03-07-2018 MINUTES

Planning · Source meeting date: 2018-03-07 · Record 58285

Open original municipal record ↗Open interactive reader

Saved text from 1 of 15 source pages. Transcription and OCR may contain errors; verify figures and wording against the original.

Source page 1

TOWN OF CANTON 
PLANNING BOARD MEETING 
WEDNESDAY, U1 RCH 7, 2018 
SALAH MEETING ROOM 
Sol WASHINGTON STREET 
7:00 P.M - 
TOWN HALL 
MINUTES 
Present: Thomas Scully, Chairman 
Robert Panico, Vice Chairman 
David McCarthy 
Patricia McDermott 
Also Present. Thomas Houston, Professional Services Corporation 
Laura Smead, Tow7ia Planner 
Karen Lawlor, Adininistrative Assistant 
Chairman Thomas Scully called to order the Planning Board meeting of March 
7, 2o18 at 7: 00 p.m. 
A motion was made by Mr. Panico and seconded by Mr. McCarthy to open the public 
meeting. Motion Approved 4-0. 
A motion was made by Mr. Panico and seconded by Mr. McCarthy to open the first hearing. 
Motion Approved 4-0. 
First Item on the Agenda - 468 & 474 NEPONSET STREET — Definitive Sub -division 
Plan ("Conuerwood Subdivision") — (Donald & Theresa Hagerty) — 
Gregory Driscoll, P.E., Jacobs Driscoll Engineering, North Easton, MA; and Attorney Matt Watsky 
introduced themselves. 
An email from Assistant Town Engineer, Lisa Grega, dated March 7, 2o18, was read into the record: 
"Hi Greg, Barbara Thissell and I discussed the plans to install individual pumps at each home in 
Copperwood Subdivision as shown in the most recent plans dated 3/2 2oi8. The Engineering 
Division is in favor of this scenario and would like to make one sugges-tion. The connection of the 
forced main to the gravity manhole atNeponset Street would be better received if the 4 inch pipe 
entered the manhole with an outside drop. In other words, Engineering recommends approval of 
the plans on the condition that the drop manhole scenario is added. Attached is our detail for a drop 
manhole. Best Regard." 
Tom Houston explained that the design E1 system is a decent system. They will put the forced main 
outside, 4' to 5' from the face of the wall which is a narrow space. He has seen individual forced mains 
which is a problem in cold weather. The issue is standby power for a prolonged power outage. 
Mariella Estates has grinder pumps in their stormwater system and a simple solution is a portable 
generator. 
The Applicant presented information regarding the generator. They were looking at a Simplex Sentry, 
24oV 6oHz. with generator receptacle sold by E One Sewer Systems.