Skip to content
Search Canton

Canton, Massachusetts · Saved source text

5-22-13 Mins

Conservation · Source meeting date: 2013-05-22 · Record 47416

Open original municipal record ↗Open interactive reader

Saved text from 1 of 8 source pages. Transcription and OCR may contain errors; verify figures and wording against the original.

Source page 1

Canton Conservation Commission 
Pequitside Farm —Tavern Room 
Canton, Ma. 02021 
PUBLIC HEARING 
Minutes 
May 22, 2013 
Attendance: Deb Sundin — Chairman, Tom Liddy — Vice Chairman, James Fitzpatrick — Clerk, 
Robert MacDonald, Steve Landry, Ed Jastrem, Gerald Carmichael. 
Conservation Agent: Cynthia O'Connell Recording Secretary: Heather Cahill 
Hearing called to order by Chairman Deb Sundin at 7:02 P.M. 
Minutes of April 3, 2013 — April 17, 2013 — May 1,2013 
Motion Made by Robert MacDonald to accept minutes of April 3, 2013 as written. 
Seconded by Tom Liddy Vote: 6 — 0 — 1 (G. Carmichael) 
Motion Made by Tom Liddy to accept minutes of April 17, 2013 as written. 
Seconded by Tom Liddy Vote: 5 — 0 — 2 ( J. Fitzpatrick, R. MacDonald 
Motion made by Robert MacDonald to accept minutes of May 1, 2013 as written. 
Seconded by Tom Liddy Vote: 7 - 0 
PUBLIC HEARINGS 
572-582 Washington Street 1842 Washington Street SW — 071 
Presented by Paul Brodmerkle, Site Design Professionals Notice of Intent and plans are 
on file at Conservation office. Conservation Agent Cynthia O'Connell conducted a site 
visit on May 14, 2013 (attached site visit report). Existing abandoned dwelling to be 
demolished and single family home to be constructed including grading, utilities and 
removal of existing dwelling after demolition. 
Plan Title: Stormwater management plan 1842 Washington Street in Canton, Ma. 
Plan Dated: May 8, 2013 Scale: 1" = 20' Plans Stamped By: Paul Brodmerkle, P.E. 
Proposed plans identify the following information: 
• Removal of existing abandoned dwelling. 
• Construction of single-family home with (4) Cultec roof re-charge units. 
• Existing cesspool to be abandoned, proposed dwelling to be connected to utilities. 
• Existing gravel driveway to be used to access proposed dwelling. 
Page 1/hc_mins_5/22/13