Skip to content
Search Canton

Canton, Massachusetts · Saved source text

Article 19 - Recommendations of the Community Preservation Committee

Town Meeting · Town Meeting archive year 2018 · Record f5bd5c12a482b2752c

Open original municipal record ↗Open interactive reader

Saved text from 4 source pages. Transcription and OCR may contain errors; verify figures and wording against the original. Retrieved 2026-10-15.

Source page 1

CCPC Available Funds
                                                                                                                        Source of Funds
                                             Title                            Category     Project       Fund         Fund         Fund      Undesignated                        Total
                                                                                            Code       Balance      Balance      Balance     Fund Balance
                                                                                                     Reserved for Reserved for Reserved for   Reserved for
                                                                                                     Open Space     Historic   Community      Community
                                                                                                     & Recreation Resources      Housing    Preservation Act
                                                                                                       (#32410)     (#32420)     (#32430)       (#32440)

             Fiscal 2014 set asides at ATM 2013 (article 41 motion 1)                                   48,000.00         48,000.00         48,000.00        316,000.00         412,000.00

             Fiscal 2015 set asides at ATM 2014 (article 21 motion 2)                                   60,000.00         60,000.00         60,000.00        390,000.00         510,000.00

             High school tennis courts (motion 3)                            Recreation    A1564      (108,000.00)                    -                -     (92,000.00)        (92,000.00)
             Veterans housing electrical boxes (motion 4)                     Housing      A1572                    -                 -    (30,000.00)                    -     (30,000.00)
             Veterans housing smoke detectors (motion 5)                      Housing      A1573                    -                 -    (18,000.00)       (45,700.00)        (63,700.00)
             Cemetery gravestones (motion 6)                                  Historic     A1574                    -    (25,000.00)                   -                  -     (25,000.00)
             Friendship quilt (motion 7)                                      Historic     A1575                    -     (2,705.00)                   -                  -      (2,705.00)
             Civil war statue (motion 8)                                      Historic     A1576                    -    (30,000.00)                   -                  -     (30,000.00)

             Fiscal 2015 projects approved at ATM 2014                                                (108,000.00)       (57,705.00)       (48,000.00)      (137,700.00)       (243,405.00)

             Balances after ATM 2014                                                                                -     50,295.00         60,000.00        568,300.00         678,595.00

             Fiscal 2016 set asides at ATM 2015 (article 19 motion 2)                                   60,000.00         60,000.00         60,000.00        390,000.00         510,000.00

             Cemetery Receiving Tomb & Retaining Wall (motion 3)              Historic     A1637                    -    (11,000.00)                   -                  -     (11,000.00)
             Ponkapoag Station Fire Bell Restoration (motion 4)               Historic     A1638                    -    (15,000.00)                   -                  -     (15,000.00)
             Tilden House Restoration (motion 5)                              Historic     A1639                    -    (84,295.00)                   -    (329,855.00)       (414,150.00)
             Historical Document Master Plan (motion 6)                       Historic     A1640                    -              -                   -     (10,000.00)        (10,000.00)
             Martha Howard Petticoat Restoration (motion 7)                   Historic     A1641                    -                 -                -      (5,895.00)         (5,895.00)
             First Parish Church Steeple and Spire Restoration (motion 8)     Historic     A1642                    -                 -                -     (99,120.00)        (99,120.00)
             Veteran’s Housing Project (motion 9)                             Housing      A1643                    -                 -   (100,000.00)                    -    (100,000.00)

             Fiscal 2016 projects approved at ATM 2015                                                              - (110,295.00)        (100,000.00)      (444,870.00)       (655,165.00)

             Balances after ATM 2015                                                                    60,000.00               -           20,000.00        513,430.00         533,430.00

             Fiscal 2017 set asides at ATM 2016 (article 24 motion 2)                                   60,000.00         60,000.00         60,000.00        390,000.00         510,000.00

             Balances available at ATM 2016 for projects                                               120,000.00         60,000.00         80,000.00        903,430.00       1,043,430.00

             Crane's Guards Militia flag (motion 3)                           Historic     A1717                    -    (18,900.00)                   -                  -     (18,900.00)
             Cemetery gravestones (motion 4)                                  Historic     A1718                    -    (36,915.00)                   -                  -     (36,915.00)
             Cemetery Receiving Tomb & Retaining Wall (motion 5)              Historic     A1719                    -     (4,185.00)                 -      (155,815.00)       (160,000.00)
             Hagan Court Senior Housing buidling repairs (motion 6)           Housing      A1720                    -              -       (80,000.00)       (40,000.00)       (120,000.00)
             Outdoor recreational facilities master plan (motion 7)          Recreation    A1721       (50,000.00)                    -                -                  -                  -

             Fiscal 2017 projects approved at ATM 2016                                                 (50,000.00)       (60,000.00)       (80,000.00)      (195,815.00)       (335,815.00)

             Balances after ATM 2016                                                                    70,000.00               -                      -     707,615.00         707,615.00

             Housing projects closed out by CCPC on 11/28/16                  Housing                               -           -          111,121.72                     -     111,121.72

             Fiscal 2018 set asides at ATM 2017 (article 27 motion 2)                                   60,000.00         60,000.00         60,000.00        390,000.00         510,000.00

             Balances available at ATM 2017 for FY 18 projects                                         130,000.00         60,000.00       171,121.72       1,097,615.00       1,328,736.72

             Rolling Mill copper roof (motion 3)                              Historic     A1816                    -              -                   -    (148,975.00)       (148,975.00)
             Library entrance (motion 4)                                      Historic     A1817                    -    (35,000.00)                   -               -        (35,000.00)
             Pequitside Farm architectual study (motion 5)                    Historic     A1818                    -    (25,000.00)                   -      (3,000.00)        (28,000.00)
             Rubin Court bathroom fan project (motion 6)                      Housing      A1819                    -                 -    (80,000.00)                    -     (80,000.00)
             Tilden & Devoll playgrounds (motion 7)                          Recreation    A1820                    -                 -                -    (401,300.00)       (401,300.00)
             Canton Little League restroom facility (motion 8)               Recreation    A1821                    -                 -                -    (173,500.00)       (173,500.00)
             Open space & recreational plans update (motion 9)              Open Space &   A1822      (110,000.00)                    -                -     (40,000.00)        (40,000.00)
                                                                             Recreation
             Paul Revere Heritage Site conservation restriction (motion 10) Open Space     A1823       (20,000.00)                    -                -                  -                  -

             Fiscal 2018 projects to be approved at ATM 2017                                          (130,000.00)       (60,000.00)       (80,000.00)      (766,775.00)       (906,775.00)

             Balances after ATM 2017                                                                          -                 -          91,121.72        330,840.00         421,961.72

             Cemetery project closed out by CCPC                              Historic     A1574                    -       133.55                     -                  -         133.55
             Firefighters' Bell project closed out by CCPC                    Historic     A1638                    -      7,825.00                    -                  -       7,825.00
             Historic Documents project closed out by CCPC                    Historic     A1640                    -           -                      -       2,646.05           2,646.05

             Fiscal 2019 set asides at ATM 2018                                                         60,000.00         60,000.00         60,000.00        390,000.00         510,000.00

             Balances available at ATM 2018 for FY 19 projects                                          60,000.00         67,958.55       151,121.72        723,486.05         942,566.32


             Additional borrowing of $325,500 for Paul Revere Heritage      Open Space &                            -                 -                -                  -                  -
             site land improvements (motion 3)                               Recreation
             Restore Ponkapoag Playground (motion 4)                        Open Space &               (60,000.00)                    -                -      (3,500.00)         (3,500.00)
                                                                             Recreation
             Bolivar Pool resurfacing & deck replacement (motion 5)         Open Space &                            -                 -                -    (300,000.00)       (300,000.00)
                                                                             Recreation
             Kennedy School bathroom & storage facility (motion 6)          Open Space &                            -                 -                -    (173,500.00)       (173,500.00)
                                                                             Recreation
             Walsh Field lights (motion 7)                                  Open Space &                            -                 -                -    (150,000.00)       (150,000.00)
                                                                             Recreation
             Exhaust fans at Rubin Court Housing (motion 8)                   Housing                               -                 -    (80,000.00)                    -     (80,000.00)
             Transfer unspent funds of $362,697.50 to Tilden House            Historic                              -                 -                -                  -                  -
             lessee (motion 9)

             Fiscal 2019 projects to be approved at ATM 2018                                           (60,000.00)                    -    (80,000.00)      (627,000.00)       (707,000.00)

             Balances after ATM 2018                                                                          -           67,958.55        71,121.72         96,486.05         235,566.32




CPA Funds.xlsx                                                                                                                                                                                   2/23/2018

Source page 2

OPEN SPACE /RECREATION

P►•oject:    Paul Revere Heritage Site —Purchase of improved land
Applicant:   Laura Smead, Town Planner on behalf of the Board of Selectmen and Paul Revere Heritage
             Commission
Amount:      $325,500
             • 2015 Annual Town Meeting approved a 10-year bond in the amount of $1.74 million to
               purchase 6.85 acres of open space at the former Plymouth Rubber site. With the passage of
               time as well as improvements to the land, including an irrigation system to keep the new
               "Town Green" green, the land has appreciated in value.
             • As proposed, the CCPC recommends modifying the bond issuance approved in 2015 (from
               $1.74 million to $2,065,500) to account for the increase in value of the parcel to be purchased.

CCPC' Vote: Recommend to Town Meeting for funding in the amount of $325,500


Project:     Restore Ponkapoag Playground
Applicant:   Recreation Commission
Amount:      $63,500
             • Playground installed in the late 1990s.
             • Structures have broken, cracked and/or missing pieces and replacement parts are no longer
               available. Playground does not meet safety guidelines.
             • Significant public support expressed by residents. Project is a priority for the Playground and
               Recreation Commission and the Playground Task Force.
             • DPW and Recreation Department have committed resources for the removal of existing
               equipment and site preparation, resulting in costs savings of approximately $5,000.
             • Town Departments cannot undertake work beyond demolition and site preparation due to
               warranty agreement with manufacturers of playground structures.
             • Proposed budget is significantly less than $$ approved for prior CPA playground projects
               (Tilden and Devoll) due to the use of engineered wood fiber rather than a poured in place
               ground surface.

cC'~'1~cC ~Jote: recommend to Town Meeting for funding in the amount of $63,500


P~•oject:    Bolivar Pool Resurfacing &Deck Replacement
Applicant:   Recreation Commission
Amount:      $300,000
             • Pool was used by more than 5,000 visitors over the summer of 2017, offers reasonably priced
               family memberships and swim lessons. Serves Canton Recreation Day Camp and Dolphins
               Swim Team.
             • Pool was built in the 1970s. Fiberglass lining installed more than a decade ago and requires
               annual repairs. Cracked decking is a safety hazard.
             • Pool house needs work but is not included in this request. The pool pumps are relatively new
               and the drains and associated systems are all functioning.
             • Comprehensive pool study to commence in early 2018 and is expected to be complete prior to
               ATM 2018. Study will review all aspects of pool complex. Recreation Commission will
               consider results of study in determining whether to move forward with proposed project.

     `n .       ;,

Source page 3

• If approved, the resurfacing and deck replacement would commence following pool closure in
                 August of this year. Due to the timing ofthe funding cycle,the Recreation Commission is
                 seeking funding prior to the completion ofthe pool study in order to undertake work in
                 advance ofthe 2019 pool season.

CCPC Vote: Recommend to Town Meeting for funding in the amount of $300,000


Pr°oject:     Construct bathroom and storage facilities at Kennedy School fields
Applicant:    Canton Little League
Amount:       $173,500
              • Canton Little League is seeking additional funding to construct a restroom and storage facility
                at the Kennedy School to support numerous sports programs that utilize these fields (1,500+
                annual users). During the original project review, the School Committee agreed to be the town-
                side project sponsor and the BRC would oversee project administration.
              • Total cost ofthe proposed project is $463,400. Ofthis, an estimated $113,000 is the cost ofthe
                concession stand (cannot be funded through CPA).
              • In 2017, the CCPC recommended and Town Meeting approved funding for 50% of the eligible
                project costs ($347,000).
              • Canton Little League pursued outside funding for the unmet financing needs and has
                commitments for nearly $60,000; however this funding is earmarked for the concession stand
                portion ofthe building.
              • All permits for construction ofthe facility have been obtained and, if approved, construction
                would commence in August of2018 with minimal to no disruption offall sports.
              • Little League has committed to pay for monitoring and maintenance of the facility. The
                building will be available to both the schools and other recreational organizations (football,
                lacrosse, soccer, etc.) for their events.

CCPC Vote: Recommend to '~'oevn Meeting for funding in the amount of $173,500


P~°oject:     Walsh Field Lights
Applicant:    Canton Public Schools
Amount:       $150,000
              • Walsh Field is one of three Canton fields available for softball(none of which have lights).
                Adding lights will allow an additional 1-2 games to be played each evening.
              • Large and growing demand for softball fields: in addition to High School softball program,
                there are 16 Little League and Ladies Softball teams.
              • Project is supported by Canton Little League.
              • Solid estimate from vendor who has completed other lighting projects in Canton.

~~'1~~' Vote: Recommend to Town Meeting for funding in the amount of $150,000




             ~l~aN "I 8 2018

                                                                                                          ~~~

Source page 4

COMMUNITY HOUSING

~r°oject:      Install exhaust fans at Rubin Court Senior Housing Complex.
Applicant:     Canton Housing Authority
Amount:        $80,000
               • Final phase ofthree-year project to address mold &mildew problems in public housing.
               • 3 buildings(38 units) at Rubin Court Senior Housing Complex.
               • Apartments are more than 50 years old, and failure to undertake this work may result in units
                 coming off line.
               • If funding for this project is approved, CPA funding for Community Housing projects will
                 remain under the 10%threshold required by the statute.

CCPC Vote: Recommend to Town Meeting for funding in the amount of $80,000


HISTORIC RESOURCES

  • A motion will be included as part ofthe FY 2019 CCPC warrant article to authorize a third party to
    receive and spend the CPA funds approved in 2015 for historic preservation work at the Tilden House.

  • This motion will not award any new funds, but rather clarifies the action taken at 2017 ATM when
    Town Meeting authorized the lease of the Tilden House with the intent of having the lessee undertake
    the preservation activities outlined in the historic structures report.

  • Following the vote to approve the lease of the building, the CCPC was informed that the original
    appropriation identified the Historic Commission and the BRC as the parties authorized to spend the
    funds.

  • As it currently stands, a third party lessee cannot spend the CPA funds awarded for this project unless
    the original motion is modified to allow this arrangement.

  • Accordingly, the CCPC warrant article will include a motion to authorize a qualified third party to spend
    the remaining funds appropriated in FY16 for the preservation ofthe Tilden House.




             JAN 1 ~ 201 +



                                                                                                         ~~~~