Meeting of the Canton Finance Committee                  Minutes Voted on: 5/13/19
                                                Meeting Minutes                              vote: 6-0-2
                                             Tuesday, April 2, 2019

Finance Committee Members Present:
Christos Arsondiadis, Rob Barker, Dan Cole, Emilio Mauro, Tim McKenna, Barbara Saint Andre and Cindy Thomas.

Finance Committee Members Absent: Cynthia Holcombe and Wai Wong.

Guests Present:
Charlie Aspinwall, Town Administrator
Liz Francis, Director, Parks &Recreation Department
John McCourt, Chairman, Parks &Recreation Committee
Mark Porter, Chairman, Board of Selectmen
James Murgia, Finance Director
Ellen Jones, Finance Committee Secretary

Opening: A meeting of the Canton Finance Committee was called to order by Chairman Barker at 7:02 pm. on
Tuesday, April 4, 2019, in the Upper Meeting Room of the Armando Recreation Center.

A.       Approval of Agenda

Chairman Barker reviewed the items on the agenda which included a discussion of Article 20 (Bolivar Pool project)
and voting on remaining Town Meeting Articles, excluding the budget article.

B.       Announcements

There were no announcements.

C.       New Business

Article 20 —Bolivar Pool Project Funds Appropriation -Discussion with James McCourt, Chairman, Parks &
Recreation Commission and Liz Francis, Director of Parks &Recreation

M r. McCourt summarized for the Finance Committee the following:

     •   In November of 2018 the Town hired an Owner's Project Manager (OPM).
     •   A design team was hired and contracted by December 2018.
     •   The project kicked off January 4, 2019 after which the Parks &Recreation Commission held multiple
         meetings as to the design and layout of the pool.
     •   The location of the pool was decided after approximately 8 revisions. The pool will have the same
         footprint but the layout will be completely different.
     •   The schematic design of the pool was shown on the meeting room screen with asix-lane pool, zero entry,
         pool house and a splash pad.

M r. McCourt turned the presentation over to Ms. Francis.

Ms. Francis referred to the pool schematics and highlighted the following:
   • The pool committee took input from residents that utilize the pool.
   • A problem with the present pool is its accessibility. The new layout addresses this issue.
   • The current pool has three levels which is not accessible for handicapped individuals and seniors.




FINCOM 20190402 Minutes                        Page 1 of9                                          x/5/19

Source page 2

•   By adding a splash pad with sliding/movable fencing/gates, the pool would be available to participants
        outside of the normal operating hours of the main pool. Access could start in June and run through
        September depending upon the weather.
    •   The current pool has five lanes. The new pool would have six lanes. The direction of the lanes would be
        rotated 90 degrees.
    •   The zero entry pool would allow easier access for handicapped participants as well as seniors.
    •   The bath house would meet the needs of participants as well as being in compliance with building codes.
        Proper changing areas, sinks and bathrooms would be provided. Storage space would be allotted for
        proper storage of pool chemicals. A snack shack would be included.
    •   The current 15-foot deep end would no longer be needed as there is no longer a diving board. The
        current slide would be retained. The deep end would be approximately 6-7 feet. Chairman Barker
        i nquired if in the future the Town might be limiting itself by not having the depth for a possible addition of
        a diving board. Mr. McCourt responded that the liability would be greater for the Town if they were to
        have a diving board and that there are special diving facilities to meet the needs of participants requiring
        a diving program. He further stated that by having a shallower pool the Town would be able to offer
        programs such as water aerobics for seniors. The current depth of the pool does not allow for these types
        of programs at the present time.
    •   The splash pad offers another park for the residents. Water will be re-filtered.

Chairman Barker spoke in support of the pool project but questioned the high cost being proposed for the project.

M r. McCourt offered the following comments with regard to the cost of the project:

   •    The design services cost was approximately $640,000. $340,000 was appropriated towards those costs in
        order to allow the Commission to present a project to 2019 Town Meeting. Current costs are $78,000 for
        OPM $180,000 for design costs thus far.
    •   During the initial $35,000 to $40,000 study for the pool which was delayed due to personnel issues within
        the Recreation Department, the cost of the pool came in with an estimated cost of approximately $4.7
        million.
    •   Since the initial study, constructions costs of the pool have risen to $5,263,000. Within the $5.2 million
        construction cost is a facility (bathhouse) that had to be increased in size because of the state's
        requirement of a certain number of bathrooms, sinks, showers and plumbing to accommodate the usage
        of the pool. The bathhouse increased in size from approximately 1,800 square feet to approximately
        2,400 square feet.
   •    The new bathhouse will have a room for chemical storage along with a chemical alarm.
   •    The mechanicals and systems for operating the pool become will be bigger and larger.
   •    The excavation of the existing pool (concrete) and bathhouse will be costly.
   •    Mr. McCourt referred Finance Committee members to the 40-page schematic information which
        contained detailed information and a breakdown for all aspects of the project (see meeting documents).
   •    Because this is a municipal project the Town must comply with prevailing rates, state ADA regulations,
        chemical storage requirements, fire alarm requirements, safety (railings) requirements and fencing
        requirements (8 feet high).
   •    The design services ($620,000 less the $340,000 previously appropriated) added to the $5.2 million, plus
        $50,000)for furniture, fixtures and equipment(FF&E), plus $458,460 for contingencies plus $48,000 for
        soft costs.
   •    The high $505.72 per square foot cost for the bathhouse was questioned by the Town. Mr. McCourt
        stated that the cost should be around $350 to $375 per square foot, however, they were hesitant at
        removing the higher amount in case the project ends up costing the higher amount. The Town can reduce
        the borrowing if the cost comes in at a lower number.
   •    The cost of moving a telephone pole has been included in the proposal as well.
   e    The current pool is 43 years old. Mr. McCourt is confident that the new pool will last as long and will be a
        big part of the community.



FINCOM 20190402 Minutes                          Page 2 of 9                                            ~/~/19

Source page 3

With regard to site location, Mr. McCourt offered the following comments:

    •    The reason for the location of the pool remaining at the current site on Bolivar Street is because the
         Building Renovation Committee and the Town did not have another location for the pool.
    •    Pequitside Farm was not available for a pool.
    •    The Paul Revere Heritage Site was not allowed as a location.
    •    The Galvin Middle School property was not a considered location because of the existing need for school
         space.
    o    If the pool were moved to a new site, the purchase of property for a site would increase the overall cost
         of the project.
    •    The parking lot cannot be paved because of it being located near wetlands.

The Finance Committee had the following comments and questions about the pool project:

        Ms. Saint Andre inquired about the alternative cost for a shade structure. Ms. Francis stated that there is
        currently a shade structure on the property. Ms. Francis also stated that I order to keep the costs down
        for the project she did not see the need for a shade structure.

The cost of diving blocks were approximately $34,000. Instead for a few thousand dollars the decking anchors
could be installed for use at a future date for adding in diving blocks.

M r. McCourt stated that Newton recently stalled a pool for $14.5 million.

        Chairman Barker inquired about the Board of Selectmen's position on the project. BOS Chairman Mark
        Porter stated that the BOS had met earlier in the day at 3:00 and voted 4-0 to support this project and big
        n umber. Mr. Porter thanked the Finance Director for his help with calculating the tax impact of this
        project. He further stated that the BOS discussed having a few public information meetings to educate
        the public about the details of the project.

         Ms. Thomas inquired about the deck square footage for the new project in comparison with the existing
         pool. Ms. Francis stated that some square footage would be lost because of the location of the splash
         pad. Ms. Thomas also spoke in support of a structure for the shade.

    •   Ms. Saint Andre inquired about the cost of $6,107,719 as compared to the cost in the schematic package
        of $5,263,464. Mr. McCourt referred to the following project costs:

        Construction                      $5,146,639
        Design                               403,950
        OPM Services                         222,670 (Owner's Project Manager)
        Soft Costs                            48,000
        FF&E                                  50,000 (Furniture, Fixtures &Equipment)
        Contingency                          458,460 (Construction Contingency approx. 7%))
        Subtotal                          $6,329,719
        Retaining Wall                       118,000 (This had inadvertently been taken out of the 15` estimate.)
        Total costs                       $6,447,719
        Less funding on hand               ($340,000) (From BOS Mitigation funds &Finance Committee Reserve Fund).
        Total Project Cost                $6,107,719

Ms. Saint Andre confirmed that the amount for the debt exclusion would be $5.9 million because $200,000 was
being recommended by the Community Preservation Committee under Article 19.




FINCOM 20190402 Mimites                         Page 3 of9                                           x/5/19

Source page 4

•   In response to Mr. McKenna's inquiry about the parking, Mr. McCourt stated that there would not bean
        i ncrease in the number of parking spaces, but that it would be reconfigured from the current layout.
        Conservation design is in process. The parking lot cannot be paved. The lot is surrounded by buffer
        zones. Any increase into the area of the buffer zone for this project would have to be restored. The
        design team has been in contact with the Conservation Commission.

    •   Ms. Francis stated that the cost to open the pool at the beginning of the season will be less expensive
        than it currently costs.

    •   Ms. Saint Andre inquired about the operation and maintenance plan associated with maintaining the
        storm water system below the parking lot and costs associated with that plan. Ms. Francis could not
        speak on the storm water maintenance costs.

    •   Ms. Saint Andre also inquired about the overall general cost of maintenance of the pool. Ms. Francis
        stated that the maintenance costs of the new pool for her department would be less than it is with the
        existing pool.

    •   Mr. Porter stated that the majority of the time has been spent on gathering financial information with
        regard to the capital cost of the pool and the focus has not been on the maintenance of the pool on a go
        forward basis. Mr. Porter stated that the BOS has a few weeks to research maintenance costs and could
        have an answer regarding maintenance costs prior to Town Meeting.

    •   Ms. Thomas inquired if there would be a change to the pool fees. Ms. Francis stated that she has not
        changed the fees since her employment with the Parks &Recreation Department. Ms. Francis further
        stated that the Commission could increase the hours of operation for the new facility, at which time they
        would have to analyze if a fee increase were needed. She stated that she would like to keep it as
        economical as possible for families. Scholarships are offered to families in need of fee assistance.

   •    Mr. McKenna inquired about the construction contingency cost of 7% as compared to the usual 12% for
        projects. Mr. McCourt stated that this was a demo and a new facility and the BRC and OPM felt 7%was
        sufficient for the contingency for this project.

    •   The timeline for the project is design for the project through June, bid documents in July, project awarded
        i n August and project start in September with an opening in July 2020.

    •   Mr. Mauro inquired about the Chestnut Hill Realty (CHR) easement request under ATM Article 26. Mr.
        McCourt stated that the pool would take precedent over the easement request. Mr. Aspinwall stated
        that CHR is under the agreement that their driveway easement project cannot interfere with the pool
        project.

    •   Of the $340,000 earmarked for design services approximately $70,000 for OPM and $180,000 for the
        design team have been spent.

    •   Mr. Cole inquired about the impact of an override on a tax bill. Mr. Murgia responded that if the Town
        were to borrow $6 million for 20 years at 4%interest rate it would add approximately $33 per year to the
        average resident's tax bill based on a $490,000 assessed value of a home. In FY19 the $490,000
        homeowner paid $6,080 in real estate taxes. Included in the $6,080 tax bill was $104 for debt exclusions.
        Next year the $104 will drop to $95, year after $88, year after $81 and year after that to $63. Mr. Murgia
        stated that fortunately the debt exclusions that are in the tax bill at the present time (Luce, Library and
        High School projects) are on the decline. The borrowing could be over 30 years but the interest rate
        would be higher.




FINCOM 20190402 Minutes                         Page 4 of 9                                           x/5/19

Source page 5

•   Mr. Cole inquired about the bathhouse cost per square foot. If the bathhouse cost was decreased from
         $505 per square foot to $375 per square foot, the total cost of the bathhouse would decrease from $1.1
         million to $826,000.

Chairman Barker thanked Ms. Francis and Mr. McCourt. The discussion with Ms. Francis and Mr. McCourt ended
at approximately 8:15 p.m.

D.       Other Business/Open Issues

The Finance Committee voted on the following 2019 Annual Town Meeting articles:

Vote -Articles 4 —Consent Agenda —Chairman Barker explained the purpose of placing articles on the Consent
Agenda in that they were non-controversial articles and that could be voted in one group.

A motion made by Ms. Saint Andre to recommend that articles 5, 6, 7, 8, 10, 13, 14, 15, 16, 22, 23, 24 and 43 be
included in the Consent Agenda Article 4 as listed in the table was seconded by Ms. Thomas. Vote: 7-0-0.

Vote —Article 20 —Bolivar Pool Protect Funds Appropriation

M r. Aspinwall provided a breakdown for the $6,107,719 Bolivar Pool Project Costs (see meeting documents).

 A motion made by Ms. Saint Andre to recommend that
(a)$6,107,719 be appropriated for the purpose of designing, permitting, environmental cleanup, reconstructing,
constructing, repairing and equipping of the town facility known as the Bolivar Pool Aquatic Center located at
199 Bolivar Street in the Town of Canton, and to meet this appropriation the Treasurer of the Town ,with the
approval of the Canton Board of Selectmen, is hereby authorized to borrow (and to issue bonds or notes of the
Town therefore) $6,107,719, provided however, that this appropriation taken hereunder shall not take effect
 unless or until a ballot question is voted by the voters to exempt the debt from the limitations of proposition
two and one half so called in accordance with the provisions of G. L. c. 59 section 21C(k), and

(b) that any premium received by the Town upon the sale of any bonds or notes approved by this vote, less any
such premium applied to the payment of costs of issuance of such bonds or notes, may be applied to the
 payment of costs approved by this vote in accordance with Chapter 44, Section 20 of the General Laws, thereby
reducing the amount authorized to be borrowed or to pay such costs by a like amount, and further

(c)That the Canton Board of Selectmen and the Canton Building Renovations Committee are authorized jointly
to expend all sums therefore, including a separate appropriation made pursuant to Article 19, Motion 9 of the
 May 13 2019 Annual Town Meeting
 was seconded by Mr. Arsondiadis. Vote. 7-0-0.
 M r. Murgia confirmed that the borrowing would be $5.9 million.

FY20 Operating Budgets —Discussion with Mark Porter, Chairman of the Board of Selectmen, and Charlie
Aspinwall, Town Administrator

M r. Porter explained that the Town successfully negotiated with the Public Employees Committee (PEC) that would
result in a savings for the health insurance budget of approximately $380,000. The Finance Committee was
provided with the following suggested uses of the $380,000 savings:

         $200,000      Add to the Finance Committee Reserve Fund budget for FY20 for any possible budget deficits
         $100,000      Budget increase for the School Department for FY20
          $30,000      Add to the Other Post Employment Benefit Budget(OPEB)for FY20
           50 000      Cushion for health insurance budget. Excess receipts for free cash.
         $380,000



FINCOM 20190=402 Minutes                        Page ~ of9                                          ~/~/19

Source page 6

If these savings are not utilized the funds would fall out as free cash.

These savings could be used to help with any deficits in the FY20 budgets. The Town could be faced with
additional costs associated with the current trash/recycling contract. The trash contract was renewed for two
years. The Town's trash company, Republic Services, is seeking to reopen the trash contract but the Town has
been seeking the advice of Town Counsel with regard to force majeure (the ability of Republic to reopen the
contract and change the terms of the contact based on unforeseen additional costs to them with regard to
recycling). Republic has been claiming they have been incurring higher recycling costs because China is rejecting
m uch of the recycling items coming from the US because the recycling not being clean enough.

Vote to Reopen Article 11, Motions 1, 2 and 3 —Authorize Certain Revolving Funds

M r. Aspinwall presented revised motions for Article 11, Motions 1, 2 and 3(see meeting documents).

A motion made by Ms. Saint Andre to reopen Article 11 Motions 1, 2 and 3 was seconded by Mr. McKenna.
Vote: 7-0-0.

Revote —Article 11 Motion 1
A motion made by Ms. Saint Andre to recommend Article 11 Motion 1 as printed in the handout and as follows



                              Department Board,
                              Committee, Agency           Fees, Charges of           Program of Activity
                             or Officer Authorized         Other Receipts             Expenses Payable
   Revolvin     Fund         to S end from Fund          Credited to Fund                from Fund                   Fiscal Years
                                                       M useum grants,
                                                                                    providing additional
                                                       museum gifts,
                                                                                    funding for museum
                                                       m useum
                                                                                    maintenance
                                                       endowments,
#152 -Paul Revere                                                                   expenses, operating
                             Paul Revere               contributions                                             Fiscal Year 2020 and
Heritage Site                                                                       expenses, capital
                             Heritage Committee        museum donations,                                         subsequent years.
M useum Fund                                                                        expenses, repair
                                                       museum rentals,
                                                                                    expenses, building
                                                       m useum admission
                                                                                    expenses, event
                                                       receipts, receipts
                                                                                    expenses.
                                                       from events.

was seconded by Mr. McKenna. Vote: 7-0-0.

Revote —Article 11 Motion 2
A motion made by Ms. Saint Andre to recommend Article 11 Motion 2 as printed in the handout and as follows:
                                Department Board,
                              Committee, Agency or       Fees, Charges of Other         Program of Activity
                               Officer Authorized to      Receipts Credited to        Expenses Payable from
     Revolving Fund              Spend from Fund                  Fund                        Fund                    Fiscal Years

                                                        Rolling Mill, open space
                                                        or historical grants,
                                                        Rolling Mill, open space
                                                        or historical gifts,
                                                        Rolling Mill, open space     providing additional
                                                        or historical                funding relative to the
                                                        endowments, Rolling          Rolling Mill, Grounds and
#142 -Paul Revere                                       Mill, open space or          Museum maintenance            Fiscal Year 2020
Heritage Site Rolling Mill   Board of Selectmen         historical contributions,    expenses, operating           and subsequent
and Open Space Fund                                     Rolling Mill, open space     expenses, capital             years
                                                        or historical donations,     expenses, repair
                                                        Rolling Mill rentals,        expenses building
                                                        grounds rentals,             expenses, event fees.
                                                        grounds use, receipts
                                                        from events.




FINCOM 20190402 Minutes                                   Pale 6 of9                                                       5/~/l9

Source page 7

and that the Board of Selectmen be hereby authorized to petition the General Court for a home rule Special Act
to create a municipal affiliated nonprofit corporation as a body politic and corporate pursuant to chapter 180 of
the General Laws or any other applicable statute to be known as "Revere &Son Heritage Trust, Inc.," whose
board of trustees is to be appointed by the Board of Selectmen of the Town of Canton and the numbers of such
board members are to be determined by the Board of Selectmen, for the purpose of the creation and operation
of an open-to-the-public Paul Revere Museum of Discovery and Innovation and the Paul Revere Heritage Site
located at Lots 3A and 36 as shown on the plan entitled "Subdivision Plan of Land in Canton Massachusetts"
prepared by VHB, Inc. and dated October 8, 2018, as determined by the board of trustees; and further to
authorize the General Court with the approval of the Board of Selectmen to make changes in the language of the
home rule petition to accomplish the public purpose thereof was seconded by Mr. McKenna.

Vote: 7-0-0.

Revote —Article 11 Motion 3

A motion made by Ms. Saint Andre to recommend Article 11 Motion 3 as printed in the handout and as follows
that the spending limits for the revolving funds established pursuant to General By-Laws Article VIII, Section 16
pursuant to the provisions of MGL chapter 44, section 53 E %:for the 2020 fiscal year beginning July 1, 2019
through June 30, 2020 and that each Revolving Fund shall be credited with the balance remaining in such fund at
the end of the FY 2019 as set forth below:

            Revolving
             Fund #                  Name of Revolvin     Fund           FY20 S endin   Limit

               110            Veteran's Services S ecial Revenues            $100,000
               119                   Librar Revolving Fund                    $75,000
               130                 Recreation Revolving Fund                 $500 000
               132                    Student Parkin    Fees                 $100,000
               134                  Pe uitside Farm Rentals                   $50,000

               135               Greenlodge Street Parking Fees              $100,000
               136                     Beautification Fund                    $10,000

               137              Animal Control S ecial Revenues               $50,000
               138                   Librar Buildin    Rentals                $50,000
               140                    COA Revolving Fund                      $50,000

               141              Board of Health S ecial Revenue               $50,000
                            Paul Revere Heritage Site Rolling Mill and
               142                      O en S ace fund                      $120,000
               145                   Traffic Mitigation Fund                  $50,000

               152          Paul Revere Heritage Site Museum Fund            $100,000



was seconded by Mr. McKenna.

Vote: 7-0-0.




FINCOM 20 190=102 Minutes                             Page 7 of'9                                  ~/~/19

Source page 8

Vote —Article 46 Motion 1

A motion made by Ms. Saint Andre to recommend that $2,684,138 be transferred to the General Fund in Fiscal
Year 2020 in order to fund the Town's annual operating budget as follows:




                                   Vote to Transfer Available Funds

            WITH A VOTE THAT $2,684,138 BE TRANSFERRED AS FOLLOWS:

                          TRANSFER FROM                        AMOUNT              PURPOSE

            AMBULANCE SERVICE                                  $1,050,000   FIRE DEPARTMENT
            WATER ENTERPRISE FUND                                 536,298   FIXED COSTS
            SOLAR FACILITY                                        347,908   TOWN-WIDE ELECTRICITY
            SEWER ENTERPRISE FUND                                 329,454   FIXED COSTS
            AMBULANCE SERVICE                                     165,150   DEBT SERVICE
            SCHOOL FOOD SERVICE                                   160,500   HEALTH INSURANCE
            GREENLODGE STREET PARKING FEES                         70,000   EXECUTIVE OFFICE
            SALE OF LOTS/GRAVES                                    10,000   CEMETERY MAINTENANCE
            BOND PREMIUM FUND                                       9,828   DEBT SERVICE
            CEMETERY PERPETUAL CARE(EXPENDABLE)                     5,000   CEMETERY MAINTENANCE

            TOTAL                                              $2,684,138




Was seconded by Ms. Thomas: Vote: 7-0-0.

E.       Approval of Minutes

The Finance Committee did not take action on the March 18, 2019 minutes.

F.       Next Meeting Date:

The next Finance Committee meeting would take place on Thursday, April 4, 2019 at 6:30 p.m. in the Community
Meeting Room of the Canton Public Library. The Town's auditors would be in attendance at the meeting on April
4`h to go over the FY18 Management Letter.

Adjournment: A motion made by Mr. McKenna to adjourn the meeting at 8:59 p.m. was seconded by
Ms. Thomas. Vote: 7-0-0.

Minutes reviewed by: Christos Arsondiadis

Respectfully submitted,




Rob Barker                                  --
Chairman, Canton Finance Committee




FINCOM 20190402 Minutes                          Page 8 of 9                                        ~/~/19

Source page 9

Canton Finance Committee Meeting
                                              Tuesday, April 2, 2019
                                               Meeting Documents



Please note: Some meeting documents may be found on the Town's website under the Posted Minutes section
(Laser Fiche).

Some of the Municipal and School Department budgets or Annual Town Meeting documents referred to in
Finance Committee meetings may be found on the Finance Committee page of the Town's website.

Agenda for April 2, 2019. (1 page).

Bolivar Pool Project Costs, provided by Charlie Aspinwall (1 page).

Bolivar Pool Project Budget Status Report and pictures of proposed pool, provided by Liz Francis, Director, Parks &
Recreation, draft dated 4/1/19(4 pages).

Bolivar Pool Facility -Schematic Design Cost Estimate —Revision 4, prepared Rider, Levett & Bucknall (RLB) dated
April 2, 2019(41 pages).

Article 4 —Consent Agenda —draft motion (1 page).

Public Employees Committee (PEC) Breakdown of $380,000 Savings, provided by Charlie Aspinwall, Town
Administrator (1 page).

Article 11 Motions 1-3 —Draft motions, provided by Charlie Aspinwall (2 pages).

Article 46 Motion 1 —Draft motion (1 page).




FINCOM 20190402 Minutes                          Page 9 of9                                          ~/~/19