FY27 Municipal Capital Requests - January 2026 - Part 1 of 3 pdf file

Budgets & Finance · Record year 2026 · Record 3dc29db562b2c7d6a2

Open original municipal record ↗Open interactive reader

Saved text from 219 source pages. Transcription and OCR may contain errors; verify figures and wording against the original. Retrieved 2026-10-15.

Source page 41

CHROMEDATA

An Autodata Solutions Brand

_ehicle: [Fleet] 2026 Ford Super Duty F-350 SRW (F3F) XL 4WD Reg Cab 145" WB 60" CA ( * Complete )

Chassis

Suspension

Shock Absorber Diameter - Front

Stabilizer Bar Diameter - Front
Tires!
Front Tire Order Code
Spare Tire Order Code
Rear Tire Size
Front Tire Capacity
Spare Tire Capacity

Revolutions/Mile @ 45 mph - Rear

Wheels
Front Wheel Size
Spare Wheel Size
Rear Wheel Material

Steering

Steering Type

Steering Ratio (:1), On Center

Turning Diameter - Curb to Curb

Brakes
Brake Type
Brake ABS System (Second Line)

Disc - Rear (Yes or )

Rear Brake Rotor Diam x Thickness

Rear Drum Diam x Width

Fuel Tank
Fuel Tank Capacity, Approx

Fuel Tank Location

N/A
N/A

TDX

512
LT275/70SR18
7180 Ibs

N/A

628

18 X Bin
Full-Size in

Steel

Re-Circulating
Ball

N/A
48.6 ft

4-Wheel Disc
4-Wheel

Yes

14.3 in

N/A

40 gal
N/A

Shock Absorber Diameter - Rear

Stabilizer Bar Diameter - Rear

Rear Tire Order Code

Front Tire Size

Spare Tire Size

Rear Tire Capacity
Revolutions/Mile @ 45 mph - Front
Revolutions/Mile @ 45 mph - Spare

Rear Wheel Size
Front Wheel Material

Spare Wheel Material

Steering Ratio (:1), Overall

Steering Ratio (:1), At Lock
Turning Diameter - Wall to Wall

Brake ABS System
Disc - Front (Yes or )
Front Brake Rotor Diam x Thickness

Drum - Rear (Yes or )

Aux Fuel Tank Capacity, Approx

Aux Fuel Tank Location

N/A
N/A

TDX
LT275/70SR18
Full-Size

7180 Ibs

628

N/A

18X 8 in
Steel
Steel

N/A

N/A
N/A

4-Wheel
Yes
14.3 in
N/A

N/A
N/A

Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or
region, Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report
preparer's input is subject to the accuracy of the input provided. Data Version: 27039, Data updated Nov 20, 2025 6:47:00 PM PST

Nov 22, 2025

Page 5

Source page 42

CHROMEDAITA

An Autodata Solutions Brand
ehicle: [Fleet] 2026 Ford Super Duty F-350 SRW (F3F) XL 4WD Reg Cab 145" WB 60" CA (+ Complete )

Dimensions

Interior Dimensions

Passenger Capacity                               3                             Front Head Room                                  40.8 in
Front Leg Room                                  43.9 in                     Front Shoulder Room                            66.7 in
Front Hip Room                                62.5 in                   Second Head Room                            N/A
Second Leg Room                                 N/A                         Second Shoulder Room                           NIA
Second Hip Room                                N/A

Exterior Dimensions

Wheelbase                                      145 in                    Length, Overall w/o rear bumper               N/A
Length, Overall w/rear bumper                N/A                     Length, Overall                               230.7 in
Width, Max w/o mirrors                            80 in                        Height, Overall                                      81.9 in
Overhang, Front                               38.3 in                   Overhang, Rear w/o bumper                  47.2 in
Front Bumper to Back of Cab                      N/A                            Cab to Axle                                             60 in
Cab to End of Frame                            107.2 in                   Ground to Top of Load Floor                    N/A
Ground to Top of Frame                         N/A                         Frame Width, Rear                               34.1 in
Ground Clearance, Front                      8.9 in                     Ground Clearance, Rear                       8.9 in
Body Length                                     0.00 ft                     Cab to Body                                      N/A

Cargo Area Dimensions

Cargo Box Width @ Top, Rear                 N/A                        Cargo Box Width @ Floor                       N/A
Cargo Box Width @ Wheelhousings             NIA                          Cargo Box (Area) Height                          N/A
Tailgate Width                                             N/A                              Cargo Volume                                             N/A
Ext'd Cab Cargo Volume                          N/A

Prices, specifications, and availability are subject to change without notice, and do not include certain fees, faxes and charges that may be required by law or vary by manufacturer or
region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report
preparer's input is subject to the accuracy of the input provided. Data Version: 27039, Data updated Nov 20, 2025 6:47:00 PM PST

Nov 22, 2025                                                                                                                                                                                                                 Page 6

Source page 43

CHROMEDATA

An Autodata Solutions Brand

_ehicle: [Fleet] 2026 Ford Super Duty F-350 SRW (F3F) XL 4WD Reg Cab 145" WB 60" CA ( » Complete )

Selected Model and Options

MODEL

CODE                  MODEL

F3F                    2026 Ford Super Duty F-350 SRW XL 4WD Reg Cab 145" WB 60" CA
COLORS

CODE                  DESCRIPTION

W6                     Green Gem
ENGINE

CODE DESCRIPTION
99N        Engine: 7.3L 2V DEVCT NA PFI V8 Gas (STD)

TRANSMISSION
CODE DESCRIPTION
44G        Transmission: TorgShift 10-Speed Automatic -inc: SelectShift, selectable drive modes: normal, tow/haul, eco,
slippery roads and off-road and transmission power take-off provision (STD)
OPTION PACKAGE
CODE DESCRIPTION
630A        Order Code 630A

AXLE RATIO
CODE DESCRIPTION
X4M        Electronic-Locking w/4.30 Axle Ratio (STD)

TIRES
CODE DESCRIPTION
TDX        Tires: LT275/70Rx18E BSW AT -inc: Spare may not be the same as road tire

PRIMARY PAINT
CODE DESCRIPTION
W6         Green Gem

Prices, specifications, and availability are subject 1o change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or

region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report

preparer’s input is subject to the accuracy of the input provided. Data Version: 27039, Data updated Nov 20, 2025 6:47:00 PM PST
Nov 22, 2025

Page 7

Source page 44

CHROMEDAITA

An Autodata Solutions Brand

vehicle: [Fleet] 2026 Ford Super Duty F-350 SRW (F3F) XL 4WD Reg Cab 145" WB 60" CA ( Complete )

SEAT TYPE
CODE DESCRIPTION
AS         Medium Dark Slate, HD Vinyl 40/20/40 Split Bench Seat -inc: center armrest, cupholder, storage, 2-way

adjustable driver/passenger headrests and driver's side manual lumbar

ADDITIONAL EQUIPMENT - MECHANICAL
CODE DESCRIPTION

473        Snow Plow Prep Package -inc: pre-selected springs (see order guide supplemental reference for springs/FGAWR
of specific vehicle configurations), Note 1: Restrictions apply; see supplemental reference or body builders layout
book for details, Note 2: Also allows for the attachment of a winch, Note 3: Highly recommended to add (86M)
dual battery on 7.3L gas engine, Adding (67B) 410 amp dual alternators for diesel engine is highly recommended
for max power output

52B          Trailer Brake Controller
67B        410 Amp Dual Alternators -inc: 250 Amp + 160 Amp
86M         Dual 68 AH/65 AGM Battery

ADDITIONAL EQUIPMENT - EXTERIOR
CODE DESCRIPTION

18B        Platform Running Boards

512        Spare Tire & Wheel -inc: Excludes carrier, 3-Ton Mechanical Jack
59H        Center High-Mounted Stop Lamp (CHMSL)

61J        3-Ton Mechanical Jack

61L            Front Wheel Well Liner (Pre-Installed)

61S        Front Splash Guards/Mud Flaps (Pre-Installed)

ADDITIONAL EQUIPMENT - INTERIOR
CODE DESCRIPTION
76C          Exterior Backup Alarm (Pre-Installed)

872         Rear View Camera & Prep Kit -inc: Pre-installed content includes cab wiring and frame wiring to the rear most
cross member, Upfitters kit includes camera w/mounting bracket, 20' jumper wire and camera mounting/aiming
instructions

Options Total

Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or
region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report
Preparer's input is subject to the accuracy of the input provided. Data Version: 27039, Data updated Nov 20, 2025 6:47:00 PM PST

Nov 22, 2025                                                                                                                                                                                                                         Page 8

Source page 45

CHROMEDATA

An Autodata Solutions Brand

vehicle: [Fleet] 2026 Ford Super Duty F-350 SRW (F3F) XL 4WD Reg Cab 145" WB 60" CA ( © Complete )

Standard Equipment
Mechanical
Engine: 7.3L 2V DEVCT NA PFI V8 Gas (STD)

Transmission: TorgShift 10-Speed Automatic -inc: SelectShift, selectable drive modes: normal, tow/haul, eco,
slippery roads and off-road and transmission power take-off provision (STD)

Electronic-Locking w/4.30 Axle Ratio (STD)
50-State Emissions System
Transmission w/Driver Selectable Mode and Oil Cooler
Electronic Transfer Case
Part-Time Four-Wheel Drive
68-Amp/Hr 750CCA Maintenance-Free Battery w/Run Down Protection
190 Amp Alternator
190 Amp Alternator
Towing Equipment -inc: Trailer Sway Control
Trailer Wiring Harness
4890# Maximum Payload
GVWR: 10,900 Ib Payload Package
HD Gas-Pressurized Shock Absorbers
Front And Rear Anti-Roll Bars
Firm Suspension
Hydraulic Power-Assist Steering
40 Gal. Fuel Tank
Single Stainless Steel Exhaust
Auto Locking Hubs
Front Suspension w/Coil Springs
Solid Axle Rear Suspension w/Leaf Springs
4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist and Hill Hold Control
Upfitter Switches
Exterior
Tires: LT275/65Rx18E BSW A/S -inc: Spare may not be the same as the road tire (STD)
Wheels w/Hub Covers
Wheels: 18" Argent Painted Steel -inc: painted hub covers/center ornaments

Black Front Bumper w/Black Rub Strip/Fascia Accent and 2 Tow Hooks

Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or
region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report
preparer's input is subject to the accuracy of the input provided. Data Version: 27039, Data updated Nov 20, 2025 6:47:00 PM PST

Nov 22, 2025                                                                                                                                                                                                                 Page 9

Source page 46

CHROMEDATA

An Autodata Solutions Brand

.ehicle: [Fleet] 2026 Ford Super Duty F-350 SRW (F3F) XL 4WD Reg Cab 145" WB 60" CA ( Complete )

Exterior

Entertainment

Interior

Black Side Windows Trim and Black Front Windshield Trim

Black Door Handles

Black Power Heated Side Mirrors w/Convex Spotter, Manual Folding and Turn Signal Indicator
Manual Extendable Trailer Style Mirrors

Fixed Rear Window

Light Tinted Glass

Variable Intermittent Wipers

Aluminum Panels

Black Grille

Autolamp Auto On/Off Reflector Halogen Daytime Running Lights Preference Setting Headlamps w/Delay-Off
Cab Clearance Lights

Perimeter/Approach Lights

Radio w/Seek-Scan, Clock, Speed Compensated Volume Control, Steering Wheel Controls, Voice Activation
and External Memory Control

Radio: AM/FM Stereo w/MP3 Player -inc: 4 speakers
4 Speakers
Fixed Antenna

2 LCD Monitors In The Front

4-Way Driver Seat -inc: Manual Recline and Fore/Aft Movement
4-Way Passenger Seat -inc: Manual Recline and Fore/Aft Movement
Manual Tilt/Telescoping Steering Column

Gauges -inc: Speedometer, Odometer, Oil Pressure, Engine Coolant Temp, Tachometer, Transmission Fluid
Temp, Engine Hour Meter, Trip Odometer and Trip Computer

Front Cupholder

Compass

Remote Keyless Entry w/Integrated Key Transmitter, Illuminated Entry and Panic Button
Cruise Control w/Steering Wheel Controls

Manual Air Conditioning

Locking Glove Box

Interior Trim -inc: Chrome Interior Accents

Full Cloth Headliner

Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or
region, Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report
preparer's input is subject to the accuracy of the input provided. Data Version: 27039, Data updated Nov 20, 2025 6:47:00 PM PST

Nov 22, 2025

Page 10

Source page 47

CHROMEDATA

An Autodata Solutions Brand

vehicle: [Fleet] 2026 Ford Super Duty F-350 SRW (F3F) XL 4WD Reg Cab 145" WB 60" CA (</ Complete )

Interior

afety-Mechanical

Urethane Gear Shifter Material

HD Vinyl 40/20/40 Split Bench Seat -inc: center armrest, cupholder, storage, 2-way adjustable driver/passenger
headrests and driver's side manual lumbar

Day-Night Rearview Mirror

Passenger Visor Vanity Mirror

Full Overhead Console w/Storage and 2 12V DC Power Outlets
Front Map Lights

Fade-To-Off Interior Lighting

Full Vinyl/Rubber Floor Covering

Smart Device Remote Engine Start

SYNC 4 Communication & Entertainment System -inc: enhanced voice recognition, 911 Assist, 8" center
display, AppLink and 1 smart-charging USB port

Ford Connectivity Package (1-Year Included) -inc: unlimited Wi-Fi hotspot, Included for 1-year from warranty
start date, Requires activation via Ford app w/credit card authorization; customer may cancel at any time,
Evolving technology/cellular networks/vehicle capability may limit functionality and prevent operation of
connected features, Ford may temporarily slow data speeds if such data usage reaches or exceeds 50GB within
a billing cycle or due to network limitations, If a customer uses more than 50% of their data usage in a roaming
country during a 60-day period, Ford may remove or limit the customer's data plan

Instrument Panel Covered Bin and Dashboard Storage
Power 1st Row Windows w/Driver And Passenger 1-Touch Up/Down
Delayed Accessory Power

Power Door Locks w/Autolock Feature

Driver Information Center

Trip Computer

Outside Temp Gauge

Digital/Analog Appearance

Seats w/Vinyl Back Material

Manual Adjustable Front Head Restraints

Front Center Armrest w/Storage

Perimeter Alarm

Securilock Anti-Theft Ignition (pats) Immobilizer

2 12V DC Power Outlets

Air Filtration

AdvanceTrac w/Roll Stability Control Electronic Stability Control (ESC) And Roll Stability Control (RSC)

Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or
region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report
Preparer’s input is subject to the accuracy of the input provided. Data Version: 27039, Data updated Nov 20, 2025 6:47:00 PM PST

Nov 22, 2025

Page 11

Source page 48

CHROMEDATA

An Autodata Solutions Brand

vehicle: [Fleet] 2026 Ford Super Duty F-350 SRW (F3F) XL 4WD Reg Cab 145" WB 60" CA ( Complete )

Safety-Mechanical

Safety-Exterior

Safety-Interior

WARRANTY

ABS And Driveline Traction Control

Side Impact Beams

Dual Stage Driver And Passenger Seat-Mounted Side Airbags
Pre-Collision Assist with Automatic Emergency Braking (AEB)

Lane Departure Warning

Collision Mitigation-Front

Tire Specific Low Tire Pressure Warning

Dual Stage Driver And Passenger Front Airbags w/Passenger Off Switch
Safety Canopy System Curtain 1st Row Airbags

Outboard Front Lap And Shoulder Safety Beits -inc: Height Adjusters

Basic Years: 3

Basic Miles/km: 36,000

Drivetrain Years: 5

Drivetrain Miles/km: 60,000

Corrosion Years: 5

Corrosion Miles/km: Unlimited
Roadside Assistance Years: 5
Roadside Assistance Miles/km: 60,000

Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or

region. Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report

preparer's input is subject fo the accuracy of the input provided. Data Version: 27039, Data updated Nov 20, 2025 6:47:00 PM PST

Nov 22, 2025

Page 12

Source page 49

TOWN OF CANTON
FORM B — FISCAL 2027
CAPITAL PROJECT / EQUIPMENT REQUEST

DEPARTMENT:                                                    SUBMITTED BY:
Sewer Enterprise / S$          Ww
prise/ Spor MWat er            W.WALSH
PROJECT / EQUIPMENT TITLE:                                     TOTAL PROJECT / EQUIPMENT COST:
4
VEHICLE #71                                                        Must be at least $5,000

Any contingency should be explained below

§ 695,000.00

DESCRIPITION:
What is the request for? Example: 4 police cruisers. What are the funding sources (if more than one)?

The Vactor will replace the flush truck as the front line piece of sewer maintenance sewer line
cleaning equipment.

PURPOSE AND JUSTIFICATION:

Why the department needs this item. If additional space is needed for justification, please add a second page.

Does this further the Town’s Green Policy? Examples: We reviewed the ‘greener’ options; however, the internal combustion engines
remain a requirement for patrol vehicles that must run for longer periods without the ability to charge. We do have hybrid vehicles in
the fleet where the role is applicable.

This versatile piece of equipment will be critical for Public Works daily operations, including: cleaning basins and
oil-water separators in compliance with our MS4 permit, maintaining sewer lift stations, supporting hydro
excavation operations for the water department. The Vactor 2100i will serve as a key asset, enhancing efficiency,
safety, and operational capability across multiple municipal infrastructure tasks.

NEED CLASSIFICATION: (Check all that apply)             Department Priority Rank:
:                                                                    (Please rank this request out of your total requests for
 Required for Safety                                                this year: #1 as top priority)

 Required by Law or Mandate                                   Priority# 1 oft 3

 Improve/Expand Service or Increased Efficiency
Fa                                                               Expected Useful Life:
Planning Classification:                                                 10 to 19 Years

Planned project or replacement (on the prior year's 5-

* If not planned, please explain in justification

Impact on Dept. Operating Budget:                         Impact to Dept. Revenue:
No Impact            by § 0.00                                 No Impact           by $0.00

For motorized equipment: Was an electric or hybrid option considered? Please explain below

OTHER COMMENTS OR INFORMATION: (Attach supporting documentation including quote)

Not an option on this vehicle.

SUBMIT

Source page 50

me \ |\ fae WOOD co., inc
EES ES |

MUNICIPAL AND CONTRACTORS' EQUIPMENT

Tel. (781) 935 1919
200 Merrimac St                                          QUOTE                                    Fax [781] 937 9809
Woburn MA 01801

To:                                                               Date:

Town of Canton                                             October 24, 2025
Department of Public Works

147 Bolivar St

Canton, MA 02021

ATT; Bill Walsh Operations Manager

C.N. Wood Enviro LLC is pleased to offer the following Vactor budget proposal through the
Sourcewell contract for your consideration.

1 New Vactor 2100I dual fan combination sewer cleaner with 12-yard hopper,1300 gallons of
water tanks, dual fan, 600’ jetting hose, hydro excavation package, single engine, mounted on a
Western Star dual axle 10-wheel chassis and all other standard equipment

Total Selling Price... $695,000.00
NOTE: due to the current market conditions and the on-going supply chain issues pricing is
subject to change.

C.N. Wood Co, Inc. is looking forward to providing the Town of Canton with the premium Vactor
products and first class service. Please do not hesitate to contact me if you have any questions or
need further information.

Best Regards,
Stephen M. Russell
Sales Representative

No warranties are made other than those extended by the manufacturer of the equipment, and in the event of alleged breach of warranty, expressed
or implied, the liability of C. N. Wood Co., Inc., shall be limited to the liability of the manufacturer to it, and shall be subject to all limitations and
conditions imposed by the manufacturer.

Seller shall not be liable for any default or delay in delivery, as a result of shipping delays, strikes, fires, lockouts, or inability to
procure materials.

Source page 51

ENGINEERED TO PERFORM
BUILT TO LAST

VACTOR

Subsidiary of Federal Signal Corporation

Source page 52

DMnNII
RMOVUL

IGINEER

As a result of Vactor’s unique, trademarked Modul-Flex
design, your equipment is engineered and manufactured
to meet your specific and most demanding applications.
Modul-Flex offers you both accuracy and flexibility, and
essential operational advantages:

Provides for maximum debris body and water tank capacities
while ensuring optimum weight distribution on every truck

Helps you meet local axle load distribution standards and
safety regulations

Center of gravity is calculated for each truck to ensure a safe
configuration with optimal weight transfer

Includes our aluminum water tanks that are warrantied for 10
years, and are customized to the right sizes, capacities, and
locations to meet specific chassis requirements

Source page 53

In all Vactor equipment models you will find rugged and innovative features that deliver
the performance you need to handle your most demanding sewer cleaning tasks.

\
|
|  Purpose-designed for sewer system cleaning and refined over 50 years of

proven performance, our unique high pressure water pump gives you the

\ | power to break up even the toughest blockages. The Jet Rodder pump is a
{  positive displacement, high-pressure, double acting, hydraulically operated,
_ single piston pump specifically designed for sewer cleaning operations, whose
| design allows for configurations up to 100 gpm US (378 Ipm) @ 2000 psi.

+ Creates a powerful “jackhammer” action to assist the nozzle in

|         breaking up and penetrating obstructions

|

|       + Run dry protection for 30 minutes certified by Vactor
\
{
|

Flow and Pressure             Power Requirements       Hose Size
+ Powered from the chassis engine without the need of auxiliary                      40. gpm @ 2500 psi/151Ipm @ 172 bar      73hp /54kW     3/4 in or Lin /19 oF 25.4mm
         engine or belt drive                                                                          6gpm @ 2000 51/227 pm e138 bar      88 np/66 KW         1in/25.4 mm
60 gpm @ 2500 psi/22? Ipm #72 bar       MOhp/e2 kW          1in/25.4 mm
I!      + Operates at 14 to 25 cycles per minute (typical configurations in                   80 gpm @ 2000 psi/ 303 Ipm @ 138 bar      eae         MeL)
i                 .                          :                                                                              80.gpm@2500psi/303Ipm@172bar «46 hp/109KW          1in/25.4 mm
\           continuous duty operations)                                                                     100 gm @ 2000 psi/379Ipm@ 138bar 146 Hp/19KW        1.44 in /31.75 mm

+ The pump location provides a flooded suction inlet to eliminate
potential cavitation damage or the need for a charge pump

'       + Single moving part reduces wear and tear of pump components
and maintenance costs

Source page 54

‘ENHANCED OPERATOR
“EXPERIENCE

Quieter engine design

Lower water fill point

Hose reel telescopes                                                              ;
High       id
out up to 15” and                                                       igh groun

clearance
rotates up to 270° for
optimal positioning

Patented twist lock pipe
restraints

»VACTOR 2100i

OFFERS YOU GREATER OPERATING
EASE AND EFFICIENCY

a oe”  ol     =e

Vactor’s Multiflow system lets operators
set the flow at a lower rpm resulting in
better fuel economy without sacrificing
performance

All water valves are located in the same
mid-ship control station, reducing the
amount of walking back and forth around
the truck by the operator

Source page 55

VACTOR 2100i
INTUITIVE IN EVERY WAY.

NEW INTUITOUCH® ONE-TOUCH IN-CAB
CONTROLS REDEFINE SIMPLICITY

+ 7” touch screen control features back lit tactile buttons

+ Includes controls and viewing screen for camera, lighting,
recirculation and PTO/Transfer case activation

+ One-Touch engagement to activate PTO and transfer case —
allowing operators to gain control of all operational systems

+ Operator can view the current operating mode, recirculation
status, flows, pressures and more

NEW INTUITOUCH CONTROL STATION PUTS ALL CLEANING SYSTEM
FUNCTIONS INTO A SINGLE, SIMPLE CONTROL PANEL

+ Articulating controls with up/down adjustment for individualized maximum comfort — articulation allows the control panel
to adjust on a 90 degree arc for better access and screen visibility while operating the hose reel and boom

+ All controls are consolidated into a single control panel including a 7” dashboard screen with glove-friendly tactile buttons featuring at-a-
glance data for water pressure and flow, hose footage, chassis RPM, vacuum information, water level’, debris tank level* and more

IntuiTouch 2-3 °

+ New, reliable touch buttons with back lit feedback
enable the operator to know if a selected function is
active

+ The hose reel joystick significantly improves response
time and pays in and out in the direction of the hose
reel

The boom joystick has a telescoping feature built in,
giving the operator full mobility with multiple direction
boom movement for quicker set up

Operators have full control of the water system via
a single Multi-Flow control dial — enabling them to
precisely match the flow and pressure to the job
requirements

+ E-stops located at all operator control points bring the
unit to a safe condition to protect both the operator
and the equipment

Source page 56

VACTOR 2100i COMES IN
THE CONFIGURATION YOU NEED

| OUR POSITIVE DISPLACEMENT (PD)
| MODEL IS IDEAL FOR PULLING
; MATERIAL LONG DISTANCES

With blower offerings providing inlet volumes in excess of 5000
CFM and 18 Hg vacuum, the Vactor 2100i PD is the machine you
need to tackle your deepest pulls. In addition, our multi-stage

» blower filtration system is the most productive of its kind, and
unique design features make the 2100i the most operator friendly
unit available,

FOR ALL AROUND SERVICE, CHOOSE
A SINGLE ENGINE, SINGLE OR DUAL
STAGE FAN MODEL

Vactor’s fan system is the right choice for all-around sanitary and storm
sewer cleaning. Whether equipped with a single or dual (for greater
vacuum) fan system, our lightweight, perfectly balanced

aluminum fan provides superior performance to handle your toughest
jobs. Our unique system also minimizes energy consumption while
maximizing performance.

CENTRIFUGAL CYCLONES

Designed and located to improve air filtration and
permit easier cleaning. The air enters the top side
of the cyclone causing a vortex and any airborne
particles to drop and be “dumped” with the rest of
the load.

Source page 57

CUSTOMIZE YOUR 2100i WITH
PERFORMANCE DRIVEN OPTIONS

RDB 2
RAPID DEPLOYMENT BOOM

Our revolutionary RDB boom telescopes 10 feet out and extends

‘the debris hose down 15 feet speeding work, and, in many cases,

eliminating the need for additional tubes, reducing operator fa-
tigue. The RDB 1015 offers you:

+ Dramatic reduction in set-up and tear-down time
with boom’s ability to pay-in and pay-out 15 feet
of vacuum hose

+ Reach greater depths without raising the position
of the boom to enhance speed and efficiency

+ The ability to work in areas of low overhead clearance
without raising the boom and still reach needed depths

WIRELESS CONTROLS

Vactor has enhanced its wireless controls with a belly pack
and handheld remotes that feature two-way data transmis-
sion, including active pressure and flow information for the
water and the ability to monitor hose footage being paid out
or retracted. Our wireless controls also allow:

+ Extensive operation with greater control away
from the fixed operator station

+ Multiple control functions including hose reel
control, boom control, e-stop and more

OVER 100 PRECISION-ENGINEERED ENHANCEMENTS

ARE AVAILABLE, INCLUDING:

+ Cold weather recirculation system

+ Liquid debris pump-off system

+ Debris flush-out system

+ Fail-safe hydraulic door locking system

« Water tank capacity up to 1,500 gallons (5,678 L)

+ Pump delivery system up to 100 gpm

+ Hose reel capacity up to 1,000 ft. (305 m)
+ Automatic hose level wind guide

+ Safety warning lighting packages

+ Hydro-Excavation Kits

Source page 58

VACTOR WATER RECYCLERS
CAN HELP YOU MINIMIZE COSTS AS YOU
MAXIMIZE RESOURCES

You can maintain and repair sewer lines and save hundreds of thousands of gallons of
fresh water every year with a Vactor Water Recycler. Beyond water savings, by eliminating
the need to refill water tanks, you drive up productivity, cutting time, effort, and expense.
Designed to work exclusively with our 2100i Series combination sewer cleaners, our
Water Recyclers offer you:

+ Continuous operation without stops

+ 5-step water filtration process combining settling, centrifugal
separation, and absolute filtration to 100 microns

+ No need to enter the debris body for maintenance                                      \
+ No moving parts inside the debris body
+ Ground level access for washing coarse screen filter
+ Automated back flush every 30 seconds

+ Self-monitoring filter with low and high pressure shutdowns                                                "
)                  5-Step Water Filtration Process
+ Water source selection—clean water, recycled water or both                     4                        1. Initial Separation (inside the
debris body by the deflector plates)
2. Coarse Screen Filter
3. Centrifugal Separation
4. Classification Filter
5. Final Settling

Source page 59

VACTOR
SERVICE AND SUPPORT

PERFORMANCE UPGRADES

Your equipment represents a significant investment for
your community or business. With our Performance
Upgrades you can maximize the life, long-term value,
versatility and performance of your equipment. Retrofit
options include updates to add new safety, productivity
and performance features.

VACTOR REBUILD PROGRAM

This comprehensive service program is designed to keep
your Vactor equipment operating at top performance.

Including:

+ An all-points vehicle inspection

+ Genuine OEM replacement parts

+ All work done by factory-trained technicians

+ 10% parts discount

+ Engineering improvements and retrofit options

+ Equipment testing to factory specifications

OPERATOR, MAINTENANCE & SERVICE
TRAINING

To help you and your team get the most from all the perfor-
mance features we build into our equipment Vactor offers
a comprehensive training program that includes hands-on
classses on operation, maintenance and service.

LEARN
MORE

Source page 60

2100i SPECIFICATIONS

Model                                                          2100i - FAN                                    2100i - PD

DESIGN                                                                Exclusive Vactor Modul-Flex®                         Exclusive Vactor Modul-Flex®
Air Mover                                              Single or Dual Stage Hydrostatic Fan               Roots / positive displacement
VACUUM RATING                                                       -                                      Up to 27 in (685 mm) Hg
INLET VOLUME                                                                =                                              Up to 5000 CFM
DRIVE                                                         Chassis driven, direct drive                       Chassis driven, direct drive

OMSI TRANSFER CASE

Hydrostatic

Direct driven off of chassis

FULLY HYDRAULIC BOOM

Proportional Boom Controls
with 180° rotation

Proportional Boom Controls
with 180° rotation

Multi-Flow system

PICKUP HOSE                                                 7 in or 8 in Diameter                                7" or 8" Diameter

DEBRIS BODY CAPACITY                              5 cu yd - 15 cu yd (3.8 m3 - 11.5 m3)               5 cu yd - 15 cu yd (3.8 m? - 11.5 m3)
WATER TANK CAPACITY                            1,000 gal - 1,500 gal (3,785 L - 5,678 L)         1,000 gal - 1,500 gal (3.785 L - 5,678 L)
WATER TANK CONSTRUCTION                             Aluminum (10-year warranty)                        Aluminum (10-year warranty)
WATER PUMP                                                Vactor Jet Rodder®                             Vactor Jet Rodder®

Multi-Flow system

WATER DELIVERY

60 gpm - 100 gpm at 2,000 psi - 3000 psi

60 gpm - 100 gpm at 2,000 psi - 3000 psi

PUMP ACTION

Continuous flow or Jack Hammer®

Continuous flow or Jack Hammer®

HOSE REEL

15 in Telescope, 270° rotation
800 ft x 1 in capacity (244 m x 2.5 cm)

15 in Telescope, 270° rotation
800 ft x 1 in capacity (244 m x 2.5 cm)

REAR DOOR

Flat, hydraulically opening with fail
safe locks

Flat, hydraulically opening with fail
safe locks

SMART TRUCK FEATURES

E-stops at all operator stations
Flow / footage meters
Smart messages

E-stops at all operator stations
Flow / footage meters
Smart messages

HAND GUN SYSTEM

CUSTOM CONFIGURATIONS

Hose Reel

35 ft of hose
High Pressure Washdown gun

Up to 1,000 ft capacity (305 m)

35 ft of hose
High Pressure Washdown gun

Up to 1,000 ft capacity (305 m)

Multiple Boom Options

RDB 1015
10 ft Extendable Boom
10 ft Tele Boom

RDB 1015
10 ft Extendable Boom
10 ft Tele Boom

5x5 Boom                           5 x 5 Boom
Axles                                                           Single or Tandem                               Single or Tandem
Tri-Drive and Drop axles also available          Tri-Drive and Drop axles also available
Controls                                                      Wireless Belly pack

Wireless Belly pack

Handheld Wireless                                   Handheld Wireless
Corded Pendant                                  Corded Pendant
WATER RECYCLING AVAILABLE                                           NO                                                      YES

10

Source page 61

OUR COMMITMENT TO QUALITY ONLY
BEGINS WITH OUR EQUIPMENT

The Vactor 2100i is manufactured in an ISO 9001 certified, advanced industrial
plant. We employ the latest technology to build the most reliable equipment, including
high-precision laser cutters, robotic welding, efficient, accurate computer numerical
controls, and a sophisticated powder coating system.

When you build a quality product you can back it up with a full one-year, unlimited hours warranty.
Vactor also backs up your investment with superior local service and support. Our goal is to
keep your machine—and your entire operation—up and running.

The 2100i can be customized to your unique requirements to meet local standards and
regulations by means of a broad selection of configurations, options and accessories.

Through our international dealer network, we maintain a vast inventory of spare parts and offer
fast shipment to any region of the world.

Altogether, the rugged, reliable Vactor 2100i is easy to operate, easy to maintain, and an easy
choice when you are looking for quality equipment that is built to last.

1

Source page 62

oi

VACTOR
BRINGING YOU THE POWER
YOU NEED TO PERFORM

Vactor Manufacturing, the world leader in sewer cleaning equipment, with more than
20,000 specialty vehicles sold worldwide in the last 15 years, is part of Federal Signal, a
leader in integrated solutions for governments and industries worldwide.

Our mission is to provide you with not only the best equipment, but the best aftermarket
service and support in the industry. Together, we can offer you comprehensive operator
training and a vast parts inventory to cut downtime and keep your operation up and running.

VACTOR

Subsidiary of Federal Signal Corporation

vactor.com

Vactor Manufacturing, LLC + 1621 South Illinois Street + Streator, IL 61364 USA
Phone 815.672.3171 * Fax 815.672.2779

Specifications subject to change without notice. Some products shown with optional equipment. Vactor®, JetRodder®, IntuiTouch®, and ParkNClean® are registered trade-
marks of Vactor Manufacturing, LLC, Products may be covered by one or more United States Patents and/or pending patent applications.
See: www.vactor.conypatents. Vactor Manufacturing, Inc. is a subsidiary of Federal Signal Corp.

Federal Signal Corp. is listed in the NYSE by the symbol FSS.
Effective Date 05/2025       PIN 00107-6,       ©2025 Vactor Manufacturing
Printed in the USA

Source page 63

TOWN OF CANTON
FORM B -— FISCAL 2027
CAPITAL PROJECT / EQUIPMENT REQUEST

DEPARTMENT:                                      SUBMITTED BY:

Water Enterprise
Michael Trotta

PROJECT / EQUIPMENT TITLE:                                     TOTAL PROJECT / EQUIPMENT COST:
Must be at least $5,000):

Any contingency should be explained below

Process Modification at the Sullivan Water
Treatment Facility (Neponset WTP)

§ 2,500,000.00

DESCRIPITION:
What is the request for? Example: 4 police cruisers. What are the funding sources (if more than one)?

Replace the ultrafiltration (UF) membrane racks at Neponset WTP with a granular media pressure
system.

PURPOSE AND JUSTIFICATION:

Why the department needs this item. If additional space is needed for justification, please add a second page.

Does this further the Town’s Green Policy? Examples: We reviewed the ‘greener’ options; however, the internal combustion engines
remain a requirement for patrol vehicles that must run for longer periods without the ability to charge. We do have hybrid vehicles in
the fleet where the role is applicable.

Project was approved for FY 26 at then estimated cost of $4,200,000 for design and construction.
Based on 90% design, estimated construction cost is $6,300,000. $4,2000,000 - $280,000 (A&E) =
$3,920,000 (Build). $3,920,000 - $6,300,000 (FY27) = $2,380,000 (Build need).

NEED CLASSIFICATION: (Check all that apply)              Department Priority Rank:
;                                                                  (Please rank this request out of your total requests for
[__] Required for Safety                                                 this year: #1 as top priority)

[_] Required by Law or Mandate                                   Priority#_ 1 of # 5

 Improve/Expand Service or Increased Efficiency
i]                                                            Expected Useful Life:

Planning Classification:                                                         20 + Years
Planned project or replacement (on the prior year's 5-

* If not planned, please explain in justification

Impact on Dept. Operating Budget:                          Impact to Dept. Revenue:
Decrease            by $ 1,000,000.00                      No Impact           by $ 0.00

For motorized equipment: Was an electric or hybrid option considered? Please explain below

OTHER COMMENTS OR INFORMATION: (Attach supporting documentation including quote)

SUBMIT

Source page 64

The Neponset Water Treatment Facility was designed with a membrane pressure filtration
treatment process. The membrane process has been determined to be costly to operate and
highly labor intensive. The facility has not been able to meet its design capacity for several years
due to failing or inoperative process components, while certain other process components have
reached the end of their useful lives. This includes numerous pipes and valves, and the
computer software and hardware critical to the operation of the facility. We have determined
that for these reasons, the existing membrane treatment process is no longer the appropriate
technology to treat the Towns water at this location.

We have been working with our consulting engineers to develop plans to restore the capacity
lost due to the failing and inoperative components. The recommended action is to remove the
membrane treatment process and replace it with granular media pressure filtration, which is the
process in use at the Pecunit WTF. The new process components will fit within the footprint of
the existing system and will not require expansion of the existing building. This will provide an
opportunity to simplify the treatment process, replace aging and failed components, and
provide a consistent treatment process across our system.

Engineer’s Estimate of Probably Construction Cost: $6,300,000.00

Source page 65

Ison Engineering, Inc

DRINKING WATER PROFESSIONALS

November 3, 2025

Mr. Michael Trotta, Superintendent
Department of Public Works

801 Washington Street

Canton, MA 02021

RE: Neponset Street WTP
Treatment Facility Modifications

Dear Mr. Trotta:

At your request, we have reviewed the project scope and developed an updated engineers estimate
of probable cost, which is based on the 90-percent design of the proposed upgrades. Based on the
experience of H2Olson and a third-party review of the design plans, our revised Estimate for
construction and construction administration as of October 2025 is $6.3 million.

We greatly appreciate the opportunity to provide you with this proposal and look forward to
continuing to work with you and the Town of Canton on this important project. If you have any
questions, please feel free to contact me at (508) 965-2037 or via e-mail at
pgn@h2olsonengineering.com.

Very Truly Yours,
H2Olson Engineering, Inc.
Peter Newton, PG
Principal Hydrogeologist

10 Riverside Drive, Suite 103                                                                                                   Tel: 508-375-7007

Lakeville, MA 02347                                                                                                  www.h2olsonengineering.com

Source page 66

TOWN OF CANTON
FORM B — FISCAL 2027
CAPITAL PROJECT / EQUIPMENT REQUEST

DEPARTMENT:                                      SUBMITTED BY:

Water Enterprise                                                .
Michael Trotta

PROJECT / EQUIPMENT TITLE:                                   TOTAL PROJECT / EQUIPMENT COST:
Must be at least $5,000):

Any contingency should be explained below

Lead Service Line (LSL) Inventory and
Replacement Planning - Phase II

§ 2,250,000.00

DESCRIPITION:
What is the request for? Example: 4 police cruisers. What are the funding sources (if more than one)?

Continue efforts to indentify public side and customer side water service types. The effort will include
excavation at water service valves, continued public outreach notifications including web based
updates of inventory of service types and GIS maps.

PURPOSE AND JUSTIFICATION:

Why the department needs this item. If additional space is needed for justification, please add a second page.

Does this further the Town’s Green Policy? Examples: We reviewed the ‘greener’ options; however, the internal combustion engines
remain a requirement for patrol vehicles that must run for longer periods without the ability to charge. We do have hybrid vehicles in
the fleet where the role is applicable.

The U.S, EPA through MassDEP has revived the 1974 Safe Drinking Water Act Lead and Copper Rule (LCRR). This

LCRR requires Canton to inventory and document the material of both Town side and Customer side service line
types. Phase | was completed, the report was filed with MassDEP. Phase II requires validation of inventory with
on site inspections, inspection results and replacement plan are due November 2027.

NEED CLASSIFICATION: (Check all that apply)             Department Priority Rank:
;                                                                      (Please rank this request out of your total requests for
[_] Required for Safety                                                 this year: #1 as top priority)

 Required by Law or Mandate                                  Priority # 2 of # 5

CL] Improve/Expand Service or Increased Efficiency

Expected Useful Life:
Planning Classification:                                                    20 + Years

Planned project or replacement (on the prior year's 5-
* If not planned, please explain in justification

Impact on Dept. Operating Budget:                          Impact to Dept. Revenue:
No Impact            by § 0.00                                  No Impact            by $ 0.00

For motorized equipment: Was an electric or hybrid option considered? Please explain below

OTHER COMMENTS OR INFORMATION: (Attach supporting documentation including quote)

MWRA 10 year no interest loan is available to fund the work.

SUBMIT

Source page 67

~~

KLEINFELDEFR

Bright People. Right Solutions.
ws

October 31°, 2025
Kleinfelder Project No.: 24004138.001A

Mr. Michael Trotta
Superintendent of Public Works
Town of Canton

801 Washington Street

Canton, MA 02021

SUBJECT:         Lead and Copper Rule Compliance Support for FY 2027
Opinion of Probable Engineering Cost for Capital Request

Dear Mr. Trotta:

Kleinfelder has been supporting the Town of Canton (hereinafter called the “Town”) meet the
compliance requirements of both the Lead and Copper Rule Revisions (LCRR) and Lead and Copper Rule
Improvements (LCRI) under a Professional Services Agreement made effective on January 1%, 2024.

The first phase of the Program ensured that the Town would meet the compliance requirements of the
October of 2024 deadline associated with the LCRR. This consisted of the following:
© Grant Application
o Prepared and submitted a DWSRF Planning Grant Application to secure funding for the
Service Line Inventory (SLI) and subsequent tasks.
e Data Compilation & Preliminary Screening
o Conducted a desktop review of historical and current records to assess service line
material data availability and quality.
o Identified data gaps and proposed a strategy for inventory development
e Inventory Development & GIS Mapping
o Created a detailed inventory of service line materials using OCR, manual transcription,
customer surveys, predictive modeling, and on-site inspections.
o Developed a GIS map linked to the inventory database, including parcel data and service
line locations.
o Ensured compatibility with MassDEP reporting requirements and submitted the inventory
before the October 16, 2024 deadline.
e Lead Service Line Replacement Plan & Sampling Plan Update
o Drafted a preliminary replacement plan outlining strategies for addressing unknown
service lines, annual updates, public notifications, and prioritization of replacements.
o Updated the sampling plan to align with new LCRR requirements and inventory findings.
e Public Outreach
o Developed FAQs and educational flyers for homeowners.
o Materials for on-site inspection notifications.
o Supported communication efforts via mail, website, and social media.

Page 1 of 3

KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p|617.497.7800 f| 617.498.4630

Source page 68

SCOPE OF LEAD AND COPPER RULE COMPLIANCE SUPPORT ~ PHASE 2

The next phase of compliance support for the Town is centered on proactive planning and early
execution with the goal to minimize future regulatory burdens and streamline compliance with the Lead
and Copper Rule Improvements (LCRI). We aim to significantly reduce the quantity of ongoing annual
notifications, reduce the risk of tap sampling exceedances, and avoid costly administrative requirements
by completing the tasks identified in Table 1 below to ensure that the Town’s only remaining obligations
under the LCRI will be limited to Lead Sampling at Schools and Childcare Facilities, Validation of Non-
Lead Services, and the targeted replacement of known Lead and Galvanized Requiring Replacement
(GRR) Service Lines beginning on November 1°, 2027. This forward-thinking plan positions the Town to
meet all federal and state requirements efficiently while protecting public health and maintaining
transparency with residents.

Asummary of the work being proposed as part of Phase 2 is presented in Table 1 below.

Table 1: Summary of Phase 2 Lead and Copper Rule Compliance Support

Task                                               Description

Predictive Modeling-Driven Inspections | Includes a combination of Basement/Private Side and
Vacuum Excavations at the valve/Public Side, on-site,
visual inspections, at a limited number of targeted
properties, and coordination with MassDEP for approval of
this approach.

Inventory & GIS Map Updates                Includes updates associated with the Town’s inventory and
Public-Facing GIS Map, as well as accompanying
submissions and Certifications to MassDEP.

Public Outreach Assistance                   Includes Social Media and Website Content, Annual Public
Outreach Assistance for Consumer Notices, a Lead Action
Levels Exceedance Notification, Consumer Confidence
Report Content, Field Inspection Targeted Public Outreach,
and Disturbance Notifications.

Lead Service Line Replacement Plan         Includes updates to the Initial Plan Summary Form that
and Sampling Plan Updates                   was submitted to MassDEP that specifies the replacement
goals and procedures and an updated Sampling Plan that
includes updated locations and collection procedure
requirements,

Schools and Licensed Child Care             Includes development of a list of Schools and Licensed
Facilities Database                             CCF’s that is to be submitted to MassDEP by November
Ast, 2027 as well as development of the backend database
that will track required Public Outreach and Sampling

results.
Replacement Design and MWRA Loan      Includes development and submission of both a planning
Application                                      and construction loan application on behalf of the Town to

MWRA focused on the aforementioned Tasks and Design,
respectively. Design will include development of 30%
Plans, Specifications, and Cost Estimate associated with
replacement.

Page 2 of 3

KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p| 617.497.7800 f| 617.498.4630

Source page 69

Hl

CAPITAL BUDGET ESTIMATE

We have developed the following Engineer’s opinion of probable engineering costs for Phase 2 Lead and
Copper Rule Compliance Support for FY27 based on similarly scoped work. A 10% contingency is
included. We have assumed a project duration from July 1%t, 2026 through November 1°, 2027.

Item                                                            Opinion of Probable Engineering Cost
Predictive Modeling-Driven Inspections                                                     $1,700,000
Inventory & GIS Map Updates                                                                     $30,000
Public Outreach Assistance                                                                       $130,000
Lead Service Line Replacement Plan                                                          $60,000
and Sampling Plan Updates

Schools and Licensed Child Care Facilities                                                    $15,000
Database

Replacement Design and MWRA Loan Application                                       $85,000
Subtotal                                                                                            $2,020,000
10% Contingency                                                                                   $202,000
Total                                                                                                $2,222,000

If you have any questions or need additional information, please don’t hesitate to contact us.

Sincerely,
KLEINFELDER
                   Mia Nbr
Ajay Sharma                                                                 Kirsten Ryan, PG
Senior Professional                                                                 Senior Project Manager
ce:      File

Page 3 of 3

KLEINFELDER One Beacon Street, Suite 8100, Boston, MA 02108 p| 617.497.7800 f| 617.498.4630

Source page 70

(nr     \                                     APPENDIX A — DRAFT 2024 Scope of Services for
Ki

LEINFELDER             Lead Service Line Inventory & Replacement Plan

Bright People. Right Solutions.
we

November 1, 2023

Mr. Michael Trotta
Director of Public Works
Town of Canton

801 Washington Street
Canton, MA 02021

RE: Capital Request Fy25 — Lead Service Line Inventory & Replacement Planning / Lead & Copper
Rule Revisions Compliance Assistance
Canton, Massachusetts

Dear Mr. Trotta:

As we recently discussed, we have prepared this Scope and Fee in support of your FY25 Capital
Request for consulting services in support of Lead and Copper Rule Revision compliance for Canton.

BACKGROUND

In 1991 the United States Environmental Protection Agency promulgated regulations known as the
Lead and Copper Rule (LCR) under the authority of the 1974 Safe Drinking Water Act. The LCR helps
protect public health by regulating water suppliers on how to treat and control for lead. Lead and
Copper Rule revisions (LCRR), finalized in 2021, significantly increases the administrative and
compliance responsibilities for Public Water Systems (PWS), as described below. It should also be
noted that the EPA is additionally undertaking Lead and Copper Rule Improvements (LCRI) rulemaking,
expected to be announced in November 2023, which could further increase the compliance
requirements:

By no later than October 16, 2024:

e LSL Inventory - Complete, and submit to MassDEP, an inventory (material and verification
method) of service lines connected to its distribution system, whether or not they are owned or
controlled by the water system (public-side from main to corporation stop and private-side from
corp to meter).

o Note that the inventory may contain service lines classified as ‘Unknown’ material,
although these are treated as lead for compliance and notification.

e Public Notice - Make the Lead Service Line Inventory (LSLI) available to the public and notify
customers who have lead service lines , galvanized downstream of lead (‘galvanized requiring
replacement or GRR’) or lines of unknown material.

e LSL Replacement Plan - Submit a plan to MassDEP detailing how the PWS will prioritize, fund,
and fully remove any identified LSLs or GRRs connected to its distribution system.

e Modified Lead Tap Sampling Plan — Modify current Sampling Plan based on results of inventory.

Page 1 of 2

KLEINFELDER        1 Beacon Street Suite 8100, Boston MA 02108 p | 617.497.7800 f | 617.498.4630

Source page 71

Michael Trotta

Director of Public Works
Town of Canton
November 1, 2023

Beginning in 2025, the LCRR further requires the following compliance activities:
e Updating the Lead Service Line Inventory annually, so that services of unknown material are
classified
o Based a preliminary review of Canton’s records, we anticipate that it probably will not be
possible to fully classify all unknowns by October 2024.
¢ Publishing the LSLI annually to customers
e Water Testing at K-8 and Licensed Childcare Facilities
o Ataminimum, test (or document good faith effort of attempting to test) 20% of facilities
per year starting in 2025

The Town of Canton water system currently has approximately 8,800 accounts and 7,300 service
connections and dates back to the 1890’s. The Town has replaced lead pipe when encountered during
the course of operations, and Water Division personnel are not currently aware of the presence of any
LSLs. However, lead goosenecks connecting to older steel pipe are suspected to remain. A very
preliminary review of the 7,298 water service tie cards provided by Canton indicate a wide variation in
the quality and availability of service line material information. The LCRR-required inventory will need
to document the material of both the Town-owned and customer-side service lines, as well as the
presence of goosenecks and any galvanized pipe that may have been installed downstream, as the
LCRR will require a plan to remove any LSLs or galvanized downstream.

In June 2022, the Massachusetts Clean Water Trust and MassDEP announced a new financial
assistance program for funding the preparation of LSL Inventories and Replacement Plans. The
program will consist of a 100% grant (no matching required). Applications began being accepted on a
first-come first-served basis beginning July 1, 2022. To date, Kleinfelder has prepared successful
applications for 8 Massachusetts communities totaling over $1.8M. Our LCR Program team is working
for small towns like Ayer and Millis, MA and for larger cities like Somerville, Cambridge, and San Diego
(CA). Kleinfelder will assist Canton with preparing a SRF Grant Application to fund the Scope of
Services for the Inventory and Replacement Plan. A proposed Draft 2024 Inventory Scope of Services
is provided in Appendix A.. We expect that the Town will be able to receive the full grant funding for the
initial Inventory which is anticipated to cost on the order of $200,000. The grant funding would likely
become available as early as end of December.

PROPOSED FY25 CAPITAL REQUEST

This section presents the anticipated LCRR compliance tasks which must be undertaken beginning in
FY25, and order of magnitude budget for planning purposes. The scope and budget will be refined in
Fall 2024 after the Lead Service Inventory work (Appendix A) is completed:

Page 2 of 9

KLEINFELDER      1 Beacon Street Suite 8100, Boston MA 02108 p | 617.497.7800 f | 617.498.4630

Source page 72

Michael Trotta

Director of Public Works
Town of Canton
November 1, 2023

Childcare Facility
sampling (required to
sample both public and
private facilities built
before 2014; 5 sites per
school, 2 per CC)

*Ht's possible but
currently unclear if
there could be
funding from DEP to
defray costs for this
task

LGRR Requirement =| Recommended —_| Tasks/ Notes

i BudgetRange     oe

LSL Inventory & Mapping | $100,000 -              Continue to populate data for service lines of

Update (required            $125,000               Unknown material (via visual inspection

annually)                                                   and/or other methods described in Appendix
A Task 2) following the 2024 initial inventory
grant project (Appendix A)

School & Licensed           $47,000*                Required to sample / attempt to sample 20%

of facilities per year starting in 2025. From
an equity and efficiency perspective, it is
probably best to do all in the first year. This
assumes ~$1000 per facility including lab;
coordination, data, reporting

According to the Dept. of Early Education
and Care (EEC) website, the Town has 33
licensed child care programs. According to
the DESE website, the Town has 14 schools
(includes all grades). Required to sample
both public and private; 5 sites per school, 2
per CC.

Note: the LCRR only requires testing of K-8
schools, and secondary schools only upon
request. We assumed all 14 for this budget
to be conservative / inclusive.

LCR Compliance Site
Sampling Assistance

$20-000- $25,000

LCRR requires 5" liter and likely new sites
based on inventory results. This assumes
consulting support for sampling training /
outreach / reporting

“Disturbance” Public
outreach / Reporting
assistance & mitigation

$12,500 - $17,500

Assist with notifications to customers per
various LCRR Public Notification
requirements for disturbance of an LSL,
potential LSL, or unknown material SL (e.g
resulting from service replacements).
Provide required pitcher filters and
replacement filters to customer (assume $50
per customer for supplies & up to 50
customers)

Total recommended
budget range

$179,500 — 214,500

KLEINFELDER

Page 3 of 9

1 Beacon Street Suite 8100, Boston MA 02108 p | 617.497.7800 f | 617.498.4630

Source page 73

Michael Trotta

Director of Public Works
Town of Canton
November 1, 2023

We hope this information is of assistance to the Town. If you have any questions regarding it, please
feel free to contact me by e-mail at kryan@kleinfelder.com or call me at (617) 498-4778.

Sincerely,

KLEINFELDER

Kiar ©  yr

Kirsten N. Ryan
Program Manager

Ce:      file

Page 4 of 9

KLEINFELDER      1 Beacon Street Suite 8100, Boston MA 02108 p | 617.497.7800 f | 617.498.4630

Source page 74

APPENDIX A — DRAFT 2024 Scope of Services, Lead Service Line Inventory & Replacement Plan

Kleinfelder proposes to perform the following tasks to help Canton Water Department meet the
compliance requirements of the October 2024 deadline of the LCRR:

Task 0: Grant Application
Prepare an DWSRF Planning Grant Application for obtaining funding for the Lead Service Line (LSL)
Inventory.

Task 1: Data & Records Preliminary Screening

Kleinfelder will perform data compilation and screening to determine the availability, type, and quality of
information for LSL inventory development and to confirm the appropriate method(s) for completing an
LSL inventory and replacement plan. Task 14 will include approximately 80 hours labor for a desktop
review of available data relating to service line material which may include review of these types and
sources of information, as available:

e Water system records such as: GIS database (water main diameter, material; fire hydrant data),
historic maps, tie card database, meter install / replacement records, historical CIP or master
plans, and SOPs, construction specifications

« Water billing information (meter size, service line size, material)

e Existing historical or verified public and private service material records (if available)

e Information used to develop pool of existing LCR sampling sites.

e« Documentation of service line materials including construction & plumbing codes and permits.

e Assessor's Database /Parcel or Structure data

« Parcel ID, Address, Year Built

e Acreage or Lot Size

e Property Class or Zoning

e Recent surveys

« Construction records (especially service line replacements, plumbing work, renovations,
or new construction)

e« School and Childcare facilities

e Inspections and records of the distribution system.

Interviews with system personnel.

Paper records will be scanned to PDF format. A preliminary excel database will be prepared, which will
be consistent with the template provided by MassDEP. A summary of data gaps will be developed, and
an approach for filling in inventory gaps (classifying unknowns) within the budget limits will be
presented in a technical memorandum.

Deliverable — Preliminary Excel database and Technical Memo describing status of data sources,
identifying data gaps and presenting a recommended approach for inventory development in Task 2.

Task 2: Inventory Development & GIS Map

Page 5 of 9

KLEINFELDER      1 Beacon Street Suite 8100, Boston MA 02108 p | 617.497.7800 f| 617.498.4630

Source page 75

APPENDIX A — DRAFT 2024 Scope of Services, Lead Service Line Inventory & Replacement Plan

Based on the information and approach developed in Task 1, inventory development will be performed,
and a GIS map developed. Inventory will likely include several of the following types of activities, as
recommended and appropriate to the findings of Task 1:

e Population of material data from PDF scans using optical character recognition (OCR).

e Visual scanning of written records (e.g tie cards, meter installation records, record plans,
property records) and population of material data using manual transcription.

e Predictive analytic statistical modeling using available data and methodologies consistent with
Association of State Drinking Water Administrators (ASDWA) framework guidance’ to assign a
material likelihood to parcels with Unknown SL materials. It is anticipated that if recommended,
modeling will be performed by BlueConduit (https://blueconduit.com) under subagreement to
Kleinfelder.

e Implementation of a customer-driven survey similar to EPA’s “Protect Your Tap” scratch/magnet
test. This would utilize either ESRI Lead Service Line Inventory App or Mass-DEP provided
application.

e On-site visual inspections, which are expected to include a combination of basement inspection
and vacuum excavation in street at a limited number of targeted properties. These properties
would be representative but random to avoid data bias and enable the creation of a
statistical/predictive model.

This Task has budgeted approximately 160 hours of Kleinfelder labor, along with DBE subconsultant
time for records review, data science, and for vacuum excavation (assume one round of approximately
30 test pits).

Deliverable —GIS Map and excel database with public and private service line material classified into
known and unknown materials. Database will be in digital format specified by MassDEP.

Task 3: Lead Service Line Replacement Plan Development and Sampling Plan Update

A -LSL Replacement Plan:

Based on the results of Tasks 1 and 2, and upon discussions with water system stakeholders, a
Service Line Replacement Plan will be prepared. The Plan framework will be designed to be consistent
with LCRR anticipated final requirements, by including the following sections:
1) Inventory:
o A strategy for determining unknown service line material for remaining unknowns unable
to be classified within the budget for Tasks 1 and 2.
o Procedures for updating the LSL Inventory annually and for providing public notice
annually of the full inventory and individual homes with LSL or ‘unknown’ status.
2) Replacement Goal and Procedures:
o LSL replacement goal rate if the trigger level is exceeded.
o Flushing procedures and standard operating procedures for disturbances.
o Procedures for conducting LSL replacements.

 Principles of Data Science for Lead Service Line Inventories and Replacement Programs, September 2020, ASDWA & Blue Conduit

Page 6 of 9

KLEINFELDER      1 Beacon Street Suite 8100, Boston MA 02108 p | 617.497.7800 f | 617.498.4630

Source page 76

APPENDIX A — DRAFT 2024 Scope of Services, Lead Service Line Inventory & Replacement Plan

3) Funding: Strategies for program funding including ways to accommodate customers that are
unable to pay for private-side LSL replacement. Recommended updates to the Town’s capital
improvement plan, as appropriate.

4) Communication: Strategies and procedure for meeting LCRR requirements.

B - Sampling Plan Update:

The number of sampling sites under the LCRR has not changed, but the locations and sampling
techniques will change under the LCRR requirements and based on the LSL Inventory. The existing
Plan will be updated to be consistent with new LCRR sampling site and collection procedure
requirements.

Task 3 will include up to two (2) meetings with water system managers and other stakeholders to
discuss and document consensus on the Plan policies and procedures. This Task assumes up to about
190 hours of labor. The detailed development of policies and ordinances are outside the scope of this
Phase 1 effort. Recommendations will be made for further Plan development in Phase 2, if warranted.

Deliverable — Draft and Final Preliminary LSL Replacement Plan; Updated Sampling Plan

Task 4: Public Outreach Assistance

This task will include the development of a Public Outreach Plan Framework and include preparation of
initial messaging educating homeowners about lead in drinking water and the utility’s plans for lead
service inventory activities. Kleinfelder will meet with the DPW Director, Water Superintendent and
Town Administrator, Public Health Director to review the Public Outreach Plan Framework, which is
proposed to include:
1) Beginning of the project: Prepare an electronic Frequently Asked Questions flyer (assume up to
2 pages) for Town to mail to water customers, add to website and promote on social media.
2) Develop a Flyer that describes the on-site inspections for the Town to distribute by mail to the
property owners and tenants targeted for inspection and to post on their website.
3) At completion of Inventory and Draft Replacement Plan: One public meeting presentation to the
Select Board.

This Task has been budgeted to include up to 100 hours of support. Additional activities may be
recommended to be funded separately, depending on the outcome of Tasks 1- 3 and the stakeholder
meetings.

Deliverables: Public Outreach Framework, electronic materials for items 4.1 through 4.3.

Task 5: Project Management and SRF Administration Support

This Task will include project administration, MBE/WBE/DBE contractor coordination and assistance
with State Revolving Fund reporting and reimbursement requirements, as well as Project Management
including workplan, staffing and schedule management. This Task assumes up to approximately 65
hours of support.

Deliverables: Monthly emailed project summaries; up to 4 SRF reimbursement request(s).

Page 7 of 9

KLEINFELDER      1 Beacon Street Suite 8100, Boston MA 02108 p | 617.497.7800 | 617.498.4630

Source page 77

APPENDIX A — DRAFT 2024 Scope of Services, Lead Service Line Inventory & Replacement Plan

EXCLUSIONS, LIMITATIONS, ASSUMPTIONS

e Note that MassDEP is in the process of preparing revised lead regulations and if those
regulations are in conflict with this Scope, a discussion about potential need to amend the scope
(and fee) will be held with Canton and Kleinfelder.

e Items not specifically identified in the Scope above are excluded.

e Town will be responsible for the following costs: mailing of Outreach materials, fees for road
opening permits, if required and police details, if required. For on-site inspection activities in
Task 2, the Town DPW will provide an operations staff to accompany the field crew with a Town
vehicle in case of resident questions / for safety.

TASK                             HOURS      LABOR BUDGET       EXPENSES & SUB- | TOTAL
CONSULTANTS        BUDGET

1 - Data Compilation &
Screening

2 - Inventory & GIS Map

3 - Preliminary Replacement
Plan

4 - Public Outreach

5- PM & SRF Admin

TOTALS

SCHEDULE

Kleinfelder will begin work within two weeks of receipt of a signed Agreement and written Notice to
Proceed and shall use its best efforts to perform all services under this Agreement as expeditiously as
is consistent with professional skill and care and the orderly progress of the work. Note that this
schedule depends in part upon the Town being available for consultation and providing information to
Kleinfelder in a timely manner. The proposed project schedule is expected to be of 11 months duration,
as shown below:

Page 8 of 9

KLEINFELDER      1 Beacon Street Suite 8100, Boston MA 02108 p | 617.497.7800 f | 617.498.4630

Source page 78

APPENDIX A — DRAFT 2024 Scope of Services, Lead Service Line Inventory & Replacement Plan

Duration
TASK                                                 Start                 (Approx.}                   End
1 - Data Compilation & Screening              111/24              2 months              3/1/2024
2 - Inventory & GIS Map                         3/1/24               5 months               8/1/2024
3 - Replacement Plan                             5/1/24               3 months               8/1/2024
4 - Public Outreach                               2/1/24               7 months               9/1/2024
5- PM & SRF Admin                            1/1/24              11 months             10/1/2024

Page 9 of 9

KLEINFELDER      1 Beacon Street Suite 8100, Boston MA 02108 p | 617.497.7800 f | 617.498.4630

Source page 79

TOWN OF CANTON
FORM B — FISCAL 2027
CAPITAL PROJECT / EQUIPMENT REQUEST

DEPARTMENT:                                                                          SUBMITTED BY:

Water Enterprise                                                .
Michael Trotta

PROJECT / EQUIPMENT TITLE:                                   TOTAL PROJECT / EQUIPMENT COST:
(Must be at least $5,000):

Any contingency should be explained below

Satellite Well at Moran Water Treatment Facility
(PWTP) - Phase II Construction

$ 450,000.00

DESCRIPITION:

What is the request for? Example: 4 police cruisers. What are the funding sources (if more than one)?

Installation and construction administration for the replacement of failing Well 14 at PWTP.

PURPOSE AND JUSTIFICATION:

Why the department needs this item. If additional space is needed for justification, please add a second page.

Does this further the Town’s Green Policy? Examples: We reviewed the ‘greener’ options; however, the internal combustion engines
remain a requirement for patrol vehicles that must run for longer periods without the ability to charge. We do have hybrid vehicles in
the fleet where the role is applicable.

Boring done under Phase | confirmed the suitability of the soils for the Satellite Well. Water quality
testing found water consistent with that of Well 11 and Well 12. Phase | investigation confirms the
viability of the installation of a satellite well.

NEED CLASSIFICATION: (Check all that apply)             Department Priority Rank:
(Please rank this request out of your total requests for
this year: #1 as top priority)

LC] Required for Safety

[| Required by Law or Mandate                                  Priority #3 of #_5

 Improve/Expand Service or Increased Efficiency
Expected Useful Life:
Planning Classification:                                                    20 + Years
Planned project or replacement (on the prior year's 5-
* If not planned, please explain in justification

Impact on Dept. Operating Budget:                         Impact to Dept. Revenue:
No Impact           by $ 9.00                              No Impact           by $ 0.00

For motorized equipment: Was an electric or hybrid option considered? Please explain below

OTHER COMMENTS OR INFORMATION: (Attach supporting documentation including quote)

Project was approved at ATM 2025.

SUBMIT

Source page 80

Pecunit Well No. 14 was installed in 2009 during the construction of the Pecunit greensand iron
and manganese removal facility. The intention of the additional well at this location was to
supplement supply to ensure the water treatment facility had adequate process water.
Unfortunately, the well was sited close to wetlands and suffers from extremely high iron. The
well has been cleaned and redeveloped numerous times over the past 15 years and its capacity
has steadily declined to the point that it is no longer cost-effective to operate. We are
proposing to replace Well No. 14 at a location more distant from the wetlands, in the same
general area as the existing Well Nos. 11 and 12, which continue to provide excellent yields. A
preliminary boring was installed in the spring of 2025 and confirmed the suitability of the soils,
and preliminary water quality testing demonstrates that the water is consistent with that from
Well Nos. 11 and 12.

Our estimate for construction cost is $375,000 for construction and $75,000 for engineering
services