Search Canton

Town of Canton, MA General & Zoning Bylaws

2. The transfer of less than one hundred (100) cubic yards of earth material from

2. The transfer of less than one hundred (100) cubic yards of earth material from one part of a lot, tract or parcel of land to another part of the same lot, tract, or parcel of land all of which is owned by the same person or persons, provided (a) prior to performing any earth removal operations, the person or persons performing such operations shall file with the applicable SPGA a site plan and as- built plan (if applicable) showing all pertinent existing conditions at the site, including without limitation the grade, topography and ground cover existing at the property; (b) any earth removal operations are consistent with all the considerations set forth in Section 7.4.12 and comply with Section 7.4.3; and (c) upon the completion of such earth removal operations, the person or persons performing such operations file(s) with the applicable SPGA a site plan and as- built plan showing the existing conditions as affected by the earth removal operations. -64-