ZB07-12-12

Zoning · Source meeting date: 2012-07-12 · Record 40303

Open original municipal record ↗Open interactive reader

Saved text from 1 of 4 source pages. Transcription and OCR may contain errors; verify figures and wording against the original.

Source page 1

Attendance; Paul B. Carroll-Chairman, Greg L. Pando, John S. Marini, Kevin T. Feeney (Alternate) 
Recording Secretary: Heather Cahill 
Minutes of July 12, 2012 
Hearing called to order at 7:00 PM by Chairman Paul Carroll. 
Chairman Carroll called hearing to order at 7:04 P.M. 
SCHEDULED HEARINGS 
Raymond R. Bass – 33C Rockland St. – 25-12-ENCB-SP-V 
Chairman Carroll read legal into record 
Raymond R. Bass, Petitioner (Owner) presented, requesting lot width through the building, Pre-Existing 
Non- Conforming Building, Special Permit and Variance if necessary. 
Petitioner lives in an existing split-level house in a General Residence District (10,000 square ft. lot), 
proposing to demolish existing home, and construction two-story home with a new foundation. Ed 
Walsh Building Commissioner recommended petitioner file for Special Permit and Variance for Lot width 
through the building of a pre-existing non-conforming building. Proposed construction will provide 25% 
more living space; new home will be in-line with existing homes on Rockland Street. Mr. Bass explained 
to the board the Canton Fire Department has asked to use existing dwelling for safety drills during the 
demolishment. 
Greg Pando – set back requirements have been met, recommends Special Permit and Variance for lot 
width through the building of a pre-existing non-conforming building. 
Paul Carroll - Proposed project is straightforward and would agree to allow Canton Fire Department use 
existing dwelling during demolishment for safety drills. 
 
Greg Pando - On Petition of Raymond R. Bass – 33C Rockland Street to Grant Special Permit and 
Variance for insufficient lot width through the building of an existing buildable lot. Reference Plan of 
Land by Leo Glover, dated June 17, 2012 with sustainable building plans by Pro Build Homes dated June 
17, 2012. When project is completed certified As Built Plan is to be submitted to the Building 
Department. 
 Seconded by John Marini Vote: Unanimous