1-5-11 Mins

Conservation · Source meeting date: 2011-01-05 · Record 47373

Open original municipal record ↗Open interactive reader

Saved text from 1 of 4 source pages. Transcription and OCR may contain errors; verify figures and wording against the original.

Source page 1

Canton Conservation Commission 
Pequitside Farm – Tavern Room 
79 Pleasant Street 
Canton, Ma. 02021 
MINUTES 
January 5, 2011 
1 
Hc 
 
 
Attendance: Robert Doe, Jr. – Chairman, Deb Sundin – Vice Chairman, 
 James Fitzpatrick – Clerk, Robert MacDonald, Kate Merrigan, 
 Tom Liddy, Bruce Rohr 
 
Conservation Agent: Robert Murphy 
Recording Secretary: Heather Cahill 
 
 
Hearing called to order by Robert Doe at 7:02 P.M. 
 
Minutes of December 1, 2010 
 Motion Made by Deb Sundin to accept minutes of December 1, 2010 as amended. 
 Seconded by Kate Merrigan Vote: 5-0-2 
 
PUBLIC HEARINGS 
 
7:10 P.M. 
 
W P East Development 25 Stagecoach Road AMOOC 124-1051 
 Presented by Nicole Dunphy, Highpoint Engineering Inc. 
 
Plan Title: Alta at Indian Woods Driveway Modification 
Plans dated December 8, 2010 
Plans Stamped By: Douglas Hartnett, P.E. 
 
Project was sold January 10, 2010 to Wood Partners. Existing conditions plan to include utilities 
based on a progress as built survey titled Utility As- Built Along Access Way located in Canton, 
Massachusetts” dated October 27, 2010 by Sullivan Engineering Group Inc. Proposed plans 
reflect minor modifications from the approved plans. 
Following modifications are: 
 
• Plans show new owner, applicant, and surveyor. 
• Secondary entrance identity sign is proposed to be installed in the northwest corner of the 
entrance driveway. Sign foundation will be approximately 63 feet north of the existing 
wetland. 
• Existing hay bale/silt fence erosion control barrier will be modified to extend around the 
limit of work for secondary sign. 
• As-built location of the new riser pole and the electrical duct bank were added to the 
plans. 
• As-built location of the new 8” water main was added to the plans.