Canton, Massachusetts · Saved source text
ZB03-13-08
Saved text from 1 of 4 source pages. Transcription and OCR may contain errors; verify figures and wording against the original.
Source page 1
Minutes of the meeting of March 13, 2008 PRESENT: Paul B. Carroll, Chairman Gregory L. Pando Charles Armando ALSO PRESENT: Velma J. Coffey, Recording Secretary Chairman Carroll opened the meeting at 7:03pm in the Salah Hearing Room, Memorial Hall. Criterion – Windsor Woods . The Board is awaiting a decision from Town Counsel. Ms. Coffey to check with Building Commissioner on any updates. Allan & Patrice Fillebrown – 10-07-ENCU/B – 40 Downes Ave. (PC,JF,GP) Hearing continued until the April 10, 2008 meeting. Baystate Basements – 60 Shawmut Rd. 06-08-MOD-SPA-V – Garage (JJF-RQ-GP Decision due May 7, 2008. Temp. Special Permit for garage on site is valid to May 2, 2008. th Continued to April 17. Marilyn Abramowitz – 884 Washington St – 67-07-SPA-SP-ENCU/B-V (JF, GP, RQ) Decision due May 7, 2008. Continued to April 17, 2008 Karin Thomason – 10-08-ENCUB/V – 19 Sutcliffe Ave Chairman Carroll read a letter, which was received, from Karin Thomason. She formally withdrew her petition. Greg Pando stated that the applicant has a right to withdraw their petition. He has no objection to Voted their withdrawal without prejudice. Motion made to allow petitioner to withdraw without prejudice. 3-0 unanimous. A withdrawal without prejudice allows the petitioner to come back before the Board at any time on this issue. Informal hearing: William Stetson Network Engines Inc appeared before the Board representing . They are re-branding their company and will be updating their sign. It is a two-sided sign located at 25 Dan Rd. The new sign will be the same size as the current sign. New colors are green, white and black. Motion made to allow NEI to rebrand their Pylon sign according to a plan submitted by Sign Design of Brockton, dated 2/2/08. Voted 3-0 unanimous Sign will be same size, new overlay. . John S. Marini – 59 Walpole St, Village on the River – Attorney Paul Schneider’s represented Mr. Marini at the informal hearing. At the last meeting, approval for a minor modification was given to petitioner on one item of a five-item letter from Norwood Engineering. The Planning Board submitted a letter approving this change. Items 1,3,4,and 5 are the items before the Board tonight. Item 1 – reduction in size of footprint of building. It will be 4000s.f. Less than originally design. It is an economic change, per Mr. Marini. The jogs are removed; the building is almost all straight. #3 – Access drive from Neponset St. Because the elevation of the building was changed, they no longer need to build the walls that were required. The driveway will now come in on a little curve, rather than straight in.