Town of Canton                                      Finance Committee and CPC Meeting Notice
                     Finance Committee
                     Rob Barker, Chair                            Meeting Date:             Tuesday, October 23, 2018
                     Tim McKenna, Vice Chair                      Meeting Time:             7:00 PM
                     Christos Arsondiadis                         Meeting Location:         Salah Meeting Room
                     Dan Cole                                                               801 Washington Street, Canton
                     Cynthia Holcombe
                     Emilio Mauro
                     Barbara Saint André
                     Cindy Thomas
                     Wai Wong




           Joint Meeting of the Finance Committee and the Capital Planning Committee

Capital Planning Committee members: Dave Emhardt, Chair; Stephanie Doughty, Bob Panico, Walter Spiegel & Andrew Staiti


                                                           Agenda

This meeting is being video recorded by Canton Community Television. Times are estimates. Items may be taken out of order.

7:00 PM         Call Meeting to Order (Minutes Primary/Alternate: Emilio Mauro / Barbara Saint André)


New Business:
7:05 PM         Metropolis Rink - Discussion with Architect and Owners Project Manager
                And Town Officials/Committee Members

7:45 PM         Discuss and Vote Special Town Meeting Article 1 Motion 1 – Adopt Rules to Govern
                Special Town Meeting - Date and Time.

                Discuss and Vote Special Town Meeting Article 1 Motion 2 – Non-Residents List.

                Discuss and Vote Special Town Meeting Article 2 – Metropolis Rink –
                Bond Authorization of new Rink.

Other Business:

ATFC (Association of Town Finance Committees) Annual Meeting, Saturday, November 3,
Devons Common Center, 9-2:30 p.m.

Minutes to be Approved:           August 1, 2018

Public Announcements/Public Comment: To be determined.

Next Meeting Date: To be determined.

Adjourn



If a topic becomes known prior to 48 hours before the scheduled meeting, the Committee will update this posting. The
Committee may also discuss a topic or topics not reasonably anticipated by the Chair 48 hours before the meeting.
20181023 FINCOM Agenda.doc

Source page 2

Recommendations of the Finance Committee
   to the Voters of Canton, Massachusetts

                      2018

              TOWN OF CANTON




         SPECIAL TOWN MEETING
WEDNESDAY, DECEMBER 12, 2018 at 7:00 p.m.


              Morse Auditorium
             Canton High School
        900 Washington Street, Canton

Study this report and come to Special Town Meeting.
             Bring this report with you.


                      YOUR VOTE at Special Town Meeting is important
                      because it establishes the priorities for our schools,
                      public works, public safety, town government and
                      future direction for our environment.

                      The Town, upon request, will endeavor, to the
                      greatest extent possible, to make available any
                      and all visual and audio devices and assistance for
                      the disabled. For more information, please call
                      781-821-5000.

Source page 3

TABLE OF CONTENTS


Special Town Meeting Articles
Art.                                                              Page #
1      Adopt Rules to Govern Special Town Meeting …………………………………
2      Metropolis Rink Appropriation ………………………………………………………




This page only to be used if needed for a filler

Source page 4

Town of Canton
                            Commonwealth of Massachusetts




Norfolk, ss

To the Constables of the Town of Canton,

Greetings:
In the name of the Commonwealth of Massachusetts you are hereby required to notify and warn the
inhabitants of the Town of Canton to meet at Morse Auditorium, on the grounds of the Canton High
School, 900 Washington Street in said town on;

                                   WEDNESDAY, THE TWELFTH DAY
                                       OF DECEMBER 2018


At seven-o’clock (7:00 P.M.) in the evening at which time and place the following articles are to be acted
upon:


                                               ARTICLE 1

ADOPT THE RULES TO GOVERN SPECIAL TOWN MEETING
Article 1 To see if the town will vote to adopt certain procedures to govern the conduct of the 2018
Special Town Meeting, or to take any other action related thereto.
Board of Selectmen


MOTION 1
MOVED:         That this 2018 Special Town Meeting shall meet on Wednesday, December 12,
2018 and if necessary on Monday, December 17, 2018 in the Morse Auditorium, on the grounds
of the Canton High School until the business of this Special Town Meeting has been concluded,
each such session to begin at 7:00 o’clock P.M. and to adjourn at 11:00 o’clock P.M., or as near
that hour as may be feasible, according to the nature of the business pending at the said hour.


                                      FINANCE COMMITTEE VOTE:


DISCUSSION: The Finance Committee recommends adoption of this motion as it formalizes procedures
that have been followed by Special Town Meetings in the past.


                         APPROVED__________DISAPPROVED__________

Source page 5

MOTION 2
MOVED:           That the following individuals be granted all of the rights and privileges of
participation in this Special Town Meeting, except the right to vote, under any article of this
warrant which affects matters within their jurisdiction:

      Charlie Aspinwall, Town Administrator
      Andrea Berardi, Deputy Director, Parks & Recreation
      Paul R. DeRensis, Town Counsel
      Jennifer Fischer-Mueller, Superintendent of Schools
      Elizabeth Francis, Director, Parks & Recreation
      Tom Houston, Professional Services Corporation, PC
      Neil Joyce, Senior Project Manager, CMS (Construction Monitoring Services)
        OPM for Rink (Owner’s Project Manager)
      Louis Jutras, Information Systems Manager
      Karen Lawlor, Administrative Assistant, Canton Planning Board
      Scott Lubker, Project Manager, CMS, (Construction Monitoring Services)
        OPM for Rink (Owner’s Project Manager)
      Brian Lynch, Facility Director
      Stephen Lynch, Representative in Congress
      James Murgia, Finance Director
      Barry Nectow, School Business Administrator
      Andrew Poliferno, Disaster Recovery Programs Coordinator, MEMA (Massachusetts
        Emergency Management Agency)
      Helena Rafferty, Deputy Police Chief
      Tom Scarlata, Principal, Bargmann Hendrie & Archetype, Inc. (bh+a) (Architect for Rink)
      Laura Smead, Town Planner
      Barbara Thissell, Town Engineer
      Walter Timilty, State Senator
      Michael Trotta, Superintendent of Public Works
      Diane Tynan, Director of Council on Aging


                                    FINANCE COMMITTEE VOTE:


DISCUSSION: The Finance Committee recommends adoption of this motion as it allows key non-
resident officials and consultants to legally participate in the Special Town Meeting and it formalizes
procedures that have been followed by Special Town Meetings in the past.


                        APPROVED__________DISAPPROVED__________

Source page 6

ARTICLE 2

METROPOLIS RINK APPROPRIATION
Article 2 To see if the Town will vote to raise and appropriate, or to transfer from available funds, or to
authorize the Town Treasurer, with the approval of the Board of Selectmen, to borrow (and to issue bonds
or notes therefore) any sum or sums of money, or by any combination of these methods of financing as
may be necessary or desirable, and furthermore, any premium received by the Town upon the sale of any
bonds or notes approved by this vote, less any such premium applied to the payment of the costs of
issuance of such bonds or notes, may be applied to the payment of costs approved by this vote in
accordance with Chapter 44, Section 20 of the General Laws, thereby reducing the amount authorized to
be borrowed or to pay such costs by a like amount, thereby making available funds for the purposes of
designing, permitting, environmental cleanup, reconstructing, constructing, repairing and equipping of the
Metropolis Rink located at 2167 Washington Street, Canton, MA 02021, and to authorize the Board of
Selectmen to accept and the Building Renovations Committee to expend, any and all insurance proceeds
received for such project, and to authorize the Board of Selectmen to accept and the Building Renovations
Committee to expend, any grants, gifts, or Federal Emergency Management Agency (FEMA)
reimbursements received therefore. Further, the Board of Selectmen shall be authorized to extend the
existing lease of the Metropolis Rink with the Department of Conservation and Recreation, set to expire on
June 30, 2030, on terms and conditions satisfactory to the Board of Selectmen, or to take any other action
in relation thereto.
Board of Selectmen for the Capital Planning Committee

MOVED:           That (if more definitive information is available regarding #s)



Or

               That the Finance Committee will make a recommendation regarding Article 2 at
the Special Town Meeting.



                                     FINANCE COMMITTEE VOTE:




DISCUSSION:


                         APPROVED__________DISAPPROVED__________

Source page 7

short-native-text

NOTES:

Source page 8

PRSRT STD
                                     U.S. POSTAGE PAID
                                       PERMIT NO. 20
                                        CANTON, MA


FINANCE COMMITTEE
TOWN HALL
801 WASHINGTON STREET
CANTON, MA 02021




                        CAR-RT SORT
                        RESIDENT
                        CANTON, MA 02021

Source page 9

Murgia, James R.

From:                         Aspinwall, Charles
Sent:                         Thursday, October 11, 2018 9:20 AM
To:                           Board of Selectmen
Cc:                           Bob McCarthy; 'Scarlata, Tom'; Neil Joyce; Murgia, James R.; Butters, Kathy;'Paul
                              DeRensis'; Chuck Armando; JR McCourt;'nick@cantoncoopbank.com'; 'rrstaiti55'
Subject:                      Rink info
Attachments:                  Rink layout.pdf


The BRC met last night and reviewed the attached layout provided by the architect. Please note the
following:

   1. Design update meeting with Commissioner Roy & DCAMM has been changed to October 24rn
      at 3 PM at DCR offices, 251 Causeway St., Boston. Parking can be arranged. It would be
      helpful to have the BOS represented by a Selectman. Please let me know who may be able to
      attend.

   2. The Special Town Meeting has been arranged for 12/12/2018 with a "snow date" of 12/17.

   3. The Finance Committee is meeting to discuss the project on 10/23 at 7 PM in the Salah
      Meeting room, 801 Washington St. BOS, BRC, Architect and OPM should attend.

   4. A bid opening date of January 23, 2019 has been set.

   5. Finances: Estimated cost of project                     $10,000,000
            Less Funds available on hand                      $2,500,000
            Less Insurance Holdback funds if project proceeds $1,000,000
            Less Insurance proceeds for code upgrades          $1,000,000
           Potential Cost to Town of Canton                  $5,500,000
           Potential FEMA reimbursement (est)@ 75%            $4,125,000*
           Estimated Net cost to town(@ 25%)                 $1,375,000

  *Dependent upon FEMA review &approval

  6. Status of lease —The following is from an email sent to the BOS on 7/17/2018 regarding a
     phone call I received from DCR Commissioner Roy:

        "DCR Commissioner Roy called and said he spoke with DCAMM and they could offer an
        extension of the lease such that we have thirty years remaining in the lease —the combination
        of what's remaining in the original lease and the extension. For instance if we bond in 2020
        we'd have ten years left of the original lease and DCAMM would authorize another 20 years."

     The lease will be discussed the October 24th DCR meeting. Town Counsel has been asked to
  attend.

Source page 10

ARGFOTECT
                                                                                                                                                                                                                                                                                                                                                OAhlt
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    3
                                                                                                                                                                                                                                                                                                                                            1       2   D101                                                                                                                                                                                                                                        sa

                                                                                                                                                                                                                                                                                                                                                         ~                                                                                                                                                                                                                                  9ar9mam Heedrie ~lvchebx. Inc.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            300 A Street
                                                                                   A                                                  8                                                                                               O                                           E                                         F                                             G                                           H                                          J                             K                                            L                               ~,~             ~~~.NA OII10
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            617350-0S07e1
                                                                                                   10-0'                                                     2V-P                                    2V-0'                                            ~P-'                                      2U-P                                       2V-0'                                          ]0'.0'                                          PO'.P                            3V-V                                        2U.P                            ZO'.0'

                                                                                                                                                                                                                                                            h]Oi
                                                                                                                                                                                                                                                                   5.~•
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            PROJECT NAIAE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            I
                                                                                                                                                                                                                                                                                                          r                                                                                             4                                                            •-'~'-'-'-'-'
                                                                                                                                                                                                                           16
                                                                                                                                                                                                                          ~'
                                                                                                                                                                                                                              `_'_____
                                                                                                                                                                                                                                                              __                                           •                        os.                                       ~                        "'02                        os.                                                                      os.                                                                             Metropolis Rink
                                                                                   i                                                  i                                                                                                                                           i                                                                                           -                                                                                                                                                             i         ~,                        i           Renovation
                                                                                                                                                    e                                                                                           ZAMBONI                                                             -'~\                                             '%'                                                                                  ~1   as                     ~ .,~~'                          F.
                                                                                                                                                                                                                                                                                       „                             f~~                  (~                          I,             ~                                                                       .
                                                                                                                                                   u°°                                                                                               120                              i                                                                                                                                              ~                .X~;'~
                                                                                   KITCHEN                                                        _~                                                                                  I                                                                                       TOILET! W                                   I                -. ,-                                                          ~ I~    ~                                f ~~~~ l~~
                                                                                                                                                                                                                                          rv=w 000a n~o~oroa
                                                                                     ~ ~g                                             I         ~     ~ECNANIC                                                                        I   cwaxWfr FREE ft~Enn                     I         _                               I    ~-..
                                                                                                                                                                                                                                                                                                                                    724                                   ~         "-,       .`~           ~. ~          ~                  ' ~~                I                             I           ~ C'        y.`         ..I '                                        I
                                                                               1 I'                           2                                                                                                                                                                                                                                                                                                                                                          TO TISHOW                                                                                                          cuexr
                                                                                                                  6I I                                                                                                                                                                                                                                                                ,CEE MEA"                                                   Z-                                               i .,.       ~
                                                                                                                                                                                                                                                                                                                                                                                                                                                                               72
                                                         (,                             -~'4                          5                        205io               ~
                                                                                                                                                                  I~R gM I                                        Q                                                                   ~'\                                                   \                                     ~P~ ~~~F~~l
                                                                                                                                                                                                                                                                                                                                                                                            ' ~5 I                             ~~~y          .:                                                                                                   r                                         Town of Canton
                                                                                                                                                                                                                                                                                                                                                                                                                              y~                  C              I             /                                              f
                                                                                                                                                                                                                     25               ~         __     zy                     I       /
                                                                                       ~~                                             I                           I       24               ~
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            ~ ~   i ~\ (`I


                                                                                                                                          :l            ~             -                                            ~.~                                                                                                      /~                                                                                                                                                                             iE'N OOOft MWEO fOft~                       y
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Pt WtT FPEE PR
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      roo~
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            eai m~~d,s~c~mM r.ia

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            PaaEci yam
                                                  Y          ~                               ~6                       --                   >     ;r .        .r                                                                   I              '\ /                         I                                                                 Y

                                                                                                     ~            -I                                                                                                                                                                                                                                                                           ~\
                                                                                                                                                                                                                                                                                                                                                                                                                              ~     sun

                                                                                                                      ==..I                ~                                                                                                                                                           N°5 ~                                                             I               ^~                               ~5                                                                                                                                                        6
                      t                                            ~                                                                                                                                                                                                          I



                                 .:~ ~~Q~                                                                                                                                 _~____ ~                                                                                 _~___ _~_~-1 ____r____                                                                                                                                                                                           _~____-~_
                                                                                                                                                                                                                                      ~5 ~
                     NO3                                                                      ~'   ELEVATOR                           I'                                               I                                          ~                                           ~                          ~R-0' ~                                             72'-0'~                6-0'                           I           30-P                           ~                                I                                        ~
                                                                                                        .__       UP                                                                                             _ ~- _                                -                                                                                            _                                                                                                                _     _                                                                                       _
                                                                                                                                                                                                                                                                                                                                            2




.r. ~i~1~
                          . ~ ~. ~
                          .,/
                                      Y.
                                            T

                                                .2                                       x~
                                                                                                                       ` I.
                                                                                                                       "~
                                                                                                                                                                                       I                                          I                                           I
                                                                                                                                                                                                                                                                               i                                        I                                             I            ~
                                                                                                                                                                                                                                                                                                                                                                                           MEAOFATNLETIC TILE
                                                                                                                                                                                                                                                                                                                                                                                                                                                             I                             i

                °                     ncKers ~ ,o                      ,                                                                  ~
                                           ~ 1~                                    ~               OFFICE
                                                                                                     112                                                              _~_
                                                                                              -                                                                                                      _           _                        _            _           _~_                            _         _~_                                                                                                                      _                                     _        _~_                                _      -~--_                                _
                                                                                         z
                                      MANAGER                ORRIDO                                                                                                                                                                                                                                                                                 _—~                             Room           -              ~                                   _~-
                                           709               rj~~                      ~-'-'-'---'-'-                                                   K-                             I                                      I                                           I                                             I                                             I                                           I                                     I                                  I                                            I                                   1
                                                                                                                                                                                                                                                                                                                                                                                    121
                                                                 ---'
                                                                                              Raom                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      z
                                                                                                                                                1
                                                                                                                                                                                                                                                                          I                                                                                                                                                                                                                                                             I
                                                     ~       n     ~       ~                  114                                 ~ ~,
                    nzm 3                                                                                                                                                                                                                                                                                                                                            1

                                  FIRST AID ~.               12    I                                                              I                     ~                                                                                                                                                           I           NEW RELRIGEtUTEOftNK SlAO
                                       10B
                                                                          NNS                      ~
                                                                                                   j                              ~                                                ~                                          I                                           I                                         I                                                I                                            I                                          I                             I                                            1
                                           ~3     _          -J                                     V                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   REVISIONS
                                                                                                                                                                                                                 _ -~- _                               _           _ -~- _                        _        _ -- _ — _ — -~ — - — - — ~                                                                                               - — _ --~ -                           _        - —~ - — - — - _-~-_ _                                                 -       _
                                                                                              -                                    ''                                 -~- — - —
                                  Restroom           nitor
                                                                                                                                  I ~~                                  I                                                     i                                           I                                         I                                                I                                         I                                          I                                I                                        1                                   I               ;
                                       1~6        707         ~~          ~/

                                           ~ .~.~.~                                           17              ~                                                                    I                                                                                      I                                         I                                                                                          I                                                                                                                                                                        5                        rvrt

                                i BOILER ROO~'F                                                                                                                                                                               I                                           I                                         I                                                I                                         I                                          I                                I                                        I                                   I.
                                                              15               ~          ~clals                  ~-                                                               ~
                                           105                     ~                   RESTROOM                   S                   ~                 ~ ~                                    NEW DASHER 64<ROS                                                                                                                                                                                                                                                                                                                                                                        oanwv~c im_E
                                                                                                           102                                                                                 aroxerrwe
                                                                                                                                                                                                                                                                          I                                         I                                                I                                         I                                         I                             I
                                                                                         '                                    ~                                                    i                                          i                                           i                                         ~                                             ~                                            i                                         i                             i                                            i                                   ~                    roposed Pian
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       ~~ -.
                    - ~ ~ --- ;_ ,--- -~- - -~-----~- - -~--- J---- L-----J--------1------~--                                                                                                                                                                                                                                                                                                                                                                                                                                                                --
                                                                   IGERA~lON                                                                                                                   N~ry f+,uar a+o wa+oRaas

                                                                   ~Q,~                                                                                                                                  NEW STEPS

                                                                                                                              1                                                I                                          I                                           I                                         I                                                 I                                           I                                          I                             I                                            I                                   I               Oanvnrtc WFow.a7pN

                                 20                                        I                                               I                    18                                                                                                                                               NEW BLJGHERS                   ^                                                                                                                                                                                  p
                                                                                                                                                                               I                    DN

                                                                           ~                                      ~           ~                                                                                                                                                                                                                                                                                                                                                                                                     ~                                   ~




                                                                                                                                               os ~                                                                                       os.                        s                                                            os.                            I                   nwv                                      os.                        I                                             ns.                         .I                        awe        I               L~m~c                    J
                                                                       `I-r++'r:.............`---i                                                                             I                                      ~                                                                                                                                                                                                                                                                                                                                                                 o,re~r"e.
                                                                                                                                                                                                                                                                    awz
                                                                          ~I                                              I                                                    1                                      1                                             ~                                        !                                                   I                                            I                                          I                             I                                            I                                   I



            -



            ~~
                                                                           i


                                                                           ~
                                                                                                                          I


                                                                                                                          ~
                                                                                                                                                                               I                                          I


                                                                                                                                                                                                                          ►
                                                                                                                                                                                                                                                                      I


                                                                                                                                                                                                                                                                      ~
                                                                                                                                                                                                                                                                                                                I


                                                                                                                                                                                                                                                                                                                ~                         8
                                                                                                                                                                                                                                                                                                                                                z                I                                            I


                                                                                                                                                                                                                                                                                                                                                                                                              ~
                                                                                                                                                                                                                                                                                                                                                                                                                                                         I                             I


                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       ~
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    I                                   I

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        o~Y~~~~
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        ~+~•             ~~~ ~~




            _                                            ~~ LEVEL 1 Proposed plan                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       n~ O

                a
            a
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        ~~~k

Source page 11

Washington Street Canton, NIA 02021




                                                                                                                                                                                                                                                                                                                        C                                                   i
                       —~
                                                                                                                                                                                                                                                                                                                                                                            ~                               ~
                                                                                WARMING ROOM                                                                                                                         I                                              ~                                                       ~
                                                                                          117                       ~                                                                                                                                                                                                                                                   1
                                                                                                                                                                                                                     ~


                                                TICKETS                                                         ~                                                                               ~"~ ~
                                                  110                                                                   ~                                                                                            ~

                                                                                                                                            OFFICE
                                                                                                                ~                z           ~~q
                                         —_— _ — _                         _   _ _              _                             _ NO2        _~_ _                           _           _                                 _       _        O


                                                                                                                                                                                                                                                                ~       ~ Unlsex locker                                 ~
                                             NIlWAGER                                                       I                                                                                                                                                                                                                                                           ~       Unisex locker
                                                                                                                                                                                                                 I                                              I             205
                                                  109                                                                                                                                                            ~                                                                                                                                                                  205

                                                                                                                                        MEN                           \
                                                                                                                                        114                n              ~                                                                            —                         —                                      ~       —~              — —
                                                                  /~ ~                                                                                                                                                                                                                                                                                                                 —          r     ~
                                                                                                            ~                                         io "
                                                                                                                                                         Awo a            /~                                 ~                                                                                                                                                                                                  ~0~
                                                                                                                                                                                                                                                           _    I
                                                                                                                                                                                                                                                                                                1,i :~♦                                                _            ~                           /;~'.
                                                                                                                                                                                                                                                                                                               ......

                                                                                                        ~                                                                                                    ~
                                                                                CORRIDOR
                                                                                     7 04
                                           FIRST PID                                                    ~                                                                                                   i
                                                10e
                                                                                                                                                                                                                                              ~~ UNISEX LOCKER AREA OPTION 1
                                                                                                                                                                                                                                                 v~~ra                                                                                 ~ UNISEX LOCKER AREA OPTION 2
                                                                                                                                                                                                                                                                                                                                       ~ yr-ra-


                 _ _   _ ' _     _   -      _             _                     _           -~                                   __                             -         _            _                                         ~
                                                                                                                                                                                                                                                                                                   J                                                        oN
                                                                                                                                                                                                         ~                   c
                                         Restraom                 JanBor                                                                                                                                                                                                                           ~                                                         I
                                                                                                                                                        is
                                           106                     107                                                        /\              \                           \`
                                                                                                                            ~~                    1    ,/~•qp 16
                                           wsaa                                                                         ~~ WOMEN                         ~
                                           19                                                                                      ~~                                 /

                                                                                                                                                                                                                                                                                                           ~                                                    ~
                                                              4            I
                                                                                                                                                                                                        I
                                                                                                                                                                                                                                                                                                                                                            8
                                                              ,\                                                                                                                           \`
                                          BOILER ROOM                                               I                                         ~~•.\                                                                                                                                       ~                1
                                                                                                                                                                                                   - ~                                                                                                                                                          1
                                                105
                                                                                                                        i        zi wsoo                                       COACHES
                                                                                                                                     ~                `'•.-..                    102


                                                                                                    ~                                                                                                I                                                                                             o
                                 ❑
                                                                                                    1                       ~                             ~                                         I                                                                                                  ~        TV                 ~
                                                                                                                                                                                                                                                                                                                                   ' TOILEfISHOWFR          ~
                                                                                      i                                                                                                                                                                                                                                                   127
                                                                                      EFRIGERATION
                                     —     — — — — —                           _ — ---~EQUIPMENi — — — — — — — —
                                                                                                                                                                                                                                     _   ~l
                                                                                                                        101                                                                 - --                                         `~                                                        I                    '
                                                                                                                                                                                                                                                                                                                        .
                                                                                                                                                                                                                                                                                                   I                                                        1
                                                                                                                                                                                                                                                                                                   O                               '/'


                                                                                                                                                                                                                                                                                 — —               I                                                                            —
~   OFFICAAREA
    ~H•.ra




                                                                                                                                                                                                                                                                             ~    TYPICALTOILET/SHOWERROOM
                                                                                                                                                                                                                                                                                  v.•=ra
~~     Bargmann                Hendr ie      +        Archetype ,               I nc.           300                           A     St reet                         Bos ton ,              Massachuset ts                            02210        Tel : (617) 350            0450         Fax: (617) 350                    0215    APRILI           2009

Source page 12

Jones, Ellen

From:                             Murgia, James R.
Sent:                             Thursday, October 18, 2018 12:19 PM
To:                               Jones, Ellen
Subject:                          FW: Updated Report
Attachments:                      FEMA Rink T Scarlata Repair Report 101118.pdf


          For Fin Com & CPC for the rink meeting next week. Thanks.

From: Butters, Kathy
Sent: Wednesday, October 17, 2018 4:36 PM
To: Murgia, James R.
Subject: Updated Report

Hi Jim,

Here is the most recent updated report on repair.

Thanks,

kathy

Kathy Butters
Town Accountant
801 Washington St.
Canton, MA 02021
(781) 575-6605




                                                           1

Source page 13

BARGMANN HENDRIE + ARCHETYPE, INC.

                                                                                                Architecture | Planning | Interior Design



9 Channel Center Street                                                             617 350 0450
Suite 300                                                                           bha@bhplus.com
Boston, MA 02210                                                                    www.bhplus.com



Date:               October 11, 2018

Project:            Metropolis Rink Renovation/Restoration
                    Canton, MA

Subject:            Scope of Work –FEMA Reimbursement



By:                 Thomas A. Scarlata, CSI, CCS, CCCA, AIA
                    Principal

The Investigation and Evaluation Report of the Metropolis Rink in Canton MA evaluated the current
condition of the structure, identified damage and code deficiencies, and proposed a scope of work to
rebuild the rink to a functional code complaint condition. Total construction and project costs were
prepared based on the requirements identified in the report. The costs did not define work that was
directly attributable to the collapse, also referred to as the “event”. This document breaks down the
components that require replacement or repair that are a direct result of the event.

DEFINITION OF THE EVENT
    • Collapse of the roof structure at the south end of the rink space (roughly ¼ of the roof)
    • Damage to roof structure adjacent to collapsed area where members were pulled or twisted
        when the roof structure collapsed
    • Damage to the wall framing at the collapsed area
    • Damage to the building envelope at the collapsed end, south, east and west walls.
    • Damage to the north wall caused by internal air pressure created by displacement of air when
        the structure fell.
    • Damage to the locker room roof structure where the support columns were displaced from the
        roof collapse.
    • Damage to the low-E ceiling membrane at the collapsed area and partial damage at the next
        bay
    • Damage to the light fixtures and devices in the collapsed portion of the rink
    • Damage to the fire alarm system devices in the collapsed portion of the rink
    • Damage to the dasherboard system in the collapsed portion of the rink
    • Damage to the fixed bleachers at the collapsed portion of the rink
    • Damage to interior finishes at the collapsed portion of the rink, rink mating, etc.
    • Damage to the interior wall between the rink and locker rooms




                             P:\3370 Canton Rink\doc\correspondence\Client\ltr-101118- Revised Scope based on FEMA Funding.docx

Source page 14

Metropolis Rink Renovation/Restoration
Scope of Work –FEMA Reimbursement
October 11, 2018
Page 2




CONSEQUENTIAL DAMAGES CAUSED BY THE EVENT

Plumbing and Hydronic Heating System
The unknown nature of the collapse prevented entrance to the building. Gas and power service were
terminated and the building’s heat and recirculation pumps were shut down. The building’s domestic
water piping, plumbing fixtures, drains, heating appliances, hydronic piping, and heating elements could
not be drained down to protect pipes, equipment, and fixtures from freezing. During the I&E
investigation, damage to frozen pipes and equipment was observed.

Damage of Finishes and Equipment from Exposure
Other damage can be attributed to the unheated condition of the building. This includes:
    • Finish damage from moisture, condensation, and freeze thaw
    • Electrical component damage and loss of function from moisture and freeze thaw
    • Refrigeration system damage and loss of function from moisture and freeze thaw

The building was functioning and received routine maintenance from the Town at the time of the event.
The closure of the rink and its unconditioned state has contributed to corrosion of metallic elements and
parts of equipment, failure of finishes, and moisture condensing and collecting in mechanical and
electrical equipment. A portion of the replacement cost of these elements is attributable to the event.

Selective Demolish Costs
The scope of work includes selective demolish of existing components that are essential to the repair of
the damaged work and reconstruction of the rink. We have not included demolition costs to remove the
collapsed structure.




                  P:\3370 Canton Rink\doc\correspondence\Client\ltr-101118- Revised Scope based on FEMA Funding.docx

Source page 15

Metropolis Rink Renovation/Restoration
Scope of Work –FEMA Reimbursement
October 11, 2018
Page 3




                                       Roof Structure of Low Rise
                                       Attributable to event




                           Wall Above attributable to
                           event




                            Work on Structure in This Bay
                            Attributable to event



                                         Area of Collapse (Event)




                P:\3370 Canton Rink\doc\correspondence\Client\ltr-101118- Revised Scope based on FEMA Funding.docx

Source page 16

Metropolis Rink Renovation/Restoration
Scope of Work -FEMA Reimbursement
October 11, 2018

Page 4

Environmental Conditions After the Event

The average air temperature on the day of the event, February 28, 2015, was 15 degrees F. The
average air temperature for the following 4 weeks in March 2015 was 30.3 degrees F. Only 10 days in
March had an average temperature above freezing. The average minimum temperature for March was
21 degrees F.

The following data was taken from the National Weather Service.
https:/v2.weather.gov/climate/xmacis.php ?wfo=box

February 2015 National Weather Service Forecast Office

Climatological Data for Milton Area, MA (ThreadEx) - February 2015

‘Temperature
Date                                                                                                      upp | cpp          Precipitation             New Snow             Snow Depth
Maximum               Minimum              Average              Departure
2015402401                                                                                                            M                                                                0.00                             00                              16
2015-02-02                                                                                      M                                                   0.34                       37                        18
2015-02-03                                                                 M                                       119                 128                 24
2015-02-04                                                                                                            M                                                                0.00                             0.0                              24
2015-02405                                                                                                            M                                                                  t                                 T                               2
2015-02-06                                                                                      M                                                   0.15                        35                        24
2015-02-07                                                                                                            M                                                                0.00                             00                              3B
2015-02-08                                                                                                           M                                                                0.32                              5.0                              27
201540209                                                                                                     M                                                            0.93                            96                            32
2015-02-10                                                                 M                                       132                  13.1                  38
2015-02-11                                                                                                            M                                                                  zi                                 T                               36
2015-02-12                                      M                       0.03           14           36
2015-02413                                      M                       0.02          06           35
2015-02-14                                      M                       0.00          0.0           4
201502615                                                                 M                                      0.96                 19.1                  45
2015-02-16                                                                 M                                      0.21                  25                  45
2015-02-17                                      M                       0.00          00           B
2015-02-18                                      M                       0.12          20           44
2015-02-19                                                                                      M                                                   0.09                        39                        4
2015-02-20                                      M                       0.02          03           41
2015-02-21                                                                 M                                      0.00                  0.0                  40
2015-02-22                                                                                  M                                                 0.34                      22                       40
2015-02-23                                                                 M                                      0.02                  02                  38
2015-02-24                                                                 M                                      0.00                  0.0                  oF
2015-02-25                                      M                       0.07           31           39
2015-02-26                   32                         B                    25                     M                   2             0                     0.00                          0.0                           38
2015402227        21          9         150        M        30     0        0.04          06           38
2015-02-28                   25                         5                      15.0                     M                   50             0                     0.00                          00                           37
Sum               698               168               :                :            1381        0              6.17                 83.6                  -
Average                    24.9                      6.0                    15.5                     M                    =              =                       =                             =                           34.2
Normal                        M                            M                         M                          :                      M              M                         M                                M                                :

Observations for each day cover the 24 hours ending
at the time given below (Local Standard Time).

Max Temperature : midnight

Min Temperature : midnight

Precipitation : Zam

Snowfall : unknown

Snow Depth : unknown

P:\3370 Canton Rink\doc\correspondence\Client\ltr-101 118- Revised Scope based on FEMA Funding.docx

[Original embedded text, retained for comparison]
Metropolis Rink Renovation/Restoration
Scope of Work –FEMA Reimbursement
October 11, 2018
Page 4




Environmental Conditions After the Event
The average air temperature on the day of the event, February 28, 2015, was 15 degrees F. The
average air temperature for the following 4 weeks in March 2015 was 30.3 degrees F. Only 10 days in
March had an average temperature above freezing. The average minimum temperature for March was
21 degrees F.

The following data was taken from the National Weather Service.
https://w2.weather.gov/climate/xmacis.php?wfo=box

February 2015 National Weather Service Forecast Office




                  P:\3370 Canton Rink\doc\correspondence\Client\ltr-101118- Revised Scope based on FEMA Funding.docx

Source page 17

Metropolis Rink Renovation/Restoration
Scope of Work -FEMA Reimbursement
October 11, 2018

Page 5

March 2015 National Weather Service Forecast Office

Climatological Data for Milton Area, MA (ThreadEx) - March 2015,

‘Temperature
Date                                                                                                                                                                  Precipitation                New Snow               Snow Depth
Minimum             Average             Departure
2015-03-01                  7        185        M                      0.00          00          36
2015403402                  16        25        M                      024          29          38
201543403                                                                                                     M                                                            0.00                            00                            7
2015-03404                                                                                                     M                                                            038                            28                            37
2015-43-05                                                                                                     M                                                              mT                               T                             35
2015403406                                                                                                     M                                                            0.02                            02                            4
201543407                                                                                                     M                                                            0.00                            00                            33
2015403408                                                                                                     M                                                            0.00                            00                            3
2015-03-09                                                                                                     M                                                              7                               T                             33
2015403610                                                            0.00          00          31
201503611                                                            on          00          27
2015403412                                                                                                                                                                    0.00                            00                            24
20154313                                                                                                                                                                    0.00                            00                            23
20153614                                                                                                                                                                      t                              00                            21
2015-03415                                                                                                                                                                    ond                            00                            21
201543416                                                            0.03          06          21
2015-43-17                                                            0.07          00          18
2015-43-18                                                                                                                                                                    0.10                             T                              16
2015-03-19                                                                                                                                                                    0.00                            00                             16
2015403-20                                                                                                                                                                    0.00                            00                             16
20154321                                                            0.08          im           7
201540322                                                            0.09          07          16
2015-03-23                                                                                                                                                                    0.00                            00                             15
2015-43-24                                                                                                                                                                    0.00                            00                             15
2015-43-25                                                            0.00          00          4
2015-03-26                                                                                                                                                                    0.08                            00                             B
20154327                                                            0.76          00          10
201540328                                                                                                                                                                    0.05                            06                             9
201540329                                                                                                                                                                    040                            44                             14
20154330                                                                                                                                                                    0.00                            00                             ui
20154331                                                                                                                                                                      T                               T                              10
‘Sum                   1202                  675                  -                    -                              0                  3.25                      133                       -
Average        38.8        218       303        M             :         -           :          24
Normal                       M                          M                       M                        -                                     M                       M                              M                              :

Observations for each day cover the 24 hours ending
at the time given below (Local Standard Time).

Max Temperature : midnight

Min Temperature : midnight

Precipitation : 7am

Snowfall : unknown

P:\3370 Canton Rink\doc\correspondence\Client\ltr-101 118- Revised Scope based on FEMA Funding.docx

[Original embedded text, retained for comparison]
Metropolis Rink Renovation/Restoration
Scope of Work –FEMA Reimbursement
October 11, 2018
Page 5




March 2015 National Weather Service Forecast Office




                P:\3370 Canton Rink\doc\correspondence\Client\ltr-101118- Revised Scope based on FEMA Funding.docx

Source page 18

Metropolis Rink Renovation/Restoration
Scope of Work –FEMA Reimbursement
October 11, 2018
Page 6




SCOPE OF WORK
Items and Description of Work Related to the Event are in Bold

SELECTIVE DEMOLITION ESSENTIAL TO RECONSTRUCTION AND REPAIR
1.     Remove existing roof trusses and structure at the rink, including wood columns and CMU infill
       walls; existing transite roof shingles are Asbestos Containing Materials.

         A portion of the adjacent roof assembly next to the collapsed area were affected by the
         collapse of the adjacent bays; connections and framing in this were severed and later
         cut away.

         The collapse of the roof at the south end of the rink cannot be attributed to the
         condition of the remaining roof trusses and supports.

1a.      Remove existing roofing on flat support building areas.

         Damage to the low rise locker room roof adjacent to the collapsed area is attributable
         to the event.

2.       Remove existing concrete rink bed and piping, and existing dasher board system around rink.

         The existing ice bed has been directly exposed to the elements (it is currently on the
         exterior of the building). Exposure damage has compromised the surface of the slab.

3.       Remove existing rink refrigeration equipment and header piping, including exterior cooling
         tower.

         The cooling tower was operational at the time of the event. Sitting idle and exposed has
         damaged the equipment and made it inoperable. A portion of this cost is attributable to
         the event.

4.       Remove existing HVAC system including hot water boiler, piping system, fan coil units, roof
         mounted exhaust fans, and central dehumidifier.

         The hydronic heating system was operational at the time of the event. The system was
         not drained. Sitting idle and exposed to freezing temperatures has caused freeze
         damage that was observed. The majority of this cost is attributable to the event.

5.       Remove existing light fixtures, emergency lighting and exit signage throughout the building.

         Replacement of equipment in the collapsed area and adjacent locker rooms is directly
         attributable to the event. The unheated and exposed condition of the building has
         caused damage to the equipment from moisture and freeze thaw cycles.




                  P:\3370 Canton Rink\doc\correspondence\Client\ltr-101118- Revised Scope based on FEMA Funding.docx

Source page 19

Metropolis Rink Renovation/Restoration
Scope of Work –FEMA Reimbursement
October 11, 2018
Page 7




6.      Remove existing plumbing – hot and cold water and waste piping – and domestic hot water
        system.

        The unheated and exposed condition of the building has caused damage to the piping
        from freezing that is directly a result of the event. The system could not be drained
        after the event.

        A review with the State Plumbing Inspector after completion of the I&E report identified
        the need to replace existing domestic water piping and hydronic piping. Visible
        portions of the underslab piping, drains, and clean-outs were inspected and freeze
        damage was observed. Testing of underground piping that is currently not visible is
        required. Replacement of piping will require removal and replacement of existing walls
        and finishes to perform the work.

7.      Remove existing loose paint on all walls and exposed ceilings in low-rise areas north and east
        of rink.

        Damage of finishes is a result of exposure and the unheated condition of the building.

        Additional partition removal will be required to expose concealed plumbing lines that
        have been damaged by freezing.

8.      Remove existing vinyl floor tiles and mastic from public rooms at the north low-rise area,
        which are Asbestos Containing Materials

        Areas in the west Locker rooms that have been subject to water damage after the
        collapse are attributable to the event.

        Damage to finishes is a result of exposure and the unheated condition of the building.




                P:\3370 Canton Rink\doc\correspondence\Client\ltr-101118- Revised Scope based on FEMA Funding.docx

Source page 20

Metropolis Rink Renovation/Restoration
Scope of Work –FEMA Reimbursement
October 11, 2018
Page 8




NEW CONSTRUCTION
1.    Provide new structural steel roof framing and roof assembly, supported on existing
      foundations.

        Structure over collapsed rink and work in immediate adjacent bay are attributable to
        the event.

2.      Provide new reinforced CMU enclosure walls with translucent façade panels on existing
        foundations.

        Walls surrounding the collapsed rink are attributable to the event.

        Damage and replacement of the north wall is attributable to the air pressure (air
        displacement) caused by the event.


3.      Provide new concrete rink bed and piping, and new dasher board system around rink.

        One third of the dasherboard system was crushed and damaged at the collapsed area
        and the slab below the collapsed area, subject to exterior exposure is attributable to
        the event.

4.      Provide new rink refrigeration system – either (3) Cimco chillers - or a hybrid gas-engine
        driven chiller with secondary electric chiller - and a new open loop cooling tower and reservoir
        tanks.

        The refrigeration system was operational at the time of the event. Sitting idle and
        exposed has damaged the system. A portion of this cost is attributable to the collapse.
        The event has made the equipment inoperable.

5.      Provide completely new HVAC system, including gas-fired boiler, pumps, piping and terminal
        units; new exhaust systems for the locker rooms, toilet rooms and chiller room; a new central
        dehumidifier and ductwork to serve the rink area; and new roof mounted exhaust fans with
        ECM motors.

        The hydronic heating system was operational at the time of the event. The system was
        not drained. Sitting idle and exposed to freezing temperatures has caused freeze
        damage. The majority of this cost is attributable to the event.

        Ventilation and control work would not be attributable to the event.




                P:\3370 Canton Rink\doc\correspondence\Client\ltr-101118- Revised Scope based on FEMA Funding.docx

Source page 21

Metropolis Rink Renovation/Restoration
Scope of Work –FEMA Reimbursement
October 11, 2018
Page 9




6.      Provide new light fixtures, emergency lighting and exit signage throughout the building.

        Light fixtures, emergency lighting and exit signage in the collapsed area of the building
        are attributable to the event.

        The unheated and exposed condition of the building has caused damaged to this
        equipment that is indirectly a result of the event.


15.     Provide completely new plumbing system, including hot and cold water and waste piping, and
        new domestic hot water system. At Women’s restroom, provide (2) new accessible toilets and
        (1) new accessible lavatory.

        The unheated and exposed condition of the building has caused damage to the piping
        from freezing that is directly a result of the event. The system could not be drained
        after the event.

        A review with the State Plumbing Inspector after completion of the I&E report identified
        the need to replace existing domestic water piping and hydronic piping. Visible
        portions of the underslab piping, drains, and clean-outs were inspected and freeze
        damage was observed. Testing of underground piping that is currently not visible is
        required. Replacement of piping will require removal and replacement of existing walls
        and finishes to perform the work.

16.     Provide new LULA lift or handicapped-accessible elevator to access the north end rink
        mezzanine.

        This is not attributable to the event.

17.     Repaint all walls and exposed ceilings in existing low-rise areas north and east of the rink.

        Damage of finishes is a result of exposure and the unheated condition of the building.

        Additional partition removal is required to expose concealed plumbing lines within the
        walls and replace the piping, fittings, and equipment.

18.     Provide new vinyl flooring in all public rooms at north low-rise area, and repaint existing floors
        and base in locker rooms at east low-rise area.

        Areas in the west locker rooms that have been subject to water damage from the
        collapse are attributable to the event.

        Damage of finishes is a result of exposure and the unheated condition of the building.




                 P:\3370 Canton Rink\doc\correspondence\Client\ltr-101118- Revised Scope based on FEMA Funding.docx

Source page 22

Metropolis Rink Renovation/Restoration
Scope of Work –FEMA Reimbursement
October 11, 2018
Page 10




19.       Provide new membrane roofing at the north and east low-rise parts of the building.

          Damage to the low rise locker room roof adjacent to the collapsed area is attributable
          to the event. Roofing on a third of the rink space is attributable to the event.

20.       Provide new fire protection system, dry system in rink, wet system in support spaces; work
          includes a new separate water service. This is a code compliance issue that is required and
          triggered by the project scope.

          This is not attributable to the event.

21.       Provide new rink dasherboard system, netting, scoreboards, goals, etc.

          A portion of this cost is attributable to the event. This is the 3rd of the rink equipment
          below the collapsed roof. The scoreboard was mounted on the wall that collapsed.

22.       Provide new aluminum decking with wood seats at existing bleacher framing.

          A portion of this cost is attributable to the event. . This is the ¼ of the bleachers
          located below the collapsed roof.

23.       Provide new low-e ceiling system in the rink.

          The low-e ceiling that was attached to the underside of the roof structure failed with the
          collapse, the remainder of the low e-ceiling was removed to expose and inspect the
          structure. Replacing the low ceiling over the entire rink area is attributable to the
          event.


Notes:
Hazmat: All work associated with the hazardous material removal is not attributable to the event.

Accessibility: Maintaining the mezzanine would require the installation of a lift (LULA) or elevator; this
is not attributable to the event.

Fire Protection: Reconstruction of the rink requires an automatic fire protection system. The area of the
collapsed portion is attributable to the event; without the event, the system would not be required




                   P:\3370 Canton Rink\doc\correspondence\Client\ltr-101118- Revised Scope based on FEMA Funding.docx

Source page 23

Metropolis Rink Renovation/Restoration                                                                                                October 11, 2018
Canton, MA

Estimate of Probable Construction Cost

Element                             Qty                 Unit       Cost           Subtotal           Total           I&E Estimate
Site Preparation
Limit of Disturbance                 $               - GSF          $          6 $               -                   $      200,000
Construction Fence, erosion
Control                              $               - lf           $        16 $                -                  $        24,375
Tree Protection                      $               - ls           $     1,530 $                -                  $         2,500
Construction Entrance                $               - LOC          $     1,500 $                -                  $         5,000
                                                                                                     $            - $       231,875

Selective Demolition Essential to Reconstruction and Repair
Roof Structure (1 Bay)       $       56,000 CF        $     0.35 $                       19,600                      $      135,000
Premium for transite         $            - $      - $         6 $                            -                      $      250,000
Concrete Rink Bed,
Dashboards                   $       10,000 sf        $       14 $                     140,000                       $      208,000

Portions of Rink Refrigeration
System and Cooling Tower       $                   1     ls         $     5,100   $          5,100                   $       15,000
HVAC System                    $               7,500     GSF        $         1   $          9,375                   $       22,500
Electrical Fit Out             $               7,500     GSF        $      0.40   $          3,000                   $       10,500
Plumbing System                $              30,000     GSF        $      0.30   $          9,000                   $        7,500
Demo Walls to Access
Plumbing                       $               5,000 GSF            $          10 $      50,000
Loose Paint Walls, ceilings at
low rise                       $               5,000 GSF            $          1 $           6,000                   $        8,500
ACM floor tile                 $                   -                                                                 $       16,000
                                                                                                     $       242,075 $      673,000

New Construction
Structural Steel and Roof
Framing                              $            60 TNS            $     4,600 $      276,000                       $      810,000
Façade at North face                 $         2,250 SF             $        51 $      114,750
CMU Exterior Façade,
Translucent Panels                   $         7,000 SF             $          51 $    357,000                       $      562,500
New Partitions for Plumbing          $         5,000 SF             $          25 $    125,000
Concrete Rink Bed
Dasherboards                         $         5,333     GSF        $      33     $    175,989                       $      512,000
Rink Refrigeration                   $             1     LS         $ 200,500     $    200,500                       $      600,000
HVAC System                          $        15,000     GSF        $      65     $    975,000                       $    1,800,000
Electrical Fit Out                   $         7,500     GSF        $      35     $    262,500                       $      975,000
Electrical Degredation from
Non-Heat                             $         7,500     GSF        $        10   $     75,000
Plumbing                             $            25     Fixture    $     6,200   $    155,000                       $      150,000
Plumbing Piping Damaged              $        30,000     GSF        $        15   $    450,000                       $            -
Toilet Room Accessories              $             -     na         $         -   $          -                       $        7,000
singer user                          $             -     na         $         -   $          -                       $        3,000



P:\3370 Canton Rink\doc\costest\Canton FEMA Calculation Estimate 101118.xlsx                                                               Page 1 pf 2

Source page 24

Metropolis Rink Renovation/Restoration                                                                                             October 11, 2018
Canton, MA

Estimate of Probable Construction Cost

Element                             Qty               Unit         Cost           Subtotal        Total           I&E Estimate
toilet shower                       $               - na           $            - $           -                   $        4,000
LULA                                $               1 ls           $            - $           -                   $       65,000
Restore Walls, low rise,
finishes                             $         5,000 GSF            $           1 $       6,000                   $       10,625
Membrane Roofing                     $         2,200 SF             $          22 $      48,400                   $      170,000
Fire Sprinkler                       $             - SF             $           5 $           -                   $      150,000
Insulation to underside of rink
structure, acoutstics           $             16,000 Fix            $          15 $     240,000                 $        240,000
                                                                                                  $   3,461,139 $      6,059,125        57%

Direct Trade Costs                                                                                $   3,703,214 $      6,964,000        53%

Design and Pricing
Contingency                                                  10%                                  $   370,321.4 $      696,400.0

Direct Trade Cost Total                                                                           $   4,073,535 $      7,660,400

General Conditions                                            9%                                  $ 366,618.19    $   689,436.00
Insurance Bonds                                            1.85%                                  $     82,143    $      236,615
Building Permitting                                        1.40%                                  $     63,312    $      120,210
Fee                                                        2.50%                                  $    114,640    $      217,667

Escalation to Feb 2019                                        4%                                  $       188,010 $      356,973

Estimated Construction Cost                                                                       $   4,888,259 $      9,281,301     53%




P:\3370 Canton Rink\doc\costest\Canton FEMA Calculation Estimate 101118.xlsx                                                            Page 2 pf 2

Source page 25

METROPOLIS RINK RENOVATION/RESTORATION
                                                                         Canton, Massachusetts
In             ation and Evaluation Report




                                                                                        ~ ~,=,
                   '
                   ~




                                                    !~"~~~.
                                                       ~. —
                                                     ~~`
                                                                       .r.-.


                                                                                              Prepared for:
        ..momo ~

          „ ~, ~ ~                                             Town of Canton Massachusetts
              N•



                                                                                              Prepared by.'

Architecture:                                                            Refrigeration Equipment and Ice Bed
Bargmann Hendrie +Archetype, Inc.                      Refrigeration Engineering &Contraction, Co. Inc.
Boston, MA —Architecture                                                                      Woburn, MA

Structural.                                                                       Hazardous Material Survey
JML Engineering                                                   Universal Environmental Consultants
Winchester, MA                                                                           Framingham, MA

Mechanical, Electrical, Plumbing, Fire Protection                                    Project Cost Estimating
C,A, Crowley Engineering, Inc.                                                   Daedalus Projects, Inc.
Taunton, MA                                                                                    Boston, MA

                                                                                              May 9, 2018

Source page 26

Metropolis Rink RenovationlRestoration Investigation and Evaluation Report
 ESTIMATED TOTAL PROJECT COST                                                                                            $8,880,000

   ITEM #                       DESCRIPTION                         UNIT     QUANTITY       UNIT COST     EXTENSION      SUBTOTALS

 Construction
       1.0 Construction Costs (Total Estimated Cost of Construction, toda~ls $)                                            ;8,880,000

 ArchitecUEngineers
       2.0 Architect Basic Services                                                                                          ;532,000
              Current Contract Amount                             LS                1               $0             $0

            Adjusted Contract Amount to New Construction Value LS                       t      $532,000       $532,000
        2.1 NE Additional Services                                                                                             ;3,500
              Hazmat Consultant                                   LS                1           $3,500          $3,500
              LEEDS process for PD/SD/DDICD/CA                    LS                1               $0             $0
               LEEDS Energy Modeling                              LS                1               $0             $0
               Professional Cost Estimate (In base fee)           LS                1               $0             $0
        2.3 Architect Reimbursables                                                                                             55,500
               General Expenses Adjusted to Construction Value    LS                1               $0              $0
               Pre-Qualification                                  LS                1           $5,000          $5,000
               Bid Document Printing                              LS                t             $500           $500
               Bid Advertisements                                 LS                1                               $0

FF&E and Technology
     4.0 Design FF&E                                              LS                1           $6,000          $6,000         $6,000
     4.1 FF&E                                                                                                                $100,000
            Kitchen &Vending Equipment                            LS                1               $0         $50,000
            Fitness Equipment                                     LS                1               $0              $0
            All other FF&E                                        LS                1          $50,000         $50,000
        4.2 Design Technology                                     LS                t           $8,000          $8,000         55,000
        4.3 Technology                                            LS                1          $50,000         $50,000        $50,000

Su000rt Services
      5.0 Structural Peer Review                                  LS                1           $4,500          $4,500         $4,500
      5.1 Materials Testing Services                                                                                          $15,000
               Concrete, Steel, etc.                              LS                1           $7,500          $7,500
               Environmental Monitoring                           LS                1           $7,500          $7,500
        5.2 Geotechnical Services, etc.                                                                                        55,000
               Soils Report/Borings                              LS                 1           $4,500          $4.500
               Water Flow/Pressure Test                          LS                 1             $500            $500
        5.3 Surveying                                            LS                 1           $6,000          $6,000         56,000
        5.4 Moving                                               allow              1                               $0             30
        5.5 LEED Commissioning (fundamental)                      LS                1               $0             $0               $0

Administrative
      6.0 Permits                                                allow              1           $6,000          $6,000         56,000
      6.1 Bond Underxriting                                      LS                 1               $0              $0             50
      6.2 Insurance and Legal                                                                                                      $0
              Legal Fees                                         LS                 1               $0              $0
              Builders Risk Insurance (Included by GC)           LS                 1               $0              $D
      6.3 Utility Company Charges                                allow              1                          $25,000        b25,000
      6.4 Administrative Costs                                   allow              t                           $2,000         $2,000
      6.5 Clerk-of-the-WorkslOPM                                 allow              1         $350,000        $350,000       5350,000


TOTAL ESTIMATED PROJECT COST (TODAY'S $)                                                                                 $9,998,500
                                                                       FLOOR AREA:               30,000 SF
                                                             COST PER SQUARE FOOT:              $333.28 ISF




est-tota~proj-wst-050918                                                                                                  Bargmann Hendrie+Archetype, Inc.

Source page 27

i~►1
                                                                   ~~AEDALUS
                                                                             Metropolis Rink
                 MAIN SUMMARY                                        Replacement Ice Rink
                                                                             30,000 GSF
                                                                TOTAL          COST/GSF


                 Site Preparation                                $231,875            $7.73
                 A. Demolition                                   $723,000           $24.10
                 B. New Construction                            $6,059,125         $201.97



                 Direct Trade Cost Subtotal                     $7,014,000         $233.80

                 Design and Pricing Contingency        10.00%    $702,000           $23.40



                 Direct Trade Cost Total                        $7,716,000         $257.20 ~


                 Burdens and Markups
                 General Conditions and Requirements   9.00%     $695,000           $23.17
                 Insurances, Bonds                     1.85%     $156,000            $5.20
                 Building Permit Fee @$14/$1000        1.40%     $120,000            $4.00
                 Fee                                   2.50%     $193,000            $6.43



                 Estimated Construction Cost Total              $8,880,000         $296.00 ~




Metropolis Rink Canton CE May 1.xlsx                                                      Main Summary
Printed 5/1/2018                                                                        Page 2 of 3 Pages

Source page 28

►AEDALUS
                                                                                                    Metropolis Rink
       DIRECT TRADE COST DETAILS                                                             Replacement Ice Rink
                                                                                                        30,000 GSF
       DESCRIPTION                                                 QUANTITY   UNIT   UNIT COST          COST

   s   Site Preparation
   s   Limit of disturbance, restoration on completion               40,000   GSF          $5.00          $200,000
   ~ o Construction fence, erosion control                            1,625    LF         $15.00            $24,375
  11   Tree protection                                                    1    LS      $2,500.00             $2,500
   ~ 2 Construction entrance                                              1   LOC      $5,000.00             $5,000
  13   Site Preparation Total                                                                             $231,875
  14
  15  A. Demolition
  ~ s 1. roof trusses, wood columns, CMU infill walls               450,000   CFT          $0.30          $135,000
  ~~    premium for transite roof shingle                            30,000    SF         $10.00          $300,000
  ~ s 2, concrete rink bed, piping, dasher board systems             16,000   GSF         $13.00          $208,000
  19 3. rink refrigerant system, exterior cooling tower                  1     LS     $15,000.00            $15,000
  20 4. HVAC system                                                  30,000   GSF          $0.75            $22,500
  2~ 5. electrical fit-out                                           30,000   GSF          $0.35            $10,500
  22 6. plumbing system                                              30,000   GSF          $0.25             $7,500
  2s 7, loose paint: walls, ceiling; North and West Low Rise          8,500   GSF          $1.00             $8,500
  za 8. ACM floor tile; North Low Rise                                3,200   SF           $5.00            $16,000
  2s A. Demolition Total                                                                                  $723,000
  2s
  2~ B. New Construction
  2a 9. structural steel roof framing and assembly                     180    TNS      $4,500.00          $810,000
  2s 10. CMU exterior facade, translucent panels                     11,250    SF        $50.00           $562,500
  30 11. concrete rink bed, piping, dasher board systems             16,000   GSF         $32.00          $512,000
  31 12. rink refrigeration system                                       1    LS     $600,000.00          $600,000
  32 13. HVAC system                                                 30,000   GSF        $60.00         $1,800,000
  33 14. Electrical fit-out                                          30,000   GSF        $32.50           $975,000
  3a 15. Plumbing fixture                                               25    FIX      $6,000.00          $150,000
  35     toilet room accessories; multi-user                             2    RMS      $3,500.00            $7,000
  ss       single-user                                                   2    RMS      $1,500.00             $3,000
  3~       toilet/shower                                                 2    RMS      $2,000.00             $4,000
  3s 16. LULA to mezzanine                                               1     LS     $65,000.00           $65,000
  39 17. paint: walls, ceiling; North and West Low Rise               8,500   GSF          $1.25           $10,625
  ao 18. membrane roofing                                             8,500    SF        $20.00           $170,000
  a~ Fire sprinkler coverage                                         30,000   GSF         $5.00           $150,000
  a2 Insulation to underside of Rink structure, acoustic quality     16,000   SF         $15.00           $240,000
  a3 B. New Construction Total                                                                         $6,059,125
  44
  45
  46




Metropolis Rink Canton CE May 1.xlsx                                                           Direct Trade Cost Details
Printed 5/1/2018                                                                                      Page 3 of 3 Pages

Source page 29

$1,375,000 BORROWED FOR RINK OVER 30 YEARS



                                $1,375,000             $1,375,000      5.00%           ANNUAL
                        FISCAL    BONDS              PRINCIPAL         BOND             DEBT
                         YEAR OUTSTANDING            PAYMENT         INTEREST          SERVICE

                         2021          $1,375,000          $45,833          $68,750      $114,583
                         2022          $1,329,167          $45,833          $66,458      $112,292
                         2023          $1,283,333          $45,833          $64,167      $110,000
                         2024          $1,237,500          $45,833          $61,875      $107,708
                         2025          $1,191,667          $45,833          $59,583      $105,417
                         2026          $1,145,833          $45,833          $57,292      $103,125
                         2027          $1,100,000          $45,833          $55,000      $100,833
                         2028          $1,054,167          $45,833          $52,708       $98,542
                         2029          $1,008,333          $45,833          $50,417       $96,250
                         2030            $962,500          $45,833          $48,125       $93,958
                         2031            $916,667          $45,833          $45,833       $91,667
                         2032            $870,833          $45,833          $43,542       $89,375
                         2033            $825,000          $45,833          $41,250       $87,083
                         ?034            $779,167          $45,833          $38,958       $84,792
                         2035            $733,333          $45,833          $36,667       $82,500
                         2036            $687,500          $45,833          $34,375       $80,208
                         2037            $641,667          $45,833          $32,083       $77,917
                         2038            $595,833          $45,833          $29,792       $75,625
                         2039            $550,000          $45,833          $?7,500       $73,333
                         ?040            $504,167          $45,833          $25,208       $71,04?
                         ?041            $458,333          $45,833          $22,917       $68,750
                         2042            $412,500          $45,833          $20,625       $66,458
                         2043            $366,667          $45,833          $18,333       $64,167
                         ?044            $320,833          $45,833          $16,04?       $61,875
                         2045            $?75,000          $45,833          $13,750       $59,583
                         2046            $??9,167          $45,833          $11,458       $57,29?
                         2047            $183,333          $45,833           $9,167       $55,000
                         ?048            $137,500          $45,833           X6,875       $52,708
                         ?049             $91,667          $45,833           $4,583       $50,417
                         ?050             $45,833          $45,833           $2,292       $48,125

                                                        $1,375,000        $1,065,625   $2,440,625

                          30    Average cost/year          $45,833          $35,521       $81,354

Debt exclusions.xlsx                                rink project-30 yrs                             10/17/2018

Source page 30

$5.5 MILLION DEBT EXCLUSION RINK PROJECT

                                                                                                   $468,594
                               $5,500,000            $5,500,000      5.00%       ANNUAL         IMPACT ON
                       FISCAL    BONDS             PRINCIPAL         BOND         DEBT         RESIDENTIA
                        YEAR OUTSTANDING           PAYMENT         INTEREST      SERVICE         TAX BILL

                        2021          $5,500,000       $183,333      $275,000      $458,333            $36
                        2022          $5,316,667       $183,333      $265,833      $449,167            $35
                        2023          $5,133,333       $183,333      $256,667      $440,000            $35
                        2024          $4,950,000       $183,333      $247,500      $430,833            $34
                        2025          $4,766,667       $183,333      $238,333      $421,667            $33
                        2026          $4,583,333       $183,333      $229,167      $412,500            $32
                        2027          $4,400,000       $183,.333     $220,000      $403,333            $32
                        2028          $4,216,667       $183,333      $210,833      $394,167            $31
                        2029          $4,033,333       $183,333      $201,667      $385,000            $30
                        2030          $3,850,000       $183,333      $192,500      $375.,833           $30
                        2031          $3,666,667       $183,333      $183,333      $366,667            $29
                        2032          $3,483,333       $183,333      $174,167      $357,500            $28
                        2033          $3,300,000       $183,333      $165,000      $348,333            $27
                        2034          $3,116,667       $183,333      $155,833      $339,167            $27
                        2035          $2,933,333       $183,333      $146,667      $330,000            $26
                        2036          $2,750,000       $183,333      $137,500      $320,833            $25
                        2037          $2,566,667       $183,33       $128,333      $311,667            $25
                        2038          $2,383,333       $183,333      $119,167      $302,500            $24
                        2039          $2,200,000       $183,333      $110,000      $293,333            $23
                        2040          $2,016,667       $183,333      $100,833      $284,167            $22
                        2041          $1,833,333       $183,333       $91,667      $275,000            $22
                        2042          $1,650,000       $183,333       $82,500      $265,833            $21
                        2043          $1,466,667       $183,33        $73,333      $?56,667            $20
                        2044          $1,283,333       $183,333       $64,167      $247,500            $19
                        2045          $1,100,000       $183,333       $55,000      $238,333            $19
                        2046            $916,667       $183,333       $45,833      $229,167            $18
                        2047            $733,333       $183,333       $36,667      $220,000            $17
                        2048            $550,000       $183,333       $27,500      $210,833            $17
                        2049            $366,667       $183,333       $18,333      $201,667            $16
                        2050            $183,333       $183,333        $9,167      $192,500            $15

                                                     $5,500,000     $4,262,500    X9,762,500          $768

                         30    Average cost/year       $183,333      $142,083      $325,417            $26


Debt exclusions.xlsx                                       rink -override                                     10/17/201

Source page 31

Association ~f To~~U~ G~u~~ance Committees
                              one Winthrop Square
                            Boston, MA 02110
                  Phone:(80o)-882-1498      (617)-426-7272
                             Fax:(617)-6g5-1314

                                                             s




 September 2018

 Dear Finance Committee Chair:

  want to invite you and your committee to the Association of Town Finance Committees' 2018 Annual
 Meeting. It will be held on Saturday, November 3rd at the Devens Common Center from ga.m.-230 p.m.

 The educational sessions offered this year include some new topics as well as old favorites. The ATFC has
 worked hard to balance the workshops to offer something for the newcomer as well as the long-serving
 finance committee member.

 The Annual Meeting is YOUR meeting. It's a great opportunity to network with your peers and to learn how
 other communities are dealing with the same issues, I encourage you to attend and take advantage of this
 great learning opportunity.

 Enclosed you will find the agenda. All registration is now online! Please visit mma.org and click on the
 meetings calendar to register. You will need an account which you can sign up for on the website. Please
 share this information with your committee and encourage your colleagues to attend. Any other interested
 local officials, like selectmen, are also invited to register.

 Please feel free to contact Senior Member Services Coordinator Denise Baker at the MMA at 800-882-1498
 if you have any questions. I look forward to seeing you in November.

 Sincerely,


~r~ ~~
 I ra Miller
 ATFC President and Sharon Finance Committee


                                                                     ta,n, C'a ~~v n • ►''~a • US
                                                                                                  RE
                                       ,~,~~2vs C~1~ at e~ ~G~
    (~r~C~. ~,,~- tn,,J( C~u~~1~ ►'' t~                                                              SEP 26 201fl
                                                                                                            CANTON
                                                                                                    TOWN OFu~:'~~~TQR
                                                                                                 FINANCE

Source page 32

IV1I~~~~ ~~~~~~~~ A~~~~Il~~~~r~ ~~' 7I'~wvr~ '~ Ilr~~~c~~
            C~~~rr~~~~~~~ ~r~r~~~~ I~YI~~~Il~~9 I`~T~~vc~r~~~m ~~ ~~~~
                           ~➢~~~r~~ CC~rr~r~r~n~r~ CC~m~~~r~

~:1~-9:~0 ~.m.                                                               ~EC~:~.~~~"~f~
R~~istg~ation, Breakfast, l~~t~~~o~l~ang                                       ~~~_ ~' `I (i 7.1 i 1 ~ ~

9:30-9:40 a.m.                                                                TOWN ~ i~►RECTOFt
                                                                            FINAf~CE
President's ~Velcortie, Ig~a I~iYI~~~, ~laa~°o~ lFi~~~~~ ~op~nmIl~~ee
Business 1l~~~~ing

%~o~l~.Y~~1 ~➢oo~.Y'LY .GdofiIllLo


(O~~~IIIlIldIl~ ~~~~~~~Il9a
~~~ ~~~1~ ~~~rr~~~~r~~ Executive Office of Economic I~~v~lopm~nt
and Housing
X0:30-noorn
~C~~curr~~~VJ~~°~~~Ihops
1Lo Budget~Ilr~~ 1~~~
This session will review national best practices in public budgeting as promoted by the
Government Finance Officers Association through ifs Distinguished Budget Award
program. Whether you are new to the Finance Committee or a veteran member,this
session will provide you with a clear roadmap for building consensus by showing how
best to organize and present your community's financial information.
John Coderre,Town Administrator, Northborough
Moderator: Mary Mc~g°ide, Billerica Finance Committee and ATFC First President

2. @FinCo~: V6j~Il~~ Tan ~1f~~auIl~ ~~r~ow A~~~~~r #So~Il~~P~[1 ~~lIla
For bitter or fcr worse, social media is hci•~ to stay. This workshop wi?1 address key
question that every finance committee member should be able to answer: Does my town
have a social media policy, and how does it apply to me? How can my town use social
media to engage and educate the citizenry? What are some common social media pitfalls
to avoid? Which social media platforms are useful for a finance committee? Otu
speakers will focus on how to leverage social media as a productive civic tool.
Jamie Hellen, Deputy Town Administrator, Franklin
Attorney TBA
Moderator: Brian Boyle, Bolton Finance Committee and ATFC Director

3. Citi~~~~ A~~~1~~~
More and more communities are holding a Citizen Academy to give residents an
opportunity to learn the ins and outs of how their government works. The presenters

Source page 33

have had great success with their academies and will discuss the planning, execution and
outcomes.
Julie Jacobson,Town Manager, Auburn
Charlotte Rodgers, Human Services Manager, Lexington
Rajon Hudson, Management Fellow, Lexington
Moderator: John Trickey,Pelham Finance Committee and ATFC Director

Noon
Luncheon

1:00-2:30 p.m.
Concurrent Workshops

1. Increasing the Effectiveness of Your Finance Committee
Finance effectiveness depends on many factors including: unity of the committee, legal
authority under bylaws, local political culture, reputation before town meeting and
effectiveness of presenter representing the Finance Committee. Experienced chairs will
discuss their experiences, what works and pitfalls to avoid. Please bring your own
lessons to share.
Al Tosti, Arlington Finance Committee Chair and ATFC Treasurer
John Trickey, Pelham Finance Committee and ATFC Director

2. Behind the Scenes in Collective Bargaining
Hear about what goes on behind the scenes in collective bargaining from a Town
Manager and an attorney that work together on negotiations. How do towns prepare?
What is the process? What outcomes can be expected? What are the impacts on the
budget? What is the role ofthe Finance Committee and what questions should members
ask?
Andrew Flanagan, Town Manager, Andover
Liz Valerio, Attorney, Valerio, Dominello &Hillman
Moderator: Mary Jane Mastrengelo, Bourne Finance Committee

3.Drafting and Setting Strong Financial Policies
This session will provide finance committee members an overview of the value of
developing and adhering to financial policies that suit the unique needs and constraints of
your municipality. It will provide both a local perspective and the success achieved from
establishing and following prudent financial policies, as well as a discussion with a rating
analyst on how financial policies factor into the rating. How management practices are
assessed and evaluated in determining creditworthiness and fiscal flexibility will also
be addressed.
Kerry LaFleur, Finance Director, Concord
Victor Mederios, Director, Standard & Poors
Moderator: Cinder McNerney, Swampscott Finance Committee and ATFC Vice
President

Source page 34

Canton Finance Committee                          Minutes Voted on:
                                              Meeting Minutes                               Vote:
                                          Wednesday, August 1, 2018


Members Present:
Christos Arsondiadis, Rob Barker, Dan Cole, Cynthia Holcombe, Emilio Mauro, Tim McKenna, Barbara Saint André
and Wai Wong.

Members Absent: Cindy Thomas.

Guests Present:
Chuck Armando, Member of the Buildings Renovation Committee (BRC)
Charles Aspinwall, Town Administrator
Bob McCarthy, Chairman, Buildings Renovation Committee (BRC)
John (JR) McCourt, Chairman, Canton Recreation Commission
Mark Porter, Chairman, Board of Selectmen
Jim Murgia, Finance Director
Ellen Jones, Finance Committee Secretary

Opening: A meeting of the Canton Finance Committee was called to order by Chairman Barker at 7:00 pm. on
Wednesday, August 1, 2018 in the Salah Meeting Room of Town Hall.

A.      Approval of Agenda

Chairman Barker reviewed the items on the agenda which included funding a study to implement renovations or
replacement of the Bolivar Pool. He introduced Charlie Aspinwall, Mark Porter and John McCourt. Chairman
Barker further stated that the Finance Committee would review the final FY19 Cherry Sheet numbers which
include the final numbers that Canton will expect to receive from the state.

B.      Announcements

There were no announcements made by the Chairman.

C.      New Business

Reserve Fund Transfer Request for Bolivar Pool Design Services - $200,000

Chairman Barker recognized Mark Porter of the Board of Selectmen. Mr. Porter thanked the members of the
Finance Committee for meeting in August.

Mr. Porter provided the following information regarding the Bolivar Pool project:
    • As with any project that is presented before Town Meeting, the Town needs to be familiar with the cost of
        the project in order for the voters to make reasonable decisions.
    • He stated that typically it costs a lot of money to have a consultant determine how much a project will
        cost.
    • If funding for the study was not approved until the Annual Town Meeting in May of 2019, then it would be
        2020 before the Town could fund the cost for the construction of the pool and it could be as late as the
        fall of 2020 before construction could commence.
    • The Recreation Commission determined that $340,000 would be needed for design services.
    • The Board of Selectmen looked at various sources of funding which included Free Cash, the Assessors
        Overlay, the Board of Selectmen’s mitigation funds and the Finance Committee Reserve Fund.



FINCOM 20180801 Minutes                        Page 1 of 5                                      10/15/18

Source page 35

•   The Board of Selectmen decided that it was wise to review with the Finance Committee first before
        spending this amount of money.
    •   Chairman Barker was contacted by the BOS to discuss how best to proceed with the funding for this study.
    •   Mr. Porter stated that the Finance Director had indicated to him that the funding for this project may not
        have to come from the FY19 Reserve Fund and that FY18 Reserve Fund was still available.
    •   The Board of Selectmen had approved the total amount of $340,000 out of their mitigation funds. Mr.
        Porter did not think that it was a good idea to use mitigation funds to fund the entire study and that it
        would be better to split the cost of this project by using some of the Reserve Fund.
    •   Mr. Porter stated that one way or another the project would be funded now to avoid an emergency
        situation in 2019 or 2020.

Chairman Barker reminded members that this project had been before the Community Preservation Committee
and Annual Town Meeting but that the project had been withdrawn until a better understanding of the exact
scope of the project was determined. Mr. Porter stated that the Community Preservation Committee had been in
support of the project but realized that a more comprehensive study for a much larger project would be needed to
resolve the numerous problems with the Bolivar Pool.

Mr. McCourt provided the following information as well:
    • The Recreation Commission along with the advice of the BRC determined that the Commission would ask
       for a new liner and a new concrete pad to extend the life of the pool.
    • After the feasibility study was completed the BRC recommended that this was not a good fix for the pool
       and it would not be a guarantee for the longevity of the already 44-year old pool.
    • The BRC’s recommendation to proceed with design services was too late to be addressed at the May 2018
       Annual Town Meeting.
    • With the total project cost to be projected at $4.5 to 5 million, the design services portion would cost
       approximately $400,000 or 8% of total cost. The Owner’s Project Manager (OPM) cost would be
       approximately $200,000 or 4% of the total project cost. An OPM is required by the state because the
       project cost is expected to be greater than $1.5 million.
    •   The Recreation Commission has the support of the BRC on this project.
    • The goal of the Commission is to have the design services completed in order to make a recommendation
       for funding of the project at the 2019 Annual Town Meeting.

Chairman Barker opened up the discussion for questions and comments from the Finance Committee.

Ms. Saint André asked for clarification on the total cost of the design process.
    • Mr. McCourt stated that the total design cost and to oversee the construction would be $625,000. This
         would be included in the $4.6 million total cost of the project.

Mr. McKenna appreciated having a copy of the report in order to review the project prior to the meeting. He
stated that he came to two conclusions: either renovation or new construction. Mr. McCourt stated that the BRC
concluded that the best approach was new construction instead of repair. If the pool were relined there was no
guarantee as to the life of the liner. Infrastructure such as sewer lines and ADA accessibility were not up to code
due to the age of the pool. If new construction were done the estimated life would be 20-30 years.

Ms. Holcombe questioned as to how the cost of the design services was determined. Mr. McCourt stated that this
was broken down in the feasibility study and based on percentages of the total cost of the project. An RFQ
(Request for Qualifications) would go out to solicit design services. The OPM would represent the Town of Canton
to represent the Town’s interests during the project.

Mr. Mauro asked about the design phase and specifics of the project. Mr. McCourt stated that the feasibility study
addressed such issues as a zero entrance pool to eliminate the need for apparatus for handicapped accessibility.
The current kiddie pool would not be replaced. There would be no future need for a 14’ deep end because it is no



FINCOM 20180801 Minutes                          Page 2 of 5                                        10/15/18

Source page 36

longer required given that there is no longer a diving board. Mr. McCourt addressed the reason for using the
existing location for the pool. There are already services to the property, the pool has served the community for
44 years at the current location, there is no other site being considered. Water, sewer and electric utilities are
already at the site. The cost for the site work for a new location would be astronomical.

Mr. Mauro asked if there was enough public input in the design process. Mr. McCarthy stated that an architect
with expertise in this area would be selected and that it could slow the project down if smaller groups of residents
had conflicting opinions or ideas on the design of the pool. Mr. McCourt is hoping to have drawings and plans
available for inspection prior to Annual Town Meeting. Mr. Porter stated that they would be willing to balance
small-group suggestions along with the suggestions of the designer.

Mr. Cole asked if the project cost included the paving of the existing parking lot. Mr. McCourt stated that it did
include site work but would not necessarily include asphalt. The BRC would have to work with the Conservation
Commission on the parking lot because it is currently located near wetlands and the lot is also considered an
earthen dam for the pond which could not have impervious surfaces.

Chairman Barker inquired as to what coordination would take place between Canton and the Blue Hills Regional
Vocational School.

Mr. McKenna inquired as to the funding for the pool. Mr. Murgia stated the following:
    • Once the cost of the project is determined he hoped that discussion would take place with the
       Community Preservation Committee.
    • He suggested that this project could be funded through borrowing similar to the land purchase at the Paul
       Revere Heritage Site.
    • It would have to be determined if this project would qualify for Community Preservation funds so the
       Town could borrow the money for the pool and have the CPA surcharge pay for the debt service.
    • Mr. McCourt is optimistic that the Community Preservation Committee would be supportive of the
       project and the method of funding.
    • Mr. Murgia explained that because this would be a $5 million project if it is not funded through the
       Community Preservation fund than it would typically be a debt exclusion override where the taxpayers
       would have to approve the borrowing of the funds through a tax increase.

Mr. Cole inquired if the Bolivar Pool project was competing with the Metropolis Rink project. Mr. Murgia stated
that it could be in competition with the Rink but that the Town is working very hard with FEMA to obtain 75%
reimbursement for the Rink project. The 75% reimbursement combined with insurance proceeds received thus far
could avoid a debt exclusion override thus having the borrowing within the tax levy.

Mr. Arsondiadis inquired if the Town had enough debt capacity to cover the pool project. Mr. Porter explained
that the Rink could be funded within the levy (if the Town were to receive the FEMA reimbursement) but that the
Bolivar Pool would require an override if Community Preservation funds were not utilized.

There would be no state aid available to help with the funding for the pool project.
                                                st
Ms. Saint André was amazed that as of August 1 the Town still had funds available from the FY18 Reserve Fund.
Mr. Murgia stated that the books had not been closed yet for FY18 and that there was $200,000 remaining in the
FY18 Reserve Fund and that there was $500,000 in the FY19 Reserve Fund. He advised that it is very early in fiscal
2019 to withdraw a substantial amount from the FY19 Reserve Fund. If the FY18 Reserve Fund were not used it
would fall out as free cash whereby the voters could then appropriate the funds at Town Meeting.

A motion made by Ms. Saint André to transfer $200,000 from the FY18 Reserve Fund to the Board of Selectmen
for the purpose of funding design services for the Bolivar Pool project was seconded by Ms. Holcombe.
Vote: 8-0-0. Mr. Barker thanked the BRC for their hard work on this project.



FINCOM 20180801 Minutes                          Page 3 of 5                                         10/15/18

Source page 37

Metropolis Rink Update

Mr. Porter deferred to Mr. Aspinwall. Mr. Aspinwall provided the following information with regards to the Rink
project
    • Town officials have been working diligently with DCR (Division of Conservation and Recreation), FEMA,
        MEMA, Representative Galvin and Senator Timilty.
    • The DCR (Division of Conservation and Recreation) has granted an extension of the Rink lease set to expire
        in 2030. DCAMM (Division of Capital Asset Management and Maintenance) Commissioner Roy offered an
        extension of the lease to another 20 years. If the project were finished in 2020 the Town would have
        another 30 years to lease the Rink.
    • If the Town were to get the replacements costs from 44% to 50% of the costs FEMA would reimburse the
        Town 75% of the project. The insurance proceeds would be removed from the top of the cost of the
        project and the 75% would be of the remaining amount of the project cost including code upgrades. The
        Town would be responsible for 25%.
    • The timing of the final determination made by FEMA was unknown at the time of the meeting.
    • The Town would be seeking appropriations in December or January. A contract would need to be in place
        by February 2019.
    • The Town is reexamining their costs already reported to FEMA. The replacement of the structural beams
        would help to get the Town at the 50% reimbursement amount.

D.      Other Business/Open Issues

FY19 Cherry Sheet Final Numbers

Mr. Murgia referred the members to the meeting documents and provided a recap of the FY19 final Cherry Sheet
numbers to the Finance Committee:
    • Because the state budget had finally been enacted the local aid amounts due to Canton were updated.
    • The net state aid for FY19 is $7.5 million. The Town had budgeted $34,000 more than that. While this is
       not great news the $7.5 million was about what the Town had expected.
    • The two meeting documents with Estimated Receipts and Estimate Charges are what the Town receives
       from the state and pays to the state.
    • The Ch. 70 receipts of $6.1 million will most likely be what the Town will receive.
    • Another fairly solid figure is the $2.2 of Unrestricted General Government Aid.
    • The final cherry sheets are used in the fall to set the tax rate.

E.      Approval of Minutes

A motion made by Mr. McKenna to approve the minutes for June 18, 2018 as written was seconded by
Mr. Cole. Vote: 6-0-2. Ms. Holcombe and Ms. Saint André abstained from the vote.

F.      Next Meeting Date: The next meeting date would be determined in the near future. Chairman Barker
spoke about holding a session sometime in September with a PowerPoint overview of how the budget process
works and the various funds that feed into the process. He asked for interested parties to let him know.

Adjournment: A motion made by Ms. Saint André to adjourn the meeting at 7:55 p.m. was seconded by
Ms. Holcombe. Vote: 7-0-0

Minutes reviewed by: Cynthia Holcombe
Respectfully submitted,

Rob Barker
Chairman, Canton Finance Committee



FINCOM 20180801 Minutes                        Page 4 of 5                                      10/15/18

Source page 38

Canton Finance Committee Meeting
                                         Wednesday, August 1, 2018
                                             Meeting Documents


Please note: These meeting documents may also be found on the Town’s website under the Posted Minutes
section (Laser Fiche).

Some of the budget or Annual Town Meeting documents referred to in meetings may be found on the Finance
Committee page of the Town’s website.

Agenda dated August 1, 2018. (1 page).

Reserve Fund Transfer Request for Fiscal Year 2018 for $200,000 dated July 30, 2018 (1 page).

Email from JR McCourt to Charles Aspinwall dated July 20, 2018 regarding Canton Pool Design Services
(3 pages).

FY2019 Local Aid Estimates dated July 27, 2018 (1 page).

Massachusetts Department of Revenue Estimated Receipts and Estimated Charges (Cherry Sheet) dated July 30,
2018 (2 pages).

Draft Report – Bolivar Swimming Pool Existing Conditions Assessment & Improvement Recommendations prepared
by CHA, dated April 27, 2018 (67 pages).




FINCOM 20180801 Minutes                         Page 5 of 5                                      10/15/18