1-16-13 Mins
Saved text from 1 of 3 source pages. Transcription and OCR may contain errors; verify figures and wording against the original.
Source page 1
Canton Conservation Commission Pequitside Farm – Tavern Room 79 Pleasant Street Canton, Ma. Minutes January 16, 2013 1 hc 1/16/13 Attendance: Deb Sundin – Chairman, Tom Liddy – Vice Chairman, Bruce Rohr – Treasurer, Robert MacDonald, James Fitzpatrick, Ed Jastrem, Steve Landry Interim Conservation Agent: Brooke Monroe Recording Secretary: Heather Cahill Hearing called to order by Deb Sundin at 7:05 P.M. Minutes of January 2, 2013 – Motion made by Robert MacDonald to vote on January 6, 2013 minutes at February 6, 2013 hearing. Seconded by Tom Liddy Vote: 7 – 0 PUBLIC HEARINGS Ghazwan Ghazi 15 Raven Road 124-1094 Presented by Seth DuFort , Outback Engineering – Notice of Intent with plans are on file at the Conservation Commission and have been submitted to ConCom. Report from Interim Agent Brooke Monroe was read into record , ( see attached report) Plan Title: Proposed Pool Enclosure # 15 Raven Road in Canton, Massachusetts Plan Dated: September 11, 2012 Plan Scale: 1” = 30’ Stamped By: Jason A. Youngquist, P.E. • Existing shed to be demolished and construction of 12’ x 20’ shed has been completed without Conservation Commission approval. • Proposed 12’ x 20’ shed has been constructed in the 30’ No build Zone. Building Department issued a permit in October 2012 for construction of 9’ x 16’ shed , ConCom is waiting for Building department’s response for incorrect size shed constructed within a NBZ. • Proposed construction of an indoor pool with 65’ x 35’ enclosure, demolition of existing shed and construction of 12’ x 20’ shed. • Proposed enclosure is 2 feet away from 100’ foot buffer zone ConCom has requested a temporary variance to work in the buffer zone be filed as a precaution. • Hay bales and filtermitt to be installed for soil and erosion control measures. • In 2001 applicant installed a 1,000 square foot deck , Certificate of Compliance has not been issued. “ As built” plan submitted (1/16/13 by attorney Chris Connolly) Brooke will need to do a site visit.