Skip to content
Search Canton

Canton, Massachusetts · Saved source text

1-27-16 mins signed

Conservation · Source meeting date: 2016-01-27 · Record 47798

Open original municipal record ↗Open interactive reader

Saved text from 1 of 3 source pages. Transcription and OCR may contain errors; verify figures and wording against the original.

Source page 1

Canton Conservation Commission 
Pequitside Farm — Tavern Room 
79 Pleasant Street 
Canton, Ma. 02021 
(781) 821-5035 
Con.Com@town.canton.ma.us 
MINUTES 
January 27,2016 @ 7:00 P.M. 
Attendance: Debra Sundin — Chairman, Donald MacAdam — Vice Chairman, 
James Fitzpatrick — Clerk, Janna Shub — Treasurer 
Absent: Robert MacDonald, Joshua Cohen, Gerald Carmichael 
Conservation Agent: Cynthia O'Connell 
Recording Secretary: Heather Cahill 
Chairman Sundin called hearing to order at 7:01 P.M. 
PUBLIC HEARINGS 
Town of Canton DPW 0 Pleasant St. RDA 22-16 
Reservoir Pond Dam 
Request for a Determination of Applicability for proposed work within the 100' 
Buffer Zone of the Bank of Reservoir Pond and the 200' Riverfront Area of 
Pequid Brook. (Map 62, Lot 5) 
James Donovan, Engineer for Town of Canton and John Connolly, Chairman for Canton 
Board of Selectman presented the following: 
• Mr. Donovan distributed enlarged and color pictures of the proposed area work 
between Pleasant Street wall and Reservoir Pond shore line. 
• Canton DPW will remove rip-rap, loose rocks and small section of fencing by 
hand, no heavy equipment. 
• Chairman Connolly requested Conservation Commission's permission for small 
area of rip rap at the southern end of the wall be installed in Spring, restricting 
access of boat trailers and launching of boats. Rip Rap be removed during the 
winter allowing access to Reservoir Pond for skating. 
• Signage will be posted at the dam Gate House, "Proceed with caution, moving 
water, skate at your own risk" 
• ConCom requested "stop for pedestrians" signage by the crosswalk by the Tilden 
House parking lot. 
• Mr. Donovan will prepare short term and long term maintenance plan for the 
removal and installation of rip-rap as an ongoing condition of the permit.