Skip to content
Search Canton

Canton, Massachusetts · Saved source text

Article 21 - Chapter 43D Designation 30 Dan Road pdf file

Town Meeting · Town Meeting archive year 2025 · Record 4d7091ee47583d593f

Open original municipal record ↗Open interactive reader

Saved text from 10 source pages. Transcription and OCR may contain errors; verify figures and wording against the original. Retrieved 2026-10-15.

Source page 1

Chapter 43D: Local Expedited Permitting
                                 |CANTON|


                                                                           Program Purpose
                                                                           Creating prompt and
                                                                           predictable permitting is a key
                                                                           element of Planning Ahead for
                                                                           Growth. Local expedited
                                                                           permitting is attractive to
                                                                           developers, increases a
                                                                           community’s visibility and is
                                                                           rewarded by preference in
                                                                           discretionary funding.
                                                                           Eligibility
                                                                           To be eligible for 43D
                                                                           designation, a municipality must
                                                                           provide for local permitting
                                                                           decisions on its designated
                                                                           priority development sites within
                                                                           180 days of a complete
                                                                           application.

 With 15 sites designated, the Town of Canton has been one of the most active participants in the
 Chapter 43D Local Expedited Permitting program. Recognizing the benefits of prompt and predictable
 zoning and permitting, the town has made a concerted effort to communicate to businesses and
 developers the specific locations where the community would like to target growth.

 Canton’s 43D Sites: By the Numbers
 • 11 out of 15 43D sites are currently occupied
 • In total, these properties constitute $38M in commercial real estate valuation
 • These sites have generated approximately $850K in local taxes

 Below are 2 examples of recent developments at 43D sites in Canton:

 150 Dan Road – designated as 43D site in 2012. In 2013 Organogenesis leased approximately
 190,000 square feet at this site in order to move its headquarters and manufacturing operations to
 Canton.

 465 Turnpike Street – designated as 43D site in 2013. sold/being redeveloped.


To learn more about Chapter 43D and other tools for promoting housing and economic development,
         please visit the website of the Massachusetts Permit Regulatory Office (MPRO) at:
                        http://www.mass.gov/hed/economic/eohed/pro/ and
                               follow us on Twitter @MA_PlanningAhead
            Executive Office of Housing and Economic Development

Source page 2

CHAPTER 43D




HISTORY
In August 2006 Chapter 43D Permitting was enacted into law,
establishing a process for the designation and tracking of Priority
Development Sites (PDS) on which municipalities offer a maximum of 180 day
local permitting process. Cities and towns that opt into the Chapter 43D Program
are able to target areas, through a streamlined local permitting process, for
housing and economic development. As of February 2014, the 43D Program has been adopted by 86
municipalities on 179 sites.

THE BENEFITS OF OPTING-IN
• Priority consideration for the MassWorks Infrastructure Program grants, brownfields remediation
  assistance, and other financing through quasi-public organizations
• Online site marketing and promotion of a community’s pro-business regulatory climate
• Improved municipal planning and permitting efficiencies
• Collection of special fees for priority development site permit applications

THE CRITERIA FOR PRIORITY DEVELOPMENT SITES
• Zoned for commercial, industrial, residential, or mixed use development
• Eligible for the development or redevelopment of at least 50,000 square feet of gross floor area
  (may include existing structures and contiguous buildings)
• Permission has been granted by the property owner (if private) for participation in the program
• Approved by the local governing authority and the state Interagency Permitting Board

THE OBLIGATIONS OF OPTING INTO CHAPTER 43D
• Within 120 days of adopting Chapter 43D, the community must
       • appoint a single municipal point of contact for streamlined permitting;
       • amend local rules, regulations, bylaws, etc. to comply with 180 day permit timeline;
       • determine and make available the requirements for each permit;
       • establish a procedure for identifying necessary permits for a project;
       • establish a procedure for determining completeness of the required submissions.
• After the 120 phase-in period is complete, the town must render permitting decisions on priority
  development sites within 180 days

Source page 3

5 0 , 0 0 0 - 1 4 0 , 0 34 SF
C G M P/ ADVANC ED MANUFA CTURING
SP A C E FOR LEAS E

Source page 4

30 Dan Road
                                                                                                                                                Land Area:       9.31 acres                     Electrical         7,200 amps, 480/277V, three-phase,
                                                                                                                                                                                                Services:          four-wire (expandable)
                                                                                                                                                Total Building   140,034 SF
                                                                                                                                                Size:            subdividable up to 50,000 SF   Fire Alarm         Notifier NFS2 - 640 series fire alarm
                                                                                                                                                                                                System:            panel

                                                                                                                                                Delivered:       2024
Colliers is pleased to offer for lease 30 Dan Road, a 140,034 SF GMP ready opportunity in Canton, MA. This newly delivered                                                                      Sprinklers         ESFR sprinklers

property features 34’ clear heights, 4 loading docks, 7,200 amps of power and up to 52’ bay spacing to accommodate                              Foundation:      Spread footing
                                                                                                                                                                                                Emergency          1500KW caterpillar diesel
prefabricated clean room technology. 30 Dan Road is located in a prime established life science cluster and effortlessly                                                                        Generator:
                                                                                                                                                Clear Height:    Up to 34’
accessible to/from the Greater Boston, Cambridge and Providence areas making it an ideal site for cGMP and advanced                                                                             HVAC:              Designed per tenant specifications
                                                                                                                                                Floor Loads:     1st floor GMP - 150+ PSF
manufacturing users.                                                                                                                                             1st and 2nd floor lab - 145
                                                                                                                                                                                                Fire Protection:   Two 8” fire mains fed by domestic water
                                                                                                                                                                 PSF
                                                                                                                                                                                                                   and one dry zone for a fully protected
                                                                                                                                                                 2nd floor mezzanine - 600
                                                                                                                                                                                                                   building
                                                                                                                                                                 PSF

                                                                                                                                                                                                Passenger          One two-stop 2,500 lb capacity
                                                                                                                                                Column           40’ x 40’ (existing)
                                                                                                                                                                                                Elevator:
                                                                                                                                                Spacing:         40’ x 52’ (expansion)

                       34’-6”                                      20’-6”                                                              11’-6”   Parking:         307 spaces
                                                                                                                                                                                                Freight Elevator   5,000 lb capacity (additional can be
                                                                                                                                                                                                                   added in
                                                                                                                                                                                                                   multi-tenant scenario)
                                                                                                                                                Loading:         4 loading docks

                                                                                                                             Loading                                                            Utilities:         Electric Services: Eversource
                                                                                           Loading Docks                                        Roof:            New roof throughout
                                                                                                                                                                                                                   Water Service: Town of Canton
                                                                                                                             Docks                                                                                 Sewer Service: Town of Canton
                                                                                                                                                Penthouse:       Fully approved, up to 21,440                      Natural Gas: Columbia Gas via 4”
                                                                                                                                                                 SF                                                high pressure line

Source page 5

Cambridge


             495
                                                       Boston
                                                                   Logan Airport       The Canton
                                                                                       Connection
                              90


                                                 95




                                                                                                 18 Miles To
                                                                                                     Boston
                                                 1


                                            95                24                                 21 Miles To
                                                                                         Logan International
                                                                                                     Airport
                                                                                   3

                                                                                                 22 Miles To
                                        1                                                        Cambrdige

                     295
                                                                                                38 Miles To
                                                                                                Providence
                           Providence
T.F. Green Airport
                                                                                                 46 Miles To
                                                             24              495
                                                                                          T.F. Green Airport

Source page 6

The Canton                                                        95        Boston




Advantage
                                                       495



                                                                                     3
                                                             95




Proven Location
4M+ SF of like-minded life science and
advanced manufacturing neighbors
                                                                       24



Strong Labor Pool
12,600+ skilled production and
life science workers



Employer Savings
13.5% life science employer savings
2.5% production employer savings



Market data based on a 7-mile radius of 30 Dan Road,
in comparison to the MSA.

Source: Lightcast.

Source page 7

First Floor
                                                                                                             BAC K O F B U I L D I N G
FRONT VIEW                                                        70,000 SF
                H I G H B AY/                  LAB/               Contiguous Floor Plate
                                                                                                                                         2 LOADING DOCKS
                   cGMP                       OFFICE
                                                                                                           2 LOADING DOCKS




                                                         MAIN
                                                       ENTRANCE




                                                                                                                                              LAB/
                                                                                                                                             OFFICE


                                                                                           H I G H B AY/
                                                                                               cGMP



BAC K V I E W
                                       H I G H B AY/
                 LAB/                     cGMP
                OFFICE




                                                                                                                                                  MAIN ENTRANCE

                                                 DOCK                                                           MEZZANINE
                                                 OUT                                                              ABOVE


                                DOCK
                                 IN
                                                                                                             FRONT OF BUILDING

Source page 8

Second Floor

\                   /
\                /             oe,
\               /     \                {
S             ?      \                i
\           /       '                |

\         /
\       /         !                U
\4          \                i
Nae           \                {
wa         '            {           LaB/

OPEN TO,BELOW       \              :            OFFICE
a          1              |
y oN           1                !
/      \          1                |

/        \
/          \                       i
’            \      0                t
/              \     0                i
/                2                {
7                  Vo                {
/                   a                          rt
\

MEZZANINE
ABOVE

Mezzanine

LaB/
OFFICE

[Original embedded text, retained for comparison]
Second Floor




                                                          LAB/
               O P E N TO B E LOW                        OFFICE




                                     MEZZANINE
                                       ABOVE




Mezzanine

                                                  ROOF
                        O P E N TO               BELOW
                         BELOW        LAB/
                                     OFFICE

Source page 9

short-native-text

Project Team

Source page 11

Kevin Brawley                   Kevin Hanna                                Curtis Cole                               Tim Allen
617 610 9799 (M)                617 763 0870 (M)                           617 549 6133 (M)                          860 202 8409 (M)
kevin.brawley@colliers.com      kevin.hanna@colliers.com                   curtis.cole@colliers.com                  tim.allen@colliers.com


                       Colliers | 100 Federal Street, Boston, MA 02110 | 617 330 8000 | colliers.com/boston
                       This document has been prepared by Colliers International for advertising and general information only. Colliers International makes no guarantees, representations or warranties of any kind,
                       expressed or implied, regarding the information including, but not limited to, warranties of content, accuracy and reliability. Any interested party should undertake their own inquiries as to the
                       accuracy of the information. Colliers International excludes unequivocally all inferred or implied terms, conditions and warranties arising out of this document and excludes all liability for loss
                       and damages arising there from. This publication is the copyrighted property of Colliers International and/or its licensor(s). ©2024. All rights reserved.