Canton, Massachusetts · Saved source text
Approved Minutes May 18 05
Saved text from 1 of 3 source pages. Transcription and OCR may contain errors; verify figures and wording against the original.
Source page 1
Canton Conservation Commission Pequitside Farm - Tavern Room 79 Pleasant Street, Canton, MA. 02021 Minutes of Meeting May 18, 2005 Attendance: Chairman - John Friel, Vice Chairman - Jim Sims, Scott Staiti, Dave McLelland Absent: Clerk - Jan Hagan, Treasurer - Robert Doe, Edward Lynch Conservation Agent: Robert Murphy Recording Secretary: Heather Cahill Chairman John Friel opens hearing at 7:03 p.m. Motion made by Dave McLelland to accept as amended minutes of May 5, 2005. Seconded by Jim Sims. Vote: Unanimous 7:05 p.m. DEP# 124-945 JMS Realty Trust, LotlA Cedarcrest Road Represented by Arthur Borden of Arthur F. Borden & Associates Construction of a roadway and infrastructure to service (10) ten lot subdivision. Planning Board has accepted existing plans. 50% of project is open space for passive recreation; open space will remain in homeowners trust. New catch basin will be built, old catch basin removed. Last manhole will be a storm center unit. Waiver approved for gazebo, which is in the 30 foot no build zone. Abutters had no comment. Agent Bob Murphy requested proper verbiage for the open space lot, that the restriction on the open space lot be recorded with the documents with the Homeowners Association Trust, that a maintenance & operation plan be developed and ongoing after the COC is issued, and that construction sequence of culvert clean up duties, and catch basin cleanup be included . Town Engineer Dan Donahue sent a letter to the Commission that was received on May 11, requesting petitioner, JMS Realty Trust, to forward their drainage calculations. Petitioner was notified. Motion Made by Scott Staiti to continue hearing ofDEP# 124-945 until June 1,2005 Seconded by Dave McLelland. Vote: Unanimous. 7:20 p.m. DEP# 124-911 Biltom Realty Trust, Lot #4, Pine Ridge Subdivision (50 June Terrace) Represented by Paul Brodmerkle of Toomey & Munson Associates Inc. Construction of a single family home, utilities and associated grading within 100 foot buffer zone. Southerly end of deck will be on a shallow ledge. Bldg Inspector wanted two deck supports moved five feet which would put them in the 30 foot no build zone. Because of construction timing, initial approval was given by the Conservation Agent. Relocated driveway for end load and to reduce rate of water flow. Motion Made by Dave McLelland to close DEP # 124-911 Seconded by Scott Staiti. Vote: Unanimous. Motion Made by Scott Staiti to Issue Standard Order of Conditions for D EP# 124-911 Seconded by Dave McLelland. Vote: Unanimous. CONTINUA TIONS Paul Crisilieo, 353 Walpole Street DEP# 124-941 Represented by Timothy Williams of Allen & Major Associates Inc. Plans approved by Planning Board. Plans revised on 4/27/05, 4-lot subdivision 1