STRATEGIC FRAMEWORK 2020-2025


STRATEGIC AREAS OF FOCUS
What is the Strategic Framework? The Strategic Framework 2020‐2025 is an implementation schedule of the short‐term or ongoing action items presented in
The Canton Master Plan. The strategic framework includes the guideline principles and rational behind each strategic area of focus. In addition to specific action
items, the framework identifies responsible municipal parties. (bold represents the Lead Responsible Party).


LIVE
 Housing & Neighborhoods
 Guiding Principle: Canton will have homes for residents at all stages of life and with diverse incomes.
 Rationale for Long‐term Strategic Objectives: The availability of homes in Canton that meet the needs of residents at all stages of life and
 incomes will open opportunities for young people to move into Canton, but also allow older residents to stay and “age in place.”
 Sub‐Section                       Action Item                                                                         Responsible Parties                          Timeframe
 A. Maintain an Inventory of Deed Restricted Affordable Housing Beyond 10%
                                                                                                                                                                    Short‐
 Housing &               A.1. Continue to monitor the progress of the Town’s Housing Action Plan and update as                                                      Term
                                                                                                                       Town Planner, Planning Board
 Neighborhoods           required.                                                                                                                                  (within 5
                                                                                                                                                                    years)
                                                                                                                       Canton Housing Authority, Commission on
 Housing &               A.3. Continue to support the maintenance and possible expansion of existing Housing
                                                                                                                       Disability, Community Preservation           Ongoing
 Neighborhoods           Authority properties.
                                                                                                                       Committee
                         A.4. Use Comprehensive Permit applications strategically to permit individual projects that
 Housing &
                         are consistent with the Town’s needs.                                                         Town Planner, Zoning Board of Appeals        Ongoing
 Neighborhoods




Canton Master Plan | Strategic Framework DRAFT                                 1                                                                      May 6, 2021

Source page 2

STRATEGIC FRAMEWORK 2020-2025

 B. Expand Housing Choice Throughout the Community
                                                                                                                                                                Short‐
 Housing &               B.1. Introduce the concept of missing middle housing options to the community and                                                      Term
                                                                                                                   Town Planner
 Neighborhoods           identify where different models could be appropriate.                                                                                  (within 5
                                                                                                                                                                years)
                                                                                                                                                                Short‐
 Housing &               B.2. Amend the Zoning Bylaw to remove impediments to the development of multi‐family                                                   Term
                                                                                                                   Town Planner, Planning Board
 Neighborhoods           housing models where they are already allowed.                                                                                         (within 5
                                                                                                                                                                years)
 C. Capture Housing Opportunities Unique to Specific Areas of Town
 Housing &               C.1. Continue to advance the development program and associated infrastructure            Paul Revere Heritage Commission, Town
                                                                                                                                                                Ongoing
 Neighborhoods           improvements for the Paul Revere Heritage Site.                                           Planner, Select Board
                                                                                                                                                                Short‐
                         C.2. Consider zoning provisions specifically tailored to the golf course parcels that
 Housing &                                                                                                                                                      Term
                         incentivize higher retention of protected open space and more flexible, environmentally   Town Planner, Planning Board
 Neighborhoods                                                                                                                                                  (within 5
                         sensitive design.
                                                                                                                                                                years)
 D. Increase Capacity to Implement Housing Strategies
                         D.1. Continue direct support of the Canton Housing Authority through contributions from
 Housing &                                                                                                         Canton Housing Authority, Community
                         the Community Preservation Act funds and direct engagement during the update of the                                                    Ongoing
 Neighborhoods                                                                                                     Preservation Committee
                         Housing Action Plan or drafting of the Housing Production Plan as applicable.
                                                                                                                                                                Easy Win
 Housing &
                         D.2. Establish an advisory Housing Committee.                                             Select Board, Town Planner                   (within 2
 Neighborhoods
                                                                                                                                                                years)
                                                                                                                                                                Short‐
 Housing &                                                                                                         Town Planner, Select Board, Planning         Term
                         D.3. Pursue the establishment of an Affordable Housing Trust.
 Neighborhoods                                                                                                     Board                                        (within 5
                                                                                                                                                                years)
 Housing &               D.4. Continue to seek assistance from state‐level programs/agencies for the
                                                                                                                   Town Planner, Select Board                   Ongoing
 Neighborhoods           implementation of housing policy initiatives.




Canton Master Plan | Strategic Framework DRAFT                               2                                                                    May 6, 2021

Source page 3

STRATEGIC FRAMEWORK 2020-2025

                                                                                                                                                                      Short‐
 Housing &                D.5. Explore the formation of a Regional Housing Services Organization with neighboring                                                     Term
                                                                                                                          Town Planner
 Neighborhoods            communities, and with assistance from MAPC.                                                                                                 (within 5
                                                                                                                                                                      years)
 Public Health & Social Wellbeing
 Guiding Principle: Canton will recognize the challenges of its most vulnerable community members and rise to meet their needs. Canton will strive
 to ensure physical and economic access for all residents to make healthy choices that enhance quality of life for all ages.
 Rationale for Long‐term Strategic Objectives: The physical make‐up of our community and the ability to access needed services impact the physical
 and mental health of residents.
 Sub‐Section                                                  Action Item                                                 Responsible Parties                         Timeframe
 A. Support Vulnerable Residents in the Community
                    A.1. Conduct community needs assessments to identify gaps in health and social services for
                                                                                                                                                                      Short‐Term
 Public Health &    current and future residents, particularly older residents and low‐income families and individuals.   Town Planner, Health Department, Canton
                                                                                                                                                                      (within 5
 Social Wellbeing   Consider additional staff and operational reorganization as needed (e.g. Substance Abuse              Public Schools, Council on Aging, CAASA
                                                                                                                                                                      years)
                    Coordinator).
                    A.2. Educate local decision‐makers on the impacts of their decisions on public health and social
                    wellbeing of Canton residents. Create an advisory committee for public health issues with             Health Department, Town Planner, CAASA,     Short‐Term
 Public Health &
                    municipal departments, including Health, Council on Aging/Senior Center, Public Safety, Canton        Council on Aging, Public Safety, Schools,   (within 5
 Social Wellbeing
                    Public Schools, Planning, and others. Use the advisory committee to improve the coordination          Commission on Disability                    years)
                    and communication of public health and social issues and services in Canton.
                    A.3. Promoting health and equity lens into local decision making/ health impacts of proposed          Town Planner, Planning Board, Board of
 Public Health &
                    projects, improving communication and coordination across health and social services in Town.         Health, Council on Aging, Commission on     Ongoing
 Social Wellbeing
                    Consider additional staffing and organizational changes as needed.                                    Disability
                                                                                                                                                                      Easy Win
 Public Health &    A.4. Explore partnerships with regional groups working on common public health issues to build
                                                                                                                          Health Department                           (within 2
 Social Wellbeing   collaborations.
                                                                                                                                                                      years)
 Public Health &    A.5. Continue performing a regular Youth Risk Assessment at the middle school and high school
                                                                                                                          Canton Public Schools                       Ongoing
 Social Wellbeing   levels and sharing data with other departments.




Canton Master Plan | Strategic Framework DRAFT                                  3                                                                      May 6, 2021

Source page 4

STRATEGIC FRAMEWORK 2020-2025

                    A.6. Develop town policies that support all ages and promote accessibility. These include
                                                                                                                        Town Planner, Engineering, Parks and
 Public Health &    diversifying housing types and designs that are more accessible and affordable, improving walking
                                                                                                                        Recreation, Council on Aging, Commission     Ongoing
 Social Wellbeing   and biking connections, addressing ADA concerns at town‐owned and managed facilities, and
                                                                                                                        on Disability
                    building opportunities for intergenerational events.
                    A.7. Look for opportunities to add space to the Senior Center to accommodate immediate needs
                                                                                                                                                                     Short‐Term
 Public Health &    and its expanding role in the community, both for the Town’s growing aging population but also
                                                                                                                        Council on Aging, Select Board               (within 5
 Social Wellbeing   serving other vulnerable residents.
                                                                                                                                                                     years)

                    A.8. Evaluate transportation needs for seniors and consider options to expand services offered by                                                Easy Win
 Public Health &
                    the Senior Center with other town‐wide transit needs, such as residents with disabilities,          Council on Aging, Commission on Disability   (within 2
 Social Wellbeing
                    students, and others. Include an evaluation of transportation needs to the Canton Food Pantry.                                                   years)
                    A.9. Promote the TND and TOD models at appropriate scales for new and infill development.
 Public Health &
                    Encourage a mix of uses, housing types, public spaces, and walking and biking connections to        Town Planner                                 Ongoing
 Social Wellbeing
                    neighboring developments.
 B. Promote Active Living in the Community
                                                                                                                                                                     Short‐Term
 Public Health &    B.1. Develop a comprehensive assessment for recreational needs with a focus on vulnerable
                                                                                                                        Parks and Recreation, Town Planner           (within 5
 Social Wellbeing   populations and areas that lack in Canton.
                                                                                                                                                                     years)
 Public Health &                                                                                                        Town Planner, Parks and Recreation,
                    B.2. Provide pedestrian and bicycle connections between parks and other recreational facilities.                                                 Ongoing
 Social Wellbeing                                                                                                       Conservation Agent, Engineering
 Public Health &    B.3. Continue to support the integration of walking and biking amenities into new development
                                                                                                                        Town Planner                                 Ongoing
 Social Wellbeing   proposals and the redevelopment of Route 138.




Canton Master Plan | Strategic Framework DRAFT                                  4                                                                    May 6, 2021

Source page 5

STRATEGIC FRAMEWORK 2020-2025

 Town Services
 Guiding Principle: Canton will continue to deliver high quality services through efficient, transparent, and open government where all residents can
 participate in local decision‐making. Canton will promote meaningful civic engagement and participation in local decision‐making by all residents.
 Rationale for Long‐term Strategic Objectives: Town services are critical to local quality of life is the capacity of the Town to understand and meet
 the needs of residents and provide opportunities for civic engagement that support open and transparent government.
 Sub‐Section                Action Item                                                                                                Responsible Parties          Timeframe
 A. Evaluate Capacity with Needs
                            A.1. Continue to pursue land use policies that will increase tax revenue in areas identified for future    Town Planner, Planning
 Town Services                                                                                                                                                       Ongoing
                            growth.                                                                                                    Board

                            A.2. Continue supporting all departments to compete for grants that could provide training, planning
 Town Services                                                                                                                         Public Works, Select Board    Ongoing
                            support, or funds for physical improvements to roads and facilities.

                            A.3. Where possible, identify where matching or supplementary funds will be needed for grants the
 Town Services                                                                                                                         Town Planner                  Ongoing
                            Town wishes to pursue and ensure those funds are available.
 B. Support our Public Schools
                            B.1. Continue to support the recent proposal to restructure how the facilities are used and the location
 Town Services                                                                                                                         Canton Public Schools         Ongoing
                            of students/school district offices identified in the Canton Public Schools facilities assessment plan.
                            B.2. Engage the Canton Public Schools, faculty, and students in municipal planning issues that go
 Town Services                                                                                                                         Town Planner                  Ongoing
                            beyond the public schools (e.g., housing, recreation, walking and biking, etc.)
                            B.3. Continue coordination with regional technical schools to broaden educational and job                  Economic Development
 Town Services                                                                                                                                                       Ongoing
                            opportunities for Canton’s youth.                                                                          Committee
 Town Services              B.4. Implement Canton Public Schools Master Plan (2017).                                                   Canton Public Schools         Ongoing
 Town Services              B.5. Maintain and upgrade facilities according to Master and Capital plans                                 Canton Public Schools         Ongoing
                                                                                                                                                                     Easy Win (within
 Town Services              B.6. Resolve vehicular and pedestrian access and parking at Luce Elementary School                         Canton Public Schools
                                                                                                                                                                     2 years)
                                                                                                                                                                     Short‐term
 Town Services              B.7. Retain funding and plans to renovate/expand or replace Galvin Middle School                           Canton Public Schools
                                                                                                                                                                     (within 5 years)
 C. Promote Inter‐Department Communication
 Town Services              C.2. Continue to advance the use of electronic applications for permit submittal and review.               Engineering, Town Planner     Ongoing


Canton Master Plan | Strategic Framework DRAFT                                   5                                                                       May 6, 2021

Source page 6

STRATEGIC FRAMEWORK 2020-2025

                             C.3. Develop a strategic plan to create and maintain a comprehensive list of data points currently
                             managed by each department. The strategic plan should define the parameters for data points, how             Information Systems
                                                                                                                                                                      Easy Win (within
 Town Services               data points will be used to measure progress in reaching local goals and objectives, and different ways      Manager, Town
                                                                                                                                                                      2 years)
                             in which departments can share and support the collection of data. State and federal requirements,           Administrator
                             restrictions, and obligations regarding data sharing must be followed.
                             C.4. Identify which data from every municipal department can be digitized into the municipal GIS                                         Short‐Term
 Town Services                                                                                                                            Engineering, Town Planner
                             database and complete digitization.                                                                                                      (within 5 years)
                             C.5. Identify opportunities to have more than one municipal department compete for and work on               Town Administrator,
 Town Services                                                                                                                                                        Ongoing
                             grant funded projects.                                                                                       Town Planner
 D. Create a Culture of Civic Participation
                             D.1. Continue to support the Canton Center for Civic Engagement and its efforts with the Canton Public
 Town Services                                                                                                                            Canton Public Library       Ongoing
                             Library to promote volunteerism among Canton teens and adults.
                             D.2. Explore other opportunities, such as reviving Canton Day, to bring residents together to learn
                                                                                                                                          Parks and Recreation,       Easy Win (within
 Town Services               about town functions and services, meet local decision makers, and promote opportunities for
                                                                                                                                          Town Planner                2 years)
                             residents to participate in local government.
                             D.3. Evaluate new technology opportunities, including proprietary products, that can enhance the             Information Systems
                                                                                                                                                                      Short‐Term
 Town Services               ability of local government to disseminate information and receive public input. Invest in annual            Manager, Town
                                                                                                                                                                      (within 5 years)
                             training for municipal staff related to the use of new technology and software.                              Administrator
                             D.4. Using the 2018 Social Media and Citizen’s Engagement Assessment as a guide, continue to
                                                                                                                                          Information Systems
                             improve policies and utilization of social media as an effective communication tool. Annually revisit the
 Town Services                                                                                                                            Manager, Town               Ongoing
                             assessment to ensure policies are current. Invest in annual training for municipal staff related to social
                                                                                                                                          Administrator
                             media usage and policies.
                             D.5. Support training of town staff in meeting facilitation and public engagement techniques (high and
                                                                                                                                                                      Short‐Term
 Town Services               low tech) to ensure effective communication before, during, and after public meetings, workshops,            Town Administrator
                                                                                                                                                                      (within 5 years)
                             and other town‐sponsored events.
                             D.6. Develop an outreach strategy to increase participation in town boards and committees to fill                                        Short‐Term
 Town Services                                                                                                                            Town Administrator
                             vacancies.                                                                                                                               (within 5 years)




Canton Master Plan | Strategic Framework DRAFT                                    6                                                                       May 6, 2021

Source page 7

STRATEGIC FRAMEWORK 2020-2025

                          D.7. Understand reasons for low to moderate participation in public meetings, workshops, and other
                          town‐sponsored events. Offer incentives to encourage attendance:
                           Consider offering food, childcare, and other reasonable incentives to encourage attendance, and
                            consider whether the timing and location of meetings is a barrier to attendance.
                           Evaluate the process by which meetings and workshops are advertised or promoted and consider
 Town Services                                                                                                                     Town Planner             Ongoing
                            more creative ways that are eye‐catching.
                           Ensure that the process is clear for the event, describing when and how the public can participate
                            and voice their ideas during the event.
                           Use multiple strategies to engage the public, using in‐person events and online options. Think about
                            different technology and how user‐friendly they are.




Canton Master Plan | Strategic Framework DRAFT                               7                                                                    May 6, 2021

Source page 8

STRATEGIC FRAMEWORK 2020-2025


WORK
 Guiding Principle: Canton will foster equitable economic prosperity and stability by retaining and expanding businesses of all sizes in collaboration
 with the business community.
 Rationale for Long‐term Strategic Objectives: Canton residents love their community for its high quality of life, diverse residential neighborhoods,
 and abundant recreational opportunities, but beyond being a great place to live, Canton is home to numerous businesses and employment
 opportunities. In fact, many are surprised to learn that Canton actually has more jobs than it has residents. Canton’s varied range of industries and
 businesses contributes to the economic vitality of the town while providing a range of job opportunities close to residents and also bolstering the
 tax base. Continuing to support a diverse and competitive local economy makes the Town an attractive place for employers and residents alike.
 Businesses in Canton rely on the Town to foster a business‐friendly climate, provide critical services and infrastructure, maintain accessibility
 through roads and sidewalks, ensure that employees and customers have safe places to live, and provide high‐quality education. Likewise, the
 Town relies on businesses to create employment opportunities, provide goods and services to its residents, and support the Town’s fiscal health
 through taxes.
 Sub‐
 Secti
 on      Action Item                                                                                                                                      Responsible Parties   Timeframe
 A. Create Mixed‐Use Environments that Attract Businesses
         A.2. Encourage a mix of uses in the town’s suburban‐style business parks, including restaurants, retail, services, entertainment, recreation,                          Short‐Term
                                                                                                                                                          Town Planner,
   ‐     etc. to increase market competitiveness. This includes standalone uses as well as adding amenities to existing office buildings. Adjust zoning                         (within 5
                                                                                                                                                          Planning Board
         as needed.                                                                                                                                                             years)
 B. Support Business Growth and Viability
                                                                                                                                                          Economic              Easy Win
         B.1. Regularly communicate with businesses to understand and address needs. Implement a business visitation program that ensures
   ‐                                                                                                                                                      Development           (within 2
         regular dialog between the town and its businesses.
                                                                                                                                                          Committee             years)
                                                                                                                                                          Economic
                                                                                                                                                                                Easy Win
                                                                                                                                                          Development
   ‐     B.2. Identify funding sources for businesses and property owners to address needs and increase awareness of opportunities.                                             (within 2
                                                                                                                                                          Committee,
                                                                                                                                                                                years)
                                                                                                                                                          Town Planner



Canton Master Plan | Strategic Framework DRAFT                                      8                                                                       May 6, 2021

Source page 9

STRATEGIC FRAMEWORK 2020-2025

                                                                                                                                                           Economic        Easy Win
  ‐    B.3. Partner with Canton Association of Business and Industry (CABI) and work together to pursue joint goals.                                       Development     (within 2
                                                                                                                                                           Committee       years)
                                                                                                                                                           Economic        Easy Win
       B.5. Open lines of communication with businesses owners and implement policies to support small retailers and improve their ability to
  ‐                                                                                                                                                        Development     (within 2
       remain viable. Work with CABI.
                                                                                                                                                           Committee       years)
 C. Market Canton as “Open for Business”
                                                                                                                                                           Economic        Easy Win
       C.1. Continue to offer economic incentives to encourage strategic commercial growth and development in Canton. Use tools such as Tax
  ‐                                                                                                                                                        Development     (within 2
       Increment Financing (TIF) to attract commercial development that aligns with town goals and strategies.
                                                                                                                                                           Committee       years)
                                                                                                                                                           Economic        Short‐Term
       C.2. Target attraction of regional growth sectors, including professional and technical services, bio and life sciences, health technology, and
  ‐                                                                                                                                                        Development     (within 5
       information technology.
                                                                                                                                                           Committee       years)
                                                                                                                                                           Economic        Short‐Term
  ‐    C.3. Target businesses that support the Town’s goals in areas such as arts and culture and sustainability.                                          Development     (within 5
                                                                                                                                                           Committee       years)
                                                                                                                                                           Economic        Short‐Term
  ‐    C.4. Attract more retail shops and restaurants to serve the needs of residents and employees. Work with CABI.                                       Development     (within 5
                                                                                                                                                           Committee       years)
       C.5. Expand external marketing efforts, including a professional economic development website. Include resources for businesses interested
                                                                                                                                                           Economic        Easy Win
       in locating in Canton, including information about available sites and utilities infrastructure, workforce availability for key industry sectors,
  ‐                                                                                                                                                        Development     (within 2
       demographic information for retail businesses, relevant approval and permitting processes, and available incentives. Work with CABI. This
                                                                                                                                                           Committee       years)
       may require additional staff, such as an Economic Development Director.
 D. Target Properties with Opportunity
                                                                                                                                                           Town Planner,
                                                                                                                                                                           Short‐Term
       D.1. Identify underutilized and/or vacant sites, work with property owners to recognize challenges and barriers to development and provide          Economic
  ‐                                                                                                                                                                        (within 5
       informational resources and potential funding sources.                                                                                              Development
                                                                                                                                                                           years)
                                                                                                                                                           Committee
                                                                                                                                                           Economic        Easy Win
       D.2. Assist with marketing of properties with commercial development potential, including listings on the town economic development
  ‐                                                                                                                                                        Development     (within 2
       website and state site selection websites, such as MassEcon.
                                                                                                                                                           Committee       years)




Canton Master Plan | Strategic Framework DRAFT                                     9                                                                         May 6, 2021

Source page 10

STRATEGIC FRAMEWORK 2020-2025

 E. Support Workforce Needs
                                                                                                                                                                            Short‐Term
           E.1. Continue partnering Canton High School with Blue Hills Regional Vocational Technical School, and explore further partnerships with       Canton Public
  ‐                                                                                                                                                                         (within 5
           Massasoit Community College, to connect businesses with talent pipelines.                                                                     Schools
                                                                                                                                                                            years)
                                                                                                                                                                            Short‐Term
  ‐        E.2. Partner with employers to make first/last mile connections between commuter rail stations and businesses.                                Town Planner       (within 5
                                                                                                                                                                            years)



PLAY
 Guiding Principle: Canton will offer community spaces and programs that enable people of all ages to be active and socialize.
 Rationale for Long‐term Strategic Objectives: Recreation, leisure activity, relaxation, and play are integral to our health and social wellbeing. Since
 the early 1900s, park and open space advocates have voiced the importance of these spaces for individuals, particularly those in more urban
 environments. These activities have physiological and mental health benefits, offering opportunities to be active with our bodies and “unplug” our
 minds from everyday stress, reconnecting with nature. They are also important as communitywide resources because they provide places for
 informal gatherings as well as organized community events and recreational programming. Beyond benefits to people, parks and open spaces also
 have ecological and economic functions. For example, land conserved as open space for activities like hiking can provide habitat for wildlife,
 recharge areas to protect water quality, and floodplain protection to help manage floodwaters. Parks and open spaces also contribute to the local
 economy. Protected open space enhances property values and provides an attractive amenity to new residents and business owners. Visitors to
 local parks and open spaces will spend money locally, supporting businesses.
 Sub‐
 Section      Action Item                                                                                                        Responsible Parties                     Timeframe
 A. Build on Existing Planning Efforts
      ‐       A.1. Implement the Trails Master Plan, including, but not limited to:
               Improve trail visibility, safety, access, and use through Canton trails information online; trailhead signage;
                 trail signage and markers; information kiosks; parking, vehicular access, and accessibility; and trail maps     Parks and Recreation, Town Planner      Ongoing
                 and descriptions, among other initiatives.
               Invest in the maintenance and upkeep of trails.




Canton Master Plan | Strategic Framework DRAFT                                        10                                                                   May 6, 2021

Source page 11

STRATEGIC FRAMEWORK 2020-2025

          A.2. Revisit and update the Pequitside Farm Master Plan to implement select recommendations, including, but
          not limited to:
           Improve circulation through the site to park and access buildings.
                                                                                                                        Conservation Commission,
    ‐      Explore new activities that enhance existing uses and features of the site.                                                                           Ongoing
                                                                                                                        Conservation Agent
           Enhance and manage natural resources, including a management plan, restoration of the open meadow,
             long‐range plan to manage successional growth trees, and explore the creation of an environmental
             education center.
          A.3. Implement the Canton Open Space and Recreation Plan (OSRP) through its:
           Seven‐Year OSRP Action Plan, which addresses natural resource protection needs, community needs, and        Parks and Recreation, Council on Aging,
    ‐                                                                                                                                                             Ongoing
             management needs.                                                                                          Commission on Disability
           ADA Transition Plan to improve access for those with disabilities.
          A.4. Implement the Earl Newhouse Waterfront Plan, including, but not limited to:
           Implement invasive species management.
    ‐      Improve trail maintenance and access.                                                                       Conservation Agent, Town Planner          Ongoing
           Improve drive access and parking.
           Add site amenities such as benches, picnic areas, signage, and kayak launch, among others.
 B. Increase Access to Parks and Open Spaces
          B.3. Work with local businesses to develop recreational opportunities for their employees that also offer     Economic Development Committee,           Short‐Term
    ‐
          access for residents. Focus on potential opportunities along Route 138.                                       Town Planner                              (within 5 years)
                                                                                                                        Conservation Commission, Commission
    ‐     B.4. Improve/maintain accessibility of conservation areas.                                                                                              Ongoing
                                                                                                                        on Disability
                                                                                                                        Parks and Recreation, Commission on
          B.5. Improve/maintain accessibility of recreation areas.                                                                                                Ongoing
                                                                                                                        Disability
 C. Build Awareness of Local Resources
                                                                                                                        Parks and Recreation, Conservation
          C.1. Develop new communication strategies that will increase public knowledge about local parks, open                                                   Short‐Term
    ‐                                                                                                                   Commission, Commission on Disability,
          spaces, and recreational opportunities. Use multi‐media approaches and consider high and low‐tech options.                                              (within 5 years)
                                                                                                                        Council on Aging
          C.5. Work with the Health Department and cross‐departmental teams to encourage healthy activities for         Parks and Recreation, Health
    ‐                                                                                                                                                             Ongoing
          adults, youth, and children at the Town’s open space and recreation areas.                                    Department




Canton Master Plan | Strategic Framework DRAFT                                   11                                                                 May 6, 2021

Source page 12

STRATEGIC FRAMEWORK 2020-2025


CONNECT
 Guiding Principle: Canton will support a safe, efficient, and convenient multimodal transportation system that serves the town’s residents and
 businesses as well as neighboring communities.
 Rationale for Long‐term Strategic Objectives: Canton’s proximate location in the Greater Boston region to transportation networks makes it a
 desirable place to live and work; however, it also exposes Canton to a great deal of traffic, making it challenging to balance regional and local
 access needs. Connectivity supports economic development, recreational and open space access, housing choice, and public infrastructure and it is
 in the Town’s best interest to enhance and broaden transportation choices in Canton.
 Neighborhood Connections
 Sub‐Section           Action Item                                                                                          Responsible Parties          Timeframe
 A. Address Walking and Biking Safety
                       A.1a. Advance preliminary design for Complete Streets projects to take advantage of using existing
 Neighborhood
                       local and state funding sources, such as Chapter 90 funds, development mitigation, Safe Routes to    Engineering, Town Planner    Easy Win (within 2 years)
 Connections
                       School, and MassWorks Infrastructure Program Grants: Top 5 projects in prioritization.
                       A.1b. Advance preliminary design for Complete Streets projects to take advantage of using existing
 Neighborhood                                                                                                                                            Short‐Term (within 5
                       local and state funding sources, such as Chapter 90 funds, development mitigation, Safe Routes to    Engineering, Town Planner
 Connections                                                                                                                                             years)
                       School, and MassWorks Infrastructure Program Grants: Next 5 projects in prioritization.
                       A.2a. Advance final design and construction for prioritized Complete Streets Projects through the
 Neighborhood
                       funding sources outlined above, as well as construction funding through the State Transportation     Engineering, Town Planner    Easy Win (within 2 years)
 Connections
                       Improvement Program (TIP) and MassDOT Complete Streets Funding program: Top 5 projects
                       A.2b. Advance final design and construction for prioritized Complete Streets Projects through the
 Neighborhood                                                                                                                                            Short‐Term (within 5
                       funding sources outlined above, as well as construction funding through the State Transportation     Engineering, Town Planner
 Connections                                                                                                                                             years)
                       Improvement Program (TIP) and MassDOT Complete Streets Funding program: Next 5 projects
 Neighborhood          A.3. Monitor the performance of all transportation projects to evaluate multimodal benefits and      Engineering, Town Planner,
                                                                                                                                                         Ongoing
 Connections           impacts and to ensure projects meet stated goals.                                                    Walk Bike Hike Committee
 C. Continue to Participate in the Safe Routes to School Program
 Neighborhood          C.1. Pursue Safe Routes to Schools Program Funding for educational programs and infrastructure       Canton Public Schools,
                                                                                                                                                         Easy Win (within 2 years)
 Connections           upgrades.                                                                                            Town Planner, Public Works




Canton Master Plan | Strategic Framework DRAFT                                12                                                                    May 6, 2021

Source page 13

STRATEGIC FRAMEWORK 2020-2025

 D. Improve Accessibility for All Ages and Abilities
                                                                                                                                 Town Planner, Council on
 Neighborhood
                         D.1. Identify funding sources to improve transportation services for persons with disabilities.         Aging, Commission on            Easy Win (within 2 years)
 Connections
                                                                                                                                 Disability,
                         D.2. Conduct an ADA audit of key corridors in town to identify locations in need of improvements        Engineering, Building
 Neighborhood                                                                                                                                                    Short‐Term (within 5
                         such as curb ramps, crosswalks, and accessible pedestrian signals, especially in relation to schools,   Department, Commission
 Connections                                                                                                                                                     years)
                         bus stops and commuter rail stations.                                                                   on Disability, Town Planner
 E. Connect New Development with Existing Places
                         E.1. Strengthen zoning that requires on‐site pedestrian circulation and linkages that build on
 Neighborhood            existing networks and consistently uphold these standards to promote connections between new            Town Planner, Planning          Short‐Term (within 5
 Connections             development and redevelopment projects and existing neighborhoods (e.g., large development              Board                           years)
                         sites to residential cul‐de‐sacs).
                         E.2. Review the zoning code to ensure zoning requires adequate parking for new projects (i.e. not
                         too much, not too little) to promote alternative modes of transportation and reduce drive alone
 Neighborhood                                                                                                                    Town Planner, Planning          Short‐Term (within 5
                         trips. For example, parking maximums instead of parking minimums, shared parking, spaces
 Connections                                                                                                                     Board                           years)
                         dedicated to carshare or electric vehicle charging stations, designated shared ride pick up/drop off
                         zones, and requiring bicycle parking.
                         E.3. Consider the connection between transportation needs and land use for future development
 Neighborhood            to manage traffic and parking demand – integrate traffic impact studies and peer reviews of traffic
                                                                                                                                 Town Planner, Engineering       Easy Win (within 2 years)
 Connections             studies for planned developments. Assess parking regulations and adopt policies that encourage
                         shared parking where appropriate.



 Town‐wide Connections
 Sub‐Section               Action Item                                                                                                     Responsible Parties             Timeframe
 A. Use Low‐Cost Techniques to Improve Traffic and Safety on Local Streets
                           A.1. Continue to evaluate the feasibility and cost of recommendations for the two Master Plan                                                   Easy Win
                                                                                                                                           Town Planner,
 Town‐Wide Connections     transportation Focus Area for implementation: Washington Street at Pleasant Street and Washington Street                                        (within 2
                                                                                                                                           Engineering, Public Works
                           at Neponset and Church streets.                                                                                                                 years)
                           A.2. Explore locations for implementing short‐term, low‐cost operational improvements such as traffic                                           Easy Win
                                                                                                                                           Engineering, Town
 Town‐Wide Connections     signal timing, pavement markings, and vehicle detection including loop detectors and video detection to                                         (within 2
                                                                                                                                           Planner, Public Works
                           improve traffic flow and reduce delay.                                                                                                          years)


Canton Master Plan | Strategic Framework DRAFT                                     13                                                                     May 6, 2021

Source page 14

STRATEGIC FRAMEWORK 2020-2025

                                                                                                                                                                       Easy Win
                         A.4. Investigate the impact of lowering speed limits on certain roads and using tactics such as temporary        Engineering, Traffic
 Town‐Wide Connections                                                                                                                                                 (within 2
                         feedback signs (also known as “Your Speed” signs) to improve safety.                                             Committee
                                                                                                                                                                       years)
                         A.5. Identify locations to implement traffic calming measures to improve safety. These may include                                            Short‐Term
                                                                                                                                          Engineering, Traffic
 Town‐Wide Connections   temporary bollards or pavement markings for rapid implementation and testing, or more permanent                                               (within 5
                                                                                                                                          Committee
                         measures like raised crosswalks, curb extensions, and pedestrian crossing islands.                                                            years)
 B. Expand Local Transit Options
                         B.1. Update/expand upon findings of the Creating Transit Links in Canton, MA (2017) report to expand                                          Short‐Term
 Town‐Wide Connections   first/last mile connections to transit through a public‐private partnership with ride‐hailing apps, or another   Town Planner                 (within 5
                         identified method such as local shuttle service.                                                                                              years)
                                                                                                                                          Town Planner,                Short‐Term
                         B.2. Work with the MBTA to improve signage and bus stop visibility for Route 716 stops along Washington
 Town‐Wide Connections                                                                                                                    Engineering, Canton MBTA     (within 5
                         Street. Discuss other opportunities to increase transit options along Route 138.
                                                                                                                                          Representative               years)
                                                                                                                                                                       Easy Win
                                                                                                                                          Council on Aging, Town
 Town‐Wide Connections   B.3. Investigate potential use of Canton Senior Center vehicles for on‐demand shuttle use during off hours.                                   (within 2
                                                                                                                                          Planner
                                                                                                                                                                       years)
                         B.4. Encourage local businesses, especially those in the Royall Street area and along Route 138, to join the
                                                                                                                                                                       Easy Win
                         Neponset Valley TMA and/or participate in the Suburban Mobility Working Group to provide suburban
 Town‐Wide Connections                                                                                                                    Town Planner                 (within 2
                         transportation options such as private shuttles or emergency ride home programs to increase local transit
                                                                                                                                                                       years)
                         and reverse commute options for employees.
 C. Explore Shared Services
                                                                                                                                                                       Easy Win
 Town‐Wide Connections   C.1. Evaluate options for bike share companies to provide services in Canton.                                    Town Planner                 (within 2
                                                                                                                                                                       years)
                                                                                                                                                                       Short‐Term
                         C.2. Amend zoning to incentivize shared mobility through requiring drop‐off/pick‐up zones in new                 Town Planner, Planning
 Town‐Wide Connections                                                                                                                                                 (within 5
                         developments and reduce parking requirements.                                                                    Board
                                                                                                                                                                       years)
 D. Embrace and Support Emerging Mobility Options
                                                                                                                                                                       Short‐Term
                         D.1. Pursue technology to support connected vehicle infrastructure to improve safety, traffic circulation,
 Town‐Wide Connections                                                                                                                    Town Planner                 (within 5
                         and congestion management.
                                                                                                                                                                       years)




Canton Master Plan | Strategic Framework DRAFT                                  14                                                                       May 6, 2021

Source page 15

STRATEGIC FRAMEWORK 2020-2025

                                                                                                                                                                    Short‐Term
                          D.3. Add public charging stations at municipal buildings to implement recommendations from the 2017          Town Planner, Building
 Town‐Wide Connections                                                                                                                                              (within 5
                          Canton Energy Reduction Plan.                                                                                Department,
                                                                                                                                                                    years)
                          D.4. Consider revising Zoning By‐laws to establish performance standards that require electric vehicle                                    Short‐Term
                                                                                                                                       Town Planner, Planning
 Town‐Wide Connections    charging stations in new developments, which may be based on development size or number of overall                                        (within 5
                                                                                                                                       Board
                          spaces in provided parking areas.                                                                                                         years)
 E. Build East‐West Connections that Reduce Traffic
                          E.1. Identify public rights‐of‐way or easements (work with private landowners where applicable) with         Town Planner, Parks and      Short‐Term
 Town‐Wide Connections    potential for off‐road multi‐use paths to enhance walking and biking connectivity through town. Existing     Recreation, Conservation     (within 5
                          resources like MAPC’s Landline Vision Plan can be used to help create these connections.                     Commission                   years)
                          E.2. Consider applying similar regulations to Section 8, item 14 on “Sidewalks, Walkways, Bikeways, and
                                                                                                                                                                    Short‐Term
                          Shared Pathways” from the Town’s 2019 amended Land Subdivision Rules and Regulations to                      Town Planner, Planning
 Town‐Wide Connections                                                                                                                                              (within 5
                          new/redevelopment that may fall outside of these regulations to require connectivity with external           Board
                                                                                                                                                                    years)
                          roadway networks.



 Regional Connections
 Sub‐Section            Action Item                                                                                                  Responsible Parties            Timeframe
 A. Expand Transit Options to Employment Areas
                        A.1. Continue to participate in the Neponset Valley Transportation Management Association (TMA) and
 Regional Connections   Suburban Mobility Working Group meetings and expand the Town’s involvement to identify options for           Town Planner                   Ongoing
                        local transportation within Canton and between neighboring towns to reduce gaps in service.
                        A.2. Encourage businesses to join Neponset Valley TMA to provide transportation demand management
                        strategies. These include carpool incentives, emergency ride home programs, and transit benefits. An
                                                                                                                                                                    Easy Win
                        employer sponsored emergency ride home program, like that provided for members of the Neponset Valley
 Regional Connections                                                                                                                Town Planner                   (within 2
                        TMS, reimburses green commuters with a free ride home in the case of an emergency, which makes people
                                                                                                                                                                    years)
                        more likely to choose transit or another sustainable travel mode because they know they will have a free
                        alternative option should an emergency occur.
 B. Connect Residents to Commuter Rail Stations
                        B.1. Maintain awareness of the status of the Canton Interchange Project. Should the project secure funding
                                                                                                                                     Walk, Bike, Hike, Committee,
 Regional Connections   and move forward in the future, advocate for maintaining bicycle and pedestrian access to the Route 128                                     Ongoing
                                                                                                                                     Town Planner
                        Commuter Rail Station.


Canton Master Plan | Strategic Framework DRAFT                                  15                                                                    May 6, 2021

Source page 16

STRATEGIC FRAMEWORK 2020-2025

                                                                                                                                                                  Short‐Term
                        B.2. Amend zoning to include developer incentives to build connections to transit, whether that is
 Regional Connections                                                                                                              Town Planner, Planning Board   (within 5
                        walking/biking paths like Paul Revere Heritage Site, bike share, or shuttle services.
                                                                                                                                                                  years)
                                                                                                                                                                  Short‐Term
                        B.3. Explore the need for and establish park and ride locations and potential for shuttle to connect to
 Regional Connections                                                                                                              Town Planner                   (within 5
                        commuter rail.
                                                                                                                                                                  years)
 C. Increase Multimodal Options on Route 138
                                                                                                                                                                  Short‐Term
                        C.1. Work with the MassDOT to implement recommendations from the Route 138 MPO Study to improve            Town Planner, Engineering,
 Regional Connections                                                                                                                                             (within 5
                        multimodal conditions.                                                                                     Public Works
                                                                                                                                                                  years)
                                                                                                                                                                  Short‐Term
                        C.2. Incentivize use of transportation management strategies for larger developments to reduce single      Town Planner, Economic
 Regional Connections                                                                                                                                             (within 5
                        occupant vehicle trips to Route 138.                                                                       Development Committee
                                                                                                                                                                  years)
 D. Build on the Regional Walking and Biking Network
                                                                                                                                   Town Planner, Walk, Bike,
                                                                                                                                                                  Easy Win
                        D.2. Increase biking amenities such as bike racks, lanes, signage and markings where appropriate to        Hike, Committee, Building
 Regional Connections                                                                                                                                             (within 2
                        facilitate longer‐distance bike trips.                                                                     Department, Parks and
                                                                                                                                                                  years)
                                                                                                                                   Recreation
                        D.3. Evaluate “Desirable Connection Areas” identified in the 2018 Open Space and Recreation Plan to                                       Short‐Term
                                                                                                                                   Engineering, Town Planner,
 Regional Connections   identify design solutions to improve public and private trail connections as well as street and sidewalk                                  (within 5
                                                                                                                                   Parks and Recreation
                        connections to better link trail systems.                                                                                                 years)




Canton Master Plan | Strategic Framework DRAFT                                    16                                                               May 6, 2021

Source page 17

STRATEGIC FRAMEWORK 2020-2025


PROTECT
 Guiding Principle: Canton will preserve, promote, and encourage adaptive reuse of historic structures and sites to retain local, regional, and
 national history and heritage and reinforce community character. Canton will support a broad range of arts and cultural experiences that make the
 Town an interesting place to live, work, and visit. Canton will protect, enhance, and restore natural ecosystems and landscapes that support clean
 air and water, and contribute to life in Canton.
 Rationale for Long‐term Strategic Objectives: Our historic and cultural resources and natural environment provide social, economic, and
 environmental value to the community. We appreciate and enjoy them today, but if not protected, future generations could not experience
 Canton in the same way. These resources are at risk because of disinvestment, development or construction activities, lack of resources to sustain
 them, or even factors beyond the borders of Canton itself. Therefore, they need to be strengthened and maintained. They are worthy of
 protection to sustain Canton’s sense of place.
 Historic Resources
 Sub‐Section      Action Item                                                                                     Responsible Parties                   Timeframe
 B. Use Local Tools to Promote Preservation
 Historic         B.1. Identify opportunities and propose projects for CPA funds to acquire, rehabilitate, or     Canton Historical Commission          Ongoing
 Resources        otherwise preserve important historic resources.
 Historic         B.3. Recognize that historic preservation efforts can conflict with environmental and energy    Canton Historical Commission,         Ongoing
 Resources        efficiency goals but educate property owners on techniques for making historic structures       Building Department
                  more energy efficient.
 C. Increase Public Awareness
 Historic         C.1. Partner with the Canton Historical Society to build public knowledge of local historical   Canton Historical Commission,         Ongoing
 Resources        figures and events.                                                                             Canton Public Library
 Historic         C.3. Use diverse media, including lectures, visual and performing arts, and social media, to    Canton Public Library, Parks and      Ongoing
 Resources        provide a range of educational opportunities for residents.                                     Recreation, Council on Aging,
                                                                                                                  Commission on Disability
 Historic         C.4. Encourage the schools to weave local history into the curriculum to the degree possible.   Canton Historical Commission,         Easy Win (within 2 years)
 Resources                                                                                                        Canton Public Schools




Canton Master Plan | Strategic Framework DRAFT                                  17                                                                   May 6, 2021

Source page 18

STRATEGIC FRAMEWORK 2020-2025

 Arts & Culture
 A. Focus on Placemaking
 Arts & Culture      A.3. Continue to distribute financial resources through the Canton Cultural Council to          Canton Cultural Council                 Ongoing
                     support programming and capacity of Canton’s arts community.

 Arts & Culture      A.4. Identify funding opportunities that support placemaking programming and initiatives.       Town Planner                            Short‐Term (within 5
                     These might include signage, public art installations, promotional materials, and special                                               years)
                     events. Sources can be regional, state, or federal agencies as well as private organizations.
                     See Appendix C.



 NATURAL ECOSYSTEMS & LANDSCAPES
 A. Support Canton’s Stormwater Management Program
 Environmental    A.1. Find opportunities to incorporate green infrastructure on Town properties and in existing or planned
                                                                                                                               Public Works, Conservation Agent        Ongoing
 Stewardship      infrastructure.
 Environmental    A.2. Continue to prioritize green infrastructure wherever practicable to manage stormwater as part of
                                                                                                                               Public Works, Conservation Agent        Ongoing
 Stewardship      public projects and investments.
 Environmental    A.4. Continue involvement in regional collaborations to help meet common stormwater management
                                                                                                                               Public Works, Conservation Agent        Ongoing
 Stewardship      goals and objectives.
                  A.5. Educate residents, property owners, and businesses about benefits and different ways of stormwater
                                                                                                                               Town Planner, Public Works,
 Environmental    management on their properties. Promote the use of rain barrels, rain gardens, and permeable pavers for
                                                                                                                               Conservation Agent, Sustainability      Ongoing
 Stewardship      driveways and walkways, as well as limiting the use of fertilizers and cleaning up pet waste, among other
                                                                                                                               Committee
                  approaches.
 Environmental    A.6. Continue to evaluate standards for stormwater management in local regulations to ensure that best       Conservation Agent, Town Planner,
                                                                                                                                                                       Ongoing
 Stewardship      practices are required in proposed development.                                                              Public Works
 B. Protect Groundwater Sources & Build Capacity
                  B.1. Contribute to regional initiatives on water quality and groundwater protection (for example,            Public Works, Town Planner,
 Environmental
                  Neponset Valley Watershed Association, MWRA, Massachusetts Department of Environmental                       Conservation Agent, Sustainability      Ongoing
 Stewardship
                  Protection).                                                                                                 Committee
 Environmental    B.2. For commercial, industrial, mixed use, and multi‐family housing, require landscaping practices that     Town Planner, Planning Board,           Easy Win
 Stewardship      are drought tolerant.                                                                                        Conservation Commission,                (within 2 years)



Canton Master Plan | Strategic Framework DRAFT                                     18                                                                    May 6, 2021

Source page 19

STRATEGIC FRAMEWORK 2020-2025

 Environmental   B.3. Develop educational outreach programs and incentives that encourage efficient water use by             Public Works, Sustainability
                                                                                                                                                                     Ongoing
 Stewardship     residents and business owners.                                                                              Committee
 Environmental
                 B.4. Continue to maintain and upgrade the municipal water supply infrastructure and capacity.               Public Works                            Ongoing
 Stewardship
 C. Use Development Standards and Other Local Policies to Protect and Improve the Natural Environment
 Environmental   C.1. Continue requiring the use of low impact design (LID) standards in areas near significant natural      Town Planner, Planning Board,
                                                                                                                                                                     Ongoing
 Stewardship     resources and encourage them town‐wide wherever possible.                                                   Conservation Agent,
 Environmental   C.2. Prioritize acquisition of properties of high conservation value that abut existing open space and      Conservation Commission,
                                                                                                                                                                     Ongoing
 Stewardship     recreational properties.                                                                                    Conservation Agent
                 C.3. Develop policies that protect the Town’s tree canopy. This might include a tree ordinance that
 Environmental   regulates various aspects of tree planting, removal, and maintenance on public and/or private property.     Conservation Commission,                Short‐Term
 Stewardship     Consider adding staff to the Conservation Department to develop and implement this and other policy         Conservation Agent                      (within 5 years)
                 changes.
                 C.4. Provide standards and guidance for the installation of landscaping that is beneficial to the natural
 Environmental                                                                                                               Conservation Commission,                Short‐Term
                 environment. Consider adding staff to the Conservation Department to develop and implement this and
 Stewardship                                                                                                                 Conservation Agent                      (within 5 years)
                 other policy changes.
 D. Manage Local Conservation Areas
                 D.1. Continue to implement recommendations of existing master plans for the Earl Newhouse Waterfront
 Environmental                                                                                                               Conservation Commission,
                 property, as well as others that may be developed. Revisit plans for Pequitside Farm and update as                                                  Ongoing
 Stewardship                                                                                                                 Conservation Agent
                 necessary.
 Environmental   D.2 Identify and prioritize other town conservation properties that need Site Management Plans to           Conservation Commission,                Short‐Term
 Stewardship     establish clear management needs and strategies.                                                            Conservation Agent                      (within 5 years)
 E. Give Residents and Businesses Opportunities to Make a Difference
                 E.2. Support residents and businesses who want to organize their own projects that have environmental
 Environmental                                                                                                                                                       Short‐Term
                 and community benefits. The Town can provide a platform either online or at Town Hall (something as         Public Works, Town Planner
 Stewardship                                                                                                                                                         (within 5 years)
                 simple as a bulletin board) to connect residents with similar interests and ideas.




Canton Master Plan | Strategic Framework DRAFT                                   19                                                                    May 6, 2021

Source page 20

STRATEGIC FRAMEWORK 2020-2025


ADAPT
 Guiding Principle: Canton will seek to increase community sustainability through climate adaptation and mitigation efforts to increase water,
 waste, and energy resource efficiency.
 Rationale for Long‐term Strategic Objectives: ADAPT focuses on planning for anticipated impacts from climate change and taking steps to do our
 part to change its course. There is widespread agreement by climate scientists that the climate is changing and it can potentially have impacts on
 our local economy, public health, water resources, infrastructure, and energy demand, among other aspects of our community. Canton is already
 vulnerable to natural hazard events, such as heavy rainfall, ice/snowstorms, wind, and heat related hazards like extreme heat, drought, and brush
 fires, and climate change is expected to increase the frequency and intensity of these hazards. Minimizing or mitigating impacts involves
 emergency planning, but also requires long‐term strategies around land development, conservation, infrastructure, and public health to limit our
 risk and bounce back.
 Energy Conservation & Generation
 Sub‐Section           Action Item                                                                                     Responsible Parties                Timeframe

 A. Build Capacity to Meet Energy Reduction Goals
 Energy Conservation    A.1. Invest in energy‐efficient equipment and facilities for municipal operations, including
                                                                                                                       Town Administrator                 Ongoing
 and Generation         schools (the Town’s largest energy consumers), that reduce energy consumption and costs.
 Energy Conservation    A.2. Increase the number of municipal electric or energy‐efficient vehicles. Add public        Public Works, Police Department,   Short‐Term (within 5
 and Generation         charging stations at municipal buildings like Town Hall, schools, and the library.             Town Administrator                 years)
 B. Provide Opportunities for Residents and Businesses
 Energy Conservation
                        B.1. Review bylaws to clarify the types of solar generation supported by the Town.             Town Planner, Planning Board       Easy Win (within 2 years)
 and Generation
                                                                                                                       Town Planner, Information
 Energy Conservation    B.2. Promote the use of state and federal energy rebate and incentive programs to residents
                                                                                                                       Systems Manager, Sustainability    Easy Win (within 2 years)
 and Generation         and businesses through the Town’s website and other outlets.
                                                                                                                       Committee
 Energy Conservation    Review local zoning by‐law and identify new language that would require or encourage                                              Short‐Term (within 5
                                                                                                                       Town Planner, Planning Board
 and Generation         residential and commercial electric charging stations.                                                                            years)




Canton Master Plan | Strategic Framework DRAFT                                   20                                                                   May 6, 2021

Source page 21

STRATEGIC FRAMEWORK 2020-2025

                       B.5. Review the zoning bylaw to ensure that public electric vehicle charging stations (Level 3)
 Energy Conservation                                                                                                                                            Short‐Term (within 5
                       are not treated similar to traditional fueling stations and can be part of parking garages or     Town Planner, Planning Board
 and Generation                                                                                                                                                 years)
                       standalone in surface parking areas, among other locations.
                       B.6. Investigate opportunities for Canton residents and businesses to access affordable           Town Administrator, Select
 Energy Conservation                                                                                                                                            Short‐Term (within 5
                       renewable energy. Evaluate the advantages and disadvantage of a municipal aggregation             Board, Town Planner,
 and Generation                                                                                                                                                 years)
                       program in Canton.                                                                                Sustainability Committee



 Natural Hazards and Climate Change

 Sub‐Section           Action Item                                                                                                    Responsible Parties                 Timeframe
 A. Build Resiliency
 Natural Hazards and   A.1. Maintain the network of stakeholders that participated in the MVP process. Consider periodic update       Town Planner, MVP Working
                                                                                                                                                                          Ongoing
 Climate Change        meetings to evaluate progress and revisit priorities as needed.                                                Group
 B. Educate the Community

 Natural Hazards and   B.1. Develop a program for public education to increase awareness of natural hazards and climate change        Town Planner, Sustainability        Short‐Term
 Climate Change        impacts and identify measures individuals can do to prepare and prevent climate change.                        Committee                           (within 5 years)

                       B.2. Continue to implement the public outreach strategies of the Town’s Hazard Mitigation Plan to              Emergency Management (Fire
 Natural Hazards and
                       increase public awareness of natural hazards and steps to reduce personal risk and impacts from these          Department), Public Works,          Ongoing
 Climate Change
                       events. Consider hiring a full time Emergency Management Director.                                             Town Planner
 Natural Hazards and   B.3. Ensure local public works and public safety officials continue to receive training related to emergency
                                                                                                                                      Town Administrator                  Ongoing
 Climate Change        management and infrastructure design. Consider hiring a full time Emergency Management Director.




Canton Master Plan | Strategic Framework DRAFT                                   21                                                                         May 6, 2021

Source page 22

STRATEGIC FRAMEWORK 2020-2025


FOCUS AREA – CANTON JUNCTION
 Guiding Principle: Canton Junction will become a compact, walkable center that connects to public transit, the Downtown, and adjacent
 neighborhoods. It will offer diverse uses and services and provide housing options for all income levels.
 Rationale for Long‐term Strategic Objectives: CANTON JUNCTION is the name of the MBTA station situated between Jackson, Beaumont, and
 Sherman streets. The station and the surrounding area are important for the future of Canton because of the opportunities that can come from
 creating a transit‐oriented development (TOD), which would meet a variety of needs for commuters and the surrounding neighborhood as well as
 the Town as a whole.
 Sub‐Section   Action Item                                                                                                    Responsible Parties            Timeframe
 B. Increase Access to Canton Junction
      ‐        B.1. Work directly with MBTA to ensure that the train station facility is considered “state‐of‐the‐art” with   Town Planner, Canton MBTA      Short‐Term (within
               regard to accessibility for people with disabilities.                                                          Representative                 5 years)
 C. Manage Parking
      ‐        C.1. Work with MBTA to develop a future parking plan that considers:
                Demand estimates for parking at Canton Junction that account for future development.                         Town Planner, Canton MBTA      Short‐Term (within
                  Future ownership of parking facilities and administration of parking fees.                                  Representative                 5 years)
                  The size and location of possible structured parking facilities.
 D. Solve the Infrastructure Challenge
      ‐        D.1. To the extent possible, develop a long‐term work plan with MassDevelopment that identifies areas                                         Short‐Term (within
                                                                                                                              Town Planner
               where they can provide assistance and where Canton will need to compete for funding.                                                          5 years)
 E. Zone for Transit Oriented Development (TOD)
      ‐                                                                                                                                                      Easy Win (within 2
               E.4. Consider the use of Chapter 40R for specific areas within the TOD neighborhood.                           Town Planner, Planning Board
                                                                                                                                                             years)
      ‐        E.5. If Chapter 40R is not pursued, use inclusionary zoning to incorporate a fixed percentage of subsidized                                   Easy Win (within 2
                                                                                                                              Town Planner, Planning Board
               affordable housing in new development proposals.                                                                                              years)




Canton Master Plan | Strategic Framework DRAFT                                    22                                                                May 6, 2021

Source page 23

STRATEGIC FRAMEWORK 2020-2025


FOCUS AREA – DOWNTOWN
 Guiding Principle: Downtown will have a strong sense of place. It will be walkable, vibrant with activity, have a broad range of uses, and connect to
 nearby destinations.
 Rationale for Long‐term Strategic Objectives: DOWNTOWN has the potential to play a leading role as a commercial/mixed use center. It primarily
 serves the day‐to‐day convenience retail needs of nearby residents, offering establishments such as banks, a pharmacy, hair and nail salons,
 convenience stores, restaurants, and a limited number of small retail shops. It is also home to small professional offices, such as attorneys,
 accountants, realtors, doctors, and others. In addition to the diverse mix of uses, Downtown boasts a strong collection of institutional buildings,
 including the Public Library, Town Hall, and the Post Office.
 Sub‐
 Section   Action Item                                                                                                               Responsible Parties         Timeframe
 A. Make Downtown Canton a Destination
           A.1. Perform outreach to local businesses in Downtown to explore the potential for partnerships with the Town that will   Economic Development        Short‐Term
    ‐
           help administer improvements, investments, and programs.                                                                  Committee, Town Planner     (within 5 years)

    ‐      A.2. Continue to invest municipal funds in Downtown infrastructure and streetscape amenities.                             Public Works                Ongoing

           A.3 Revisit zoning in the Downtown to:
            Clarify the Zoning Map to have one set of development procedures and standards for the Downtown area.
            Revise signage requirements to ensure high quality design and appropriately scaled signage.
            Revise the Use Table to ensure that only highly desirable uses are allowed in the Downtown area. Highly desirable       Town Planner, Planning      Short‐Term
    ‐
              uses are those that contribute to the development of a cohesive, walkable, and attractive Downtown experience.         Board                       (within 5 years)
            Include better standards for dimensional requirements that reflect best practices in downtown design.
            Develop design standards/guidelines for elements like building form, façades, pedestrian space, building materials,
              and other important aspects of site and architectural design.
 B. Implement the Downtown Parking Strategy
                                                                                                                                     Town Planner, Economic      Short‐Term
    ‐      B.2. Work with private property owners to open underutilized parking to the general public.
                                                                                                                                     Development Committee       (within 5 years)
           B.4. Adjust parking requirements in the zoning bylaw. Current parking requirements for Downtown exceed standard           Town Planner, Planning      Short‐Term
    ‐
           recommendations for a mixed‐use vibrant downtown.                                                                         Board                       (within 5 years)




Canton Master Plan | Strategic Framework DRAFT                                  23                                                                     May 6, 2021

Source page 24

STRATEGIC FRAMEWORK 2020-2025

 C. Expand Shared‐Mobility and On‐Demand Services
          C.1. Use results of the Parking Strategy and curbside inventory to designate ride share drop off/pick up zones for                                        Short‐Term
    ‐                                                                                                                                   Town Planner, Engineering
          services like Uber and Lyft to provide curbside management.                                                                                               (within 5 years)
 D. Establish Strong Connections
          D.1 Support multimodal infrastructure between the Paul Revere Heritage Site and Downtown Canton as well as Canton
    ‐                                                                                                                                   Town Planner, Engineering   Ongoing
          Junction.
          D.2. Identify resources for new development in Downtown to reduce vehicle trips, such as bike share programs, bicycle                                     Short‐Term
    ‐                                                                                                                                   Town Planner
          parking, or designating ride‐share pick‐up/drop‐off locations.                                                                                            (within 5 years)
 E. Improve Multimodal Transportation
    ‐     E.2 Pursue funding for design and construction for the Complete Streets projects prioritized in Downtown Canton.              Engineering                 Ongoing

          E.3. Include in the design process projects on the Complete Streets Prioritization list when designing future facilities in
    ‐                                                                                                                                   Engineering, Town Planner   Ongoing
          the Downtown area, such as on‐street or separated bike lanes.




Canton Master Plan | Strategic Framework DRAFT                                     24                                                                    May 6, 2021

Source page 25

STRATEGIC FRAMEWORK 2020-2025


FOCUS AREA – ROUTE 138
 Guiding Principle: Route 138 will be transformed into a revitalized destination with expanded businesses, shopping, entertainment, and residences
 while increasing safety and access for all modes of transportation.
 Rationale for Long‐term Strategic Objectives: ROUTE 138 runs from Milton in the north all the way through Fall River to the Rhode Island border to
 the south. In each of the eight municipalities through which it runs, including Canton, Route 138 is a major arterial carrying high volumes of traffic
 on a regional scale. Canton has capitalized on Route 138’s popularity, allowing it to become one of the Town’s greatest economic engines. The
 Route 138 focus area concentrates on the roadway from Randolph Street to the Stoughton town line. There are opportunities for continued
 economic growth and supporting this growth with amenities and other uses that make the area attractive to new businesses.
 Sub‐
 Sectio
 n        Action Item                                                                                                                 Responsible Parties             Timeframe
 A. Implement the Boston Region MPO Route 138 Study
          A.1 Continue conversations with MassDOT and advocate for changes in the roadway that create safer conditions for
    ‐                                                                                                                                 Town Planner                    Ongoing
          pedestrians and bicyclists. This could include the Town paying to develop design concepts.
          A.2. Coordinate with developers on Route 138 to secure funding and/or access permits from MassDOT as appropriate to
    ‐                                                                                                                                 Town Planner                    Ongoing
          implement multimodal recommendations.
          A.3. Revise zoning bylaw to require connectivity of business sites with the surrounding transportation network, such as
                                                                                                                                                                      Short‐Term
    ‐     new pedestrian and/or bicycle connections. This can be modeled after the Town’s existing Land Subdivision Rules and         Town Planner, Planning Board
                                                                                                                                                                      (within 5 years)
          Regulations.
          A.5. Identify areas where residential uses would be appropriate, focusing on locations where walking and biking                                             Short‐Term
    ‐                                                                                                                                 Town Planner, Planning Board
          improvements of the roadway are planned.                                                                                                                    (within 5 years)
          A.4. Work with property owners and MassDOT to develop and adopt access management practices for future                                                      Short‐Term
    ‐                                                                                                                                 Town Planner
          development that will reduce vehicle conflicts and improve safety and traffic circulation                                                                   (within 5 years)
 B. Provide Alternatives for Commuters
          B.1. Work with business centers/employers on Route 138 to join the Neponset Valley TMA to provide transportation            Town Planner, Economic          Easy Win
    ‐
          demand strategies for employees.                                                                                            Development Committee           (within 2 years)
          B.2. Explore opportunities for transit options from Route 138 to Canton commuter rail stations, such as shared, privately                                   Short‐Term
    ‐                                                                                                                                 Town Planner
          run transportation services and shuttles or publicly run shuttles.                                                                                          (within 5 years)




Canton Master Plan | Strategic Framework DRAFT                                    25                                                                    May 6, 2021

Source page 26

STRATEGIC FRAMEWORK 2020-2025

         B.3. Negotiate with developers to implement pedestrian and bicycle improvements recommended in the 2017 corridor
   ‐     study to provide connectivity corridor wide for walkers and bikers.                                                           Town Planner                  Ongoing


 C. Continue Economic Development
         C.1. Adjust zoning to encourage a mix of uses, including restaurants, retail, services, entertainment, recreation, etc., to   Town Planner, Planning
                                                                                                                                                                     Short‐Term
   ‐     increase market competitiveness. This includes standalone uses as well as adding amenities to existing office buildings.      Board, Economic
                                                                                                                                                                     (within 5 years)
         See RKG Route 138 Study.                                                                                                      Development Committee
         C.4. Encourage a shared sense of identity among the varied businesses along the corridor by hosting business‐oriented         Economic Development          Easy Win
   ‐
         programming and social events.                                                                                                Committee, Town Planner       (within 2 years)



 Indicators of Excellence: Criteria that measure success toward meeting Strategic Framework objectives
 Action Plan Implementation Outcomes Resident and Business Feedback Municipal and School Responsibilities