Canton, Massachusetts · Saved source text
Article 20 _Chapman Curb and Sdwk
Saved text from 2 source pages. Transcription and OCR may contain errors; verify figures and wording against the original. Retrieved 2026-10-15.
Source page 1
Chapman Street Curb and Sidewalk Estimate
Project Length 3,900 linear feet
Item Unit Cost
1 Saw Cut Road 4,500 lf 2.05
2 Unclassified Excavation 1,900 cy 21.00
3 Gravel Base 1,000 cy 21.00
4 Bit. Conc. Sidewalk 2,300 sy 42.85
5 Curb Removed and Reset 500 lf 20.00
6 Curb New 3,900 lf 37.80
7 Catch Basin Inlet 10 ea 125.00
8 Loam and Seed 1,000 sy 11.75
9 Police 375 hr 65.00Source page 2
ATM 2014
Total
9,225.00
39,900.00
21,000.00
98,555.00
10,000.00
147,420.00
1,250.00
11,750.00
24,375.00
363,475.00