7.6.4 Special Permit Required. No wind facility over sixty (60) kilowatts of rated
7.6.4 Special Permit Required. No wind facility over sixty (60) kilowatts of rated nameplate capacity shall be erected, constructed, installed or modified as provided in this section without first obtaining a special permit. The Special Permit Granting Authority shall be the Zoning Board of Appeals.