Search Canton

Town of Canton, MA General & Zoning Bylaws

7.4.5 Submittal Requirements. A report outlining environmental concerns relating to

7.4.5 Submittal Requirements. A report outlining environmental concerns relating to the Proposed earth removal operation is required as part of the Special Permit process. The report shall include an Existing Conditions Site Analysis Plan showing wetlands, slopes over fifteen (15) percent, soil conditions, fall water tables, areas within the Flood Hazard Areas, Groundwater Protection District, and such other natural features as the Special Permit Granting Authority may request. The report shall also include an evaluation of the impact of the earth'" removal operations on the water quality and hydrology of the immediate neighborhood.