Canton, Massachusetts · Saved source text
ConComm-Con-Com (3)
Saved text from 1 of 5 source pages. Transcription and OCR may contain errors; verify figures and wording against the original.
Source page 1
Canton Conservation Commission Pequitside Farm — Tavern Room 79 Pleasant Street Canton, Ma. 02021 Minutes January 6, 2010 Attendance: Robert Doe — Chairman, Deb Sundin — Vice Chairman, James Fitzpatrick — Clerk Tom Liddy, Kate Merrigan Absent: Robert MacDonald, Dave McLelland Conservation Agent: Robert Murphy Recording Secretary: Heather Cahill Hearing opened at 7:01 P.M. by Chairman Robert Doe Minutes of December 2, 2009 Minutes to be voted at next meeting PUBLIC H EARING Doug represented by Joe plans submitted to 1 existing parking lot excavation for built construction of roar -d drainage and site; Additional 100 park Deep Sump catch b spots to be manholes, planting infiltration 12 acre • water quality includes pervious pavement, bio- retention (rain garden) and infiltrati( • Runoff will to be treated and discharge into existing drainage system. • Hay bales and silt fence to be installed. • Berm and sediment basins to be installed to control erosion from construction site, vehicles tracking soil, and the generation of dust. • Oil and grit separators to be installed. • Operation and Maintenance plan submitted with plans. • Pollution Prevention Plan submitted with NOI. Deb Sundin recommended to applicant that plans must show location of snow storage. Motion Made by Deb Sundin to close hearing for SW -026, 5 Campanelli Circle. Seconded by Kate Merrigan Vote: Yes — 5 No -0 Motion Made by Deb Sundin issue SW -026, 5 Campanelli Drive. Seconded by Kate Merrigan Vote: Yes — 5, No -0 1 1/6/10 he