760        sz ©    409s **"
er SS oe

Source page 39

OMS Ver, 0004.18.01 (Current)                                                                                                                          town of canton police
Product availability and pricing subject to change.                                                                                                  town of canton police
Quote Number: KGC7R5G

UNIT SUMMARY

The following is a schedule of the windows and doors for this project. For additional unit details, please see Line Item
Quotes.

Additional charges, tax or Terms and Conditions may apply. Detail pricing is per unit.

NUMBER OF LINES: 1                        TOTAL UNIT QTY: 1                           EXT NET PRICE: USD 2,295.55
LINE       MARK UNIT             PRODUCT LINE         ITEM                                                       NET PRICE       Qry        EXTENDED NET
PRICE
1                                  Ultimate                  Double Hung G2                                              2,295.55           a                  2,295.55
RO 43” X 86 1/2”
Entered as
RO 43" X 86 1/2"
OMS Ver. 0004.18.01 (Current)                             Processed on: 11/19/2025 10:46:43 AM                                                        Page 1of5

For product warranty information please visit, www.marvin.com/support/warranty

Source page 40

OMS Ver, 0004.18.01 (Current)

Product availability and pricing subject to change.

LINE ITEM QUOTES

town of canton police

town of canton police

Quote Number: KGC7R5G

The following is a schedule of the windows and doors for this project. For additional unit details, please see Line Item
Quotes. Additional charges, tax or Terms and Conditions may apply. Detail pricing is per unit.            .

For product warranty information please visit, www.marvin.com/support/warranty

Line #1     Mark Unit:                         |    Net Price:      |      2,295.55
Qty: 1                                                     Ext, Net Price: jjl|_ USD           2,295.53)
+ gibt                                       Stone White Clad Exterior
MARVIN SS                                     Bare Pine Interior
\                                                                  Ultimate Double Hung G2
Rough Opening 43" X 86 1/2"
Top Sash
Stone White Clad Sash Exterior
na                                                             Bare Pine Sash Interior
IG
Low £2 w/Argon
Black Stainless Steel Perimeter Bar
GBG - Contour
Rectangular 4W4H
Stone White Ext - White Int
Ogee Interior Glazing Profile
a                                                           Bottom Sash
°                                                                Stone White Clad Sash Exterior
Bare Pine Sash Interior
IG
Low E2 w/Argon
AS                                                                                     Black Stainless Steel Perimeter Bar
’     “en                                   GBG - Contour
aipetee psiRO                                                          Rectangular 2W1H
RO 43" X 86 1/2"                                                  Stone White Ext - White [nt
Egress Information                                                      Ogee Interior Glazing Profile.
.             «            .             "                           Beige Interior Weather Strip Package
Width: 38 13/32" Height: 37 41/64                              White Exterior Weather Strip Package
Net Clear Opening: 10.04 SqFt                                     White Sash Lock
Urecton 03 Information                                                  White Top Sash Strike Plate Assembly Color
Solar Heat Gain Coefficient: 0.27                                 Extruded Aluminum Screen
hed                         ‘i          :                                              Stone White Surround
Visible Light Transmittance: 0.46                                   Bright View Mesh
Condensation Resistance: 55                                    ek
CPD Number: MAR-N-425-23487-00002                    49 6" ane Combo Ship Loose
Performance Grade                                               iting Fi
Licensee #1127                       Naiting Fin u    stabil      ices Suh     h
AAMAJWDMACSA 101/1.S.2/A440-17                           Note: Unit Availability and Price is Subject to Change
LC-PGSO 1149X2223 mm (45.3X87.5 in)
Water Resistance: 7.52 psf
LC-PGS50 DP +50/-50
FL47635
Project Subtotal Net Price: USD      2,295.55
6.250% Sales Tax: USD        143.47
Project Total Net Price: USD           2,439.02