Canton, Massachusetts · Saved source text
8-13-14 Minutes
Saved text from 1 of 12 source pages. Transcription and OCR may contain errors; verify figures and wording against the original.
Source page 1
Canton Conservation Commission Pequitside Farm – Tavern Room 79 Pleasant Street Canton, Ma. 02021 (781) 821-5035 Con.Com@town.canton.ma.us MINUTES August 13, 2014@ 7:00 P.M. 1 Attendance: Debra Sundin – Chairman, Robert MacDonald – Vice Chairman, Steve Landry – Treasurer, James Fitzpatrick – Clerk, Gerald Carmichael, Ed Jastrem. Conservation Agent: Cynthia O’Connell Recording Secretary: Heather Cahill Hearing called to order by Chairman Sundin at 7:04 P.M. PUBLIC HEARINGS John Gillespie 80 Culloden Dr. RDA Presented by Mr. Gillespie for construction of 8 foot by 10 foot addition at rear of existing home rebuild existing original 22 foot by 36 foot existing deck at rear of home and 25 foot by 5 foot farmers porch on front of home, proposed construction within 100 foot buffer zone. Conservation Agent – conducted a site visit, majority of existing house is within the 100’ foot Buffer Zone, and she recommends issuing a negative three determination of applicability with four special conditions. Motion Made by Robert MacDonald vote to issue a negative three determination with four special conditions for proposed construction of 8 foot by 10-foot deck, rebuild existing 22 foot by 36-foot deck and 25 foot by 5-foot farmer’s porch for property located at 80 Culloden Road. Seconded by Steve Landry Vote: 6 - 0 Crystal & Brandon Lamb 111 High Street SW-089-14/LDP-0165-14 Presented by Arthur f. Borden & Associates, Inc. Notice of Intent and plans on file with Conservation Commission. Proposed construction of a single family home in a single residence “B” district, with grading, utilities, and storm water management system. Following information presented to ConCom: • Single –family home in residence “B” district. • Installation of two Storm Water Cultec Recharger 280 Chambers. Conservation Agent must inspect during installation of storm water management system. • Installation of Straw Wattle and silt fencing erosion control barrier. Erosion control to be installed inspected and approved by Conservation Agent prior to construction. • Proposed plan shows “isolated land subject to flooding delineated by Kathryn Nadeau of Wetland Works.