Canton Finance Committee                    Minutes Voted on:
                                               801 Washington Street                     Vote:
                                                 Canton, MA 02021



                    Joint Meeting of the Finance Committee and Capital Planning Committee
                                                Meeting Minutes
                                              September 25, 2024
                                        Salah Meeting Room – Town Hall


Finance Committee Members Present: Dan Cole, John Leonetti, Emilio Mauro, Kristin Mirliani and Cindy Thomas.

Finance Committee Members absent: Dave Clough, Anne Lang, Maureen Menconi and Reuki Schutt.

Guests Present:

John Connolly, Select Board member
Dave Emhardt, Chair, Capital Planning Committee
Derek Folan, Superintendent, Canton Public Schools
Jason Green Capital Planning Committee
Ellen Jones, Recording Secretary
Lisa Lopez, Capital Planning Committee
Greg Murphy, Capital Planning Committee
Randy Scollins III, Finance Director
See below minutes for list of guests.

Call Meeting to Order: Mr. Mauro called the joint meeting of the Finance Committee and Capital Planning Committee
to order at 7:00 p.m. Mr. Mauro introduced himself as the Chair of the Finance Committee and asked that attendees
introduce themselves.

New Business - Mr. Mauro announced that the Finance Committee would be discussing the Galvin Middle School
Project and the funding for the project. Mr. Mauro turned the meeting over to the Finance Director, Randy Scollins.

William H. Galvin Middle School Building Project Funding Presentation – William Scollins, III

Mr. Scollins thanked Mr. Mauro. This is the second meeting discussing the Galvin Middle School Project.

Mr. Scollins gave an overview of the slides that would be presented as follows:

Slide 1 – Total Project Cost Estimate.
Slide 2 – During Construction: Timing of Construction Cost and Financing Estimates.
Slide 3 – Permanent Financing.
Slide 4 – Estimated Norfolk Count Retirement System (NCRS) Pension Assessment Savings.
Slide 5 – GMS Excluded Debt Impact on Single Family and Condominium Property Value Ranges If
         Unused Levy Capacity & Pension Savings are Funding Sources
Slide 6 Debt Limit Calculation and Estimated Debt Limit Projections
Slide 7 – Tax Impact of $166.7 Million Debt Exclusion Project.


Mr. Scollins gave a detailed presentation of the funding for the Galvin Middle School Project as follows:

Slide 1 – Total Project Cost Estimate

    •    The total project cost estimate is $241.76 million which includes $11.7 million for contingencies. The project
         would include GMS new construction and Grades 5 to 8 configurations. The project would also include an 800
         seat auditorium, turf fields with lighting and partial geothermal (for public spaces).
    •    $1.5 million for feasibility costs has already been funded from Free Cash with a reimbursement rate of 52.88%
         on the $1.5 million. (At the time of application for the project the reimbursement rate for the feasibility costs
         was 47.31% but because of the evaluation of the project the MSBA awarded points for various reasons.)


FINCOM 20240925 DRAFT Minutes KM WRS.docx         Page 1 of 8                                            10/6/24

Source page 2

•   Construction costs of $240.26 million with a 30.618% reimbursement rate to be permanently funded with a
        30-year bond at project completion in Fiscal 2030.

Mr. Mauro inquired about the effect on the Town’s debt capacity. Mr. Scollins explained that once the full amount of
the $241 million is borrowed for, that would count against the Town’s debt capacity. In slide 6, Mr. Scollins would
explain how the $241 million is not counted against the Town’s debt capacity.

Slide 2 – During Construction: Timing of Construction Cost and Financing Estimates

    •   Mr. Scollins spoke about three different components of financing and the various construction phases during
        the financing.

    •   Table 1: During Construction – Construction Costs: for 4 ½ years there would be construction costs. MSBA
        reimbursement rate of 29.53% due to $2.6 million in holdbacks. Estimated Funding: $240,264, 835; MSBA
        Initial Reimbursements: $70,960,578 and Net Town Funding: $169,304,257

    •   Table 2: During Construction – Financing Costs – Five phases during the construction phase. Funding would
        be through BANs (short-term borrowing through Bond Anticipation Notes) over 4 ½ years with a total estimated
        Net Town Cumulative Funding of $169.3 million. Interest costs: Estimated $13.65 million over the construction
        project timeline depending upon interest rates.

    •   Table 3 : During Construction – Funding of Financing Costs – Various Funding Sources for the $13.65 million:
        $8 million from Capital Stabilization Fund, $793,200 from MSBA Feasibility Reimbursement, Interest Earnings
        $979,000 and Unused Tax Levy Capacity with the Levy Limit of approximately $3.9 million. All of these totaled
        would cover the interest costs of $13.65 million. The recommendation is that Unused Levy Capacity of $1.91
        million for FY28 and $1.97 million for FY29 be used towards funding. The Town has been below the Levy Limit
        in anticipation of this project to minimize the impact on the taxpayer. The Town has not been hitting the full
        levy limit for the past four years and will continue to do that through FY27 thus saving the taxpayers
        approximately $10 million by being below the levy limit. There would be no need for excluded debt to be
        added to taxes during this timeframe. The intent is to fund the carrying costs for this project with funding
        sources and cash that the Town has that are within the levy limit as opposed to increasing taxes beyond the
        levy limit. There would be no excluded debt increase to the taxpayer for two years but then it would be up to
        the Select Board and others involved in the budget process whether the Town goes back to under the levy
        limit.

Slide 3 – Permanent Financing

    •   The intent/recommendation is to leverage currently unused levy capacity to be a permanent funding source
        for the permanent debt in order to reduce how much excluded debt would need to be borrowed.
    •   With regard to the Bond Anticipation Notes, Mr. Leonetti inquired if there was any concern in receiving those
        BANS. Mr. Scollins said no. The Town issues the bonds when it goes to market annually to fund its debt.
        The Town has a AAA bond rating which helps the Town receive the most competitive rate for its borrowing. It
        is a controlled bid process with all the bond buyers having the chance to participate in the bond offering. The
        Town usually receives 6-12 bids and are sought after because of the Town’s rating. The intent is to issue
        permanent bonds in 2030 once the final BAN is paid off. The amount of the last BAN less the amount of the
        MSBA holdback will be the amount that the Town will borrow permanently for a 30-year bond.

    •   The intention of the funds that have been set aside into the Capital Stabilization Fund at Annual Town Meetings
        (approximately $1 million per year) has been for this project however, Capital Stabilization Funds can be voted
        for any legal purpose. The Town invests these funds seeking the most competitive interest rates.

    •   Mr. Scollins reviewed the key variables of the permanent financing for the project. The Town’s share for the
        project would be a 30-year bond of $166,700,359 (project is a 50 year asset). Legislation is currently proposed
        this year to allow 40-year borrowing for projects of this size. Mr. Scollins would discourage borrowing for a
        bond greater than 30 years because of the added interests costs of approximately $33.34 million. The interest
        rate for a 40-year bond would be expected to be higher than the rate for a 30-year bond. A 4% interest rate
        is being assumed for this project. The Town’s last borrowing was at a 3.6% interest rate. A 1% interest rate
        in either direction may cost or save the Town $25.80 million.

    •   Mr. Scollins stated that the Town did recently refinance many of its borrowings and can refinance any of the
        bonds but not before 10 years. However, municipalities can consider refinancing in the 9th year to consider
        refinancing in the 10th year. If the Town changed its mind because interest rates were low and perhaps a 25-
        year bond instead of a 30-year bond was considered, Mr. Scollins stated that a 30-year bond was a reasonable


FINCOM 20240925 DRAFT Minutes KM WRS.docx       Page 2 of 8                                           10/6/24

Source page 3

assumption at this time. If the rates were half of what they are now, a 20 or 25 year bond could be considered
         but then you would have to balance this with taxpayer impact.

    •    Mr. Leonetti inquired that if the interest rates were dropping, would the Town be able to consider issuing a
         permanent bond prior to 2030 instead of the Bond Anticipation Notes. This could be done but then the Town
         would be paying carrying costs and financing costs which could result in more costs. Mr. Scollins will be
         evaluating the interests rates each year. If the borrowing were to occur earlier in the process this could impact
         the excluded debt and thus could have an impact on the taxpayer. This would most likely be a policy decision.

    •    In response to Ms. Lopez’ inquiry as to what could go wrong with the borrowing, Mr. Scollins replied that
         anything is possible and anything could go wrong. There could be another economic meltdown, another
         situation such as COVID, another savings and loan like scandal or the markets could go crazy and thus impact
         the Town’s borrowing costs. The 4% interest rate that Mr. Scollins is assuming for the project is a relatively
         conservative number based on today’s economic environment.

    •    Mr. Scollins provided four different scenarios that could affect the impact on the average residential tax bill:

         1) Impact of existing excluded debt payoffs,
         2) if No other funding sources besides excluded debt,
         3) If Use Unused Levy Capacity or
         4) if Use Unused Levy Capacity and Pension Assessment Savings.

Scenario 4 is estimated to impact the average residential tax bill by $499 in the 1st year 2030 or by $198 for the 30-
year average.

Slide 4 – Estimated Norfolk County Retirement System (NCRS) Pension Assessment Savings

    •    It is estimated that the NCRS Pension Fund will be fully funded by FY29.

    •    Based on the NCRS Actuarial Report, Canton will save approximately $7 million in FY30.

    •    These funds are the funds that the Town is paying to NCRS and is a General Fund expense and is one of the
         largest expenses in the fixed costs budget. The reason that it is so high is because the Town is paying down
         the unfunded pension liability. The current goal of NCRS is to have this unfunded pension liability fully funded
         in 2030.

    •    By 2029 the Town of Canton will be paying its highest estimated pension assessment of $8.6 million. In 2030
         the pension assessment paid to NCRS will be approximately $933,717 which is an approximate savings of
         $7.7 million.

    •    The Town could use $3.3 million or 44% of the $7 million in savings for the first 10 years of the bond with it
         tapered down to 0% in 25 years.

    •    There are other capital needs (1860 Washington Street, possibly a third Fire Station, renovations for the Town
         Hall etc.) for the use of these funds. The pension savings could be used for many capital purposes but it
         would be most likely up to the policy makers.

    •    In response to Ms. Thomas’ question about a portion of the pension savings going towards the Town’s OPEB
         (Other Post Employee Benefits) liability, Mr. Scollins stated that there are 28 communities in Norfolk County
         that are also deciding on what to do with their NCRS pension savings. Mr. Scollins’ counterpart in Foxboro is
         recommending part of their NCRS pension savings be used for one of their elementary school renovation or
         expansion projects. Prior to Mr. Scollins becoming aware of the Galvin Middle School project it has always
         been his idea to use the NCRS pension savings towards the unfunded OPEB liability. To minimize the impact
         to the taxpayer for the Galvin Middle School project, the pension savings would be a near term opportunity to
         provide the tax relief. Mr. Scollins is not suggesting that 100% of the pension savings be used towards the
         Galvin Middle School project but that could be a policy decision.

    •    Mr. Murphy of the Capital Planning Committee inquired if there were other sources of funding available and if
         so, why were these not considered for the Galvin project? Mr. Scollins is unaware of any other funding sources
         of “scale” that would make a “dent” in this debt service. Mr. Scollins does not recommend that the Town draw
         down its reserves. The Town has maintained its AAA bond rating by having reserves of at least 15%. The
         primary purpose of having these reserves is if the Town were to have financial difficulties, the bond buyers
         want to know that the Town is going to be able to pay its debt service.


FINCOM 20240925 DRAFT Minutes KM WRS.docx         Page 3 of 8                                             10/6/24

Source page 4

Slide 5 – GMS Excluded Debt Impact on Single Family and Condominium Property Value Ranges if Unused
Levy Capacity & Pension Assessment Savings Are Funding Sources

    •    The figures in Slide 5 are based on the average assessed value of $725,700 for all residential properties
         (single family homes and condominiums that are in the residential class).

    •    The tax burden split is 60.5% residential and 39.5% commercial. Assessed values, tax rate and tax split will
         vary every year.

    •    Mr. Leonetti inquired if any study has been done on the impact on the net value of a home price value of
         having a new school built in the Town and what would be the net benefit to the homeowner of having an
         increase in taxes. Mr. Scollins does not have any study or statistics regarding this but his assumption is that
         a new school such as the one being proposed would mostly likely have a positive impact on the home values.

    •    Slide 5 assumes using a mix of excluded debt, unused levy capacity and a portion of the pension assessment
         savings, the result being that only 40%, or $108 million, of the total Galvin Middle School Debt Service ($270
         million) is estimated to be funded from excluded debt.

Slide 6 – Debt Limit Calculation and Estimated Debt Limit Projections

    •    The total assessed valuation of all properties is over $7 billion. Mr. Scollins is estimating that the values could
         be pushing towards $9.8 over time which should reduce the burden of not only individual taxpayers but all
         taxpayers.

    •    Canton’s current debt limit (5% of property valuation) is $380.4 million ($7,608,654,220 x 5% = $380,432,711).

    •    Total debt outstanding today is approximately $69 million.

    •    After all the outstanding debt outside the debt limit plus authorized but not yet issue debt outside the limit is
         subtracted from the debt limit of $380,432,711 the remaining borrowing capacity under the debt limit is
         $348,969,098. The MSBA’s authorization for the project, which the Town would have to approve at Special
         Town Meeting is $241,764,835.

    •    The remaining borrowing capacity under the debt limit is $107,204,263 which has been a static number
         because of the amortization of debt.

    •    In FY31 $75,064,263 of unused Galvin Middle School authorization would be rescinded, bringing the Town’s
         remaining borrowing capacity under the debt limit back up to $182,268,739.

    •    Postscript Update: It has since been learned from the Town’s Financial Advisor that the anticipated borrowing
         for the GMS project is not subject to the debt limit and therefore will not count against it.

Slide 7 – Tax Impact of $166.7 Million Debt Exclusion Project

    •    Mr. Scollins stated that the table on Slide 7 takes all of the considerations of the permanent borrowing and
         places them on one page. These are his reasonable assumptions. All 30 years of the borrowing are on one
         page and how the $166.7 million is amortized. Principal payments of $5.5 million each year. Bond interest
         costs are assumed at a 4% interest rate.

    •    Total annual debt service in the first year is estimated at $12.2 million. Overall total debt service is estimated
         at $270,054,582.

    •    Unused levy capacity increases 3% every year. The total represents 36% of the total annual debt service.
         Pension assessment savings tapers down by year 25 (or 2054) and represents 24% of the total annual debt
         service. Funding from excluded debt represents $107.5 million or 40% of the total annual debt service.

    •    The estimated impact on the average residential tax bill in the first year is $539, but this is before the excluded
         debt is rolled off which decreases the impact on the average residential tax bill to $499 for the first year.

Ms. Mirliani suggested that when the information is provided at Town Meeting that the additional $142 to be rolled out
to the taxpayers and not just the $499.




FINCOM 20240925 DRAFT Minutes KM WRS.docx         Page 4 of 8                                              10/6/24

Source page 5

Ms. Thomas suggested presenting the information in a clear, transparent manner for the average taxpayer. She also
mentioned that the Assessors have many abatement programs for the senior and veteran population that should be
mentioned to taxpayers. Select Board member Mr. Connolly also spoke about the Senior Rebate program and that the
Assessor’s office has an open door policy that is confidential to help guide seniors and veterans with their tax bills.

Mr. Leonetti asked as to what is involved in order to get the significant reduction that gets to the home cost for the
unused levy capacity and pension saving. He also asked as to what is required to get those funding amounts approved
so that the model Mr. Scollins presented is out. Is there anything required. Mr. Scollins replied that because there are
two components there are two requirements. One is when the budget is prepared for the year with the excluded debt
that all funding sources have been identified to pay the excluded debt. He will also be looking at the excluded debt tax.
By using the unused levy capacity, he will look at that and identify that as a funding source for the debt service. With
regard to the tax rate setting process with the Select Board it is required that the Town will commit to taxing to the levy
limit. With regard to the pension assessment savings, Mr. Scollins’ assumption and recommendation will be that a
certain portion will go to the debt service, which is a budgetary decision in the budgetary process as the budget is
recommended by the Finance Committee and ultimately voted by the voters.

Mr. Murphy inquired if any capital or operating expenses had been forecasted for the Galvin Middle School Project.
Mr. Folan stated that it was part of the MSBA process for the School to cost out these expenses within the plan, such
as transportation, educator staff, custodial staff etc.

The MSBA crafted the article, the motion and the ballot vote. It will be basically a “Yes” or “No” decision for the voter.
There is no alternative option that will be allowed on the floor of Town Meeting for any of the unreimbursables in the
Scope of the project. The School Committee/District committed on the Form 3011 budget to the MSBA to include the
Grade 5-8 configuration and the auditorium.

Mr. Jim Rogers of LeftField stated that as they try to get geothermal in schools there are two programs they seek out:
one is MassSave and the other is the Infraction Reduction Act which can pay up to 30% of the cost of geothermal.

The auditorium being proposed for the Galvin Project is 800 seats as compared to the Morse Auditorium which is 834
seats.

Mr. Mauro asked Mr. Folan to go through the bidding process. Mr. Folan stated that once a district is entered into the
MSBA process, MSBA goes through everything with quality checks along the way. Upon entering into the program and
a liaison is assigned, an OPM is established and an RFP is established, a committee with the rubrics. This is submitted
to the MSBA which they approve all the language that goes out for the bid, companies bid, a School Building Committee
is established, a sub-committee is established to be the Selection Committee. LeftField was selected and a contract
was negotiated with them which is reviewed by the attorneys at MSBA. All rubrics and minutes must be submitted and
once approved the OPM is established. The selection of the Design Team is set up as part of an MSBA meeting, which
has 16 votes on the Design Selection Committee, with the district having three votes (Mr. Folan, Mr. Connolly and the
School Committee Chair) on the committee. Rankings were submitted to MSBA, Ai3 emerged, a contract was
established and vetted and voted by MSBA. A decision is made to go with either a Bid-Build or Construction Manager
at Risk (CMR). Consigli emerged as the top candidate.

Ms. Linda Liporto of LeftField clarified that the terminology “bidding “ is wrong. Per Massachusetts state bidding laws
all of these selections are qualifications-based. There is no cost involved. There is a ranking system based on the
School Committee that selects the OPM and vetted by the MSBA and approved by the MSBA. It is based on categories
such as workload, what other projects the firm is working on and if the company has the qualifications for this project.
MSBA is heavily involved in the process from the very beginning. The designer services are RFSs or Requests For
Services which go out for qualification-based services and a design firm is selected, with MSBA very involved in that
selection process. The same qualifications are looked at as the architectural firm. Once the firm is selected, based on
the ranking system, then they enter into contract negotiations, at which point numbers and contract costs are discussed.
Once all of these firms are selected, MSBA has guidelines as to how much these firms should be paid for these services.
There is very little bidding involved. MSBA has average costs on their website as to how much the OPMs are paid.
The School Building Committee decides to proceed with a CMR on board early with the project. The subcommittee
has rankings. It is not necessarily the highest-ranked CM that has the lowest pricing. Ms. Liporto referenced a Harvard
study that was done on the correlation of the values of homes increasing by 6% due to the completion of a major project
within a town.

Mr. Mauro gave the members of the firms in attendance the opportunity to provide comments.

Mr. Justin Thibeault, Principal of Ai3 Architects, stated that there has been a lot of involvement and community
engagement with the project. Bill O’Rourke, Project Executive of Consigli Construction, stated that it has been a
tremendous process so far working with all those involved and is looking forward to moving on to the next steps with
the project. Tim Ericson of Consigli, a resident of Canton, is also looking forward to the project. He will be doing all


FINCOM 20240925 DRAFT Minutes KM WRS.docx         Page 5 of 8                                             10/6/24

Source page 6

the estimating on the project and will be working on keeping to the maximum guaranteed price. Mr. Brian Lynch, the
Assistant Superintendent of Finance and Operations, previously worked at MSBA and has seen many of the projects
go through the life cycle. He stated that this is a great team that has been put together and is looking forward to the
process.

Mr. Connolly spoke passionately about the project. He stated that he went to the Kennedy School and they had double
sessions. He was the first class at the Hansen School. He was the first class to graduate in 1973 at the Galvin Middle
School. His parents did things for the Town and for the children. He stated that it is now our turn to do it for the kids
of the Town today. In his opinion it is the best thing in the Town for the children. Neighborhoods turnover and the
Elderly go to different places. His old neighborhood on Old Coach Road is made up of all young families that come to
Canton for quality education. He said that he is asked by many people, “why should we do this”? He said “because it
is the right thing to do for the whole town”. “We have to do this.”

Mr. Green, of the Capital Planning Committee, suggested on keeping a focus on how the students will be impacted by
the construction going on around them. These are the same group of students that were affected by COVID. Mr.
Mauro stated that there is a plan in place to help mitigate things while construction is going on. Mr. Folan is hoping
that this will be a learning experience and educational engagement for the students.

Mr. Mauro thanked all of the members of the Team that were present and thanked Mr. Scollins for the Funding
Presentation.

Special Town Meeting Articles – Preview of Warrant Articles

Mr. Scollins stated that in addition to the Special Town Meeting with the Galvin School project, there is a Special Town
Meeting within the Special Town Meeting. These are all draft articles that are still being reviewed by Town Counsel.

Appropriation for Neponset Water Treatment Facility Replacement Filtration System

Set Salaries for Elected Officials which will correct the Town Clerk’s salary for FY25. There was one figure in the
budget article and a different figure in the warrant article. Town Counsel suggested an article for the STM to correct
the figure in the previous ATM article in order to be transparent.

Adjust Fiscal ’25 Accounts – This article will appropriate the additional state aid of $224,224 that the Town has received.

Appropriation to Increase Special Education Reserve Account.

Five Planning Board articles which are all Zoning housekeeping articles.

Minutes

A motion made by Ms. Mirliani to approve the July 10, 2024, meeting minutes was seconded by Mr. Cole.
Vote: 3-0-2. Ms. Thomas and Mr. Leonetti reviewed the minutes but abstained because they were not in attendance
at the meeting.

Next Meeting Date
Mr. Scollins stated that the work of the Finance Committee must be completed by October 16, 2024 in order to send
the document to Town Counsel for his review. Mr. Scollins suggested the Capital Planning Committee meet on their
own over the next week to review the Galvin Middle School Project and the Neponset Filtration Project. He also
suggested a joint meeting of the Capital Planning Committee and the Finance Committee on October 7, 2024 to discuss
the Galvin Middle School Project, the Appropriation for the Neponset Water Treatment Facility Replacement Filtration
System and to review and vote the non-zoning articles. The Planning Board may be ready to meet with the Finance
Committee on October 15.

The Finance Committee has been challenged with meeting a quorum for meetings. October 7th and October 9th may
be possible Zoom meeting dates. October 2nd and October 3rd are not options for meetings due to the Rosha Shana
holiday.

Ms. Thomas stated that there had been feedback on the last Town Meeting about discussions and whether or not a
minority discussion should be included. There had been comments that a minority discussion representing only one
vote against an article sometimes carried more weight than the majority discussion. She stated that it has been past
practice that a minority discussion was only included if there were a number of members that voted against an article,
otherwise, the minority discussion would be integrated within the main discussion. She suggested that it might be
something the Committee should take a vote on. Mr. Emhardt stated that the CPC would, even if it was one vote, allow
a minority opinion to be included in their CPC discussion. Mr. Emhardt was not attempting to tell the Finance Committee


FINCOM 20240925 DRAFT Minutes KM WRS.docx         Page 6 of 8                                             10/6/24

Source page 7

what to do with regard to minority discussions. In response to Ms. Mirliani’s question as to who crafts the minority
language to be included in the discussion, Ms. Thomas stated that it was the writer of the majority discussion that
included the language and that there would be a review of the discussions by the Committee.

Adjournment

A motion made by Ms. Thomas to adjourn the meeting at approximately 9:35 p.m. was seconded by Ms. Mirliani.
Vote: 5-0-0.

Minutes reviewed by: Ms. Kristin Mirliani

Respectfully submitted,




Emilio E. Mauro, Jr. , Chair, Canton Finance Committee




FINCOM 20240925 DRAFT Minutes KM WRS.docx      Page 7 of 8                                          10/6/24

Source page 8

Finance Committee
                                            Meeting Documents
                                            September 25, 2024

Please note: Some meeting documents may be found on the Town’s website under the Posted Minutes
section (Laser Fiche).

Agenda – September 25, 2024.

William H. Galvin Middle School Funding Recommendations – Funding Recommendations – September 24, 2024,
William Scollins, III (9 pages).




FINCOM 20240925 DRAFT Minutes KM WRS.docx   Page 8 of 8                                    10/6/24

Source page 9

WILLIAM H. GALVIN MIDDLE SCHOOL PROJECT
      FUNDING RECOMMENDATION
                Town of Canton

           For Discussion Purposes Only

               Updated October 2, 2024

Source page 10

WILLIAM H. GALVIN MIDDLE SCHOOL PROJECT
             FUNDING RECOMMENDATION

                         Table of Contents
Page
 1     TOTAL PROJECT COST

 2     DURING CONSTRUCTION FINANCING

 3     PERMANENT FINANCING & TAX PAYER IMPACT

 4     N.C.R.S. PENSION ASSESSMENT SAVINGS

 5     SINGLE FAMILY VALUE RANGES & TAX PAYER IMPACT

6      DEBT LIMIT

7      ANNUAL BOND PAYMENT, FUNDING COMPONENTS, & TAX PAYER IMPACTS

Source page 11

10/2/2024



                                              WILLIAM H. GALVIN MIDDLE SCHOOL PROJECT
                                                     TOTAL PROJECT COST ESTIMATE
                                       Option #9: New Construction and 5 to 8 Grade Configuration
                            800 Seat Auditorium, Turf Fields w/Lighting, and Partial Geothermal (Public Spaces)
                                                              Town of Canton


                                                                 TOTAL PROJECT COST
                                                                        MSBA
                        PROJECT                                    REIMBURSEMENT                                  TOWN SHARE
                     COMPONENTS             TOTAL PROJECT COST          RATE           MSBA SHARE    TOWN SHARE HOW FUNDED
                  FEASIBILITY STUDY                      1,500,000     52.880%               793,200     706,800 FREE CASH
                  CONSTRUCTION COST                    240,264,835     30.618%            73,564,476 166,700,359 30 YEAR BOND
                  TOTAL PROJECT COST                   241,764,835     30.756%            74,357,676 167,407,159



                               TOTAL PROJECT COST ESTIMATE for GMS NEW CONSTRUCTION and 5 to 8 GRADE CONFIGURATION,
                       INCLUDING AN 800 SEAT AUDITORIUM, TURF FIELDS with LIGHTING, and PARTIAL GEOTHERMAL (for Public Spaces)
                                                    IS $241.76MM INCLUDING $11.7MM of CONTINGENCY.
                      $1.5MM in FEASABILITY COSTS HAVE BEEN PREVIOUSLY FUNDED FROM FREE CASH - 52.88% REIMBURSEMENT RATE.
                                          $240.26MM in CONSTRUCTION COST with a 30.618% REIMBURSEMENT RATE
                                  to be PERMANENTLY FUNDED with a 30 YEAR BOND at PROJECT COMPLETION in FISCAL 2030




Galvin MS Funding Requirement Estimates V.10.xlsx                TOTAL PROJECT COST                                                PAGE 1

Source page 12

10/2/2024
                                                                           WILLIAM H. GALVIN MIDDLE SCHOOL PROJECT
                                                            DURING CONSTRUCTION: TIMING of CONSTRUCTION COST and FINANCING ESTIMATES
                                                                                         Town of Canton

                                                                                             DURING CONSTRUCTION - CONSTRUCTION COSTS
                                                                                                                          ESTIMATED      MSBA INITIAL   MSBA INITIAL                 NET TOWN
                                                                                                                         CUMULATIVE      REIMBURSE-     REIMBURSE-       NET TOWN CUMULATIVE
                                     TIME FRAME                CONSTRUCTION PHASE                  EST'D FUNDING           FUNDING        MENT %*        MENT $*         FUNDING     FUNDING
                                      1/25 - 6/25         Detailed Design & Bidding Specs                8,490,244             8,490,244   29.534%         2,507,536       5,982,708   5,982,708
                                                          Complete Design, Bidding Specs
                                      7/25 - 6/26                                                           35,467,084       43,957,328    29.534%         10,474,961     24,992,123     30,974,831
                                                          & Construction enabling work
                                      7/26 - 6/27         1st Year Construction                         71,108,612          115,065,940    29.534%         21,001,443     50,107,169     81,082,000
                                      7/27 - 6/28         2nd Year Construction                         71,303,778          186,369,718    29.534%         21,059,084     50,244,694    131,326,695
                                      7/28 - 6/29         Building Demo & Closeout                      53,895,117          240,264,835    29.534%         15,917,555     37,977,562    169,304,257
                                        TOTAL                                                          240,264,835                                         70,960,578    169,304,257
                                * Reimbursement Rate of 29.534'% is net of est'd MSBA holdback of $2.6MM.
                                           PROJECT TIMELINE 4 1/2 YEARS: ~1 YEAR DESIGN & BID SPEC DEVELOPMENT, ~2 1/2 YEARS CONSTRUCTION, ~1 YEAR DEMO & CLOSEOUT
                                          MSBA REIMBURSEMENT RATE (29.53%) DURING the PROJECT WILL BE LOWER THAN the STATED RATE (30.18%) DUE to a $2.6MM HOLDBACK

                                                                                                DURING CONSTRUCTION - FINANCING COSTS
                                                                                                     NET TOWN                             ESTIMATED
                                                                                                    CUMULATIVE                             INTEREST       ESTIMATED
                                     TIME FRAME                CONSTRUCTION PHASE                    FUNDING      TYPE of FINANCING          RATE       INTEREST COST    ISSUE DATE     PAYOFF DATE
                                      1/25 - 6/25         Detailed Design & Bidding Specs               5,982,708   BAN 6 Months             4.00%            119,654      1 / 2025       7 / 2025
                                                          Complete Design, Bidding Specs
                                      7/25 - 6/26                                                           30,974,831    BAN 1 Year        3.75%           1,161,556      7 / 2025       7 / 2026
                                                          & Construction enabling work
                                      7/26 - 6/27         1st Year Construction                         81,082,000        BAN 1 Year        3.50%           2,837,870      7 / 2026       7 / 2027
                                      7/27 - 6/28         2nd Year Construction                        131,326,695        BAN 1 Year        3.17%           4,163,570      7 / 2027       7 / 2028
                                      7/28 - 6/29         Building Demo & Closeout                     169,304,257        BAN 1 Year        3.17%           5,367,607      7 / 2028       7 / 2029
                                        TOTAL                                                                                                              13,650,257

                                 FINANCING DURING CONSTRUCTION WILL BE VIA SHORT-TERM BORROWINGS of 6 MONTH & 1 YEAR B.A.N.s, GROWING to the TOTAL TOWN COMMITMENT
                                                   B.A.N. ESTIMATED INTEREST (CARRYING) COSTS ARE ~$13.65MM OVER the CONSTRUCTION PROJECT TIMELINE

                                                                                        DURING CONSTRUCTION - FUNDING of FINANCING COSTS
                                                                                                                                          Cumulative
                                                            Capital Stabilization Funding   MSBA Feasibility             Unused Levy      Combined         Interest       Remaining
                                      Fiscal Year                   Plus Interest          Reimbursement +I               Capacity         Funding        Payments       Cash Funding
                                         FY 23                                   1,025,877             -                            -       1,025,877               -       1,025,877
                                         FY 24                                   1,092,879             -                            -       2,118,756               -       2,118,756
                                         FY 25                                   1,140,000         793,200                          -       4,051,956               -       4,051,956
                                         FY 26                                   1,141,818          31,728                          -       5,225,502          119,654      5,105,848
                                         FY 27                                   1,204,234             -                            -       6,429,736        1,161,556      5,148,526
                                         FY 28                                   1,180,198             -                      1,910,484     9,520,418        2,837,870      5,401,338
                                         FY 29                                   1,162,040             -                      1,967,798    12,650,257        4,163,570      4,367,607
                                         FY 30                                   1,000,000             -                            -      13,650,257        5,367,607            -
                                                                                 8,947,047         824,928                    3,878,282           -        13,650,257

                                                 ASSUMED INTEREST COST FUNDING SOURCES ARE CAPITAL STABLIZATION $8MM, MSBA FEASIBILITY REIMBURSEMENT ($793K),
                                                   INTEREST EARNINGS ON THESE AMOUNTS (~$979K), AND UNUSED TAX LEVY CAPACITY WITHIN THE LEVY LIMIT ($~3.9MM)

Galvin MS Funding Requirement Estimates V.10.xlsx                                                      DURING CONSTRUCTION FINANCING                                                                    PAGE 2

Source page 13

WILLIAM H. GALVIN MIDDLE SCHOOL PROJECT
                                                                             PERMANENT FINANCING                                                                  10/2/2024
                                                                                 Town of Canton

                                     KEY VARIABLES
    PROJECT COST             MSBA SHARE %     MSBA SHARE $                  TOWN SHARE $
       240,264,835             30.618%             73,564,476                  166,700,359

    BOND AMOUNT             TERM IN YEARS*            INTEREST RATE^          FY ISSUED
       166,700,359                30                      4.00%                 2030
      ^$25.84 Million = Impact of 1% Change in the Interest Rate
      *$33.34 Million = Increased Interest Cost if Bond Over 40 Years



                                                     EXCLUDED DEBT ESTIMATED IMPACT on AVERAGE RESIDENTIAL TAX BILL (ARTB)
                           TOTAL EXCLUDED
   OTHER FUNDING          DEBT SERVICE (P&I)                       EXCLUDED DEBT ESTIMATED IMPACT
                                                                                                                                  SCENARIO NOTES
    ($'s Millions)            REQUIRED                             on AVERAGE RESIDENTIAL TAX BILL*
                             ($'s Millions)
                                                       1st YEAR: 2030      LAST YEAR: 2059     30 YEAR Avg.

                                                            ($40)               ($87)                 ($74)   Impact of Existing Excluded Debt Payoffs

           $0                       $270                    $886                $350              $608        If NO Other Funding Sources Besides Excluded Debt

           $96                      $174                    $732                ($11)             $365        If Use UNUSED Levy Capacity

           $66                      $108                    $499                ($11)             $198        If Use Unused Levy Capacity & Pension Assessment Savings
 * All amounts are net of existing excluded debt payoffs.


             IMPACT of EXCLUDED DEBT PAYOFFS on the "ARTB" IS a $40 REDUX FROM TODAY & WILL BE AN $87 REDUX in the LAST YEAR of the BOND (2059).
         IF NO OTHER FUNDING SOURCES BESIDES EXCLUDED DEBT, GMS EXCLUDED DEBT IMPACT on the ARTB IS $886 IN YR 1, & $608 ON AVG. OVER 30 YEARS.
                       IF UNUSED LEVY CAPACITY IS USED, GMS EXCLUDED DEBT IMPACT on the ARTB IS $732 IN YR 1, & $365 ON AVG. OVER 30 YEARS.
   IF UNUSED LEVY CAPACITY & PENSION ASSESSMENT SAVINGS IS USED, GMS EXCLUDED DEBT IMPACT on the ARTB IS $499 IN YR 1, & $198 ON AVG. OVER 30 YEARS.
           TOWN'S PENSION LIABILITY IS SCHEDULED to be FULLY FUNDED BY FYE 2029. APPROXIMATELY $7MM IN SAVINGS IS EXPECTED STARTING IN FY 2030.
      THIS RESULT IS ACHIEVED BY USING ~44%, OR ~$3.1MM, of THIS SAVINGS for the 1ST 10 YEARS and TAPERING DOWN USE of this SAVINGS to 0% IN 25 YEARS.
Galvin MS Funding Requirement Estimates V.10.xlsx                                PERMANENT FINANCING                                                                PAGE 3

Source page 14

10/2/2024
                                                ESTIMATED N.C.R.S. PENSION ASSESSMENT SAVINGS

                                                        ACTUAL &
                                                        ESTIMATED           ANNUAL        ANNUAL
                                                 FISCAL  PENSION          % INCREASE    $ INCREASE
                                            YEAR YEAR ASSESSMENT          (DECREASE)    (DECREASE)
                                             -10  2019     5,245,794          9.4%            449,547
                                              -9  2020     5,635,051          7.4%            389,257
                                              -8  2021     6,031,916          7.0%            396,865
                                              -7  2022     6,445,520          6.9%            413,604
                                              -6  2023     6,929,184          7.5%            483,664
                                              -5  2024     7,303,647          5.4%            374,463
                                              -4  2025     7,565,945          3.6%            262,298
                                              -3  2026     7,832,228          3.5%            266,283
                                              -2  2027     8,107,884          3.5%            275,655
                                              -1  2028     8,393,240          3.5%            285,357
                                              0   2029     8,688,640          3.5%            295,400
                                              1   2030       933,717         -89.3%        (7,754,923)
                                              2   2031       945,800          1.3%             12,083
                                              3   2032       957,081          1.2%             11,280
                                              4   2033       967,460          1.1%             10,380
                                              5   2034       981,972          1.5%             14,512
                                              6   2035       996,702          1.5%             14,730
                                              7   2036     1,011,652          1.5%             14,951
                                              8   2037     1,026,827          1.5%             15,175
                                              9   2038     1,042,230          1.5%             15,402
                                              10  2039     1,057,863          1.5%             15,633

                                N.C.R.S. PENSION ASSESSMENT CONTINUES to GROW THRU 2029 to ~$8.7MM.
                      UNFUNDED PENSION LIABILITY ON TRACK & SCHEDULED TO BE FULLY FUNDED BY FYE 2029.
                               PENSION ASSESSMENT SAVINGS EXPECTED TO BE AT LEAST $7MM IN FY 2030.
                            FY 2030 WILL BE THE 1ST YEAR of the GMS PERMANENT FINANCING DEBT SERVICE.
                      A PORTION OF THESE SAVINGS IS RECOMMENDED TO BE USED TO FUND GMS DEBT SERVICE.
                                                                                                            PAGE 4
Galvin MS Funding Requirement Estimates V.10.xlsx          PENSION ASSESSMENT SAVINGS

Source page 15

10/2/2024


         GMS EXCLUDED DEBT IMPACT ON SINGLE FAMILY & CONDOMINIUM PROPERTY VALUE RANGES*
            IF UNUSED LEVY CAPACITY & PENSION ASSESSMENT SAVINGS ARE FUNDING SOURCES
                                                                            $0.69
        SINGLE FAMILY                                                   1ST YEAR GMS
          PROPERTY                                                     EXCLUDED DEBT
          ASSESSED                                                     IMPACT ON AVG.           # of                   CUMULATIVE
        VALUE RANGE                         AVG.VALUE                     TAX BILL           PROPERTIES   % of TOTAL    % of TOTAL
         $150K - $250K                          $214,465                     $147               151          2.1%          2.1%
          $250K - $350K                              $292,006                   $201              392       5.4%          7.5%
          $350K - $450K                              $413,595                   $284              592       8.2%          15.7%
          $450K - $550K                              $500,786                   $344             1252       17.3%         33.0%
          $550K - $650K                              $600,901                   $413             1111       15.4%         48.4%
          $650K - $750K                              $697,510                   $480              994       13.8%         62.1%
          $750K - $850K                              $798,275                   $549              851       11.8%         73.9%
          $850K - $950K                              $899,433                   $618              521       7.2%          81.1%
        $950K - $1,050K                              $999,350                   $687              375       5.2%          86.3%
       $1,050K - $1,150K                          $1,095,695                    $753              318       4.4%          90.7%
       $1,150K - $1,250K                          $1,197,090                    $823              186       2.6%          93.3%
       $1,250K - $4,250K                          $1,515,302                   $1,042             486       6.7%         100.0%
  * Single Family & Condo properties represent 90% of all residential classes of property.       7229       100.0%

                                                  ASSESSED VALUES and TAX RATE ARE BASED on FY 2024.
                PROPERTY TAXES ARE CURRENTLY BASED ON A 60.5% RESIDENTIAL / 39.5% COMMERCIALTAX SPLIT.
                                        ASSESSED VALUES, TAX RATE and TAX SPLIT WILL VARY EVERY YEAR.
                            AVERAGE ASSESSED VALUE of ALL RESIDENTIAL PROPERTIES IS CURRENTLY $725.7K
   ASSUMING A MIX of EXCLUDED DEBT, UNUSED LEVY CAPACITY, and A PORTION of EST'D PENSION ASSESMENT SAVINGS,
        ONLY 40%, or $108MM, of the TOTAL GMS DEBT SERVICE ($270MM) IS EST'D to be FUNDED FROM EXCLUDED DEBT.



Galvin MS Funding Requirement Estimates V.10.xlsx                      SINGLE FAM & CONDO VALUE RANGES                               PAGE 5

Source page 16

10/2/2024


                                                           DEBT LIMIT CALCULATION


                     A)    CANTON'S TOTAL TAXABLE PROPERTY VALUATION                                        7,608,654,220

                     B)    DEBT LIMIT - 5% of PROPERTY VALUATION (A x 5%)                                    380,432,711

                           Total Outstanding Debt                                                             59,748,533
                           Total Debt Authorized But Not Yet Issued                                            9,255,139
                     C)    GROSS DEBT                                                                         69,003,672

                     D)    AMOUNT of OUTSTANDING DEBT WHICH IS OUTSIDE the DEBT LIMIT                         34,325,058

                     E)    AMOUNT of AUTHORIZED BUT NOT YET ISSUED WHICH IS OUTSIDE the DEBT LIMIT             3,215,000

                           OUTSTANDING DEBT OUTSIDE the DEBT LIMIT PLUS
                     F)
                            AUTHORIZED BUT NOT YET ISSUED DEBT OUTSIDE the LIMIT (D + E)                      37,540,058

                     G)    NET DEBT SUBJECT to the DEBT LIMIT (C - F)                                         31,463,614
                     H)    REMAINING BORROWING CAPACITY UNDER the DEBT LIMIT (B - G)                         348,969,098

                           DECEMBER 2024 GALVIN MIDDLE SCHOOL - AUTHORIZATION IS OUTSIDE the LIMIT           241,764,835


                          MASSACHUSETTS MUNICIPALITIES' DEBT IS LIMITED TO 5% of ASSESSED TAXABLE PROPERTY VALUE.
                                   CANTON'S DEBT LIMIT IS CURRENTLY $380.4MM, VERSUS GROSS DEBT OF $69MM.
                  GROSS DEBT INCLUDES OUTSIDE the LIMIT DEBT OUTSTANDING ($34.3MM) & AUTHORIZED & UNISSUED ($3.2MM).
                                           WATER & SEWER DEBT IS OUTSIDE the LIMIT and TOTALS $37.5MM.
                                               CANTON DEBT SUBJECT to the DEBT LIMIT IS $31.5MM.
                                          CURRENT BORROWING CAPACITY UNDER the DEBT LIMIT IS $349MM
                                                and IS UNAFFECTED BY the GALVIN AUTHORIZATION



Galvin MS Funding Requirement Estimates V.10.xlsx                       DEBT LIMIT                                            PAGE 6

Source page 17

TAX IMPACT of $166.7 MILLION DEBT EXCLUSION PROJECT                                                                                                                    10/2/2024




                                                                                   1            44.02%                                                                   FY 2024 Values
              Borrowed   Term in Years         Interest Rate                 OTHER POSSIBLE FUNDING SOURCES                       FY 2024 Levy Split        5,793,895,560 1,814,758,660       725,688     EXISTING EXCLUDED DEBT PAY DOWN IMPACT           IMPACT ON AVG.        IMPACT ON AVG.      COMBINED IMPACT
            $166,700,359      30                   4.00%       ANNUAL                         Pension         FUNDED FROM      60.4774%      39.5226%        IMPACT ON     IMPACT ON IMPACT ON AVG. Existing (FY24) Residential Impact On Impact On Avg. RESIDENTIAL TAX BILL RESIDENTIAL TAX BILL   OF EXCLUDED DEBT
     FISCAL    BONDS      PRINCIPAL                BOND         DEBT          Unused Levy    Assessment        EXCLUDED       Residential   Commercial      RESIDENTIAL COMMERCIAL      RESIDENTIAL   Excluded Debt   Levy Tax Residential  Residential   NET OF EXCLUDED       OF USING EXCESS       & USING EXCESS
YEAR YEAR OUTSTANDING PAYMENT                   INTEREST       SERVICE          Capacity       Savings           DEBT            Levy          Levy           TAX RATE      TAX RATE      TAX BILL    Tax Paid Down  Reduction   Tax Rate    Tax Bill      DEBT PAY DOWN          LEVY CAPACITY       LEVY CAPACITY

  1   2030     $166,700,359     $5,556,679        $6,668,014   $12,224,693      $2,026,832      $3,081,365       $7,116,496     $4,303,872    $2,812,624       $0.74        $1.55          $539             $528,885    $319,856    ($0.06)    ($40)            $499                 $254                   $753
  2   2031     $161,143,680     $5,556,679        $6,445,747   $12,002,426      $2,087,637      $3,081,365       $6,833,424     $4,132,677    $2,700,747       $0.71        $1.49          $518             $553,665    $334,842    ($0.06)    ($42)            $476                 $261                   $737
  3   2032     $155,587,002     $5,556,679        $6,223,480   $11,780,159      $2,150,266      $3,081,365       $6,548,527     $3,960,379    $2,588,148       $0.68        $1.43          $496             $573,195    $346,653    ($0.06)    ($43)            $453                 $269                   $722
  4   2033     $150,030,323     $5,556,679        $6,001,213   $11,557,892      $2,214,774      $3,081,365       $6,261,752     $3,786,945    $2,474,807       $0.65        $1.36          $474             $592,725    $358,464    ($0.06)    ($45)            $429                 $277                   $707
  5   2034     $144,473,644     $5,556,679        $5,778,946   $11,335,624      $2,281,217      $3,081,365       $5,973,042     $3,612,340    $2,360,701       $0.62        $1.30          $452             $606,995    $367,095    ($0.06)    ($46)            $406                 $286                   $692
  6   2035     $138,916,966     $5,556,679        $5,556,679   $11,113,357      $2,349,654      $3,081,365       $5,682,338     $3,436,530    $2,245,808       $0.59        $1.24          $430             $621,190    $375,679    ($0.06)    ($47)            $383                 $294                   $678
  7   2036     $133,360,287     $5,556,679        $5,334,411   $10,891,090      $2,420,144      $3,081,365       $5,389,582     $3,259,479    $2,130,103       $0.56        $1.17          $408             $635,723    $384,469    ($0.07)    ($48)            $360                 $303                   $663
  8   2037     $127,803,609     $5,556,679        $5,112,144   $10,668,823      $2,492,748      $3,081,365       $5,094,710     $3,081,148    $2,013,562       $0.53        $1.11          $386             $650,783    $393,577    ($0.07)    ($49)            $337                 $312                   $649
  9   2038     $122,246,930     $5,556,679        $4,889,877   $10,446,556      $2,567,530      $3,081,365       $4,797,660     $2,901,500    $1,896,160       $0.50        $1.04          $363             $846,182    $511,749    ($0.09)    ($64)            $299                 $322                   $621
 10   2039     $116,690,251     $5,556,679        $4,667,610   $10,224,289      $2,644,556      $3,081,365       $4,498,367     $2,720,496    $1,777,872       $0.47        $0.98          $341             $856,368    $517,909    ($0.09)    ($65)            $276                 $331                   $607
 11   2040     $111,133,573     $5,556,679        $4,445,343   $10,002,022      $2,723,893      $2,896,483       $4,381,646     $2,649,905    $1,731,740       $0.46        $0.95          $332             $867,268    $524,501    ($0.09)    ($66)            $266                 $341                   $607
 12   2041     $105,576,894     $5,556,679        $4,223,076    $9,779,754      $2,805,610      $2,896,483       $4,077,662     $2,466,064    $1,611,598       $0.43        $0.89          $309           $1,149,168    $694,987    ($0.12)    ($87)            $222                 $351                   $573
 13   2042     $100,020,215     $5,556,679        $4,000,809    $9,557,487      $2,889,778      $2,896,483       $3,771,226     $2,280,740    $1,490,487       $0.39        $0.82          $286           $1,153,368    $697,527    ($0.12)    ($87)            $198                 $362                   $560
 14   2043      $94,463,537     $5,556,679        $3,778,541    $9,335,220      $2,976,471      $2,896,483       $3,462,266     $2,093,888    $1,368,377       $0.36        $0.75          $262           $1,153,368    $697,527    ($0.12)    ($87)            $175                 $373                   $548
 15   2044      $88,906,858     $5,556,679        $3,556,274    $9,112,953      $3,065,765      $2,896,483       $3,150,704     $1,905,464    $1,245,240       $0.33        $0.69          $239           $1,153,368    $697,527    ($0.12)    ($87)            $151                 $384                   $535
 16   2045      $83,350,180     $5,556,679        $3,334,007    $8,890,686      $3,157,738      $2,773,229       $2,959,719     $1,789,961    $1,169,758       $0.31        $0.64          $224           $1,153,368    $697,527    ($0.12)    ($87)            $137                 $396                   $532
 17   2046      $77,793,501     $5,556,679        $3,111,740    $8,668,419      $3,252,471      $2,711,601       $2,704,347     $1,635,519    $1,068,828       $0.28        $0.59          $205           $1,153,368    $697,527    ($0.12)    ($87)            $117                 $407                   $525
 18   2047      $72,236,822     $5,556,679        $2,889,473    $8,446,152      $3,350,045      $2,619,160       $2,476,947     $1,497,993      $978,954       $0.26        $0.54          $188           $1,153,368    $697,527    ($0.12)    ($87)            $100                 $420                   $520
 19   2048      $66,680,144     $5,556,679        $2,667,206    $8,223,884      $3,450,546      $2,465,092       $2,308,246     $1,395,967      $912,279       $0.24        $0.50          $175           $1,153,368    $697,527    ($0.12)    ($87)             $87                 $432                   $520
 20   2049      $61,123,465     $5,556,679        $2,444,939    $8,001,617      $3,554,062      $2,277,129       $2,170,426     $1,312,617      $857,809       $0.23        $0.47          $164           $1,153,368    $697,527    ($0.12)    ($87)             $77                 $445                   $522
 21   2050      $55,566,786     $5,556,679        $2,222,671    $7,779,350      $3,660,684      $2,049,108       $2,069,558     $1,251,615      $817,943       $0.22        $0.45          $157           $1,153,368    $697,527    ($0.12)    ($87)             $69                 $459                   $528
 22   2051      $50,010,108     $5,556,679        $2,000,404    $7,557,083      $3,770,505      $1,818,005       $1,968,573     $1,190,542      $778,031       $0.21        $0.43          $149           $1,153,368    $697,527    ($0.12)    ($87)             $62                 $472                   $534
 23   2052      $44,453,429     $5,556,679        $1,778,137    $7,334,816      $3,883,620      $1,583,020       $1,868,175     $1,129,824      $738,351       $0.20        $0.41          $142           $1,153,368    $697,527    ($0.12)    ($87)             $54                 $486                   $541
 24   2053      $38,896,750     $5,556,679        $1,555,870    $7,112,549      $4,000,129      $1,349,638       $1,762,782     $1,066,085      $696,697       $0.18        $0.38          $134           $1,153,368    $697,527    ($0.12)    ($87)             $46                 $501                   $547
 25   2054      $33,340,072     $5,556,679        $1,333,603    $6,890,282      $4,120,132      $1,115,454       $1,654,695     $1,000,716      $653,978       $0.17        $0.36          $125           $1,153,368    $697,527    ($0.12)    ($87)             $38                 $516                   $554
 26   2055      $27,783,393     $5,556,679        $1,111,336    $6,668,014      $4,243,736                       $2,424,278     $1,466,140      $958,138       $0.25        $0.53          $184           $1,153,368    $697,527    ($0.12)    ($87)             $96                 $532                   $628
 27   2056      $22,226,715     $5,556,679          $889,069    $6,445,747      $4,371,048                       $2,074,699     $1,254,724      $819,975       $0.22        $0.45          $157           $1,153,368    $697,527    ($0.12)    ($87)             $70                 $547                   $617
 28   2057      $16,670,036     $5,556,679          $666,801    $6,223,480      $4,502,180                       $1,721,300     $1,040,998      $680,303       $0.18        $0.37          $130           $1,153,368    $697,527    ($0.12)    ($87)             $43                 $564                   $607
 29   2058      $11,113,357     $5,556,679          $444,534    $6,001,213      $4,637,245                       $1,363,968       $824,892      $539,075       $0.14        $0.30          $103           $1,153,368    $697,527    ($0.12)    ($87)             $16                 $581                   $597
 30   2059       $5,556,679     $5,556,679          $222,267    $5,778,946      $4,776,363                       $1,002,583       $606,336      $396,247       $0.10        $0.22          $76            $1,153,368    $697,527    ($0.12)    ($87)            ($11)                $598                   $587

                            $166,700,359     $103,354,223 $270,054,582         $96,427,381     $66,057,503     $107,569,698   $65,055,356 $42,514,341         $11.23        $23.43        $8,148          29,242,776   17,685,271   ($3.05)   ($2,215)         $5,933               $12,078               $18,011
                      Percent Share of Annual Debt Service   100%                36%             24%              40%                                                                                     11%
                                                                                                               Average Cost Per $1,000 / Year to Taxpayer      $0.37         $0.78         $272                                     ($0.10)   ($73.84)          $198                 $403                   $600




         Galvin MS Funding Requirement Estimates V.10.xlsx                                                                                             Opt. 9 $240.26MM GMS PROJECT                                                                                                                    PAGE 7