6. Required Documents. Pursuant to the site plan review process and in addition

6. Required Documents. Pursuant to the site plan review process and in addition to documents otherwise required pursuant to Section 10.5 of this Zoning Bylaw, the project proponent shall provide the following documents: (a) A site plan showing: i. Property lines and physical features, including roads, for the project site; ii. Proposed changes to the landscape of the site, grading, vegetation clearing and planting, exterior lighting, screening vegetation or structures; iii. Blueprints or drawings of the solar photovoltaic installation signed by a Professional Engineer licensed to practice in the Commonwealth of Massachusetts showing the proposed layout of the system and any potential shading from nearby structures; iv. One (1) or three (3) line electrical diagram detailing the solar photovoltaic installation, associated components, and electrical interconnection methods, with all National Electrical Code compliant disconnects and overcurrent devices; v. Documentation of the major system components to be used, including the PV panels, mounting system, and inverter; vi. Name, address, and contact information for proposed system installer; vii. Name, address, phone number and signature of the project proponent, as well as all co-proponents or property owners, if any; viii. The name, contact information and signature of any agents representing the project proponent; and (b) Documentation of actual or prospective access and control of the project site; (c) An operation and maintenance plan: -119- (d) Zoning district designation for the parcel(s) of land comprising the project site (submission of a copy of a zoning map with the parcel(s) identified is suitable for this purpose); (e) Proof of liability insurance; and (f) Description of financial surety that satisfies Section 9.7.10.3.