Article 31 - JFK Bathroom, Storage and Snack Shack Facilities pdf file

Town Meeting · Town Meeting archive year 2021 · Record 8379832c080f4e9cd4

Open original municipal record ↗Open interactive reader

Saved text from 40 source pages. Transcription and OCR may contain errors; verify figures and wording against the original. Retrieved 2026-10-15.

Source page 1

Kennedy School Fields Restroom Facility Estimate

Project Estimate        $ 817,709.00
Sewer Line                 79,791.00
Engineering Fees          110,000.00
            Total Cost:                  $ 1,007,500.00

CCPC funding              (347,500.00)
Little League funds        (60,000.00)
Warrant Request           (600,000.00)
         Total Funding:                  $ (1,007,500.00)

    Net (surplus)loss:                   $           -

Source page 2

Article 31 – Mike Rota presentation to the Finance Committee on March 24, 2021
Thank you all for taking the time to consider this warrant. As you know, this project has been in the
making for quite some time. We have encountered substantial roadblocks with funding, prevailing wage
costs, construction roadblocks and unforeseeable increases in materials costs.

There are countless hours invested in this project, know that it is fully vetted by the Zoning Board,
ConCom, School committee, Rec Dept., Danny Erickson, all the town’s PTA organizations and sports
programs that use the complex.

All of the aforementioned see the project as necessary and something that a substantial number of the
town’s population would benefit from.

These 4 athletic fields benefit the towns baseball and softball programs, football, soccer, lacrosse, and
field hockey programs as well as folks participating in the Kennedy School field day. Not to mention
Canton Little League has hosted many regional and state championship tournaments here as well as
several pitch, hit and run statewide events.

While the cost of this project totals over $1 million, it is the least expensive project in recent years that
affects the most amount of children, their parents, siblings, grandparents, and other extended family
members. Sadly, these same people must leave the fields to find water and more sanitary facilities.

I joined the board a long while back when the Rec Dept used to provide sanitary facilities at all the fields.
Over time, the restrooms at Devoll and Ponkapoag were shuttered, and the porta-potties removed.

CLL had no choice but to supply, maintain and pay for 7+ porta potties throughout the town – all at
substantial expense to the league. Over the past 3 years we have worked with the Rec Board and
through the Rec Dept, have opened the shuttered restrooms - provided CLL maintains them. A step in
the right direction.

CLL remains committed to the town as we have since 1952. We permitted and built the first new field in
Canton in more than 50 years and have raised and spent hundreds of thousands of dollars on
improvements from lighting to field re-construction.

We host an annual parade and cookout through town each spring feeding more than 1,000 people at no
cost- to the people or the town. We supply Automated External Defibrillators (AEDs) at all baseball and
softball fields throughout Canton as well as pay for their on-going maintenance in cooperation with the
Canton Fire Dept.

Canton is a top-notch community and one of the only surrounding communities that does not have this
type of facility at such a highly used complex.

Canton attracts young families for what the town has to offer; great schools, town services, recreation
programs and the facilities where they take place to name a few. I hope you believe as I do, and support
this facility as a welcomed, long overdue amenity and another investment in what makes Canton a top-
notch community.

Source page 5

TOWN OF CANTON

JOHN F. KENNEDY ELEMENTARY SCHOOL FIELD

COMPLEX BATHROOM FACILITY

DRAWING SHEETS                          GENERAL NOTES:                   LIST OF ABBREVIATIONS
©      pros Nene! Ome aN carconsuLtme Licsia.teesooco | [REET ABOVE FINISH FLOOR                    CONTACT INFORMATION:
GENERAL                                   on         Bs TOE CONTACTS COMME. COE        ‘APPROX APPROXIMATE,
0-01 COVER SHEET                      {itty aUToWOBLE LasuiT aN UnrElLA PoLGIES ron 8         iT, BITUMINOUS                   Archi
FPROECT ALLoF WHE conmmacrors msuteRs san-esovocawawer | [BURT BUILT UP ROOFING                  rchitect
cv                              {GF SusAGGKTION FAVOR OF Ogura Nae’ srr AO CB         ce      CATCH BASIN
‘Gr-01 LAYOUT PLAN                        SonsuTNG Le                                     ‘CHU CONCRETE MASONRY UNIT
NOTE:                               2.01 UTILITY PLAN                     1 conTMCTORSULL REsPoNSSLEFORCECHNGANDOOGRONATAG | [EONE. | CONCRETE
CONTRACTOR TO FIELD VERIFY ALL     €3.01 CIVIL NOTES LEGEND, &            ‘ALLOMENGIONS WATH ARCHTECTURAL DRAWINGS, FI CASE OF ODARLICT,    Se oe
LOCATOR MAP                           DIMENSIONS AND CONDITIONS.            "ABBREVIATIONS                  ATHITECT SLL BE NORD AND SHALL EBOLYE THE COMPACT.
THE CONTRAGTOR Als PELD VERIFY ALLDMENSONS AND CONDITION     E      EQUAL
63.02 SITE DETAILS                                                                                                   EL ERCa WAY
GS-03 UTILITY DETAILS                    FRolectsecchcaions Ok wen he onans ok Soschx0N        FO       FLOOR DRAIN
63.06 UTILITY DETAILS                      Tee MORE STRNGOHT REDITEUENTD Onl GOMER Te             He      HANDICAP
SCRETION OFTHE ARCA                             Hr      HEIGHT
ARCHITECTURAL                                                                                                                TIN ——[INVERTNE
ARCHITECTURAL                 6 _THECONTRAGTOR SHALL MAKE No SEWATONFROM DESIGN ORAWNGS      TOUT INVERT OUT
OT FLOOR PLAN AND REFLECTED CELNG        Fe ee i gone                             is         INVERT QUT
‘2 FOUNDATION PLAN AND ROO PLAN | a a | THA —| Mao
‘A201 EXTERIOR ELEVATIONS               BEREPCATED. A CONDITIN FOONDNOY DTALED SAL BE          MN, [MINIMUM
‘ABO1 EXTERIOR WALL DETAILS                    {CoNSTRUETEDINA MANNER SAR TO VAT OFTHE TGA. DETAKS         MO MASONRY OPENING
conecywmaarrucastecooesanDLoca.tansano | [NWA [NOT APPLICABLE
PLUMBING                           (8 ALL Worm AL COMPLY WTHAPRUCABLE CODES AND LOCAL LAS.        Nite NOTIN CONTRACT
OT PLUMBING FLOOR PLAN                                                                          NTS NOT-TO SCALE
P100 PLUMBING FLOOR PLAN              G6 GENERAL CONTRACTOR SHALL COORDINATE LOCATIONS OF OPENNGS, PITS,     Oc.      ‘ON CENTER                     250 DORCHESTER AVENUE
Sones, sus, Tenenes, sLéeves, ofPRessone oROOIES, 20          ‘OD OVERHEAD DOOR
vuccuanoaL                           CRE Ene WT MeGUNUEAL ESTP. AND PLING TER         ‘Ob | OVERHEAD BGO                 BOSTON, MA 02127
MECHANICAL                                          “                                 PAV. PAVERS.
MOOT MECHANICAL NOTES, DETAILS &     Cr resction oF ALT CoUPONENT Fas NO PROMS On HAE       PT.     PRESSURE TREATED
Meo? SUES ais a SCHEDULES        TUADE FoR CONDITIONS OCCLARANG DURING coNSTRUCTION Tis Me sO.e | [SINE      SIMILAR TO.                      P: (617) 268-8977
e                      ReshoustoLt oF ti contro To MARE PROPSR Ab ADEGUNE       $5       STAINLESS STEEL                   4
M100 MECHANICAL FIRST FLOOR PLAN        PROVSIONS FOR STABLITY OF, ANDALL STRESSES TO, MESTRUCTUREDUE | [7      TREAD                   Fo (617) 464-2971
a                                                                                °       eooNs                               TYE [PICA
:            3              %                                                                                68 CONTRACTOR SUL NOT sca DRAGS. conraAcroR shau.ecuesr | [UO.N. [UNLESS OTHERWISE NOTED                 |          |
ELECTRICAL                            SitontaSoasor wroaironscaureacorswour me nosraon | [VaR--—|-VERIFY IN FELD                  cbi@cbiconsultingllc.com
?                                                OT ELECTRICAL LEGEND AND               DMENSONS OR FORMATION SFALLBE DONEAT SOMA TosK AND sea | [WGE—T We COE BASE.                 www.cbiconsultingllc.com
BERENOVED AND REMSTALLZO YO THe SPEGHIATIONS OFTHE ARCHTEST                                                i      ;
£002 ELECTRICAL RIStR & SCHEDULES            Soman So noe                                  ZEC.| ZINC COATED COPPER               www.vidaris.com
‘                    £003 ELECTRIGAL OETALS               (zis AB NETHODS OF CONETRLCTIN AS HELLAS COUPLANE WT      He       PLUS OR MINUS
E004 ELECTRICAL SITE PLAN                  (to OTHER SAFETY LAWS AND REGULATIONS LUSH                                               Owner
=                     EIDD ELECTRICAL LIGHTING AND POWER PLAN | _ RESPONSILTY oF Mie ConTraGTon. is SvaGONT ACTORS) SUPPLE,
FAQO1 FIRE ALARM RISER DIAGRAM & FIRE            ‘CONSUATANTS AND SERVANTS                                                    SYMBOL LEGEND                 —_—_—
nn                                         ‘ALARM PLAN,                   (G10 FOR ALL TEMS THAT ARE TO BE REUSED ANDIOR REINSTALLED AS PART OF                                               TOWN OF CANTON

he won
DAMAGE. IF ANY OAMAGE OCCURS THE CONTRACTOR SHALL REPAIR

TM GO IT'S INA IE NEW CONDITION OR REPLACE TH
nen            *      “

THE SAME OR BETTER THAN THE ORVGNAL ITEM       “

SEE DETAIL 88 ON
SHEET AXXX

BREAK LINE

DIMENSION LINE

EXTENT

DOOR TAG.

=——
om
6

WINDOW TAG

BARRY S. NECTOW,
960 WASHINGTON ST.
CANTON, MA 02021

Phone: 781-821-5060 X 1245
Fax: 781-575-6500

Email: nectowb@cantonma.org

CONSULTINGLLC
@ A Vidaris Company

250 DORCHESTER AVENUE
Boston, MA 02197

(617) 268-8977
B(ei7) a4seca971

cbi @cbiconsultinglic.com

JOHN F. KENNEDY
ELEMENTARY
SCHOOL
FIELD COMPLEX
BATHROOM
FACILITY

TOWN OF
CANTON

96 WASHINGTON ST.
CANTON, MA 02021

COVER SHEET

DESIGN
DEVELOPMENT

Date         cnorno18
Projet Nebo 3181535

GI-01

Source page 6

cLodme

MAINTAIN AND PROTECT
EXISTING SIDEWALK

‘MEET AND MATCH erTUMIOUS
CONCRETE. SIDEWALK WTF
EXISTING SIDEWALK’
BITUMINOUS CONCRETE
SIDEWALK (TYP.)

1.S'MDE GRAVEL
DRIP ECDE (TYP )

FACE OF QUILOING
(WP)

Liwts oF euuoine
‘OVERHANG.AND_CONDRETE
AMO, UNDERNEATH

N MAINTAIN: AND PROTECT
wee SOT

AND BLEACHERS

se
Cece Sea at

EXSTNG CONCRE-E PAD

\

\NAINTAIW AND PROTECT
EXISTING BLEACHERS

iN
CONSULTINGLLC
@ A Vidaris Company

28¢ DORCHESTER AVENUE
2 (S17) 268-6977
17) Seac3971

JOHN F. KENNEDY
ELEMENTARY
SCHOOL
FIELD COMPLEX
BATHROOM
FACILITY

TOWN OF
CANTON

96 WASHINGTONST.
CANTON, MA 02021

LAYOUT PLAN

‘sb son

DESIGN
DEVELOPMENT

Source page 7

4 CUTve_Fob 4, 2019-130pm_JSOARES

APPROXIWATE LOCATON OF asd 7 %
SEVE MANHOLE, CONHECT FORCEMAIN.
TG EDISTIRNG SEER MANHOLE.        i}

2
ry
                                    :
»

+

~\_FORCEWAIN AR RELEASE. VALVE.

SEWE® MARHOLE
a
2
2
2
2
2
2
z          2° scHo-40 pve
77 Sone PORCEMAN
#7 sonss pve) F
1,800 GALLON GREASE TRAP        \ a
Inv in=tge.95:
wv 0UT=188.30

DUPLEX SANITARY PLUP STATION
IN IN=155.27
Inv OUT=158.27

4° SORS5 P\C SEWER SERVICE
itey OUr=158.80

4" Cl_VENT INTO BUILZING:
‘AND THROUGH ROGF

4° SDRSS PVC SEWER SERVICE
(GREASE WASTE)

INV OUT=155.80

RELOCATE IRRIGATION CCNTROL VALVES
{AND ALL ASSOCIATED |RRIGATION:
FING AROUND STRUCTURE

eecTmcaL ao nae uns         ee
SHOWN FOR COORDINATION ONLY.               GAEDE

Reno RecmOL PENS Re MRS
a

/

Vi

CONTRACTOR TO PERFORM TEST PIT AT
EASTING DATE VALVE TO DETERMINE
LOCATION OF EXISTING WATER MAI.
GENNECT 2" TYPE-K COPPER WATER LINE
Ta MAN NITS CORPORATION STOP

\CEONNECT FEER 70 EXISTING
FROM CLASS ROOM

\_connecr 2over To exse ~~ ——=
Guy Pe pois

NOTES:

CONTRACTCR SHALL RESTORE ALL DIS"URBED SUFFAPES TO
EXISTING CONDITIONS. 2EFER TO DETALS FOR RESTORATON DUE
TC. TRENCHING ACTIVES.

2 COMTRACTCR SHALL RELOCATE ALL IRRIGATION CONTROL, VALVES
‘AND IRRIGATION PIPING ENCOUNTERED DURING CONSTRUCTION OF
NEW BUILDING.

»
CONSULTING LLC

@ A Vidaris Company

28¢ DORCHESTER AVENUE

2 (S17) 268-6977
G17) 40823977

JOHN F. KENNEDY
ELEMENTARY
SCHOOL
FIELD COMPLEX
BATHROOM
FACILITY

TOWN OF
CANTON

96 WASHINGTONST.
CANTON, MA 02021

UTILITY PLAN

DESIGN
DEVELOPMENT

C2-01 |

Source page 8

QNI3134)FKRettConNCACNI3IIE CDT Ang_fn 29, 2019-549 pm_JSOARES

EROSION AND SEDIMENT CONTROL NOTES:

1

10
1

12

13

4

15

‘ALL EROSION AND SEDIMENT CONTRO. MEASURES SHALL BE CONSTRUCTED AND MAINTANED 1
‘ACCORDANCE. WITH THE LATEST EDTON” OF THE "WASSACHUSETTS ERCSION AND SEDIMENT CON'ROL
‘GUIDELINES. FOR_URGAN AND. SUBURBAN AREAS" REFAREC BY DEPARTMENT OF EXVROMMEATAL
PROTECTION, SUREAU OF SESOURCE PROTECTION, AND THE CURRENT NFDES GENERA PERMIT FOR
‘STORMWATER DISCHARGES FROM CONSTRUCTON. ASTIVTCS,

MEANS OF EROSON AND SEDNENT PROTECTION AS NOTED ON THE DRAWNGS NOICATE MnaMUM
RECOMMENDED PROVISIONS, “THE CONTRACTOR IS RESPONSIBLE FOR FNAL SELECTION AND. PLACEMENT
(OF EROSION AND SEDMENTATION CONTROLS BASED ON ACTUAL STE CONEITIONS. AUD CONSTRUCTION
CONDITIONS, \ADOITIOUAL NEANS JF PROTECTON SHAL_. BE FROVDED BY. THE COWTRACTOR AS
REQUIRED “OR CONTUED OR UNORESEES EROSION PROBLEMS, OR AS DIRECTED BY CONTROLING
MINICPAL AUTHGRITES, AT NO ADDITOWAL EXPENSE TO THE OWNER.

AN EROSION, CONTRO. GARRER SHALL BE INSTALLED ALONG THE EDGE OF PROPOSED DEVELOPKENT
[AS INDICATED INTHE PLAN PHIOR TO COMMENCEMENT OF DEMOLITION O8 CONSTRUCTON OPERATINS,

SSEDMENT CONTROL VEASURES SHALL. BE ADJUSTED TO NET FIELD COUDITONS AT THE TIME OF AND
DURNG ALL PHASES OF CONSTFUCTON 700 ‘BE CONSTRUCTED PRIOR TO. AND AMEDIATELY AFTER
[ANY GRADWS OR DISTURBANCE OF EXISING SURFACE MATERIAL CH THE STE

AFTER ANY SIGNFICANT RAINFALL (GREATER. TAN 0.25 INCHES OF RANFALL WIM 24. HOURS),
SEDMENT CONTROL. STRUCTURES SHALL BE SPECTED FOR INIEGRITY. ANY DAMAGE. SHALL BE
(CORRECTED MMEDIATELY.

PERIDIC INSPECTON AND MANITENANCE OF ALL SEDMENT CONTROL STRUCTURES SHALL BE PROWDED
TO. ENSURE THAT THE NTENDED “PURPCSE 1S ACCCMPUSHED, "THE CONTRACTOR SHALL BE
RESPONSDLE FOR AL. SEDMENT LEAVAG. THE LIMIT OF WORK. SEDMEVT ONTROL MEASURES SHALL
BE WY WORKING COND TON AT THE END OF EACH WORKING DAY,

THE CONTRACTOR SHALL BE RESPONSBLE FOR PREVENTING SEDMENT FROM ENTERINS. ANY STOR
DRANAGE’ SYSTEM AND FROM BENG CONVEYED TO ANY WETLAND RESOURCE AREA, PUBLIC PAYS,
[ABUTING PROPERTY, OR OUTSDE OF THE PROJECT UM'S

THE COVTRACTOR SHALL FROTECT ALL DRANAGE SWAIES AND GROUND SURFACES WITHIN THE UMIT
(OF WORK FROM EROSYE CONDTICNS. STRAW BALE, CRUSHED STOWE OR EQUIVALENT CHECK DAMS ARE
TO BE_PROMIDED_AT A WAGMUM CF TPO HUNDRED (200) FOOT SPAGIG, OF LESS AS SITEXSPEGIG
‘CONDITIONS WARSANT, WITHIN ALL DRANAGE SWALES AND DITCHES AND "AT LPSTREAM SIDES OF ALL.
DRANAGE BEETS.

ALL STOCK PLES SHALL GE PRCTECTED AND LOCATED A MNMUM OF 100" FROM EXSTNG: WETLAND
RESOURGE AREAS & MTHIN THE UIT OF WORK.

ANY SEDIMEAT TRACKED ONTO PAVED AREAS SHALL BE SMEPT AT THE END OF ZACH WORKING DAY.

ALL SEDIVENT RETAED BY EROSCN AND SEDMENT CONTROL MEASURES SHALL BE LEGALLY DISPOSED
oF oFFSTE.

TEMPORARY DIVERSION DITCHES, PERMANENT DITCHES, CHANNELS, EMBANKUENTS, AND ANY DENUDED
SURFACE THAT MLL BE EXEGS2D FOR m PEROD OF 14 CALENDAR CAYS OR MORE SHALL BE
‘CONSIDERED CRIICAL VECETATICN AREAS. THESE AREAS SHALL BE STABLIZED/PROTECTED. WTA
[APPROPRIATE EROSICN CONTROL MATTING CR OTHER EROSON CONROL METAODS.

DUS" SHALL BE CONTROLLED BY WATERS OR OTHER APPROMED METHODS AS DIRECTED BY THE
PPERMITING AUTHORI-Y OR OWNER.

THE CONTRACTOR SHALL USE TEMPORARY SEEDNG, MULCHING, OR OTHER APPROVED STABIIZATION
MEASURES TO PROTECT EXPOSED AREAS OUFING PROLONGED “CONSTRUCTION OR OTHER LAND
DISTUREANCE. “STOCKPILES THAT MLL 3 EXPOSED FOR LONGER THAN 14 OAYS SHALL BE
STABLIZED.

THE CONTRACTOR IS RESPONSBLE FOR REMOVAL OF ALL ERCSION AND SEDIMENT CONTROLS AT THE

CCOMPLETON OF SITE CONSTRUCTION, BUT ONLY WHEN RECTED BY THE CITY/TOWN OF 000K
(CONSERVATION AGENT STASLIZE OR SEED BARE AREAS LEFT AFTER EROSION CONTROL REMOVAL.

GENERAL NOTES:

10.

1

2

13.

1.

15.

TOPOGRAPHIC DATA, PROPERTY LINE INFORMATION, AND EXISTING SITE FEATURES WERE
COBTANED FROM A FLAN ENTITLED "TOPOGRAPHIC PLAN, JFK ELEMENTARY SCHOOL, 1€O
DEDHAM STREET, CANTOR, MA", PREPARED BY NISCH ENGINEERING, CATED
11/12/2018.

‘THE 1967 FLOOD INSURANCE RATE MAP DOES NOT SHOW THE STE TO BE WITKIN A
100-YEAR FLOOD FLAIN.

‘THE CONTRACTOR SHALL COMPLY WITH MASSACHUSETTS GENERAL LAWS CRAPTER 82,
SECTION 40, AS AMENDEC, WHCH STATES THAT NOONE MAY EXCAWATE IN THE
COMMONWEALTH OF MASSACHUSETTS EXCEPT IN AN EMERGENCY. WITHOUT 72. HOURS
NOTICE, =XCLUSIVEOF SATURDAYS, SUNDAYS, AND LEGAL HOLIDAYS, TO NATURAL GAS
PIPELNE COMPANIES, AND MUNIGPAL UTILITY DEPARTMENTS. THAT SUPPLY GAS,
ELECTRIGTY, TELEPSONE, O% CABLE TELEVISION SERVICE IM OR TO THE GTY OR TOM
WHERE THE EXCAVATION IS TO BE MADE. THE CONTRACTOR SHALL CAL. “DIG SAFE”
‘AT 1-885-D1G~SAFE,

THE CONTRACTOR SHALL COMPLY WTH MASSACHUSETTS GENERAL LAWS CHAPTER 824,
‘ALSO REFERRED TO AS JACKIE'S LAW, AS DETAILED IN SECTION 520 OMR 14.00 CF
THE CODE OF MASSACHUSETTS. REGULATIONS.

THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE FEDERAL STATE. AND LOCAL
Laws, RULES “REGULATIONS “AND "SAFETY CODES IN THE COTSTRUCTON. OF “ALL
i

THE LOCATIONS AND ELEVATIONS OF ALL EXSTNG UTUTIES ARE AFPROXMATE AND
ALL UMILTES WAY NOT BE SHOWN, PRESENCE AND LOCATIONS OF ALL UTLITES. WITHIN
THE LMT OF WGRK MUST 3E DETERURED BY THE CONTRACTOR PRIOR TO
COMMENCEMENT CF" CONSTRUCTION ACTIVITY. "THE CONTRACTOR SHALL EE
FESPONSBLE FOR IDENTIFYING AND CONTACTING THE CONTROLLING AUTHORITES
AND/OR UTILITY COMPANIES RELATVE TO THE LOCATIONS AND ELEVATIONS OF THEIR
LINES.” “HE CONTRACTOR SHALL KEEP A RECORD O- ANY DISCRE=ANCES OR CHANGES
I THE LOCATIONS OF ANY UTILITIES SHOW 0% ENCOUNTERED DJRING CONSTRUCTION
ANY DISCREPANCIES SHALL BE REPORTED TO THE-ONNER AND NITSCH ENGINEERING.
SNY_DAWAGE RESULTING FROM THE FAILURE OF “HE CONTRACTOR TO MAKE THESE
EETERMIMATIONS AND CONTACTS SHALL SE SORNE EY THE CONTRACTOR,

THE CONTRACTOR SHALL, THROUGHOUT CONSTRUCTION, TAKE ADEQUATE PRECAUTIONS
TO PROTECT ALL WALKS, GRADNG, SIDEWALKS AND ‘SITE DETA-S OUTSIDE OF THE
UNIT OF WORK AS DEFINED ON THE DRAWNGS AND SHALL REPAIR AND REPLACE CR
OTHERWISE MAKE GOOD AS DIRECTED BY THE ENGINEER O% OWNER’S DESIGNATED
FEPRESEVTATIVE ANY SUCH OR OTHER DAMAGE SO CAUSED.

‘THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR JOB SIE SAFETY AND ALL
CONSTRUCTION MEANS AND METHODS,

PRIOR. TO BEGINNING CONSTRUCTION, THE CONTRACTOR SHALL BECOME FAMILIAR. Wit
THE SITE AND CONSTRUSTION. DOCUMENTS TO DEVELO> A THOROUGH UNDERSTANONG
(OF THE PROJECT, INGLUCING ANY SPECIAL CONDITIONS AND CONS"RAINTS,

IT IS THE CONTRACTOR'S RESPONSIBILITY TO_BECOME FAMIUAR WITH THE PROMECT SITE
AND TO. VERIFY ALL CONDFIONS INTHE FELD AND REFCRT. DISCREPANCIES BETWEEN
FLANS AND ACTUAL CONDITIONS TO THE OWNER OR OVNER'S REPRESENTATION
IMMEDIATELY.

THE CONTRACTOR SHALL CONDUCT ALL NECESSARY CONSTRUCTION NOTFCATIONS AND
APPLY FOR AND OBTAIN ALL NECESSARY CONSTRUCTION PERMITS.

‘THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE ESTABLISHMENT AND U:
VERTICAL ANC HOR ZONTAL SONSTRUCTION CONTROLS.

OF ALL

ELEVATIONS REFER TO X00:

THE CORTRACTOR SHALL COMPLY MITH THE OROER OF CONDITIONS DATED XK XX,
XXX AND ISSUED BY THE 10X% CONSERVATION COWMISSION (DEP #XXX—XX0.

FOR SOI. INFORMATION REFER TO GEOTECHNICAL REPORT.

UTILITY NOTES:

1

‘ALL UMILIFY CONNECTIONS ARE SUEECT TO THE APPROVAL OF, AND GRANTING OF PERMITS B, THE
LOCAL MNCIPALITY IT SHAL BE THE SOLE RESPONSBILITY OF THE CON'RACTOR’ 10 CBTAN ALL
PERMITS. 9ND APPROVALS RE-ATED TO UTLITY WORK PRIOR 10 COMMENCEVENT OF CORSTRUCTION.

THE CONTRACTER SHALL BE SOLELY RESPONSIBLE FOR OBTANNG ALL PERMISSICNS FOR, AND FOR
CCONOLCTNG ALL PREPARATICNS RELATED TO. WORK AFFECTING ANY UTAITES WIN THE JURSDCTON
CE ANY MON-MUNCEAL UTLITY COMPANY, INGLLDING BUT NOT LMITED 10 ELECTAC, TELEPHONE,
‘AND /CR GAS. THE CONTRASTCR SHALL NOTFY ALL APPROPRIATE. AGENCIES, DEPARTMENTS, AND
LUTLUTY CIMPANES, IN NRITNG, AT LEAST 7 DAYS (OR PER UTIUTY COMPANY REQUREWENT) AND NOT
ORE THAN 30 DATS PRIOR TO ANY CONSTRUCTION

THE CONTRACTOR SHALL MANTAN UTLITES SERMCING BUILDINGS 4M FACIUTIES MITHIN CR OUTSOE
THE PROECT UMIT UNESS THE INTERRUPTION OF SERACE 'S CCORDNATED WTH THE 2¥ER

‘ALL WATER, SEVER, AND DRWN WORK SHALL BE FERFORMED ADCGRDING TO THE RECIRENENTS AND
[STANDARD SPEGFICATINS OF THE LOCAL MUNCIPALT.

CAS, TELECOMMUNCATCNS AND ELECTRIC SERVICES ARE_TO BE DESKGNED BY EACH UTLITY COMPALY
1B CooRONATION WTH THE NECFANICA., ELECTRIC, ANZ PLUMBING. SONSU. TANTS.

THE CONTRACTOR SHALL COCROINATE. CONSTRUCTION ACTIVES OF NEN UTUTES WITH GAS,
TELECIMMINICATION AND ELECTRICAL SERVICES,

STALL WATER LINES THA WINMUM OF FIVE FEET OF COVER AND A MAXIMUM OF SEVEN FEET
(COVER FROM THE FINAL OESISN GRADES.

WANTAN 10 FEET HORIZONTAL SEPARATON AND 16 INCHES VERTICAL SEPARATON (WATER OVER
SEVER) BETWEEN SEWER AND WATER LINES. WHEREVER THERE IS LESS THAN 10 FEET OF HORIZONTAL
SSEPARATIIN. AND “8 INCHES O VERTICAL SEPARATION BE WEEN A PROPOSED CR. EXISTNG. SEVER
LUNE "O REMAN AND A. PROPCSED OR EXSTING WHER LNETO REMAN 20TH. WATER-MAN AND
‘SEVER MAN’ SHALL BE CONSTRUSTED OF MECHANICAL JONT CEMENT LINED DUCTLE IFON PPE *OR A
CISTANCE OF T0-FEET ON ETHER SCE OF THE CROSSING. OVE (1) FULL LENG'H OF WATER PPE
‘SHALL BE CENTERED CMER THE SEWER AT THE CROSSING

THE CONTRACTER SHALL MANTAN ALL ENISTNG UTUTES EXCEPT “HOSE NOTED TO BE ABANDONED
AND /CR REMOMED  LISPOSED,

THE GENERAL CONTRACTOR IS RESPONSIBLE FOR TRENCHING, BACKRLLNG, AND SURFACE 2ESTORATON
FOR GAS UTIUTY S/STEUS.

AL onsr

JIUTES SHALL BE INSTALLED UNDERGROUND UNLESS CTHERWSE NOTED.

‘AL EIISING AND PROPOSED MANHOLE FRAMES, COVESS, VALVES, C-EANOUTS, CASTINGS, ETC. SHALL
EE RASED To FISHED GRADE PRIOR TO FINAL GRADING ANC PAVING CONSTRICTIO.

PROPOSED LEGEND

©@OOOOO::3

s™

eH
cw

w
Wo

~
»
7

UM OF WORK

[EASTING UTLITY TO EE ABANDONED,
REVOVED AND DSPOSED IF IN COLD
Wh NEW STE IMPROVEMENTS, OR AS
INCICATED CN DRAWNGS.

[EROSION COVTFCL BARRIER
‘CONSTRUCTION FENCE

DOCWESTIC WATER PIPE
PRE PRCTECTION PIPE
SANITARY SEWER PIPE

STORM DRAIN PIPE

AS PIPE

ELECTRIC DUCTBANK
TELECOM DUCTBANK
CHILLED WATER PIPE:
STEAM PIPE

CONDENSATE RETURN PIPE
HCT WATER PIPE /RETURN
HEATING HOT WATER
REUSE WATER PIPE

GREY WATER PIPE

FUTURE, UTUTY, SHOWN FOR
INFORWATION Ow

INLET PROTECTION

ELEVATION CONTOURS
MaTOH UNE

AREA DRAIN
ACCESS BASN

RAN MANHOLE

WATER QUALITY STRUCTURE
CATCH BASIN

DOUBLE CATCH BASIN
WATER QUALITY INLET
SEWER MANHOLE

STEAM MANHOLE

TELECOM MANHOLE
ELECTRIC MANHOLE
CHHLLED WATER VALVE
WATER VALVE

FRE HYDRANT

ABBREVIATIONS
Aa ACCESS BASH
AD ARES ORAIN
BC BOTTON OF CUR ELEVATION
C3 ATDH BASIN
(cca APE CoD BER
1 CAST IRON
Gh CONTROL JOINT
cL CENTER UNE
co CLEANCUT
co? CENTER OF PPE
© CARER PIPE
(CP> CORRUGATED POLTETHILENE PPE
C3 DOUBLE CATCH BASIN
DL DUCTILE IRON PIPE: CEMENT NED
NH ORAN MANHOLE
EH ELECTR HARDHOLE
EJ EXPANSION JOINT
EMH ELECTR MANHOLE
FD. FOUNDATION DRAN
FFE INSHED FLOOR ALEVATON
We WIGH PONT
HD MRE HYCRANT
Ny NVERT ELEVATION
LF UNEAR FEET
Low. UMIT OF woRK
tow Port
UW UB WASTE
(Ma> —MAINTAN ANC PROTECT
No HOT IN CONTRACT
(0D ON OENTER
(OCS OURET CONTROL STRUCTURE
PERNETER DFAIN
PERFORATED

Pye
Rad
Ras
PO
RM
‘su

To?
103

uo
uso
vor

wos
we

POLIVINYL CHLORIDE PPE
REMOVE AND DIS=OSE
REMOVE AND STOCKPILE
ROOF (RAN

RM ELEVATION

SEVER MANHOLE

SEVER SERVCE.

TOP OF SURB ELEVATION
TELECOM HAVOHOLE
TELECOM MADHOLE

TOP OF 2

70P OF DUCT BANK
TyPeAL

UNDERORAIN

UNDERSLAB DRAN
VERTICAL GRANITE CURB
WATER QUALITY MET
WATER GUALTY STRUCTURE
WATRR VALVE

»
CONSULTING LLC

@ A Vidaris Company

28¢ DORCHESTER AVENUE
BOSTON, Ma 02127

2 (S17) 268-6977
G17) 40823977

S1@ch conse ingtts.com

JOHN F. KENNEDY
ELEMENTARY
SCHOOL
FIELD COMPLEX
BATHROOM
FACILITY

TOWN OF
CANTON

96 WASHINGTONST.
CANTON, MA 02021

Drang Tate

CIVIL NOTES,
LEGEND, &
ABBREVIATIONS

Fv

‘sb son

DESIGN
DEVELOPMENT

wn             as

C3-01

Source page 9

LOWNT SPAONG =                                                                                 HoT Mi ASPHALT
| WONT SPENT 4 gost sor                                                     2
OR 6" MAX,                                                                                     COURSES (ADJUST TO SRADE)
of] 0         | xe w2.e/ae wr                                                          Tae COAT
.        ne                a                                                                                  =
are    4" CONCRETE                                                E  F           Z     ZZZA
a) Gee tae                                                         ‘
«        )                                          MATCH EXISTING          —      \   (reer                         ~
8" GRAVEL BORROW                                       BASE COURSE =| TRE            \   COURSE
(woot wos. TRE “37                                                          CONSULTING LLC
conpacten sunsrane                                                                        “saveur                                 rv)
a Reno Unsara aTERIAL. &                                                                                                         A Vidaris Company
Revace Wein Geavet Suntow                                 Woes                                                                  tse poncuestex avenue
(Wet wos. TYRE *3") COMPACTER                         teTRGOSeD CONCRETE BASE COURSE SHALL BE LEYGL WH                       OG TA,
is waves                                        Tie OS Ce EMBTING Base COURS
o(si7) 208-6977
CONCRETE SIDEWALK DETAIL                                PAVEMENT RESTORATION OVER TRENCH DETAIL                     red
NOT TO SCALE                                                                        NOT 10 SOALE                                              sbiQcolconmeitingtisacon
1 HOT MX_ASPHALT      NOTES:                               pusuc sree | SURAT                                     ELEMENTARY
re                       tor oun                                     Paveye SUE STEEL | SEW
s.0Pe (TP)                  "LOT MIX         1. SURFACE FINISH 70       (SEE DETAL)              savour                        SCHOOL
SPAT Boer             we
15 Hom          F                        Sirrounctve AREA
rm |                       | eae                         7,                        —                       FIELD COMPLEX
RESTORATION WTHN sANGUT & TACK cont~/ |
rs                                      =               ROADWAY SHAL._ EE      GRAVEL BORRGW ——“E-                f-FLowABL= FLL PER                    BATHROOM
LANDSCAPED                            Langgcyre          COMPLETED BY TFE COMPACTED IN <* LETS.                     B.PM, STANDARD
AER             5          _             bas              Sparon  “Pueuc “SSeS was oeNSLy                I Seatacations                           FACILITY
2 gana) Gowehcreo                      eee      A ba                 | Sie Sac zane,
Perrier ene     GE   SRAVEL BORROW. SS     Fi                                   oT WILOSO —_£ woTH AS INDICATED | REMONE.
UNSUITABLE WATERIAL de REFLAZE 1p          KuooT 1.03.0 TYPE "8")         my                                cme et)                       UNSUITABLE MATERIAL &

TH GRAVEL BORRCW                                                                                                                              REPLACE

om                                                                                  Sh STANDAED                          "Ht GRAVEL BORRON
woprtana ee)                                                                                  SPECHIONTONS                        (Moor M05. TPE "3")
HOT MIX ASPHALT SIDEWALK DETAIL                               SURFACE RESTORATION WITHIN PUBLIC WAYS DETAIL
NOT TO SCALE                                                                      NOT TO SCALE
_

|                                                      TOWN OF
|_ROUNDEE ¥ MAK, STONES                                     CANTON

96 WASHINGTONST.
| SEOTEXTILE FILTER FABRIC                                CANTON, MA 02021
COMPACTED SUBGRACE
REMOVE UNSUITABLE MATERIAL &
REPLACE. WITH GRAVEL. BORROW

(WOOT M1.03.0 TYPE “B*) COMPACTED               eee
Nie" LAveRS
GRAVEL DRIP EDGE DETAIL
NOT TO SONE                                               SITE DETAILS

|
i                                                                                                                                                                                                                                                         DESIGN
4                                                                                                                                                                                                                                                               DEVELOPMENT

C3-02

QUI3I34)FK Retscontca

Source page 10

[COT éwe_Jan 29, 2019-5509m_JSOARES

QUI3I24)FK Retreat

ADJUST RIMS TO PROPOSED FINISH GRADE
USING GRADE RINGS IF NECESSARY,

re ce
Jpn oan

\                                     ‘i      -      -         j
t                                 f                          T
ae
SECTION C-C                SECTION D-D
ROUND                        SQUARE

ro
aR aS
WATER GATE BOX DETAIL
~—           comee
:                                                      +
ae
APPROXIMATELY                 fe ts

(MAIN TUBE SHOE

3/8" copPER:
Save wre

(   6" WATER,
MAN

‘CORPORATICN STOP:

TEMPORARY WATER CONNECTION DETAIL
FOR 3/4" SERVICE PIPES

WeMAXIMUM TRENCH WICTH PW = MAXIMUM PAVNG
WoT = W + 1-0" D=DUTSIDE DIAMETER.
UNSHEATHED TRENCH: W = D+ 2: 3'-0" MIN
SHEATHED TRENCH: W = D+ 2° + SHEATENG WIDTH
4'=2" Wis. WTHCUT WALERS 5'-0" MIN. WITH WALERS
TRENCH BOX OR HYDRAULIC SHORING: W= D+ 2° +
(WALL SHLD WOTH <= 6") + 1' FOR TRENCH 80x

BT. CONC. PAVENENT OR
PATCH (SEE TYPICAL
ew                 PAVEMENT DETAIL AND
NATERAL SPECS.)

ee er
eee
eae                        eee
‘SCREENED GRAVEL-                      [—*" + doa.
CONCRETE SAND     we    -     {4 D HAUNCHING
SE                            panes
ota po       rae
SOREENED ene,
PVC PIPE TRENCH DETAIL

4
3,000 951 ceuent

(CONCRETE, NIN

ZURN CLEAHOUT
PRODUCT NO. 78=1402-BF—HD
‘CAST IRON WITH HEAVY

‘CUTY BRASS TO> OR
APPROVED EQUAL

6" PVC 45" BEND

MAN LINE:

Neve wie, acaprers
'AS NECESSARY

TYPICAL CLEANOUT DETAIL
NOT TO SCALE

(CROSS COUNTRY         ROADS__RCAD SHOULDERS,

DRNEWAYS, WALKAAYS:

24” SEWER MANHOLE COVER—\

rst crane,

ADJUST TD FINISH
RADE WITH COURSES.
(OF MORTARED B3ICK
2-COURSES MIN,
AC COURSES UAX.

STEEL ReINFcRCeD———_ |

BED OF NOPTAR

COPOLYMER
POLYPROPYLENE
PLASTIC. STEPS:
woctp) s+
TO BOTTOM = MiN“}'.4-c" DIA

MORTAR _JONNTS. INSIDE:                       +
2.OUT AFTER Precast. ff ——SSS~& a

SECTIONS ARE It PLACE
in, /

(nP)           ;
i                  Te:
127 MIN. COMPACTED GRAVEL BORROW

onary,          ——+
SEWER,
(WOOT M1030 "TYPE B") COMPACTED SUBBASE

INVERTS TO BE INVERTED ARCH
W/RED SEVER BRICK LAID AS.
‘STRETCHERS & ON EDGE
PRECAST CONC,

MANHOLE EASE.                         T
'SESTION

FRAME TO GE SET IN FULL

BIT. CONC.
CEMENT CONCRETE COLLAR

PRECAST CONCRETE
MH ECCENTRIC CONE

SECTION OF FLAT SLAB
SECTION @ SHALLOW NH

PRECAST CONCRETE M4
RISER SECTION

BRICK SHELF SHALL BE
SLOPEC) TOWARD.
CHANNEL. LOWEST SHELF
ELEVATION TO BE AT
LEAST AS HIGY AS
CROWY OF HIGHEST PPE
RUBEER BLOT
UNSUITABLE

MATERIAL To BE
REMOVED AND
REPLACED W/SRAVEL
BORROW (WOO)

M030 "TPE 8°)
COMPAZTEC

IN eT LA

s

TYPICAL SEWER MANHOLE DETAIL

NOT TO SCALE

(CROSS COUNTRY:

3° LOAN
AND SEED.

SEE PAVEMENT
SECTION CETAIL

Mn,
Mex

5
iN

Laz

WATER TRENCH DETAIL
NOT TO SCALE

}—BANK RUN GRAVEL

AAND/OR SUITABLE
MATERIAL FROM THE

TAVATION COMPACTED
12" UFTS

SAND AROUND PIPE:
i                              COMPACTED IN 6” LIFTS

Dene IRON CLASS 52

WATER PIPE

»
CONSULTING LLC

@ A Vidaris Company

28¢ DORCHESTER AVENUE

2 (S17) 268-6977
G17) 40823977

JOHN F. KENNEDY
ELEMENTARY
SCHOOL
FIELD COMPLEX
BATHROOM
FACILITY

TOWN OF
CANTON

96 WASHINGTONST.
CANTON, MA 02021

UTILITY DETAILS

DESIGN
DEVELOPMENT

C3-03

Source page 11

COT wg_fn29, 2019-551 pm_JSOARES

2413134) Rte

MANHOLE FRAWE—

PND CO

(ve. FoR Two)

26

WATERTICAT

CONCRETE COVER ON
TD? OF TANK (TYP)
NER

=

PLAN                             |

wa ||

(COVERS                                 i ——{—-« Pre vent

401A, INET
ScH-a0 Fv

PDUIST TO GRADE
‘TH SEWER BRICK

SETA FIISH GRADE

i           1-0"

T
eur,        ale

ae                    Me

12 CRUSHED STONE              ol
(woot waci4) | ———

ELEVATION

spromcanon:

1. CONCRE'E wINUM STRENGTH ~ 6009 PS: @ 28 DAYS

2, STEEL FENEORGIMENT —VASTA AGIS GR66, ATED OR ACQ7 — 1 MI COVER

5 sree Soko = AuseTO Hzduse © Eat COVER O10 5 Feet

Staten RS 9 AS

3 SONSTRUGTION JONT = SEALET WIM 1" IA, BUTYL RUBBER O8 EQUIVALENT

8 TONAL CAPO 1,500 CAL-ONS

1,500 GALLON GREASE TRAP DETAIL

NOT TO SCALE

SUPPLIED TH
MAA SMNCTION BOX

4° IA INET
RugaER BOOT                             y pve STUB
w/cLaNe
| rain sack HOLE:
coro                                              sn

BARNES SEAI1

NoTEs:

41. CONCRETE: 4,000 PSI MINIMUM AFTER 28 DAYS.

2. DESIGN CONFCRMS WITH 310 CMF 15.CO0, DEP TILE 5
REGS, FOR PUMP CHAUBERS.

‘3. ALL REINFORCEMENT PER ASTM C1227.
JOINT SEALED WITH BUTYL RESIN.

5, COVER EXCEEDS 4 FECT, HEAVE DUTY TANK REQUIRED.
ALSO AVAILABLE IN AASHTO HS-29 LOADING,

6. PUMPS AND AZCESSOREES OPTIONAL

7. SUPPUED NEMAT PUMP CONTROL PANEL W/ALARM

DUPLEX PUMP STATION

NOT TO SCALE

»
CONSULTING LLC

@ A Vidaris Company

28¢ DORCHESTER AVENUE

2 (S17) 268-6977
G17) 40823977

JOHN F. KENNEDY
ELEMENTARY
SCHOOL
FIELD COMPLEX
BATHROOM
FACILITY

TOWN OF
CANTON

96 WASHINGTONST.
CANTON, MA 02021

UTILITY DETAILS

DESIGN
DEVELOPMENT

C3-04

Source page 12

©                                                           ?                       ®                                                      FLOOR PLAN LEGEND:

SS                           —                     "        se                        a                                                                                                                                        [D> euros entRviexrr, TrPIcaL
a era Lay                                 —-— enonerenence une, rca
voone | vaowe                                    Soo                                                                                     4
weaes | aare                                             /                   Leo                                                             3
nase | Ma                                                     ihn
.                                                                                                                                                                                                             @® __criowerenence, 1ve1cal
i:                       <7-Pr INSULATED                                                           ~    -                      &                      -@                                                  mw
HoLLOwferal 0008                   Pee     §                        ALUM                                                                                                 Roo                                         CONSULTING,LLC
ISHS ag ee te,                 |            9             samme,                                                                                                      FA ROOM TAG, TYPICAL
| 8                       cot RLY       a                                                                                                       faa]                                           @ A Vidaris Company
5                    JES oe          it            E                                     srencoumn |                                         ;           .              ase ooncnesreR AVENUE
;                                                                                                                                                                                        GYPSUM BOARD WALL. TYPICAL                 APSO EN
‘                       x]                   \               «                       ON METAL FRAME               +                                   TeEL SERVING COUNTER
a fs           Ok                                                                                          sansa                                                        6" om WAL, TYPICAL
a            1                                         :                                              ong                                  | cago                                 A          z
           i | >                                                                            ce                                              i                                 4 ©                        rowan
seructa swose wos
|                            ,                         A                            saat                                                                                                    JOHN F. KENNEDY
4                                  1                                           €                            Nimont oF" cna                                    H                              H                                                                             STAR BREAREINE, TYPICAS                               ELEMENTARY
telco] ow fos
.                               \ Lautan      Te                                           ano snk                                                                                                                                                                        SCHOOL
dy                           Ame              n
“|                     insutareD Hou ow     i       \ Lo                sear                                                                                                                              FIELD COMPLEX
7                               ETAL 00% a0     4                  Pac)                                                                                                                                                   WALL TYPE LEGEND:                                       BATHROOM
——s                                                     :                           an                   id                            “©               O- row                                      FACILITY
PEER Tone ME              aasrotee                             se Poe                           |                       |                       3                                    6 MUI WALL WT 6 METAL STUD AND
ces                                ,                             2                                                                                                      Sa TS NET
aan                              ee                   eee               |                       |                                                  O-Ring
:       O—  orrewermswo
                crest                                                                               ta
FLOOR PLAN                                                                                                                                                                    Ves
VC
.                  ;                                                                                  TOWN OF
-        ‘                                                                                                                                              <             OOF OECK PANTED.                                                                            CANTON
Seunnt                         \                                                                                                               '                       :                    #0059
REFLECTED CEILING PLAN LEGEND:                            FENN Moxos
7                                 goa oan mre res
)                                   }                       }                                                             YPSUM WALL BOARD CEILNG
|                                                           VV                                               1                                               &                                               FLOOR PLAN
             =                            —              =                                                                                        ®             42g ceunsneonen                            AND REFLECTED
=                           is |                                             '                      H                                                                                                 CEILING PLAN
©, PENDANT LIGHT EOTURE
[Shan ens                      H                                                                                                   vie
pines                                                                                                                                                                                                      1-0°X 4.0" LIGHT FIXTURE                                        Ss
O,
_                                                                                                                                                   +                                                                                                                        DESIGN
DEVELOPMENT
Zhasdeelects                cferocta                                                                                                                                                                                ae
7 esis
e                                                                                      sores

7 aa
LECTED CEILING PLAN                                                                                                                                                                           ye

Source page 13

Ca    0
Lis                                                                                                        N
/                                                   CONSULTINGLLC
\ exe noe counn                                                               @ A Vidaris Company
JOHN F. KENNEDY
BEER ae                                                                     ELEMENTARY
i.             Roane                                     SCHOOL
       1                                                                                              FIELD COMPLEX
7        Lo.                                   .
LT!                                                             BATHROOM
a                                                                                                                FACILITY

“«—
it      }
(4 EQUNpatiON PLAN                                                                                                                                             YY Ys

w

o                  g                                                                                  TOWN OF
cuesesroe                    |                                                                                              CANTON

!            !                                                     96 WASHINGTON ST.
/     /                                                                                                                                                 CANTON, MA 02021
-         af a eee ee a      tt at} I HY    -—-—-—®                                   FOUNDATION
Hl                    iL Vi    ee                                 PLAN AND
inn                    pty    nee                                 ROOF PLAN
yl                             Wy yey pl      |      Le ee ee
yl                              Wy yey pl      |      WP Pep Pa pp ye pp yt    _~conrinjous Roce BOARD
yl                            Wy yey pl      |      en                                         ia
|     |                                                   ia     ia     |           |           |     |     |     |     |     |     |     |     He
yl                     Wy yee pl    |    ee                                    on ws
io                             WAL LE Ed      |      1
fi                            yy      AT ap ay Pay                                            2G CoO
|                                                   WO We
|i                Try | pay    |    Wl a ay a aa a                                  oo
yl                             Wy yy yl      |      WE PW Pa Pp py     CCONTRLOUS EVES BEA                                  (se)
yl                             Wy yey Al      |      Le ee ee
_       1   1   t   t   t   tot   t   t   t   t   tot   tot   t   t   t      1   1   it   Ll   Ll   Ll   i) aie        -—®                                ‘ie
DESIGN
DEVELOPMENT
senor se exTEnOR GRADE LYMOOD         vr. wooo mrTERS@ 106                                                                        :                                                                             °        i

‘OD
ROOF PLAN,                                                                                                                                                                                                                      \        )

:

Source page 14

iS
CONSULTINGLLC
@ A Vidaris Company

Ty

DOPPT Teer ee ee eee ee eee eee ee eee reer rt
T               m

250 DORCHESTER AVENUE

BOSTON, MA 02

voce pone                                                                                             JOHN F. KENNEDY
NORTH ELEVATION                                                                                                                                                                                                                        ELEMENTARY
pe we                                                                                                                                                                                                  SCHOOL

FIELD COMPLEX

©

BATHROOM
FACILITY

/   Woob RAFTERS
I exe.

pon

eee

a TaSeS es ees es SSS Se a                          Fn
besa aw awe ererec wees vaeesnerav ene eae pg] neanerasies

Pe ne eS et A ee a        a                         TOWN OF
a                                                 ‘POST, PAINTED |                                           CANTON

ro
SATA aFUTUTANITETLTEIEFIFOTLIENINEIET HERE LER ETT                                                              ssyrsmeroyst
     a eee ee esee      oa                                          ENEMA
2 SOUTH ELEVATION                                                               EXTERIOR
Baeee                                                                                                                                                                                                                       ELEVATIONS
Xs                       Pg
6                                                OR Oo
Zw os                ee   aoe                      PK oe
Poot  oo                    poEoot    oor  SS                          oe
Cer                         Sooo oop pod                        (se)
ao      Lit                Doo eee
| ee        ooo.                      i eseeee ese ee earns fas eaesesene
S| Ct ty   re i |           Doro              ‘Submis
fesetaatsesesesewenenssooarenl                           ee      aaa
ease pacman eremenerereeeaee                          Se rrr ee                                          DESIGN
po                    ee GG GG GGG                             DEVELOPMENT

(owes ELEVATION                                                                                            ©) EAST ELEVATION

Source page 15

£°0xYFLOORNG SYSTEM,

CONTINJOUS ICE & WATER SHIELD OVER ENTIRE ROOF

\\conmuous eaves aera,

ore 000m 18%
—>

G) TYPICAL WALL SECTION

iS
CONSULTINGLLC
@ A Vidaris Company

250 DORCHESTER AVENUE
Boston, MA 02197

Pasir)
Ftei7)

oie

JOHN F. KENNEDY
ELEMENTARY
SCHOOL
FIELD COMPLEX
BATHROOM
FACILITY

TOWN OF
CANTON

96 WASHINGTON ST.
CANTON, MA 02021

EXTERIOR
WALL DETAILS

DESIGN
DEVELOPMENT

cnorno18

Source page 16

C O N S U L T I N G, L L C
                 A Vidaris Company
250 DORCHESTER AVENUE
B O S T O N, M A 0 2 1 2 7

P: ( 6 1 7 ) 2 6 8 - 8 9 7 7
F: ( 6 1 7 ) 4 6 4 - 2 9 7 1

 cbi@cbiconsultingllc.com
 www.cbiconsultingllc.com
 www.vidaris.com




 JOHN F. KENNEDY
    ELEMENTARY
      SCHOOL
  FIELD COMPLEX
     BATHROOM
      FACILITY




              TOWN OF
              CANTON
              96 WASHINGTON ST.
               CANTON, MA 02021


Drawing Title:




              PLUMBING
             FLOOR PLAN

Revisions:



                    S E T
                S S
              E R N
            R
          G FO IO
        O
      PR NOT UCT
             S TR
         O N
       C
Submission:


         DESIGN
      DEVELOPMENT
                               Date:              02/07/2019
                               Project Number: CB181535
                               Project Manager:          BS
                               Drawn By:                 LE
                               Scale:         As Indicated




              P001

Source page 17

C O N S U L T I N G, L L C
                                                                                                                            A Vidaris Company
                                                                                                           250 DORCHESTER AVENUE
                                                                                                           B O S T O N, M A 0 2 1 2 7

                                                                                                           P: ( 6 1 7 ) 2 6 8 - 8 9 7 7
                                                                                                           F: ( 6 1 7 ) 4 6 4 - 2 9 7 1

                                                                                                            cbi@cbiconsultingllc.com
                                                                                                            www.cbiconsultingllc.com
                                                                                                            www.vidaris.com




                                                                                                            JOHN F. KENNEDY
                                                                                                               ELEMENTARY
                                                                                                                 SCHOOL
                                                                                                             FIELD COMPLEX
                                                                                                                BATHROOM
                                                                                                                 FACILITY




                                                                                                                         TOWN OF
                                                                                                                         CANTON
                                                                                                                         96 WASHINGTON ST.
                                                                                                                          CANTON, MA 02021

                                                                                         1             2   Drawing Title:




                                                                                                                         PLUMBING
VENDING   VENDING                                                                                                       FLOOR PLAN
MACHINE   MACHINE
 N.I.C.    N.I.C.




                    CHANGING                                                                               Revisions:




                               BOILER
                      TABLE
     WOMENS
    BATHROOM                            JANITOR'S
                                         CLOSET                                                                                S E T
       101
                                          100A
                                                                                                                           S S
                                                                                                                         E R N
                                                                                                                       R
                                                                                                                     G FO IO
                                                                                                                   O
                                                                                                                 PR NOT UCT
                                                                                                                        S TR
                                                    CONCESSION                               COVERED
                                                                                                                    O N
                                                      STAND
                                                       100
                                                                                               AREA
                                                                                                100
                                                                                                                  C
                                                                                                           Submission:


                                                                                                                    DESIGN
      MENS
    BATHROOM
                                                                                                                 DEVELOPMENT
       102
                    CHANGING                                                                                                              Date:              02/07/2019
                      TABLE                                                                                                               Project Number: CB181535
                                                                                                                                          Project Manager:          BS
                                                                                                                                          Drawn By:                 LE
                                                                                                                                          Scale:         As Indicated


                                                                 PLUMBING - Floor Plan
                                                            1 SCALE: 1/4"= 1'-0"
                                                                                                                         P100

Source page 18

DUCTWORK LEGEND    DRAWING NOTES        ABBREVIATIONS   GENERAL NOTES




                  EQUIPMENT TAGS
                                                                         C O N S U L T I N G, L L C
                                         DAMPERS
                                                                                         A Vidaris Company
                                                                         250 DORCHESTER AVENUE
                                                                         B O S T O N, M A 0 2 1 2 7

                  AIR DEVICE LEGEND   CONTROL LEGEND                    P: ( 6 1 7 ) 2 6 8 - 8 9 7 7
                                                                        F: ( 6 1 7 ) 4 6 4 - 2 9 7 1

                                                                         cbi@cbiconsultingllc.com
                                                                         www.cbiconsultingllc.com
                                                                         www.vidaris.com




                                                                         JOHN F. KENNEDY
                                                                            ELEMENTARY
                                                                              SCHOOL
                                                                          FIELD COMPLEX
                                                                             BATHROOM
                                                                              FACILITY




                                                                                      TOWN OF
                                                                                      CANTON
                                                                                      96 WASHINGTON ST.
                                                                                       CANTON, MA 02021


                                                                        Drawing Title:




                                                                              MECHANICAL
                                                                                NOTES &
                                                                             SPECIFICATIONS

                                                                        Revisions:



                                                                                            SE T
                                                                                        S S
                                                                                      E R N
                                                                                    R
                                                                                  G FO IO
                                                                                O
                                                                              PR NOT UCT
                                                                                     S TR
                                                                                 O N
                                                                               C
                                                                        Submission:


                                                                                 DESIGN
                                                                              DEVELOPMENT
                                                                                                       Date:              02/07/2019
                                                                                                       Project Number: CB181535
                                                                                                       Project Manager:
                                                                                                       Drawn By:
                                                                                                       Scale:




                                                                                      M001

Source page 19

C O N S U L T I N G, L L C
                                 A Vidaris Company
                 250 DORCHESTER AVENUE
                 B O S T O N, M A 0 2 1 2 7

                P: ( 6 1 7 ) 2 6 8 - 8 9 7 7
                F: ( 6 1 7 ) 4 6 4 - 2 9 7 1

                 cbi@cbiconsultingllc.com
                 www.cbiconsultingllc.com
                 www.vidaris.com




                 JOHN F. KENNEDY
                    ELEMENTARY
                      SCHOOL
                  FIELD COMPLEX
                     BATHROOM
                      FACILITY




                              TOWN OF
“   ”
        “   ”
                              CANTON
                              96 WASHINGTON ST.
                               CANTON, MA 02021


                Drawing Title:




                             MECHANICAL
                              DETAILS &
                             SCHEDULES

                Revisions:



                                    SE T
                                S S
                              E R N
                            R
                          G FO IO
                        O
                      PR NOT UCT
                             S TR
                         O N
                       C
                Submission:


                         DESIGN
                      DEVELOPMENT
                                               Date:              02/07/2019
                                               Project Number: CB181535
                                               Project Manager:
                                               Drawn By:
                                               Scale:




                             M002

Source page 20

C O N S U L T I N G, L L C
                                                                                                         A Vidaris Company
                                                                                         250 DORCHESTER AVENUE
                                                                                         B O S T O N, M A 0 2 1 2 7

                                                                                        P: ( 6 1 7 ) 2 6 8 - 8 9 7 7
                                                                                        F: ( 6 1 7 ) 4 6 4 - 2 9 7 1

                                                                                         cbi@cbiconsultingllc.com
                                                                                         www.cbiconsultingllc.com
                                                                                         www.vidaris.com




                                                                  1             2        JOHN F. KENNEDY
                                                                                            ELEMENTARY
                                                                                              SCHOOL
                                                                                          FIELD COMPLEX
VENDING
MACHINE
          VENDING
          MACHINE
                                                                                             BATHROOM
 N.I.C.    N.I.C.
                                                                                              FACILITY
                                                                                    A
                    CHANGING




                                BOILER
                      TABLE
     WOMENS
    BATHROOM                             JANITOR'S
                                          CLOSET
       101
                                           100A




                                                     CONCESSION       COVERED
                                                       STAND            AREA
                                                        100              100

                                                                                                      TOWN OF
                                                                                                      CANTON
                                                                                                      96 WASHINGTON ST.
      MENS
    BATHROOM                                                                                           CANTON, MA 02021
       102
                    CHANGING
                      TABLE                                                             Drawing Title:
                                                                                    B




                                                                                            MECHANICAL
                                                                                         FIRST FLOOR PLAN


                          MECHANICAL - First Floor Plan                                 Revisions:
                     1 SCALE: 1/4"= 1'-0"
                                                                                                            S E T
                                                                                                        S S
                                                                                                      E R N
                                                                                                    R
                                                                                                  G FO IO
                                                                                                O
                                                                                              PR NOT UCT
                                                                                                     S TR
                                                                                                 O N
                                                                                               C
                                                                                        Submission:


                                                                                                 DESIGN
                                                                                              DEVELOPMENT
                                                                                                                       Date:              02/07/2019
                                                                                                                       Project Number: CB181535
                                                                                                                       Project Manager:
                                                                                                                       Drawn By:
                                                                                                                       Scale:




                                                                                                     M100

Source page 21

C O N S U L T I N G, L L C
                 A Vidaris Company
 250 DORCHESTER AVENUE
 B O S T O N, M A 0 2 1 2 7

 P: ( 6 1 7 ) 2 6 8 - 8 9 7 7
 F: ( 6 1 7 ) 4 6 4 - 2 9 7 1

 cbi@cbiconsultingllc.com
 www.cbiconsultingllc.com
 www.vidaris.com




 JOHN F. KENNEDY
    ELEMENTARY
      SCHOOL
  FIELD COMPLEX
     BATHROOM
      FACILITY




              TOWN OF
              CANTON
              96 WASHINGTON ST.
               CANTON, MA 02021


Drawing Title:




       ELECTRICAL
      LEGEND AND
     SPECIFICATIONS

Revisions:



                   S E T
               S S
             E R N
           R
          G FO IO
        O
      PR NOT UCT
            S TR
         ON
       C
Submission:


         DESIGN
      DEVELOPMENT
                                Date:              02/07/2019
                                Project Number: CB181535
                                Project Manager:
                                Drawn By:
                                Scale:




              E001

Source page 22

ACT LOCATON WIM UTLY.

(~           —

apesorouige-2e

x0 Le.

$i RT

POWER RISER DIAGRAM
NTS,

srs

RECTAL CONTRACTOR HLL ROWDE GOR, 240 YLT, S-PISE OBCOWEET

8 COCESSON TMD

DECAL CMTCTOR SLL GRIND W ACOROMCE WT NEE ARTEL 250 AS AMENED or WASSACHISET
Esme. Oe

Bas
ears,

— Ngraon
(y 7 cout
TELE/DATA RISER DIAGRAM

ES

[GREESSON SIND EC. SHUL GIROMNE ENCT ROME W ILD (UPROMUATY 900)

LIGHTING FIXTURE SCHEDULE

i%
we                  CONSULTINGLLC

@ A Vidaris Company

5                                  (617) 269-097

F(si7) 4ee2971

cbi@cbiconsultinglic.com

weer                ve | watme |r
ference ware                                                 ce                                    vf           ©          7
li cave nae                                               now                               ‘|          BS         ve
lou wore exec sre ww To (2) Hs                    mt                           a]          we
Prorat

1. AL ECESEDFRTUE TN To BE PANED TO WATE BUN

2 MTE 4 SMPTE WO CFOWELE STEM LENG AL NEES MOAT OME, FER EIS, WANE COWEVNS, EES

PANEL 'PP1', 200 AMP, 120/208 VOLT, 3 PHASE, 4 WIRE AND GROUND
LORD DESCRIPTION    A] 8 | CJpHase| no |PH| No jpHase| A [8 |S    LOAD DESCRIPTION
[BRTHROGH RECPS:              7]              2] 11          20 [700             TSN
-[VENOING WACHINE REGF-      Ta]__ Fos pa a 20    Top]   PATER FOUNTAN
[VENDING WAGHINE REGP        FC)      1020 [FIRE ALARM PANEL
[GENERAL RECP:                 ied              20-[ 7A          20050            TRAP PRIMER
[OVERCOUNTER RECP-                 oe)         oT           7         700            5
[OVERCOUNTER RECP..        oe] ae.    2     Toe
rou           ro] rte   2    Tega
IME CLOCK           oa] Pa tate    5    To] _leot
pune        12]    2 bsta    200)
wo es    »   Zao] _|WaTeR HEATER (HWH)
[ort             «o Ke       za
lpune          ir     a Pita      Li]
"           Gedy    [Psstetse] 7   Sa0]__|wawe up ae
[poor             Fn md       a0
[SPACE & HARDWARE      1   [see 20-T       [SPACE & HARDWARE
[SPACE & HARDWARE           a pope        [SPACE & RAROWARE
ELECTED     SUSTOTATS     iF. @5[12 35] 20)
1583 KVA                     ‘OPTIONS:
TOTALLOAD 4728 KVA

JOHN F. KENNEDY
ELEMENTARY
SCHOOL
FIELD COMPLEX
BATHROOM
FACILITY

TOWN OF
CANTON

196 WASHINGTON ST.
CANTON, MA 02021

ELECTRICAL
RISER &
SCHEDULES

DESIGN
DEVELOPMENT

E002

[Original embedded text, retained for comparison]
C O N S U L T I N G, L L C
                 A Vidaris Company
 250 DORCHESTER AVENUE
 B O S T O N, M A 0 2 1 2 7

 P: ( 6 1 7 ) 2 6 8 - 8 9 7 7
 F: ( 6 1 7 ) 4 6 4 - 2 9 7 1

 cbi@cbiconsultingllc.com
 www.cbiconsultingllc.com
 www.vidaris.com




 JOHN F. KENNEDY
    ELEMENTARY
      SCHOOL
  FIELD COMPLEX
     BATHROOM
      FACILITY




              TOWN OF
              CANTON
              96 WASHINGTON ST.
               CANTON, MA 02021


Drawing Title:




             ELECTRICAL
               RISER &
             SCHEDULES

Revisions:



                   S E T
               S S
             E R N
           R
          G FO IO
        O
      PR NOT UCT
            S TR
         ON
       C
Submission:


         DESIGN
      DEVELOPMENT
                                Date:              02/07/2019
                                Project Number: CB181535
                                Project Manager:
                                Drawn By:
                                Scale:




              E002

Source page 23

C O N S U L T I N G, L L C
                 A Vidaris Company
 250 DORCHESTER AVENUE
 B O S T O N, M A 0 2 1 2 7

 P: ( 6 1 7 ) 2 6 8 - 8 9 7 7
 F: ( 6 1 7 ) 4 6 4 - 2 9 7 1

 cbi@cbiconsultingllc.com
 www.cbiconsultingllc.com
 www.vidaris.com




 JOHN F. KENNEDY
    ELEMENTARY
      SCHOOL
  FIELD COMPLEX
     BATHROOM
      FACILITY




              TOWN OF
              CANTON
              96 WASHINGTON ST.
               CANTON, MA 02021


Drawing Title:




             ELECTRICAL
               DETAILS

Revisions:



                   S E T
               S S
             E R N
           R
          G FO IO
        O
      PR NOT UCT
            S TR
         ON
       C
Submission:


         DESIGN
      DEVELOPMENT
                                Date:              02/07/2019
                                Project Number: CB181535
                                Project Manager:
                                Drawn By:
                                Scale:




              E003

Source page 24

BIRCHCROFT   ROAD




                                                  C O N S U L T I N G, L L C
                                                                  A Vidaris Company
                                                  250 DORCHESTER AVENUE
                                                  B O S T O N, M A 0 2 1 2 7

                                                  P: ( 6 1 7 ) 2 6 8 - 8 9 7 7
                                                  F: ( 6 1 7 ) 4 6 4 - 2 9 7 1

                                                  cbi@cbiconsultingllc.com
                                                  www.cbiconsultingllc.com
                                                  www.vidaris.com




                                                  JOHN F. KENNEDY
                                                     ELEMENTARY
                                                       SCHOOL
                                                   FIELD COMPLEX
                                                      BATHROOM
                                                       FACILITY




                                                               TOWN OF
                                                               CANTON
                                                               96 WASHINGTON ST.
                                                                CANTON, MA 02021


                                                 Drawing Title:




                                                              ELECTRICAL
                                                               SITE PLAN

                                                 Revisions:



                                                                    S E T
                                                                S S
                                                              E R N
                                                            R
                                                           G FO IO
                                                         O
                                                       PR NOT UCT
                                                             S TR
                                                          ON
                                                        C
                                                 Submission:


                                                          DESIGN
                                                       DEVELOPMENT
                                                                                 Date:              02/07/2019
                        ELECTRICAL - Site Plan
                    1 SCALE: 1"= 30'-0"                                          Project Number: CB181535
                                                                                 Project Manager:
                                                                                 Drawn By:
                                                                                 Scale:




                                                               E004

Source page 25

1             2




    VENDING   VENDING
    MACHINE   MACHINE
     N.I.C.    N.I.C.



                                                                                         A
                        CHANGING




                                    BOILER
         WOMENS
                          TABLE                                                               C O N S U L T I N G, L L C
        BATHROOM                             JANITOR'S
           101
                                              CLOSET
                                               100A
                                                                                                              A Vidaris Company
                                                                                              250 DORCHESTER AVENUE
                                                                                              B O S T O N, M A 0 2 1 2 7

                                                                                              P: ( 6 1 7 ) 2 6 8 - 8 9 7 7
                                                                                              F: ( 6 1 7 ) 4 6 4 - 2 9 7 1

                                                                                              cbi@cbiconsultingllc.com
                                                                                              www.cbiconsultingllc.com
                                                         CONCESSION        COVERED            www.vidaris.com
                                                           STAND             AREA
                                                            100               100



                                                                                              JOHN F. KENNEDY
                                                                                                 ELEMENTARY
          MENS
        BATHROOM
                                                                                                   SCHOOL
           102
                        CHANGING                                                               FIELD COMPLEX
                          TABLE
                                                                                         B        BATHROOM
                                                                                                   FACILITY



                              ELECTRICAL - First Floor Lighting Plan
                         1 SCALE: 1/4"= 1'-0"



                                                                       1             2
                                                                                                           TOWN OF
                                                                                                           CANTON
                                                                                                           96 WASHINGTON ST.
                                                                                                            CANTON, MA 02021


                                                                                             Drawing Title:
    VENDING   VENDING
    MACHINE   MACHINE
     N.I.C.    N.I.C.
                                                                                                      ELECTRICAL
A
                        CHANGING
                                    BOILER
                                                                                         A           LIGHTING AND
                          TABLE
         WOMENS
        BATHROOM                             JANITOR'S
                                                                                                     POWER PLAN
                                              CLOSET
           101
                                               100A



                                                                                             Revisions:



                                                                                                                S E T
                                                         CONCESSION        COVERED
                                                                                                            S S
                                                                                                          E R N
                                                           STAND
                                                            100
                                                                             AREA
                                                                              100                       R
                                                                                                       G FO IO
                                                                                                     O
                                                                                                   PR NOT UCT
                                                                                                         S TR
                                                                                                      ON
          MENS
        BATHROOM
                                                                                                    C
           102
                        CHANGING                                                             Submission:
                          TABLE
B                                                                                        B
                                                                                                      DESIGN
                                                                                                   DEVELOPMENT
                                                                                                                             Date:              02/07/2019
                                                                                                                             Project Number: CB181535
                                                                                                                             Project Manager:
                                                                                                                             Drawn By:
                              ELECTRICAL - First Floor Power Plan
                         2 SCALE: 1/4"= 1'-0"                                                                                Scale:




                                                                                                           E100

Source page 26

C O N S U L T I N G, L L C
                                                                                                A Vidaris Company
                                                                                250 DORCHESTER AVENUE
                                                                                B O S T O N, M A 0 2 1 2 7

                                                                                P: ( 6 1 7 ) 2 6 8 - 8 9 7 7
                                                                                F: ( 6 1 7 ) 4 6 4 - 2 9 7 1

                                                                                cbi@cbiconsultingllc.com
                                                                                www.cbiconsultingllc.com
                                                                                www.vidaris.com




                                                                                JOHN F. KENNEDY
                                                                                   ELEMENTARY
                                                                                     SCHOOL
                                                                                 FIELD COMPLEX
                                                                                    BATHROOM
                                                                                     FACILITY




                                                                                             TOWN OF
                                                                                             CANTON
                                                                                             96 WASHINGTON ST.
                                                                                              CANTON, MA 02021


                                                                               Drawing Title:




VENDING
MACHINE
          VENDING
          MACHINE
                                                                                     FIRE ALARM
 N.I.C.    N.I.C.
                                                                                  RISER DIAGRAM &
                    CHANGING
                                                                                  FIRE ALARM PLAN




                                   BOILER
                      TABLE
     WOMENS
    BATHROOM                                JANITOR'S
                                             CLOSET
       101
                                              100A
                                                                               Revisions:



                                                                                                  S E T
                                                                                              S S
                                                                                            E R N
                                                                                          R
                                                                                         G FO IO
                                                                                       O
                                                                                     PR NOT UCT
                                                        CONCESSION   COVERED
                                                          STAND        AREA
                                                           100          100

                                                                                           S TR
                                                                                        ON
                                                                                      C
      MENS                                                                     Submission:
    BATHROOM
       102
                    CHANGING
                      TABLE
                                                                                        DESIGN
                                                                                     DEVELOPMENT
                                                                                                               Date:              02/07/2019
                                                                                                               Project Number: CB181535
                                                                                                               Project Manager:
                                                                                                               Drawn By:
                                                                                                               Scale:


                               ELECTRICAL - First Floor Plan
                      1 SCALE: 1/4"= 1'-0"
                                                                                       FA001

Source page 27

PM&C LLC

20 Downer Ave, Suite 5
Hingham, MA 02043
(T) 781-740-8007

(F) 781-740-1012

Design Development Estimate

JFK Elementary School

Bathrooom & Concessions

Canton, MA

Prepared for:

CBI Consulting, LLC

February 12, 2019

Source page 28

PM&. .

JFK Elementary School
Bathrooom & Concessions                                                                                                                                                                        12-Feb-19
Canton, MA
Design Development Estimate
MAIN CONSTRUCTION COST SUMMARY
Construction        Gross               $/sf                  Estimated
Start            Floor Area                               Construction Cost
JFK FIELD BATHROOMS & CONCESSIONS
Apr-19
BATHROOMS & CONCESSIONS BUILDING                                                                               861                                                       $412,895
REMOVE HAZARDOUS MATERIALS                                                                                                                                                               N/A
SITEWORK                                                                                                                                                                                                $216,147
SUB-TOTAL                                                                                                                              861                                                      $629,042
ESCALATION TO START OF CONSTRUCTION                                           1%                                                                               $6,290
DESIGN AND PRICING CONTINGENCY                                                            5%                                                                                          $31,767
SUB-TOTAL                                                                                                                              861                                                       $667,099
GENERAL CONDITIONS                                                                                                                10%                                                                                                                   $66,710
GENERAL REQUIREMENTS                                                                                                                                                                                            $32,200
BONDS                                                                                                           1.25%                                                                                  $8,339
INSURANCE                                                                                                  1.50%                                                                                $10,006
PERMIT                                                                                                                                                                                                     Waived
OVERHEAD + PROFIT                                                                        5.0%                                                                       $33,355
TOTAL OF ALL CONSTRUCTION                                                                                                                                                                       $817,709

Canton JFK Elementary Schoo! Bathroom-Concession DD 2.11.19 REV1       Page 2

PMC - Project Management Cost

Source page 29

C
fea

JFK Elementary School
Bathrooom & Concessions                                                                                                                                                   12-Feb-19

Canton, MA

Design Development Estimate

This feasibility cost estimate was produced from drawings, narratives and other documentation prepared by CBI Consulting. and their design
team dated January 29, 2019. Design and engineering changes occurring subsequent to the issue of these documents have not been
incorporated in this estimate.

This estimate includes all direct construction costs, general contractor's overhead, fee and design contingency. Cost escalation assumes start
dates indicated.

Bidding conditions are expected to be public bidding under Chapter 149 of the Massachusetts General Laws to pre-qualified general contractors,
and pre-qualified sub-contractors, open specifications for materials and manufactures.

The estimate is based on prevailing wage rates for construction in this market and represents a reasonable opinion of cost. It is not a prediction
of the successful bid from a contractor as bids will vary due to fluctuating market conditions, errors and omissions, proprietary specifications,
lack or surplus of bidders, perception of risk, etc. Consequently the estimate is expected to fall within the range of bids from a number of
competitive contractors or subcontractors, however we do not warrant that bids or negotiated prices will not vary from the final construction cost
estimate.

ITEMS NOT CONSIDERED IN THIS ESTIMATE

Items not included in this estimate are:
Land acquisition, feasibility, and financing costs
All professional fees and insurance
Site or existing conditions surveys investigations costs, including to determine
subsoil conditions
All Furnishings, Fixtures and Equipment
Items identified in the design as Not In Contract (NIC)
Items identified in the design as by others
Owner supplied and/or installed items as indicated in the estimate
Utility company back charges, including work required off-site
Work to City streets and sidewalks, (except as noted in this estimate)
Construction contingency
Contaminated soils removal

Canton JFK Elementary School Bathroom-Concession DD 2.11.19 REV1       Page 3                                                           PMC - Project Management Cost

Source page 30

P

cy

o

be
oe

JFK Elementary School
Bathrooom & Concessions
Canton, MA

Design Development Estimate

12-Feb-19

CONSTRUCTION COST SUMMARY

BUILDING SYSTEM                                                     SUB-TOTAL

A1o

Bio

B20

B30

C10

C30

D2o

D30

D40

D50

E1o

F2o

TOTAL

JFK FIELD BATHROOMS & CONCESSIONS
FOUNDATIONS
A1010      Standard Foundations                                            $47,877
A1o20 —_ Special Foundations                                                            $0
A1030 —_—_ Lowest Floor Construction                                             $8,891                  $56,768          $65.93        13.7%
SUPERSTRUCTURE
Bio1o        Upper Floor Construction                                                    $3,500
B1020       Roof Construction                                                      $48,000                  $51,500          $59.81        12.5%
EXTERIOR CLOSURE
B2010       Exterior Walls                                                                     $54,820
B2020 = Windows /Curtainwall                                                   $8,900
B2og0 Exterior Doors                                                            $10,930                  $74,650          $86.70        18.1%
ROOFING
Bg010 —swRRoof Coverings                                                                    $39,680
B3020 _ Roof Openings                                                                       $4,500                    $44,180            $51.31         10.7%
INTERIOR CONSTRUCTION
C1010       Partitions                                                                    $16,259
C1020 —— Interior Doors                                                               $2,460
C1030 _—Specialties/Millwork                                                    $10,441                  $29,160          $33.87         7.1%
INTERIOR FINISHES
C3010 ~— Wall Finishes                                                                $4,287
C3020 ~—s— Floor Finishes                                                        $9,030
C3030 ~—— Ceiling Finishes                                                             $9,191                  $22,508          $26.14         5.5%
PLUMBING
Deo          Plumbing                                                                    $57,325                  $57,325          $66.58 13.9%
HVAC
D3go0          HVAC                                                                          $22,471                   $22,471          $26.10         5.4%
FIRE PROTECTION
D4o           Fire Protection                                                                              $o                               $o             $0.00          0.0%
ELECTRICAL
Ds010 __ Electrical Systems                                                 $46,833                $46,833         $54.39       11.3%
EQUIPMENT
E10          Equipment                                                                    $7,500                    $7,500            $8.71         1.8%
SELECTIVE BUILDING DEMOLITION
F2010       Building Elements Demolition                                                $o
F2020 Hazardous Components Abatement                                     $o                           $o           $0.00         0.0%

TOTAL DIRECT COST (Trade Costs)                                                                                    $412,895         $479.55 100.0%

Canton JFK Elementary School Bathroom-Concession DD 2.11.19 REV1       Page 4

PMC - Project Management Cost

Source page 31

wb

a

20
a
22
23
24
25,
26,
27
28
29
go

a

33
34
35
36

37
a8

39

40
"a

a2

43

@

JEK Elementary School
Bathrooom & Concessions
Canton, MA

Design Development Estimate

12-Feb-19

GFA                                    863

DESCRIPTION

UNIT
cosT

EST'D                               SUB
cosr                             TOTAL

TOTAL

QTy                 UNIT                                                                                                                                               cost

JFK FIELD BATHROOMS & CONCESSIONS

GROSS FLOOR AREA CALCULATION

Bathrooms & Concessions Building

861

TOTAL GROSS FLOOR AREA (GIA)

A1o FOUNDATIONS

A1010 STANDARD FOUNDATIONS

861 sf

033000 CONCRETE
Strip footings to exterior walls - 2'-0" x.1'-0"
033000                  Formwork                                                                                 305         sf                    12.00                   3,660
033000                  Re-bar                                                                                   1,044        Ibs.                     1.20                    1,253
033000                Concrete material                                                              wd        cy                125.00                 4,375
033000                        Placing concrete                                                                                                    pee            cy                          90.00                             990
033000                  Formwork                                                                                420         sf                    14.00                   5,880
033000                  Re-bar                                                                                      630        Ibs.                      120                      756
033000               Concrete material; 4,000 psi                                               10        ey                125.00                 1,250
033000                  Placing concrete                                                                          20         cy                   90.00                     goo
Thickened slab at interior load bearing walls
033000                           Formwork                                                                                                                          105              sf                              12.00                             1,260
033000                  Re-bar                                                                                       120        Ibs.                     1.20                       144
033000                Concrete material                                                               6        ey                125.00                   750
033000                  Placing concrete                                                                            6         cy                   90.00                      540
Spread Footings - 3’ x 3'x 1 along existing wall
033000                  Formwork                                                                                   48         sf                    14.00                      672
033000                  Re-bar                                                                                       173        lbs.                     1.20                      208
033000               Concrete material                                                                1        cy               125.00                   225
033000                  Placing concrete                                                                             1         cy                 200.00                      200
033000                 Set anchor bolts grout plates                                                    4        ea                 165.00                    660
033000              Concrete piers                                                            1       ey             750.00                750
070001 WATERPROOFING, DAMPPROOFING AND CAULKING
070003                   Dampproofing foundation                                                        210         sf                      2.50                        NR
072100 +=THERMAL INSULATION
o72to0                   Insulation                                                                                 870         sf                      3.00                   2,610
312000 EARTHWORK
312000                   Excavation                                                                                 161         cy                   50.00                   8,050
312000                 Store on site for reuse                                                           161        cy                  12.00                  1,932
giz000                   Backfill with existing fill                                                            150         ey                   30.00                   4,500
Spread Footings
312000                 Excavation - includes thickened slab work                              35        cy                 50.00                  1,750
312000                  Store on site for reuse                                                              35        cy                   12.00                    420
312000                    Backtill with existing fill                                                                   28          cy                     30.00                       840
912000                   Premium for ledge removal at foundations                                              cy                   80.00 NR
Canton JFK Elementary School Bathroom-Concession DD 2.11.19 REV1                               Page 5                                                                                     PMC - Project Management Cost

Source page 32

PM«:

JFK Elementary School                                                                                                                                                                                                                                                               12-Feb-19
Bathrooom & Concessions
Canton, MA
Design Development Estimate                                                                                                                                                                                                GFA                          861
UNIT                  ESTD                    SUB                     TOTAL
DESCRIPTION                                                qry           UNIT            cosr                  cosT                   TOTAL                     cost
JFK FIELD BATHROOMS & CONCESSIONS
52312000                   Reuse surplus material on-site                                                    18         cy                    10.00                      180
53       312000                   Gravel base at footings                                                                 14         cy                   38.00                      532
Bt      033000               Foundation drain                                                            145        If                 22.00                3,190
55       033000                  Allowance for dewatering                                                              1         Is               2,500.00.                   2,500
56                                  SUBTOTAL                                                                                                                                                                           47,877
37
58                          A1020 SPECIAL FOUNDATIONS
59                                    No work in this section
60                                  SUBTOTAL
6
6a                      A1030 LOWEST FLOOR CONSTRUCTION
63                            033000 CONCRETE
64                                    la           i         ” thi                                                                  861         of
65       033000                Vapor barrier, Stego wrap or similar                                      861        sf                    1.00                    861
66       033000                  WWF reinforcement                                                                 990         sf                       1.10                   1,089
67      033000              Concrete - 4" thick; 4,000 psi                                            pS       cy              130.00               1,430
8       033000                 Barrier 1 Admixture                                                                  aL        cy                   65.00                      715
69       033000                  Placing concrete                                                                           wa         cy                    75.00                      825
70      033000                Finishing and curing concrete                                             861        sf                   3.00                 2,583
na         033000                      Sawcut full depth control joints                                                          861           sf                          0.20                           172
rR
73                           312000 EARTHWORK
74       312000                  Gravel beneath slab on grade; 12" thick, compacted                   32        cy                  38.00                   1,216
structural fill
8
7                  072100 THERMAL INSULATION
n      072100                Rigid insulation                                                                                                                           NR
7                                  SUBTOTAL                                                                                                                                                                             8,801

79

Bo                                                  TOTAL - FOUNDATIONS                                                                                                                                                                            $56,768

81

82

83                                   B10 SUPERSTRUCTURE                                                                             |
ay
85                        B1o10 FLOOR CONSTRUCTION
86                                CMU structure - w/ Exterior Walls
87                                  Tube steel columns                                                                  0.70        tns             5,000.00                   3,500
88                                  SUBTOTAL                                                                                                                                                                            3,500
a9
9                    Bio2z0 ROOF CONSTRUCTION
a        951200                     Roof beams - galvanized                                                               5.60         tns              §,000.00                  28,000
92       051200                   Roof tube steel - galvanized                                                     0.36        tas             5,000.00                   1,800
93       951200                   3" Metal deck, typical                                                            2,800         sf                      3.50                  9,800
oF                                  Moment connections                                                                   12         ea                 450,00                   5,400
98       051200                  Miscellaneous steel angles, plates & lintels                                  1        Is             3,000.00                 3,000
6
7                            078100 FIREPROOFING/FIRESTOPPING
98       078100                 Spray-applied fireproofing to beams and deck                                                                                        NR
9                                No work in this section
100                                 SUBTOTAL                                                                                                                                                                          48,000
101
102                                             TOTAL - SUPERSTRUCTURE                                                                                                                                                                        $51,500   ]

Canton JFK Elementary School Bathroom-Concession DD 2.11.19 REV1                                Page 6                                                                                        PMC - Project Managemant Cost

Source page 33

PMé

JFK Elementary School                                                                                                                                                                                                                                                               12+Feb-19
Bathrooom & Concessions
Canton, MA
Design Development Estimate                                                                                                                                                                                GFA                        861
UNIT                           EST'D                               SUB                                TOTAL
DESCRIPTION                                                          ory              UNIT               cosT                      cosT                       TOTAL

JFK FIELD BATHROOMS & CONCESSIONS

103

104

105                  B20 EXTERIOR CLOSURE                                       ]

106

107                   B2010 EXTERIOR WALLS

108 042000                8" CMU                                                                         180        sf                 23.00                4,140
109 942000                12" CMU                                                                     1,238        sf                 28.00              34,664
M0                                  Staging to masonry                                                                1,418         sf                      5.00                   7,090
8                     051000 MISC. METALS

NB                                  Allowance for louvers (none shown)                                              1         Is                  500.00                      500
a4                             Misc. metals to masonry                                                   861        sf                   2.50                 2,153
16                          051500 ORNAMENTAL METALS

u7                                     Stainless steel serving counter                                                            1          Is                 1,500.00                     1,500
"9                   061000 ROUGH CARPENTRY

¥20                                 Blocking - doors/windows/trim                                                     1         Is                  §00.00                     500
yan                                  Plywood/Back-up for siding                                                     100         sf                      5.00                      500
122                                  Wood fascia                                                                              140          if                      6.50                      910
i                 070001 WATERPROOFING, DAMPPROOFING AND CAULKING

125                                Air and vapor barrier to exterior closure                                 100         sf                     6.50                     650
126                                   AVB at window openings                                                               45          If                       2.50                        13,
127                                  Miscellaneous sealants                                                                   1         Is                  500.00                      500
128

129                 074000 SIDING

130                                 Vinyl siding                                                                               100         sf                    16.00                   1,600
131                                  SUBTOTAL                                                                                                                                                                           54,820
132

433                   Bzoz0 WINDOWS

4

335               080001 = FIBERGLASS WINDOWS

136                                     Fiberglass windows - double hung                                                   65          sf                     60.00                    3,900
8                   083313. METAL COILING SHUTTERS

139                                     Single window opening - manual                                                        4         ea                1,500.00                     1,500
440                               triple window opening - manual                                                1        ea             3,500.00                 3,500
sgt                                  SUBTOTAL                                                                                                                                                                            8,900
142

143,                   Beogo EXTERIOR DOORS

143

45                 081110 DOORS AND FRAMES

146                                   Entry door - concession                                                                    1         ea                1,250.00                    1,250
1497                               Entry doors - bathrooms                                                          2        ea              1,250.00                 2,500
vio                 087100 DOOR HARDWARE

150 aBy100                   Door hardware - electrified locksets & closures                            3        leaf             1,000.00                  3,000
ist                  099000 PAINTING

153 099000                  Prep & paint underneath side of deck                                 1,540        sf                    2.50                 3,850

Canton JFK Elamentary School Balhroom-Concession DD 2.11.19 REV1                              Page 7                                                                                 PMG - Project Management Cost

Source page 34

166

184
185,

186

187
188

189

190
19t

192
193

194
195

196
197
198
199
200

a1

PM

JFK Elementary School                                                                                                                                                                                                                                                               12-Feb-19
Bathrooom & Concessions
Canton, MA
Design Development Estimate                                                                                                                                                                                                                   GFA                             861
UNIT                           EST'D                               SUB                                TOTAL
DESCRIPTION                                                          ory             UNIT               cosT                      cosr                       TOTAL                        cost
JFK FIELD BATHROOMS & CONCESSIONS
999000                 Paint doors and frames                                                            3        ea                 110.00                    330
SUBTOTAL                                                                                                                                                                                                             10,930

TOTAL - EXTERIOR CLOSURE                                                                                                                                                                      $74,650

[ B30 ROOFING

Bg010 ROOF COVERINGS

970002                   Pitched roof
70002                 Asphalt shingles on ice & water on plywood sheathing         2,686         sf                   14.00                37,604
070002                Miscellaneous Roofing
70002                       Roof to wall flashing                                                                              220           If                          6.50                       1,430
070003                   Miscellaneous flashings                                                            861         sf                      0.75                      646
970002                Aluminum downspouts & scuppers                                                                               drip strip
SUBTOTAL                                                                                                                                                                          39,680
B3g020 ROOF OPENINGS
070002                       Solar tubes                                                                                                     6           ea                     750.00                      4,500
SUBTOTAL                                                                                                                                                                            4,500
L                                 TOTAL - ROOFING                                                                                                                                                                                  $44,180
C1o INTERIOR CONSTRUCTION
C1010 PARTITIONS
042000 MASONRY
942000                     6" CMU backup                                                                              500          sf                     22.00                   11,000
055000 MISCELLANEOUS METALS
955000                  Seismic clips at new CMU partitions                                          5        ea                 130.00                    650
061000 ROUGH CARPENTRY
961000                  Rough blocking to partitions                                                  35         If                    3.00                     105
070001 ~=WATERPROOFING, DAMPPROOFING AND CAULKING
970001                    Fire stopping                                                                                  1         Is                  250.00                      250
970001                     Miscellaneous sealants throughout building                                861         gsf                       0.50                        431
092900 GYPSUM BOARD ASSEMBLIES
92900                   Typical interior partition                                                           125         sf                    15.00                    1,875
ag2900                  Single sided partition                                                           190        sf                   10.25                  1,948
SUBTOTAL                                                                                                                                                                           16,259
Cioz0 INTERIOR DOORS
070001 WATERPROOFING, DAMPPROOFING AND CAULKING
970001                     Sealants & caulking                                                                              1          ea                     60.00                          60
Canton JFK Elementary School Sathroom-Concession DD 2.11.19 REV4                             Page 8                                                                                PMC - Project Management Cost

Source page 35

PMé

JFK Elementary School                                                                                                                                                                                                                                                               12-Feb-19
Bathrooom & Concessions
Canton, MA
Design Development Estimate                                                                                                                                                                                                                    GFA                             861
UNIT                      ESTD                         ‘SUB
DESCRIPTION                                                          Quy              UNIT               cosr                      cost                       TOTAL                         cost

JFK FIELD BATHROOMS & CONCESSIONS

205                          081110 DOORS AND FRAMES

206                                        New door/frame/hardware                                                                        1          ea                  1,750.00                       1,750

207

208                    083110 ACCESS DOORS AND FRAMES

209 084000                 Access doors, allow                                                                   1        Is                500.00                    500

210

an                     099000 PAINTING

212 o990an                   Paint doors and frames                                                                  1         ea                  150.00                      150

ag             SUBTOTAL                                                                 2,460

ay

a5,                       C1030 SPECIALTIES / MILLWORK

216

27                          055000 MISCELLANEOUS METALS

218 055000                   Miscellaneous support at toilet partitions                                     2        rms                250.00                      500

219

220                 061000 ROUGH CARPENTRY

221 961000                 Backer panels in electrical closets                                           t        Is               250.00                   250

222 061000                  Allowance for interior wood blocking                                    861        gsf                   0.50                    431

223

224                       101100 VISUAL DISPLAY SURFACES

225 101100                        Marker boards                                                                                                            sf                       22.00                                                                      N/A

226

227                          101200 DISPLAY CASES

228 101200                  Display cases - bathrooms/concession                                                 ea                350.00                                                      N/A

101400 SIGNAGE

231 191400                    Building Sign                                                                                            ea               1,500.00                                                           N/A

232 © 101400                    Room Signs                                                                                   3         ea                  120.00                      360

233

234                       102110 TOILET COMPARTMENTS - Phenolic

235       202110                        ADA                                                                                                                 2           ea                  1,500.00                      3,000

236 n2110                        Standard                                                                                                          1          ea                     850.00                          850

237° 102110                 Urinal screens                                                                    1       ea               450.00                   450

238

239                     102800 TOILET ACCESSORIES

240                                        Gang bathroom                                                                                             2         rms               2,000.00                      4,000

2a                                        Janitors Closet Accessories                                                                        a         rms                   250.00                          250

242

43                    404400 FIRE PROTECTION SPECIALTIES

244103400                       Fire extinguisher cabinets                                                                          1           ea                     350.00                          350

245                                        SUBTOTAL                                                                                                                                                                                                              10,441

246

247                                             TOTAL - INTERIOR CONSTRUCTION                                                                                                                                                                                                   $29,160

248

249

250      [C30 INTERIOR FINISHES

251

252                       C3010 WALL FINISHES

253

254                     099000 =PAINTING

255 999000                  Paint new interior partitions - epoxy                                  2,858        sf                     1.50                 4,287

Canton JFK Elementary Schoo! Bathroom-Concession DD 2,11,19 REV?                                 Page 3                                                                                           PMC - Project Managemont Cost

Source page 36

261

262
263

264

265
266
267

269
270
27
272

273
274

299
300
got
gaz
303
304
305

306

PM2”

JEK Elementary School                                                                                                                                                                                                                                                               12-Feb-19

Bathrooom & Concessions

Canton, MA

Design Development Estimate                                                                                                                                                                                                                   GFA                             861

UNIT                  ESTD                     SUB                     TOTAL
DESCRIPTION                                         |       ory           UNIT            cosT                   cost                   TOTAL                     cost

JFK FIELD BATHROOMS & CONCESSIONS

SUBTOTAL                                                                                                                                                                            4,287
C3020 FLOOR FINISHES
033000 CONCRETE
933000                   Sealed concrete                                                                         -              sf                      1.50                                                           N/A
096470 FLUID-APPLIED FLOORING

096470                 Poured resin flooring w/ integral base; Duraflex or               645        sf                 14.00                9,030
similar
SUBTOTAL                                                                                                                                                                            9,030

Cgo030 CEILING FINISHES
092900 GYPSUM BOARD ASSEMBLIES

g2900                  GWB ceilings - interior                                                           645         sf                   13.00                  8,385

092900                 GWB ceilings - exterior                                                      -            sf                  15.00

992900                   GWB soffits                                                                               -              sf                      0.50                                                           N/A

099000 PAINTING

99000                   Paint to gwb ceilings                                                                 645         sf                       1.25                      806

SUBTOTAL                                                                                                                                                                             9,191
TOTAL - INTERIOR FINISHES                                                                                                                                                                      $22,508
Dio CONVEYING SYSTEMS                                           |
No work in this section
SUBTOTAL                                                                                                                                                                                -
[                    TOTAL - CONVEYING SYSTEMS
I    D20 PLUMBING
Deo PLUMBING, GENERALLY
Plumbing Fixtures & Specialties/Equipment
Water closet                                                                                  3         ea                   985.00                  2,955
Lavatory                                                                                        4         ea                   835.00                  3,340
Urinal                                                                                             1         ea                 1,100.00                  1,100
Mop basin                                                                                      1         ea                   970.00                     970
Dual level drinking fountain with water fill                                 4        ea              3,600.00                3,600
3 compartment sink                                                             1        ea             2,050.00               2,050
Hand sink                                                                                      1         ea                1,200.00                  1,200
Hose bibb                                                                                       1         ea                   250.00                     250
Wail hydrant                                                                                  1         ea                  400.00                    400
Floor drains                                                                                  4         ea                   550.00                 2,200
Cleanouts                                                                                      3         ea                   350.00                  1,050
Grease interceptor                                                                         1         ea                 1,150.00                   1,150
Grease Trap included with civil
Trap primer                                                                                   1         ea                   860.00                    860
Canton JFK Elementary School Balhroom-Concession DD 2.11.19 REV1                               Page 10                                                                                      PMG - Project Management Cost

Source page 37

307
308
309
310
gu
312

313,

314
315
26
37
a8
319
320
32

322

34
325
326
327
328
329
330
33%

332

333

345

351
352
353
354
355
356

PM:

JEK Elementary School
Bathrooom & Concessions
Canton, MA

Design Development Estimate

12-Feb-19

GFA                                    861

DESCRIPTION                                                Qry
JFK FIELD BATHROOMS & CONCESSIONS
Water heater 50 gal elect                                                                1
Domestic Water Type L Copper Pipe
Rough-in                                                                                  320

Sanitary Waste And Vent Pipe w/ Hangers
Rough-in                                                                                  400
Gas Piping

Assumes cooking surface to be serviced via propane
tank

Propane piping
Coordination & BIM
Coring, sleeves
Commissioning support
Testing and sterilization

ee ee

Fees & permits
SUBTOTAL

UNIT

ea

If

UNIT
COST

2,600.00

30.00

45.00

500.00

6,000.00

EST'D
cosT

2,600

9,600

18,000

6,000
included
included
included
included

SUB                                TOTAL
cost

N/A

N/A

57,325

{            TOTAL - PLUMBING

$57,325

[ D30 Hvac

Dg0 HVAC, GENERALLY
Air distribution / Equipment
Electric ceiling heater
Exhaust fans - bathrooms
Kitchen exhaust fan

wee

Kitchen make-up air unit
Sheet metal & Accessories
Sheet metal & accessories                                                               140
Grease duct 12"x12"w/ fire wrap                                                      12
Exhaust register 12"x12”                                                                2
Duct accessories                                                                             1
Automatic Temperature Controls

Temperature controls - local                                                         5
Balancing

System testing & balancing                                                       861
Miscellaneous

Rigging & equipment rental
Coordination & BIM
Commissioning support

Coring, sleeves

Equipment start-up and inspection
Vibration & seismic restraints

tt

Fees & permits
SUBTOTAL

ea
ea
ea

ea

Ib

ea

Is

zones

sf

750.00
1,000.00
1,900.00

750.00

15.00

90.00

140.00

500.00

750.00

1.00

3,500.00
3,000.00

3,750
1,000
1,900

750

2,100
1,080
280
500

3,750

861

3,500

3,000
included
included
included
included
included

22,471

{                                             TOTAL - HVAC

$22,471 |

[ Dgo0 FIRE PROTECTION

Canton JFK Elementary School Bathroom-Concession DD 2.11.19 REV1                              Page 11

PMC - Project Management Cost

Source page 38

PM«.

JFK Elementary School                                                                                                                                                                                                                                                               12-Feb-19
Bathrooom & Concessions
Canton, MA
Design Development Estimate                                                                                                                                                                                                GFA                          861
UNIT                    £EST'D                      SUB                       TOTAL
DESCRIPTION                                                                         Qry                 UNIT                  cost                            CosT                             TOTAL                               cosT

JFK FIELD BATHROOMS & CONCESSIONS
357

358        Dgo FIRE PROTECTION, GENERALLY

359                                 Fire supression - building                                                                                                           N/A

360                            Fire supression - kitchen                                                                                             w/ hood

361                                  SUBTOTAL                                                                                                                                                                                -

362

368                                          TOTAL - FIRE PROTECTION                                                                            CdS

364

365,

366                              D50 ELECTRICAL

367

368                 Ds5010 SERVICE & DISTRIBUTION

369                                 Normal Power

370                                          Meter socket w/Main disconnect switch                                        1           Is                      850.00                       850

371                                      Panelboard 100A 120/208V                                                      1         ea                2,300.00                 2,300

a72                                             100A feed                                                                                               20           If                         30.00                        600

a73                                 Equipment Wiring

374                                      Drinking fountain feed and connection                                     1         ea                   500.00                    500

375                                        Electric ceiling heater 30A FSS feed and                                      1         ea                    800.00                     800
connection

376                                      Electric water heater 30A F'SS feed and connection                   1         ea                   700.00                    700

377                                      Exhaust fan thermal switch feed and connection                       1         ea                   650.00                    650

378                                   Kitchen exhaust fan 30A FSS feed and connection                  1        ea                 800.00                  800

379                                   Make up air fan 30A FSS feed and connection                         1        ea                 800.00                   800

380                                Cooking hood feed and connection                                      1        ea                500.00                 500

381                                    FACP feed and connection                                                      1        ea                  250.00                   250

382                                 SUBTOTAL                                                                                                                                                                             8,750

383

384                 D5020 LIGHTING & POWER

385                                  Lighting - A fixtures                                                                          1         ea                   450.00                     450

386                                 Lighting - B fixtures                                                                      4         ea                   275.00                  1,100

387                                Lighting - C fixtures                                                                  12        ea                  225.00                 2,700

388                                 EBU                                                                                              3         ea                   150.00                    450

389                                        EBU WP                                                                                                         3           ea                       170.00                         510

390                                 Exit                                                                                               3         ea                   170.00                     510

ao                                        Time clock                                                                                                      1           ea                      200.00                        200

392                                 Single pole switch                                                                          4         ea                     35.00                     140

398                                    Ceiling occupancy sensor                                                                    2         ea                     125.00                      250

304                            GFI duplex receptacle                                                        13        ea                  35.00                  455

395                                 WP device plate                                                                             3         ea                     12.00                      36

396                                 Device plate                                                                                 14         ea                       4.00                       56

397                                        Device box                                                                                                   46          ea                         32.00                      1,472

398                                            Lighting and branch circuit                                                                        700             If                              8.00                       5,600

399                                 SUBTOTAL                                                                                                                                                                           13,929

400

aor                   D5030 COMMUNICATION & SECURITY SYSTEMS

402                                                 Tel/Data

Canton JFK Elementary School Balhroom-Concession OD 2.11.19 REV1                               Page 12                                                                                      PMC - Project Management Cost

Source page 39

412
43
ay
5
ne
a7
as

a9

a

422

424
425
426
427

428

430

43
432
433
434
435
436
437
438
439

Ase

449
450
451
452

PMé

JFK Elementary School                                                                                                                                                                                                                                                            12+Feb-19
Bathrooom & Concessions
Canton, MA.
Design Development Estimate                                                                                                                                                                                GFA                        861
UNIT                  ESTD                     SUB                     TOTAL
DESCRIPTION                                         |       ory           UNIT            cosT        |          cosT                   TOTAL         |           cosr
JFK FIELD BATHROOMS & CONCESSIONS
Demarcation board                                                                   ea                650.00                  650
Telephone/data device including drop, cabling and                 4        ea                  300.00                 1,200
device allow
Fire Alarm
FACP                                                                                         1         ea                 1,150.00                   1,150
Auto dialer                                                                                 1         ea                   475.00                     475
Knox box                                                                                   1         ea                   350.00                     350
Beacon                                                                                       1         ea                   250.00                     250
Smoke detector                                                                         3         ea                    145.00                     435
Heat detector                                                                             1         ea                   150.00                     150
Manual pull station                                                              3        ea                  125.00                   375
Audio/visual device                                                  1       ea               145.00                145
Visual device                                                                             2         ea                   120.00                    240
Fire alarm system                                                                      1         ls                5,350.00                  5,350
Device box                                                                                              12,           ea                         32.00                        384
Lighting and branch circuit                                       480        ite                   7.50              3,600
Testing and training                                                                  1         Is                   400.00                    400
Security System
Security system including 3 door contacts                                     1         Is                3,000.00                 3,000
SUBTOTAL                                                                                                                                                                            18,154
D5040 OTHER ELECTRICAL SYSTEMS
Coordination & BIM                                                                       1         Is                                                6,000
Commissioning support                                                                              1           Is                                                      included
Coring, sleeves                                                                               1         Is                                             included
Equipment start-up and inspection                                                    4          ls                                                 included
Testing, studies                                                                              1         Is                                             included
Fees & permits                                                                                      1          Is                                                 included
SUBTOTAL                                                                                                                                                                            6,000
[                               TOTAL - GLECTRICAL                                                                                                                                                                $46,833 |
[_ £10 EQUIPMENT
E10 EQUIPMENT, GENERALLY
Hood w/ fire suppression                                                        1        Is              7,500.00                 7,500
SUBTOTAL                                                                                7,500

TOTAL - EQUIPMENT

£20 FURNISHINGS

E2010 FIXED FURNISHINGS
CASEWORK

No work in this section
SUBTOTAL

E2020 MOVABLE FURNISHINGS

Canton JFK Efementary School Bathroom-Concession DD 2.11.19 REV1

Page 13

$7,500 |

PMC - Project Management Cost

Source page 40

PM.

JFK Elementary School                                                                                                                                                                                                                                                               12-Feb-19
Bathrooom & Concessions
Canton, MA
Design Development Estimate                                                                                                                                                                                                                   GFA                             861
UNIT                  ESTD                     SUB                     TOTAL
DESCRIPTION                                                Qry           UNIT            cost                  cost                   TOTAL                     cost
JFK FIELD BATHROOMS & CONCESSIONS
453                              All movable furnishings to be provided and installed                                                                                                             NIC
by owner
454                                 SUBTOTAL                                                                                                                                                                                -
455
456      [           TOTAL - FURNISHINGS
457
458
489                   F1o SPECIAL CONSTRUCTION
460
aot                      Fito SPECIAL CONSTRUCTION
462                                  No work in this section
463                                 SUBTOTAL                                                                                                                                                                                -
64,
465                                              TOTAL - SPECIAL CONSTRUCTION                                                                                                                                                                                                                           |
466
467
468                        F2o0 SELECTIVE BUILDING DEMOLITION
469
470               F2o10 BUILDING ELEMENTS DEMOLITION
an                               No work in this section
472                                 SUBTOTAL                                                                                                                                                                                -
473
44               F2020 HAZARDOUS COMPONENTS ABATEMENT
475                                        See summary
476                                 SUBTOTAL
4a77
478                           TOTAL - SELECTIVE BUILDING DEMOLITION

Canton JFK Elementary School Bathroom-Concession DD 2.11.19 REV1                             Page 14                                                                                PMC - Project Management Cost

Source page 41

35
36
37
38
39
40

a

43
44
a5
46
47
38

49

PM’

JFK Elementary School                                                                                                                                                                                                                                                               12-Feb-19
Bathrooom & Concessions
Canton, MA
Design Development Estimate
CST                                                                                                                                          L    UNIT                 ESTD                    SUB                         TOTAL
CODE                                          DESCRIPTION                                                Qry          UNIT           cosT                 cost                   TOTAL                        cosr
SITEWORK
Gio SITE PREPARATION & DEMOLITION
Site construction fence/barricades                                           400         If                 14.00                  5,600
Construction gates/entrance                                                         1        ea           5,000.00                  5,000
Miscellaneous demolition                                                              1        Is               750.00                      750
Site Earthwork
Strip topsoil                                                                               1m        cy                 12.00                   1,332
Rock removal                                                                                                                          Not anticipated
Rough grade site                                                                                1,500          sf                       0.15                          225
Final grade and prep for site walks/patios                                1,435         sf                     1.00                     1,435
Erosion control; silt fence, straw bales & catch basin              400        If                  9.00                  3,600
protection
Site preparation and demolition allowance                                1        Is          5,000.00                5,000
SUBTOTAL                                                                                                                                                                    22,942
Geo SITE IMPROVEMENTS
Patio Paving
Concrete paving/ sidewalks
gravel base 12”                                                                            53        cy                40.00                   2,120
6" concrete bituminous paving                       1,435    sf         6.00         8,610
SUBTOTAL                                                                                                                                                                                                                                                        10,730
andscapi        thletic Fields
Repair all site sidewalks, curbs, landscaping affected                      1         Is                10,000                  10,000
by construction
Stone drip strip                                                                         145         If                 14.00                  2,030
Landscaping allowance                                                                 1        Is           5,000.00                  5,000
SUBTOTAL                                                                                                                                                                     17,030
G30 CIVIL MECHANICAL UTILITIES
Water supply
New water service                                                                                 305          If                    35.00                     10,675
‘Test pits to locate existing gate valve                                               1         Is             1,500.00                    1,500
Connect to existing line                                                                 1       loc           3,500.00                  3,500
Curb stop                                                                                      1       loc              500.00                     500
Sanitary sewer
Sewer                                                                                      600         If                 70.00                42,000
Connect to existing line                                                                 1       loc          4,000.00                  4,000
Manhole                                                                                       1       loc          5,000.00                  5,000
Pump station                                                                                L       loc          9,000.00                  9,000
Storm Sewer
Site drainage                                                                                                                                             NR
SUBTOTAL                                                                                                                                                                                                                                                        76,175
G33 GAS SERVICES
Excavate and backfill for gas                                                                                                                                             NR
SUBTOTAL                                                                                                                                                                          -
G33 TELECOM SERVICES
Excavate and backfill for telecom                                                       710          if                    22.00                     15,620
Communications ductbank/conduit, empty                              710         If                  35.00                24,850
Canton JFK Elementary School Bathroom-Concession DD 2.11,19 REV1                                                       Page 15                                                                                                            PMC - Project Management Cost

Source page 42

JFK Elementary School                                                                                                                                                                                                                                                             12-Feb-19
Bathrooom & Concessions
Canton, MA.

Design Development Estimate

cst                                                                                                                                                                                 UNIT                    ESTD                        SUB                             TOTAL
CODE                                                  DESCRIPTION                                                         Qry            UNIT            cosT                     cosT                      TOTAL                             cosT
SITEWORK

82                                  Fiber optic cabling                                                                            °         Is                     0.00                                                            by Owner's Vendor

53                                                SUBTOTAL                                                                                                                                                                                                                                                      40,470

St

58                           G40 ELECTRICAL UTILITIES

36                                 Excavate and backfill for electrical                                             520         if                 22.00                  1,440

7                                       Electric ductbank/conduit, empty                                                    520          lf                      35.00                    18,200                                                 ‘

58                                      Electric service, aluminum feeders                                                   520          If                      33.00                     17,160                                             4

89                                   Duplex sanitary pump station feed and connection                          4         ea              1,500.00                     1,500

6o                                   Electrical to relocated irrigation controls                                          1         Is                 500.00                       500

o                               Assumes no site lighting required

oa                                      SUBTOTAL                                                                                                                                                                                                    48,800

63

64

6%                                 TOTAL - SITE DEVELOPMENT                                                                                                                             $216,147

Canton JFK Elementary Schoo! Bathroom-Concession DD 2.11.19 REV1                                                              Page 16                                                                                                                         PMC + Project Management Cost