Canton, Massachusetts · Saved source text
8-24-16 mins signed
Saved text from 1 of 9 source pages. Transcription and OCR may contain errors; verify figures and wording against the original.
Source page 1
Canton Conservation Commission Pequitside Farm — Tavern Room 79 Pleasant Street Canton, Ma. 02021 (781)821-5035 Con.Com@town.canton.ma.us MINUTES August 24, 2016 @ 7:00 P.M. Attendance: Debra Sundin — Chairman (arrived at 7:15 P.M.), Donald MacAdam — Vice Chairman, James Fitzpatrick — Clerk, Gerald Carmichael, Joshua Cohen, Robert MacDonald Absent: Janna Shub Conservation Agent: Cynthia O'Connell Recording Secretary: Heather Cahill Vice —Chairman, Donald MacAdam called hearing to order at 7:01 P.M. PUBLIC HEARINGS Algonquin Gas Route 138 RDA -35-16 Transmission, LLC Request for Determination of Applicability to conduct two geotechnical borings located on each side of Route 138 within Algonquin Gas's maintained Q-1 System Right Of Way and approximately 20 -feet east of the shoulder of Route 138 within an existing gravel parking lot within the maintained Q-1 System Right Of Way. Geotechnical boring locations are within the 100' Buffer Zone of a Bordering Vegetated Wetland. (Map 75, Lot 7 and Map 89, Lot 26) Power Point presentation by Jon Bonsall of Access Northeast and Mike Tyrell of TRC Solutions presented the following: • Request for a Negative Determination for two Geotechnical borings along Rte. 138, to allow Algonquin Gas to assess the feasibility of utilizing a jack and bore trenchless construction technique to install an underground pipeline associated with Access Northeast Pipeline project across Rte. 138. • Proposed work is within the 100' Buffer Zone of a Bordering Vegetated Wetland, proposed boring work won't impact wetlands. Standard tracked drill rig to collect the geotechnical samples. Water and Bentonite mixture lubricant will be utilized for the drill bit. • Once samples are collected, the boring holes will be back-filled to ground level with a Bentonite cement grout. • Proposed boring work will take two to three days for each boring.