Canton, Massachusetts · Saved source text
8-20-08 Mins
Saved text from 1 of 6 source pages. Transcription and OCR may contain errors; verify figures and wording against the original.
Source page 1
79 Pleasant Street Canton Conservation Commission Pequitside Farm — Tavern Room Canton, Ma. 02021 PUBLIC HEARING AUGUST 20, 2008 Attendance: Chairman — Robert Doe, Clerk — James Fitzpatrick, Tom Liddy, Dave McLelland, Robert MacDonald Absent: Vice-Chairman — Deb Sundin, Kate Merrigan Conservation Agent: Robert Murphy Recording Secretary: Heather Cahill Chairman Robert Doe calls meeting to order at 7:02 P.M. Minutes of August 6, 2008: Motion Made by Robert MacDonald to accept minutes as amended. Seconded by Dave McLelland Vote: Yes - 5, No — 0 7:10 P.M. Town of Canton/DPW Route 138 Rehabilitation 124-1026 Represented by Tim McIntosh of VHB, plans submitted to ConCom. Rehabilitation of route 138 is a Town funded project that is constructed and designed by Massachusetts Highway Department. Project proposes to rehabilitate 2,700 square feet section of Turnpike Street between Sassamon Street and Z.andolph Street. Improvements will include cold plane and overlay, sidewalk construction, installation of storm water structures, curbing or berms and pavement striping for increased safety and improved traffic flow along the corridor. Work will include: • Narrowing the roadway • Cold planning and overlaying the existing roadway • Constructing a 5.5 foot sidewalk on the west side of Turnpike Street, between Sunny Brook Lane and Sassamon Street. • Installing curbing and berms on both sides of the reconstructed roadway • Installing storm water management devices including storm water collection system, new infiltration systems or detention basins and water quality swales. Projected start date Spring 2009. Motion Made by Robert MacDonald to 44eoe hearing for DEP # 124-1026 Seconded by Dave McLelland Vote: Yes — 5, No — 0 1 8/20/08 he