10.18 Erosion Control – The Permit Holder shall be responsible for all
10.18 Erosion Control – The Permit Holder shall be responsible for all erosion control and for obtaining any necessary permits from the Conservation Commission. The Permit Holder or Contractor shall protect drainage structures from siltation by whatever means required including but not limited to the installation of hay bales and/or filter fabric. In the event that a drainage structure becomes damaged from siltation as a result of the Street Opening Work, the Permit Holder or Contractor shall clean the structure before completing the Temporary Patch. 107 Subsection 11. Required Construction Techniques All Street Opening Work and materials used therein must conform to the most recently published edition of the Massachusetts Highway Department’s Standard Specifications for Highways and Bridges, with the federal OSHA requirements and with the American with Disabilities Act and the Architectural Access Board Regulations as then currently in effect. In addition, the following specific requirements also apply. Exceptions to these requirements may be made at the discretion of the Awarding Authority or Awarding Authority Representative at the time the Street Opening Work is in progress.