f = 7 WU of (nan#nn, J a5Sar4USrttS 
Tom 11 ZONING BOARD OF APPEALS 
MEMORIAL HALL 
801 WASHINGTON STREET 
CANTON, MA 02021 
TEL: (781) 575-6589 FAX: (781) 575-6574 
Minutes of the meeting of February 8, 2018 
PRESENT: Gregory L. Pando, Vice Chairman 
John R. McCourt 
Charles J. Armando 
Also Present: Tamra Stock, Recording Secretary 
Not Present: Paul B. Carroll, Chairman 
Gary E. Vinciguerra 
Meeting Held in the Salah Hearing Room, 2nd floor, 801 Washington Street, Canton, MA 
Acting Chairman Pando opened the meeting at 7:00 pm and reads the agenda. 
Alex Zhang/CCAA Enterprise, LLC. — 454 York Street — 8-18-ENCB-SP-V 
Acting Chairman Pando opens the hearing and reads the petition. The project manager and 
designer for the job states this is a non -conforming lot with a lot of wetlands. He explains 
the existing dwelling is sitting on the hill. The owner of the property would like to raze the 
existing dwelling and construct a new single family dwelling. Chairman Pando asks if the 
petitioner has been to the Conservation Commission. Yes, they have the approval and have 
recorded it with the registry of deeds. Chairman Pando asks for a copy for the file. The 
petitioner hands in a copy to the Board. Chairman Pando states he is familiar with the 
property and the existing structure is small. Chairman Pando states from the look of the 
new plan you need relief on the front setback. Chairman Pando asks if the front porch is 
going to be open or covered. Covered with a roof. Chairman Pando goes over the setbacks 
that are required. Chairman Pando explains this is a unique parcel that has a lot of wetlands 
and issues with the topography and it creates a hardship because this is the only area of the 
property that you can build on. Chairman Pando asks if the only relief needed on the front 
yard setback. No, we also need relief on the height of the dwelling. Chairman Pando asks if 
the petitioner has an elevation for the proposed dwelling to show the height. The project 
manager hands in a set of plans to the Board and explains the height is 32.4'. Chairman 
Pando asks how the height was measured. The project manager explains the measured 
from the average grade to the top of the ridge. Chairman Pando explains the way the height 
of a dwelling measured. You only need to go to the midpoint of the ridge. That could 
change the number you have on the plans. Chairman Pando states the summary is relief on 
the front yard setback and now possibly height. Mr. McCourt concurs with the thoughts on 
the height issue and he has no problem with the relief needed from the front yard setback. 
Mr. Charles Armando states he has no issues with the request. Chairman Pando reviews 
the plans and explains the height issue is because the property drops off in the back of the 
dwelling. From the street it appears it is a normal height so there is no impact to the 
neighborhood.