Canton, Massachusetts · Saved source text
12-19-07 Mins
Saved text from 1 of 3 source pages. Transcription and OCR may contain errors; verify figures and wording against the original.
Source page 1
Canton Conservation Commission Pequitside Farm — Tavern Room 79 Pleasant Street Canton, Ma. 02021 December 19, 2007 First Draft No Public Hearing Attendance: Chairman — Robert Doe, Vice - Chairman Jan Hagan, Treasurer — Ed Lynch Robert MacDonald, Kate Merrigan, Dave McLelland Absent: Clerk — James Fitzpatrick Conservation Agent: Robert Murphy Recording Secretary: Heather Cahill NO PUBLIC HEARINGS Chairman Robert Doe calls meeting to order at 7:03 P.M. Minutes of December 5, 2007: Motion Made by Robert MacDonald to accept minutes of December 5, 2007 as amended. Seconded by Jan Hagan Vote: Yes — 6 No — 0 CONTINUATIONS Nayan Patel 3 Overlook Road DEP# 124-1008 Conservation Agent Robert Murphy has been emailing Mr. Patel's engineer, still working on plans. Motion Made by Jan Hagan to continue DEP# 124-1008 until January 2, 2008. Seconded by Robert MacDonald Vote: Yes —6 No —0 Lewis Piantedosi 21 Steeple Chase Road DEP# 124-1002 Minutes of December 5, 2007, states meeting continued until January 16, 2007. Canton Development Partners LLC 104 Revere Street DEP# 124-1009 Deborah Levis 21 Cynthia Road DEP# 124-1010 Represented by Attorney Suzanne Matthews, requested estimate for cost of work submitted to ConCom. Estimate of $ 15,780.00 includes cost of work, plantings, and attorney fees: Plantings $10,080.00 Other Expenses $ 5,070.00 ° Ms. Matthews explains to ConCom that drainage issue needs to be corrected, waiting for proposal from town engineer. Levis's due accept full responsibility of their mistake of removing trees and damage that was done. Peter Jackson of Park Planning Associates explained to ConCom that he met with DCR; DCR agrees that Levis's have complied with no further fines; letter will follow with DCR's decision. Mr. Jackson recommends that town of Canton should resolve drainage problem at Harrison Road. Mr. Jackson looked at drainage problem found: • Catch Basin Blocked • Catch Basin be cleaned by DPW • Curbing orberm be installed to control flow of water to catch basin Conservation Agent Robert Murphy explained to ConCom that slope should be stabilized with rock, to prevent erosion. Rock should be difficult to walk on to limit use as a path to Ponkapog Pond. 1 First Draft 12/19/07 HC